2014-11-24 1600 West Loop TIA Final
Transcription
2014-11-24 1600 West Loop TIA Final
EXECUTIVE SUMMARY As requested by Gensler, Walter P Moore has conducted a traffic impact analysis for a proposed mixed-use development at 1600 West Loop in Houston, Texas. The purpose of the study was to determine the potential impacts to traffic operations in the area related to the proposed development. The site is bounded by IH 610 southbound frontage road to the east, Holly Hurst to the west, Post Oak Boulevard to the north, and Hallmark Street to the south. The proposed site is anticipated to open in 2016. Study Area Eleven existing intersections in the study area were analyzed as part of the Traffic Impact Analysis. The intersections include: Post Oak Blvd. at IH 610 NB Frontage Road (signalized) Post Oak Blvd. at IH 610 SB Frontage Road (signalized) San Felipe at IH 610 NB Frontage Road (signalized) San Felipe at IH 610 SB Frontage Road (signalized) Post Oak Blvd. at Hollyhurst Ln. (signalized) San Felipe at Hallmark Dr. (signalized) Hollyhurst Ln. at Hallmark Dr. (minor street stop control) IH 610 Southbound Frontage Road at North Driveway (minor street stop control) IH 610 Southbound Frontage Road at South Driveway (minor street stop control) Hollyhurst at North Parking Lot Driveway (minor street stop control) Hollyhurst at South Parking lot Driveway (minor street stop control) Trip Generation/Distribution The Institute of Transportation Engineers (ITE) publication, Trip Generation, 9th edition, was used to determine the amount of traffic generated by the development. The generated site trips were distributed to area intersections using a combination of existing and expected travel patterns. Background volumes for the year 2016 were developed considering a 1% annual growth rate plus projected traffic from three nearby proposed developments: Alpha Tower development, Four Oaks Place, and JLB Post Oak. Projected AM peak hour and PM peak hour traffic volumes were determined by adding the site generated traffic to background traffic volumes. Analysis Intersection operations were analyzed using Synchro 8.0, software developed to automate procedures found in the Highway Capacity Manual. Capacity analyses were performed for existing conditions; Background conditions including projected traffic from the proposed adjacent developments; Projected conditions which include the background conditions plus site generated traffic for the 1600 West Loop development. The following changes in intersection levels of service were seen during the peak hours when comparing background and proposed conditions that may require mitigation: 1600 West Loop Traffic Impact Analysis Page i PM Peak Hour Post Oak Blvd. at Hollyhurst Ln o The intersection currently operates at LOS C (33.7 sec/veh). o The intersection will degrade to LOS D (41.5) in the background condition. o When considering the proposed development, the intersection will operate at LOS F (81.2 sec/veh). Mitigation To mitigate the impact of the proposed 1600 West Loop development, a turn bay for the northbound right turn movement should be provided at the intersection of Post Oak Blvd. and Hollyhurst. Additionally, if the turn bay is added, the traffic signal timings should be adjusted to accommodate the revised lane configuration. At this time, there is limited right-of-way at this intersection. The property in the southeast corner is built to the right-of-way line. The property owner is dedicating ROW to the City of Houston along their property for future widening of Hollyhurst. Due to the restricted right-of-way, a feasible alternative is to adjust the signal timing plan. Retiming the intersection will improve the level of service during the PM peak from LOS F (81.2 sec/veh) to LOS E (74.6 sec/veh). A comparison of level of service from the background condition, the proposed conditions, and both mitigation options can be seen in Table 11 and Table 12. It is also recommended to not allow U-turns particularly for the eastbound movement to further reduce delays. A no U-turn sign could be posted. Summary Based on this traffic impact analysis for the proposed 1600 West Loop development, there will be some impact to the surrounding intersections when the adjacent developments and the proposed development are fully built and operational. With the adjacent developments and the proposed 1600 West Loop development, travel patterns on Post Oak Blvd., Hollyhurst Ln. Hallmark Dr. San Felipe, and the IH 610 frontage roads will change. Retiming the traffic signals and optimizing the network offset can reduce overall delay along Post Oak Blvd. and Hollyhurst Ln. It is recommended that the developer work with the City of Houston to ensure that signal timings at the surrounding intersections are optimized and coordinated when the proposed site is fully developed. 1600 West Loop Traffic Impact Analysis Page ii CONTENTS INTRODUCTION ............................................................................................................................... 1 AREA CONDITIONS ......................................................................................................................... 1 Roadways ..................................................................................................................................... 1 Intersections ................................................................................................................................. 2 Volumes ........................................................................................................................................ 3 PLANNED DEVELOPMENT .............................................................................................................. 4 Site Development .......................................................................................................................... 4 PROJECTED CONDITIONS .............................................................................................................. 4 Trip Generation ............................................................................................................................. 4 Trip Distribution ............................................................................................................................. 5 TRAFFIC ANALYSIS ....................................................................................................................... 10 Existing Conditions...................................................................................................................... 11 Background Conditions .............................................................................................................. 12 Proposed Conditions .................................................................................................................. 12 Level of Service Comparison ....................................................................................................... 18 MITIGATION ANALYSIS.................................................................................................................. 19 CONCLUSIONS AND RECOMMENDATIONS................................................................................. 21 TAB ONE: TAB TWO: TAB THREE: TAB FOUR: TAB FIVE: Existing Traffic Volumes Existing Conditions Capacity Analysis Background Conditions Capacity Analysis Proposed Conditions Capacity Analysis Proposed Mitigation Analysis 1600 West Loop Traffic Impact Analysis Page iii LIST OF FIGURES FIGURE 1: Site Location Map FIGURE 2: Existing Lane Configurations FIGURE 3: Existing Volumes AM Peak Hour FIGURE 4: Existing Volumes PM Peak Hour FIGURE 5: Proposed Site Layout FIGURE 6: AM Peak Hour Site Generated Trips FIGURE 7: PM Peak Hour Site Generated Trips FIGURE 8: Proposed Inbound Trip Distribution (Hotel) FIGURE 9: Proposed Inbound Trip Distribution (Restaurant) FIGURE 10: Proposed Inbound Trip Distribution (Office) FIGURE 11: Proposed Outbound Trip Distribution (Hotel) FIGURE 12: Proposed Outbound Trip Distribution (Restaurant) FIGURE 13: Proposed Outbound Trip Distribution (Office) FIGURE 14: AM Peak Hour Background Development Site Generated Trips FIGURE 15: PM Peak Hour Background Development Site Generated Trips FIGURE 16: Background Volumes (2016) AM Peak Hour FIGURE 17: Background Volumes (2016) PM Peak Hour FIGURE 18: Proposed Volumes (2016) AM Peak Hour FIGURE 19: Proposed Volumes (2016) PM Peak Hour FIGURE 20: Existing LOS and Delay AM Peak Hour FIGURE 21: Existing LOS and Delay PM Peak Hour FIGURE 22: Background (2016) LOS and Delay AM Peak Hour FIGURE 23: Background (2016) LOS and Delay PM Peak Hour FIGURE 24: Proposed (2016) LOS and Delay AM Peak Hour FIGURE 25: Proposed (2016) LOS and Delay PM Peak Hour 1600 West Loop Traffic Impact Analysis Page iv LIST OF TABLES TABLE 1: Existing Peak Hour Volumes TABLE 2: Trip Generation Equations TABLE 3: Trip Generation Volumes TABLE 4: Adjacent Developments Trip Generation Volumes TABLE 5: AM Peak Hour Traffic Volumes TABLE 6: PM Peak Hour Traffic Volumes TABLE 7: Level of Service Criteria for Signalized Intersections TABLE 8: Level of Service Criteria for Unsignalized Intersections TABLE 9: AM Peak Hour Level of Service Comparison TABLE 10: PM Peak Hour Level of Service Comparison TABLE 11: Post Oak Blvd. at Hollyhurst Ln: Mitigation - AM Peak Hour TABLE 12: Post Oak Blvd. at Hollyhurst Ln: Mitigation - PM Peak Hour 1600 West Loop Traffic Impact Analysis Page v INTRODUCTION As requested by Gensler, Walter P Moore conducted a traffic impact analysis for a proposed development which will include a 260 room hotel and conference center, 27,000 square feet of quality restaurants, and 363,250 SF of office space in Houston, Texas. The purpose of the study was to determine the potential impacts to traffic operations in the area related to the proposed development. Transportation and site improvements to mitigate impacts were investigated, if necessary. AREA CONDITIONS The proposed 1600 West Loop development is located east of Uptown Houston on the IH 610 West Loop. The site is bordered by the IH 610 southbound frontage road to the east, Hollyhurst to the west, Post Oak Boulevard to the north, and Hallmark to the south. Currently, the northeast corner of the site is occupied by an existing office building and a Bentley car dealership. Several other projects are under construction or in the design phase in the surrounding area. Information regarding these developments was provided by the City of Houston for use in this study. • Alpha Tower is located west of the site. It includes 830,000 SF of office development. The Alpha Tower development is anticipated to open in 2016. • Four Oaks Place is located west of the site. It includes 540,000 SF of office space. It is under construction and expected to open in 2015. • JLB Post Oak is a proposed multifamily development located west of the site. It includes 350 apartment units and 74 residential condominiums. JLB Post Oak is anticipated to open in 2015. A site location map showing the general location of the proposed development is provided in Figure 1. The following sections describe the existing conditions in the study area. ROADWAYS The primary roadways in the study area are San Felipe Street, Post Oak Blvd., Hollyhurst Lane, Hallmark Drive, and the IH 610 frontage roads. They are described in the following paragraphs. 1600 West Loop Traffic Impact Analysis Page 1 \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-01.dwg Nov 24, 2014 - 3:40am Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 SITE LOCATION MAP WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. San Felipe Street is an east-west major thoroughfare. It has three lanes in each direction divided by a landscaped median. Left turn bays are located at major intersections. The posted speed limit on San Felipe is 35 mph. Post Oak Boulevard is a north-south major thoroughfare. It has three lanes in each direction divided by a landscaped median. Left turn bays are located at major intersections. The posted speed limit on Post Oak Blvd. is 35 mph. Hollyhurst Lane is a north-south local street. It has one lane in each direction. The posted speed limit on Hollyhurst Ln. is 30 mph. Hallmark Drive is an east-west local street that connects the southbound IH 610 frontage road to San Felipe. It has one lane in each direction and parking allowed on-street. The speed limit on Hallmark Dr. is 30 mph. IH 610 Frontage Roads run north and south. Both frontage roads have 3 lanes in each direction and provide connection to the IH 610 West Loop. The posted speed limits on the frontage roads is 45 mph. INTERSECTIONS There are eleven existing intersections in the study area that were analyzed as part of this study. The existing lane configurations can be seen in Figure 2. The intersections include: • Post Oak Blvd. at IH 610 NB Frontage Road (signalized) • Post Oak Blvd. at IH 610 SB Frontage Road (signalized) • San Felipe at IH 610 NB Frontage Road (signalized) • San Felipe at IH 610 SB Frontage Road (signalized) • Post Oak Blvd. at Hollyhurst Ln. (signalized) • San Felipe at Hallmark Dr. (signalized) • Hollyhurst Ln. at Hallmark Dr. (minor street stop control) • IH 610 Southbound Frontage Road at North Driveway (minor street stop control) • IH 610 Southbound Frontage Road at South Driveway (minor street stop control) • Hollyhurst at North Parking Lot Driveway (minor street stop control) • Hollyhurst at South Parking Driveway (minor street stop control) 1600 West Loop Traffic Impact Analysis Page 2 Nov 24, 2014 - 3:40am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-02A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING LANE CONFIGURATIONS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:40am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-02B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING LANE CONFIGURATIONS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. VOLUMES Turning movement counts were collected at the intersections in the study area on Tuesday, April 1, 2014. Data was collected from 7:00-9:00 AM and 4:00-6:00 PM. Table 1 shows the existing traffic volumes and Figures 3 and 4 illustrate the existing AM peak hour (7:45 AM ~ 8:45 AM) and PM peak hour (4:00 PM ~ 5:00 PM) volumes. Existing counts are found under TAB ONE. Table 1: Existing Peak Hour Volumes Analysis Period AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM Turning Movement Volumes Eastbound Westbound Northbound Southbound Thru Left Thru Right Left Thru Right Left Right Left Thru Right (1) IH 610 Northbound Frontage Road at Post Oak Blvd. 466 709 128 194 196 491 93 1569 366 289 423 80 853 35 (2) IH 610 Southbound Frontage Road at Post Oak Blvd. 603 88 30 294 572 502 1154 1673 120 95 274 262 531 541 (3) IH 610 Northbound Frontage Road at San Felipe 521 899 755 355 916 1105 331 751 782 1023 523 364 959 178 (4) IH 610 Southbound Frontage Road Road at San Felipe 1043 499 331 1340 377 690 367 1263 555 474 913 270 837 94 (5) Post Oak Blvd. at Hollyhurst 102 616 87 37 1327 57 13 6 40 58 35 365 181 1526 37 8 705 91 12 18 183 110 15 292 (6) San Felipe at Hallmark 65 1576 1 25 1341 74 3 4 6 4 5 48 42 1604 5 32 985 79 27 6 32 8 7 84 (7) Hollyhurst at Hallmark 87 38 23 25 36 34 78 46 48 29 56 57 (9) IH 610 Southbound Frontage Road at Hallmark 44 522 81 171 818 17 (11) IH 610 Southbound Frontage Road at South Driveway 4 598 100 28 800 7 (12) IH 610 Southbound Frontage Road at North Driveway 4 601 1 6 826 4 (13) Hollyhurst at North Parking Lot Driveway 1 2 112 22 24 38 11 25 119 1 3 99 (14) Hollyhurst at South Parking Lot Driveway 0 0 106 0 0 68 0 0 129 0 0 107 - 1600 West Loop Traffic Impact Analysis Page 3 Nov 24, 2014 - 3:40am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-03A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING VOLUMES AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:40am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-03B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING VOLUMES AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:40am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-04A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING VOLUMES PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:40am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-04B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING VOLUMES PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. PLANNED DEVELOPMENT SITE ITE DEVELOPMENT The proposed 1600 West Loop development is located east of Uptown Houston on the IH 610 southbound frontage road. The site is bordered by IH 610 southbound frontage road to the east, Hollyhurst Ln. to the west, Post Oak Blvd. to the north, and Hallmark Dr. to the south. The project site plan is provided in Figure 5. The proposed development includes two parcels of quality restaurants, an office building with a garage, and a hotel and conference center. The proposed development is anticipated to open in 2016. PROJECTED CONDITIONS TRIP GENERATION To complete a Traffic Impact Analysis for the proposed development, the number of trips expected to be generated by the planned facilities must be determined. The number of trips generated by the development during an average weekday, and for weekday peak hours, is based on the land use type and size of the building. Standard rates for an office building (Land Use 710 – General Office Building), Hotel ( Land Use 310 - Hotel), and Quality Restaurant (Land Use 931 – Quality Sit-Down Restaurant), from the Institute of Transportation Engineers (ITE) publication, Trip Generation, 9th edition, were used to determine the amount of traffic generated by the development. The average rate and the regression equations were used to estimate trips generated during the Weekday, AM Peak Hour, and PM Peak Hour in accordance with the City of Houston’s Traffic Impact Study Guidelines. The trip generation equations and/or average trip generation rates for Quality Restaurant, General Office Building, and Hotel together with the directional distribution are presented in Table 2. 2 Table 2: Trip Generation Equations ITE Land Use Quality Restaurant (931) Weekday Weighted Average Rate Directional Distribution Fitted Curve Equation Office (710) Directional Distribution 89.95 Directional Distribution PM Peak Hour 0.81 7.49 Enter Exit Enter Exit Enter Exit 50% 50% 82% 18% 67% 33% Ln(T)=0.76Ln(x)+3.68 Ln(T)=0.80Ln(x)+1.57 Ln(T)=1.12Ln(x)+78.45 Enter 50% Weighted Average Rate Hotel (310) AM Peak Hour Exit Enter 50% 88% 0.98 Exit Enter 12% 17% 0.53 Exit 83% 0.60 Enter Exit Enter Exit Enter Exit 50% 50% 59% 41% 51% 49% X= 1,000 Sq ft Gross Floor Area 1600 West Loop Traffic Impact Analysis Page 4 Nov 24, 2014 - 3:41am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-05.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED SITE LAYOUT WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Table 3 shows a summary of the trips generated by the proposed development land uses. Figures 6 and 7 illustrate the proposed site generated trips.. Table 3: Trip Generation Volumes Trip Generation (vehicles per hour) 1 Size Development1 Weekday Traffic (VPD) Weekday Peak Hour AM Total Exit Total Total Enter Exit Quality Restaurant (931) 27,000 SF 2,428 22 18 4 202 135 67 Office (710) 363,250 SF 3,499 537 473 64 485 82 403 Hotel (310) 260 Rooms Total Trip Generation 1 Enter PM 1,954 138 81 57 156 80 76 7,881 7,881 697 572 125 125 843 297 297 546 Information Provided by Owner TRIP DISTRIBUTION After determining the number of trips generated by the proposed development, the trips were distributed among roadways accessing the site using a combination of existing and expected travel patterns. This process involves examining the roadways and the expected travel patterns between the site and other trip ends, based on available routes in the study area. All traffic assignments were made over the most reasonable routes for each direction. Figures 8 through 10 illustrate the proposed inbound trip distribution for quality restaurant, office, and hotel, respectively while Figures 11 through 13 illustrate the proposed outbound trip distribution. In accordance with City of Houston’s Traffic Impact Analysis Guidelines, background traffic volumes for 2016 were calculated using a 1% annual growth rate. As discussed with City of Houston staff, projected trips from adjacent developments were included in the calculations of background traffic. In addition to the site generated trips by the proposed development, several other projects are under construction or in the design phase in the surrounding area. Table 4 shows a summary of the predicted trips generated by adjacent projects. Figures 14 and 15 illustrate the background site generated trips. 1600 West Loop Traffic Impact Analysis Page 5 Nov 24, 2014 - 3:41am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-06A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 AM PEAK HOUR 1600 WEST LOOP SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-06B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 AM PEAK HOUR 1600 WEST LOOP SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-07A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PM PEAK HOUR 1600 WEST LOOP SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-07B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PM PEAK HOUR 1600 WEST LOOP SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 2 3 25%(15%) 1 3%(8%) 4 6%(12%) 6%(5%) 14%(9%) 15%(20%) 5 8%(4%) 5%(8%) 6 15%(12%) 16%(15%) 25%(27%) 12%(12%) 15%(12%) 7 3%(3%) 2%(2%) 8 14%(9%) 5%(5%) 15%(12%) 3%(6%) 7%(12%) 20%(15%) 1%(1%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-08A.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED INBOUND TRIP DISTRIBUTION-HOTEL WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 10%(5%) 10%(10%) 10%(10%) 3%(5%) 20%(20%) 14 12 50%(50%) 13 11 20%(20%) 10 20%(20%) 9 3%(5%) 7%(10%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-08B.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED INBOUND TRIP DISTRIBUTION-HOTEL WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 2 3 25%(15%) 1 3%(8%) 4 6%(10%) 6%(7%) 14%(12%) 13%(18%) 5 8%(5%) 5%(8%) 6 10%(10%) 16%(14%) 22%(24%) 10%(10%) 10%(10%) 7 3%(3%) 2%(2%) 8 14%(12%) 10%(7%) 10%(10%) 3%(6%) 7%(12%) 25%(20%) 1%(1%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-09A.dwg N.T.S. 25%(20%) LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED INBOUND TRIP DISTRIBUTION-RESTAURANTS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 65%(65%) 14 12 65%(65%) 13 11 65%(65%) 10 10%(15%) 9 10%(15%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-09B.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED INBOUND TRIP DISTRIBUTION-RESTAURANTS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 2 3 25%(15%) 1 3%(8%) 4 12%(17%) 28/%(30%) 5 6 8%(6%) 6%(4%) 2%(2%) 16%(13%) 5%(10%) 7 5%(5%) 8 28%(30%) 25%(24%) 20%(17%) 10%(18%) 16%(10%) 24%(24%) 1%(1%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-10A.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED INBOUND TRIP DISTRIBUTION-OFFICE WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 14 36%(29%) 12 36%(29%) 11 20%(19%) 10 25%(24%) 15%(23%) 13 16%(10%) 9 15%(23%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-10B.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED INBOUND TRIP DISTRIBUTION-OFFICE WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 3 4 5%(12%) 19%(24%) 20%(16%) 13%(15%) 2 12%(7%) 1 5%(5%) 10%(16%) 7 2%(3%) 12%(7%) 8 10%(16%) 1%(1%) 6 4%(6%) 5 15%(11%) 5%(7%) 5%(0%) 13%(20%) 5%(4%) 19%(12%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-11A.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED OUTBOUND TRIP DISTRIBUTION-HOTEL WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:41am 10 11 40%(40%) 9 64%(62%) 24%(22%) 13 12 40%(40%) 14 20%(20%) 11%(11%) 5%(7%) 11%(11%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-11B.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED OUTBOUND TRIP DISTRIBUTION-HOTEL WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am 3 4 5%(12%) 19%(24%) 20%(16%) 13%(15%) 2 8%(7%) 1 5%(5%) 2%(3%) 25%(25%) 4%(7%) 10%(16%) 8%(7%) 8 5%(0%) 7 1%(1%) 6 8%(6%) 5 15%(11%) 4%(7%) 10%(16%) 5%(0%) 13%(20%) 5%(4%) 19%(12%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-12A.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED OUTBOUND TRIP DISTRIBUTION-RESTAURANTS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am 9 10 35%(37%) 25%(25%) 11 12 35%(37%) 13 14 31%(31%) 5%(0%) 31%(31%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-12B.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED OUTBOUND TRIP DISTRIBUTION-RESTAURANTS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am 3 3%(4%) 2%(3%) 8 11%(7%) 22%(20%) 5%(3%) 11%(10%) 7 1%(1%) 5%(3%) 6 15%(11%) 15%(22%) 5 16%(13%) 15%(22%) 5%(0%) 8%(14%) 5%(4%) 11%(7%) 10%(18%) 4 10%(10%) 2 19%(24%) 13%(12%) 1 19%(12%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-13A.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED OUTBOUND TRIP DISTRIBUTION-OFFICE WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am 9 10 20%(26%) 22%(20%) 11 12 20%(26%) 13 14 36%(37%) 11%(10%) 36%(37%) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-13B.dwg N.T.S. LEGEND: XX - AM (XX) - PM Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED OUTBOUND TRIP DISTRIBUTION-OFFICE WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-14A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 AM PEAK HOUR BACKGROUND DEVELOPMENT SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-14B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 AM PEAK HOUR BACKGROUND DEVELOPMENT SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-15A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PM PEAK HOUR BACKGROUND DEVELOPMENT SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-15B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PM PEAK HOUR BACKGROUND DEVELOPMENT SITE GENERATED TRIPS WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Table 4: Adjacent Projects Trip Generation Volumes Peak Hour Trip Generation (VPH) 1 Size Development Weekday Traffic (VPD) AM Peak Hour PM Peak Hour Total Enter Exit Total Enter Exit Alpha Tower 830,000 SF (Office) 8,5102 1,220 1,086 134 1,110 166 944 Five Oaks 526,977 (Office) 13,023 SF (Shopping Center) 350 units 4,797 709 624 85 669 114 555 1,805 46 28 18 163 78 85 2,328 179 36 143 217 141 76 Total 6,079 436 151 285 507 300 207 Five Oaks JBL-Post Oak 1 Information Provided by City of Houston 2 Trips generation after transit reduction Figures 16 and 17 illustrate background volumes, with adjacent projects, for the AM and PM peak hours. Figures 18 and 19 illustrate proposed volumes for the AM and PM peak hours accounting for the trips generated by 1600 West Loop. Tables 5 and 6 show all turning movement volumes for existing, background, and proposed conditions for the AM and PM peak hours. 1600 West Loop Traffic Impact Analysis Page 6 Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-16A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND VOLUMES (2016) AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-16B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND VOLUMES (2016) AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-17A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND VOLUMES (2016) PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-17B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND VOLUMES (2016) PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-18A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED VOLUMES (2016) AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-18B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED VOLUMES (2016) AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:42am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-19A.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED VOLUMES (2016) PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-19B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED VOLUMES (2016) PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Table 5: AM Peak Hour Traffic Volumes Analysis Period Left Existing (2014) Background (2016) Proposed (2016) 466 498 507 Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) 521 564 582 Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) 102 111 111 Existing (2014) Background (2016) Proposed (2016) 65 66 166 Existing (2014) Background (2016) Proposed (2016) 87 89 224 Existing (2014) Background (2016) Proposed (2016) 119 Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) - 1600 West Loop Turning Movement Volumes Eastbound Westbound Northbound Eastbound Thru Right Left Thru Right Left Thru Right (1) IH 610 Northbound Frontage Road at Post Oak Blvd. 709 128 194 196 491 93 730 172 198 442 522 107 736 188 198 463 535 113 (2) IH 610 Southbound Frontage Road at Post Oak Blvd. 603 88 30 294 645 114 49 564 660 119 86 564 (3) IH 610 Northbound Frontage Road at San Felipe 899 755 355 916 1105 331 947 839 439 1076 1291 338 966 902 445 1160 1344 338 (4) IH 610 Southbound Frontage Road at San Felipe 1043 499 331 1340 1118 533 338 1578 1134 533 338 1725 (5) Post Oak Blvd. at Hollyhurst 616 87 37 1327 57 13 6 40 682 97 38 1761 58 13 6 41 685 151 38 1761 58 36 8 56 (6) San Felipe at Hallmark 1576 1 25 1341 74 3 4 6 1686 1 25 1732 75 3 4 6 1699 1 25 1732 222 3 10 6 (7) Hollyhurst at Hallmark 38 23 25 39 23 26 158 30 26 (8) Hallmark at Driveway B 70 83 76 (9) IH 610 Southbound Frontage Road at Hallmark 44 45 59 (10) IH 610 Southbound Frontage Road at Driveway A 27 - Left Southbound Thru Right - - - 572 583 583 502 647 790 1154 1319 1319 - - - 377 395 415 690 718 741 367 527 527 58 59 61 35 36 63 365 417 417 4 4 7 5 5 7 48 49 68 36 37 37 - 34 35 52 14 - 7 - 522 709 752 81 83 159 - 879 126 Traffic Impact Analysis Page 7 Table 5: AM Peak Hour Traffic Volumes Continued Analysis Period Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) Turning Movement Volumes Eastbound Westbound Northbound Left Thru Right Left Thru Right Left Thru Right (11) IH 610 Southbound Southbound Frontage Road at South Driveway 4 4 24 (12) IH 610 Southbound Frontage Road at North Driveway 4 4 (13) Hollyhurst at North Parking Lot Driveway/Driveway Driveway/Driveway D 1 2 112 22 1 2 114 22 9 14 143 30 (14) Hollyhurst at South Parking Lot Driveway/Driveway Driveway/Driveway C 0 0 106 0 0 0 108 0 10 29 116 125 Left Southbound Thru Right - 598 787 989 100 102 - - 601 790 992 1 1 138 24 24 30 38 39 114 - 0 0 74 68 69 77 - Table Table 6: PM Peak Hour Traffic Volumes Analysis Period Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) Existing (2014) Background (2016) Proposed (2016) 1600 West Loop Turning Movement Volumes Eastbound Westbound Northbound Left Thru Right Left Thru Right Left Thru Right (1) IH 610 Northbound Frontage Road at Post Oak Blvd. 1569 366 289 423 80 853 35 1723 391 327 432 152 1015 56 1813 412 351 432 187 1100 56 (2) IH 610 Southbound Frontage Road at Post Oak Blvd. 1673 120 95 274 1847 244 113 366 1958 261 172 366 (3) IH 610 Northbound Frontage Road at San Felipe 751 782 1023 523 364 959 178 931 889 1078 569 405 1012 182 978 948 1106 592 426 1047 182 (4) IH 610 Southbound Frontage Road at San Felipe 1263 555 474 913 1503 661 484 999 1538 661 484 1047 (5) Post Oak Blvd. at Hollyhurst 188 1526 37 10 705 91 12 18 183 223 1819 44 10 836 93 12 18 187 223 1832 85 10 836 93 77 34 298 Left Southbound Thru Right - - - 262 267 267 531 572 616 541 583 583 - - - 270 316 386 837 934 1065 94 142 152 110 112 116 15 15 26 292 307 307 Traffic Impact Analysis Page 8 Table 6: PM Peak Hour Traffic Volumes Continued Analysis Period Eastbound Thru Right Left Existing (2014) Background (2016) Proposed (2016) 65 66 93 1604 1946 1969 5 5 5 Existing (2014) Background (2016) Proposed (2016) 78 80 113 46 47 94 - Existing (2014) Background (2016) Proposed (2016) - - - 47 122 Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) - Existing (2014) Background (2016) Proposed (2016) - Turning Movement Volumes Northbound Westbound Left Thru Right Left Thru Right (6) San Felipe at Hallmark 36 985 79 27 6 32 37 1119 81 28 6 33 37 1129 129 28 10 33 (7) Hollyhurst at Hallmark 48 29 49 30 81 30 (8) Hallmark at Driveway B - 59 0 (9) IH 610 Southbound Frontage Frontage Road at Hallmark 171 174 276 (10) IH 610 Southbound Frontage at Driveway A 136 (11) IH 610 Southbound Frontage Road at South Driveway 28 29 70 (12) SB 610 Frontage Road at North Driveway 6 6 (13) Hollyhurst at North Parking Lot Driveway* Driveway* 11 25 119 1 11 26 121 1 11 41 298 9 (14) Hollyhurst at South Parking Lot Driveway* Driveway* 0 0 129 0 0 0 132 0 46 177 140 25 Left Southbound Thru Right 8 8 20 7 7 12 84 86 147 56 57 57 - 57 58 104 - - - 101 - 32 - 818 1011 1174 17 17 17 - 1048 128 - 800 993 1115 7 7 - - 826 1020 1140 4 4 41 3 3 11 99 101 145 - 0 0 44 107 109 109 - * The existing driveways will be moved to the proposed locations indicated as driveway D and C, respectively. 1600 West Loop Traffic Impact Analysis Page 9 TRAFFIC ANALYSIS After developing the projected turning movement volumes for the AM and PM peak hours, capacity analyses were performed for existing conditions, background conditions, and proposed conditions. Intersection operations were analyzed using Synchro 8.0, software developed to automate procedures found in the Highway Capacity Manual. Results of the existing and proposed conditions analyses were compared to determine the impact of the proposed development on the surrounding roadways. Results of the capacity analyses are reported in standard level of service (LOS) format, with the most favorable conditions being designated as LOS A and the poorest conditions indicated by LOS F. Intersection level of service is based on the amount of delay that each vehicle encounters at a given intersection. The level of service criteria for signalized intersections, along with a brief description of the conditions experienced for each level of service grade, can be seen in Table 7. The level of service criteria for unsignalized intersections can be seen in Table 8. Table 7: Level of Service Criteria for Signalized Intersections Level of Service Stopped Delay (seconds/vehicle) A ≤ 10 B > 10 and ≤ 20 C > 20 and ≤ 35 D > 35 and ≤ 55 E > 55 and ≤ 80 F > 80 1600 West Loop Description At a single intersection most vehicles do not stop at all. When linked with other signals, vehicles progress through intersections without stopping. At a single intersection some vehicles stop before getting a green signal. When linked with other signals, some cars may have to stop but most progress through the intersection without stopping. At a single intersection, a significant number of vehicles must stop and wait for a green signal. Some vehicles may have to wait through one full signal cycle before being able to move through the intersection. At this level, congestion is noticeable. Many vehicles have to stop while waiting for a green signal. A noticeable number of vehicles have to wait through one full cycle before being able to continue through the intersection. At this level, almost all vehicles have to wait through one or more full signal cycles before moving through the intersection. When linked with other signals, progression is slow. At this level, the number of vehicles entering the intersection exceeds its capacity. Vehicles have to wait through multiple full signal cycles before moving through the intersection. Traffic Impact Analysis Page 10 Table 8: Level of Service Criteria for Unsignalized Unsignalized Intersections Level of Service Avg. Total Delay (seconds/vehicle) A ≤ 10 B > 10 and ≤ 15 C > 15 and ≤ 25 D > 25 and ≤ 35 E > 35 and ≤ 50 F > 50 Description At most, one vehicle is waiting to move through the intersection when the driver reaches the stop sign. Most often, the driver pulls up to the stop sign and is immediately free to proceed through the intersection. When the driver reaches the intersection, one or two vehicles are in front of him. Once those vehicles proceed through the intersection, the driver is able to continue without opposition. At this level, several vehicles may be in front of the driver at a two-way stop-controlled intersection. At an all-way stopcontrolled intersection, there may be two or more vehicles at each approach that the driver has to wait for before getting his turn. At this level, there are at least four vehicles in front of the driver and several vehicles at the other approaches. Also, for twoway stop-controlled conditions, the volume of traffic on the uncontrolled street may be high. When the driver reaches the intersection, there are between five and eight vehicles in front of him and many vehicles at the other approaches that must also proceed through the intersection before the driver may continue. At this level, the driver must wait for eight to ten cars at his approach to move through the intersection along with at least five vehicles at the other approaches. This level can also occur at two-way stop-controlled intersections when the uncontrolled street has such a high volume that no gaps are available in the traffic stream for the vehicles at the cross street to continue. Transportation agencies generally consider operations at or above LOS C to be acceptable. In more dense areas, operations at or above LOS D may also be considered acceptable during peak traffic hours. EXISTING CONDITIONS For the analysis of existing conditions, existing traffic count data along with current traffic signal timings obtained from the City of Houston were used. Existing AM peak hour and PM peak hour LOS can be seen in Figures Figures 20 and 21. 21 Existing conditions capacity analyses can be found under TAB THREE. 1600 West Loop Traffic Impact Analysis Page 11 Nov 24, 2014 - 3:43am B(10.0) E(68.1) F(86.2) 8 E(66.6) B (11.3) A(0) A(0) A (5.5) A(7.5) A(0) B(13.7) A(4.0) D(49.4) B(13.7) A(4.0) D(49.4) B(19.1) D(41.8) F(81.6) D(41.8) B(19.1) B(17.2) B(17.2) F(80.9) C (29.7) D(41.3) 7 B(17.2) C(25.4) D(41.8) F(83.3) A(1.1) D(37.6) D(37.5) A(8.7) D(51.7) C(26.4) D (44.4) C(29.3) D(51.7) 6 D(42.9) D(54.5) 5 F B(10.0) E(63.2) B(11.6) E(63.2) B(15.3) E(60.8) C(32.7) D (38.5) E(63.2) C (31.7) B(14.6) A(6.7) F(313.8) C(24.2) F(222.5) C(24.2) 4 E(68.1) 3 C(34.7) D(51.9) 2 C(34.7) 1 D(42.9) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-20A.dwg N.T.S. A(0) Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING LOS AND DELAY AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. C(21.5) Nov 24, 2014 - 3:43am A(0) A(0) 12 A (0.8) A(0) 11 A(0) 10 A(0) 9 A (0.1) B(11.7) A (0.1) B(11.7) B(11.8) 14 A(9.3) A(0) A(0) A (0) A(0) A(0) A (1.0) A(0) A(0) A(0) A(9.3) A(0) 13 A(0) A(7.6) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-20B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING LOS AND DELAY AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am B(10.3) B(10.4) D(45.8) D(46.4) 8 E(72.9) B (12.4) A(0) A(0) A (5.6) A(7.5) A(0.5) B(14.5) A(3.1) D(51.5) B(14.5) A(3.1) D(51.5) D(46.5) E(59.5) D(46.5) B(18.6) B(15.1) B(15.1) D(45.0) C (33.7) B(18.6) B(15.1) C(29.6) D(46.5) F(109.8) A(1.4) E(78.6) F(152.7) 7 B(10.3) F(124.1) F(115.4) B(10.3) E (56.7) A(9.2) C(24.8) 6 A(9.1) F(214.0) 5 F F(115.4) F(124.1) E(69.6) B(14.4) F(188.2) B(13.4) F (94.1) F(124.1) E (71.1) F(194.2) A(0.9) E(60.2) F(92.4) F(269.4) F(92.4) 4 D(45.8) 3 F(94.9) E(70.6) 2 F(94.9) 1 A(9.1) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-21A.dwg N.T.S. A(0) Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING LOS AND DELAY PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. A(2.7) Nov 24, 2014 - 3:43am A(0) A(0) 12 A (3.1) A(0) 11 A(0) 10 A(0) 9 A (0.4) C(18.5) A (0.1) B(13.0) B(12.7) 14 A(9.4) A(0) A(0) A (0) A(0) A(0) A (1.4) A(0) A(0) A(0) A(9.4) A(0) 13 A(0) A(7.5) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-21B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 EXISTING LOS AND DELAY PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. BACKGROUND CONDITIONS For the analysis of background conditions, traffic volumes for 2016, along with current traffic signal timings obtained from the City of Houston, were used. Adjacent volumes from surrounding developments and proposed mitigation improvements that were approved by the City of Houston were also included in the background conditions. This included a northbound right turn bay at the Post Oak Blvd. at San Felipe intersection. Background AM peak hour and PM peak hour levels of service can be seen in Figures 22 and 23. 23 Background conditions capacity analyses can be found under TAB FOUR. PROPOSED CONDITIONS For the analysis of the proposed conditions, the proposed traffic volumes along with current traffic signal timings obtained from the City of Houston were used. Proposed AM peak hour and PM peak hour LOS can be seen in Figures 24 and 25. Proposed conditions capacity analyses can be found under TAB FIVE. A comparison of existing, background, and proposed AM and PM peak hour level of service and delay can be found in Table 9 and Table 10. Table 9: AM Peak Hour Level of Service Comparison Analysis Period Level of Service (delay in seconds per vehicle) by Approach and Movement Eastbound ound Westbound Northbound Southbound Eastb Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right (1) IH 610 Northbound Frontage Road at Post Oak Blvd. B 15.3 B Background 2016 18.5 B Proposed 2016 19.8 Existing 2014 B 11.6 B 14.2 B 15.5 n/a n/a n/a n/a n/a n/a C 24.2 C 33.8 D 36.8 C 24.2 C 33.8 D 36.8 E E E 63.2 63.2 63.2 F F F 176.6 176.6 176.6 F F F 195.5 195.5 195.5 C 31.7 F 82.7 F 92.1 n/a n/a n/a (2) IH 610 Southbound Frontage Road at Post Oak Blvd. Existing 2014 n/a Background 2016 n/a Proposed 2016 n/a 1600 West Loop D 51.7 D 53.4 D 53.6 D 51.7 D 53.4 D 53.6 C 32.7 D 40.5 D 40.3 A 6.7 A 7.5 A 7.2 n/a n/a n/a n/a n/a n/a D 51.9 D 53.4 D 53.4 C 34.7 F 85.4 F 97.1 C 34.7 F 85.4 F 97.1 D 38.5 E 63.1 E 69.7 Traffic Impact Analysis Page 12 Table Table 9: AM Peak Hour Level of Service Comparison (continued) Analysis Period Level of Service (delay in seconds per vehicle) by Approach and Movement Eastbound Westbound Northbound Southbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right (3) IH 610 Northbound Frontage Road at San Felipe C Existing 2014 29.3 C Background 2016 29.5 C Proposed 2016 30.9 A 8.7 B 10.2 B 10.5 n/a n/a n/a n/a n/a n/a E 60.8 E 60.9 E 62.0 B 14.6 C 27.1 C 28.3 F F 222.5 313.8 F F 358.9 470.8 F F 428.9 520.7 D 37.5 D 48.4 D 51.5 F 130.5 F 200.1 F 228.6 n/a n/a n/a (4) IH 610 Southbound Frontage Road at San Felipe D 37.6 D 38.8 D 47.0 D 41.3 D 51.1 E 56.1 C 21.5 C 23.2 C 23.6 F 83.3 F Background 2016 84.5 F Proposed 2016 84.5 B 19.1 C 20.6 C 23.0 B 19.1 C 20.6 C 23.0 F 80.9 E 73.1 E 73.1 C 25.4 C 33.2 D 40.7 F 81.6 F Background 2016 80.3 E Proposed 2016 74.4 B 13.7 B 17.9 C 22.1 B 13.7 B 17.9 C 22.1 E 66.6 E 63.1 E 56.3 A 4.0 B 10.4 C 24.0 Existing 2014 n/a Background 2016 n/a Proposed 2016 n/a C 26.4 D 53.4 D 55.0 n/a n/a n/a n/a n/a n/a F E E 86.2 68.1 68.1 F F F 89.8 129.3 129.3 F F F 106.6 137.4 137.4 D 44.4 E 69.3 E 75.0 D 41.8 D 42.2 E 72.0 D 56.3 D 53.6 D 53.6 D 42.9 D 53.2 D 46.7 D 42.9 D 53.2 D 46.7 C 29.7 D 35.1 D 39.5 A 0 A 0 A 0 B 17.2 B 17.1 B 16.2 B 17.2 B 17.1 B 16.2 B 17.2 B 17.1 B 16.2 B 11.3 B 15.7 C 25.4 B 10.0 B 10.1 C 15.2 A 5.5 A 5.6 A 6.1 C 24.0 A 0 A 0 C 17.1 (5) Post Oak Blvd. at Hollyhurst Existing 2014 A 1.1 A 0.7 A 0.7 D 41.8 D 42.2 E 72.0 D 41.8 D 42.2 E 72.0 (6) San Felipe at Hallmark Existing 2014 A 4.0 B 10.4 C 24.0 D 49.4 D 49.4 D 49.8 D 49.4 D 49.4 D 49.8 (7) Hollyhurst at Hallmark Existing 2014 Background 2016 Proposed 2016 A 7.5 A 7.5 A 8.3 Existing 2014 n/a Background 2016 n/a Proposed 2016 A 7.8 1600 West Loop A 0 A 0 A 0 A 0 A 0 A 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a A A n/a 0 0 A A n/a 0 0 A A n/a 0 0 (8) Hallmark at Driveway B A n/a n/a 0 A n/a n/a 0 A A n/a 0 0 B 10.0 B 10.1 C 15.2 n/a n/a n/a n/a n/a C 24.0 n/a Traffic Impact Analysis Page 13 Table 9: AM Peak Hour Level of Service Comparison (continued) Analysis Period Existing 2014 Background 2016 Proposed 2016 Existing 2014 Background 2016 Proposed 2016 Existing 2014 Background 2016 Proposed 2016 Existing 2014 Background 2016 Proposed 2016 Existing 2014 Background 2016 Proposed 2016 Existing 2014 Background 2016 Proposed 2016 Level of Service (delay in seconds per vehicle) by Approach and Movement Eastbound Westbound Northbound Southbound Intersection Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right (9) IH 610 Southbound Frontage Road at Hallmark B A A A n/a n/a n/a n/a n/a 11.7 0 0 0.8 B A A A n/a n/a n/a n/a n/a 11.7 0 0 0.8 B A A A n/a n/a n/a n/a n/a 14.1 0 0 0.9 (10) IH 610 Southbound Frontage Road at Driveway A A A n/a n/a n/a n/a n/a 0 0 A A n/a n/a n/a n/a n/a 0 0 B A A A n/a n/a n/a n/a n/a 14.4 0 0 0.4 (11) IH 610 Southbound Frontage Road at South Driveway B A A A n/a n/a n/a n/a n/a 11.7 0 0 0.1 B A A A n/a n/a n/a n/a n/a 11.7 0 0 0.1 B A A n/a n/a n/a n/a n/a n/a 13.9 0 0.3 (12) IH 610 Southbound Frontage Road at North Driveway B A A A n/a n/a n/a n/a n/a 11.8 0 0 0.1 B A A A n/a n/a n/a n/a n/a 12.9 0 0 0.1 A A A n/a n/a n/a n/a 0 0 0 (13) Hollyhurst Hollyhurst at North Parking Lot Driveway/Driveway D A A A A A n/a n/a n/a n/a 9.3 9.3 7.6 0 1.0 A A A A A n/a n/a n/a n/a 9.4 9.4 7.6 0 1.0 B B A A A n/a n/a n/a n/a 10.1 10.1 7.7 0 1.4 (14) Hollyhurst at South Parking Lot Driveway/Driveway C A A A A A n/a n/a n/a n/a 0 0 0 0 0 A A A A A n/a n/a n/a n/a 0 0 0 0 0 B B A A A n/a n/a n/a n/a 10.2 10.2 8.0 0 2.3 1600 West Loop Traffic Impact Analysis Page 14 Table 10: 10: PM Peak Hour Level of Service Comparison Analysis Period Level of Service (delay in seconds per vehicle) by Approach and Movement Westbound Northbound Southbound Eastbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right (1) IH 610 Northbound Frontage Road at Post Oak Blvd. E 69.6 E Background 2016 61.4 E Proposed 2016 64.3 B 14.4 D 54.6 E 55.4 Existing 2014 n/a n/a n/a n/a n/a n/a F F F F F 92.4 92.4 124.1 124.1 124.1 F F F F F 108.1 108.1 240.8 240.8 240.8 F F F F F 117.9 117.5 298.6 298.6 298.6 E 71.1 F 121.6 F 143.5 n/a n/a n/a (2) IH 610 Southbound Frontage Road at Post Oak Blvd. Existing 2014 n/a Background 2016 n/a Proposed 2016 n/a F F 115.4 115.4 F F 112.6 112.6 F F 122.7 122.7 B 13.4 B 19.0 C 24.7 A 0.9 A 1.3 A 1.6 n/a n/a n/a n/a n/a n/a E 70.6 E 71.8 E 71.8 F F 94.9 94.9 F F 121.6 121.6 F F 139.8 139.8 F 94.1 F 99.9 F 110.2 (3) IH 610 Northbound Frontage Road at San Felipe A 9.2 C Background 2016 28.0 D Proposed 2016 50.5 C 24.8 E 59.4 E 59.8 Existing 2014 n/a n/a n/a n/a n/a n/a F F 188.2 194.2 F F 215.3 274.7 F F 229.4 307.0 E 60.2 E 62.9 E 65.0 F 269.4 F 303.5 F 326.7 B 10.4 B 11.3 B 11.3 F 131.6 F 158.3 F 172.8 n/a n/a n/a (4) IH 610 Southbound Frontage Road at San Felipe E F 78.6 152.7 F F 99.8 251.4 F F 108.1 251.4 A 2.7 A 3.3 A 3.7 F 109.8 F Background 2016 146.9 F Proposed 2016 146.9 B 18.6 C 27.9 E 76.4 B 18.6 C 27.9 E 76.4 D 45.0 D 46.1 D 46.5 C 29.6 C 32.5 D 37.1 E 59.5 D Background 2016 50.7 D Proposed 2016 54.4 B 14.5 B 16.5 B 16.7 B 14.5 B 16.5 B 16.7 E 72.9 F 84.9 F 85.0 A 3.1 A 6.5 A 6.5 Existing 2014 n/a Background 2016 n/a Proposed 2016 n/a B 10.3 C 23.3 D 37.7 D 46.4 D 49.4 E 56.0 D 45.8 D 48.9 D 53.7 D 45.8 D 48.9 D 53.7 E 56.7 F 81.2 F 86.4 D D D F 46.5 46.5 46.5 214.0 D D D F 52.9 52.9 52.9 229.0 F F F F 196.1 196.1 196.1 222.1 A 9.1 A 9.1 A 8.2 A 9.1 B 9.1 A 8.2 C 33.7 D 41.5 F 81.2 B 15.1 B 15.0 B 17.6 B 15.1 B 15.0 B 17.6 B 12.4 B 14.6 B 15.1 n/a n/a n/a n/a n/a n/a (5) Post Oak Blvd. at Hollyhurst Existing 2014 A 1.4 A 1.5 A 1.4 (6) San Felipe at Hallmark Existing 2014 1600 West Loop A 3.1 A 6.5 A 6.5 D 51.5 D 51.6 D 52.8 D 51.5 D 51.6 D 52.8 A 0.5 A 0.5 A 0.5 B 15.1 B 15.0 B 17.6 Traffic Impact Analysis Page 15 Table 10: PM Peak Hour Level of Service Comparison (continued) Analysis Period Level of Service (delay in seconds per vehicle) by Approach and Movement Westbound Northbound Southbound Eastbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right (7) Hollyhurst at Hallmark Existing 2014 Background 2016 Proposed 2016 A 7.5 A 7.5 A 7.7 A 0 A 0 A 0 Existing 2014 n/a Background 2016 n/a Proposed 2016 A 7.4 A 0 A 0 A 0 Existing 2014 n/a n/a Background 2016 n/a n/a Proposed 2016 n/a n/a Existing 2014 n/a n/a Background 2016 n/a n/a Proposed 2016 n/a n/a Existing 2014 n/a n/a Background 2016 n/a n/a Proposed 2016 n/a n/a Existing 2014 n/a n/a Background 2016 n/a n/a Proposed 2016 n/a n/a 1600 West Loop A A B n/a 0 0 10.3 A A B n/a n/a n/a 0 0 10.3 A A A B n/a n/a 0 0 0 11.2 (8) Hallmark at Driveway B A n/a n/a n/a n/a 0 A n/a n/a n/a n/a 0 A A B n/a n/a 0 0 11.3 (9) IH 610 Southbound Frontage Road at Hallmark C n/a n/a n/a 18.5 C n/a n/a n/a 23.3 F n/a n/a n/a 65.3 (10) IH 610 Southbound Frontage Road at Driveway A A n/a n/a n/a 0 A n/a n/a n/a 0 C n/a n/a n/a 21.9 (11) IH 610 Southbound Frontage Road at South Driveway B n/a n/a n/a 13.0 B n/a n/a n/a 14.5 C n/a n/a n/a 17.1 (12) IH 610 Southbound Frontage Road at North Driveway B n/a n/a n/a 12.7 B n/a n/a n/a 14.1 n/a n/a n/a n/a n/a n/a B 10.3 B 10.3 B 11.2 A 5.6 A 5.5 A 5.6 n/a B 11.3 A 0 A 0 A 5.1 A 0 A 0 A 0 A 0 A 0 A 0 A 3.1 A 3.4 B 12.3 A 0 A 0 A 0 A 0 A 0 A 0 A 0 A 0 A 2.3 A 0 A 0 A 0 A 0 A 0 A 0.4 A 0.4 A 1.0 n/a n/a n/a n/a n/a A 0 A 0 A 0 n/a A 0 A 0 A 0 A 0.1 A 0.1 A 0 Traffic Impact Analysis Page 16 Table 10: PM Peak Hour Level of Service Comparison (continued) Analysis Period Existing 2014 Background 2016 Proposed 2016 Existing 2014 Background 2016 Proposed 2016 Level of Service (delay in seconds per vehicle) by Approach and Movement Eastbound Westbound Northbound Southbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right (13) Hollyhurst at North Parking Lot Driveway/Driveway D A A A A A A A n/a n/a n/a n/a 9.4 9.4 0 0 7.5 0 1.4 A A A A A A A n/a n/a n/a n/a 9.4 9.4 0 0 7.5 0 1.4 B B A A A A A n/a n/a n/a n/a 10.9 10.9 0 0 8.0 0 1.3 (14) Hollyhurst at South Parking Lot Driveway/Driveway C A A A A A A A n/a n/a n/a n/a 0 0 0 0 0 0 0 A A A A A A A n/a n/a n/a n/a 0 0 0 0 0 0 0 B B A A A A A n/a n/a n/a n/a 11.4 11.4 0 0 7.7 0 5.3 1600 West Loop Traffic Impact Analysis Page 17 Nov 24, 2014 - 3:43am B(10.1) F(129.3) F(89.8) 8 E(63.1) B (15.7) X(X.X) X(X.X) A (5.6) A(7.5) A(0) B(17.9) B(10.4) D(49.4) B(17.9) B(10.4) D(49.4) C(20.6) D(42.2) F(80.3) D(42.2) C(20.6) B(17.1) B(17.1) E(73.1) D (35.1) D(51.1) 7 B(17.1) D(33.2) D(42.2) F(84.5) A(0.8) C(23.2) D(38.8) D(48.4) B(10.2) D(53.4) D(53.6) E (69.3) C(29.6) D(53.4) 6 D(53.2) D(53.6) 5 F B(10.1) F(176.6) B(14.2) F(176.6) B(18.5) E(60.9) D(40.5) E (63.1) F(176.6) F (82.7) C(27.1) A(7.5) F(470.8) C(33.8) F(358.9) C(33.8) 4 F(129.3) 3 F(85.4) D(53.4) 2 F(85.4) 1 D(53.2) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-22A.dwg N.T.S. A(0) Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND (2016) LOS AND DELAY AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am 12 A(0) A(0) A (0.8) A(0) 11 A(0) 10 A(0) 9 A (0.1) B(11.7) A (0.1) B(11.7) B(12.9) 14 A(9.4) A(0) A(0) A (0) A(0) A(0) A (1.0) A(0) A(0) A(0) A(9.4) A(0) 13 A(0) A(7.6) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-22B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND (2016) LOS AND DELAY AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am F (99.9) E(59.4) F(112.6) B(16.5) B (14.6) B(10.3) B(10.3) D(48.9) D(49.4) A(0) A(0) A (5.5) A(7.5) A(0.5) B(16.5) D(48.9) F(99.8) 8 F(84.9) D(51.6) C(27.9) D(52.9) D(52.9) D(50.7) A(6.5) D(51.6) D (41.5) C(27.9) B(15.0) B(15.0) D(46.1) A(6.5) A(3.3) F(251.4) 7 B(15.0) D(32.5) D(52.9) F(146.9) A(1.5) C(23.3) F (81.2) C(28.0) 6 A(9.1) F(229.0) 5 F F(112.6) F(124.1) F(124.1) F(124.1) E(61.4) D(54.6) F(215.3) B(19.0) B(11.3) F F(274.7) A(1.3) E(62.9) F(108.1) 4 F(303.5) F(108.1) 3 F(121.6) E(71.8) 2 F(121.6) 1 A(9.1) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-23A.dwg N.T.S. A(0) Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND (2016) LOS AND DELAY PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am 12 A(0) A(0) A (3.4) A(0) 11 A(0) 10 A(0) 9 A (0.4) C(23.3) A (0.1) B(14.5) B(14.1) 14 A(9.4) A(0) A(0) A (0) A(0) A(0) A (1.4) A(0) A(0) A(0) A(9.4) A(0) 13 A(0) A(7.5) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-23B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 BACKGROUND (2016) LOS AND DELAY PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am C (25.4) A(0) A(0) A (6.1) A(8.3) F(137.4) F(106.6) A(7.8) A(0) C(24.0) C(24.0) C(15.2) 8 E(56.3) A(0) C(22.1) C(24.0) D(49.8) C(22.1) C(24.0) D(49.8) C(23.0) E(72.0) E(74.4) E(72.0) C(23.0) B(16.2) B(16.2) E(73.1) D (39.5) E(56.1) 7 B(16.2) D(40.7) E(72.0) F(84.5) A(0.7) C(23.6) D(47.0) D(51.5) B(10.5) D(53.6) D(55.0) E (75.0) C(30.9) D(53.6) 6 D(46.7) D(53.6) 5 F C(15.2) F(195.5) B(15.5) F(195.5) B(19.8) E(62.0) D(40.3) E (69.7) F(195.5) F (92.1) C(28.3) A(7.2) F(520.7) D(36.8) F(428.9) D(36.8) 4 F(137.4) 3 F(97.1) D(53.4) 2 F(97.1) 1 D(46.7) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-24A.dwg N.T.S. A(0) A(0) C (17.1) A(0) Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED (2016) LOS AND DELAY AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am A (0.9) A(0) A (0.4) B(14.1) A (0.3) B(14.4) A (0) B(13.9) 14 A(0) A(8.0) B(10.1) B(10.1) B(10.2) A(0) A (2.3) A(0) A(0) A (1.4) B(10.2) A(0) 13 A(0) 12 A(0) A(0) 11 A(0) A(0) 10 A(0) 9 A(0) A(7.7) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-24B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED (2016) LOS AND DELAY AM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am F B(16.7) B (15.1) A(0) D(53.7) E(56.0) A(7.4) A(0) B(11.3) B(11.3) A(0) A (5.6) A(7.7) A(0.5) B(16.7) D(53.7) B(11.3) F(108.1) 8 F(85.0) D(52.8) E(76.4) F(196.1) F(196.1) D(54.4) A(6.5) D(52.8) F (81.2) E(76.4) B(17.6) B(17.6) D(46.5) A(6.5) A(3.7) F(251.4) 7 B(17.6) D(37.1) F(196.1) F(146.9) A(1.4) E(65.0) E(59.8) F(122.7) D(37.7) F (86.4) D(50.5) 6 A(8.2) F(222.1) 5 F F(122.7) F(298.6) F(298.6) E(55.4) F(298.6) E(64.3) F(229.4) C(24.7) F(326.7) F F(307.0) A(1.6) B(11.2) F(117.9) 4 B(11.2) F(117.9) 3 F(139.8) E(71.8) 2 F(139.8) 1 A(8.2) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-25A.dwg N.T.S. A(0) A(0) A (5.1) A(0) Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED (2016) LOS AND DELAY PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. Nov 24, 2014 - 3:43am B (12.3) A(0) A (2.3) F(65.3) A (1.0) C(21.9) A (0) C(17.1) 14 A(0) A(7.7) B(10.9) B(10.9) B(11.4) A(0) A (5.3) A(0) A(0) A (1.3) B(11.4) A(0) 13 A(0) 12 A(0) A(0) 11 A(0) A(0) 10 A(0) 9 A(0) A(8.0) \\HOU-SERVER\Projects\T03\2014\14008-00 1600 West Loop TIA\Cad\Traffic\TIA Figures\T03-14008-00-FIGURE-25B.dwg N.T.S. Project Name: 1600 WEST LOOP TIA Sheet Title: W A L T E R P . M O O R E AND A S S OC IA TE S , 1301 McKINN E Y, SUITE 1100 HOU S TON, TE XAS 77010 PHONE : 713.630.7300 F AX : I NC . 713.630.7396 PROPOSED (2016) LOS AND DELAY PM PEAK HOUR WPMA P.N.: Designed by: VAS Date: Drawn by: NOVEMBER 2014 Copyright C TME 2014 WALTER P. MOORE AND ASSOCIATES, INC. Sheet No. LEVEL OF SERVICE COMPARISON As can be seen in the previous tables, some intersections are impacted by the additional site traffic under proposed conditions. The following is a summary of findings based on the analysis conducted as part of this traffic impact analysis: AM Peak Hour Post Oak Blvd at IH 610 Northbound Frontage Road o Level of service declines from LOS F (82.7 sec/veh) in the background condition to LOS F (92.1 sec/veh) in the proposed condition. The change in delay is less than 10 seconds and does not warrant mitigation. San Felipe at IH 610 Northbound Frontage Road o Level of service declines from LOS F (200.1 sec/veh) in the background condition to LOS F (228.6 sec/veh) in the proposed condition. The change in delay is less than 30 seconds and does not warrant mitigation. PM Peak Hour Post Oak Blvd at NB 610 Frontage Road o Level of service declines from LOS F (121.6 sec/veh) in the background condition to LOS F (143.5 sec/veh) in the proposed condition. The change in delay is less than 25 seconds and does not warrant mitigation. Post Oak Blvd at SB 610 Frontage Road o Level of service declines from LOS F (99.9 sec/veh) in the background condition to LOS F (110.2 sec/veh) in the proposed condition. The change in delay is less than 15 seconds and does not warrant mitigation. San Felipe at NB 610 Frontage Road o Level of service declines from LOS F (158.3 sec/veh) in the background condition to LOS F (172.8 sec/veh) in the proposed condition. The change in delay is less than 15 seconds and does not warrant mitigation. San Felipe at SB 610 Frontage Road o Level of service declines from LOS F (81.2 sec/veh) in the background condition to LOS F (86.4 sec/veh) in the proposed condition. The change in delay is less than 10 seconds and does not warrant mitigation. Post Oak Blvd. at Hollyhurst 1600 West Loop Traffic Impact Analysis Page 18 o Level of service declines from LOS C (33.7 sec/veh) under existing condition, LOS D (41.5 sec/veh) under background condition, and LOS F (81.2 sec/veh) under proposed condition. This intersection requires mitigation to bring the level of service to at least under background condition. The addition of a northbound right turn bay with signal timing adjustments would improve LOS to E (reduce delay from 81.2 sec/veh to 68.1 sec/veh). Signal timing changes only would improve the LOS to E, but the reduction in delay would be less (reduce delay from 81.2 sec/veh to 74.6 sec/veh). MITIGATION ANALYSIS As can be seen in the previous tables, there will be some impact to surrounding roadways when the proposed 1600 West Loop development is fully built and operational. The only intersection that requires mitigation is the intersection of Post Oak Blvd. at Hollyhurst Ln. To mitigate the impact of the proposed 1600 West Loop development at the Post Oak Blvd. at Hollyhurst Ln. intersection, a turn bay for the northbound right turn movement could be provided. Additionally, if a turn bay is added, the traffic signal timings should be adjusted to accommodate the revised lane configuration. At this time, there is limited right-of-way at this intersection. The property in the southeast corner is built to the right-of-way line. The property owner is dedicating ROW to the City of Houston along their property for future widening of Hollyhurst. Due to the restricted right-of-way, a feasible alternative is to adjust the signal timing plan. Retiming the intersection of Post Oak Blvd. at Hollyhurst will improve the level of service during the PM peak hour from LOS F (81.2 sec/veh) to LOS E (74.6 sec/veh). A comparison of level of service from the background condition, the proposed conditions, and both mitigation options can be seen in Table 11 and Table 12. It is also recommended to restrict eastbound u-turns to further reduce delays. A no U-turn sign could be posted. 1600 West Loop Traffic Impact Analysis Page 19 Table 11: Post Oak at Hollyhurst: Mitigation – AM Peak Hour Level of Service (delay in seconds per vehicle) by Approach and Movement Eastbound Westbound Northbound Southbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right F C C E C A D D D D D D D Background 84.5 20.6 20.6 73.1 33.2 0.7 42.2 42.2 42.2 53.6 53.2 53.2 35.1 F C C E D A E E E D D D D Proposed 84.5 23.0 23.0 73.1 40.7 0.7 72.0 72.0 72.0 53.6 46.7 46.7 39.5 F C C E D A F F A D E E D NB RT Bay Mitigation 125.0 24.2 24.2 76.8 37.5 0.7 83.2 83.2 3.4 44.5 39.2 39.2 37.3 Signal F C C E D A D D D D E E D Timing 88.9 26.4 26.4 72.1 40.7 1.1 50.7 50.7 50.7 52.4 55.3 55.3 41.0 Mitigation Analysis Period Table 12: Post Oak at Hollyhurst: Mitigation – PM Peak Hour Level of Service (delay in seconds per vehicle) by Approach and Movement Eastbound Westbound Northbound Southbound Intersection Left Thru Right Left Thru Right Left Thru Right Left Thru Right A D D D F A B D F C C D C Background 146.9 27.9 27.9 46.1 32.5 1.5 52.9 52.9 52.9 229.0 9.1 9.1 41.5 F E E D D A F F F F A A F Proposed 146.9 76.4 76.4 46.5 37.1 1.4 196.1 196.1 196.1 222.1 8.2 8.2 81.2 F E E D D A F D F F A A E NB RT Bay Mitigation 146.9 75.7 75.7 46.5 36.7 1.4 92.2 92.2 100.4 138.1 8.3 8.3 68.1 Signal A F F F F C C E E F F E D Timing 66.1 88.2 88.2 55.9 47.5 1.5 127.8 127.8 127.8 83.2 22.6 22.6 74.6 Mitigation Analysis Period 1600 West Loop Traffic Impact Analysis Page 20 CONCLUSIONS AND RECOMMENDATIONS Based on this traffic impact analysis for the new 1600 West Loop development, there will be some impact to the surrounding intersections when the adjacent developments and the proposed 1600 West Loop development are fully built and operational. To mitigate the impact at the intersection of Post Oak Blvd. at Hollyhurst Ln., a northbound right turn bay could be provided and the signal timing plan updated. However, due to limited right-of-way, it is not feasible at this time to add the northbound turn bay. It is still possible to improve the level of service by adjusting the traffic signal timings. 1600 West Loop Traffic Impact Analysis Page 21 TAB ONE Existing Traffic Volumes 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Left 87 91 94 118 117 126 105 90 Eastbound Post Oak Blvd Thru Right U 110 129 158 164 195 182 168 172 Left 371 412 417 369 262 333 372 428 Eastbound Post Oak Blvd Thru Right U 87 88 81 110 103 122 104 101 Time 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 IH 610 NBFR at Post Oak Blvd Tuesday, April 01, 2014 CJH Peds 0 0 0 0 0 0 0 0 Left A.M. PEAK PERIOD Westbound Post Oak Blvd Thru Right U Peds Left 17 30 1 51 19 40 1 43 25 60 2 35 28 60 3 46 35 41 1 45 36 36 0 58 29 57 1 47 38 53 1 36 Northbound IH 610 NBFR Thru Right U 77 14 87 13 94 14 124 18 132 26 115 20 120 29 111 28 Peds 0 0 4 1 1 0 1 0 Southbound IH 610 NBFR Thru Right U 44 66 79 86 114 94 107 96 Peds 0 0 0 0 0 0 0 0 Southbound IH 610 NBFR Thru Right U 37 33 31 27 30 25 15 27 Peds 0 0 0 1 0 0 0 0 Left 0 0 0 0 0 Southbound IH 610 NBFR Thru Right U 0 0 86 0 0 114 0 0 94 0 0 107 0 0 401 Peds 0 0 0 0 0 5 0 Left Vehicle Total 430 488 559 644 705 667 662 624 P.M. PEAK PERIOD Time 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Westbound Peds 0 0 0 0 0 0 0 0 Left Thru 68 64 76 81 90 85 79 89 Right 109 113 106 95 70 90 85 107 U Peds 0 1 1 0 0 6 0 1 Left 23 14 19 24 6 18 13 19 Northbound IH 610 NBFR Thru Right U 205 13 221 7 247 5 180 10 158 4 206 1 179 0 165 2 A.M. Peak Hour 7:45 8:45 A.M. Peak Hour 7:45 8:00 8:15 8:30 TOTAL Ped Conflicts PHF P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 118 117 126 105 466 0 Eastbound Post Oak Blvd Thru Right U 164 0 0 195 0 0 182 0 0 168 0 0 709 0 0 3 Left 0 0 0 0 0 Thru 28 35 36 29 128 8 Right 60 41 36 57 194 U 0 0 0 0 0 Peds 3 1 0 1 5 5 Left 46 45 58 47 196 Left 371 412 417 369 1569 1 8 Westbound Peds 0 0 0 0 0 Left 0 0 0 0 0 10 Thru 68 64 76 81 289 Right 109 113 106 95 423 3 Northbound IH 610 NBFR Thru Right U 124 18 0 132 26 0 115 20 0 120 29 0 491 93 0 3 0.925 0.909 ##### ##### ##### ##### 0.889 0.808 ##### 0.417 0.845 Eastbound Post Oak Blvd Thru Right U 87 0 0 88 0 0 81 0 0 110 0 0 366 0 0 Left Vehicle Total 913 952 982 896 723 880 847 938 P.M. Peak Hour 16:00 17:00 Westbound Peds 0 0 0 0 0 Peds 3 5 0 0 0 0 2 1 U 0 0 0 0 0 Peds 0 1 1 0 2 Left 23 14 19 24 80 8 Peds 1 1 0 1 3 8 0.93 0.802 ##### Northbound IH 610 NBFR Thru Right U 205 13 0 221 7 0 247 5 0 180 10 0 853 35 0 10 0.75 Peds 3 5 0 0 8 Vehicle Total 644 705 667 662 2678 8 ##### ##### ##### 0.879 ##### 0.9496 Left 0 0 0 0 0 Southbound IH 610 NBFR Thru Right U 0 0 37 0 0 33 0 0 31 0 0 27 0 0 128 3 1 Peds 0 0 0 1 1 Vehicle Total 913 952 982 896 3743 11 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Time Left 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 IH 610 SBFR at Post Oak Blvd Tuesday, April 01, 2014 CJH Eastbound Post Oak Blvd Thru Right U 97 23 0 109 31 0 115 27 0 143 22 0 145 25 0 170 20 0 130 21 0 117 20 0 Peds 0 0 0 0 0 0 0 0 Left 6 7 8 10 8 11 1 12 A.M. PEAK PERIOD Westbound Northbound Post Oak Blvd IH 610 SBFR Thru Right U Peds Left U Thru Right 57 0 0 13 57 0 0 14 51 0 0 9 63 0 0 17 70 0 0 9 84 0 0 14 74 0 0 32 62 0 0 32 Left 33 20 20 22 26 25 12 14 P.M. PEAK PERIOD Westbound Northbound Post Oak Blvd IH 610 SBFR Thru Right U Peds Left U Thru Right 59 0 0 20 58 0 0 13 74 0 0 16 82 0 0 11 68 1 0 11 78 0 0 17 80 0 0 16 95 0 0 18 Eastbound Time Left 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Thru 360 404 409 360 277 351 391 444 Right 37 25 28 30 22 19 19 27 U 1 0 1 1 0 0 2 0 Peds 0 0 0 1 0 0 0 0 A.M. Peak Hour 7:45 8:45 Eastbound Left 0 0 0 0 0 8 Thru 360 404 409 360 1533 Right 37 25 28 30 120 8 U 1 0 1 1 3 Peds 0 0 0 1 1 Peds 4 3 0 0 0 0 0 0 Left 96 111 134 137 155 137 128 135 Peds 0 0 1 0 0 0 0 0 Left 59 62 56 63 66 78 71 66 Southbound IH 610 SBFR Thru Right U 130 132 138 145 129 131 134 133 136 136 103 146 110 165 80 157 Peds 3 0 3 1 2 4 2 1 Left 137 155 137 128 557 Southbound IH 610 SBFR Thru Right U 133 297 0 118 298 0 125 269 0 126 290 0 502 1154 0 Peds 0 0 0 0 0 Vehicle Total 662 747 757 822 828 830 802 778 Vehicle Total 831 865 864 836 743 817 866 901 P.M. Peak Hour 16:00 17:00 A.M. Westbound Northbound Eastbound Post Oak Blvd IH 610 SBFR Peak Hour Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U 7:45 0 143 22 0 0 10 63 0 0 0 0 0 0 17 8:00 0 145 25 0 0 8 70 0 0 0 0 0 0 9 8:15 0 170 20 0 0 11 84 0 0 0 0 0 0 14 8:30 0 130 21 0 0 1 74 0 0 0 0 0 0 32 TOTAL 0 588 88 0 0 30 291 0 0 0 0 0 0 72 Ped 0 4 4 0 4 4 Conflicts PHF ##### 0.865 0.88 ##### ##### 0.682 0.866 ##### ##### ##### ##### ##### ##### 0.563 P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Peds 0 0 4 2 1 0 1 0 Southbound IH 610 SBFR Thru Right U 90 280 114 304 132 281 133 297 118 298 125 269 126 290 123 277 Left 33 20 20 22 95 7 Westbound Post Oak Blvd Thru Right U 59 0 0 58 0 0 74 0 0 82 0 0 273 0 0 7 Peds 0 0 0 0 0 Left 0 0 0 0 0 Northbound IH 610 SBFR Thru Right U 0 0 20 0 0 13 0 0 16 0 0 11 0 0 60 8 7 Peds 2 1 0 1 4 0 0.5 Peds 4 3 0 0 7 0 Vehicle Total 822 828 830 802 3282 4 0.898 0.944 0.968 ##### ##### 0.9886 Left 59 62 56 63 240 7 Southbound IH 610 SBFR Thru Right U 130 132 0 138 145 0 129 131 0 134 133 0 531 541 0 8 Peds 3 0 3 1 7 Vehicle Total 831 865 864 836 3396 15 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Left 71 121 127 148 129 110 134 83 Eastbound San Felipe Thru Right 153 194 209 211 244 218 226 234 Left 183 195 189 183 206 237 248 214 Eastbound San Felipe Thru Right 194 185 186 215 201 186 257 222 Time 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Time 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 IH 610 NBFR @ San Felipe Tuesday, April 01, 2014 CJH U 0 0 0 0 0 0 0 0 U 0 1 0 0 0 0 0 0 Peds 0 0 0 0 0 0 0 0 Peds 0 0 0 0 0 0 0 0 Left Left A.M. PEAK PERIOD Westbound San Felipe Thru Right U Peds Left 122 53 1 206 158 73 1 206 196 104 2 170 182 98 2 215 183 95 1 236 185 67 2 229 205 95 0 236 187 85 1 244 Northbound IH 610 NBFR Thru Right U 173 59 59 209 75 56 209 76 70 264 81 89 293 90 121 271 88 101 277 72 102 267 68 79 P.M. PEAK PERIOD Westbound San Felipe Thru Right U Peds Left 262 131 1 90 249 142 2 76 272 132 3 106 231 118 4 89 187 51 4 92 207 56 5 80 273 74 5 95 299 119 3 110 Northbound IH 610 NBFR Thru Right U 231 45 41 259 32 27 238 53 41 231 48 37 154 43 26 144 39 34 167 34 27 219 54 21 A.M. Peak Hour 7:45 8:45 A.M. Peak Hour 7:45 8:00 8:15 8:30 TOTAL Ped Conflicts PHF P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 148 129 110 134 521 Eastbound San Felipe Thru Right 211 0 244 0 218 0 226 0 899 0 Southbound IH 610 NBFR Thru Right U 54 36 45 22 16 26 29 22 Peds 0 0 0 0 1 9 2 0 Left 0 0 0 0 0 Southbound IH 610 NBFR Thru Right U 0 0 32 0 0 44 0 0 34 0 0 32 0 0 142 Peds 0 1 0 0 1 6 1 Left 0.97 0.943 0.919 0.853 0.375 ##### ##### ##### 0.807 0.25 Left 183 195 189 183 750 Eastbound San Felipe Thru Right 194 0 185 0 186 0 215 0 780 0 Left 90 76 106 89 361 Northbound IH 610 NBFR Thru Right U 231 45 41 259 32 27 238 53 41 231 48 37 959 178 146 Peds 0 0 0 0 0 6 16 8 U 0 1 0 0 1 Peds 0 0 0 0 0 Left 0 0 0 0 0 16 U 0 0 0 0 0 Northbound IH 610 NBFR Thru Right U 264 81 89 293 90 121 271 88 101 277 72 102 1105 331 413 0.921 ##### ##### ##### ##### 0.921 0.906 ##### 0.625 6 Left 0 0 0 0 0 Westbound San Felipe Thru Right 182 98 183 95 185 67 205 95 755 355 0.88 3 Vehicle Total 925 1123 1185 1320 1435 1303 1379 1287 Vehicle Total 1231 1202 1262 1174 976 1009 1204 1280 P.M. Peak Hour 16:00 17:00 Left 215 236 229 236 916 0 Peds 0 0 0 0 0 Peds 1 0 1 4 1 5 2 0 Peds 0 0 0 0 1 0 0 0 Left Peds 2 1 2 0 5 1 U 0 0 0 0 0 Peds 0 2 5 2 0 1 0 1 Southbound IH 610 NBFR Thru Right U 29 31 24 32 44 34 32 40 6 Westbound San Felipe Thru Right 262 131 249 142 272 132 231 118 1014 523 10 3 U 0 0 0 0 0 Peds 1 2 3 4 10 Peds 2 0 1 0 3 8 Peds 1 0 1 4 6 Left 0 0 0 0 0 Southbound IH 610 NBFR Thru Right U 0 0 54 0 0 36 0 0 45 0 0 22 0 0 157 10 0 Vehicle Total 1320 1435 1303 1379 5437 9 0.9472 Vehicle Total 1231 1202 1262 1174 4869 16 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Time Left 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Eastbound San Felipe Thru Right 137 86 234 96 246 156 265 154 278 127 228 115 254 103 207 118 IH 610 SBFR @ San Felipe Tuesday, April 01, 2014 CJH U 0 0 0 0 0 0 0 0 Peds 1 0 1 2 0 0 0 0 Left 46 76 87 90 67 80 93 78 A.M. PEAK PERIOD Westbound Northbound San Felipe IH 610 SBFR Thru Right U Peds Left U Thru Right 273 0 287 0 271 0 309 0 350 0 336 0 341 0 358 0 Peds 0 1 1 0 0 0 2 0 Left 81 74 83 87 82 99 103 109 Southbound IH 610 SBFR Thru Right U 119 82 29 143 68 31 168 89 24 161 86 33 160 98 43 170 87 36 199 96 30 157 101 40 Peds 0 0 3 1 1 3 1 0 Vehicle Total 853 1009 1124 1185 1205 1151 1219 1168 P.M. PEAK PERIOD Time Left 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Eastbound San Felipe Thru Right 305 138 313 163 304 107 341 147 355 159 349 129 425 101 366 142 Westbound U 1 0 0 0 0 0 0 0 Peds 1 1 3 0 3 3 1 1 Left 136 106 124 108 81 99 130 130 Thru 210 219 258 226 180 190 238 269 Right U Peds 0 0 0 0 0 0 0 0 Left A.M. Peak Hour 7:45 8:45 A.M. Eastbound San Felipe Peak Hour Left Thru Right U Peds 7:45 0 265 154 0 2 8:00 0 278 127 0 0 8:15 0 228 115 0 0 8:30 0 254 103 0 0 TOTAL 0 1025 499 0 2 Ped 8 4 Conflicts PHF ##### 0.922 0.81 ##### 0.25 P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 0 0 0 0 0 5 Eastbound San Felipe Thru Right 305 138 313 163 304 107 341 147 1263 555 5 Peds 1 1 3 0 5 Southbound Peds 0 0 0 0 0 2 1 0 Left 66 65 69 70 58 64 69 72 Thru 208 221 217 191 176 180 177 133 Right 31 19 29 15 18 34 47 33 U 56 35 44 25 31 29 31 22 Peds 0 0 0 0 4 8 1 1 U 33 43 36 30 142 Peds 1 1 3 1 6 Vehicle Total 1151 1141 1152 1123 1058 1074 1218 1167 P.M. Peak Hour 16:00 17:00 Westbound Left 90 67 80 93 330 Thru 309 350 336 341 1336 2 Right 0 0 0 0 0 U 0 0 0 0 0 Peds 0 0 0 0 0 6 Left 0 0 0 0 0 4 Northbound IH 610 SBFR Thru Right U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Left 136 106 124 108 474 0 Thru 210 219 258 226 913 Right 0 0 0 0 0 0 U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 5 Southbound Peds 0 0 0 2 2 Left 87 82 99 103 371 6 8 0.25 0.9 0.867 0.936 0.826 2 0.887 0.954 ##### ##### ##### ##### ##### ##### ##### Westbound U 1 0 0 0 1 Northbound IH 610 SBFR Thru Right U Northbound IH 610 SBFR Thru Right U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Thru 161 160 170 199 690 Right 86 98 87 96 367 Left 66 65 69 70 270 0 Thru 208 221 217 191 837 Right 31 19 29 15 94 5 1185 1205 1151 1219 4760 10 0.5 Southbound Peds 0 0 0 0 0 Vehicle Total U 56 35 44 25 160 Peds 0 0 0 0 0 0.9762 Vehicle Total 1151 1141 1152 1123 4567 5 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Left 10 8 18 12 28 16 26 29 Eastbound Post Oak Blvd Thru Right U 104 15 0 111 10 2 115 16 2 142 17 5 170 31 5 169 19 6 135 20 4 126 31 2 Left 33 41 53 54 38 36 47 83 Eastbound Post Oak Blvd Thru Right U 384 10 1 395 10 2 388 8 3 359 9 1 253 8 1 324 9 1 354 9 2 429 14 5 Time 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Time 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Post Oak Blvd @ Hollyhurst Tuesday, April 01, 2014 CJH Peds 0 0 0 0 2 1 0 0 Peds 1 0 2 0 0 0 0 1 Left 2 4 4 8 11 6 11 13 A.M. PEAK PERIOD Westbound Northbound Post Oak Blvd Hollyhurst Thru Right U Peds Left U Thru Right 334 14 0 1 4 1 4 343 18 1 1 4 3 6 312 8 0 0 0 1 11 352 13 0 1 1 2 12 325 17 0 0 3 3 9 315 18 1 3 4 0 9 335 9 0 4 5 1 10 306 18 3 2 5 4 9 Left 2 3 2 1 2 5 4 4 P.M. PEAK PERIOD Westbound Northbound Post Oak Blvd Hollyhurst Thru Right U Peds Left U Thru Right 172 28 1 1 2 6 42 183 14 0 1 4 6 43 178 26 1 1 3 0 45 172 23 0 1 3 6 53 195 12 0 0 5 10 55 202 21 0 0 5 7 50 209 24 0 0 8 9 43 211 25 0 6 3 10 30 A.M. Peak Hour 7:45 8:45 A.M. Peak Hour 7:45 8:00 8:15 8:30 TOTAL Ped Conflicts PHF P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 12 28 16 26 82 Eastbound Post Oak Blvd Thru Right U 142 17 5 170 31 5 169 19 6 135 20 4 616 87 20 11 8 Peds 0 2 1 0 3 Left 33 41 53 54 181 Left 8 11 6 11 36 13 26 9 Peds 1 0 2 0 3 Left 21 17 12 16 13 17 12 18 Peds 1 0 6 0 2 5 1 6 Southbound Peds 1 3 1 1 0 0 0 6 Left 28 23 31 28 17 16 21 25 Thru 4 2 4 5 4 5 4 2 Right 63 65 78 86 100 74 108 93 U Peds 2 6 10 5 3 3 7 8 Vehicle Total 581 592 580 687 714 669 673 650 Vehicle Total 776 791 820 800 700 755 842 934 P.M. Peak Hour 16:00 17:00 Westbound Post Oak Blvd Thru Right U 352 13 0 325 17 0 315 18 1 335 9 0 1327 57 1 Left 2 3 2 1 8 10 Peds 1 0 3 4 8 Left 1 3 4 5 13 0.5 0.65 16 0.732 0.906 0.702 0.833 0.375 0.818 0.942 0.792 Eastbound Post Oak Blvd Thru Right U 384 10 1 395 10 2 388 8 3 359 9 1 1526 37 7 Peds 0 2 3 2 1 1 1 1 Southbound Uptown Park Blvd Thru Right U 9 63 7 58 7 74 6 101 6 93 12 77 11 94 9 77 8 0.25 Westbound Post Oak Blvd Thru Right U 172 28 1 183 14 0 178 26 1 172 23 0 705 91 2 27 Northbound Hollyhurst Thru Right 2 12 3 9 0 9 1 10 6 40 Peds 1 1 1 1 4 Left 2 4 3 3 12 9 Southbound U 0 0 0 0 0 Peds 2 1 1 1 5 13 0.5 Left 16 13 17 12 58 Thru 6 6 12 11 35 16 Right 101 93 77 94 365 U 0 0 0 0 0 11 10 0.4 Southbound U 0 0 0 0 0 Peds 1 3 1 1 6 Left 28 23 31 28 110 27 Thru 4 2 4 5 15 Right 63 65 78 86 292 26 Vehicle Total 687 714 669 673 2743 24 0.833 ##### 0.625 0.853 0.729 0.903 ##### Northbound Hollyhurst Thru Right 6 42 6 43 0 45 6 53 18 183 Peds 0 2 5 1 8 U 0 0 0 0 0 Peds 2 6 10 5 23 0.9604 Vehicle Total 776 791 820 800 3187 36 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Hallmark @ San Felipe Tuesday, April 01, 2014 CJH A.M. PEAK PERIOD Time 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Left 7 4 10 10 17 17 6 14 Eastbound San Felipe Thru Right 229 0 365 0 397 1 431 1 420 0 363 0 362 0 336 5 U 1 0 1 2 7 3 3 5 Peds 1 0 0 0 0 0 0 0 Left 5 3 3 5 5 8 5 10 Westbound San Felipe Thru Right 269 16 296 17 293 15 327 17 341 16 331 17 342 24 378 28 Left 9 9 6 8 7 6 3 9 Westbound San Felipe Thru Right 231 23 233 21 270 22 251 13 239 18 224 15 288 17 295 17 U 1 0 0 0 2 0 0 2 Peds 0 0 0 0 0 0 0 1 Left 1 2 3 1 1 1 0 1 Northbound Hallmark Dr Thru Right U 0 1 0 1 0 2 0 1 2 0 0 3 2 2 1 2 Peds 1 0 2 0 0 1 0 0 Left 2 2 1 1 2 0 1 0 Southbound Hallmark Dr Thru Right U 0 13 0 6 0 11 0 13 1 10 4 12 0 13 2 11 Peds 0 1 1 0 1 0 1 1 Left 2 1 2 3 9 9 4 5 Southbound Hallmark Dr Thru Right U 1 17 3 18 1 21 2 28 0 31 0 33 1 23 2 15 Peds 0 0 1 2 0 1 4 0 Southbound Hallmark Dr Thru Right 0 13 1 10 4 12 0 13 5 48 Peds 0 1 0 1 2 Vehicle Total 545 696 737 809 824 759 760 795 P.M. PEAK PERIOD Eastbound Time 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Left 13 4 9 16 17 13 5 4 Thru 398 426 378 402 422 352 441 421 Right 3 0 2 0 2 2 3 3 U 4 7 5 7 5 7 5 5 Peds 1 0 0 0 3 0 1 0 Northbound U 2 0 0 2 5 0 2 2 Peds 0 0 0 0 0 0 0 3 Left 6 5 4 12 9 5 8 9 Thru 0 1 2 3 1 2 6 1 A.M. Peak Hour 7:45 8:45 A.M. Peak Hour 7:45 8:00 8:15 8:30 TOTAL Ped Conflicts PHF P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Thru 431 420 363 362 1576 Right 1 0 0 0 1 0.735 0.914 0.25 2 U 2 7 3 3 15 Peds 0 0 0 0 0 1 Left 5 5 8 5 23 4 Thru 398 426 378 402 1604 Right 3 0 2 0 5 11 Westbound San Felipe Thru Right 327 17 341 16 331 17 342 24 1341 74 1 0.536 ##### 0.719 Eastbound Left 13 4 9 16 42 U 4 7 5 7 23 Peds 1 0 0 0 1 U Peds 1 1 7 1 1 1 0 2 Vehicle Total 721 733 723 761 776 685 820 797 P.M. Peak Hour 16:00 17:00 Eastbound Left 10 17 17 6 50 Right 12 5 1 14 11 17 14 9 Left 9 9 6 8 32 10 Northbound U 0 2 0 0 2 Peds 0 0 0 0 0 Left 1 1 1 0 3 0.25 ##### 0.75 2 0.98 0.771 Westbound San Felipe Thru Right 231 23 233 21 270 22 251 13 985 79 3 Thru 0 2 0 2 4 Right 1 0 3 2 6 0.5 0.5 1 U 0 0 0 0 0 Peds 0 0 1 0 1 Left 1 2 0 1 4 2 2 ##### 0.25 0.5 0.313 0.923 ##### Left 2 1 2 3 8 Southbound Hallmark Dr Thru Right 1 17 3 18 1 21 2 28 7 84 1 Northbound U 2 0 0 2 4 Peds 0 0 0 0 0 Left 6 5 4 12 27 11 Thru 0 1 2 3 6 Right 12 5 1 14 32 10 U 0 0 0 0 0 Peds 1 1 7 1 10 3 4 U 0 0 0 0 0 Vehicle Total 809 824 759 760 3152 3 U 0 0 0 0 0 0.5 Peds 0 0 1 2 3 0.9563 Vehicle Total 721 733 723 761 2938 14 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Hallmark @ Hollyhurst Tuesday, April 01, 2014 CJH A.M. PEAK PERIOD Left 15 15 12 15 20 25 27 33 Eastbound Hallmark Dr Thru Right 6 0 9 1 8 1 9 2 10 2 9 1 5 0 9 1 Left 19 21 21 17 24 24 23 19 Eastbound Hallmark Dr Thru Right 14 0 9 0 10 0 13 0 9 0 8 0 4 0 4 0 Time 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 U 0 0 1 0 0 0 0 0 Peds 3 0 1 1 0 0 0 0 Left 7 4 8 3 2 3 3 0 Westbound Hallmark Dr Thru Right 5 2 2 4 4 2 4 5 7 4 6 4 6 12 4 8 U 0 0 0 0 1 0 0 0 Peds 0 0 0 0 0 0 0 0 Left 0 0 0 0 0 0 0 0 Northbound Parking Garage Thru Right U 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 Peds 0 0 0 0 0 0 0 0 Left 8 9 7 5 11 12 8 10 Southbound Hollyhurst Thru Right 2 10 2 5 2 7 0 9 1 7 0 7 0 11 1 8 U 0 0 0 0 0 0 0 0 Peds 0 0 0 1 0 0 0 0 U 1 0 0 0 0 0 0 0 Peds 0 0 0 1 0 0 0 0 U 0 0 0 0 0 Peds 1 0 0 0 1 Vehicle Total 55 51 53 53 65 67 72 74 P.M. PEAK PERIOD Time 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Westbound U 3 1 2 5 1 0 0 0 Peds 0 0 0 0 0 1 0 0 Left 0 0 0 0 0 0 0 0 Thru 7 7 5 10 16 18 11 4 Right 6 9 10 4 10 7 7 10 U 0 0 0 0 0 0 0 0 Peds 0 0 0 0 0 0 0 5 Left 1 0 2 1 0 1 0 3 Northbound Parking Garage Thru Right U 5 5 4 5 5 6 1 2 3 2 0 1 2 0 0 1 A.M. Peak Hour 7:45 8:45 A.M. Peak Hour 7:45 8:00 8:15 8:30 TOTAL Ped Conflicts PHF P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 15 20 25 27 87 2 Eastbound Hallmark Dr Thru Right 9 2 10 2 9 1 5 0 33 5 1 1 Eastbound Hallmark Dr Thru Right 14 0 9 0 10 0 13 0 46 0 0 Left 3 2 3 3 11 Thru 4 7 6 6 23 0 0.806 0.825 0.625 ##### Left 19 21 21 17 78 Peds 1 0 0 0 1 0.25 Right 5 4 4 12 25 U 0 1 0 0 1 Peds 0 0 0 0 0 1 0.917 0.821 0.521 Left 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 0 Thru 7 7 5 10 29 Right 6 9 10 4 29 1 Northbound Parking Garage Thru Right U 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0.25 Left 20 14 14 8 10 9 9 15 Thru 0 0 0 0 0 0 0 0 Right 10 16 14 17 26 22 17 14 U 0 0 0 0 0 0.25 Peds 0 0 0 0 0 Northbound Parking Garage Thru Right U 5 5 0 4 5 0 5 6 0 1 2 0 15 18 0 Left 1 0 2 1 4 0 Southbound Peds 0 0 0 0 0 0 ##### ##### Westbound U 3 1 2 5 11 Peds 0 0 0 0 0 0 0 0 Vehicle Total 91 86 89 78 101 90 73 70 P.M. Peak Hour 16:00 17:00 Westbound U 0 0 0 0 0 Southbound Thru 0 1 0 0 1 Right 9 7 7 11 34 0.25 0.773 ##### 1 ##### ##### ##### 0 Left 5 11 12 8 36 0.75 2 Left 20 14 14 8 56 1 Thru 0 0 0 0 0 Right 10 16 14 17 57 1 53 65 67 72 257 2 0.25 Southbound Peds 0 0 0 0 0 Vehicle Total U 1 0 0 0 1 Peds 0 0 0 1 1 0.8924 Vehicle Total 91 86 89 78 344 1 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: IH 610 SBFR @ Hallmark Tuesday, April 01, 2014 CJH Eastbound Time Left Thru 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Right 10 12 10 6 14 16 8 12 U 0 0 1 0 0 0 0 0 Peds 1 0 2 0 0 0 0 0 Eastbound Time Left Thru 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Right 55 35 49 32 36 26 23 27 U 0 0 0 0 0 0 0 0 Peds 5 0 0 1 0 0 4 1 A.M. PEAK PERIOD Westbound Northbound IH 10 WB Frontage Road SH 6 NB Thru Right U Peds Left U Left Thru Right P.M. PEAK PERIOD Westbound Northbound IH 10 WB Frontage Road SH 6 NB Thru Right U Peds Left U Left Thru Right A.M. Peak Hour 7:45 8:45 Peds 0 0 0 0 0 0 0 0 Left Southbound IH 610 SBFR Thru Right U 104 24 128 26 124 27 140 18 123 18 136 18 123 27 129 15 Peds 0 0 0 0 0 0 0 0 Southbound Peds 0 0 0 0 0 0 0 0 Left Thru 223 204 200 191 180 177 151 134 Right 5 2 2 8 10 15 11 10 U Peds 0 0 0 0 0 0 0 0 Vehicle Total 138 166 162 164 155 170 158 156 Vehicle Total 283 241 251 231 226 218 185 171 P.M. Peak Hour 16:00 17:00 A.M. Westbound Northbound Southbound Eastbound Vehicle IH 10 WB Frontage Road SH 6 NB Peak Total Hour Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds 7:45 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 140 18 0 0 164 8:00 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 123 18 0 0 155 8:15 0 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 136 18 0 0 170 8:30 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 123 27 0 0 158 TOTAL 0 0 44 0 0 0 0 0 0 0 0 0 0 0 0 0 522 81 0 0 647 Ped 0 0 0 0 0 0 0 0 0 Conflicts PHF ##### ##### 0.688 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### 0.932 0.75 ##### ##### 0.9515 P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Eastbound Left 0 0 0 0 0 6 Thru 0 0 0 0 0 Right 55 35 49 32 171 6 U 0 0 0 0 0 Peds 5 0 0 1 6 Westbound IH 10 WB Frontage Road Thru Right U Left Peds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Left 0 0 0 0 0 6 Northbound SH 6 NB Thru Right 0 0 0 0 0 0 0 0 0 0 0 Southbound U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 0 Thru 223 204 200 191 818 Right 5 2 2 8 17 6 U 0 0 0 0 0 Peds 0 0 0 0 0 Vehicle Total 283 241 251 231 1006 6 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: IH 610 SBFR @ North Driveway Tuesday, April 01, 2014 CJH A.M. PEAK PERIOD Time Left 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Eastbound Landry's Driveway Thru Right U 1 0 1 0 0 1 3 1 Westbound Peds 0 0 2 0 0 0 0 0 Left Thru Right Northbound U Peds Left Thru Right U Peds 0 0 0 0 0 0 0 0 Left Southbound SB 6 SB Thru Right U 125 8 157 9 160 17 161 20 141 24 150 20 146 36 146 41 Peds 0 0 0 0 0 0 0 0 Southbound SB 6 SB Thru Right U 217 4 198 1 190 1 195 1 196 8 167 2 156 2 144 2 Peds 0 0 0 0 0 0 0 0 Vehicle Total 134 166 178 181 165 171 185 188 P.M. PEAK PERIOD Time Left 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Eastbound Landry's Driveway Thru Right U 5 9 12 2 10 9 8 4 Westbound Peds 5 0 0 0 0 0 3 1 Left Thru Right Northbound U Peds Left Thru A.M. Peak Hour 7:45 8:45 Right U Peds 0 0 0 0 0 0 0 0 Left Vehicle Total 226 208 203 198 214 178 166 150 P.M. Peak Hour 16:00 17:00 A.M. Westbound Northbound Southbound Eastbound Vehicle Landry's Driveway SB 6 SB Peak Total Hour Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds 7:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 161 20 0 0 181 8:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 141 24 0 0 165 8:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 150 20 0 0 171 8:30 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 146 36 0 0 185 TOTAL 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 598 100 0 0 702 Ped 0 0 0 0 0 0 0 0 0 Conflicts PHF ##### ##### 0.333 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### 0.929 0.694 ##### ##### 0.9486 P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 0 0 0 0 0 Eastbound Landry's Driveway Thru Right U 0 5 0 0 9 0 0 12 0 0 2 0 0 28 0 5 5 Westbound Peds 5 0 0 0 5 Left 0 0 0 0 0 0 Thru 0 0 0 0 0 Right 0 0 0 0 0 0 Northbound U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 5 Thru 0 0 0 0 0 Right 0 0 0 0 0 0 U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 0 Southbound SB 6 SB Thru Right 217 4 198 1 190 1 195 1 800 7 5 U 0 0 0 0 0 Peds 0 0 0 0 0 Vehicle Total 226 208 203 198 835 5 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: IH 610 SBFR @ SouthDriveway Tuesday, April 01, 2014 CJH A.M. PEAK PERIOD Time Left 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Eastbound Bentley Driveway Thru Right U 0 0 0 1 0 2 1 1 Westbound Peds 0 0 2 1 12 9 13 33 Left Eastbound Time Left Thru 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Right 4 1 1 0 1 1 1 0 U Peds 4 0 2 1 1 1 0 2 Left Thru Right Northbound U Peds Left Thru Right U P.M. PEAK PERIOD Westbound Northbound 0 Thru Right U Peds Left U Thru Right A.M. Peak Hour 7:45 8:45 Peds Peds Left Left Southbound IH 610 SBFR Thru Right U 126 0 155 2 160 1 160 1 141 0 151 0 149 0 144 1 Peds 0 0 0 0 0 0 0 0 Southbound IH 610 SBFR Thru Right U 219 2 208 1 202 0 197 1 205 0 175 0 162 2 145 2 Peds 0 0 0 0 0 0 0 0 Vehicle Total 126 157 161 162 141 153 150 146 Vehicle Total 225 210 203 198 206 176 165 147 P.M. Peak Hour 16:00 17:00 A.M. Westbound Northbound Southbound Eastbound Vehicle 0 IH 610 SBFR Peak Total Hour Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds 7:45 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 160 1 0 0 162 8:00 0 0 0 0 12 0 0 0 0 0 0 0 0 0 0 0 141 0 0 0 141 8:15 0 0 2 0 9 0 0 0 0 0 0 0 0 0 0 0 151 0 0 0 153 8:30 0 0 1 0 13 0 0 0 0 0 0 0 0 0 0 0 149 0 0 0 150 TOTAL 0 0 4 0 35 0 0 0 0 0 0 0 0 0 0 0 601 1 0 0 606 Ped 35 35 0 0 35 0 0 35 35 Conflicts PHF ##### ##### 0.5 ##### 0.673 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### 0.939 0.25 ##### ##### 0.9352 P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Eastbound Left 0 0 0 0 0 7 Thru 0 0 0 0 0 Right 4 1 1 0 6 7 U 0 0 0 0 0 Peds 4 0 2 1 7 Left 0 0 0 0 0 0 Westbound 0 Thru Right 0 0 0 0 0 0 0 0 0 0 0 Northbound U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 7 Thru 0 0 0 0 0 Right 0 0 0 0 0 0 U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 0 Southbound IH 610 SBFR Thru Right U 219 2 0 208 1 0 202 0 0 197 1 0 826 4 0 7 Peds 0 0 0 0 0 Vehicle Total 225 210 203 198 836 7 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Hollyhurst @ North Parking Lot Driveway Tuesday, April 01, 2014 CJH A.M. PEAK PERIOD Eastbound Left 0 1 0 1 0 0 0 0 Westbound Parking Lot Thru Right 0 2 1 0 0 2 0 1 Left 3 3 3 2 12 4 8 1 Westbound Parking Lot Thru Right 6 3 8 8 18 8 5 5 Time Left Thru Right U Peds 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 U 0 0 0 0 0 0 0 0 Peds 1 0 0 1 0 0 0 0 Left Northbound Hollyhurst Thru Right U 18 3 18 4 17 1 21 6 26 1 27 8 38 7 31 11 Peds 0 0 0 0 0 0 0 1 Left 2 2 2 7 6 7 4 12 Southbound Hollyhurst Thru Right 7 11 11 6 11 13 8 13 U 0 0 0 0 0 0 0 0 Peds 1 0 0 2 0 0 0 0 U 0 0 0 1 0 0 2 0 Peds 0 0 0 0 0 1 0 2 U 0 0 0 0 0 Peds 2 0 0 0 2 Vehicle Total 30 38 32 41 44 57 57 68 P.M. PEAK PERIOD Time Left Eastbound 0 Thru Right U Peds 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 U 0 0 0 0 0 0 0 0 Peds 2 0 0 0 0 0 0 0 Left A.M. Peak Hour 7:45 8:45 A.M. Eastbound 0 Peak Hour Left Thru Right U Peds 7:45 0 0 0 0 0 8:00 0 0 0 0 0 8:15 0 0 0 0 0 8:30 0 0 0 0 0 TOTAL 0 0 0 0 0 Ped 2 0 Conflicts PHF ##### ##### ##### ##### ##### P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 0 0 0 0 0 0 Eastbound 0 Thru Right 0 0 0 0 0 0 0 0 0 0 0 U 0 0 0 0 0 Peds 0 0 0 0 0 Northbound Hollyhurst Thru Right U 28 0 37 0 28 1 26 0 37 1 34 1 34 0 28 0 Southbound Peds 0 0 0 0 0 0 0 0 Left 0 2 0 1 1 0 0 0 Thru 23 24 26 26 21 33 18 29 Right Vehicle Total 60 69 66 64 90 80 67 63 P.M. Peak Hour 16:00 17:00 Left 1 0 0 0 1 Westbound Parking Lot Thru Right 0 0 0 0 0 2 0 0 0 2 1 0.25 Left 3 3 3 2 11 2 U 0 0 0 0 0 Peds 1 0 0 0 1 ##### 0.25 3 ##### 0.25 0 Westbound Parking Lot Thru Right 0 6 0 3 0 8 0 8 0 25 2 Left 0 0 0 0 0 U 0 0 0 0 0 Peds 2 0 0 0 2 Northbound Hollyhurst Thru Right 21 6 26 1 27 8 38 7 112 22 Southbound U 0 0 0 0 0 Peds 0 0 0 0 0 1 Left 7 6 7 4 24 Thru 6 11 13 8 38 3 Right 0 0 0 0 0 2 Left 0 0 0 0 0 0 2 0.25 Southbound U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 2 0 1 3 2 Thru 23 24 26 26 99 Right 0 0 0 0 0 0 41 44 57 57 199 3 ##### 0.737 0.688 ##### ##### 0.857 0.731 ##### ##### Northbound Hollyhurst Thru Right 28 0 37 0 28 1 26 0 119 1 Vehicle Total U 0 0 0 1 1 Peds 0 0 0 0 0 0.8728 Vehicle Total 60 69 66 64 259 2 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Hollyhurst @ South Parking Lot Driveway Tuesday, April 01, 2014 CJH Left 0 0 0 0 0 0 0 0 A.M. PEAK PERIOD Westbound South Parking Lot Thru Right U Peds Left 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 Left 0 0 0 0 0 0 0 0 P.M. PEAK PERIOD Westbound South Parking Lot Thru Right U Peds Left 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 Eastbound Time Left Thru Right U Peds 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Time Left Eastbound 0 Thru Right U Peds 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 Northbound Hollyhurst Thru Right U 15 14 12 19 20 30 37 34 Peds 1 0 0 1 0 2 0 0 Left Northbound Thru 30 35 34 30 35 32 33 32 A.M. Peak Hour 7:45 8:45 Right U Peds 0 0 0 0 0 0 0 0 Left Southbound Hollyhurst Thru Right 16 16 17 16 16 17 19 20 U 0 0 0 0 0 0 0 0 Peds 0 0 0 0 0 0 0 0 Southbound Hollyhurst Thru Right 27 28 28 24 29 33 19 27 U 0 0 1 0 0 0 0 0 Peds 0 0 0 0 0 0 0 0 Vehicle Total 31 30 29 35 36 47 56 54 Vehicle Total 57 63 63 54 64 65 52 59 P.M. Peak Hour 16:00 17:00 A.M. Westbound Northbound Southbound Eastbound Vehicle 0 South Parking Lot Hollyhurst Peak Total Hour Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds Left Thru Right U Peds 7:45 0 0 0 0 0 0 0 0 0 1 0 19 0 0 1 0 16 0 0 0 35 8:00 0 0 0 0 0 0 0 0 0 0 0 20 0 0 0 0 16 0 0 0 36 8:15 0 0 0 0 0 0 0 0 0 0 0 30 0 0 2 0 17 0 0 0 47 8:30 0 0 0 0 0 0 0 0 0 0 0 37 0 0 0 0 19 0 0 0 56 TOTAL 0 0 0 0 0 0 0 0 0 1 0 106 0 0 3 0 68 0 0 0 174 Ped 0 3 4 1 3 4 1 0 4 Conflicts PHF ##### ##### ##### ##### ##### ##### ##### ##### ##### 0.25 ##### 0.716 ##### ##### 0.375 ##### 0.895 ##### ##### ##### 0.7768 P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 0 0 0 0 0 0 Eastbound 0 Thru Right 0 0 0 0 0 0 0 0 0 0 0 U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 Westbound South Parking Lot Thru Right U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Northbound Peds 1 0 0 1 2 Left 0 0 0 0 0 0 Thru 30 35 34 30 129 Right 0 0 0 0 0 2 U 0 0 0 0 0 Peds 0 0 0 0 0 Left 0 0 0 0 0 2 Southbound Hollyhurst Thru Right 27 0 28 0 28 0 24 0 107 0 0 U 0 0 1 0 1 Peds 0 0 0 0 0 Vehicle Total 57 63 63 54 237 2 1600 West Loop TIA Walter P Moore Project T03-14008-00 Turning Movement Counts - RAW DATA Count Location: Count Date: Weather Conditions: Road Surface Condition: Names of Counters: Area Peak Hour Tuesday, April 01, 2014 CJH A.M. PEAK PERIOD Left 190 239 261 303 311 294 298 249 Eastbound Thru Right U 836 135 1 1151 150 2 1248 212 5 1365 203 7 1462 199 12 1339 174 9 1280 156 7 1201 189 7 Left 619 673 689 639 547 643 695 748 Eastbound Thru Right 1742 252 1820 243 1756 207 1800 220 1620 238 1692 195 1976 164 1987 217 Time 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 Peds 6 0 8 4 14 10 13 33 Left 66 95 110 117 93 108 113 113 Westbound Thru Right 1077 115 1162 154 1152 190 1265 193 1311 173 1293 144 1332 197 1333 193 Left 183 141 155 141 128 139 157 158 Westbound Thru Right 1009 303 1013 302 1133 304 1053 261 975 179 1004 197 1178 212 1262 283 U 1 1 0 0 3 1 0 5 Peds 5 3 4 8 2 5 5 5 Left 262 255 208 263 285 292 288 286 Northbound Thru Right U 284 81 72 331 99 70 334 104 79 431 118 106 476 126 130 443 128 115 475 120 134 448 118 111 Peds 2 5 19 8 3 5 5 3 Left 210 215 239 253 269 272 256 284 Thru 598 733 781 783 718 778 781 744 Southbound Right 480 478 507 545 548 490 567 531 U 102 128 127 151 201 164 169 176 Peds 2 1 11 4 5 8 3 7 Thru 1052 1026 997 965 947 873 798 696 Southbound Right 264 267 276 289 329 326 375 326 U 148 104 121 75 77 80 77 71 Peds 5 6 14 10 10 26 16 12 Thru 783 718 778 781 3060 Southbound Right 545 548 490 567 2150 U 151 201 164 169 685 Peds 4 5 8 3 20 0.852 0.625 U 148 104 121 75 448 Peds 5 6 14 10 35 Vehicle Total 4510 5263 5557 6103 6317 6044 6173 5988 P.M. PEAK PERIOD Time 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 U 10 11 11 14 7 8 9 10 Peds 17 1 7 3 7 5 9 6 U 3 0 1 2 6 0 2 2 Peds 5 4 5 6 4 11 5 18 Left 122 99 134 129 112 109 124 144 Northbound Thru Right 505 117 563 92 554 111 477 127 398 116 425 109 430 91 455 96 A.M. Peak Hour 7:45 8:45 A.M. Peak Hour 7:45 8:00 8:15 8:30 TOTAL Ped Conflicts PHF P.M. Peak Hour 16:00 16:15 16:30 16:45 TOTAL Ped Conflicts Left 303 311 294 298 1206 Eastbound Thru Right U 1365 203 7 1462 199 12 1339 174 9 1280 156 7 5446 732 35 61 0.931 Left 619 673 689 639 2620 Eastbound Thru Right 1742 252 1820 243 1756 207 1800 220 7118 922 63 0.901 Left 117 93 108 113 431 0.732 0.921 65 Westbound Thru Right 1265 193 1311 173 1293 144 1332 197 5201 707 41 0.729 U 10 11 11 14 46 Peds 17 1 7 3 28 Peds 10 12 9 6 2 8 5 9 Left 175 167 172 173 161 176 174 183 Vehicle Total 6565 6561 6678 6413 5877 6027 6505 6677 P.M. Peak Hour 16:00 17:00 Peds 4 14 10 13 41 62 0.969 U 61 40 57 48 37 51 43 39 Left 183 141 155 141 620 57 U 0 3 1 0 4 Peds 8 2 5 5 20 Left 263 285 292 288 1128 0.333 0.625 0.966 40 0.976 0.897 62 Westbound Thru Right 1009 303 1013 302 1133 304 1053 261 4208 1170 55 Northbound Thru Right U 431 118 106 476 126 130 443 128 115 475 120 134 1825 492 485 U 3 0 1 2 6 Peds 5 4 5 6 20 Peds 8 3 5 5 21 Left 253 269 272 256 1050 0.656 0.965 41 0.959 0.961 40 0.905 Left 122 99 134 129 484 Northbound Thru Right U 505 117 61 563 92 40 554 111 57 477 127 48 2099 447 206 65 57 Peds 10 12 9 6 37 Left 175 167 172 173 687 55 61 0.977011 Thru 1052 1026 997 965 4040 0.947972 Southbound Right 264 267 276 289 1096 63 Vehicle Total 6103 6317 6044 6173 24637 102 0.975 Vehicle Total 6565 6561 6678 6413 26217 120 TAB TWO Existing Conditions Capacity Analysis 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 466 1610 0.950 1610 709 3373 0.995 3373 0 0 0 0 128 4569 194 0 196 0 93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 403 Split 5 15 834 NA 5 15 0 0 4569 204 339 NA 6 0 0 Perm 491 4919 0.988 4913 14 821 NA 87 0 0 0 0 87 80.7 0.54 0.47 8.8 6.6 15.3 B 80.7 0.54 0.46 7.8 3.8 11.6 B 12.8 B 30.0 5.7 21.3 0.14 0.41 24.2 0.0 24.2 C 24.2 C 30.6 0.20 0.81 63.2 0.0 63.2 E 63.2 E Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 31.7 Intersection LOS: C Intersection Capacity Utilization 83.9% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 1: IH 610 NBFR & Post Oak Blvd Synchro 8 Report Page 1 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd AM Peak ø1 ø2 ø3 ø4 ø5 ø7 ø8 ø11 ø15 1 2 3 4 5 7 8 11 15 22.0 35.0 8.0 60.0 27.0 8.0 25.0 25.0 60.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 2 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 603 4977 88 0 0 0 0 0 0 0 0 0 0 0 0 572 1522 0.950 1522 27 Prot 1 11 300 NA 1 2 11 0 0 0 0 502 4312 0.998 4312 422 1731 NA 34 1154 0 4977 16 698 NA 2 294 3390 0.955 3238 0 0 0 30 1610 0.950 1608 0 0 520 Perm 0 0 34 35.0 5.7 29.4 0.20 0.71 50.8 0.9 51.7 D 51.7 D 41.2 0.27 0.06 32.7 0.0 32.7 C 70.6 0.47 0.25 6.4 0.3 6.7 A 8.9 A 62.0 0.41 0.83 51.9 0.0 51.9 D 62.0 0.41 1.34dr 34.6 0.0 34.7 C 38.6 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 38.5 Intersection LOS: D Intersection Capacity Utilization 83.9% ICU Level of Service E Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 2: Post Oak Blvd & IH 610 SBFR Synchro 8 Report Page 3 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR AM Peak ø1 ø3 ø4 ø5 ø6 ø7 ø8 ø11 ø15 1 3 4 5 6 7 8 11 15 22.0 8.0 60.0 27.0 30.0 8.0 25.0 25.0 60.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 4 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 521 3433 0.950 3427 899 3539 0 0 0 0 755 6408 355 1583 1105 3539 331 1583 0 0 0 0 0 0 3539 0 0 6408 3539 0 0 0 0 795 NA 6 964 Perm 1163 NA 87 1531 185 348 Perm 0 548 946 Prot NA 5 15 5 15 18 1536 338 374 Perm 916 3433 0.950 3406 0 0 0 45.4 0.30 0.53 27.8 1.5 29.3 C 75.4 0.50 0.53 6.5 2.2 8.7 A 16.3 B 35.0 5.6 27.0 0.18 0.69 60.8 0.0 60.8 E 46.0 D 6 35.0 5.6 27.0 0.18 0.68 14.6 0.0 14.6 B 87 30.8 0.21 1.38 222.5 0.0 222.5 F 87 30.8 0.21 1.60 313.8 0.0 313.8 F 239.4 F 30.8 0.21 0.75 37.5 0.0 37.5 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 30 (20%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.60 Intersection Signal Delay: 130.5 Intersection LOS: F Intersection Capacity Utilization 115.8% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 3: IH 610 NBFR & San Felipe Synchro 8 Report Page 5 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe AM Peak ø1 ø2 ø4 ø5 ø7 ø8 ø15 ø18 1 2 4 5 7 8 15 18 62.0 45.0 43.0 38.0 7.0 27.0 13.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 6 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe AM Peak NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR 0 0 0 0 0 0 0 0 1043 6408 499 1583 0 0 0 0 0 6408 3539 0 0 0 0 0 0 1064 NA 2 1546 218 509 Perm 331 3433 0.950 3428 1340 3539 0 690 4506 0.998 4504 72 1117 NA 4 367 0 0 377 1522 0.950 1498 338 Prot 1 1367 NA 12 0 346 Perm 4 43.0 5.6 37.4 0.25 0.93 86.2 0.0 86.2 F 43.0 5.6 37.4 0.25 0.95 68.1 0.0 68.1 E 72.4 E 45.0 5.6 39.4 0.26 0.63 37.5 0.2 37.6 D 38.8 D 2 45.0 5.6 39.4 0.26 0.90 41.3 0.0 41.3 D 62.0 5.6 56.4 0.38 0.26 20.5 1.0 21.5 C 101.4 0.68 0.57 2.7 23.7 26.4 C 25.4 C Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 30 (20%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.60 Intersection Signal Delay: 44.4 Intersection LOS: D Intersection Capacity Utilization 115.8% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 4: IH 610 SBFR & San Felipe Synchro 8 Report Page 7 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe AM Peak ø5 ø6 ø7 ø8 ø15 ø18 5 6 7 8 15 18 38.0 35.0 7.0 27.0 13.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 8 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 20 0 616 4960 87 0 1 0 57 1583 13 0 0 0 5085 0 58 1770 0.950 1708 0 Prot 5 107 Prot 5 0 0 Prot 1 39 Prot 1 1382 NA 6 1516 145 59 Perm 23.0 23.0 5.0 14.0 0.09 0.65 83.3 0.0 83.3 F 23.0 23.0 5.0 13.3 0.09 0.25 80.9 0.0 80.9 F 75.0 6.0 81.3 0.54 0.50 25.0 0.5 25.4 C 25.9 C 6 1618 0.000 0 42 62 NA 8 3 20.0 6.0 9.0 0.06 0.45 41.8 0.0 41.8 D 41.8 D 40 0 4960 23 733 NA 2 36 1770 0.950 1743 1327 5085 0 82 1770 0.950 1764 75.0 6.0 84.1 0.56 0.26 19.1 0.0 19.1 B 27.2 C 6 75.0 6.0 81.3 0.54 0.07 1.1 0.0 1.1 A 0 pm+pt 3 8 7.0 0 0 60 Prot 7 25.0 6.0 25.5 0.17 0.20 54.5 0.0 54.5 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 60 (40%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 29.7 Intersection LOS: C Intersection Capacity Utilization 70.9% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report Page 9 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak SBT SBR 35 1568 365 0 1568 165 416 NA 4 8 25.0 6.0 37.7 0.25 0.80 42.9 0.0 42.9 D 44.4 D 0 0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 10 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe AM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 15 0 1576 5085 1 0 2 0 74 0 3 0 4 0 0 0 0 0 68 Prot 5 1643 NA 2 0 0 Prot 1 26 Prot 1 0 0 Perm 1562 96 6 Perm 0 0 Prot 5 5040 10 1474 NA 6 4 1824 0.933 1737 6 1583 5085 23 1770 0.950 1769 1341 5040 0 50 1770 0.950 1769 17.0 17.0 5.4 10.8 0.07 0.54 81.6 0.0 81.6 F 85.0 5.4 100.1 0.67 0.48 13.7 0.0 13.7 B 16.4 B 25.0 25.0 5.4 8.9 0.06 0.25 66.6 0.0 66.6 E 93.0 5.4 96.1 0.64 0.46 4.0 0.0 4.0 A 5.1 A 8 40.0 7 NA 8 40.0 5.7 29.0 0.19 0.02 49.4 0.0 49.4 D 26.6 C 8 40.0 5.7 29.0 0.19 0.02 0.0 0.0 0.0 A 0 Perm 4 40.0 Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 15 (10%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.54 Intersection Signal Delay: 11.3 Intersection LOS: B Intersection Capacity Utilization 82.3% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 6: Hallmark & San Felipe Synchro 8 Report Page 11 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe AM Peak SBT SBR 5 1624 0.989 1611 50 59 NA 4 48 0 0 0 40.0 5.7 29.0 0.19 0.17 17.2 0.0 17.2 B 17.2 B Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 12 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 7: Hallmark & Hollyhurst Ln AM Peak 5.5 EBL 87 2 Free 0 89 2 98 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 56 4.12 2.218 1549 - Approach HCM Control Delay, s HCM LOS EB 5.2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 1546 - EBL 1546 0.063 7.5 A 0.2 EBT 38 0 Free None 0 0 89 2 43 WBT 23 0 Free 0 0 89 2 26 0 - Major2 WB 0 EBT - WBT - WBR 25 1 Free None 89 2 28 0 - SBL 36 1 Stop 0 0 0 89 2 40 SBR 34 2 Stop None 92 2 37 Minor2 280 42 238 6.42 5.42 5.42 3.518 710 980 802 44 6.22 3.318 1026 - 663 663 978 750 1023 - SB 10 B WBR SBLn1 797 - 0.097 10 B 0.3 Synchro 8 Report Page 1 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 9: Hallmark & IH 610 SBFR AM Peak 0.8 EBL 0 0 Stop 0 0 95 2 0 EBR 44 0 Stop None 0 95 2 46 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 592 592 0 6.44 7.34 3.82 440 380 - 316 7.14 3.92 580 - 440 440 380 - 580 - Approach HCM Control Delay, s HCM LOS EB 11.7 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 580 0.08 11.7 B 0.3 NBL 0 0 Free 95 2 0 NBT 0 0 Free None 0 0 95 2 0 SBT 522 0 Free 0 0 95 2 549 SBR 81 0 Free None 95 2 85 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 2 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 11: IH 610 SBFR & Existing South AM Peak 0.1 EBL 0 0 Stop 0 0 95 2 0 EBR 4 0 Stop None 0 95 2 4 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 682 682 0 6.44 7.34 3.82 391 330 - 366 7.14 3.92 539 - 391 391 330 - 539 - Approach HCM Control Delay, s HCM LOS EB 11.7 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 539 0.008 11.7 B 0 NBL 0 0 Free 95 2 0 NBT 0 0 Free None 0 0 95 2 0 SBT 598 0 Free 0 0 95 2 629 SBR 100 0 Free None 95 2 105 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 3 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 12: IH 610 SBFR & Existing North AM Peak 0.1 EBL 0 0 Stop 0 0 94 2 0 EBR 4 35 Stop None 0 94 2 4 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 675 675 0 6.44 7.34 3.82 395 333 - 354 7.14 3.92 548 - 372 372 323 - 532 - Approach HCM Control Delay, s HCM LOS EB 11.8 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 532 0.008 11.8 B 0 NBL 0 0 Free 94 2 0 NBT 0 0 Free None 0 0 94 2 0 SBT 601 0 Free 0 0 94 2 639 SBR 1 35 Free None 94 2 1 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 4 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 13: Existing North Lot AM Peak 1 WBL 1 1 Stop 0 0 0 87 2 1 WBR 2 3 Stop None 87 2 2 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 243 144 99 6.42 5.42 5.42 3.518 745 883 925 147 6.22 3.318 900 - 728 728 881 906 896 - Approach HCM Control Delay, s HCM LOS WB 9.3 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 112 0 Free 0 0 87 2 129 Major1 0 NB 0 NBR WBLn1 832 - 0.004 9.3 A 0 SBL 1419 0.019 7.6 A 0.1 NBR 22 1 Free None 87 2 25 0 - SBL 24 3 Free 87 2 28 Major2 157 4.12 2.218 1423 1419 - SBT 38 0 Free None 0 0 87 2 44 0 - SB 2.9 SBT 0 A - Synchro 8 Report Page 5 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 14: Hollyhurst Ln & Existing South Lot AM Peak 0 WBL 0 4 Stop 0 0 0 78 2 0 WBR 0 1 Stop None 78 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 227 140 87 6.42 5.42 5.42 3.518 761 887 936 141 6.22 3.318 907 - 756 756 884 933 903 - Approach HCM Control Delay, s HCM LOS WB 0 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 106 0 Free 0 0 78 2 136 Major1 0 NB 0 NBR WBLn1 0 A - SBL 1442 0 A 0 NBR 0 4 Free None 78 2 0 0 - SBL 0 1 Free 78 2 0 Major2 140 4.12 2.218 1443 1442 - SBT 68 0 Free None 0 0 78 2 87 0 - SB 0 SBT - Synchro 8 Report Page 6 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 1569 1610 0.950 1610 366 3278 0.967 3278 0 0 0 0 289 4585 423 0 80 0 35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 826 Split 5 15 1211 NA 5 15 0 0 4585 13 749 NA 6 0 0 Perm 853 5034 0.996 5029 3 1019 NA 87 0 0 0 0 87 81.3 0.54 0.95 25.5 44.1 69.6 E 81.3 0.54 0.91dl 5.9 8.5 14.4 B 36.8 D 30.0 5.7 24.3 0.16 1.65dr 92.4 0.0 92.4 F 92.4 F 27.0 0.18 1.12 124.1 0.0 124.1 F 124.1 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.12 Intersection Signal Delay: 71.1 Intersection LOS: E Intersection Capacity Utilization 65.9% ICU Level of Service C Analysis Period (min) 15 dl Defacto Left Lane. Recode with 1 though lane as a left lane. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 1: IH 610 NBFR & Post Oak Blvd Synchro 8 Report Page 1 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd PM Peak ø1 ø2 ø3 ø4 ø5 ø7 ø8 ø11 ø15 1 2 3 4 5 7 8 11 15 22.0 65.0 8.0 30.0 57.0 8.0 25.0 25.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 2 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 1673 5028 120 0 0 0 0 0 0 0 0 0 0 0 0 262 1522 0.950 1507 87 Prot 1 11 290 NA 1 2 11 0 0 0 0 531 4395 0.999 4394 149 1121 NA 34 541 0 5028 9 1829 NA 2 274 3383 0.948 3214 0 0 0 95 1610 0.950 1609 0 0 240 Perm 0 0 34 65.0 5.7 59.3 0.40 0.92 69.5 45.9 115.4 F 115.4 F 41.3 0.28 0.20 11.6 1.8 13.4 B 100.6 0.67 0.19 0.6 0.3 0.9 A 3.8 A 32.0 0.21 0.75 70.6 0.0 70.6 E 32.0 0.21 1.27dr 94.1 0.8 94.9 F 90.6 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.12 Intersection Signal Delay: 94.1 Intersection LOS: F Intersection Capacity Utilization 65.9% ICU Level of Service C Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 2: Post Oak Blvd & IH 610 SBFR Synchro 8 Report Page 3 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR PM Peak ø1 ø3 ø4 ø5 ø6 ø7 ø8 ø11 ø15 1 3 4 5 6 7 8 11 15 22.0 8.0 30.0 57.0 30.0 8.0 25.0 25.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 4 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 751 3433 0.950 3433 782 3539 0 0 0 0 1023 6408 523 1583 959 3539 178 1583 0 0 0 0 0 0 3539 0 0 6408 3539 0 0 0 0 1066 NA 6 1499 182 185 Perm 0 782 815 Prot NA 5 15 16 5 15 18 1390 260 545 Perm 364 3433 0.950 3379 0 0 0 60.4 0.40 0.57 6.7 2.4 9.2 A 72.4 0.48 0.48 7.5 17.3 24.8 C 17.2 B 25.0 5.6 19.4 0.13 1.29 188.2 0.0 188.2 F 190.3 F 379 Perm 6 25.0 5.6 19.4 0.13 1.34 194.2 0.0 194.2 F 8 34.0 5.6 28.4 0.19 0.59 59.9 0.3 60.2 E 999 NA 8 34.0 5.6 28.4 0.19 1.49 269.4 0.0 269.4 F 188.0 F 8 34.0 5.6 28.4 0.19 0.43 10.4 0.0 10.4 B Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 35 (23%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.49 Intersection Signal Delay: 131.6 Intersection LOS: F Intersection Capacity Utilization 95.4% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 3: IH 610 NBFR & San Felipe Synchro 8 Report Page 5 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe PM Peak ø1 ø2 ø4 ø5 ø15 ø16 ø18 1 2 4 5 15 16 18 59.0 38.0 53.0 25.0 28.0 13.0 25.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 6 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe PM Peak NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR 0 0 0 0 0 0 0 0 1263 6408 555 1583 0 0 0 0 0 6408 3539 0 0 0 0 0 0 1276 NA 2 1583 141 561 Perm 474 3433 0.950 3433 913 3539 0 837 4729 0.999 4729 12 967 NA 4 94 0 0 270 1522 0.950 1522 479 Prot 1 922 NA 12 0 246 Perm 4 53.0 5.6 47.4 0.32 0.51 46.4 0.0 46.4 D 53.0 5.6 47.4 0.32 0.64 45.8 0.0 45.8 D 46.0 D 38.0 5.6 32.4 0.22 0.92 55.9 22.7 78.6 E 101.2 F 2 38.0 5.6 32.4 0.22 1.24 152.7 0.0 152.7 F 59.0 5.6 53.4 0.36 0.39 1.1 1.7 2.7 A 91.4 0.61 0.43 4.3 6.1 10.3 B 7.7 A Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 35 (23%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.49 Intersection Signal Delay: 56.7 Intersection LOS: E Intersection Capacity Utilization 95.4% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 4: IH 610 SBFR & San Felipe Synchro 8 Report Page 7 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe PM Peak ø5 ø6 ø8 ø15 ø16 ø18 5 6 8 15 16 18 25.0 25.0 34.0 28.0 13.0 25.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 8 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 7 0 1526 5059 37 0 2 0 91 1583 12 0 0 0 5085 0 110 1770 0.950 1686 0 Prot 5 195 Prot 5 15 0 0 Prot 1 10 Prot 1 727 NA 6 1482 182 94 Perm 23.0 23.0 5.0 10.7 0.07 0.08 45.0 0.0 45.0 D 50.0 5.5 57.1 0.38 0.38 29.6 0.0 29.6 C 26.6 C 18 1583 0.000 0 161 220 NA 8 3 20.0 6.0 12.6 0.08 0.79 37.3 9.2 46.5 D 46.5 D 183 0 5059 3 1611 NA 2 8 1770 0.950 1763 705 5085 0 181 1770 0.364 665 23.0 17.9 0.12 0.92 109.8 0.0 109.8 F 75.0 5.5 95.9 0.64 0.50 18.3 0.3 18.6 B 28.4 C 6 50.0 5.5 57.1 0.38 0.14 1.4 0.0 1.4 A 0 pm+pt 3 8 7.0 0 0 113 Prot 7 25.0 6.0 14.9 0.10 0.65 81.3 132.7 214.0 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 33.7 Intersection LOS: C Intersection Capacity Utilization 87.3% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report Page 9 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak SBT SBR 15 1525 292 0 1525 301 316 NA 4 8 25.0 6.0 33.4 0.22 0.55 9.1 0.0 9.1 A 63.1 E 0 ø15 0 15 25.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 10 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe PM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 23 0 1604 5084 5 0 4 0 79 0 27 0 8 0 0 0 0 0 68 Prot 5 1659 NA 2 0 0 Prot 1 37 Prot 1 0 0 Perm 1544 96 33 Perm 0 0 Prot 5 5023 15 1096 NA 6 6 1788 0.787 1450 32 1583 5084 32 1770 0.950 1763 985 5023 0 42 1770 0.950 1766 17.0 17.0 5.4 19.7 0.13 0.29 59.5 0.0 59.5 E 85.0 5.4 98.1 0.65 0.50 14.5 0.0 14.5 B 16.3 B 25.0 25.0 5.4 8.6 0.06 0.37 72.9 0.0 72.9 E 93.0 5.4 87.2 0.58 0.37 3.1 0.0 3.1 A 5.4 A 8 40.0 34 NA 8 40.0 5.7 29.0 0.19 0.12 51.5 0.0 51.5 D 26.4 C 8 40.0 5.7 29.0 0.19 0.09 0.5 0.0 0.5 A 0 Perm 4 40.0 Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 10 (7%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.50 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 82.9% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 6: Hallmark & San Felipe Synchro 8 Report Page 11 1660 West Loop TIA Existing Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe PM Peak SBT SBR 7 1617 0.982 1593 87 102 NA 4 84 0 0 0 40.0 5.7 29.0 0.19 0.27 15.1 0.0 15.1 B 15.1 B Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 12 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 7: Hallmark & Hollyhurst Ln PM Peak 5.6 EBL 78 1 Free 0 95 2 82 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 82 4.12 2.218 1515 - Approach HCM Control Delay, s HCM LOS EB 4.7 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 1514 - EBL 1514 0.054 7.5 A 0.2 EBT 46 0 Free None 0 0 95 2 48 WBT 48 0 Free 0 0 95 2 51 0 - Major2 WB 0 EBT - WBT - WBR 29 1 Free None 95 2 31 0 - SBL 56 1 Stop 0 0 0 95 2 59 SBR 57 1 Stop None 95 2 60 Minor2 280 67 213 6.42 5.42 5.42 3.518 710 956 823 68 6.22 3.318 995 - 670 670 955 778 993 - SB 10.3 B WBR SBLn1 802 - 0.148 10.3 B 0.5 Synchro 8 Report Page 1 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 9: Hallmark & IH 610 SBFR PM Peak 3.1 EBL 0 6 Stop 0 0 89 2 0 EBR 171 6 Stop None 0 89 2 192 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 935 935 0 6.44 7.34 3.82 279 221 - 474 7.14 3.92 459 - 276 276 220 - 457 - Approach HCM Control Delay, s HCM LOS EB 18.5 C Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 457 0.42 18.5 C 2 NBL 0 6 Free 89 2 0 NBT 0 0 Free None 0 0 89 2 0 SBT 818 0 Free 0 0 89 2 919 SBR 17 6 Free None 89 2 19 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 2 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 11: IH 610 SBFR & Existing South PM Peak 0.4 EBL 0 5 Stop 0 0 92 2 0 EBR 28 5 Stop None 0 92 2 30 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 878 878 0 6.44 7.34 3.82 301 242 - 443 7.14 3.92 481 - 298 298 241 - 479 - Approach HCM Control Delay, s HCM LOS EB 13 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 479 0.064 13 B 0.2 NBL 0 5 Free 92 2 0 NBT 0 0 Free None 0 0 92 2 0 SBT 800 0 Free 0 0 92 2 870 SBR 7 5 Free None 92 2 8 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 3 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 12: IH 610 SBFR & Existing North PM Peak 0.1 EBL 0 7 Stop 0 0 93 2 0 EBR 6 7 Stop None 0 93 2 6 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 897 897 0 6.44 7.34 3.82 294 235 - 452 7.14 3.92 474 - 291 291 234 - 471 - Approach HCM Control Delay, s HCM LOS EB 12.7 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 471 0.014 12.7 B 0 NBL 0 7 Free 93 2 0 NBT 0 0 Free None 0 0 93 2 0 SBT 826 0 Free 0 0 93 2 888 SBR 4 7 Free None 93 2 4 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 4 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 13: Existing North Lot PM Peak 1.4 WBL 11 2 Stop 0 0 0 94 2 12 WBR 25 2 Stop None 94 2 27 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 241 129 112 6.42 5.42 5.42 3.518 747 897 913 131 6.22 3.318 919 - 743 743 896 910 916 - Approach HCM Control Delay, s HCM LOS WB 9.4 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 119 0 Free 0 0 94 2 127 Major1 0 NB 0 NBR WBLn1 855 - 0.045 9.4 A 0.1 SBL 1453 0.002 7.5 A 0 NBR 1 2 Free None 94 2 1 0 - SBL 3 2 Free 94 2 3 Major2 130 4.12 2.218 1455 1453 - SBT 99 0 Free None 0 0 94 2 105 0 - SB 0.2 SBT 0 A - Synchro 8 Report Page 5 1660 West Loop TIA Existing Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 14: Hollyhurst Ln & Existing South Lot PM Peak 0 WBL 0 2 Stop 0 0 0 94 2 0 WBR 0 2 Stop None 94 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 253 139 114 6.42 5.42 5.42 3.518 736 888 911 141 6.22 3.318 907 - 734 734 887 909 904 - Approach HCM Control Delay, s HCM LOS WB 0 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 129 0 Free 0 0 94 2 137 Major1 0 NB 0 NBR WBLn1 0 A - SBL 1443 0 A 0 NBR 0 2 Free None 94 2 0 0 - SBL 0 2 Free 94 2 0 Major2 139 4.12 2.218 1445 1443 - SBT 107 0 Free None 0 0 94 2 114 0 - SB 0 SBT - Synchro 8 Report Page 6 TAB THREE Background Conditions Capacity Analysis 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 498 1610 0.950 1610 730 3370 0.994 3370 0 0 0 0 172 4626 198 0 442 0 107 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 419 Split 5 15 873 NA 5 15 0 0 4626 165 389 NA 6 0 0 Perm 522 4896 0.980 4886 11 1127 NA 87 0 0 0 0 87 81.3 0.54 0.48 8.7 9.9 18.5 B 81.3 0.54 0.48 7.8 6.4 14.2 B 15.6 B 30.0 5.7 24.2 0.16 0.44 33.8 0.0 33.8 C 33.8 C 27.1 0.18 1.42dl 176.6 0.0 176.6 F 176.6 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.27 Intersection Signal Delay: 82.7 Intersection LOS: F Intersection Capacity Utilization 96.3% ICU Level of Service F Analysis Period (min) 15 dl Defacto Left Lane. Recode with 1 though lane as a left lane. Splits and Phases: Walter P Moore 6/5/2014 1: IH 610 NBFR & Post Oak Blvd Synchro 8 Report Page 1 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd AM Peak ø1 ø2 ø3 ø4 ø5 ø7 ø8 ø11 ø15 1 2 3 4 5 7 8 11 15 22.0 35.0 8.0 60.0 27.0 8.0 25.0 25.0 60.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 2 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 645 4960 114 0 0 0 0 0 0 0 0 0 0 0 0 583 1522 0.950 1522 44 Prot 1 11 575 NA 1 2 11 0 0 0 0 647 4331 0.999 4331 262 2045 NA 34 1319 0 4960 21 767 NA 2 564 3390 0.955 3238 0 0 0 49 1610 0.950 1608 0 0 530 Perm 0 0 34 35.0 5.7 29.3 0.20 0.78 51.6 1.8 53.4 D 53.4 D 41.3 0.28 0.10 40.5 0.0 40.5 D 70.6 0.47 0.47 6.5 0.9 7.4 A 9.8 A 62.0 0.41 0.84 53.4 0.0 53.4 D 62.0 0.41 1.72dr 72.9 12.6 85.4 F 78.8 E Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.27 Intersection Signal Delay: 63.1 Intersection LOS: E Intersection Capacity Utilization 96.3% ICU Level of Service F Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 2: Post Oak Blvd & IH 610 SBFR Synchro 8 Report Page 3 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR AM Peak ø1 ø3 ø4 ø5 ø6 ø7 ø8 ø11 ø15 1 3 4 5 6 7 8 11 15 22.0 8.0 60.0 27.0 30.0 8.0 25.0 25.0 60.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 4 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 564 3433 0.950 3428 947 3539 0 0 0 0 839 6408 439 1583 1291 3539 338 1583 0 0 0 0 0 0 3539 0 0 6408 3539 0 0 0 0 883 NA 6 1133 Perm 1359 NA 87 1531 162 356 Perm 0 594 997 Prot NA 5 15 5 15 18 1536 343 462 Perm 1076 3433 0.950 3406 0 0 0 45.4 0.30 0.57 27.4 2.1 29.5 C 75.4 0.50 0.56 6.9 3.3 10.2 B 17.4 B 35.0 5.6 28.5 0.19 0.73 60.9 0.0 60.9 E 49.3 D 6 35.0 5.6 28.5 0.19 0.81 27.1 0.0 27.1 C 87 29.3 0.20 1.70 358.9 0.0 358.9 F 87 29.3 0.20 1.97 470.8 0.0 470.8 F 373.5 F 29.3 0.20 0.83 48.4 0.0 48.4 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 30 (20%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.97 Intersection Signal Delay: 200.1 Intersection LOS: F Intersection Capacity Utilization 131.7% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 3: IH 610 NBFR & San Felipe Synchro 8 Report Page 5 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe AM Peak ø1 ø2 ø4 ø5 ø7 ø8 ø15 ø18 1 2 4 5 7 8 15 18 62.0 45.0 43.0 38.0 7.0 27.0 13.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 6 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe AM Peak NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR 0 0 0 0 0 0 0 0 1118 6408 533 1583 0 0 0 0 0 6408 3539 0 0 0 0 0 0 1141 NA 2 1546 211 544 Perm 338 3433 0.950 3429 1578 3539 0 718 4442 0.999 4440 43 1321 NA 4 538 0 0 384 1522 0.950 1498 345 Prot 1 1610 NA 12 0 353 Perm 4 43.0 5.6 37.4 0.25 0.95 89.8 0.0 89.8 F 43.0 5.6 37.4 0.25 1.37dr 129.3 0.0 129.3 F 120.9 F 45.0 5.6 39.4 0.26 0.68 38.5 0.2 38.8 D 42.7 D 2 45.0 5.6 39.4 0.26 0.97 51.1 0.0 51.1 D 62.0 5.6 56.4 0.38 0.27 22.1 1.2 23.2 C 101.4 0.68 0.67 4.8 48.6 53.4 D 48.1 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 30 (20%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.97 Intersection Signal Delay: 69.3 Intersection LOS: E Intersection Capacity Utilization 131.7% ICU Level of Service H Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 4: IH 610 SBFR & San Felipe Synchro 8 Report Page 7 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe AM Peak ø5 ø6 ø7 ø8 ø15 ø18 5 6 7 8 15 18 38.0 35.0 7.0 27.0 13.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 8 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 20 0 682 4960 97 0 1 0 58 1583 13 0 0 0 5085 0 59 1770 0.950 1708 0 Prot 5 117 Prot 5 0 0 Prot 1 40 Prot 1 1834 NA 6 1516 145 60 Perm 23.0 23.0 5.0 14.6 0.10 0.68 84.5 0.0 84.5 F 23.0 23.0 5.0 13.8 0.09 0.25 73.1 0.0 73.1 E 75.0 6.0 77.9 0.52 0.69 31.6 1.5 33.2 C 33.0 C 6 1615 0.000 0 43 63 NA 8 3 20.0 6.0 9.1 0.06 0.46 42.2 0.0 42.2 D 42.2 D 41 0 4960 23 811 NA 2 37 1770 0.950 1745 1761 5085 0 91 1770 0.950 1767 75.0 6.0 80.8 0.54 0.30 20.6 0.0 20.6 C 28.6 C 6 75.0 6.0 77.9 0.52 0.07 0.7 0.0 0.7 A 0 pm+pt 3 8 7.0 0 0 61 Prot 7 25.0 6.0 28.2 0.19 0.18 53.6 0.0 53.6 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 60 (40%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 35.1 Intersection LOS: D Intersection Capacity Utilization 83.0% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report Page 9 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak SBT SBR 36 1566 417 0 1566 155 472 NA 4 8 25.0 6.0 40.4 0.27 0.88 53.2 0.0 53.2 D 53.3 D 0 0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 10 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe AM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 15 0 1686 5085 1 0 2 0 75 0 3 0 4 0 0 0 0 0 69 Prot 5 1757 NA 2 0 0 Prot 1 26 Prot 1 0 0 Perm 1562 96 6 Perm 0 0 Prot 5 5051 7 1882 NA 6 4 1824 0.933 1737 6 1583 5085 23 1770 0.950 1769 1732 5051 0 51 1770 0.950 1769 17.0 17.0 5.4 11.2 0.07 0.53 80.3 0.0 80.3 F 85.0 5.4 95.1 0.63 0.55 17.9 0.0 17.9 B 20.2 C 25.0 25.0 5.4 14.0 0.09 0.16 63.1 0.0 63.1 E 93.0 5.4 95.8 0.64 0.58 10.4 0.0 10.4 B 11.2 B 8 40.0 7 NA 8 40.0 5.7 29.0 0.19 0.02 49.4 0.0 49.4 D 26.6 C 8 40.0 5.7 29.0 0.19 0.02 0.0 0.0 0.0 A 0 Perm 4 40.0 Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 15 (10%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 15.7 Intersection LOS: B Intersection Capacity Utilization 84.4% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 6: Hallmark & San Felipe Synchro 8 Report Page 11 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe AM Peak SBT SBR 5 1623 0.989 1609 51 60 NA 4 49 0 0 0 40.0 5.7 29.0 0.19 0.17 17.1 0.0 17.1 B 17.1 B Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 12 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 7: Hallmark & Hollyhurst Ln AM Peak 5.6 EBL 89 2 Free 0 89 2 100 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 57 4.12 2.218 1547 - Approach HCM Control Delay, s HCM LOS EB 5.2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 1544 - EBL 1544 0.065 7.5 A 0.2 EBT 39 0 Free None 0 0 89 2 44 WBT 23 0 Free 0 0 89 2 26 0 - Major2 WB 0 EBT - WBT - WBR 26 1 Free None 89 2 29 0 - SBL 37 1 Stop 0 0 0 89 2 42 SBR 35 2 Stop None 92 2 38 Minor2 286 42 244 6.42 5.42 5.42 3.518 704 980 797 44 6.22 3.318 1026 - 656 656 978 744 1023 - SB 10.1 B WBR SBLn1 792 - 0.101 10.1 B 0.3 Synchro 8 Report Page 1 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 9: Hallmark & IH 610 SBFR AM Peak 0.8 EBL 0 0 Stop 0 0 95 2 0 EBR 44 0 Stop None 0 95 2 46 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 592 592 0 6.44 7.34 3.82 440 380 - 316 7.14 3.92 580 - 440 440 380 - 580 - Approach HCM Control Delay, s HCM LOS EB 11.7 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 580 0.08 11.7 B 0.3 NBL 0 0 Free 95 2 0 NBT 0 0 Free None 0 0 95 2 0 SBT 522 0 Free 0 0 95 2 549 SBR 81 0 Free None 95 2 85 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 2 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 11: IH 610 SBFR AM Peak 0.1 EBL 0 0 Stop 0 0 95 2 0 EBR 4 0 Stop None 0 95 2 4 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 682 682 0 6.44 7.34 3.82 391 330 - 366 7.14 3.92 539 - 391 391 330 - 539 - Approach HCM Control Delay, s HCM LOS EB 11.7 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 539 0.008 11.7 B 0 NBL 0 0 Free 95 2 0 NBT 0 0 Free None 0 0 95 2 0 SBT 598 0 Free 0 0 95 2 629 SBR 100 0 Free None 95 2 105 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 3 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 12: IH 610 SBFR AM Peak 0.1 EBL 0 0 Stop 0 0 94 2 0 EBR 4 35 Stop None 0 94 2 4 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 876 876 0 6.44 7.34 3.82 302 243 - 455 7.14 3.92 472 - 285 285 236 - 458 - Approach HCM Control Delay, s HCM LOS EB 12.9 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 458 0.009 12.9 B 0 NBL 0 0 Free 94 2 0 NBT 0 0 Free None 0 0 94 2 0 SBT 790 0 Free 0 0 94 2 840 SBR 1 35 Free None 94 2 1 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 4 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 13: Existing North Lot AM Peak 1 WBL 1 1 Stop 0 0 0 87 2 1 WBR 2 3 Stop None 87 2 2 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 250 149 101 6.42 5.42 5.42 3.518 739 879 923 152 6.22 3.318 894 - 722 722 877 904 890 - Approach HCM Control Delay, s HCM LOS WB 9.4 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 116 0 Free 0 0 87 2 133 Major1 0 NB 0 NBR WBLn1 826 - 0.004 9.4 A 0 SBL 1413 0.02 7.6 A 0.1 NBR 22 1 Free None 87 2 25 0 - SBL 24 3 Free 87 2 28 Major2 162 4.12 2.218 1417 1413 - SBT 40 0 Free None 0 0 87 2 46 0 - SB 2.8 SBT 0 A - Synchro 8 Report Page 5 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 14: Hollyhurst Ln & Existing South Lot AM Peak 0 WBL 0 4 Stop 0 0 0 78 2 0 WBR 0 1 Stop None 78 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 235 145 90 6.42 5.42 5.42 3.518 753 882 934 146 6.22 3.318 901 - 748 748 879 931 897 - Approach HCM Control Delay, s HCM LOS WB 0 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 110 0 Free 0 0 78 2 141 Major1 0 NB 0 NBR WBLn1 0 A - SBL 1436 0 A 0 NBR 0 4 Free None 78 2 0 0 - SBL 0 1 Free 78 2 0 Major2 145 4.12 2.218 1437 1436 - SBT 70 0 Free None 0 0 78 2 90 0 - SB 0 SBT - Synchro 8 Report Page 6 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 1723 1610 0.950 1610 391 3278 0.967 3278 0 0 0 0 327 4607 432 0 152 0 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 907 Split 5 15 1319 NA 5 15 0 0 4607 9 799 NA 6 0 0 Perm 1015 5013 0.994 5004 4 1289 NA 87 0 0 0 0 87 81.3 0.54 1.04 37.3 24.1 61.4 E 81.3 0.54 1.00dl 6.0 48.6 54.6 D 57.4 E 30.0 5.7 24.3 0.16 1.72dr 108.1 0.0 108.1 F 108.1 F 27.0 0.18 1.43 240.8 0.0 240.8 F 240.8 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.43 Intersection Signal Delay: 121.6 Intersection LOS: F Intersection Capacity Utilization 74.4% ICU Level of Service D Analysis Period (min) 15 dl Defacto Left Lane. Recode with 1 though lane as a left lane. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 1: IH 610 NBFR & Post Oak Blvd Synchro 8 Report Page 1 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd PM Peak ø1 ø2 ø3 ø4 ø5 ø7 ø8 ø11 ø15 1 2 3 4 5 7 8 11 15 22.0 65.0 8.0 30.0 57.0 8.0 25.0 25.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 2 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 1847 4983 244 0 0 0 0 0 0 0 0 0 0 0 0 267 1522 0.950 1507 103 Prot 1 11 385 NA 1 2 11 0 0 0 0 572 4395 0.999 4394 149 1206 NA 34 583 0 4983 19 2134 NA 2 366 3383 0.903 3061 0 0 0 113 1610 0.950 1610 0 0 245 Perm 0 0 34 65.0 5.7 59.3 0.40 1.08 102.2 10.5 112.6 F 112.6 F 41.3 0.28 0.23 16.5 2.5 19.0 B 100.6 0.67 0.27 0.8 0.5 1.3 A 5.0 A 32.0 0.21 0.76 71.8 0.0 71.8 E 32.0 0.21 1.37dr 121.6 0.0 121.6 F 113.2 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.43 Intersection Signal Delay: 99.9 Intersection LOS: F Intersection Capacity Utilization 74.4% ICU Level of Service D Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 6/5/2014 2: Post Oak Blvd & IH 610 SBFR Synchro 8 Report Page 3 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR PM Peak ø1 ø3 ø4 ø5 ø6 ø7 ø8 ø11 ø15 1 3 4 5 6 7 8 11 15 22.0 8.0 30.0 57.0 30.0 8.0 25.0 25.0 30.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 4 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 931 3433 0.950 3433 889 3539 0 0 0 0 1078 6408 569 1583 1012 3539 182 1583 0 0 0 0 0 0 3539 0 0 6408 3539 0 0 0 0 1123 NA 6 422 Perm 1054 NA 8 1499 182 190 Perm 0 970 926 Prot NA 5 15 16 5 15 18 1390 240 593 Perm 405 3433 0.950 3379 0 0 0 59.5 0.40 0.71 9.3 18.8 28.0 C 72.4 0.48 0.54 8.2 51.2 59.4 E 43.3 D 25.0 5.6 19.4 0.13 1.36 215.3 0.0 215.3 F 235.9 F 6 25.0 5.6 19.4 0.13 1.53 274.7 0.0 274.7 F 8 34.0 5.6 28.4 0.19 0.66 62.0 0.9 62.9 E 34.0 5.6 28.4 0.19 1.57 303.5 0.0 303.5 F 209.3 F 8 34.0 5.6 28.4 0.19 0.44 11.3 0.0 11.3 B Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 35 (23%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.57 Intersection Signal Delay: 158.3 Intersection LOS: F Intersection Capacity Utilization 135.1% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 3: IH 610 NBFR & San Felipe Synchro 8 Report Page 5 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe PM Peak ø1 ø2 ø4 ø5 ø15 ø16 ø18 1 2 4 5 15 16 18 59.0 38.0 53.0 25.0 28.0 13.0 25.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 6 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe PM Peak NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR 0 0 0 0 0 0 0 0 1503 6408 661 1583 0 0 0 0 0 6408 3539 0 0 0 0 0 0 1518 NA 2 1583 141 668 Perm 484 3433 0.950 3433 999 3539 0 934 4710 0.999 4710 17 1118 NA 4 142 0 0 316 1522 0.950 1522 489 Prot 1 1009 NA 12 0 287 Perm 4 53.0 5.6 47.4 0.32 0.60 49.4 0.0 49.4 D 53.0 5.6 47.4 0.32 0.75 48.9 0.0 48.9 D 49.0 D 38.0 5.6 32.4 0.22 1.10 97.9 1.9 99.8 F 146.1 F 2 38.0 5.6 32.4 0.22 1.48 251.4 0.0 251.4 F 59.0 5.6 53.4 0.36 0.40 1.3 2.0 3.3 A 91.4 0.61 0.47 5.5 17.9 23.3 C 16.8 B Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 35 (23%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.57 Intersection Signal Delay: 81.2 Intersection LOS: F Intersection Capacity Utilization 135.1% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 4: IH 610 SBFR & San Felipe Synchro 8 Report Page 7 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe PM Peak ø5 ø6 ø8 ø15 ø16 ø18 5 6 8 15 16 18 25.0 25.0 34.0 28.0 13.0 25.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 8 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 7 0 1819 5059 44 0 2 0 93 1583 12 0 0 0 5085 0 112 1770 0.950 1687 0 Prot 5 231 Prot 5 15 0 0 Prot 1 10 Prot 1 862 NA 6 1482 182 96 Perm 23.0 23.0 5.0 10.7 0.07 0.08 46.1 0.0 46.1 D 50.0 5.5 56.9 0.38 0.45 32.5 0.0 32.5 C 29.6 C 18 1583 0.000 0 165 224 NA 8 3 20.0 6.0 12.6 0.08 0.79 36.0 16.8 52.9 D 52.9 D 187 0 5059 3 1920 NA 2 8 1770 0.950 1766 836 5085 0 216 1770 0.317 581 23.0 18.0 0.12 1.09 146.9 0.0 146.9 F 75.0 5.5 95.7 0.64 0.59 20.4 7.4 27.9 C 40.6 D 6 50.0 5.5 56.9 0.38 0.14 1.5 0.0 1.5 A 0 pm+pt 3 8 7.0 0 0 115 Prot 7 25.0 6.0 15.0 0.10 0.65 81.5 147.5 229.0 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 41.5 Intersection LOS: D Intersection Capacity Utilization 94.3% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report Page 9 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak SBT SBR 15 1525 307 0 1525 316 331 NA 4 8 25.0 6.0 33.6 0.22 0.56 9.1 0.0 9.1 A 65.8 E 0 ø15 0 15 25.0 Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 10 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe PM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 23 0 1946 5085 5 0 4 0 81 0 28 0 8 0 0 0 0 0 69 Prot 5 2011 NA 2 0 0 Prot 1 38 Prot 1 0 0 Perm 1544 96 34 Perm 0 0 Prot 5 5028 13 1238 NA 6 6 1788 0.783 1442 33 1583 5085 33 1770 0.950 1766 1119 5028 0 43 1770 0.950 1767 17.0 17.0 5.4 26.7 0.18 0.22 50.7 0.0 50.7 D 85.0 5.4 98.0 0.65 0.61 16.5 0.0 16.5 B 17.6 B 25.0 25.0 5.4 8.6 0.06 0.38 84.9 0.0 84.9 F 93.0 5.4 80.2 0.53 0.46 6.5 0.0 6.5 A 8.8 A 8 40.0 35 NA 8 40.0 5.7 29.0 0.19 0.13 51.6 0.0 51.6 D 26.4 C 8 40.0 5.7 29.0 0.19 0.09 0.5 0.0 0.5 A 0 Perm 4 40.0 Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 10 (7%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 14.6 Intersection LOS: B Intersection Capacity Utilization 89.5% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 6/5/2014 6: Hallmark & San Felipe Synchro 8 Report Page 11 1660 West Loop TIA Background Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe PM Peak SBT SBR 7 1615 0.983 1593 89 104 NA 4 86 0 0 0 40.0 5.7 29.0 0.19 0.27 15.0 0.0 15.0 B 15.0 B Intersection Summary Walter P Moore 6/5/2014 Synchro 8 Report Page 12 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 7: Hallmark & Hollyhurst Ln PM Peak 5.5 EBL 80 1 Free 0 95 2 84 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 84 4.12 2.218 1513 - Approach HCM Control Delay, s HCM LOS EB 4.7 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 1512 - EBL 1512 0.056 7.5 A 0.2 EBT 47 0 Free None 0 0 95 2 49 WBT 49 0 Free 0 0 95 2 52 0 - Major2 WB 0 EBT - WBT - WBR 30 1 Free None 95 2 32 0 - SBL 57 1 Stop 0 0 0 95 2 60 SBR 58 1 Stop None 95 2 61 Minor2 286 68 218 6.42 5.42 5.42 3.518 704 955 818 69 6.22 3.318 994 - 664 664 954 772 992 - SB 10.3 B WBR SBLn1 797 - 0.152 10.3 B 0.5 Synchro 8 Report Page 1 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 9: Hallmark & IH 610 SBFR PM Peak 3.4 EBL 0 6 Stop 0 0 89 2 0 EBR 174 6 Stop None 0 89 2 196 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1152 1152 0 6.44 7.34 3.82 208 156 - 583 7.14 3.92 390 - 206 206 155 - 388 - Approach HCM Control Delay, s HCM LOS EB 23.3 C Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 388 0.504 23.3 C 2.7 NBL 0 6 Free 89 2 0 NBT 0 0 Free None 0 0 89 2 0 SBT 1011 0 Free 0 0 89 2 1136 SBR 17 6 Free None 89 2 19 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 2 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 11: IH 610 SBFR & Existing South PM Peak 0.4 EBL 0 5 Stop 0 0 92 2 0 EBR 29 5 Stop None 0 92 2 32 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1088 1088 0 6.44 7.34 3.82 227 173 - 547 7.14 3.92 412 - 225 225 172 - 410 - Approach HCM Control Delay, s HCM LOS EB 14.5 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 410 0.077 14.5 B 0.2 NBL 0 5 Free 92 2 0 NBT 0 0 Free None 0 0 92 2 0 SBT 993 0 Free 0 0 92 2 1079 SBR 7 5 Free None 92 2 8 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 3 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 12: IH 610 SBFR & Existing North PM Peak 0.1 EBL 0 7 Stop 0 0 93 2 0 EBR 6 7 Stop None 0 93 2 6 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1106 1106 0 6.44 7.34 3.82 221 168 - 557 7.14 3.92 406 - 218 218 167 - 404 - Approach HCM Control Delay, s HCM LOS EB 14.1 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 EBLn1 404 0.016 14.1 B 0 NBL 0 7 Free 93 2 0 NBT 0 0 Free None 0 0 93 2 0 SBT 1020 0 Free 0 0 93 2 1097 SBR 4 7 Free None 93 2 4 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 4 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 13: Existing North Lot PM Peak 1.4 WBL 11 2 Stop 0 0 0 94 2 12 WBR 26 2 Stop None 94 2 28 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 245 131 114 6.42 5.42 5.42 3.518 743 895 911 133 6.22 3.318 916 - 739 739 894 908 913 - Approach HCM Control Delay, s HCM LOS WB 9.4 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 121 0 Free 0 0 94 2 129 Major1 0 NB 0 NBR WBLn1 853 - 0.046 9.4 A 0.1 SBL 1451 0.002 7.5 A 0 NBR 1 2 Free None 94 2 1 0 - SBL 3 2 Free 94 2 3 Major2 132 4.12 2.218 1453 1451 - SBT 101 0 Free None 0 0 94 2 107 0 - SB 0.2 SBT 0 A - Synchro 8 Report Page 5 1660 West Loop TIA Background Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 14: Hollyhurst Ln & Existing South Lot PM Peak 0 WBL 0 2 Stop 0 0 0 94 2 0 WBR 0 2 Stop None 94 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 258 142 116 6.42 5.42 5.42 3.518 731 885 909 144 6.22 3.318 903 - 729 729 884 907 900 - Approach HCM Control Delay, s HCM LOS WB 0 A Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 5/23/2014 NBT - NBT 132 0 Free 0 0 94 2 140 Major1 0 NB 0 NBR WBLn1 0 A - SBL 1439 0 A 0 NBR 0 2 Free None 94 2 0 0 - SBL 0 2 Free 94 2 0 Major2 142 4.12 2.218 1441 1439 - SBT 109 0 Free None 0 0 94 2 116 0 - SB 0 SBT - Synchro 8 Report Page 6 TAB FOUR Proposed Condition Capacity Analysis 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe AM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 582 3433 0.950 3428 966 3539 0 0 0 0 902 6408 445 1583 1344 3539 338 1583 0 0 0 0 0 0 3539 0 0 6408 3539 0 0 0 0 949 NA 6 1221 Perm 1415 NA 87 1531 156 356 Perm 0 613 1017 Prot NA 5 15 5 15 18 1536 340 468 Perm 1160 3433 0.950 3406 0 0 0 45.4 0.30 0.59 28.4 2.5 30.9 C 75.4 0.50 0.57 6.5 4.1 10.5 B 18.2 B 35.0 5.6 29.0 0.19 0.77 62.0 0.0 62.0 E 50.9 D 6 35.0 5.6 29.0 0.19 0.82 28.3 0.0 28.3 C 87 28.8 0.19 1.87 428.8 0.2 428.9 F 87 28.8 0.19 2.08 520.7 0.0 520.7 F 427.4 F 28.8 0.19 0.85 51.5 0.0 51.5 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 30 (20%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 2.08 Intersection Signal Delay: 228.6 Intersection LOS: F Intersection Capacity Utilization 134.1% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 3: IH 610 NBFR & San Felipe Synchro 8 Report Page 5 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe AM Peak ø1 ø2 ø4 ø5 ø7 ø8 ø15 ø18 1 2 4 5 7 8 15 18 62.0 45.0 43.0 38.0 7.0 27.0 13.0 30.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 6 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: Beltway 8 SBFR & San Felipe AM Peak NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR 0 0 0 0 0 0 0 0 1134 6408 533 1583 0 0 0 0 0 6408 3539 0 0 0 0 0 0 1157 NA 2 1546 210 544 Perm 338 3433 0.950 3429 1725 3539 0 741 4449 0.998 4447 32 1336 NA 4 527 0 0 415 1522 0.950 1498 345 Prot 1 1760 NA 12 0 381 Perm 4 43.0 5.6 37.4 0.25 1.02 106.6 0.0 106.6 F 43.0 5.6 37.4 0.25 1.37dr 137.4 0.0 137.4 F 130.6 F 45.0 5.6 39.4 0.26 0.69 46.7 0.3 47.0 D 49.9 D 2 45.0 5.6 39.4 0.26 0.97 56.1 0.0 56.1 E 62.0 5.6 56.4 0.38 0.27 22.3 1.3 23.6 C 101.4 0.68 0.74 6.6 48.4 55.0 D 49.9 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 30 (20%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 2.08 Intersection Signal Delay: 75.0 Intersection LOS: E Intersection Capacity Utilization 134.1% ICU Level of Service H Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 9/4/2014 4: Beltway 8 SBFR & San Felipe Synchro 8 Report Page 7 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: Beltway 8 SBFR & San Felipe AM Peak ø5 ø6 ø7 ø8 ø15 ø18 5 6 7 8 15 18 38.0 35.0 7.0 27.0 13.0 30.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 8 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 20 0 685 4907 151 0 1 0 58 1583 36 0 0 0 5085 0 61 1770 0.950 1712 0 Prot 5 117 Prot 5 0 0 Prot 1 40 Prot 1 1834 NA 6 1516 145 60 Perm 23.0 23.0 5.0 14.6 0.10 0.68 84.5 0.0 84.5 F 23.0 23.0 5.0 13.8 0.09 0.25 73.1 0.0 73.1 E 75.0 6.0 72.1 0.48 0.75 36.0 4.8 40.7 D 40.1 D 8 1645 0.000 0 33 104 NA 8 3 20.0 6.0 11.5 0.08 0.67 72.0 0.0 72.0 E 72.0 E 56 0 4907 43 871 NA 2 37 1770 0.950 1747 1761 5085 0 91 1770 0.950 1767 75.0 6.0 75.0 0.50 0.35 23.0 0.0 23.0 C 30.3 C 6 75.0 6.0 72.1 0.48 0.07 0.7 0.0 0.7 A 0 pm+pt 3 8 7.0 0 0 64 Prot 7 25.0 6.0 28.8 0.19 0.19 53.6 0.0 53.6 D Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 60 (40%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 39.5 Intersection LOS: D Intersection Capacity Utilization 93.6% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report Page 9 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak SBT SBR 63 1583 417 0 1583 155 500 NA 4 8 25.0 6.0 46.3 0.31 0.84 46.7 0.0 46.7 D 47.5 D 0 0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 10 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe AM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 15 0 1699 5085 1 0 2 0 222 0 3 0 7 0 0 0 0 0 173 Prot 5 1771 NA 2 0 0 Prot 1 26 Prot 1 0 0 Perm 1562 96 6 Perm 0 0 Prot 5 4990 26 2035 NA 6 10 1842 0.958 1784 6 1583 5085 23 1770 0.950 1769 1732 4990 0 151 1770 0.950 1769 17.0 17.0 5.4 21.8 0.15 0.68 74.7 0.0 74.7 E 85.0 5.4 89.7 0.60 0.58 22.1 0.0 22.1 C 26.8 C 25.0 25.0 5.4 19.4 0.13 0.11 56.3 0.0 56.3 E 93.0 5.4 82.7 0.55 0.74 24.0 0.0 24.0 C 24.4 C 8 40.0 13 NA 8 40.0 5.7 29.0 0.19 0.04 49.8 0.0 49.8 D 34.0 C 8 40.0 5.7 29.0 0.19 0.02 0.0 0.0 0.0 A 0 Perm 4 40.0 Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 15 (10%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 25.4 Intersection LOS: C Intersection Capacity Utilization 85.5% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 6: Hallmark & San Felipe Synchro 8 Report Page 11 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe AM Peak SBT SBR 7 1625 0.984 1605 71 85 NA 4 68 0 0 0 40.0 5.7 29.0 0.19 0.23 16.2 0.0 16.2 B 16.2 B Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 12 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 7: Hallmark & Hollyhurst Ln AM Peak 6.1 EBL 224 158 Free 0 89 2 252 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 65 4.14 2.22 1535 - Approach HCM Control Delay, s HCM LOS EB 4.9 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 1333 - EBL 1333 0.189 8.3 A 0.7 EBT 156 0 Free None 0 0 89 2 175 WBT 30 0 Free 0 0 89 2 34 0 - Major2 WB 0 EBT - WBT - WBR 26 1 Free None 89 2 29 0 - SBL 37 1 Stop 0 0 0 89 2 42 SBR 52 2 Stop None 92 2 57 Minor2 729 50 679 6.63 5.83 5.43 3.519 374 967 503 191 6.93 3.319 819 - 302 302 965 407 710 - SB 15.2 C WBR SBLn1 451 - 0.218 15.2 C 0.8 Synchro 8 Report Page 1 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 8: Hallmark & Driveway B AM Peak 17.1 EBL 119 0 Free 92 2 129 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 173 4.14 2.22 1401 - Approach HCM Control Delay, s HCM LOS EB 4.9 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 1401 - EBL 1401 0.092 7.8 A 0.3 EBT 70 0 Free None 0 0 92 2 76 WBT 83 0 Free 0 0 92 2 90 0 - Major2 WB 0 EBT 0 A - WBT - WBR 76 0 Free None 92 2 83 0 - SBL 7 0 Stop 0 0 0 92 2 8 SBR 714 0 Stop None 92 2 776 Minor2 467 132 335 6.63 5.83 5.43 3.519 539 881 724 86 6.93 3.319 956 - 487 487 881 654 956 - SB 24 C WBR SBLn1 947 - 0.828 24 C 9.7 Synchro 8 Report Page 2 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 9: Hallmark & IH 610 SBFR AM Peak 0.9 EBL 0 0 Stop 0 0 95 2 0 EBR 59 0 Stop None 0 95 2 62 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 875 875 0 6.44 7.34 3.82 302 243 - 478 7.14 3.92 456 - 302 302 243 - 456 - Approach HCM Control Delay, s HCM LOS EB 14.1 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 EBLn1 456 0.136 14.1 B 0.5 NBL 0 0 Free 95 2 0 NBT 0 0 Free None 0 0 95 2 0 SBT 752 0 Free 0 0 95 2 792 SBR 159 0 Free None 95 2 167 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 3 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 10: IH 610 SBFR & Driveway A AM Peak 0.4 EBL 0 0 Stop 0 0 92 2 0 EBR 27 0 Stop None 0 92 2 29 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1024 1024 0 6.44 7.34 3.82 247 192 - 545 7.14 3.92 413 - 247 247 192 - 413 - Approach HCM Control Delay, s HCM LOS EB 14.4 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 EBLn1 413 0.071 14.4 B 0.2 NBL 0 0 Free 92 2 0 NBT 0 0 Free None 0 0 92 2 0 SBT 879 0 Free 0 0 92 2 955 SBR 126 0 Free None 92 2 137 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 4 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 11: IH 610 SBFR & Existing South AM Peak 0.3 EBL 0 0 Stop 0 0 95 2 0 EBR 24 0 Stop None 0 95 2 25 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1041 1041 0 6.44 7.34 3.82 242 186 - 520 7.14 3.92 429 - 242 242 186 - 429 - Approach HCM Control Delay, s HCM LOS EB 13.9 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 EBLn1 429 0.059 13.9 B 0.2 NBL 0 0 Free 95 2 0 NBT 0 0 Free None 0 0 95 2 0 SBT 989 0 Free 0 0 95 2 1041 SBR 0 0 Free None 95 2 0 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 5 1660 West Loop TIA Proposed Condition 12: IH 610 SBFR & Existing North AM Peak HCM research expects at least one 'Stop' controlled approach at the intersection. Walter P Moore 9/4/2014 Synchro 8 Report Page 6 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 13: Driveway D AM Peak 1.4 WBL 9 1 Stop 0 0 0 87 2 10 WBR 14 3 Stop None 87 2 16 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 385 185 200 6.42 5.42 5.42 3.518 618 847 834 188 6.22 3.318 854 - 599 599 845 811 850 - Approach HCM Control Delay, s HCM LOS WB 10.1 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBT - Walter P Moore 9/4/2014 NBT 143 0 Free 0 0 87 2 164 Major1 0 NB 0 NBR WBLn1 730 - 0.036 10.1 B 0.1 SBL 1367 0.025 7.7 A 0.1 NBR 30 1 Free None 87 2 34 0 - SBL 30 3 Free 87 2 34 Major2 202 4.12 2.218 1370 1367 - SBT 114 0 Free None 0 0 87 2 131 0 - SB 1.6 SBT 0 A - Synchro 8 Report Page 7 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 14: Hollyhurst Ln & Driveway C AM Peak 2.3 WBL 10 0 Stop 0 0 0 92 2 11 WBR 29 0 Stop None 92 2 32 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 442 195 247 6.42 5.42 5.42 3.518 573 838 794 195 6.22 3.318 846 - 535 535 838 742 846 - Approach HCM Control Delay, s HCM LOS WB 10.2 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBT - Walter P Moore 9/4/2014 NBT 116 0 Free 0 0 92 2 126 Major1 0 NB 0 NBR WBLn1 736 - 0.058 10.2 B 0.2 SBL 1300 0.063 8 A 0.2 NBR 127 0 Free None 92 2 138 0 - SBL 75 0 Free 92 2 82 Major2 264 4.12 2.218 1300 1300 - SBT 77 0 Free None 0 0 92 2 84 0 - SB 3.9 SBT 0 A - Synchro 8 Report Page 8 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 1813 1610 0.950 1610 412 3278 0.967 3278 0 0 0 0 351 4618 432 0 187 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 954 Split 5 15 1388 NA 5 15 0 0 4618 7 824 NA 6 0 0 Perm 1100 5013 0.993 5004 4 1414 NA 87 0 0 0 0 87 81.3 0.54 1.09 60.5 3.8 64.3 E 81.3 0.54 1.05dl 6.9 48.4 55.4 E 59.0 E 30.0 5.7 24.3 0.16 1.72dr 117.9 0.0 117.9 F 117.9 F 27.0 0.18 1.56 298.1 0.0 298.1 F 298.1 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.56 Intersection Signal Delay: 143.4 Intersection LOS: F Intersection Capacity Utilization 78.8% ICU Level of Service D Analysis Period (min) 15 dl Defacto Left Lane. Recode with 1 though lane as a left lane. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 9/4/2014 1: IH 610 NBFR & Post Oak Blvd Synchro 8 Report Page 1 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 1: IH 610 NBFR & Post Oak Blvd PM Peak ø1 ø2 ø3 ø4 ø5 ø7 ø8 ø11 ø15 1 2 3 4 5 7 8 11 15 22.0 65.0 8.0 30.0 57.0 8.0 25.0 25.0 30.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 2 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 1958 4983 261 0 0 0 0 0 0 0 0 0 0 0 0 267 1522 0.950 1507 158 Prot 1 11 391 NA 1 2 11 0 0 0 0 616 4411 0.999 4410 139 1251 NA 34 583 0 4983 19 2264 NA 2 366 3383 0.821 2783 0 0 0 172 1610 0.950 1610 0 0 245 Perm 0 0 34 65.0 5.7 59.3 0.40 1.14 121.8 0.9 122.7 F 122.7 F 41.3 0.28 0.36 18.5 6.2 24.7 C 100.6 0.67 0.30 1.1 0.5 1.6 A 8.2 A 32.0 0.21 0.76 71.8 0.0 71.8 E 32.0 0.21 1.40dr 139.8 0.0 139.8 F 128.7 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 4:SBTL and 15:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.56 Intersection Signal Delay: 110.2 Intersection LOS: F Intersection Capacity Utilization 78.8% ICU Level of Service D Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: Walter P Moore 9/4/2014 2: Post Oak Blvd & IH 610 SBFR Synchro 8 Report Page 3 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2: Post Oak Blvd & IH 610 SBFR PM Peak ø1 ø3 ø4 ø5 ø6 ø7 ø8 ø11 ø15 1 3 4 5 6 7 8 11 15 22.0 8.0 30.0 57.0 30.0 8.0 25.0 25.0 30.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 4 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe PM Peak EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 987 3433 0.950 3433 948 3539 0 0 0 0 1106 6408 592 1583 1047 3539 182 1583 0 0 0 0 0 0 3539 0 0 6408 3539 0 0 0 0 1152 NA 6 444 Perm 1091 NA 8 1499 182 190 Perm 0 1028 988 Prot NA 5 15 16 5 15 18 1390 236 617 Perm 426 3433 0.950 3379 0 0 0 60.4 0.40 0.74 11.5 39.1 50.5 D 72.4 0.48 0.58 8.8 51.0 59.8 E 55.1 E 25.0 5.6 19.4 0.13 1.39 229.3 0.1 229.4 F 256.5 F 6 25.0 5.6 19.4 0.13 1.60 307.0 0.0 307.0 F 8 34.0 5.6 28.4 0.19 0.69 63.3 1.7 65.0 E 34.0 5.6 28.4 0.19 1.63 326.7 0.0 326.7 F 224.6 F 8 34.0 5.6 28.4 0.19 0.44 11.3 0.0 11.3 B Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 35 (23%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.63 Intersection Signal Delay: 172.8 Intersection LOS: F Intersection Capacity Utilization 140.6% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 3: IH 610 NBFR & San Felipe Synchro 8 Report Page 5 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 3: IH 610 NBFR & San Felipe PM Peak ø1 ø2 ø4 ø5 ø15 ø16 ø18 1 2 4 5 15 16 18 59.0 38.0 53.0 25.0 28.0 13.0 25.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 6 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe PM Peak NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR 0 0 0 0 0 0 0 0 1538 6408 661 1583 0 0 0 0 0 6408 3539 0 0 0 0 0 0 1554 NA 2 1583 141 668 Perm 484 3433 0.950 3433 1047 3539 0 1065 4710 0.998 4710 16 1269 NA 4 152 0 0 386 1522 0.950 1522 489 Prot 1 1058 NA 12 0 351 Perm 4 53.0 5.6 47.4 0.32 0.73 56.0 0.0 56.0 E 53.0 5.6 47.4 0.32 0.85 53.7 0.0 53.7 D 54.2 D 38.0 5.6 32.4 0.22 1.12 107.5 0.6 108.1 F 151.2 F 2 38.0 5.6 32.4 0.22 1.48 251.4 0.0 251.4 F 59.0 5.6 53.4 0.36 0.40 1.6 2.1 3.7 A 91.4 0.61 0.49 6.2 31.5 37.7 D 27.0 C Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 35 (23%), Referenced to phase 2:NWSE and 5:, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.63 Intersection Signal Delay: 86.4 Intersection LOS: F Intersection Capacity Utilization 140.6% ICU Level of Service H Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 4: IH 610 SBFR & San Felipe Synchro 8 Report Page 7 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 4: IH 610 SBFR & San Felipe PM Peak ø5 ø6 ø8 ø15 ø16 ø18 5 6 8 15 16 18 25.0 25.0 34.0 28.0 13.0 25.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 8 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 7 0 1832 5039 85 0 2 0 93 1583 77 0 0 0 5085 0 116 1770 0.950 1707 0 Prot 5 231 Prot 5 15 0 0 Prot 1 10 Prot 1 862 NA 6 1482 182 96 Perm 23.0 23.0 5.0 10.7 0.07 0.08 46.5 0.0 46.5 D 50.0 5.5 44.5 0.30 0.57 37.1 0.0 37.1 D 33.7 C 34 1615 0.000 0 71 421 NA 8 3 20.0 6.0 24.6 0.16 1.30 194.8 1.3 196.1 F 196.1 F 298 0 5039 6 1977 NA 2 8 1770 0.950 1766 836 5085 0 216 1770 0.317 581 23.0 18.0 0.12 1.09 146.9 0.0 146.9 F 75.0 5.5 83.3 0.56 0.71 27.9 48.5 76.4 E 83.8 F 6 50.0 5.5 44.5 0.30 0.17 1.4 0.0 1.4 A 0 pm+pt 3 8 7.0 0 0 120 Prot 7 25.0 6.0 15.4 0.10 0.66 81.4 140.7 222.1 F Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.30 Intersection Signal Delay: 81.2 Intersection LOS: F Intersection Capacity Utilization 107.1% ICU Level of Service G Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report Page 9 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak SBT SBR 26 1537 307 0 1537 316 343 NA 4 8 25.0 6.0 46.0 0.31 0.50 8.2 0.0 8.2 A 63.6 E 0 ø15 0 15 25.0 Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 10 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe PM Peak EBU EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL 23 0 1969 5085 5 0 4 0 129 0 28 0 20 0 0 0 0 0 97 Prot 5 2035 NA 2 0 0 Prot 1 38 Prot 1 0 0 Perm 1544 96 34 Perm 0 0 Prot 5 5000 22 1297 NA 6 10 1796 0.650 1201 33 1583 5085 33 1770 0.950 1766 1129 5000 0 70 1770 0.950 1767 17.0 17.0 5.4 25.9 0.17 0.32 54.4 0.0 54.4 D 85.0 5.4 98.0 0.65 0.61 16.7 0.0 16.7 B 18.4 B 25.0 25.0 5.4 8.6 0.06 0.38 85.0 0.0 85.0 F 93.0 5.4 78.6 0.52 0.49 6.5 0.0 6.5 A 8.8 A 8 40.0 39 NA 8 40.0 5.7 29.0 0.19 0.17 52.8 0.0 52.8 D 28.4 C 8 40.0 5.7 29.0 0.19 0.09 0.5 0.0 0.5 A 0 Perm 4 40.0 Intersection Summary Cycle Length: 150 Actuated Cycle Length: 150 Offset: 10 (7%), Referenced to phase 2:EBT and 6:WBT, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 15.1 Intersection LOS: B Intersection Capacity Utilization 90.0% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 9/4/2014 6: Hallmark & San Felipe Synchro 8 Report Page 11 1660 West Loop TIA Proposed Condition Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 6: Hallmark & San Felipe PM Peak SBT SBR 12 1622 0.965 1573 143 185 NA 4 147 0 0 0 40.0 5.7 29.0 0.19 0.44 17.6 0.0 17.6 B 17.6 B Intersection Summary Walter P Moore 9/4/2014 Synchro 8 Report Page 12 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 7: Hallmark & Hollyhurst Ln PM Peak 5.6 EBL 113 1 Free 0 95 2 119 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 118 4.14 2.22 1468 - Approach HCM Control Delay, s HCM LOS EB 4.2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 1467 - EBL 1467 0.081 7.7 A 0.3 EBT 94 0 Free None 0 0 95 2 99 WBT 81 0 Free 0 0 95 2 85 0 - Major2 WB 0 EBT - WBT - WBR 30 1 Free None 95 2 32 0 - SBL 57 1 Stop 0 0 0 95 2 60 SBR 104 1 Stop None 95 2 109 Minor2 439 102 337 6.63 5.83 5.43 3.519 561 911 722 60 6.93 3.319 993 - 515 515 910 663 991 - SB 11.2 B WBR SBLn1 747 - 0.227 11.2 B 0.9 Synchro 8 Report Page 1 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 8: Hallmark PM Peak 5.1 EBL 47 0 Free 92 2 51 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 64 4.14 2.22 1536 - Approach HCM Control Delay, s HCM LOS EB 2.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 1536 - EBL 1536 0.033 7.4 A 0.1 EBT 122 0 Free None 0 0 92 2 133 WBT 59 0 Free 0 0 92 2 64 0 - Major2 WB 0 EBT 0 A - WBT - WBR 0 0 Free None 92 2 0 0 - SBL 101 0 Stop 0 0 0 92 2 110 SBR 32 0 Stop None 92 2 35 Minor2 299 64 235 6.63 5.83 5.43 3.519 680 951 803 32 6.93 3.319 1035 - 656 656 951 774 1035 - SB 11.3 B WBR SBLn1 719 - 0.201 11.3 B 0.7 Synchro 8 Report Page 2 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 9: Hallmark & IH 610 SBFR PM Peak 12.3 EBL 0 6 Stop 0 0 89 2 0 EBR 276 6 Stop None 0 89 2 310 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1335 1335 0 6.44 7.34 3.82 162 116 - 674 7.14 3.92 341 - 160 160 115 - 339 - Approach HCM Control Delay, s HCM LOS EB 65.3 F Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 EBLn1 339 0.915 65.3 F 9.1 NBL 0 6 Free 89 2 0 NBT 0 0 Free None 0 0 89 2 0 SBT 1174 0 Free 0 0 89 2 1319 SBR 17 6 Free None 89 2 19 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 3 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 10: IH 610 SBFR PM Peak 2.3 EBL 0 0 Stop 0 0 92 2 0 EBR 136 0 Stop None 0 92 2 148 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1209 1209 0 6.44 7.34 3.82 192 142 - 638 7.14 3.92 359 - 192 192 142 - 359 - Approach HCM Control Delay, s HCM LOS EB 21.9 C Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 EBLn1 359 0.412 21.9 C 2 NBL 0 0 Free 92 2 0 NBT 0 0 Free None 0 0 92 2 0 SBT 1048 0 Free 0 0 92 2 1139 SBR 128 0 Free None 92 2 139 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 4 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 11: IH 610 SBFR & Existing South PM Peak 1 EBL 0 5 Stop 0 0 92 2 0 EBR 70 5 Stop None 0 92 2 76 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor2 1217 1217 0 6.44 7.34 3.82 190 140 - 610 7.14 3.92 375 - 188 188 139 - 373 - Approach HCM Control Delay, s HCM LOS EB 17.1 C Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Walter P Moore 9/4/2014 EBLn1 373 0.204 17.1 C 0.8 NBL 0 5 Free 92 2 0 NBT 0 0 Free None 0 0 92 2 0 SBT 1115 0 Free 0 0 92 2 1212 SBR 0 5 Free None 92 2 0 Major2 - 0 - SB 0 SBT - SBR - Synchro 8 Report Page 5 1660 West Loop TIA Proposed Condition 12: IH 610 SBFR & Existing North PM Peak HCM research expects at least one 'Stop' controlled approach at the intersection. Walter P Moore 9/4/2014 Synchro 8 Report Page 6 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 13: Existing North Lot PM Peak 1.3 WBL 11 2 Stop 0 0 0 94 2 12 WBR 41 2 Stop None 94 2 44 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 502 324 178 6.42 5.42 5.42 3.518 529 733 853 326 6.22 3.318 715 - 521 521 732 842 713 - Approach HCM Control Delay, s HCM LOS WB 10.9 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBT - Walter P Moore 9/4/2014 NBT 298 0 Free 0 0 94 2 317 Major1 0 NB 0 NBR WBLn1 661 - 0.084 10.9 B 0.3 SBL 1229 0.01 8 A 0 NBR 9 2 Free None 94 2 10 0 - SBL 11 2 Free 94 2 12 Major2 329 4.12 2.218 1231 1229 - SBT 145 0 Free None 0 0 94 2 154 0 - SB 0.6 SBT 0 A - Synchro 8 Report Page 7 1660 West Loop TIA Proposed Condition Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 14: Hollyhurst Ln PM Peak 5.3 WBL 46 0 Stop 0 0 0 92 2 50 WBR 177 0 Stop None 92 2 192 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 380 166 214 6.42 5.42 5.42 3.518 622 863 822 166 6.22 3.318 878 - 599 599 863 792 878 - Approach HCM Control Delay, s HCM LOS WB 11.4 B Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBT - Walter P Moore 9/4/2014 NBT 140 0 Free 0 0 92 2 152 Major1 0 NB 0 NBR WBLn1 801 - 0.303 11.4 B 1.3 SBL 1397 0.034 7.7 A 0.1 NBR 25 0 Free None 92 2 27 0 - SBL 44 0 Free 92 2 48 Major2 179 4.12 2.218 1397 1397 - SBT 109 0 Free None 0 0 92 2 118 0 - SB 2.2 SBT 0 A - Synchro 8 Report Page 8 TAB FIVE Proposed Mitigation 1660 West Loop TIA Proposed Condition - Mitigated with Turn Bays Added Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS EBU EBL EBT 5 5 4.0 9.0 16.0 10.7% 11.0 3.5 1.5 Lag Yes 3.0 None EBR 5: Hollyhurst Ln & Post Oak Blvd AM Peak WBU WBL WBT 2 1 1 6 4.0 10.0 9.0 29.0 16.0 70.0 10.7% 46.7% 11.0 64.0 3.5 4.0 1.5 2.0 0.0 0.0 5.0 6.0 Lag Lead Yes Yes 3.0 3.0 None C-Max 5.0 18.0 0 11.0 74.2 0.07 0.49 0.91 0.36 125.0 24.2 0.0 0.0 125.0 24.2 F C 36.1 D 4.0 9.0 16.0 10.7% 11.0 3.5 1.5 Lag Yes 3.0 None WBR 6 6 NBL 8 3 NBT 3 8 NBR 8 8 SBL 4 7 4.0 10.0 10.0 9.0 29.0 29.0 16.0 70.0 70.0 10.7% 46.7% 46.7% 11.0 64.0 64.0 3.5 4.0 4.0 1.5 2.0 2.0 0.0 0.0 0.0 5.0 6.0 6.0 Lag Lead Lead Yes Yes Yes 3.0 3.0 3.0 None C-Max C-Max 5.0 5.0 18.0 18.0 0 0 9.9 71.0 71.0 0.07 0.47 0.47 0.34 0.76 0.08 76.8 35.1 0.7 0.0 2.4 0.0 76.8 37.5 0.7 E D A 37.1 D 1.0 7.0 12.0 8.0% 6.0 4.0 2.0 8.0 14.0 20.0 13.3% 14.0 4.0 2.0 0.0 6.0 8.0 14.0 20.0 13.3% 14.0 4.0 2.0 0.0 6.0 1.0 7.0 32.0 21.3% 26.0 4.0 2.0 0.0 6.0 3.0 None 3.0 None 3.0 None 3.0 Max 9.8 0.07 0.40 83.2 0.0 83.2 F 38.7 D 9.8 0.07 0.25 3.4 0.0 3.4 A 38.0 0.25 0.14 44.5 0.0 44.5 D Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Offset: 60 (40%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 37.3 Intersection LOS: D Intersection Capacity Utilization 85.9% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: Walter P Moore 10/9/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report 1660 West Loop TIA Proposed Condition - Mitigated with Turn Bays Added Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS SBT 8 4 5: Hollyhurst Ln & Post Oak Blvd AM Peak SBR 8.0 14.0 32.0 21.3% 26.0 4.0 2.0 0.0 6.0 3.0 Max 51.0 0.34 0.78 39.2 0.0 39.2 D 39.8 D Intersection Summary Walter P Moore 10/9/2014 Synchro 8 Report 1660 West Loop TIA Proposed Condition (Mitigated) Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd AM Peak EBU EBL EBT 5 5 4.0 9.0 19.0 12.7% 14.0 3.5 1.5 Lag Yes 3.0 Max EBR WBU WBL WBT 2 1 1 6 4.0 10.0 9.0 29.0 19.0 65.0 12.7% 43.3% 14.0 59.0 3.5 4.0 1.5 2.0 0.0 0.0 5.0 6.0 Lag Lead Yes Yes 3.0 3.0 Max C-Max 5.0 18.0 0 14.0 70.0 0.09 0.47 0.71 0.38 88.9 26.4 0.0 0.0 88.9 26.4 F C 33.8 C 4.0 9.0 19.0 12.7% 14.0 3.5 1.5 Lag Yes 3.0 None WBR 6 6 NBL 8 3 NBT 3 8 NBR SBL 4 7 4.0 10.0 10.0 9.0 29.0 29.0 19.0 65.0 65.0 12.7% 43.3% 43.3% 14.0 59.0 59.0 3.5 4.0 4.0 1.5 2.0 2.0 0.0 0.0 0.0 5.0 6.0 6.0 Lag Lead Lead Yes Yes Yes 3.0 3.0 3.0 None C-Max C-Max 5.0 5.0 18.0 18.0 0 0 12.3 66.2 66.2 0.08 0.44 0.44 0.28 0.82 0.08 72.1 37.0 1.1 0.0 3.7 0.0 72.1 40.7 1.1 E D A 40.1 D 1.0 7.0 11.0 7.3% 5.0 4.0 2.0 4.0 20.0 20.0 13.3% 16.0 3.5 0.5 0.0 4.0 1.0 7.0 35.0 23.3% 29.0 4.0 2.0 0.0 6.0 3.0 Max 3.0 None 5.0 11.0 0 15.8 0.11 0.61 50.7 0.0 50.7 D 50.7 D 3.0 Max 29.0 0.19 0.19 52.4 0.0 52.4 D Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Offset: 60 (40%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 41.0 Intersection LOS: D Intersection Capacity Utilization 92.0% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 5: Hollyhurst Ln & Post Oak Blvd Walter P Moore Proposed Condition (Mitigated) Synchro 8 Report 1660 West Loop TIA Proposed Condition (Mitigated) Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS SBT 8 4 5: Hollyhurst Ln & Post Oak Blvd AM Peak SBR 8.0 14.0 35.0 23.3% 29.0 4.0 2.0 0.0 6.0 3.0 Max 41.8 0.28 0.90 55.3 0.0 55.3 E 55.0 D Intersection Summary Walter P Moore Proposed Condition (Mitigated) Synchro 8 Report 1660 West Loop TIA Proposed Condition - Mitigated with Turn Bays Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS EBU EBL EBT 5 5 15 4.0 9.0 23.0 15.3% 18.0 3.5 1.5 Lag Yes 3.0 None 18.0 0.12 1.09 146.9 0.0 146.9 F EBR 5: Hollyhurst Ln & Post Oak Blvd PM Peak WBU WBL WBT 2 1 1 6 10.0 28.5 75.0 50.0% 69.5 4.0 1.5 0.0 5.5 Lead Yes 3.0 C-Max 5.0 18.0 0 84.5 0.56 0.70 27.2 48.4 75.7 E 83.1 F 4.0 9.0 23.0 15.3% 18.0 3.5 1.5 Lag Yes 3.0 None WBR 6 6 NBL 8 3 NBT 3 8 NBR 8 8 SBL 4.0 10.0 10.0 9.0 28.5 28.5 23.0 50.0 50.0 15.3% 33.3% 33.3% 18.0 44.5 44.5 3.5 4.0 4.0 1.5 1.5 1.5 0.0 0.0 0.0 5.0 5.5 5.5 Lag Lead Lead Yes Yes Yes 3.0 3.0 3.0 None C-Max C-Max 5.0 5.0 18.0 18.0 0 0 10.7 45.7 45.7 0.07 0.30 0.30 0.08 0.56 0.17 46.5 36.7 1.4 0.0 0.0 0.0 46.5 36.7 1.4 D D A 33.3 C 1.0 7.0 7.0 4.7% 1.0 4.0 2.0 8.0 14.0 20.0 13.3% 14.0 4.0 2.0 0.0 6.0 8.0 14.0 20.0 13.3% 14.0 4.0 2.0 0.0 6.0 1.0 7.0 25.0 16.7% 19.0 4.0 2.0 0.0 6.0 2.0 None 3.0 None 3.0 None 3.0 Max 12.8 0.09 0.75 92.2 0.0 92.2 F 98.2 F 12.8 0.09 0.91 47.3 53.1 100.4 F 26.0 0.17 0.39 59.4 78.7 138.1 F 7 Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 85 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 68.1 Intersection LOS: E Intersection Capacity Utilization 101.5% ICU Level of Service G Analysis Period (min) 15 Splits and Phases: Walter P Moore 10/9/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report 1660 West Loop TIA Proposed Condition - Mitigated with Turn Bays Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS SBT 8 4 SBR 5: Hollyhurst Ln & Post Oak Blvd PM Peak ø15 8.0 14.0 25.0 16.7% 19.0 4.0 2.0 0.0 6.0 4.0 9.0 25.0 17% 20.0 3.5 1.5 3.0 Max 3.0 None 44.8 0.30 0.50 8.3 0.0 8.3 A 42.0 D Intersection Summary Walter P Moore 10/9/2014 Synchro 8 Report 1660 West Loop TIA Proposed Condition (Mitigated) Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 5: Hollyhurst Ln & Post Oak Blvd PM Peak EBU EBL EBT 5 15 5 15 29.3 0.20 0.67 66.1 0.0 66.1 E EBR WBU WBL WBT 2 1 1 6 10.0 28.5 70.0 46.7% 64.5 4.0 1.5 0.0 5.5 Lead Yes 3.0 C-Max 5.0 18.0 0 69.2 0.46 0.85 40.4 47.8 88.2 F 85.9 F 4.0 9.0 9.0 6.0% 4.0 3.5 1.5 Lag Yes 3.0 None WBR 6 6 NBL 8 3 NBT 4.0 10.0 10.0 9.0 28.5 28.5 9.0 44.0 44.0 6.0% 29.3% 29.3% 4.0 38.5 38.5 3.5 4.0 4.0 1.5 1.5 1.5 0.0 0.0 0.0 5.0 5.5 5.5 Lag Lead Lead Yes Yes Yes 3.0 3.0 3.0 None C-Max C-Max 5.0 5.0 18.0 18.0 0 0 4.0 38.5 38.5 0.03 0.26 0.26 0.21 0.66 0.19 55.9 47.5 1.5 0.0 0.0 0.0 55.9 47.5 1.5 E D A 43.0 D 1.0 7.0 35.0 23.3% 29.0 4.0 2.0 1.0 7.0 22.0 14.7% 16.0 4.0 2.0 0.0 6.0 2.0 Max 3.0 Max 38 37.7 0.25 0.93 64.1 63.7 127.8 F 127.8 F NBR SBL 4 7 16.0 0.11 0.64 80.4 2.9 83.2 F Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 150 Offset: 85 (57%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 74.6 Intersection LOS: E Intersection Capacity Utilization 107.1% ICU Level of Service G Analysis Period (min) 15 Splits and Phases: Walter P Moore 10/9/2014 5: Hollyhurst Ln & Post Oak Blvd Synchro 8 Report 1660 West Loop TIA Proposed Condition (Mitigated) Lane Group Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS SBT SBR 5: Hollyhurst Ln & Post Oak Blvd PM Peak ø5 ø8 ø15 4.0 9.0 26.0 17% 21.0 3.5 1.5 8.0 14.0 14.0 9% 8.0 4.0 2.0 4.0 9.0 9.0 6% 4.0 3.5 1.5 Lag Yes 3.0 None 3.0 Max 3.0 None 4 8.0 14.0 22.0 14.7% 16.0 4.0 2.0 0.0 6.0 3.0 Max 16.0 0.11 0.78 22.6 0.0 22.6 C 38.3 D Intersection Summary Walter P Moore 10/9/2014 Synchro 8 Report
Similar documents
service manual
RM-EA001 Remote Commander (1) (KLV-V26A10E,KLV-V32A10E) RM-ED001 Remote Commander (1) (KDL-V26A12U,KDL-V32A12U)
More information