STRUCTURAL DESIGN CRITERIA FOUNDATION NOTES CONCRETE & REINFORCING STEEL NOTES EARTHWORK NOTES 1. GOVERNING CODE: 2012 IBC AS MODIFIED BY UFC 3-301-01 FLOOR LIVE LOAD MATERIAL PROPERTIES (U.N.O.) COMPRESSIVE STRENGTH - F'c = 4 KSI CONCRETE REINFORCEMENT - Fy = 60 KSI (A615 GR 60) EW-1. 2. NET ALLOWABLE SOIL BEARING PRESSURE = 2000 PSF PER WHITAKER LABORATORY, INC. GEOTECHNICAL REPORT. REPORT NO.: 11-22-13-1, DATED 11-22-2013 AND REPORT NO.: 1-9-14-1, DATED 01-09-2014. SEE GEOTECHNICAL REPORT AND SPECIFICATIONS FOR DEFINITION OF MATERIALS AND COMPACTION REQUIREMENTS, PRESSURE GROUTING SPECIFICATIONS / REQUIREMENTS, AND LOCATIONS. CR-1. EW-2. U.N.O., THE CONTRACTOR SHALL RETAIN AN INDEPENDENT, QUALIFIED GEOTECHNICAL ENGINEERING FIRM/TESTING AGENCY TO IDENTIFY AREAS OF POOR SOILS, TO MONITOR PROPER SUBGRADE PREPARATIONS AND TO OVERSEE AND TEST THE PLACEMENT OF COMPACTED FILL MATERIAL. MASONRY (CMU) WALL ON CONCRETE FOOTING ALL SUBTERRANEAN STRUCTURES, UTILITIES, PIPING, ETC. IIN THE AREA OF EXCAVATIONS TO BE LOCATED AND MARKED BY CONTRACTOR PRIOR TO EARTH REMOVAL WORK. CONTRACTOR TO MAINTAIN MARKERS UNTIL EXCAVATION ACTIVITIES HAVE CEASED. IF UNDERGROUND UTILITY CONFLICTS ARE DISCOVERED BEFORE OR ENCOUNTERED DURING EXCAVATION, NOTIFY THE GOVERNMENT IMMEDIATELY. CONCRETE FOUNDATION WALL ON CONCRETE FOOTING ROOF LIVE LOAD MINIMUM ROOF LIVE LOAD: F-2. ROOF SNOW LOAD NO SNOW LOADING AT SITE WIND DESIGN DATA F-3. BASIC WIND SPEED (3-SECOND GUST): RISK CATEGORY: WIND IMPORTANCE FACTOR: WIND EXPOSURE: INTERNAL PRESSURE COEFFICIENT: F-4. FOOTING SUBGRADES SHALL BE CLEAN AND FREE OF DEBRIS, STANDING WATER, AND LOOSE SOIL. F-5. II IE = 1.0 F-6. SITE CLASS: E DESIGN EARTHQUAKE SPECTRAL ACCELERATIONS AT SHORT PERIODS: SDS = 0.539 G AT A PERIOD OF 1 SECOND: SD1 = 0.279 G F-7. SEISMIC DESIGN CATEGORY: BASIC SEISMIC-FORCE-RESISTING-SYSTEM: DESIGN BASE SHEAR: SEISMIC RESPONSE COEFFICIENTS: RESPONSE MODIFICATION FACTOR: ANALYSIS PROCEDURE: F-8. SDC = D SFRS = SRCMU VS = 7.5 KIPS CS = 0.108 R=5 EQUIVALENT LATERAL FORCE COORDINATE WITH ARCHITECTURAL AND CIVIL DRAWINGS FOR MISCELLANEOUS FOUNDATIONS NOT SHOWN ON STRUCTURAL DRAWINGS. CONTROL JOINTS IN THE CAST-IN-PLACE CONCRETE FOUNDATION WALLS SHALL BE PLACED AT SPACING NOT TO EXCEED 20' O.C. OR AS LOCATED PER DRAWINGS AND SHOULD ALIGN WITH MASONRY CONTROL JOINTS WHERE APPLICABLE. SEE DETAIL SHEETS FOR CONTROL JOINT DETAILS. PROVIDE VERTICAL "V" GROOVE AT ALL CONSTRUCTION AND CONTROL JOINTS. CONTRACTOR SHALL SUBMIT PLANS OF JOINT LOCATIONS FOR APPROVAL. SEE TYPICAL SLAB-ON-GRADE DETAILS FOR SLAB AND SUB-BASE REQUIREMENTS. THESE WILL BE TYPICAL THROUGHOUT UNLESS NOTED OTHERWISE. A LEAN CONCRETE MUD SLAB 2" TO 3" THICK SHALL BE USED IN THE FOOTING EXCAVATION IF THE BOTTOM OF THE EXCAVATION TENDS TO BECOME MUDDY AND SOFT DUE TO CONSTRUCTION ACTIVITY. LEAN CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 2000 PSI. EW-6. CR-3. CR-4. CR-5. MATERIAL PROPERTIES (U.N.O.) COMPRESSIVE STRENGTH MASONRY REINFORCEMENT MORTAR GROUT AT 28-DAYS FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO START OF CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY CONFLICTS PRIOR TO BEGINNING WORK. DO NOT SCALE DRAWINGS!!!! G-6. G-7. G-8. G-9. FOR CLARITY, ALL EXTERIOR SLABS AND SIDEWALKS MAY NOT BE SHOWN. FOR EXACT DIMENSIONS, LOCATIONS, JOINTS AND SCORE LINES, SEE ARCHITECTURAL AND/OR CIVIL DRAWINGS. VERIFY ALL SIZES, WEIGHTS AND LOCATIONS OF MECHANICAL AND ELECTRICAL EQUIPMENT, ROOF PENETRATIONS, DUCTS, ETC. WITH MECHANICAL AND ELECTRICAL CONTRACTORS AND FIELD CONDITIONS. DETAILS MARKED "TYPICAL" MAY OR MAY NOT BE CUT ON PLANS, BUT SHALL APPLY UNLESS NOTED OTHERWISE. STRUCTURAL SYSTEM IS DESIGNED TO WORK AS A COMPLETED SYSTEM, ANY SHORING OR BRACING NECESSARY DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION PLANS FOR SLEEVES, INSERTS, ETC. NOT SHOWN ON STRUCTURAL PLANS. NO PIPES OR SLEEVES FOR MECHANICAL TRADES SHALL PASS THROUGH STRUCTURAL MEMBERS WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL SITE SAFETY AND ALL ACCIDENTS WHICH RESULT IN DEATH, PERSONAL INJURY, OR DAMAGE TO PROPERTY ARISING OUT OF OR IN CONNECTION WITH THE PERFORMANCE OF THE WORK. M-1. M-2. EW-8. CR-6. ALL REINFORCEMENT BARS SHALL BE FABRICATED IN ACCORDANCE WITH THE LATEST CRSI MANUAL OF STANDARD PRACTICE AND SHALL BE CLEAN AND FREE OF GREASE AND SCALING RUST. CR-7. CONTINUOUS TOP AND BOTTOM BARS, WHEN SHOWN IN TRANSVERSE SECTION ONLY, SHALL BE LAPPED AS FOLLOWS: TOP BARS NEAR MID-SPANS; BOTTOM BARS DIRECTLY OVER SUPPORTS, U.N.O. CR-8. WATER STOPS SHALL BE PROVIDED IN HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS WHERE FINISHED FLOOR IS BELOW EXTERIOR GRADE UNLESS OMISSION IS APPROVED BY THE ENGINEER. CR-9. HOOK HORIZONTAL WALL AND BEAM REINFORCING BARS AT DISCONTINUOUS ENDS, TYPICAL U.N.O. EXTEND REINFORCEMENT TO FAR FACE OF PIERS/PEDESTALS AND/OR COLUMNS U.N.O. 9/2/2014 10:55:44 AM DENOTES DEPRESSION FOR WALL/DOOR OPENING (-8" U.N.O.) INDICATES PIER MARK INDICATES PIER NO FILL SHALL BE PLACED OVER FROZEN, MUDDY, OR OTHER DELETERIOUS MATERIAL. NO FILL SHALL BE PLACED OVER A PREVIOUS LIFT THAT HAS NOT BEEN ADEQUATELY COMPACTED PER SPECIFICATIONS. INDICATES CONCRETE FOOTING INDICATES NEW GRID DESIGNATION (HEXAGON SHAPE AT EXISTING GRID) A BACKFILL AGAINST FOUNDATION WALLS SHALL BE PLACED EVENLY ON ALL SIDES IN ORDER TO ACHIEVE GENERALLY BALANCED LOADINGS. FRAMING PLAN INDICATES KNEE BRACING CONNECTED TO BEAM (BELOW FRAMING MEMBER) INDICATES BEAM FRAMING OVER HOLLOW STRUCTURAL SECTION (HSS) COLUMN - F'm = 1500 PSI - Fy = 60 KSI (A615 GR 60) - TYPE S (ASTM C270) - 2500 PSI (ASTM C476) ALL MASONRY WALLS ARE TO BE GROUTED SOLID ALL MASONRY WALLS ARE TO HAVE 9 GAUGE HORIZONTAL JOINT REINFORCEMENT WHICH DOES NOT EXCEED 16 INCHES ON CENTER VERTICALLY.. ALL LAPS SHALL BE 50 BAR DIAMETERS U.N.O. M-4. PROVIDE CORNER SPLICE BARS FOR ALL BOND BEAMS OCCURRING AT CORNERS OR WALL INTERSECTIONS. SPLICE BAR TO BE THE SAME SIZE AS BARS IN THE BOND BEAM. M-5. WHERE MASONRY IS APPLIED ADJACENT TO STEEL MEMBERS (BEAMS AND COLUMNS) PROVIDE ANCHORING DEVICES PER SPECIFICATIONS. M-6. REFER TO ARCHITECTURAL PLANS AND DOOR/FRAME SCHEDULES FOR LINTEL ROUGH OPENING LOCATIONS, SIZES, AND ELEVATIONS. M-7. USE SLEEVE TYPE EXPANSION ANCHORS IN NON-STRUCTURAL CMU WALL PARTITIONS, UNLESS NOTED OTHERWISE. M-8. M-9. SECTIONS, DETAILS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE, UNLESS OTHERWISE SHOWN. ALL CMU WALLS SHALL BE REINFORCED WITH A MINIMUM #5 VERTICAL BAR AT 24" O.C. AND (2) HORIZONTAL BARS (BOND BEAMS) AT 48" O.C. PROVIDE (2) #5 HORIZONTAL BARS CONTINUOUS AT TOP OF WALL. PROVIDE #5 DOWELS AT 24" O.C. INTO FOOTINGS. REFER TO STRUCTURAL AND/OR ARCHITECTURAL DRAWINGS FOR CONTROL JOINT LOCATIONS. WHERE CMU CONTROL JOINT LOCATIONS ARE NOT INDICATED, PROVIDE THEM AT 20' MAXIMUM CENTERS; SUBMIT CMU CONTROL JOINT LAYOUT TO THE ENGINEER FOR APPROVAL. M-10. MASONRY DESIGN IS BASED ON INSPECTED WORKMANSHIP. M-11. PROVIDE HOT AND COLD WEATHER PROCEDURES AND TEMPORARY MOISTURE PROTECTION IN ACCORDANCE WITH ACI RECOMMENDATIONS AND PROJECT SPECIFICATIONS. PROVIDE HORIZONTAL BOND BEAMS (DIAPHRAGM CHORDS) WITH (2) #5 BARS CONTINUOUS, BENEATH FLOOR/ROOF MEMBER BEARING ELEVATIONS AND AT DECK EDGE. M-13. MASONRY SHALL BE PLACED IN ONE-HALF RUNNING BOND U.N.O. M-14. THE EXTERIOR MASONRY WALLS ARE PART OF THE MAIN WIND- AND SEISMIC FORCE RESISTING SYSTEM. SEE THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTION AND TESTING. INDICATES BEAM FRAMING OVER WIDE FLANGE (WF) COLUMN B.O. = BOTTOM OF _____ BP# = BASE PLATE TYPE INDICATES BEAM FRAMING INTO SIDE OF COLUMN BRG = BEARING INDICATES MOMENT CONNECTION C TO C = CENTER TO CENTER CCJ = CONSTRUCTION CONTROL JOINT INDICATES REQUIRED UPWARD CAMBER IN BEAM (INCHES) CJ = CONTROL JOINT C.L.S.M. = CONTROLLED LOW STRENGTH MATERIAL ("FLOWABLE FILL") CONT = CONTINUOUS DBLT = DOUBLE-TEE DIA = DIAMETER DTB = DOUBLE-TEE BEARING EF = EACH FACE EL = ELEVATION EW = EACH WAY CR-13. ALL CONCRETE FOUNDATION WALLS SHALL HAVE A MINIMUM OF (2) #5 BARS CONTINUOUS TOP AND BOTTOM, UNLESS NOTED OR DETAILED OTHERWISE. F# = SPREAD FOOTING TYPE INDICATES TYPICAL BEAM SHEAR SPLICE FDTN = FOUNDATION INDICATES BEAM FRAMING INTO SIDE OF BEAM CR-14. EXTEND ALL PIER STEEL TO PROVIDE STD. HOOK UNDER FOOTING REINFORCEMENT, UNLESS NOTED OTHERWISE. FV = FIELD VERIFY GALV = GALVANIZED CR-15. ALL CONCRETE DESIGN AND CONSTRUCTION SHALL CONFORM WITH THE LOCAL BUILDING CODE REQUIREMENTS AND THOSE OF THE FOLLOWING STANDARDS (LATEST EDITION): HPC = HIGH PERFORMANCE COATING JB = JOIST BEARING (ELEVATION) LLH = LONG LEG HORIZONTAL LLV = LONG LEG VERTICAL MCJ = MASONRY CONTROL JOINT NIC = NOT IN CONTRACT CR-16. SEE SECTION 033000 OF SPECIFICATIONS FOR INFORMATION REGARDING CR-16. CONCRETE MIX DESIGN, TESTING, MATERIALS, AND ADMIXTURES. NTS = NOT TO SCALE OC = ON CENTER CR-17. ALUMINUM CONDUIT IS NOT PERMITTED TO BE EMBEDDED IN CONCRETE. P# = PIER TYPE PCB = PRECAST BEARING (ELEVATION) PRCST = PRECAST Rxn = REACTION SF# = STRIP FOOTING TYPE SIM = SIMILAR SST = STAINLESS STEEL STL = STEEL TBD = TO BE DETERMINED T.O. = TOP OF _____ TOC = TOP OF CONCRETE TOF = TOP OF FOOTING TOL = TOP OF LEDGE TOP = TOP OF PIER 2" 1" 1 1/2" 1" CR-12. PROVIDE ADDITIONAL #5 BARS AT 4'-0" LONG 3" BELOW TOP OF SLAB AT 45° TO ALL REENTRANT CORNERS AND OPENINGS IN CONCRETE SLABS AND AS SHOWN. "ACI 318, BUILDING CODE REQUIREMENTS FOR REINFORCED CONC." "ACI 315, DETAILS AND DETAILING OF CONCRETE REINFORCEMENT" "ACI 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BLDGS." "ACI 307, RECOMMENDED PRACTICE FOR CONCRETE FORM WORK" CR-18. REFER TO FLATWORK DRAWINGS AND/OR SPECIFICATIONS FOR SLAB-ON-GRADE FINISH TYPES AND DEPRESSIONS REQUIRED FOR MATS, TILE, AND OTHER FINISH MATERIALS. CR-19. PROVIDE FOOTING DOWELS TO MATCH VERTICAL WALL REINFORCING. WHERE WALL REINFORCING IS NOT INDICATED, DOWEL FOOTING TO FOUNDATION WALLS WITH #5 REBAR AT 16" O.C. BY 3'-0" LONG, WITH STANDARD HOOKS EMBEDDED A MINIMUM OF 9" INTO FOOTING. CR-20. ALL PIER FOOTINGS TO HAVE DOWELS WITH STANDARD HOOKS OF SAME SIZE AND QUANTITY AS PIER STEEL. DOWELS TO LAP PIER STEEL AS REQUIRED FOR A CLASS "B" TENSION SPLICE. CR-21. ALL OPENINGS IN CONCRETE FOUNDATION WALLS ARE TO HAVE (4) #5 DIAGONAL BARS EACH FACE OF THE WALL UNLESS OTHERWISE NOTED. BARS SHALL EXTEND 2 FEET BEYOND OPENING ON EACH SIDE. CR-22. UNLESS NOTED OTHERWISE, THICKEN THE SLAB-ON-GRADE BENEATH INTERIOR MASONRY PARTITIONS 8 INCHES BELOW BOTTOM OF SLAB ON GRADE. THICKENED PORTION TO EXTEND 8 INCHES BEYOND THE FACE OF THE WALL ON EACH SIDE. REINFORCE THE THICKENED PORTION WITH (3) #5 CONTINUOUS, LONGITUDINAL REINFORCING BARS AND #5 TRANSVERSE BARS AT 16" O.C., U.N.O. CR-23. PITCH CONCRETE TO FLOOR DRAINS. COORDINATE WITH PLUMBING AND ARCHITECTURAL DRAWINGS. CR-24. UNLESS NOTED OTHERWISE, PROVIDE CONTROL OR CONSTRUCTION JOINTS IN SLABS-ON-GRADE CR-24. AT 15 FOOT MAXIMUM CENTERS EACH DIRECTION. CONTRACTOR SHALL SUBMIT PLANS OF JOINT LOCATIONS TO THE GOVERNMENT FOR APPROVAL PRIOR TO CASTING SLABS-ON GRADE. COORDINATE WITH ARCHITECTURAL DRAWINGS AND FLOOR FINISHES SUCH AS TILE AND TERRAZZO. CR-25. ALL DOWELS INTO EXISTING CONCRETE OR SOLID MASONRY TO BE EPOXY ANCHORED WITH HILTI HITRE500 ADHESIVE OR EQUIVALENT, (UNLESS NOTED OTHERWISE, U.N.O.) TOS = TOP OF STEEL TOW = TOP OF WALL TPC = TOP OF PRECAST TSL = TOP OF SLAB TYP = TYPICAL UNO = UNLESS NOTED OTHERWISE WWF = WELDED WIRE FABRIC/REINFORCEMENT J o i n t V e n t u r e INDICATES SPREAD FOOTING MARK INDICATES BRACING CONNECTED TO BEAM (BELOW FRAMING MEMBER) 3" 2" 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 INDICATES COLUMN 1 ABBREVIATIONS FOOTINGS: BOTTOM & SIDES TOP WALLS: EXTERIOR EXPOSURE INTERIOR EXPOSURE BEAMS/COLUMNS: OVER TIES OR STIRRUPS ELEVATED SLABS: M-3. M-12. G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-001.DWG EW-7. STRIP FOOTING DESIGNATION SF3 REINFORCING SHALL BE DETAILED IN ACCORDANCE WITH ACI 315. CR-11. CONCRETE REINFORCEMENT PROTECTION/CLEAR COVER, U.N.O.: G-1. G-5. HORIZONTAL BARS SHALL BE DETAILED TO SHOW THE DISTANCE FROM AT LEAST ONE END OF THE BAR TO THE NEAREST BUILDING GRID LINE OR WALL. FOUNDATION WALL DESIGNATION FOOTING STEP REFERENCE THE GEOTECHNICAL REPORT INCLUDED IN THE APPENDIX OF THE SPECIFICATIONS FOR REQUIREMENTS FOR EXCAVATION AND CONTROL OF GROUND WATER DURING CONSTRUCTION. EXISTING SOILS MAY EXPERIENCE A LOSS OF STRENGTH IF SURFACE WATER IS ALLOWED TO ACCUMULATE IN THE EXCAVATIONS; DO NOT ALLOW SURFACE WATER TO ACCUMULATE IN THE BOTTOM OF EXCAVATIONS. WHERE STRUCTURES DERIVE SUPPORT FROM FILL-SUPPORTED FOUNDATIONS AND AT SLAB-ON-GRADE, FILL SHALL BE COMPACTED TO 98% OF STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698), U.N.O. FW# (0.75) SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE MASONRY NOTES G-4. LAP LENGTH SHALL BE SPECIFICALLY NOTED ON SHOP DRAWINGS WHERE MORE THAN ONE BAR MAKES UP A CONTINUOUS STRING. CR-10. PROVIDE HOT/COLD WEATHER PROCEDURES AND PROTECTION IN ACCORDANCE WITH ACI RECOMMENDATIONS AND PROJECT SPECIFICATIONS. GENERAL NOTES G-3. #7:4'-2" TOP OF WALL ELEVATION INDICATES BEAM SIZE (000'-0") SPECIAL LOADS BUILDING IS DESIGNATED SEISMIC DESIGN CATEGORY D; THEREFORE SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE ARE REQUIRED. SEE "STRUCTURAL TESTING AND INSPECTION" NOTES. G-2. #6:2'-7" #11:9'-0" TOW 100'-0" FLOOD DESIGN DATA SPECIAL LOADING CONDITIONS ARE NOT APPLICABLE TO THE DESIGN OF THIS BUILDING; THEREFORE SPECIAL LOADS ARE NOT REQUIRED 9. #5:1'-10" #10:7'-8" FOR EPOXY COATED BARS, PROVIDE 1.5 TIMES THE INDICATED LAP LENGTH. FOR TOP BARS PROVIDE 1.3 TIMES THE INDICATED LAP LENGTH. BUILDING IS NOT LOCATED IN FLOOD HAZARD AREA; THEREFORE FLOOD DESIGN DATA IS NOT REQUIRED 8. #4:1'-4" #9:6'-4" EW-5. BEFORE PLACING FOOTINGS, FOUNDATIONS OR SLAB-ON-GRADE, THE SUB-GRADE SHALL BE PREPARED AND INSPECTED AS REQUIRED BY THE SPECIFICATIONS. TOP OF FOOTING ELEVATION P1 MAPPED, MCE, 5% DAMPED, SPECTRAL ACCELERATIONS: AT SHORT PERIODS: Ss = 0.400 G AT A PERIOD OF 1 SECOND: S1 = 0.122 G ALL BAR LAPS SHALL CONFORM TO ACI 318 CLASS "B" SPLICE CRITERIA. USE TOP BAR LAP LENGTHS FOR TOP BARS IN SLABS AND BEAMS OVER 14" DEEP. MINIMUM BAR LAPS AS FOLLOWS U.N.O.: #3:1'-4" #8:5'-2" EARTHQUAKE DESIGN DATA RISK CATEGORY: IMPORTANCE FACTOR: 7. CR-2. EW-4 TOF 96'-0" INDICATES TOP OF STEEL ELEVATION INDICATES NUMBER OF 3/4" x 5" SHEAR STUDS FULLY WELDED TO TOP OF BEAM PER 1/2-SPAN [14] 6. V3S = 133 MPH II IW = 1.0 C GCPI = +/- .18 PROVIDE PVC SLEEVES THROUGH FOUNDATION WALLS/FOOTINGS FOR PIPE, CONDUIT, AND CABLE PENETRATIONS, INCLUDING ELECTRICAL GROUNDING SYSTEM CABLES. SEE APPROPRIATE DRAWINGS FOR LOCATIONS/SIZES. PLACE SLEEVES IN LOCATIONS TO AVOID DISPLACING REINFORCING STEEL. EW-3. W16x36 5. THE FOUNDATION CONTRACTOR SHALL FULLY REVIEW UNDER-GROUND PLUMBING AND FIRE PROTECTION DRAWINGS AND SHALL COORDINATE WITH THE UNDER-GROUND PLUMBING CONTRACTOR TO DEPRESS FOOTINGS AND PROVIDE PIPE SLEEVES THROUGH FOUNDATION WALLS AS NECESSARY TO ACCOMMODATE PLUMBING LINES OR TRAPS WHICH PENETRATE CONCRETE FOOTINGS OR FOUNDATIONS. CONCRETE FOOTING INDICATES CONNECTION DESIGNED BY FABRICATOR TO DELIVER 46k VERTICAL LOAD TO CENTERLINE OF COLUMN OR CONNECTING MEMBER 46k 4. 20 PSF ALL COLUMN FOOTINGS ARE TO BE CENTERED UNDER COLUMN CENTERLINES, UNLESS NOTED OR DETAILED OTHERWISE. 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com INDICATES BEAM FRAMING OVER BEAM GENERAL SYMBOLS # © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA F-1. 3. PROVIDE ONE (1) HOOKED REINFORCING BAR IN CONCRETE FLOOR SLAB TO SERVE AS A “CONCRETE ENCASED ELECTRODE” IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE. COORDINATE WITH ELECTRICAL CONTRACTOR FOR EXACT LOCATION. HOOKED REINFORCING BAR SHALL CONFORM TO THE FOLLOWING: A. UNCOATED, LOW-ALLOY STEEL, CONFORMING TO ASTM A706. B. BAR SIZE NUMBER 4. C. HOOKED AT ONE END ONLY. D. MINIMUM HORIZONTAL LENGTH OF REINFORCING BAR ENCASED IN CONCRETE SLAB SHALL BE 20’-0”. E. MINIMUM VERTICAL PROJECTION OF REINFORCING BAR HOOK ABOVE CONCRETE SLAB SHALL BE 1’-8”. F. MINIMUM COVER ALL AROUND REINFORCING BAR SHALL BE 2”. GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 125 PSF FOUNDATION PLAN F1 PUMP ROOM SLAB-ON-GRADE: STRUCTURAL SYMBOLOGY ISSUED 09/05/14 TYPE B-3 FINAL SUBMITTAL KEYED NOTE ELEVATION 1.5B20 DECK SPAN L# LINTEL DESIGNATOR SW# STRUCTURAL WALL TYPE SLAB X STRUCTURAL SLAB TYPE SD# SNOW DRIFT DESIGNATOR TTMPS/RJA NO.: M&H NO.: X EXISTING BUILDING GRID DATE: DESIGNED BY: X NEW BUILDING GRID DRAWN BY: CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS 1 S-501 DETAIL OR SECTION # STRUCTURAL ELEVATION SHEET CONTENTS STRUCTURAL NOTES, SYMBOLS AND ABBREVIATIONS SHEET NO. S-001 MATERIAL PROPERTIES (U.N.0.) Fy = 50 KSI (A992 OR A572 Gr 50) - W-SHAPES Fy = 36 KSI (A36) - C-SHAPES & ANGLES Fy = 36 KSI (A36) - PLATES & BARS Fy = 46 KSI (A500 Gr B) - SQUARE TUBES Fy = 35 KSI (A53 TYPE S, Gr B) - ROUND TUBES Fy = 36 KSI (A36) - RODS MATERIAL PROPERTIES (U.N.0) ROOF DECK: 20 GAUGE, GALVANIZED, Fy = 33 KSI S-1. STEEL BEAMS WITH RESIDUAL CAMBER RESULTING FROM MILL FABRICATION OR ROLLING SHALL BE SHOP FABRICATED AND ERECTED SUCH THAT THIS RESIDUAL CAMBER COUNTERACTS GRAVITY LOAD DEFLECTION. MD-2. U.N.O., ALL BOLTED CONNECTIONS SHALL UTILIZE 3/4 INCH DIAMETER A325-N BOLTS TIGHTENED TO THE SNUG-TIGHT CONDITION. THE SNUG-TIGHT CONDITION IS DEFINED BY THE RCSC'S "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS". MD-3. U.N.O., METAL DECKING SHALL BE CONTINUOUS OVER 3 SPANS AND HAVE JOINTS OVER SUPPORTING MEMBERS. MD-4. THE METAL ROOF DECK IS A PART OF THE MAIN WIND- AND SEISMIC FORCE RESISTING SYSTEM. SEE THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTION AND TESTING. S-2. S-3. S-4. ALL ANCHOR BOLTS ARE TO BE 1 INCH DIAMETER F1554 Gr. 36 THREADED RODS UNLESS NOTED OTHERWISE. (2)-1/2 INCH DIAMETER ANCHOR BOLTS SHALL BE PROVIDED AT ALL BEAM AND LINTEL BEARINGS ON CONCRETE OR MASONRY. U.N.O., POST INSTALLED ANCHORS ARE TO BE HILTI RE-500-SD ADHESIVE ANCHORS FOR SOLID BASE MATERIAL AS MANUFACTURED BY HILTI FASTENING SYSTEMS OF TULSA, OKLAHOMA OR EQUAL. INSTALL ANCHORS WITH EMBEDMENT DEPTHS INDICATED. S-5. STUD ANCHORS ARE TO BE NELSON STUDS OR EQUAL (ASTM A108). S-6. BEAM AND LINTEL PLATES SHALL BE FULLY GROUTED WITH A MINIMUM 1/2" NON-SHRINK GROUT. S-7. ALL WELDING OF NEW STEEL IS TO BE WITH E70XX ELECTRODES, U.N.O. WELDING SHALL BE IN ACCORDANCE WITH THE LATEST AWS SPECIFICATIONS BY CERTIFIED WELDERS. S-8. S-9. WHEN FIELD WELDING TO EXISTING STEEL, ADJUST WELDING PROCEDURES AS REQUIRED TO BE COMPATIBLE WITH THE NEW AND EXISTING STEEL. SHOP DRAWINGS SD-1. SHOP DRAWINGS SHALL BE SUBMITTED FOR STRUCTURAL ITEMS AS REQUIRED BY THE SPECIFICATIONS. CONSTRUCTION DOCUMENTS SHALL NOT BE REPRODUCED FOR USE AS SHOP DRAWINGS. SD-2. THE GENERAL CONTRACTOR SHALL REVIEW ALL SHOP DRAWINGS AND PRODUCT DATA FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS PRIOR TO SUBMITTAL. REVIEWED SUBMITTALS SHALL BE STAMPED BY THE CONTRACTOR. ANY SHOP DRAWING OR PRODUCT DATA NOT REVIEWED AND STAMPED BY THE GENERAL CONTRACTOR WILL BE REJECTED. GENERAL CONTRACTOR SHALL CLOUD OR FLAG ALL ITEMS NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SHALL VERIFY ALL DIMENSIONS. SD-3. SD-4. SD-5. ANY CHANGES, SUBSTITUTIONS OR DEVIATIONS FROM THE ORIGINAL CONTRACT DRAWINGS SHALL BE CLOUDED BY THE MANUFACTURER OR FABRICATOR. ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS WHICH ARE CLOUDED OR FLAGGED BY SUBMITTING PARTIES SHALL NOT BE CONSIDERED APPROVED AFTER THE ENGINEER'S REVIEW, UNLESS SPECIFICALLY NOTED ACCORDINGLY BY THE ENGINEER. THE APPROVED SHOP DRAWINGS DO NOT REPLACE THE ORIGINAL CONTRACT DRAWINGS. ITEMS OMITTED OR SHOWN INCORRECTLY ARE NOT TO BE CONSIDERED CHANGES TO THE ORIGINAL CONTRACT DRAWINGS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ITEMS OMITTED OR SHOWN INCORRECTLY ARE CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DRAWINGS. SHOP DRAWINGS WILL BE RETURNED FOR RESUBMITTAL IF MAJOR ERRORS ARE FOUND DURING REVIEW. S-11. ALL CONNECTIONS TO PIPE AND TUBE COLUMNS SHALL BE THROUGH PLATE CONNECTIONS UNLESS OTHERWISE INDICATED. SD-7. ALLOW A MINIMUM OF (10) WORKING DAYS FOR REVIEW OF SHOP DRAWINGS BY THE STRUCTURAL ENGINEER. S-12. THE CONTRACTOR SHALL FURNISH AND INSTALL MISCELLANEOUS STEEL (CURBS, HANGERS, BRACING, ETC.) AS INDICATED AND AS NECESSARY PER ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS. S-13. ALL EXTERIOR MASONRY SHELF ANGLES, LINTEL BEAMS, AND LINTEL PLATES SHALL BE HOT DIPPED GALVANIZED ACCORDING TO ASTM A123. S-14 REFER TO SPECIFICATION SECTION 024100 FOR REQUIREMENTS DURING WELDING PROCEDURES IN AREAS CONTAINING LEAD BASED PAINT. S-15 ANY EXISTING EQUIPMENT IN THE HANGAR BAY THAT WILL BE REMOVED AS PART OF THE DEMOLITION PLANS SHALL BE REMOVED PRIOR TO WELDING OF THE REINFORCEMENT FOR THE EXISTING ROOF TRUSSES. THE EXISTING OVERHEAD CRANES SHALL NOT BE USED AND SHALL BE POSITIONED SO THEY WILL INDUCE THE LEAST AMOUNT OF STRESS ON TRUSS MEMBERS DURING WELDING PROCEDURES. SEE PAINTING SPECIFICATION FOR AREAS REQUIRING REPAINTING AFTER WELDING PROCEDURES. MATERIAL PROPERTIES (U.N.0) COMPLY WITH SJI'S "SPECIFICATIONS" FOR WEB AND STEEL-ANGLE CHORD MEMBERS. J-1. BAR JOISTS SHALL BE DESIGNED TO RESIST FORCES INDICATED ON DRAWINGS AND SPECIFICATIONS. J-2. TYPICAL BAR JOISTS ARE NOT DESIGNED FOR CONCENTRATED LOADS. PLACE LOADS AT PANEL POINTS OR WELD ADDITIONAL DOUBLE ANGLE MEMBERS ONE EACH SIDE FROM POINT OF CONCENTRATED LOAD TO THE NEAREST PANEL POINT ON THE OPPOSITE CHORD. J-3. ALL FIELD MODIFICATIONS OR REPAIRS TO THE JOIST, OR JOIST GIRDERS, SHALL BE APPROVED BY THE JOIST MANUFACTURER IN WRITING. THIS LETTER SHALL BE FORWARDED TO THE ENGINEER FOR REVIEW. J-4. J-5. J-6. CUTTING & DRILLING OF CHORD OR WEB MEMBERS IN BAR JOISTS, OR JOIST GIRDERS, IS NOT PERMITTED. ALL BRIDGING SHALL BE EQUALLY SPACED, UNLESS NOTED OTHERWISE, BY JOIST MANUFACTURER. CONTRACTOR(S) SHALL PROVIDE MEANS FOR ADEQUATE DISTRIBUTION OF CONSTRUCTION LOADS SO THAT CARRYING CAPACITY OF ANY BAR JOIST, JOIST GIRDER, OR OTHER STRUCTURAL MEMBER IS NOT EXCEEDED. J-7. JOIST SHALL BE CONSIDERED AS UNSTABLE DURING ERECTION. UNDER NO CIRCUMSTANCES ARE CONSTRUCTION LOADS OF ANY DESCRIPTION TO BE PLACED ON UNBRIDGED JOISTS. THE APPLICATION OF CONSTRUCTION LOADS ON UNBRIDGED JOISTS IS IN DIRECT VIOLATION OF O.S.H.A. REGULATIONS. J-8. WHERE X-BRIDGING INTERFERES WITH MECHANICAL PIPING OR DUCTWORK, UTILIZE HORIZONTAL BRIDGING AS DIRECTED BY JOIST MANUFACTURER. J-9. ALL BRIDGING SHALL BE PER SJI AND AS REQUIRED FOR DESIGN LOADS. TI-2. AN APPROVED, INDEPENDENT THIRD PARTY SPECIAL INSPECTION AND TESTING AGENCY (SIA) SHALL BE RETAINED BY THE CONTRACTOR TO PROVIDE FIELD AND LAB TESTING OF CONSTRUCTION MATERIALS AND TO PROVIDE SPECIAL INSPECTIONS. HOWEVER, QUALITY CONTROL INSPECTIONS ARE REQUIRED BY THE CONTRACTOR'S INSPECTOR (EXAMPLE = STRUCTURAL STEEL QCI) SEE NOTES BELOW. ALL SPECIAL INSPECTIONS AND TESTING SHALL BE PAID FOR BY THE CONTRACTOR. TI-3. THE SIA SHALL BE INDEPENDENT FROM THE CONTRACTOR RESPONSIBLE FOR THE WORK BEING INSPECTED. SPECIAL INSPECTION AND TESTING SHALL BE DONE BY APPROVED, QUALIFIED PERSONNEL SATISFACTORY TO THE AUTHORITY HAVING JURISDICTION. TI-4. SPECIAL INSPECTION AND TESTING DO NOT REPLACE CODE-REQUIRED INSPECTIONS OR STRUCTURAL OBSERVATIONS. THE SIA SHALL SUBMIT WRITTEN DOCUMENTATION TO THE BUILDING OFFICIAL AND THE DESIGN PROFESSIONAL DEMONSTRATING THAT THE SPECIAL INSPECTORS PERFORMING INSPECTIONS AND TESTING ON THE PROJECT ARE COMPETENT AND HAVE THE RELEVANT EXPERIENCE OR TRAINING. EXPERIENCE OR TRAINING SHALL BE CONSIDERED RELEVANT WHEN THE DOCUMENTED EXPERIENCE OR TRAINING IS RELATED IN COMPLEXITY TO THE SAME TYPE OF SPECIAL INSPECTION ACTIVITIES FOR PROJECTS OF SIMILAR COMPLEXITY AND MATERIAL QUALITIES. THESE QUALIFICATIONS ARE IN ADDITION TO QUALIFICATIONS SPECIFIED IN OTHER SECTIONS OF THE 2012 IBC AS MODIFIED BY UFC 3-301-01. TI-6. CONTRACTOR’S RESPONSIBILITY: A. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT ALL STRUCTURAL WORK FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY INSPECTION PROVIDED BY OTHERS DOES NOT RELIEVE THE CONTRACTOR OF THIS RESPONSIBILITY. ANY DEVIATIONS FROM THE CONTRACT DOCUMENTS THAT ARE FOUND AT A LATER DATE AND ARE DECLARED TO BE SIGNIFICANT BY THE STRUCTURAL ENGINEER SHALL BE CORRECTED BY THE CONTRACTOR WITHOUT COST OR ANY DELAY TO THE PROJECT SCHEDULE. B. TEMPORARY CONSTRUCTION AND SITE SAFETY ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE SIA IS NOT INSPECTING FOR O.S.H.A. COMPLIANCE OR REQUIRED TO INSPECT TEMPORARY CONSTRUCTION, SUCH AS TEMPORARY BRACING OR SHORING. D. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND- OR SEISMIC FORCE RESISTING SYSTEM OR COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE AUTHORITY HAVING JURISDICTION (BUILDING OFFICIAL) AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR’S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTION. E. SST1-1. REFER TO “STATEMENT OF SPECIAL INSPECTION AND TESTING” FOR GENERAL SPECIAL INSPECTION AND TESTING REQUIREMENTS. SSTI-2. STEEL ELEMENTS SIMILAR TO STRUCTURAL STEEL SHALL BE TREATED AS STRUCTURAL STEEL FOR PURPOSES OF SPECIAL INSPECTION AND TESTING. SUCH ITEMS INCLUDE BUT ARE NOT LIMITED TO: STAIRS, SHEAR STUDS, BASE PLATES NOT PART OF STRUCTURAL FRAME, EMBEDDED STEEL PARTS, ARCHITECTURAL COMPONENTS, MISCELLANEOUS METAL FABRICATIONS, BEARING PLATES, AND CATWALKS. STRUCTURAL STEEL: THE CONTRACTOR AND SUBCONTRACTOR(S) RESPONSIBLE FOR ERECTION AND FABRICATION SHALL BE RESPONSIBLE FOR QUALITY CONTROL INSPECTORS (QCI) IN ACCORDANCE WITH AISC 360 AND AISC 341. REFER TO STRUCTURAL STEEL TESTING AND INSPECTION NOTES. TI-7. THE SIA IS NOT AUTHORIZED TO DIRECT OR APPROVE ANY CHANGES FROM THE CONTRACT DOCUMENTS. IF THE CONTRACTOR WISHES TO QUESTION THE SIA'S INTERPRETATION OF THE CONTRACT DOCUMENTS, HE MAY DO SO WITH THE OWNER ASSISTED BY THE DESIGN PROFESSIONAL. TI-8. THE SIA IS NOT AUTHORIZED TO STOP OR DELAY THE WORK. IF THE CONTRACTOR ELECTS TO CONTINUE WITH A CERTAIN PORTION OF WORK AFTER BEING NOTIFIED BY THE SIA THAT SUCH WORK IS NOT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR DOES SO AT THEIR OWN RISK AND MAY BE REQUIRED TO CORRECT THE WORK AT A LATER DATE. TI-9. THESE NOTES AND THE PROJECT SPECIFICATIONS TYPICALLY INDICATE THE FREQUENCY OF TESTING AND SPECIAL INSPECTIONS. WHERE THE FREQUENCY IS NOT INDICATED, THE SIA SHALL SUBMIT A PROPOSAL OF SPECIAL INSPECTION AND TESTING INTERVALS TO THE OWNER. 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com CONTRACTOR QCI AND QAI (SIA) SHALL HAVE A CLEAR UNDERSTANDING OF THE SCOPE AND EXTENT OF THE SEISMIC FORCE RESISTING SYSTEM (SFRS) INCLUDING ITEMS SUCH AS BRACED FRAMES, MOMENT FRAMES, DIAPHRAGM CHORDS, COLLECTORS, ASSOCIATED CONNECTIONS, ASSOCIATED FOUNDATIONS AND ANCHORAGE, FOR THE PURPOSE OF APPLYING SFRS-SPECIFIC REQUIREMENTS TO THE PROJECT. SSTI-3. NON-DESTRUCTIVE TESTING (NDT), INCLUDING ULTRASONIC TESTING (UT), MAGNETIC PARTICLE TESTING (MT), PENETRANT TESTING (PT) AND RADIOGRAPHIC TESTING (RT), WHERE REQUIRED, SHALL BE PERFORMED BY THE SIA IN ACCORDANCE WITH AWS D1.1. DOCUMENT ALL NDT IN ACCORDANCE WITH AISC 360 CHAPTER N AND AISC 341 CHAPTER J. SSTI-4. FOR STRUCTURAL STEEL, SPECIAL INSPECTION AND TESTING SHALL INCLUDE SCOPE LISTED IN THE FOLLOWING TABLE. GENERALLY DOCUMENT SCOPE AND CONCLUSIONS OF INSPECTIONS PERFORMED EVEN IF “D” (DOCUMENT) IS NOT LISTED IN THE TABLE. ABSENCE OF A “D” IN THE TABLE BELOW DOES NOT WAIVE GENERAL DOCUMENTATION REQUIREMENTS. TABLE 2 NOTES: (SEE SHEET S-003) A. ** INDICATES REQUIREMENTS ARE APPLICABLE FOR ELEMENTS OF THE SFRS ONLY B. DEFINITIONS FOR USE WITH THIS TABLE: DOCUMENT (D): INSPECTOR TO PREPARE REPORTS INDICATING THAT THE WORK HAS BEEN PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. FOR SHOP FABRICATION, THE REPORT SHALL INDICATE THE PIECE MARK OF THE PIECE INSPECTED. FOR FIELD WORK, THE REPORT SHALL INDICATE THE REFERENCE GRID LINES AND FLOOR/ELEVATION INSPECTED. NON-COMPLIANT WORK SHALL BE NOTED IN THE INSPECTION REPORT. THE CONTRACTOR SHALL PROVIDE THE SIA ACCESS TO ALL PLACES WHERE THE WORK IS BEING PERFORMED. A MINIMUM OF 24 HOURS NOTIFICATION SHALL BE GIVEN TO THE SIA AND DESIGN PROFESSIONAL PRIOR TO THE COMMENCEMENT OF WORK REQUIRING TESTING OR INSPECTION. THE WORK FOR WHICH SPECIAL INSPECTION IS REQUIRED SHALL REMAIN ACCESSIBLE AND EXPOSED FOR SPECIAL INSPECTION PURPOSES UNTIL COMPLETION OF THE REQUIRED SPECIAL INSPECTIONS. C. SHOP DRAWING REVIEW IS INTENDED ONLY FOR GENERAL CONFORMANCE TO THE DESIGN CONCEPT AND CONSTRUCTION DOCUMENTS. SD-6. STEEL BAR JOISTS 9/2/2014 10:56:31 AM U.N.O., ALL MISCELLANEOUS OPENINGS IN METAL ROOF DECK ARE TO BE FRAMED BY 5x3x3/8" ANGLES. LONG LEG OF ANGLES SHALL BE VERTICAL. ANGLES SHALL BE WELDED TO THE TOP CHORD/FLANGE OF ROOF FRAMING AND EACH OTHER. UNLESS NOTED OTHERWISE, THE MINIMUM CONNECTION PLATE/ANGLE THICKNESS SHALL BE 5/16", THE MINIMUM WELD 1/4", AND THE MINIMUM DESIGN LOAD ON ANY CONNECTION 10 KIPS. S-16 G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-002.DWG BUTTON PUNCHING ROOF DECK IS NOT PERMITTED. REFERENCE DRAWINGS FOR ROOF DECK ATTACHMENT REQUIREMENTS. STRUCTURAL DIAPHRAGM ACTION IS PROVIDED BY THE ROOF DECK AND ITS ATTACHMENT. TI-5 STEEL CONNECTIONS NOT DETAILED ON THE PLANS ARE TO BE THE FABRICATOR'S STANDARD AND ARE TO BE SELECTED AND DESIGNED IN ACCORDANCE WITH AISC ASD SPECIFICATIONS, TYPE 2 FRAMING CONNECTIONS, FOR THE REACTIONS INDICATED. MINIMUM NO. BOLTS PER CONNECTION n = 2 FOR MEMBERS 10 INCHES DEEP OR LESS n = 3 FOR MEMBERS 12, 14, OR 15 INCHES DEEP n = 4 FOR MEMBERS 16 OR 18 INCHES DEEP n = 5 FOR MEMBERS 21 OR 24 INCHES DEEP n = 6 FOR MEMBERS 27 OR 30 INCHES DEEP n = 8 FOR MEMBERS 33 OR 36 INCHES DEEP S-10. MD-1. TI-1. REFER TO "STRUCTURAL STEEL SPECIAL INSPECTION AND TESTING" NOTES FOR STRUCTURAL STEEL AND STEEL ELEMENTS SIMILAR TO STRUCTURAL STEEL. NON-DESTRUCTIVE TESTING (NDT) TERMS: ULTRASONIC TESTING (UT), MAGNETIC PARTICLE TESTING (MT), PENETRANT TESTING (PT), RADIOGRAPHIC TESTING (RT) OBSERVE (O): OBSERVE THESE ITEMS ON A RANDOM BASIS FOR ELEMENTS NOT PART OF THE SFRS. WHERE MARKED WITH AN “ O* “ THE OBSERVATIONS FOR ELEMENTS OF THE SFRS SHALL BE MADE ON A RANDOM, DAILY BASIS IN ACCORDANCE WITH AISC 341. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS. PERFORM (P): PERFORM INSPECTION FOR EACH JOINT OR MEMBER. WHERE MARKED WITH A “ P* “ THE INSPECTIONS SHALL BE PERFORMED PRIOR TO THE FINAL ACCEPTANCE FOR EACH JOINT OR MEMBER IN ACCORDANCE WITH AISC 341. QUALITY ASSURANCE INSPECTOR (QAI): THE SPECIAL INSPECTION AND TESTING AGENCY (SIA) QUALITY CONTROL INSPECTOR (QCI): THE FABRICATOR’S QC INSPECTOR FOR SHOP FABRICATION OR ERECTOR’S FIELD QC INSPECTOR FOR FIELD WORK. QCI SHALL BE PROVIDED BY THE CONTRACTOR SHOULD QCI NOT BE PROVIDED BY FABRICATOR AND ERECTOR. C. REFER TO SPECIFICATIONS FOR TESTING REQUIREMENTS AND ADDITIONAL QUALITY ASSURANCE REQUIREMENTS. 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 J o i n t V e n t u r e © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA METAL DECK STRUCTURAL STEEL SPECIAL INSPECTION AND TESTING GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 STRUCTURAL STEEL NOTES STATEMENT OF SPECIAL INSPECTION AND TESTING ISSUED 09/05/14 TI-10. THE SIA SHALL ISSUE ONGOING REPORTS OF INSPECTIONS AND TESTS TO THE BUILDING OFFICIAL, CONTRACTOR AND DESIGN PROFESSIONAL. TYPE B-3 FINAL SUBMITTAL TI-11. THE SIA SHALL KEEP REPORTS OF EACH INSPECTION AND TESTING ACTIVITY. REPORTS SHALL INDICATE WHETHER THE WORK WAS IN COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. DEFICIENCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF THEY ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE AUTHORITY HAVING JURISDICTION (BUILDING OFFICIAL) AND DESIGN PROFESSIONAL PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK. TI-12. THE SIA SHALL PREPARE AND SUBMIT A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSPECTIONS AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED AT A POINT IN TIME AGREED UPON PRIOR TO THE START OF WORK BY THE APPLICANT AND THE BUILDING OFFICIAL. TTMPS/RJA NO.: M&H NO.: DATE: DESIGNED BY: TI-13. FABRICATOR SPECIAL INSPECTIONS: UNLESS OTHERWISE APPROVED, SPECIAL INSPECTIONS SHALL BE PERFORMED FOR WORK AT FABRICATION SHOPS. SPECIAL INSPECTIONS AT THE FABRICATION SHOP BY THE SIA COULD BE WAIVED BY THE OWNER IF THE FABRICATION SHOP IS REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION IN ACCORDANCE WITH CODE (1704.2.5.2). APPROVAL SHALL BE EVALUATED BY THE SIA AND ESTABLISHED WITH THE OWNER PRIOR TO FABRICATION. THE FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE OWNER AND BUILDING OFFICIAL IN ACCORDANCE WITH CODE (1704.5.2) STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. THE OWNER AND SIA RESERVE THE RIGHT TO INSPECT THE WORK AT THE FABRICATION SHOP REGARDLESS OF FABRICATOR QUALIFICATIONS / CERTIFICATIONS. TI-14. STRUCTURAL SPECIAL INSPECTION AND TESTING BY THE SIA SHALL INCLUDE THE SCOPE IN TABLE 1. WHERE PROJECT GEOTECHNICAL ENGINEER IS INDICATED, THE ENGINEER RESPONSIBLE FOR THE SOILS REPORT RELIED ON FOR DESIGN, OR HIS DESIGNEE, SHALL PERFORM THE INSPECTIONS AND TESTING. DRAWN BY: CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS SHEET CONTENTS STRUCTURAL NOTES SHEET NO. S-002 TABLE 2: STRUCTURAL STEEL SPECIAL INSPECTION AND TESTING COMMENTS CODE / STANDARD REFERENCE (IBC 2012 UNO) SOILS: VERIFICATION THAT OVER-EXCAVATION EXTENDS TO PROPER DEPTH, HAS REACHED PROPER MATERIAL, AND HAS EXTENDED TO PROPER HORIZONTAL EXTENTS X BY PROJECT GEOTECHNICAL ENGINEER TABLE 1705.6 (2) SOILS: PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVATION OF SUBGRADE AT BOTTOM OF OVER-EXCAVATION, AND VERIFY THAT SITE HAS BEEN PREPARED PROPERLY X SOILS: CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS X SOILS: DURING PLACEMENT AND COMPACTION OF COMPACTED FILL, VERIFICATION OF USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES X BY PROJECT GEOTECHNICAL ENGINEER P O N5.7 P O N5.7 TABLE 1705.6 (5) ERECTED STEEL FRAME TO VERIFY COMPLIANCE WITH THE DETAILS SHOWN ON ERECTION DRAWINGS INCLUDING BRACES, STIFFENERS, MEMBER LOCATIONS, AND JOINT DETAILS O P N5.7 X BY PROJECT GEOTECHNICAL ENGINEER TABLE 1705.6 (3) PLACEMENT OF ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL, FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS (DIAMETER, GRADE, TYPE, LENGTH, EMBEDMENT DEPTH) TABLE 1705.6 (4) P D N5.7 BY PROJECT GEOTECHNICAL ENGINEER FABRICATIONS AND ERECTED STEEL FRAME, FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS O X INSPECTION OF WELDING PROCEDURE SPECIFICATIONS (WPSs) P P TABLE N5.4-1 AISC 341 TABLE J6-1 MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES P P TABLE N5.4-1 AISC 341 TABLE J6-1 MATERIAL IDENTIFICATION (TYPE/GRADE) O* O* TABLE N5.4-1 AISC 341 TABLE J6-1 WELDER IDENTIFICATION SYSTEM O* O* GROOVE WELD FIT-UP: JOINT GEOMETRY, JOINT PREPARATION, DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL), CLEANLINESS (CONDITION OF STEEL SURFACES), TACKING (TACK WELD QUALITY AND LOCATION), BACKING TYPE AND FIT O BY PROJECT GEOTECHNICAL ENGINEER TABLE 1705.6 (2) SOILS: VERIFICATION OF MATERIALS BELOW FOOTINGS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY X X BY PROJECT GEOTECHNICAL ENGINEER TABLE 1705.6 (1) X X CONCRETE REINFORCEMENT: VERIFICATION OF A706 STEEL FOR WELDED REINFORCEMENT X CONCRETE REINFORCEMENT: SHEAR REINFORCEMENT (STIRRUPS, TIES, SPIRALS) BY PROJECT GEOTECHNICAL ENGINEER CONCRETE: PRE-PLACEMENT INSPECTION OF CAST-IN-PLACE ANCHORS AND EMBEDS X CONCRETE: PRE-PLACEMENT INSPECTION OF FORMWORK FOR SHAPE, LOCATION, DIMENSIONS X CONCRETE: PLACEMENT – VERIFICATION OF REQUIRED DESIGN MIX X CONCRETE: PLACEMENT -TESTING FOR SLUMP, AIR CONTENT, TEMPERATURE AT TIME WHEN STRENGTH SAMPLES ARE MADE X CONCRETE: INSPECTION OF CONC. PLACEMENT FOR PROPER APPLICATION / CONSOLIDATION X TABLE 1705.6 (4) TABLE 1705.3 (1) ACI 318: 3.5, 7.1-7.7 CONFIRM WITH MILL CERTIFICATE X COORDINATE WITH STEEL INSPECTION REQUIREMENTS TABLE 1705.2.2 AWS D1.4 ACI 318: 3.5.2 TABLE 1705.2.2 1705.2.1 TABLE 1705.3 (3) ACI 318: 8.1.3, 21.2.8, ACI 318 D9.2 VERIFY PRIOR TO DEPOSITING. NOTE ADDITIVES (ADMIXTURES, WATER, ETC) ADDED PRIOR TO PLACEMENT X MASONRY: GROUT PLACEMENT – VERIFICATION OF REQUIRED DESIGN MIX X MASONRY: GROUT PLACEMENT – SIZE AND LOCATION OF STRUCTURAL ELEMENTS X MASONRY: GROUT PLACEMENT –TYPE SIZE, AND LOCATION OF ANCHORS INCLUDING OTHER DETAILS OF ANCHORAGE OF MASONRY TO STRUCTURAL MEMEBERS, FRAMES OR OTHER CONSTRUCTION X MASONRY: GROUT PLACEMENT -TESTING FOR SLUMP, AIR CONTENT, TEMPERATURE AT TIME WHEN STRENGTH SAMPLES ARE MADE X MASONRY: GROUT PLACEMENTINSPECTION OF GROUT PLACEMENT FOR PROPER APPLICATION/CONSOLIDATION X O* TABLE N5.4-2 AISC 341 TABLE J6-2 ENVIRONMENTAL CONDITIONS (WIND SPEED WITHIN LIMITS, PRECIPITATION AND TEMPERATURE) O* O* TABLE N5.4-2 AISC 341 TABLE J6-2 WPS FOLLOWED: WELDING EQUIPMENT SETTINGS, TRAVEL SPEED, SELECTED WELDING MATERIALS, SHIELDING GAS (TYPE, FLOW RATE), PREHEAT, INTERPASS TEMPERATURE MAINTAINED WITHIN MIN/MAX, PROPER POSITION (F, V, H, OH), INTERMIX** OF FILLER METALS AVOIDED UNLESS APPROVED O* O* TABLE N5.4-2 AISC 341 TABLE J6-2 WELDING TECHNIQUES: INTERPASS AND FINAL CLEANING, EACH PASS WITHIN PROFILE LIMITATIONS, EACH PASS MEETS QUALITY REQUIREMENTS O* O* TABLE N5.4-2 AISC 341 TABLE J6-2 WELDS CLEANED O* O* TABLE N5.4-3 AISC 341 TABLE J6-3 SIZE, LENGTH AND LOCATION OF WELDS P* P* TABLE N5.4-3 AISC 341 TABLE J6-3 WELDS MEET VISUAL ACCEPTANCE CRITERIA: CRACK PROHIBITION, WELD/BASE METAL FUSION, CRATER CROSS SECTION, WELD PROFILES, WELD SIZE, UNDERCUT, POROSITY P* P* TABLE N5.4-3 AISC 341 TABLE J6-3 D** D** ARC STRIKES P P K-AREA P P PLACEMENT OF REINFORCING OR CONTOURING FILLET WELDS (IF REQUIRED) P* D** P* D** BACKING REMOVED AND WELD TABS REMOVED AND FINISHED, AND FILLET WELDS ADDED (IF REQUIRED) P* D** P* D** TABLE N5.4-3 AISC 341 TABLE J6-3 REPAIR ACTIVITIES P* TMS 602/ACI 530.1/ASCE 6 ART. 3.3 F P* D** TABLE N5.4-3 AISC 341 TABLE J6-3 ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER P* P* D TABLE N5.4-3 TMS 402 / ACI 530 / ASCE 5 SEC. 1.16.4.3, 1.17.1 CJP GROOVE WELD NDT: 100% UT ALL CJP GROOVE WELDED JOINTS P* (SIA) UT NOT REQUIRED FOR MATERIAL ¼” THICK OR LESS TABLE N5.4-3 TMS 602/ACI 530.1/ASCE 6 ART. 1.5 B.1.b.3 **BEAM TO COLUMN CJP GROOVE WELD NDT: 25% MT P* (SIA) IN ADDITION TO UT. ACCEPTANCE CRITERIA OF IRREGULARITIES PER AWS D1.1 TABLE 6.2 AISC 341 J6.2 **BASE METAL NDT FOR LAMELLAR TEARING AN LAMINATIONS: 100% UT TESTED FOR DISCONTINUITIES BEHIND AND ADJACENT TO FUSION LINE P* (SIA) APPLIES ONLY AT “T” AND CORNER JOINTS WHERE CONNECTED MATERIAL > 3/4” CONNECTED WITH A CJP GROOVE WELD TO BASE METAL > 11/2”; SEE AISC 341 J6.2d FOR ACCEPTANCE CRITERIA AISC 341 J6.2 TMS 602/ACI 530.1/ASCE 6 ART. 3.5, 3.6C **BEAM COPE AND ACCESS HOLE NDT: 100% MT OR PT P* (SIA) APPLIES ONLY AT THERMALLY CUT SURFACES AT WELDED CONNECTIONS FOR MEMBERS WITH FLANGES OR WEBS THICKER THAN 1 1/2” AISC 341 J6.2 TMS 602/ACI 530.1/ASCE 6 TMS 602/ACI 530.1/ASCE 6 MANUFACTURER’S CERTIFICATIONS FOR FASTENER MATERIALS O P TABLE N5.6-1 FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS O O TABLE N5.6-1 TABLE 1705.2.2 (1a) PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM THE SHEAR PLANE) O* O* TABLE N5.6-1 AISC 341 TABLE J7-1 TABLE 1705.2.2 (1b) PROPER BOLTING PROCEDURE SELECTED FOR THE JOINT DETAIL O* O* TABLE N5.6-1 AISC 341 TABLE J7-1 TABLE 1705.2.2 (2a) AWS D1.3 CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND HOLE PREPARATION, MEET REQUIREMENTS O* O* TABLE N5.6-1 AISC 341 TABLE J7-1 INSPECT IN ACCORDANCE WITH APPROVED RESEARCH REPORT TABLE 1705.3 (3) ACI 318 INSPECT IN ACCORDANCE WITH APPROVED RESEARCH REPORT (CONTINUOUS - DO NOT LOWER INSPECTION FREQUENCY) TABLE 1705.3 (4) ACI 318: 3.8.6, 8.1.3, 21.2.8, ACI 318 D9.2, D9.2.4 TMS 402 / ACI 530 / ASCE 5 SEC. 1.16 TMS 602 / ACI 530.1 / ASCE 6 ART. 2.4, 3.4, 3.2, 3.6A VERIFY PRIOR TO DEPOSITING X MASONRY: VERIFICATION OF PROTECTION FROM THE ADVERSE EFFECTS OF WEATHER, HEATING EQUIPMENT, WELDING AND OTHER POTENTIALLY HARMFUL CONDITIONS. X STEEL DECK: MATERIAL VERIFICATION - MARKINGS AND CONFORMANCE TO ASTM STANDARDS X STEEL DECK: MATERIAL VERIFICATION - MANUFACTURER’S CERTIFIED TEST REPORTS X STEEL DECK: INSPECTION OF DECK FASTENING (WELDING AND OTHER FASTENERS) X INCLUDES FORM DECK, ROOF DECK, COMPOSITE DECK FOR COMPOSITE CONSTRUCTION SEE ALSO STRUCTURAL STEEL SPECIAL INSPECTION AND TESTING NOTES MECHANICAL / ELECTRICAL COMPONENTS: INSPECTION OF SEISMIC ANCHORAGE FOR EMERGENCY AND STANDBY POWER SYSTEMS X MECHANICAL / ELECTRICAL COMPONENTS: INSPECTION AND VERIFICATION OF SUPPORTS, ATTACHMENTS AND SEISMIC BRACING. VERIFICATION OF RESTRAINT ELEMENTS MEET PROJECT REQUIREMENTS. X MECHANICAL / ELECTRICAL COMPONENTS: INSPECTION OF VIBRATION ISOLATION SYSTEMS X FIRE PROTECTION: SPRAYED, MASTIC, INTUMESCENT, PENETRATIONS AND JOINTS NOT COVERED IN THIS TABLE. REFER TO FIRE PROTECTION DRAWINGS AND CODE REQUIREMENTS TMS 602/ACI 530.1/ASCE 6 1705.11.6 (1) NOT REQUIRED FOR ITEMS UNDER 20 LBS. OR LESS IN ANY LOCATION; NOT REQUIRED FOR FLOOR-SUPPORTED ITEMS 400 LBS OR LESS AND HAVING CENTER OF GRAVITY 4 FT. OR LESS ABOVE FLOOR. TABLE NOTES: A. TMS 602 / ACI 530.1 / ASCE 6 ART. 2.1, 2.6A, 2.6B, 2.6C, 2.4 G.1.b, 3.3B REFER TO SPECIFICATIONS FOR TESTING REQUIREMENTS AND ADDITIONAL QUALITY ASSURANCE REQUIREMENTS. 1705.12.3 ASCE 7-10 13.2.1 ASCE 7-10 TABLE 13.2-1 1705.11.6 (5) 1705.13, 1705.14, 1705.16, 1705.17 MT** (SIA) SEE AISC 360 TABLE N5.4-2 FOR MORE INFORMATION. **MT WHERE WELDING OF DOUBLER PLATES, CONTINUITY PLATES, AND STIFFENER PLATES HAS BEEN PERFORMED IN THE K-AREA. TEST/INSPECT AREA WITHIN 3” OF THE WELD. TABLE N5.4-3 AISC 341 J6.2 REQUIRED FOR ELEMENTS OF THE SFRS ONLY AISC 341 TABLE J6-3 V e n t u r e 09/05/14 P* D** PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER COMPONENTS O* FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED O* O* TABLE N5.6-2 AISC 341 TABLE J7-1 JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING OPERATION O* O* TABLE N5.6-2 AISC 341 TABLE J7-1 FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING O* O* TABLE N5.6-2 AISC 341 TABLE J7-1 FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH RCSC SPECIFICATION PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE EDGES O* O* TABLE N5.6-2 AISC 341 TABLE J7-1 ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS P D** P D** TABLE N5.6-3 AISC 341 TABLE J7-1 P P TABLE N6.1 BY QCI © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. ISSUED PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED PLACEMENT AND INSTALLATION OF STEEL DECK O* D** TABLE N5.4-1 TABLE N5.4-3 TMS 602/ACI 530.1/ASCE 6 X MASONRY: GROUT COMPRESSIVE STRENGTH TESTING (FOR NON-SFRS, ONLY OBSERVE IS REQUIRED FOR QC) O* X J o i n t O* P/O** NO WELDING OVER CRACKED TACK WELDS CONCRETE POST-INSTALLED ANCHORS: INSPECTION OF POST-INSTALLED MECHANICAL ANCHORS; VERIFICATION OF APPROVED RESEARCH REPORT ACI 355.2 PREQUALIFIED MASONRY: PRIOR TO GROUTING, INSPECTION OF REINFORCING STEEL PLACEMENT, ANCHORAGE AND EMBEDDED ELEMENTS TABLE N5.4-1 AISC 341 TABLE J6-1 TABLE N5.4-2 AISC 341 TABLE J6-2 ACI 318, ACI 305, ACI 306 X **SEE AISC 341 TABLE J6-1 FOR TRANSITIONING FROM PERFORM TO OBSERVE -DAILY - AT SFRS ELEMENTS. O* X MASONRY: MORTAR COMPRESSIVE STRENGTH TESTING O 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 TABLE N5.4-1 AISC 341 TABLE J6-1 O* CONCRETE: VERIFICATION OF PROTECTION FROM THE ADVERSE EFFECTS OF WEATHER, HEATING EQUIPMENT, WELDING AND OTHER POTENTIALLY HARMFUL CONDITIONS. INCLUDE MORTAR SAMPLES FILLET WELD FIT-UP: DIMENSIONS (ALIGNMENT, GAPS AT ROOT), CLEANLINESS (CONDITION OF STEEL SURFACES), TACKING (TACK WELD QUALITY AND LOCATION) O* CONTROL AND HANDLING OF WELDING AND CONSUMABLES (PACKAGING, EXPOSURE CONTROL) ACI 318: 5.6 X O* TABLE N5.4-2 AISC 341 TABLE J6-2 TABLE 1705.3 (8) ACI 318: 5.11-5.13 X CONFIGURATION AND FINISH OF ACCESS HOLES (FOR NON-SFRS, ONLY OBSERVE IS REQUIRED FOR QC) O* TABLE 1705.3 (5) ACI 318: CH. 4, 5.2-5.4 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com O* P/O** O* X MASONRY: CMU MATERIAL VERIFICATION, INSPECTION OF CMU PLACEMENT, MORTAR PRODUCT VERIFICATION, MORTAR MIXING AND CURING, MORTAR JOINTS TABLE N5.4-1 AISC 341 TABLE J6-1 USE OF QUALIFIED WELDERS TABLE 1705.3 (7) ACI 318: 5.9, 5.10 X **SEE AISC 341 TABLE J6-1 FOR TRANSITIONING FROM PERFORM TO OBSERVE -DAILY - AT SFRS ELEMENTS. O CONCRETE: INSPECTION OF FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES CONCRETE POST-INSTALLED ANCHORS: INSPECTION OF POST-INSTALLED ADHESIVE ANCHORS (INCLUDING ANCHORS WITH SUSTAINED TENSION AND UPWARDLY INCLINED ANCHORS); VERIFICATION OF INSTALLER CERTIFICATION; VERIFICATION OF APPROVED RESEARCH REPORT ACI 355.2 PREQUALIFIED TABLE N5.4-1 AISC 341 TABLE J6-1 CHECK WELDING EQUIPMENT TABLE 1705.3 (6) ASTM C 172, ASTM C 31 ACI 318: 5.6, 5.8 X SEE AISC 360 TABLE N5.4-1 FOR MORE INFORMATION - TABLE 1705.3 (12) ACI 318: 6.1.1 X CONCRETE: COMPRESSIVE STRENGTH TESTING 9/2/2014 10:57:11 AM FABRICATED STEEL TO VERIFY COMPLIANCE WITH SHOP DRAWINGS X CONCRETE REINFORCEMENT: INSPECTION OF REINFORCING STEEL AND PLACEMENT CODE / STANDARD REFERENCE (AISC 360-10 UNO) TESTING QAI (SIA) X X INSPECTION QCI SOILS: VERIFICATION THAT FOOTING EXCAVATION EXTENDS TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL SOILS: VERIFICATION THAT UNDERSLAB BASE MATERIALS HAVE BEEN PROPERLY PLACED AND COMPACTED G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-003.DWG X STRUCTURAL STEEL / STEEL ELEMENT ITEM TABLE N5.6-1 AISC 341 TABLE J7-1 TTMPS/RJA NO.: M&H NO.: DATE: DESIGNED BY: O* SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA SPECIAL INSPECTION TESTING (SEE CONT. PERIODIC SPECS) ITEM GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 TABLE 1: SPECIAL INSPECTION AND TESTING TABLE N5.6-1 AISC 341 TABLE J7-1 DRAWN BY: CHECKED BY: TYPE B-3 FINAL SUBMITTAL XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS SHEET CONTENTS STRUCTURAL SPECIAL INSPECTION TABLES SHEET NO. S-003 14 13 8'-6" 12 5'-6" 11 10 4'-3" 9 FOUNDATION PLAN GENERAL NOTES: 9'-9" 1'-1 1/4" 32'-0" 4" TOF = -1'-10 1/2" (FIELD VERIFY) 5'-2" 1'-2" 2'-0" 1'-0" 3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS, AND SYMBOLOGY. 4. STRIP FOOTINGS SHALL BE CENTERED UNDER FOUNDATION/MASONRY WALLS UNLESS NOTED OTHERWISE. 5. SLOPE FINISH GRADE AWAY FROM BUILDING. BB TOF 98'-8" 2'-0" 1'-0" DD 15'-7" GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 EE 6'-7" CONTINUOUS STRIP FOOTING REINFORCING. PROVIDE STANDARD HOOK AT BAR ENDS AS SHOWN. 5'-5" 3 S-102 1'-4" L PLAN NORTH TYPICAL FOOTING INTERSECTIONS 1 NO SCALE ENLARGED FOUNDATION PLAN (CLIN 1) 1/8" = 1'-0" 0 8" CMU WALL. GROUT ALL CELLS SOLID. (TYP.) EXISTING GRADE BEAM EXISTING PIER (BEYOND) 16' 1/2" FLEXIBLE JOINT FILLER CONCRETE FLOOR SLAB (SEE FLATWORK PLAN) #5 MASONRY DOWELS AT SAME SPACING AND LOCATIONS AS WALL REINFORCING. SEE S-001. 1/2" FLEXIBLE JOINT FILLER T.O. SLAB 100'-0" 4" (1) #5x18" BAR, DRILL AND EPOXY 6" INTO EXISTING GRADE BEAM AT 24" O.C. EQUAL T.O. FOOTING SEE FOUNDATION PLAN 1'-0" 1'-0" EQUAL #5 MASONRY DOWELS AT SAME SPACING AND LOCATIONS AS WALL REINFORCING. SEE S-001. T.O. FOOTING SEE PLAN 3'-6" EXISTING SPREAD FOOTING (BEYOND) WALL FOOTING (CLIN 1) 3/4" = 1'-0" 8' 8" CMU WALL. GROUT ALL CELLS SOLID. (TYP.) (5) #5 BARS TOP AND BOTTOM WITH #3 TIES AT 18" O.C. 4 4' 2'-0" 2 ISSUED (2) #5 BARS TOP AND (3) #5 BARS BOTTOM WITH #3 TIES AT 18" O.C. 09/05/14 WALL FOOTING (CLIN 1) TYPE B-3 FINAL SUBMITTAL 3/4" = 1'-0" PROVIDE DOWELS TO LAP WITH TYPICAL WALL REINFORCING, MATCH SIZE AND SPACING. TTMPS/RJA NO.: M&H NO.: DATE: T.O. FOOTING 99'-4" DESIGNED BY: DRAWN BY: T.O. FOOTING 98'-8" " CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS -0 1' SHEET CONTENTS 2'-6" LAP TYPICAL ENLARGED FOUNDATION PLAN AND DETAILS SEE DETAIL 2/S-102 FOR FOOTING REINFORCEMENT STEPPED FOOTING NOTES: 1. SEE FOUNDATION PLAN FOR FOOTING STEP LOCATIONS. 2. STEPPED FOOTING TO BE POURED MONOLITHICALLY. 9/2/2014 10:58:11 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-102.DWG V e n t u r e © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. 2'-0" 1'-0" TOF = -1'-10 1/2" (FIELD VERIFY) TOF 98'-8" 2 S-102 TOF 99'-4" 4 S-102 J o i n t SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA 3'-6" 1'-0" CLASS B LAP FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR FINAL DECISION. 15'-7" TOF 99'-4" CLASS B LAP BENT BAR AT CORNERS SHALL MATCH FOOTING REINFORCING 2. 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 31'-4" CLASS B LAP SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON CIVIL SITE PLAN = ELEVATION 100'-0" ON STRUCTURAL DRAWINGS. CC TOF 98'-8" 3'-6" 1'-0" TOF 99'-4" EXISTING FOOTING (TYPICAL) 6'-6" 4" AA 1. 3 STEPPED FOOTING (CLIN 1) NO SCALE SHEET NO. KEYPLAN S-102 14 13 8'-6" 12 5'-6" 11 10 4'-3" 9 FLATWORK PLAN GENERAL NOTES: 9'-9" 1'-1 1/4" 32'-0" 8'-0" STOOP X X SEE STRUCTURAL SLAB TYPES FOR SUBGRADE INFO. (2) #4 BARS CONTINUOUS T.O. PAD 100'-4" SEE NOTE 6 (TYP.) 5'-2" 1'-2" REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS, AND SYMBOLOGY. 4. REFER TO DETAIL 2/S-112 FOR STRUCTURAL SLAB TYPES. 5. FLOAT AND TROWEL FLOOR SLABS PER REQUIREMENTS OF ARCH. FLOOR FINISH SYSTEM. 6. 4'x4' DEPRESSED SLAB AT FLOOR DRAIN. DIMENSIONS ARE FROM FACE OF WALL TO CENTERLINE OF DRAIN. EVENLY SLOPE ALL SIDES OF DEPRESSED SLAB TO DRAIN. SEE ARCHITECTURAL DRAWINGS FOR TOP OF DRAIN ELEVATION. 5'-0" STOOP T.O. PAD 100'-4" DD J o i n t V e n t u r e © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. CJ CJ 15'-7" 6'-6" SEE S-102 #5 MASONRY DOWELS AT SAME SPACING AND LOCATIONS AS WALL REINFORCING 3. 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 31'-4" X 14'-6" X 8" X 6'-6" CJ CJ 8" T.O. FOOTING SEE PLAN 6'-7" 5'-5" RAMP L RAMP 100'-5" RAMP 99'-6" PLAN NORTH 1 1'-4" LANDING 100'-5" ENLARGED FLATWORK PLAN (CLIN 1) 1/8" = 1'-0" 1/4 SLAB THICKNESS (1 1/4" MINIMUM) 0 4' 8' 16' C L CONSTRUCTION JOINT FLOOR CONTROL JOINT FILLER 1/4" WIDE JOINT (2 BLADES) (SAW CUT 4 TO 12 HOURS AFTER CONCRETE IS PLACED) TYPICAL SLAB-ON-GRADE (SEE FLATWORK PLAN) 4" CONCRETE SLAB WITH 6x6-W1.4xW1.4 WWF CENTERED IN SLAB NO SCALE X X X VAPOR BARRIER (SECTION - 033000) GRANULAR, FREE DRAINING GRAVEL OR COARSE SAND AS REQUIRED BY GEOTECHNICAL REPORT AS REQ. CONCRETE SLAB CONSTRUCTION JOINT (TYPICAL) 3 X 4" MIN #4 DOWEL x 3'-0" LONG AT 36" O.C. (CENTERED IN SLAB) X SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 EE CJ CJ 5'-0" TYPE 4 CJ CJ 3/4" = 1'-0" CJ TYPICAL CONCRETE STOOP (CLIN 1) CJ 7'-6" 13'-9" CJ - X FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR FINAL DECISION. 15'-7" 2% X 2. 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com 16'-11" TSL 100'-0" TYPE 4 SLAB X SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON CIVIL SITE PLAN = ELEVATION 100'-0" ON STRUCTURAL DRAWINGS. TYPE 6 1/2" FLEXIBLE JOINT FILLER PER ARCH. DWGS. T.O. SLAB 100'-0" BB CC 5'-0" STOOP CONCRETE FLOOR SLAB (SEE FLATWORK PLAN) CJ DOOR JAMB BEYOND 4" 5'-0" STOOP AA 1. ISSUED 09/05/14 TYPE B-3 FINAL SUBMITTAL SATISFACTORY SOIL FILL AS REQUIRED BY GEOTECHNICAL REPORT (IF REQUIRED) PREPARED SUB-GRADE AS REQUIRED BY GEOTECHNICAL REPORT SEE FIRE PROTECTION PLANS FOR SIZE AND LOCATION STEEL TROWEL AND SEAL TOOL EDGES TYPICAL SLAB-ON-GRADE (SEE FLATWORK PLAN) 6" #4 BARS AT 12" O.C. EACH WAY CENTERED T.O. EQPT. PAD SEE PLAN 4 CONCRETE SLAB CONTROL JOINT "CJ" (TYPICAL) NO SCALE DATE: DRAWN BY: GRANULAR, FREE DRAINING GRAVEL OR COARSE SAND AS REQUIRED BY GEOTECHNICAL REPORT CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS SHEET CONTENTS SATISFACTORY SOIL FILL AS REQUIRED BY GEOTECHNICAL REPORT 2/3 "T" 12" M&H NO.: DESIGNED BY: "T" #4 BENT BARS AT 12" O.C. ALL AROUND 9/2/2014 10:59:02 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-112.DWG CONCRETE FLOOR SLAB (SEE DETAIL 2/S-112) TTMPS/RJA NO.: VAPOR BARRIER (SECTION - 033000) 4" MIN FLOOR CONTROL JOINT FILLER 2" CLEAR 1/8" WIDE JOINT (SAW CUT 4 TO 12 HOURS AFTER CONCRETE IS PLACED) CONCRETE SLAB WITH #4 BARS AT 16" O.C., EACH WAY, AT 2" CLEAR FROM TOP OF SLAB AS REQ. 1/4 SLAB THICKNESS (1 1/4" MINIMUM) TYPE 4 ENLARGED FLATWORK PLAN AND DETAILS PREPARED SUB-GRADE AS REQUIRED BY GEOTECHNICAL REPORT TYPE 6 VARIES SHEET NO. 12" - TYPICAL EQUIPMENT PAD (CLIN 1) NO SCALE 2 STRUCTURAL SLAB TYPES (CLIN 1) NO SCALE KEYPLAN S-112 ROOF FRAMING PLAN GENERAL NOTES: 20 19 18 17 16 15 14 13 12 11 1. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR FINAL DECISION. DIMENSIONS SHOWN FOR EXISTING CONDITIONS ARE +/-. 2. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS, AND SYMBOLOGY. 3. ONLY PERTINENT ITEMS HAVE BEEN SHOWN ON THE ROOF FRAMING PLAN. OTHER ITEMS HAVE BEEN OMITTED FOR CLARITY. 10 247'-0" 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com 1 S-142 AA 6'-4" AA BB UP BB TRUSS 'T8' CC 4 SIM S-541 EXISTING ROOF TRUSS (NO REINFORCING REQUIRED) J o i n t TRUSS 'T7' EE 6'-7" EE 1 S-541 1 S-542 2 NEW DRAFT S-542 CURTAIN EXISTING ROOF TRUSS (REINFORCING REQUIRED) K K EXISTING ROOF TRUSS (REINFORCING REQUIRED) TRUSS 'T5' J J 1 S-541 H 28'-9" EXISTING DRAFT CURTAIN TO REMAIN TRUSS 'T4' G 1 S-541 G 28'-9" EXISTING ROOF TRUSS (REINFORCING REQUIRED) F EXISTING ROOF TRUSS (REINFORCING REQUIRED) F UTILIZE THREE ROOF PURLINS WHERE REQUIRED DUE TO HEF FOAM GENERATOR LOCATION TRUSS 'T3' E H 187'-10" 187'-10" EXISTING ROOF PURLINS SUPPORTING PROPOSED HEF FOAM GENERATORS E 28'-9" 1 S-541 4 S-541 D D EXISTING ROOF TRUSS (REINFORCING REQUIRED) TRUSS 'T2' C C 1 S-541 B 28'-9" APPROXIMATE LOCATION OF PROPOSED FOAM GENERATORS. SEE FIRE PROTECTION DRAWINGS. (TYPICAL) EXISTING ROOF TRUSS (NO REINFORCING REQUIRED) A ISSUED B 09/05/14 TYPE B-3 FINAL SUBMITTAL A TRUSS 'T1' ZZ ZZ YY YY 48'-0" V e n t u r e © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. L TRUSS 'T6' 28'-9" L 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 DD 31'-2" DD SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA EXISTING ROOF TRUSS (NO REINFORCING REQUIRED) GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 CC 173'-0" 48'-0" TTMPS/RJA NO.: M&H NO.: 269'-0" DATE: DESIGNED BY: DRAWN BY: CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM 20 18 17 16 14.9 SHEET CONTENTS PLAN NORTH 1 14.1 13 OVERALL ROOF FRAMING PLAN 12 11 OVERALL ROOF FRAMING PLAN 9 1/16" = 1'-0" 0 8' 16' 32' SHEET NO. 9/2/2014 11:05:46 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-141.DWG DO NOT SCALE DRAWINGS KEYPLAN S-141 MC4x13.8 BETWEEN OUTRIGGERS (TYP. OF 3). BOND BEAM (SEE DETAIL 5/S-521). PROVIDE 10'-0" LAP IN BOND BEAM WHERE BOND BEAM CROSSES COURSING (IF BOND BEAM STEPPED). 1'-1 1/4" SEE ARCH. DWGS. FOR EXP. JOINT COVER 32'-0" 4" MC12x10.6. SEE DETAIL 7/S-142 FOR SIMILAR CONN. SEE ARCH. FOR SLOPE REQUIREMENTS. (FIELD VERIFY CONDITIONS PRIOR TO FABRICATION) 2" CLEAR 3/16 3/16 1 1/2 1 1/2 CONCENTRATED BEAM LOAD ON BOTTOM CHORD 5'-2" 4. MINIMUM JOIST BEARING LENGTH REQUIREMENTS ARE AS FOLLOWS UNLESS NOTED OR DETAILED OTHERWISE; - AT MASONRY WALLS - "K" SERIES - MIN. 4" - "KCS" SERIES - MIN. 4" - "LH" SERIES - MIN. 6" - "DLH" SERIES - MIN. 6" 18K6 SEE 7/S-521 FOR OPENING REQUIREMENTS AT TEST HEADER OPENINGS J o i n t DD X.XXX 3.601 18K6 2 S-142 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 KEYED NOTES: METAL DECK SHALL BE 1 1/2" 20 GA. TYPE 'B' METAL ROOK DECK. PROVIDE 5/8" DIAMETER PUDDLE WELDS IN A 36/5 PATTERN WITH (4) #10 TEK SIDELAP SCREWS. PROVIDE 5/8" DIAMETER PUDDLE WELDS AT 6" O.C. AROUND PERIMETER. EE 1 1/2 1 1/2 JOIST WEB JOINT ("PANEL POINT") 3 S-142 ANCHOR MC12 TO BLOCK WALL W/ L3x3x1/4 AND (2) 3/4"Ø HILTI KWIK BOLT 3 OR EQUIV. L 6 S-142 CONCENTRATED HANGER LOAD ON BOTTOM CHORD PLAN NORTH TYPICAL PROVISIONS AT CONCENTRATED LOADS ON OPEN WEB STEEL JOISTS/GIRDERS 1 NO SCALE ENLARGED FRAMING PLAN (CLIN 1) 1/8" = 1'-0" 0 MC12x10.6. SEE DETAIL 7/S-142 FOR CONN. INFO. SEE ARCH. DWG. FOR EXP. JT. COVER STEEL DECK STEEL JOIST (TYPICAL) 2" HORIZONTAL BRIDGING ANGLES BOLT TO JOISTS PER SJI STANDARDS. ANGLE SIZE, LOCATION, AND NUMBER OF ROWS TO BE BY JOIST MANUFACTURER AND SJI. 3" X 3" X 3/16" ANGLE, WELD TO JOISTS 1/8 1/8 4 4 4' 8' 16' STEEL DECK 1/2x6x0'-9" STEEL BEARING PLATE WITH (2) 1/2" DIA. X 6" HEADED "NELSON" STUD ANCHORS 1/8 1/8 4 4 STEEL JOIST STEEL JOIST 20 GA. DECK CLOSURE (TYP.) STEEL DECK 6" X 9" X 1/2" STEEL BEARING PLATE WITH (2) 1/2" DIA. X 6" HEADED "NELSON" STUD ANCHORS JOIST BEARING SEE FRAMING PLANS JOIST BEARING SEE FRAMING PLANS 4" BOND BEAM (SEE DETAIL 5/S-521) BOND BEAM (SEE DETAIL 5/S-521) VERTICAL WALL REINFORCING STEEL TO CONTINUE THRU BOND BEAMS (TYPICAL) VERTICAL WALL REINFORCING STEEL TO CONTINUE THRU BOND BEAMS (TYPICAL) BRIDGING SUPPORT ANGLE AND EXPANSION ANCHORS PER JOIST MANUFACTURERS STANDARD AND SJI. - REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS, AND SYMBOLOGY. 15'-7" L1 L1 18K6 MCJ BOTTOM CHORD HORIZONTAL BRIDGING AT BAY NEXT TO WALL. WELD OR BOLT TO ANGLE AT WALL PER SJI STANDARD. ANGLE SIZE TO BE BY JOIST MANUFACTURER AND SJI. 3. 6'-7" DO NOT DRILL MOUNTING HOLES IN BOTTOM CHORD OF JOISTS WITHOUT WRITTEN APPROVAL OF JOIST MANUFACTURER. JB 111'-4" 5'-5" NOTE: FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT/ENGINEER FOR FINAL DECISION. 1'-4" 3/16 3/16 2. EXISTING BUILDING HORIZONTAL JOIST BRIDGING AT CMU WALL V e n t u r e © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. ISSUED JOIST BEARING AT MASONRY WALL (CLIN 1) 4 3/4" = 1'-0" 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com BB 15'-7" TOP CHORD STEEL JOIST (TYPICAL) OR JOIST GIRDER - 1 HR. FIRE RATED MASONRY WALL. SEE ARCH. 4 DWGS. S-142 SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON CIVIL SITE PLAN = ELEVATION 100'-0" ON STRUCTURAL DRAWINGS. CC 31'-4" TRADE/CONTRACTOR INSTALLING HANGER OR BEAM SHALL PROVIDE EXTRA 2" x 2" x 3/16" STEEL STRUTS (1 EA. SIDE) FROM HANGER/BEAM LOCATION TO NEAREST OPPOSITE CHORD JOINT FOR ALL CONCENTRATED LOADS BETWEEN WEB JOINTS IN TOP OR BOTTOM CHORD 3.601 JOIST WEB JOINT ("PANEL POINT") 18K6 MCJ BY OTHERS AS REQUIRED CONCENTRATED LOAD ON TOP CHORD 1. 18K6 NEW MC12X10.6 1" = 1'-0" L1 MCJ NEW MC12X10.6 SEE DETAILS 6 &7/S-521 FOR OPENING REQUIREMENTS AT THROUGH WALL PIPING CANOPY OUTRIGGER SUPPORT (CLIN 1) 4" 3 S-142 1'-2" EXISTING BUILDING 6'-6" AA JB 116'-8" 6 ROOF FRAMING PLAN GENERAL NOTES: 9'-9" SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA RIP COURSE TO UNDERSIDE OF METAL DECK 4'-3" 9 5'-8" MC4x13.8 OUTRIGGERS AT 2'-0" O.C. 10 4 SPACES AT 5'-0" = 20'-0" METAL ROOF DECK (SEE FRAMING PLAN) MC4x13.8 OUTRIGGERS AT 2'-0" O.C. PL1/2x6x0'-9" WITH (1) 1/2" DIA. x 6" HEADED "NELSON" STUD ANCHOR 5'-6" 11 5'-8" 4" MIN 8'-6" 12 L1 SEE ARCH. DWGS. FOR ROOF SLOPE 1/2" MIN 20 GA. DECK CLOSURE (TYP.) 13 MCJ PL1/4x4xLENGTH REQUIRED EQUAL GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 14 EQUAL 1" = 1'-0" 2 09/05/14 JOIST BEARING AT MASONRY WALL (CLIN 1) TYPE B-3 FINAL SUBMITTAL 1" = 1'-0" WT5x16.5 MC12x10.6 DOUBLE ANGLE TRUSS MEMBER (WF COLUMN CONNECTION SIMILAR) FASTEN DECK @ 6" O.C. STEEL DECK 1/8 TOP VIEW 2 L3x3x1/4 EACH SIDE 5" TOP OF CHANNEL 18'-0"± (FIELD VERIFY) 1/8" BENT PLATE BETWEEN BAR JOISTS WITH 6" (MIN.) WIDE TOP FLANGE AND 2" (MIN.) WIDE BOTTOM FLANGE. HEIGHT AS REQUIRED. (6) 3/4"Ø BOLTS DOUBLE ANGLE TRUSS MEMBER STEEL CHANNEL CONNECTION (CLIN 1) 1" = 1'-0" 5/8" DIA. PUDDLE WELDS @ 6" O.C. JOIST BEARING SEE FRAMING PLANS JOIST BEARING VARIES METAL DECK (SEE PLAN) TTMPS/RJA NO.: M&H NO.: DATE: DESIGNED BY: DRAWN BY: RIP COURSE TO UNDERSIDE OF METAL DECK CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS BOND BEAM (SEE DETAIL 5/S-521) SHEET CONTENTS BOND BEAM (SEE DETAIL5/S-521). PROVIDE 10'-0" LAP IN BOND BEAM WHERE BOND BEAM CROSSES COURSING (IF BOND BEAM STEPPED). ENLARGED FRAMING PLAN AND DETAILS MASONRY WALL (SEE PLAN) MC12x10.6 SHEET NO. WT5x16.5 7 4" X 6" X 1/4" STEEL BEARING PLATE @ 12" O.C. WITH (2) 1/2" DIA. X 6" HEADED "NELSON" STUD ANCHORS VERTICAL WALL REINFORCING STEEL TO CONTINUE THRU BOND BEAMS (TYPICAL) (6) 3/4"Ø BOLTS 9/2/2014 11:00:04 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-142.DWG L3x3x1/4 EACH SIDE OF WT. BOLT TO WT W/ (3) 3/4"Ø BOLTS (TYP.) L4x4x1/4xCONTINUOUS, WITH 3/4" DIAMETER x 4" LONG HEADED STUDS AT 24" O.C. 5 SHEAR TRANSFER DETAIL BETWEEN BAR JOISTS (CLIN 1) 1" = 1'-0" 3 STEEL DECK BEARING AT MASONRY WALL (CLIN 1) 1" = 1'-0" KEYPLAN S-142 MASONRY WALL ABOVE (SEE PLAN) 8" CMU GROUT SOLID ALL CORES 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com EQ. WALL REINFORCEMENT CONTINUOUS INTO BOND BEAM 3" (1) COURSE BOND BEAM WITH (2) #5 BARS, CONTINUOUS AT BOTTOM 3" EQ. 9 GAUGE GALVANIZED REBAR POSITIONER AT 6'-0" MAX. VERTICAL SPACING MASONRY OPENING BELOW REINFORCING BAR FULL HEIGHT. SEE DETAILS FOR SIZE AND SPACING. LAP SPLICE ALL BARS 48 BAR DIAMETERS (MINIMUM) RUN VERTICAL REINFORCING TO TOP OF WALL L1 LINTEL (CLIN 1) NO SCALE 1 (2) #5 BARS CONTINUOUS (BAR LAP LENGTH TO BE 30") (TYPICAL U.N.O.) TYPICAL TYPICAL VERTICAL BAR PLACEMENT IN MASONRY CORE (CLIN 1) 1 1/2" = 1'-0" 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 TOP OF WALL SEALANT (TYP. ALL INTERIOR WALL FACES) HORIZONTAL WALL REINFORCING TO BE CONTINUOUS THRU JOINT CONTINUOUS BACKER ROD (BOTH SIDES OF JOINT) HORIZONTAL JOINT REINFORCING SHALL NOT RUN THRU CONTROL JOINT (2) #5 BARS CONTINUOUS (BAR LAP LENGTH TO BE 30") (TYPICAL U.N.O.) INTERMEDIATE 5 THESE ARE TYPICAL REQUIREMENTS THAT APPLY TO ALL BOND BEAMS. INCORPORATE OTHER PROVISIONS REQUIRED BY SPECIFIC DETAILS ELSEWHERE. TYPICAL MASONRY BOND BEAM (CLIN 1) 1" = 1'-0" PREFORMED RUBBER CONTROL JOINT SEALANT (TYP. ALL EXTERIOR WALL FACES) (1) VERTICAL BAR FULL HEIGHT, SIZE TO MATCH WALL REINFORCING. (TYPICAL EACH SIDE OF CONTROL JOINT) GROUT ALL CORES SOLID. SEE GENERAL NOTES FOR SPACING REQUIREMENTS (U.N.O.) CMU BOND BEAM (SEE PLANS) 2 RATED FIRE SAFING PER SPECS/CODE AT RATED WALLS (SOLID GROUT ELSEWHERE) JAMB REINFORCEMENT CONTINUOUS FULL HEIGHT ALL CORES GROUTED SOLID 2'-0" CONCRETE MASONRY CONTROL JOINT (CLIN 1) NO SCALE TYPICAL SEE DETAIL 1/S-521 FOR BAR PLACEMENT AND LAP REQUIREMENTS. STAINLESS STEEL ESCUTCHEONS 8" (1) BAR PER CORE ELEVATION COPE BOTTOM OF CMU BOND BEAM TO ALLOW JAMB REINFORCEMENT CONTINUOUS FULL HEIGHT CMU BOND BEAM LINTEL (SEE PLANS) 6 GROUT ALL CORES SOLID SINGLE PIPE PENETRATION AT MASONRY WALL (CLIN 1) NO SCALE BAR SIZE AND SPACING PER PLANS 2'-0" TYPICAL GROUT ALL CORES SOLID 24" TYP. (2) #5 BARS VERTICAL SECTION 9 (1) BAR PER CORE TYPICAL CMU BOND BEAM LINTEL AT JAMB (CLIN 1) (2) #5 BARS HORIZONTAL NO SCALE TYP. MASONRY REINFORCEMENT AT CORNERS AND WALL ENDS (CLIN 1) 3 J o i n t V e n t u r e © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 WALL REINFORCING CONTINUOUS SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA 8 RIP COURSE ABOVE BOND BEAM FOR SLOPED OR VARYING HEIGHT TOP OF WALLS ISSUED 09/05/14 TYPE B-3 FINAL SUBMITTAL 3/4" = 1'-0" LINTEL (SEE PLAN OR SCHEDULE) (2) #5 BARS HORIZONTAL 24" TYP. 48 BAR DIAMETERS TTMPS/RJA NO.: M&H NO.: DESIGNED BY: NOTE: IN ADDITION TO OPENINGS SHOWN ON THE DRAWINGS, MASONRY AND STEEL WORK SHALL INCLUDE PROVIDING MASONRY WALL OPENINGS AND ASSOCIATED LINTELS REQUIRED FOR MECHANICAL/ELECTRICAL EQUIPMENT (OTHER THAN INDIVIDUAL PIPE PENETRATIONS FIELD DRILLED BY THE APPROPRIATE TRADES DURING THEIR WORK), INCLUDING COORDINATING WITH OTHER TRADES, GENERAL CONTRACTOR, ARCHITECT/ENGINEER, AND FINAL MECHANICAL AND ELECTRICAL DRAWINGS TO VERIFY EXACT SIZES AND LOCATIONS OF ALL SUCH OPENINGS AS WORK PROGRESSES. FINAL SIZES MAY NOT BE AVAILABLE UNTIL EQUIPMENT SHOP DRAWINGS ARE RECEIVED FROM SUCCESSFUL BIDDERS. ALL PARTIES SHOULD BE PREPARED TO PLAN AND COOPERATE ACCORDINGLY TO AVOID UNNECESSARY DELAYS IN THE WORK. 9/2/2014 11:01:01 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-521.DWG DATE: 7 TYPICAL MASONRY OPENING REINFORCEMENT (CLIN 1) NO SCALE DRAWN BY: CHECKED BY: XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS (2) #5 BARS CONTINUOUS (U.N.O.) SHEET CONTENTS MASONRY DETAILS TYPICAL BOND BEAM (SEE DETAIL) SHEET NO. 4 TYPICAL BOND BEAM INTERSECTION (CLIN 1) 1" = 1'-0" S-521 AT TRUSSES T2, T3 AND T4 ONLY 2 S-541 2 AT TRUSSES T2, T3 AND T4 ONLY S-541 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com AT TRUSSES T5 AND T6 ONLY 3 S-541 3 AT TRUSSES T5 AND T6 ONLY S-541 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 J o i n t V e n t u r e EXISTING TRUSS ELEVATION (REINFORCE WHERE SHOWN) 1/8" = 1'-0" NOTE: FIELD VERIFY HEF FRAME LOCATIONS WITH EXISTING ROOF STRUCTURE AND THE FIRE PROTECTION DRAWINGS PRIOR TO FABRICATION. FRAME TO EXISTING ROOF PURLINS OUTSIDE OF EACH END OF HEF UNIT. (3) PURLINS MAY BE NECESSARY. PROVIDE EXTRA VERTICAL ANGLES AT LOCATIONS WHERE (3) PURLINS ARE UTILIZED. EXISTING ROOF PURLIN, TYPICAL L3x3x3/8, TYPICAL, WITH 1/2" DIA. THRU BOLTS AT JOINTS L3x3x3/8 DIAGONAL WITH 1/2" DIA. THRU BOLTS AT JOINTS. MAX. SLOPE 1.75:1 (UTILIZE THREE ROOF PURLINS WHEN EXCEEDED) "± 2'-6 D L (FIE Y) IF VER L4x3x3/8LLV, WITH 3/8" END PLATES BOLT TO EX. PURLIN FLANGE AND WEB EACH END OF EXIST. TRUSS WEB 3/16 3/16 NEW PL3/16x1 EACH SIDE 2 2 NOTE: SEE S-002 FOR STRUCTURAL STEEL NOTES. B WT5x19.5, TYP. BOLTED TO EX. PURLIN WITH (4) 1/2" DIA. THRU BOLTS 1/4 TYP ER LD V IE ± (F 3/16 3/16 ISSUED 09/05/14 8" EACH END, 2" AT 7" O.C. CONT. WELD NEW BAR TO EXISTING GUSSET PLATES (TYPICAL) B 11'-0"± L3x3x3/8 DIAG. BRACE, ATTACH TO FRAME ON OPP. SIDE OF HEF UNIT (FIELD VERIFY ) A EXISTING GUSSET PLATE NEW PL1/2x4 A DRAWN BY: 6" EACH END, 2" AT 5" O.C. INT. 3'-10" 4 HEF UNIT SUPPORT NO SCALE EXISTING TRUSS WEB (LL3x2-1/2x1/4) NEW PL3/16x1 3/16 3 EXISTING TRUSS REINFORCEMENT AT TRUSSES T5 AND T6 3/8" = 1'-0" CHECKED BY: DETAIL A-A 2 EXISTING TRUSS REINFORCEMENT AT TRUSSES T2, T3 AND T4 3/8" = 1'-0" XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS EXISTING TRUSS CHORD (LL4x3x3/8) NEW 4" PLATE DETAIL B-B HEF UNIT, REFER TO FIRE PROTECTION DRAWINGS (WEIGHT = APPROX. 400 LBS.) 9/2/2014 11:01:43 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-541.DWG NEW PL5/16x4 5'-4"X5'-4" M&H NO.: DESIGNED BY: EXISTING TRUSS PL1/2x4x0'-10", TYPICAL LOCATE AT HEF BOLT LOCATIONS TTMPS/RJA NO.: DATE: EXISTING TRUSS L4x3x3/8LLV EACH SIDE OF HEF UNIT TYPE B-3 FINAL SUBMITTAL 1/4 1/4 IFY) " 9'-6 SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA 1 GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. SHEET CONTENTS TRUSS REINFORCEING DETAILS SHEET NO. S-541 TRIM DRAFT CURTAIN FOR CHANGE IN ORIENTATION. PROVIDE FILLER OR CLOSURE PLATES AS NECESSARY. 3 S-542 MITER STEEL ANGLES AND PROVIDE 1/4" CONNECTION PLATE WITH (1) 1/2" DIA. THRU BOLT AT THE END OF EACH MEMBER (TYP.) 2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com NEW L4x4x1/4 CONT. BOLT TO BOTTOM FLANGE OF EACH ROOF PURLIN WITH (2) 1/2" DIA. THRU BOLTS 2 S-542 12 4 NEW L2-1/2x2-1/2x1/4 HANGER AT EACH EXIST. ROOF PURLIN. BOLT TO NEW CONT. ANGLES AT TOP AND BOTTOM WITH (1) 1/2" DIA. THRU BOLT EACH END EXISTING CRANE 5'-0"± (FIELD VERIFY) 3384 PEACHTREE RD. NE SUITE 550 ATLANTA, GA 30326 USA (404) 239-1000 J o i n t DRAFT CURTAIN ELEVATION AT TRUSS 'T6' 1/8" = 1'-0" EXISTING W10x15 ROOF PURLIN (FIELD VERIFY SIZE) EXISTING W10x15 ROOF PURLIN (FIELD VERIFY SIZE) EXISTING W10x15 ROOF PURLIN (FIELD VERIFY SIZE) 1/4" PLATE (ROTATE AS REQ'D TO RECEIVE KICKER) (1) 1/2" DIA. THRU BOLT L4x4x1/4 CONTINUOUS. BOLT TO BOTTOM FLANGE OF EXISTING ROOF PURLINS WITH (2) 1/2" DIA. THRU BOLTS CLIP HORIZ. LEG AND EXTEND VERT. LEG OF STEEL ANGLE OVER L4X4 EXTEND DRAFT CURTAIN TO WITHIN 1" OF ROOF DECK L4x4x1/4 CLIP ANGLE BOLTED TO BOTTOM FLANGE OF EXISTING ROOF PURLINS WITH (2) 1/2" DIA. THRU BOLTS. CLIP HORIZ. LEG AND EXTEND VERT. LEG OF STEEL ANGLE OVER L4X4 NOTE 1: (1) 1/2" DIA. THRU BOLT EACH END L4x4x1/4 CONTINUOUS. BOLT TO BOTTOM FLANGE OF EXISTING ROOF PURLINS WITH (2) 1/2" DIA. THRU BOLTS DIMENSIONS SHOWN ARE APPROXIMATE. BOTTOM OF DRAFT CURTAIN ELEVATION SHALL NOT BE MORE THAN SEVEN-EIGHTHS OF THE DISTANCE FROM THE FLOOR TO THE ROOF DECK (I.E. HEIGHT OF DRAFT CURTAIN SHALL NOT BE LESS THAN ONE-EIGHTH THE DISTANCE FROM THE FLOOR TO THE ROOF DECK). 6'-0"± EXISTING TRUSS 'T6' STEEL ANGLE KICKER AT EACH VERTICAL HANGER. 2:1 MAX. SLOPE. STEEL ANGLE SIZE IS BASED ON THE FOLLOWING: LENGTHS UP TO 8'-0": L3x3x1/4 8'-0" TO 13'-0": L4x4x1/4 OR (2) L3x3x1/4 5'-6" ± 5'-0"± EXISTING TRUSS 'T6' NEW METAL DECK DRAFT CURTAIN. 1 1/2" TYPE B, 20 GAUGE METAL DECK. PROVIDE #10 TEK SCREWS AT 12" O.C. (MAX) AT STEEL ANGLES AND ALL SIDELAPS. PAINT TO MATCH EXISTING DRAFT CURTAIN. L4x4x1/4 CLIP ANGLE BOLTED TO BOTTOM FLANGE OF EXISTING ROOF PURLINS WITH (2) 1/2" DIA. THRU BOLTS. (1) 1/2" DIA. THRU BOLT EXISTING TRUSS 'T7' VARIES EXTEND DRAFT CURTAIN TO WITHIN 1" OF ROOF DECK 1/4" PLATE (ROTATE AS REQ'D TO RECEIVE KICKER) SEE DETAIL 2/S-542 FOR DRAFT CURTAIN INFORMATION (1) 1/2" DIA. THRU BOLT EACH END © Copyright 2014 2014 This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents. ISSUED 09/05/14 STEEL ANGLE KICKER AT EACH VERTICAL HANGER. 2:1 MAX. SLOPE. STEEL ANGLE SIZE IS BASED ON THE FOLLOWING: LENGTHS UP TO 8'-0": L3x3x1/4 8'-0" TO 13'-0": L4x4x1/4 OR (2) L3x3x1/4 TTMPS/RJA NO.: M&H NO.: DATE: DESIGNED BY: DRAWN BY: CHECKED BY: 9"± L3x2x1/4 LLV CONT. SEE NOTE 1 VARIES (1) 1/2" DIA. THRU BOLT L2-1/2x2-1/2x1/4 VERTICAL HANGER AT EACH ROOF PURLIN 2 9/2/2014 11:04:59 AM G:\USERS\DMATTHEWS\SANGB\AUTOCAD\B-3\S-542.DWG L3x2x1/4 LLV CONT. DRAFT CURTAIN NO SCALE (1) 1/2" DIA. THRU BOLT L2-1/2x2-1/2x1/4 VERTICAL HANGER AT EACH ROOF PURLIN SAVANNAH/HILTON HEAD IAP, GEORGIA SAVANNAH, GEORGIA 1 V e n t u r e GEORGIA, ANG - 165TH AW/CES REPAIR FIRE SUPRRESSION, B1905 ANG PROJECT NO.: XDQU 112284 173'-0" ± OUT TO OUT OF EXISTING ROOF TRUSSES(FIELD VERIFY) BOTTOM OF DRAFT CURTAIN NOTES: 1. DO NOT ATTACH ANY DRAFT CURTAIN COMPONENTS TO THE EXISTING TRUSSES. 2. TRIM DRAFT CURTAIN TO FIT AROUND EXISTING FRAMING AND OTHER APPURTENANCES. CARE SHOULD BE TAKEN AROUND EXISTING FALL ARREST SYSTEM. ANY RECONFIGURATION OF THE EXISTING FALL ARREST SYSTEM WILL REQUIRE RECERTIFICATION AT THE EXPENSE OF THE CONTRACTOR. NEW L3x2x1/4 LLV CONT. BOLT TO EACH VERTICAL ANGLE WITH (1) 1/2" DIA. THRU BOLT 20'-6"± (FIELD VERIFY) EXISTING CRANE 47'-8" TO BOTTOM OF DRAFT CURTAIN DRAFT CURTAIN ORIENTATION TYPE B-3 FINAL SUBMITTAL XDQU 112284 32651-00-131317.01 05 SEP 2014 DRM MJE DRM DO NOT SCALE DRAWINGS SHEET CONTENTS BOT. OF DRAFT CURTAIN 47'-8" A.F.F. 3 SECTION NEAR RIDGE NO SCALE DRAFT CURTAIN DETAILS SHEET NO. S-542