September 4, 2013 Linda Mayhood, Interim General Manager Hot

Transcription

September 4, 2013 Linda Mayhood, Interim General Manager Hot
September 4, 2013
Linda Mayhood, Interim General Manager
Hot Springs Village POA
895 DeSoto Blvd.
Hot Springs Village, AR 71909
Re:
Compliance Inspection (Garland & Saline Co)
AFIN: 26-00105
NPDES Permit No.: AR0039284
63-00883
ARG640089
Dear Ms. Mayhood:
On August 22, 2013 I performed a routine compliance inspection of the Cedar Creek wastewater
treatment facility and the water treatment plant wastewater facility in accordance with the
provisions of the Federal Clean Water Act, the Arkansas Water and Air Pollution Control Act, and
the regulations promulgated thereunder. This inspection revealed the following violations:
AR0039284
1. The grit removal system including the paddle drive and motor and the bar screen rake is out of
service due to excessive corrosion. These treatment units should be replaced or repaired as soon
as possible. This is a violation of Part III, Section B, 1, A of the permit.
2. At the time of the inspection, one of the two aerators in one of the two digesters was out of
service. This treatment unit should be replaced or repaired as soon as possible. This is a
violation of Part III, Section B, 1, A of the permit.
3. Chloride, Sulfate and TDS are being collected as a composite. The permit requires that these
samples be collected as a grab sample. This is a violation of Part 1A, Section A of the
permit.
4. Sample preservation is not being documented in the facility’s records. Typically this is noted on
the Chain of Custody (COC) forms. This is a violation of Part III, Section C, 3 of the permit.
5. The biomonitoring results indicate a dilution series of 32%, 42%, 56%, 80% and 100%. The
permit requires 32%, 45%, 56%, 80% and 100%. This is a violation of Part II, 10.1.a of the
permit.
Hot Springs Village POA
Page 2
ARG640089
1. The facility performs their own sampling and analysis of pH, TRC and Dissolved Aluminum.
Missing from the onsite records are the sample date, sample time, name or initials of sampler,
analyses date, analyses time, name or initials of analyst and the sample location. This is a
violation of Part 6.8 of the permit.
2. Excessive sludge has accumulated in the treatment pond. No sludge storage capacity was
available and sludge was observed being discharged to the receiving stream. Additionally,
excessively tall vegetation, specifically trees, has grown up on the interior banks of the pond
levees. This is a violation of Part 2.1 and 5.1 of the permit.
3. The facility is referencing HACH Method 8012 for analyzing Dissolved Aluminum. This is not
an approved method. This is a violation of Part 6.3 of the permit.
The above items require your immediate attention. Please submit a written response to these
findings to the Water Division Inspection Branch, of this Department. This response should be
mailed to the address below, or e-mailed to [email protected]. This
response should contain documentation describing the course of action taken to correct each item
noted. This corrective action should be completed as soon as possible, and the written response
with all necessary documentations (i.e. photos) is due by September 18, 2013.
If I can be of any assistance, please contact me at 870 389-6970.
Sincerely,
Shan Lynch
District 7 Field Inspector
Water Division
NPDES Report Page 2
ADEQ Water NPDES Inspection
AFIN: 26-00105
Permit #: AR0039284
Form Approved
OMB No. 2040-0003
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Washington, D.C. 20460
NPDES Compliance Inspection Report
Section A: National Data System Coding
Transaction Code
1
N
2
5
NPDES
3
A
R
0
0
3
9
Yr/Mo/Day
2
8
4
11
1
12
3
0
8
Inspec. Type
2
2
17
18
Inspector
C
19
S
Fac. Type
20
1
Remarks
Inspection Work Days
67
Facility Evaluation Rating
70
69
BI
3
71
QA
N
72
N
-------------------------------Reserved-----------------------------73
74
75
80
Section B: Facility Data
Name and Location of Facility Inspected (For industrial users discharging to POTW, also
include POTW name and NPDES permit number)
Hot Springs Village POA – Cedar Creek WWTP
at 198 Cortez Road in Hot Springs Village
Entry Time/Date
0917 / 8-22-2013
Permit Effective Date
November 1, 2010
Exit Time/Date
1210 / 8-22-2013
Permit Expiration Date
October 31, 2015
Name(s) of On-Site Representative(s)/Title(s)/Phone and Fax Number(s)
Billy Graves / Water & Wastewater Superintendent / 501 922-5523
Charles Hicks / Chief Operator / 501 922-1620
Kurtis Richardson / Operator / 501 922-1620
Other Facility Data
Minor mun.
Name, Address of Responsible Official/Title/Phone and Fax Number
PDS# 073342
Contacted
Linda Mayhood / Interim General manager / 501 922-5531
895 DeSoto Blvd.
Hot Springs Village, AR 71909
Yes

No

Section C: Areas Evaluated During Inspection
(S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated)
S
Permit
S
Records/Reports
S
S
Facility Site Review
N
S
Effluent/Receiving Waters
S
Flow Measurement
M
Self-Monitoring Program
S
Compliance Schedules
N
Operations & Maintenance
M
Sampling
Sludge Handling/Disposal
N
Pollution Prevention
Pretreatment
N
Multimedia
M
N
N
Laboratory
Storm Water
Other:
Section D: Summary of Findings/Comments (Attach additional sheets if necessary)
Sec. C, 2 – The grit removal system including the paddle drive and motor and the bar screen rake is out of service due to excessive corrosion. These treatment
units should be replaced or repaired as soon as possible.
Sec. C, 2 – At the time of the inspection, one of the two aerators in one of the two digesters was out of service. This treatment unit should be replaced or repaired
as soon as possible.
Sec. D, 6 – Chloride, Sulfate and TDS is being collected as a composite. The permit requires that these samples be collected as a grab sample.
Sec. C, 6, b – Sample preservation is not being noted on the COC forms.
Sec. F, 8, b – The biomonitoring results indicate a dilution series of 32%, 42%, 56%, 80% and 100%. The permit requires 32%, 45%, 56%, 80% and 100%.
Name(s) and Signature(s) of Inspector(s)
Agency/Office/Telephone
Date
Shan Lynch
ADEQ / Dist. 7 / (870) 389-6970
August 23, 2013
Signature of Reviewer
Agency/Office/Phone and Fax Numbers
ADEQ / NLR / 501-682-0642
Date
September 4, 2013
Kerri McCabe
NPDES Report Page 3
ADEQ Water NPDES Inspection
AFIN: 26-00105
Permit #: AR0039284
SECTION A: PERMIT VERIFICATION
PERMIT SATISFACTORILY ADDRESSES OBSERVATIONS
DETAILS:
S M U NA NE
Y
Y
Y
Y
1. CORRECT NAME AND MAILING ADDRESS OF PERMITTEE:
2. NOTIFICATION GIVEN TO EPA/STATE OF NEW DIFFERENT OR INCREASED DISCHARGES:
3. NUMBER AND LOCATION OF DISCHARGE POINTS AS DESCRIBED IN PERMIT:
4. ALL DISCHARGES ARE PERMITTED:
N
N
N
N
NA
NA
NA
NA
NE
NE
NE
NE
SECTION B: RECORDKEEPING AND REPORTING EVALUATION
RECORDS AND REPORTS MAINTAINED AS REQUIRED BY PERMIT
DETAILS:
1.
ANALYTICAL RESULTS CONSISTENT WITH DATA REPORTED ON DMRS:
2.
SAMPLING AND ANALYSES DATA ADEQUATE AND INCLUDE:
a. DATES AND TIME(S) OF SAMPLING:
b. EXACT LOCATION(S) OF SAMPLING:
c. NAME OF INDIVIDUAL PERFORMING SAMPLING:
d. ANALYTICAL METHODS AND TECHNIQUES:
e. RESULTS OF CALIBRATIONS:
f. RESULTS OF ANALYSES:
g. DATES AND TIMES OF ANALYSES:
h. NAME OF PERSON(S) PERFORMING ANALYSES:
3.
LABORATORY EQUIPMENT CALIBRATION AND MAINTENANCE RECORDS ADEQUATE:
4.
PLANT RECORDS INCLUDE SCHEDULES, DATES OF EQUIPMENT MAINTENANCE AND REPAIR:
5.
EFFLUENT LOADINGS CALCULATED USING DAILY EFFLUENT FLOW AND DAILY ANALYTICAL DATA:
S M U NA NE
Y
 S M
Y
Y
Y
Y
Y
Y
Y
Y
 S M
 S M
Y
N
U
N
N
N
N
N
N
N
N
U
U
N
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
SECTION C: OPERATIONS AND MAINTENANCE
TREATMENT FACILITY PROPERLY OPERATED AND MAINTAINED
DETAILS:
1.
TREATMENT UNITS PROPERLY OPERATED:
2.
TREATMENT UNITS PROPERLY MAINTAINED:
3.
STANDBY POWER OR OTHER EQUIVALENT PROVIDED:
4.
ADEQUATE ALARM SYSTEM FOR POWER OR EQUIPMENT FAILURES AVAILABLE:
5.
ALL NEEDED TREATMENT UNITS IN SERVICE:
6.
ADEQUATE NUMBER OF QUALIFIED OPERATORS PROVIDED:
7.
SPARE PARTS AND SUPPLIES INVENTORY MAINTAINED:
8.
OPERATION AND MAINTENANCE MANUAL AVAILABLE:
9.
STANDARD OPERATING PROCEDURES AND SCHEDULES ESTABLISHED:
10. PROCEDURES FOR EMERGENCY TREATMENT CONTROL ESTABLISHED:
11. HAVE BYPASSES/OVERFLOWS OCCURRED AT THE PLANT OR IN THE COLLECTION SYSTEM IN THE LAST YEAR:
12. IF SO, HAS THE REGULATORY AGENCY BEEN NOTIFIED:
13. HAS CORRECTIVE ACTION BEEN TAKEN TO PREVENT ADDITIONAL BYPASSES/OVERFLOWS:
14. HAVE ANY HYDRAULIC OVERLOADS OCCURRED AT THE TREATMENT PLANT:
15. IF SO, DID PERMIT VIOLATIONS OCCUR AS A RESULT:
S M U NA NE
S
S
S
S
S
S
S
M
M
M
M
M
M
M
Y
Y
Y
Y
Y
Y
Y
Y
U
U
U
U
U
U
U
N
N
N
N
N
N
N
N
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NPDES Report Page 4
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
ADEQ Water NPDES Inspection
AFIN: 26-00105
Permit #: AR0039284
SECTION D: SAMPLING
S M U NA NE
PERMITTEE SAMPLING MEETS PERMIT REQUIREMENTS
DETAILS:
1.
SAMPLES TAKEN AT SITE(S) SPECIFIED IN PERMIT:
2.
LOCATIONS ADEQUATE FOR REPRESENTATIVE SAMPLES:
3.
FLOW PROPORTIONED SAMPLES OBTAINED WHEN REQUIRED BY PERMIT:
4.
SAMPLING AND ANALYSES COMPLETED ON PARAMETERS SPECIFIED IN PERMIT:
5.
SAMPLING AND ANALYSES PERFORMED AT FREQUENCY SPECIFIED IN PERMIT:
6.
SAMPLE COLLECTION PROCEDURES ADEQUATE:
a. SAMPLES REFRIGERATED DURING COMPOSITING:
b. PROPER PRESERVATION TECHNIQUES USED:
c. CONTAINERS AND SAMPLE HOLDING TIMES CONFORM TO 40 CFR 136:
7.
IF MONITORING IS PERFORMED MORE OFTEN THAN REQUIRED ARE RESULTS REPORTED ON THE DMR:
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
SECTION E: FLOW MEASUREMENT
PERMITTEE FLOW MEASUREMENT MEETS PERMIT REQUIREMENTS
DETAILS:
1.
PRIMARY FLOW MEASUREMENT DEVICE PROPERLY INSTALLED AND MAINTAINED:
2.
FLOW MEASURED AT EACH OUTFALL AS REQUIRED:
3.
SECONDARY INSTRUMENTS (TOTALIZERS, RECORDERS, ETC.) PROPERLY OPERATED AND MAINTAINED:
4.
CALIBRATION FREQUENCY ADEQUATE:
5.
RECORDS MAINTAINED OF CALIBRATION PROCEDURES:
TYPE OF DEVICE: weir
6.
CALIBRATION CHECKS DONE TO ASSURE CONTINUED COMPLIANCE:
7.
FLOW ENTERING DEVICE WELL DISTRIBUTED ACROSS THE CHANNEL AND FREE OF TURBULENCE:
8.
FLOW MEASUREMENT EQUIPMENT ADEQUATE TO HANDLE EXPECTED RANGE OF FLOW RATES:
9.
HEAD MEASURED AT PROPER LOCATION:
S M U NA NE
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
NA
NA
NA
NA
NA
NA
NA
NA
NA
NE
NE
NE
NE
NE
NE
NE
NE
NE
SECTION F: LABORATORY
PERMITTEE LABORATORY PROCEDURES MEET PERMIT REQUIREMENTS
DETAILS:
1.
EPA APPROVED ANALYTICAL PROCEDURES USED (40 CFR 136.3 FOR LIQUIDS, 503.8(B) FOR SLUDGES) :
2.
IF ALTERNATIVE ANALYTICAL PROCEDURES ARE USED, PROPER APPROVAL HAS BEEN OBTAINED:
3.
SATISFACTORY CALIBRATION AND MAINTENANCE OF INSTRUMENTS AND EQUIPMENT:
4.
QUALITY CONTROL PROCEDURES ADEQUATE:
5.
DUPLICATE SAMPLES ARE ANALYZED >10% OF THE TIME:
6.
SPIKED SAMPLES ARE ANALYZED >10% OF THE TIME:
7.
COMMERCIAL LABORATORY USED:
8.
S M U NA NE
Y
Y
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
a. LAB NAME:
American Interplex Corp.
b. LAB ADDRESS:
8600 Kanis Rd.; Little Rock, AR 72204
c. PARAMETERS PERFORMED:
CBOD, TSS, NH3-N, FCB, Total Recoverable Copper, TP, NO3 + NO2 - N, Chloride, Sulfate, TDS, biomonitoring
BIOMONITORING PROCEDURES ADEQUATE:
a. PROPER ORGANISMS USED:
b. PROPER DILUTION SERIES FOLLOWED:
c. PROPER TEST METHODS AND DURATION:
d. RETESTS AND/OR TRE PERFORMED AS REQUIRED:
Y
Y
Y
Y
Y
N
N
N
N
N
NA
NA
NA
NA
NA
NA
NA
NE
NE
NE
NE
NE
NE
NE
NA
NA
NA
NA
NA
NE
NE
NE
NE
NE
NPDES Report Page 5
ADEQ Water NPDES Inspection
AFIN: 26-00105
Permit #: AR0039284
SECTION G: EFFLUENT/RECEIVING WATERS OBSERVATIONS
S M U NA NE
BASED ON VISUAL OBSERVATIONS ONLY
DETAILS:
OUTFALL #:
OIL SHEEN
GREASE
TURBIDITY
VISIBLE FOAM
FLOATING SOLIDS
COLOR
OTHER
001
none
none
none
none
none
clear
NA
SECTION H: SLUDGE DISPOSAL
SLUDGE DISPOSAL MEETS PERMIT REQUIREMENTS
DETAILS:
1.
SLUDGE MANAGEMENT ADEQUATE TO MAINTAIN EFFLUENT QUALITY:
2.
SLUDGE RECORDS MAINTAINED AS REQUIRED BY 40 CFR 503:
3.
FOR LAND APPLIED SLUDGE, TYPE OF LAND APPLIED TO: (E.G., FOREST, AGRICULTURAL, PUBLIC CONTACT SITE):
S M U NA NE
S M U NA NE
S M U NA NE
SECTION I: SAMPLING INSPECTION PROCEDURES
SAMPLE RESULTS WITHIN PERMIT REQUIREMENTS
DETAILS:
Y N NA NE
1.
SAMPLES OBTAINED THIS INSPECTION:
2.
TYPE OF SAMPLE:
3.
SAMPLES PRESERVED:
4.
FLOW PROPORTIONED SAMPLES OBTAINED:
5.
SAMPLE OBTAINED FROM FACILITY'S SAMPLING DEVICE:
6.
SAMPLE REPRESENTATIVE OF VOLUME AND NATURE OF DISCHARGE:
GRAB:
COMPOSITE:
S M U NA NE
METHOD:
7.
SAMPLE SPLIT WITH PERMITTEE:
8.
CHAIN-OF-CUSTODY PROCEDURES EMPLOYED:
9.
SAMPLES COLLECTED IN ACCORDANCE WITH PERMIT:
FREQUENCY:
Y
Y
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
NA
NA
NA
NA
NA
NA
NA
NE
NE
NE
NE
NE
NE
NE
SECTION J: STORM WATER POLLUTION PREVENTION PLAN
STORM WATER MANAGEMENT MEETS PERMIT REQUIREMENTS
DETAILS:
1.
SWPPP UPDATED AS NEEDED:
DATE OF LAST UPDATE:
2.
SITE MAP INCLUDING ALL DISCHARGES AND SURFACE WATERS:
3.
POLLUTION PREVENTION TEAM IDENTIFIED:
4.
POLLUTION PREVENTION TEAM PROPERLY TRAINED:
5.
LIST OF POTENTIAL POLLUTANT SOURCES:
6.
LIST OF POTENTIAL SOURCES AND PAST SPILLS AND LEAKS:
7.
ALL NON-STORM WATER DISCHARGES ARE AUTHORIZED:
8.
LIST OF STRUCTURAL BMPS:
9.
LIST OF NON-STRUCTURAL BMPS:
10.
BMPS PROPERLY OPERATED AND MAINTAINED:
11.
INSPECTIONS CONDUCTED AS REQUIRED:
S M U NA NE
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
N
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NPDES Report Page 6
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
ADEQ Water NPDES Inspection
AFIN: 26-00105
Permit #: AR0039284
FLOW CALCULATION SHEET
Date:
8-22-2013
Head in Inches:
Time: 1030
0.78
Feet: 0.8683
Type & Size of Primary Flow Measurement Device: 90o V-notch weir
Name & Model of Secondary Flow Measurement Device:
Siemens HydroRanger 200
Date of last Calibration of Secondary Flow Device: 8-9-2013
Recorded Flow at Date & Time Listed Above:
Calculated Flow at Date & Time Listed Above:
0.89 MGD
(Facility Flow Meter)
0.8683 MGD
(Flow is calculated using flow charts in: ISCO Open Channel Flow Measurement Handbook-5th Edition)
% Error =
% Error =
Recorded Value - Calculated Value
Calculated Value
0.89
0.8683
% Error =
0.217
0.8683
X 100
% Error =
0.249
X 100
% Error =
2.49
%
0.8683
X 100
X 100
Comments:
NPDES Report Page 7
ADEQ Water NPDES Inspection
AFIN: 26-00105
Permit #: AR0039284
DMR Calculation Check
Reporting Period:
Parameter Checked:
From
13
Year
05
Month
01
Day
To
13
Year
05
Month
31
Day
CBOD
Loading
Mass
Mo. Avg. - lbs/day
Concentration
Monthly
Mo. Avg. - mg/l
7-day Avg. - mg/l
Reported Value:
7.7
2.0
2.0
Calculated Value:
7.7
2.0
2.0
Permit Value:
83.4
10.0
15.0
If calculated value does not equal reported value, explain:
same
NPDES Report Page 8
McCabe, Kerri
From:
Sent:
To:
Subject:
McCabe, Kerri
Thursday, September 19, 2013 8:06 AM
McCabe, Kerri
FW: Hot Springs Village - Compliance Inspection 8-22-13, AFIN: 26-00105 63-00883, ARG0039284 ARG640089
From: Jason Temple [mailto:[email protected]]
Sent: Tuesday, September 17, 2013 7:50 PM
To: Lynch, Shan
Subject: Hot Springs Village - Compliance Inspection 8-22-13, AFIN: 26-00105 63-00883, ARG0039284 ARG640089
Mr. Lynch, The following are my interim responses to the reference Compliance Inspection report dated September 4, 2013. AR0039284 Response #1 – The grit removal system motor is being replaced and the gear box will be evaluated and replaced if needed to bring the unit on line. The bar screen rake is being rebuilt out of stainless steel. Response #2 – The digester aerator motor has shorted out and was sent to be rewound on 8‐12‐13. Response #3 – Grab samples per the permit will be taken for Chloride, Sulfate, and TDS beginning on the next round of sampling in October. Response #4 – Documentation of the sample preservation will be documented on the Chain of Custody form. Response #5 – The lab will use 45% dilution instead of 42% on the biomonitoring test beginning in October. 1
ARG640089 Response #1 – In house sampling records will include the sample date, time, name or initials of sampler, analyses date, analysis time, name or initials of analyst, and sample location on future in house testing. Response #2 – The clearing of the trees and vegetation around the sludge pond will be completed in September 2013. Evaluation of the existing sludge volumes for removal, dewatering, and disposal by land application of Water Treatment Residuals by General Permit No. 0000‐WG‐WR or to the Saline County land fill are currently being determined. Please note the receiving stream drains back to the reservoir for a closed system. None of the floating polymers you saw discharging leave the property and remain within the water treatment system. Response #3 – the testing for dissolved aluminum will be conducted by a licensed third party testing lab and in accordance with the permitted approved method. Upon completion of the repairs noted above, photos and further documentation will be sent. Thank you for assistance in bringing these deficiencies to our attention. Jason Charles Temple, PE Director of Public Works Hot Springs Village 895 DeSoto Blvd, HSV, AR 71909 (O) 501.922.5528, (F) 501.922.5017 Email: [email protected] Web: www.hsvpoa.org 2
September 27, 2013
Linda Mayhood, Interim General Manager
Hot Springs Village POA
895 DeSoto Blvd.
Hot Springs Village, AR 71909
Re:
Response to Inspection (Garland and Saline Co)
AFIN: 26-00105
NPDES Permit No.: AR0039284
63-00883
ARG640089
Dear Ms. Mayhood:
I have reviewed the response pertaining to my August 22, 2013 inspections of the Hot
Springs Village Cedar Creek wastewater treatment facility and the Hot Springs Village
water treatment facility. The information provided sufficiently addresses the violations
referenced in my inspection report. At this time, the Department has no further
comment concerning this particular inspection. Acceptance of this response by the
Department does not preclude any future enforcement action deemed necessary at this
site or any other site.
If we need further information concerning this matter, we will contact you. Thank you for
your attention to this matter. Should you have any questions, feel free to contact me at
870 389-6970 or you may e-mail me at [email protected].
Sincerely,
Shan Lynch
District 7 Field Inspector
Water Division
McCabe, Kerri
From:
Sent:
To:
Subject:
Attachments:
Lynch, Shan
Monday, September 30, 2013 9:37 AM
McCabe, Kerri
FW: Hot Springs Village - Compliance Inspection 8-22-13, AFIN: 26-00105 63-00883, ARG0039284 ARG640089
WP_20130925_004.jpg
Here’s a photo you can attach to the HSV water plant inspection. ARG640089. Not sure of the water ID#. Also, since he’s having trouble with our e‐mail address, I told him that he can send any correspondence directly to me and that I’d forward it on to the main office. From: Jason Temple [mailto:[email protected]]
Sent: Thursday, September 26, 2013 10:54 AM
To: Lynch, Shan
Cc: 'Billy Graves'; 'Linda Mayhood'; [email protected]
Subject: RE: Hot Springs Village - Compliance Inspection 8-22-13, AFIN: 26-00105 63-00883, ARG0039284 ARG640089
Shan, We are still in progress with the repairs. Started the clearing around the sludge pond at the water plant per the picture attached. The email address Water‐Inspection‐[email protected] did not work. Should it all be lower case? Would you like me to use your email address or the other for future email correspondences. Thank you for the reply. Jason Charles Temple, PE Director of Public Works Hot Springs Village 895 DeSoto Blvd, HSV, AR 71909 (O) 501.922.5528, (F) 501.922.5017 1
Email: [email protected] Web: www.hsvpoa.org From: Lynch, Shan [mailto:[email protected]]
Sent: Thursday, September 26, 2013 9:33 AM
To: 'Jason Temple'
Subject: RE: Hot Springs Village - Compliance Inspection 8-22-13, AFIN: 26-00105 63-00883, ARG0039284 ARG640089
Mr. Temple, I will be sending an adequate response letter in regards to the inspections, but, will still want some correspondence when the repairs and corrections are finalized. Thanks, Shan Lynch From: Jason Temple [mailto:[email protected]]
Sent: Tuesday, September 17, 2013 7:50 PM
To: Lynch, Shan
Subject: Hot Springs Village - Compliance Inspection 8-22-13, AFIN: 26-00105 63-00883, ARG0039284 ARG640089
Mr. Lynch, The following are my interim responses to the reference Compliance Inspection report dated September 4, 2013. AR0039284 Response #1 – The grit removal system motor is being replaced and the gear box will be evaluated and replaced if needed to bring the unit on line. The bar screen rake is being rebuilt out of stainless steel. Response #2 – The digester aerator motor has shorted out and was sent to be rewound on 8‐12‐13. Response #3 – Grab samples per the permit will be taken for Chloride, Sulfate, and TDS beginning on the next round of sampling in October. Response #4 – Documentation of the sample preservation will be documented on the Chain of Custody form. 2
Response #5 – The lab will use 45% dilution instead of 42% on the biomonitoring test beginning in October. ARG640089 Response #1 – In house sampling records will include the sample date, time, name or initials of sampler, analyses date, analysis time, name or initials of analyst, and sample location on future in house testing. Response #2 – The clearing of the trees and vegetation around the sludge pond will be completed in September 2013. Evaluation of the existing sludge volumes for removal, dewatering, and disposal by land application of Water Treatment Residuals by General Permit No. 0000‐WG‐WR or to the Saline County land fill are currently being determined. Please note the receiving stream drains back to the reservoir for a closed system. None of the floating polymers you saw discharging leave the property and remain within the water treatment system. Response #3 – the testing for dissolved aluminum will be conducted by a licensed third party testing lab and in accordance with the permitted approved method. Upon completion of the repairs noted above, photos and further documentation will be sent. Thank you for assistance in bringing these deficiencies to our attention. Jason Charles Temple, PE Director of Public Works Hot Springs Village 895 DeSoto Blvd, HSV, AR 71909 (O) 501.922.5528, (F) 501.922.5017 Email: [email protected] Web: www.hsvpoa.org 3