McAlpin Industries/Your Sports Depot
Transcription
McAlpin Industries/Your Sports Depot
Traffic Impact Study for the proposed McAlpin Industries/Your Sports Depot Town of Walworth Wayne County, New York April 2013 Updated January 2016 Project No. 35072 Prepared For: McAlpin Industries, Inc. 255 Hollenbeck Street Rochester, New York 14621 Attn: Mr. Mark Lockerby, CFO Mr. Pat Laber,P.E., Schultz Associates Prepared By: 3495 Winton Place Building E, Suite 110 Rochester, New York 14623 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY TABLE OF CONTENTS LIST OF TABLES ................................................................................................................................................... ii LIST OF FIGURES ................................................................................................................................................. ii LIST OF APPENDICES ........................................................................................................................................ ii LIST OF REFERENCES ........................................................................................................................................ ii EXECUTIVE SUMMARY ..................................................................................................................................... iii I. INTRODUCTION ................................................................................................................ 1 II. LOCATION ........................................................................................................................... 1 III. EXISTING HIGHWAY SYSTEM........................................................................................ 1 IV. EXISTING TRAFFIC CONDITIONS ............................................................................... 1 A. Peak Intervals for Analysis ..................................................................................................1 B. Existing Traffic Volume Data ..............................................................................................2 V. FUTURE AREA DEVELOPMENT AND LOCAL GROWTH ..................................... 2 VI. PROPOSED DEVELOPMENT ............................................................................................ 2 A. Description .............................................................................................................................2 B. Site Traffic Generation.........................................................................................................2 C. Site Traffic Distribution .......................................................................................................3 VII. FULL DEVELOPMENT VOLUMES.................................................................................... 4 VIII. CAPACITY ANALYSIS ........................................................................................................ 4 IX. SIGHT DISTANCE ANALYSIS .......................................................................................... 6 X. LEFT TURN TREATMENT WARRANT INVESTIGATION....................................... 7 XI. CONCLUSIONS ................................................................................................................... 7 XII. FIGURES .................................................................................................................................. 8 i Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY LIST OF TABLES TABLE I SITE GENERATED TRIPS ...................................................................................................3 TABLE II CAPACITY ANALYSIS RESULTS .....................................................................................5 TABLE III SIGHT DISTANCE REQUIREMENT AND MEASUREMENTS .................................6 LIST OF FIGURES FIGURE 1 SITE LOCATION & STUDY AREA FIGURE 2 LANE GEOMETRY & AVERAGE DAILY TRAFFIC FIGURE 3 PEAK HOUR VOLUMES – 2015 EXISTING BASE CONDITIONS FIGURE 4 CONCEPT SITE PLAN FIGURE 5 TRIP DISTRIBUTION FIGURE 6 SITE GENERATED TRIPS FIGURE 7 PEAK HOUR VOLUMES – FULL DEVELOPMENT CONDITIONS LIST OF APPENDICES A1. COLLECTED TRAFFIC VOLUME DATA A2. MISCELLANEOUS TRAFFIC DATA AND CALCULATIONS A3. LOS CRITERIA/DEFINITIONS A4. LEVEL OF SERVICE CALCULATIONS – EXISTING CONDITIONS A5. LEVEL OF SERVICE CALCULATIONS – FULL BUILD CONDITIONS LIST OF REFERENCES 1. HCM 2010 Highway Capacity Manual. Transportation Research Board. The National Academies, Washington, DC: 2010. 2. Trip Generation, Ninth Edition. Institute of Transportation Engineers. Washington, DC. 2012. 3. NCHRP Report 279, Intersection Channelization Design Guide. Transportation Research Board. 1985. 4. Manual on Uniform Traffic Control Devices for Street and Highways (MUTCD). Federal Highway Administration. 2009. 5. NYSDOT Traffic Data Viewer. 2012. Retrieved from https://www.dot.ny.gov/tdv 6. A Policy on Geometric Design of Highways and Streets. The American Association of State Highway Transportation Officials (AASHTO). Washington, DC: 2011 ii Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY EXECUTIVE SUMMARY OVERVIEW The purpose of this updated report is to identify the potential traffic impacts associated with the proposed McAlpin Industries/Your Sports Depot Development in the Town of Walworth, New York. A Traffic Impact Study (TIS) was completed in April 2013 for solely Your Sports Depot. This report updates the original TIS to include McAlpin Industries, a manufacturing facility. The originally proposed building will be divided, with half of the space leased to McAlpin Industries, while the remaining portion will be utilized by Your Sports Depot. As well, the originally proposed athletic fields will remain under this updated development proposal. Within this report, the operating characteristics of the proposed access point and impacts to the adjacent roadway network are identified and mitigating measures, if needed, are provided to minimize any capacity or safety concerns. In an effort to define traffic impact, this analysis determines the extent of existing traffic conditions and determines the traffic operations that would result from the proposed development. Future full development traffic volumes and operating conditions are evaluated. The proposed development site is located on the south side of NY Route 441 in the Town of Walworth, Wayne County, New York. The proposed site is bounded by NY Route 441 to the north, storage buildings to the east, and open space to the south and west. The study area includes the intersections of NY Route 441 at Walworth Road and Canandaigua Road. The proposed updated project consists of a total of 122,916 square foot (SF) of development, including an indoor sports complex (59,677 SF) and light manufacturing facility (63,239 SF), and two outdoor soccer fields on 23.4 ± acres of land at 856 NY Route 441. This is an update from the originally proposed 138,000 SF indoor sports facility. Access to the development will be provided via an existing access driveway servicing the storage buildings, east of the site. Construction of the proposed development is anticipated to reach full build-out within one year. Town of Walworth officials were contacted to discuss projects within the study area that are under construction and/or approved. There are no identified projects within the immediate study area. Historical traffic growth on NY Route 441 indicates a downward trend. For this reason, as well as the duration of the time needed to complete construction of the proposed development, no growth rate was applied to existing base conditions. CONCLUSIONS & RECOMMENDATIONS This Traffic Impact Study evaluates the potential traffic impacts resulting from the projected traffic volumes from the proposed McAlpin Industries/Your Sports Depot Development. The results of this study determine that the existing transportation network can adequately accommodate the projected traffic volumes and resulting impacts to study area intersections. The following sets forth conclusions and recommendations based upon the results of the analyses: 1. The proposed development is expected to generate approximately 35 entering/22 exiting vehicle trips during the PM peak hour and 44 entering/47 exiting vehicle trips during the SAT peak hour. iii Updated January 2016 Traffic Impact Study 2. Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY Based on the analysis, it has been determined that the existing site driveway is the optimum feasible location for maximum visibility. Any brush and foliage along the sight lines should be removed to ensure maximum visibility. 3. Required stopping sight distances and desirable intersection sight distance to the west of the proposed site driveway are not met. Therefore, an advanced intersection warning sign (MUTCD Sign W2-2R) is recommended for eastbound traffic on NY Route 441 approaching the site driveway. 4. The intersection warning sign may also be posted with a Supplemental Warning Plaque, positioned underneath the intersection warning sign, depicting the word “DRIVEWAY.” Further, the sign should be installed with a Flashing Warning Beacon. The Flashing Beacon should operate when truck movements occur, as well as during peak operating hours of the Your Sports Depot facility. 5. A left turn lane is not warranted for westbound traffic turning left into the proposed site driveway. 6. The proposed development will not result in any potentially significant adverse traffic impacts to the study area intersections. iv Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY I. INTRODUCTION The purpose of this updated report is to identify the potential traffic impacts associated with the proposed McAlpin Industries/Your Sports Depot Development in the Town of Walworth, New York. A Traffic Impact Study (TIS) was completed in April 2013 for solely Your Sports Depot. This report updates the original TIS to include McAlpin Industries, a manufacturing facility. The originally proposed building will be divided, with half of the space leased to McAlpin Industries, while the remaining portion will be utilized by Your Sports Depot. As well, the originally proposed athletic fields will remain under this updated development proposal. Within this report, the operating characteristics of the proposed access point and impacts to the adjacent roadway network are identified and mitigating measures, if needed, are provided to minimize any capacity or safety concerns. In an effort to define traffic impact, this analysis determines the extent of existing traffic conditions and determines the traffic operations that would result from the proposed development. Future full development traffic volumes and operating conditions are evaluated. II. LOCATION The proposed development site is located on the south side of NY Route 441 in the Town of Walworth, Wayne County, New York. The proposed site is bounded by NY Route 441 to the north, storage buildings to the east, and open space to the south and west. The study area includes the intersections of NY Route 441 at Walworth Road and Canandaigua Road. The site location and study area are shown in Figure 1 – Site Location and Study Area (all figures are included at the end of this report). III. EXISTING HIGHWAY SYSTEM NY Route 441 is functionally classified as an urban collector roadway under the jurisdiction of the New York State Department of Transportation (NYSDOT). Within the study area, motorists travel east and west using one travel lane in each direction. According to the most recent machine count data recorded by the NYSDOT, NY Route 441 carries an Annual Average Daily Traffic (AADT) of 4,298 vehicles per day (vpd). The posted speed limit is 55 miles per hour (MPH) within the immediate area of the proposed site. Existing traffic data information was obtained from the NYSDOT Traffic Data Viewer, 2012. Figure 2 illustrates the lane geometry at each of the study intersections and the ADT volumes on the study roadways. IV. EXISTING TRAFFIC CONDITIONS A. Peak Intervals for Analysis Given the functional characteristics of the land uses proposed for the site (sports facility and manufacturing facility), the peak hours selected for analysis are the weekday commuter PM and weekend SAT midday peaks. The combination of site traffic and adjacent through traffic produces the greatest demand during these time periods. 1 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY B. Existing Traffic Volume Data Weekday PM (4:00-6:00PM) and weekend SAT (11:30AM-1:30PM) peak hour volumes were collected by SRF & Associates at the intersections of NY Route 441 at Walworth Road and Canandaigua Road. Data collection was conducted between Tuesday, January 16th 2013 and Saturday, January 19th, 2013. The peak hour traffic periods generally occurred between 4:30-5:30PM and 11:30AM-12:30PM for the study intersections. The 2013 existing volumes were reviewed and increased to account for changes in traffic growth between 2013 and 2015. The existing weekday PM and weekend SAT peak hour volumes are shown in Figure 3. V. FUTURE AREA DEVELOPMENT AND LOCAL GROWTH Construction of the proposed development is anticipated to reach full build-out within one year. Town of Walworth officials were contacted to discuss projects within the study area that are under construction and/or approved. There are no identified projects within the immediate study area. Historical traffic growth on NY Route 441 indicates a downward trend. For this reason, as well as the duration of the time needed to complete construction of the proposed development, no growth rate was applied to existing base conditions. VI. PROPOSED DEVELOPMENT A. Description The proposed updated development consists of 122,916 square foot (SF) including an indoor sports complex (59,677 SF) and light manufacturing facility (63,239 SF), and two outdoor soccer fields on 23.4 ± acres of land at 856 NY Route 441. This is an update from the originally proposed 138,000 SF indoor sports facility. Access to the development will be provided via an existing access driveway servicing the storage buildings, east of the site. Figure 4 illustrates the proposed concept site plan. B. Site Traffic Generation The next step in the evaluation is to determine the additional traffic attributable to the development as defined, vehicle trips entering and exiting the site. The volume of traffic generated by a site is dependent on the intended land use and size of the development. Trip generation is an estimate of the number of trips generated by a specific building or land use. These trips represent the volume of traffic entering and exiting the development. Trip Generation, 9th Edition is used as a reference for this information. The trip rate for the peak hour of the generator may or may not coincide in time or volume with the trip rate for the peak hour of adjacent street traffic. Volumes generated during the peak hour of adjacent street traffic, in this case the weekday PM and weekend SAT commuter peaks, represent a more critical volume when analyzing the capacity of the system; those intervals will provide the basis of this analysis. ITE suggests that local trip generation data should be utilized, if available. This report uses the ITE Land Use Code Soccer Complex (ITE #488), as it is most comparable to sports 2 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY facilities, as determined from data collected by SRF & Associates at other similar sites. Trip generation for the development was estimated based upon the following: To estimate the trips generated during the PM peak hour, a trip generation rate was calculated based on data collected by SRF & Associates at a similar site. Weekend SAT peak hour trip generation was estimated using the ITE Land Use Code 488, Soccer Complex. Trip generation estimates for the proposed McAlpin Industries component were provided by the applicant. According to McAlpin Industries, their portion of the facility would generate the following traffic movements: 2 trucks/day with incoming materials between 8:00AM and 1:00PM. 2 trucks/day with outgoing shipments between 3:30 and 4:00PM. 8 to 10 associates arriving between 6:30 and 7:00AM and leaving between 3:00 and 3:30PM. 8 associates arriving between 3:00 and 3:30PM and leaving between 11:30PM and midnight. Based on the off-peak time of operations and arrival/departure patterns of the vehicle traffic associated with McAlpin Industries, and given the primary study peak hours used for this report (weekday 4:30-5:30PM and weekend 11:30AM-12:30PM) do not coincide with the industrial operations, this report does not analyze the impact McAlpin Industries will have on the study intersections during the peak traffic periods. Table I summarizes the volume of projected trips for the weekday PM and weekend SAT peak hours. All trip generation calculations are included in Appendix A2 of this report. TABLE I SITE GENERATED TRIPS DESCRIPTION Indoor Sports Facility PM PEAK ENTER EXIT 59,677 SF 35 22 SIZE SAT PEAK ENTER EXIT 44 47 The proposed development is expected to generate approximately 35 entering/22 exiting vehicle trips during the PM peak hour and 44 entering/47 exiting vehicle trips during the SAT peak hour. C. Site Traffic Distribution The cumulative effect of site traffic on the transportation network is dependent on the origins and destinations of that traffic and the location of the access drives serving the site. The proposed arrival/departure distribution of traffic to be generated at this site is considered a function of several parameters, including the following: Employment centers; Residential centers; Existing highway network; Existing traffic patterns; and 3 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY Existing traffic conditions and controls Figure 5 shows the anticipated trip distribution pattern percentages for full build-out of the proposed McAlpin Industries/Your Sports Depot Development. Figures 6 shows the resulting total site generated traffic as assigned to the study area intersections for the weekday PM and weekend SAT peak hour periods under full build-out conditions. VII. FULL DEVELOPMENT VOLUMES The projected design hour traffic volumes were developed for the weekday PM and weekend SAT peak hours by combining the existing traffic conditions (Figure 3), and projected site generated volumes for full build-out of the proposed development (Figure 6) to yield the total traffic conditions expected at full development. Figure 7 illustrates the total weekday PM and weekend SAT peak hour volumes anticipated for the proposed development under full build-out conditions. VIII. CAPACITY ANALYSIS Capacity analysis is a technique used for determining a measure of effectiveness for a section of roadway and/or intersection based on the number of vehicles during a specific time period. The measure of effectiveness used for the capacity analysis is referred to as a Level of Service (LOS). Levels of Service are calculated to provide an indication of the amount of delay that a motorist experiences while traveling along a roadway or through an intersection. Since the most amount of delay to motorists usually occurs at intersections, capacity analysis typically focuses on intersections, as opposed to highway segments. Six Levels of Service are defined for analysis purposes. They are assigned letter designations, from "A" to "F", with LOS "A" representing the best conditions and LOS "F" the worst. Suggested ranges of service capacity and an explanation of Levels of Service are included in the Appendix. The standard procedure for capacity analysis of signalized and un-signalized intersections is outlined in the Highway Capacity Manual (HCM 2010) published by the Transportation Research Board. Traffic analysis software, Synchro 8, which is based on procedures and methodologies contained in the HCM 2010, was used to analyze operating conditions at study area intersections. The procedure yields a Level of Service (LOS) based on the HCM 2010 as an indicator of how well intersections operate. Existing operating conditions during the peak study periods are evaluated to determine a basis for comparison with the projected future conditions. The future traffic conditions generated by the development were analyzed to assess the operations of the intersections in the study area. Capacity results for existing and full development conditions are listed in Table II. The discussion following the table summarizes capacity conditions. All capacity analysis calculations are included in the Appendix. 4 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY TABLE II CAPACI TY ANALY SI S RESU LTS EXISTING CONDITIONS INTERSECTION NY Route 441/Canandaigua Road Eastbound – NY Route 441 Westbound – NY Route 441 Northbound – Canandaigua Road Southbound – Canandaigua Road NY Route 441/Proposed Site Driveway Westbound – NY Route 441 Northbound – Proposed Driveway NY Route 441/Walworth Road Eastbound – NY Route 441 Southbound – Walworth Road NY Route 441/Walworth Road (Southbound Traffic Entering onto NY Route 441) Southbound – Walworth Road FULL DEVELOPMENT CONDITIONS PM SAT PM SAT A(7.6) A(7.9) B(13.9) C(17.0) A(7.5) A(7.5) B(11.0) B(11.7) A(7.6) A(8.0) B(14.7) C(17.5) A(7.6) A(7.6) B(11.6) B(11.9) A(8.0) B(11.7) A(7.6) B(10.5) NA A(7.7) B(14.0) A(7.6) B(10.9) A(7.7) B(14.5) A(7.6) B(11.4) A(8.7) A(8.5) A(8.7) A(8.6) Notes: B(11.7) = Level of Service(delay in seconds per vehicle) NA = Approach does not exist and/or was not analyzed during this condition NY Route 441 / Canandaigua Road All approaches operate at Level of Service “C” or better during both peak hours under all conditions. No change in LOS is projected as a result of the proposed development. No mitigation is warranted or recommended. NY Route 441 / Proposed Site Driveway The approaches are expected to operate at a level of service of “B” or better under full development conditions. Northbound traffic will not experience significant delays exiting the site during both peak hours. An advanced intersection warning sign is recommended for eastbound traffic on NY Route 441 approaching the site driveway. A detailed discussion regarding Intersection Sight Distance and the preceding recommendation can be found in Section IX. As was stated earlier, the proposed McAlpin Industries component of peak hour trip generation occurs outside of the peak hour study periods used in this report. However, a Synchro analysis was undertaken at the NY Route 441/Proposed Site Driveway intersection during the AM and PM peak hours, as dictated by the peak arrival and departure times of McAlpin Industries. Peak hour through traffic volumes were determined using 2009 NYSDOT Hourly Traffic Volume Data. For conservative purposes, the peak hour trip generation volumes from the proposed Your Sports Depot component were included in the assessment. The results of the analysis indicate that all approaches operate at LOS “A” during the AM peak hour and LOS “B” or better during the PM peak hour. Given the volume of site generated trips during these peak hours, no further analysis is needed at the remaining study area intersections. 5 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY NY Route 441 / Walworth Road All approaches operate at Level of Service “B” or better during both peak hours under all conditions. No change in LOS is projected as a result of the proposed development. No mitigation is warranted or recommended. NY Route 441 / Walworth Road (Southbound Traffic Entering onto NY Route 441) The southbound approach operates at LOS “A”. No change in level of service is expected as a result of the proposed development between existing and full development conditions. No mitigation is warranted or recommended. IX. SIGHT DISTANCE ANALYSIS Sight distances were investigated at the proposed site driveway on NY Route 441. Sight distance is provided at intersections to allow drivers to perceive the presence of potentially conflicting vehicles. This should occur in sufficient time for a motorist to stop or adjust their speed, as appropriate, to avoid a collision at the intersection. Sight distance is also provided at intersections to allow the drivers of stopped vehicles a sufficient view of the intersecting highway to anticipate and avoid potential incidents. If the available sight distance for an entering or crossing vehicle is at least equal to the appropriate stopping sight distance for the major road, then drivers have sufficient sight distance to anticipate and avoid collisions. To enhance traffic operations, intersection sight distances that exceed stopping sight distances are desirable along the major road. A Policy on Geometric Design of Highways and Streets published by the American Association of State Highway and Transportation Officials (AASHTO), 2011, was used as a reference to establish the required stopping sight distance and desirable intersection sight distance for the proposed site driveway. Required stopping distances and desirable intersection sight distances are based on the design speed for a given section of roadway; generally, the design speed is the posted speed limit plus 5 MPH. For example, the posted speed limit along NY Route 441 is 55 MPH in the vicinity of the site. Hence a design speed of 60 MPH was used. The required stopping distance and desirable intersection sight distances based on the design speed is shown in Table III. TABLE III S I G HT DI STANCE REQU IREMENT AND MEASU REMENTS INTERSECTION NY Route 441 / Proposed site driveway Posted Speed Limit (mph) Design Speed (mph) Desirable Intersection Sight Distance (ISD) for Left Turn from Stop (ft) Required Stopping Sight Distance (SSD) (ft) 55 60 665’ 570’ Available Sight Distance (ft) to the: Left Right 444’ SSD 467’ ISD >800’ The available sight distance to the right is in excess of the desirable intersection sight distances and required stopping sight distance at the proposed site driveway on NY Route 441. The available sight distance on NY Route 441 to the left from the proposed site driveway is less than the desirable intersection sight distance and required stopping sight distance. 6 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY Based on the analysis, it has been determined that the existing site driveway is the optimum feasible location for maximum visibility. An advanced intersection warning sign is recommended for eastbound traffic on NY Route 441 approaching the site driveway. As stated in the Manual of Uniform Traffic Control Devices (MUTCD), Section 5C.03, Support 02: “Intersection signs may be used where engineering judgment indicates a need to inform the road user in advance of an intersection.” The Side Road Intersection Warning Sign (MUTCD Sign W2-2R) should be installed along the south side of NY Route 441 facing eastbound traffic to notify drivers of the upcoming driveway. The intersection warning sign may also be posted with a Supplemental Warning Plaque, positioned underneath the intersection warning sign, depicting the word “DRIVEWAY”. Further, the sign should be installed with a Flashing Warning Beacon similar to the image shown to the right. The Intersection warning sign with flashing MUTCD states that, “Typical applications of beacon, NY Route 250, Perinton Warning Beacons include…as supplemental emphasis to warning signs.” Guidance for installation states, “Warning Beacons should be operated only during those periods or times when the condition or regulation exists.” The benefit of providing the flashing sequence is to enhance the advanced warning of the site driveway, especially as it relates to tractor trailer traffic. Therefore, the Flashing Beacon should operate when truck movements occur, as well as during peak operating hours of the Your Sports Depot facility. The sign should be located such that is does not conflict with other existing signage and should be located a minimum of 800 feet west of the proposed driveway. Any brush and foliage along the sight lines should be maintained to ensure maximum visibility. X. LEFT TURN TREATMENT WARRANT INVESTIGATION Volume warrants for a left turn treatment at the site driveway on NY Route 441 were investigated using the Transportation Research Board's NCHRP Report 279, Intersection Channelization Design Guide, 1985. Provisions for left turn lane facilities should be established where traffic volumes are high enough and safety considerations are sufficient to warrant the additional lane. The combination of projected volumes (Figure 7) turning left onto the site driveway on NY Route 441 indicate that a left turn treatment is not warranted for the westbound left-turn movement entering the site driveway under full development conditions during both peak hours. All supporting calculations are included in the Appendix of this report. XI. CONCLUSIONS & RECOMMENDATIONS This Traffic Impact Study evaluates the potential traffic impacts resulting from the projected traffic volumes from the proposed McAlpin Industries/Your Sports Depot Development. The results of this study determine that the existing transportation network can adequately 7 Updated January 2016 Traffic Impact Study Proposed McAlpin Industries/Your Sports Depot Town of Walworth, NY accommodate the projected traffic volumes and resulting impacts to study area intersections. The following sets forth conclusions and recommendations based upon the results of the analyses: 1. The proposed development is expected to generate approximately 35 entering/22 exiting vehicle trips during the PM peak hour and 44 entering/47 exiting vehicle trips during the SAT peak hour. 2. Based on the analysis, it has been determined that the existing site driveway is the optimum feasible location for maximum visibility. Any brush and foliage along the sight lines should be removed to ensure maximum visibility. 3. Required stopping sight distances and desirable intersection sight distance to the west of the proposed site driveway are not met. Therefore, an advanced intersection warning sign (MUTCD Sign W2-2R) is recommended for eastbound traffic on NY Route 441 approaching the site driveway. 4. The intersection warning sign may also be posted with a Supplemental Warning Plaque, positioned underneath the intersection warning sign, depicting the word “DRIVEWAY.” Further, the sign should be installed with a Flashing Warning Beacon. The Flashing Beacon should operate when truck movements occur, as well as during peak operating hours of the Your Sports Depot facility. 5. A left turn lane is not warranted for westbound traffic turning left into the proposed site driveway. 6. The proposed development will not result in any potentially significant adverse traffic impacts to the study area intersections. XII. FIGURES Figures 1 through 7 are included on the following pages. 8 Updated January 2016 ! ! th R d Bay Ln berr y Wes t Wa lwor Proposed Driveway Study Intersection Legend w De rry be ! !3 Study Area Study Site Ln Wes tw ood Tr l Cir 0 500 1,000 Feet TOWN OF WALWORTH, NY 2,000 PROPOSED MCALPIN INDUSTRIES/ YOUR SPORTS DEPOT DEVELOPMENT Woo dlan ds PROP OS ED MCALP IN INDUS TRIES/ YOUR SP ORT S DE PO T ! !2 Penfield Rd · FIGURE 1 - SITE LOCATION AND STUDY AREA ! !1 Canandaigua Rd FIGURE 4 - CONCEPT SITE PLAN APPENDICES A1 Collected Traffic Volume Data 1 2 2 0 5 17 12.4 1.5 17 100 0 0 0 0 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % Unshifted % Unshifted Bank 1 % Bank 1 Bank 2 % Bank 2 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total Start Time 84 61.3 7.3 84 100 0 0 0 0 9 18 9 8 44 36 26.3 3.1 36 100 0 0 0 0 9 5 3 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CANANDAIGUA RD Southbound Right Thru Left Peds 0 9 2 0 0 8 1 0 9 11 9 0 3 12 7 0 12 40 19 0 24 7.4 2.1 24 100 0 0 0 0 6 3 2 2 13 249 77.1 21.8 249 100 0 0 0 0 20 31 39 33 123 50 15.5 4.4 50 100 0 0 0 0 7 7 7 6 27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 69 44.2 6 69 100 0 0 0 0 10 11 7 6 34 64 41 5.6 64 100 0 0 0 0 9 8 6 8 31 23 14.7 2 23 100 0 0 0 0 3 1 2 2 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Groups Printed- Unshifted - Bank 1 - Bank 2 RT 441 CANANDAIGUA RD Westbound Northbound Right Thru Left Peds Right Thru Left Peds 3 29 6 0 2 10 5 0 3 25 6 0 3 10 4 0 1 29 6 0 24 6 4 0 4 43 5 0 6 7 2 0 11 126 23 0 35 33 15 0 16 3 1.4 16 100 0 0 0 0 2 2 3 2 9 492 93.4 43 492 100 0 0 0 0 64 66 64 61 255 19 3.6 1.7 19 100 0 0 0 0 2 3 4 1 10 RT 441 Eastbound Right Thru Left 4 53 2 1 54 1 0 57 3 2 73 3 7 237 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1143 100 0 0 0 0 1143 142 157 148 129 576 Peds Int. Total 0 125 0 116 0 159 0 167 0 567 Bank 1 % Bank 1 Bank 2 % Bank 2 % Unshifted % App. Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.8 52.6 31.6 PHF .417 .694 .833 .000 15 50 30 0 Unshifted 0 0 0 0 0 0 0 0 0 0 0 0 9 6 7 0 0 0 0 0 0 0 0 30 0 0 0 0 0 30 0 Left Peds 0 0 0 0 Peak Hour Data 15 50 0 0 0 0 15 50 Right Thru 81 91 172 0 0 0 0 0 0 81 91 172 Out In Total CANANDAIGUA RD Left Thru Right Peds 0 10 30 51 0 0 0 0 0 0 0 0 10 30 51 0 Unshifted Bank 1 Bank 2 4 2 3 1 10 0 0 0 0 0 0 0 0 0 0 0 0 0 56 33 11 0 .779 .531 .833 .625 .000 162 51 30 10 0 8 30 CANANDAIGUA RD Out In Total 55 95 150 0 0 0 0 0 0 55 150 95 0 0 0 0 24 6 10 11 51 33 41 162 52 36 App. Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .936 625 .888 277 2.2 93.9 4 0 .669 .750 .890 .917 .000 91 6 260 11 0 159 167 60 142 157 625 73 64 66 260 78 3 3 2 3 11 57 2 Int. Total 68 71 277 15 22 20 91 2 2 6 0 App. Total 0 0 0 0 0 34 Right RT 441 Eastbound Thru Left Peds : RT441.Canadaigua.PM.Peak : 00000000 : 1/16/2013 :2 App. Total File Name Site Code Start Date Page No CANANDAIGUA RD Northbound Right Thru Left Peds North Peak Hour Begins at 04:30 PM 0 0 0 0 8.6 75.9 15.4 0 .819 .583 .715 .893 .000 95 14 123 25 0 CANANDAIGUA RD RT 441 Southbound Westbound Thru Left Peds Right Right Thru Left Peds App. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 9 11 9 0 29 1 29 6 0 3 12 7 0 22 4 43 5 0 04:45 PM 05:00 PM 1 9 9 0 19 6 20 7 0 05:15 PM 2 18 5 0 25 3 31 7 0 15 50 30 0 95 14 123 25 0 Total Volume Start Time Total 425 0 0 425 In 277 0 0 277 : RT441.Canadaigua.PM.Peak : 00000000 : 1/16/2013 :1 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 14 123 0 0 0 0 14 123 Right Thru RT 441 Out 148 0 0 148 11 0 0 11 Left 6 260 0 0 0 0 0 0 0 0 6 260 Peds Right Thru File Name Site Code Start Date Page No SRF & Associates SRF & Associates RT 441 Out In 341 162 0 0 0 0 341 162 Total 503 0 0 503 25 0 0 0 0 0 25 0 Left Peds 0 1 2 0 3 2 0 7 9.2 1 7 100 0 0 0 0 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 01:00 PM 01:15 PM Grand Total Apprch % Total % Unshifted % Unshifted Bank 1 % Bank 1 Bank 2 % Bank 2 11:30 AM 11:45 AM Total Start Time 5 6 56 73.7 7.6 56 100 0 0 0 0 8 5 6 7 26 1 1 13 17.1 1.8 13 100 0 0 0 0 3 1 2 2 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CANANDAIGUA RD Southbound Right Thru Left Peds 1 6 3 0 1 13 0 0 2 19 3 0 0 6 18 6 2.4 18 100 0 0 0 0 3 4 1 0 8 34 34 255 84.7 34.6 255 100 0 0 0 0 35 26 26 34 121 2 3 28 9.3 3.8 28 100 0 0 0 0 1 5 3 7 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 4 44 44 6 44 100 0 0 0 0 2 6 8 3 19 5 3 36 36 4.9 36 100 0 0 0 0 8 8 1 5 22 3 4 20 20 2.7 20 100 0 0 0 0 2 4 1 1 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Groups Printed- Unshifted - Bank 1 - Bank 2 RT 441 CANANDAIGUA RD Westbound Northbound Right Thru Left Peds Right Thru Left Peds 3 33 4 0 11 5 3 0 1 33 3 0 1 1 2 0 4 66 7 0 12 6 5 0 3 1 19 7.3 2.6 19 100 0 0 0 0 2 1 2 3 8 29 22 230 88.8 31.2 230 100 0 0 0 0 26 34 28 35 123 2 0 10 3.9 1.4 10 100 0 0 0 0 1 1 2 0 4 RT 441 Eastbound Right Thru Left 5 29 1 2 27 3 7 56 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 736 100 0 0 0 0 95 84 736 91 96 82 97 366 Peds Int. Total 0 104 0 87 0 191 : RT441.Canadaigua.SAT.Peak : 00000000 : 1/19/2013 :1 Bank 1 % Bank 1 Bank 2 % Bank 2 % Unshifted Unshifted 0 0 0 0 3 Right 0 0 0 0 32 0 0 0 0 7 42 0 0 0 0 0 0 0 0 0 0 0 0 0 11 0 0 0 0 0 0 0 0 20 151 22 1 8 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 7 0 Left Peds Peak Hour Data 3 32 0 0 0 0 3 32 Right Thru 0 0 0 0 55 53 108 0 0 0 0 0 0 55 53 108 Out In Total CANANDAIGUA RD Left Thru Right Peds 11 22 20 0 0 0 0 0 0 0 0 0 11 22 20 0 0 0 0 0 0 0 0 0 0 0 0 0 29 36 132 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 1 6 4.5 App. Total 0 0 0 0 27 26 34 116 RT 441 Eastbound Thru Left Peds .917 132 10 5 2 2 Right 7.6 87.9 .697 .500 .853 .500 .000 53 10 116 6 0 53 19 4 12 App. Total 0 0 0 0 .909 378 91 96 378 104 Int. Total : RT441.Canadaigua.SAT.Peak : 00000000 : 1/19/2013 :2 11 127 0 0 0 0 11 127 Right Thru Unshifted Bank 1 Bank 2 2 2 4 11 0 37.7 41.5 20.8 .944 .455 .688 .688 .000 151 20 22 11 0 11 1 2 40 37 39 CANANDAIGUA RD Out In Total 39 42 81 0 0 0 0 0 0 39 81 42 0 0 0 0 0 File Name Site Code Start Date Page No CANANDAIGUA RD Northbound Thru Left Peds Right App. Total North Peak Hour Begins at 11:30 AM 13 127 CANANDAIGUA RD RT 441 Southbound Westbound Thru Left Peds App. Total Right Thru Left Peds Peak Hour Analysis From 11:30 AM to 01:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:30 AM 11:30 AM 1 3 1 0 0 1 33 3 0 11:45 AM 13 14 1 0 12:00 PM 0 8 3 0 11 3 35 12:15 PM 1 5 1 0 7 4 5 3 32 7 0 42 11 127 13 0 Total Volume 0 7.3 84.1 8.6 7.1 76.2 16.7 0 % App. Total .750 .688 .907 .650 .000 PHF .750 .615 .583 .000 Start Time 6 0 0 6 File Name Site Code Start Date Page No 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 SRF & Associates Total 273 0 0 273 RT 441 Out In 141 132 0 0 0 0 141 132 Left 10 116 0 0 0 0 0 0 0 0 10 116 Peds Right Thru SRF & Associates 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 RT 441 Out In 143 151 0 0 0 0 143 151 Total 294 0 0 294 13 0 0 0 0 0 13 0 Left Peds 10 11 8 3 32 60 75 6.1 60 100 0 0 0 0 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % Unshifted % Unshifted Bank 1 % Bank 1 Bank 2 % Bank 2 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total Start Time 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 25 2 20 100 0 0 0 0 7 3 3 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walworth Road Southbound Right Thru Left Peds 5 0 2 0 8 0 0 0 10 0 1 0 5 0 4 0 28 0 7 0 32 11.1 3.2 32 100 0 0 0 0 4 5 5 3 17 256 88.9 25.9 256 100 0 0 0 0 23 27 39 32 121 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Groups Printed- Unshifted - Bank 1 - Bank 2 RT441 Westbound Northbound Right Thru Left Peds Right Thru Left 1 37 0 0 0 0 0 5 22 0 0 0 0 0 2 35 0 0 0 0 0 7 41 0 0 0 0 0 15 135 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Peds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Right 0 0 0 0 0 515 82.9 52.1 515 100 0 0 0 0 59 69 68 60 256 106 17.1 10.7 106 100 0 0 0 0 14 14 14 12 54 RT441 Eastbound Thru Left 53 8 61 11 64 18 81 15 259 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 989 100 0 0 0 0 989 117 129 137 110 493 Peds Int. Total 0 106 0 107 0 130 0 153 0 496 : RT441.Walworth.PM.Peak : 00330041 : 1/16/2013 :1 Bank 1 % Bank 1 Bank 2 % Bank 2 % Unshifted % App. Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.4 0 70.6 PHF .818 .000 .536 .000 36 0 15 0 Unshifted Thru 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 0 0 0 0 0 15 0 Left Peds 0 0 0 0 Peak Hour Data 36 0 0 0 0 0 36 0 Right Thru Walworth Road Out In Total 79 51 130 0 0 0 0 0 0 79 130 51 0 0 0 0 0 0 0 0 0 Right Out 0 0 0 0 0 0 0 0 0 0 0 0 0 In 0 0 0 0 0 0 0 0 Total Thru Right Peds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .864 529 .870 334 0 81.7 18.3 0 .000 .000 .843 .847 .000 0 0 273 61 0 130 153 81 117 129 529 82 Int. Total 96 59 69 273 0 0 0 0 0 App. Total 73 83 334 18 15 14 14 61 64 Right 0 0 0 0 0 0 0 0 0 0 App. Total Thru RT441 Eastbound Left Peds : RT441.Walworth.PM.Peak : 00330041 : 1/16/2013 :2 RT441 In 144 0 0 144 Left Unshifted Bank 1 Bank 2 0 0 0 0 0 0 0 0 0 .750 .000 .000 .000 .000 144 0 0 0 0 27 32 144 48 37 App. Total File Name Site Code Start Date Page No Northbound Left Peds Thru North Peak Hour Begins at 04:30 PM 0 0 0 0 0 0 12.5 87.5 .750 .643 .768 .000 .000 51 18 126 0 0 Walworth Road RT441 Southbound Westbound Thru Left Left Peds Peds Right Right App. Total Peak Hour Analysis From 04:30 PM to 05:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 10 0 1 0 11 2 35 0 0 5 0 4 0 9 7 41 0 0 04:45 PM 05:00 PM 10 0 7 0 17 4 23 0 0 05:15 PM 11 0 3 0 14 5 27 0 0 36 0 15 0 51 18 126 0 0 Total Volume Start Time 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 Total 496 0 0 496 RT441 In 334 0 0 334 File Name Site Code Start Date Page No SRF & Associates SRF & Associates 18 126 0 0 0 0 18 126 Right Thru Out 162 0 0 162 61 0 0 61 Left 0 273 0 0 0 0 0 0 0 0 0 273 Peds Right Thru Out 288 0 0 288 Total 432 0 0 432 0 0 0 0 0 0 0 0 Left Peds 6 12 6 10 34 3 3 65 67.7 9.6 65 100 0 0 0 0 12:00 PM 12:15 PM 12:30 PM 12:45 PM Total 01:00 PM 01:15 PM Grand Total Apprch % Total % Unshifted % Unshifted Bank 1 % Bank 1 Bank 2 % Bank 2 11:30 AM 11:45 AM Total Start Time 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1 31 32.3 4.6 31 100 0 0 0 0 3 7 4 3 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walworth Road Southbound Right Thru Left Peds 12 0 7 0 13 0 3 0 25 0 10 0 6 4 26 9.1 3.8 26 100 0 0 0 0 6 3 0 1 10 34 34 260 90.9 38.3 260 100 0 0 0 0 32 29 23 35 119 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Groups Printed- Unshifted - Bank 1 - Bank 2 RT441 Northbound Westbound Right Thru Left Peds Right Thru Left 4 34 0 0 0 0 0 2 39 0 0 0 0 0 6 73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Right 0 0 0 31 24 234 78.8 34.5 234 100 0 0 0 0 28 31 29 34 122 4 9 63 21.2 9.3 63 100 0 0 0 0 12 3 7 8 30 RT441 Eastbound Thru Left 28 9 29 11 57 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 679 100 0 0 0 0 81 75 679 87 85 69 91 332 Peds Int. Total 0 94 0 97 0 191 : RT441.Walworth.SAT.PEak : 00330042 : 1/19/2013 :1 Peds 0 0 0 File Name Site Code Start Date Page No Thru Bank 1 % Bank 1 Bank 2 % Bank 2 % Unshifted 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PHF .827 .000 .714 .000 43 0 20 0 Unshifted Right 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32 149 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 0 0 0 0 20 0 Left Peds 0 0 0 0 Peak Hour Data 43 0 0 0 0 0 43 0 Right Thru Walworth Road Out In Total 50 63 113 0 0 0 0 0 0 50 113 63 0 0 0 0 0 0 38 41 Out 0 0 0 0 0 0 0 0 0 In 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .944 151 0 0 0 0 34 151 0 31 0 116 0 76.8 23.2 0 .000 .000 .935 .729 .000 0 0 116 35 0 0 0 0 0 9 11 12 3 35 App. Total 37 40 28 29 0 0 RT441 Eastbound Left Peds Thru Right 0 0 0 0 App. Total 0 0 0 0 .936 363 85 363 94 97 Int. Total : RT441.Walworth.SAT.PEak : 00330042 : 1/19/2013 :2 RT441 In 149 0 0 149 Left Thru Right Peds 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Unshifted Bank 1 Bank 2 0 0 0 0 0 Northbound Left Peds Thru File Name Site Code Start Date Page No .909 .000 .000 .000 .000 149 0 0 0 0 Right App. Total North Peak Hour Begins at 11:30 AM 0 0 0 0 .829 .625 .859 .000 .000 63 15 134 0 0 Walworth Road RT441 Southbound Westbound Left Peds App. Total Right Thru Left Peds Peak Hour Analysis From 11:30 AM to 01:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 11:30 AM 11:30 AM 12 0 4 34 0 0 7 19 11:45 AM 0 0 13 39 12:00 PM 6 0 3 0 9 6 12:15 PM 12 0 7 0 19 3 29 0 0 43 0 20 0 63 15 134 0 0 Total Volume 0 31.7 0 10.1 89.9 0 0 % App. Total 68.3 Start Time 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 SRF & Associates Total 328 0 0 328 RT441 In 151 0 0 151 35 0 0 35 Left 0 116 0 0 0 0 0 0 0 0 0 116 Peds Right Thru SRF & Associates 3495 Winton Place, Building E, Suite 110 Rochester, NY 14623 15 134 0 0 0 0 15 134 Right Thru Out 177 0 0 177 Out 136 0 0 136 Total 285 0 0 285 0 0 0 0 0 0 0 0 Left Peds A2 Miscellaneous Traffic Data and Calculations Project Information Project Name: No: Date: City: State/Province: Zip/Postal Code: Country: Client Name: Analyst's Name: McAlpin Industries 35072 12/29/2015 Walworth New York Edition: United States McAlpin DLK ITE‐TGM 9th Edition/SRF & Associates Land Use Size 9488 ‐ Athletic Complex 59.68 Sq Ft PM Peak Hour SAT Peak Hour Entry Exit Entry Exit 35 22 44 47 PROPOSED MCALPIN INDUSTRIES/YOUR SPORTS DEPOT DEVELOPMENT TOWN OF WALWORTH, NY PM PEAK LOCATION INTERSECTION DESCRIPTION NUMBER 1 2 3 NY Route 441 / Canandaigua Road SR ST SL WR WT WL NR NT NL ER ET EL NY Route 441 / Proposed Driveway SR ST SL WR WT WL NR NT NL ER ET EL NY Route 441 / Walworth Road SR ST SL WR WT WL NR NT NL ER ET EL Num of yrs Num of yrs 2 1 Total Full Proposed Your Sports Depot Bkgd Bkgd Existing Volume Volume Enter Exit Trips IN Trips OUT Site Build Volume 0.25% 0.0% Dist. % Dist. % 35 22 Trips Volumes 15 50 30 14 123 25 51 30 10 6 260 11 15 50 30 14 124 25 51 30 10 6 261 11 15 50 30 14 124 25 51 30 10 6 261 11 0 0 0 0 144 0 0 0 0 0 288 0 0 0 0 0 145 0 0 0 0 0 289 0 0 0 0 0 145 0 0 0 0 0 289 0 36 0 15 18 126 0 0 0 0 0 273 61 36 0 15 18 127 0 0 0 0 0 274 61 36 0 15 18 127 0 0 0 0 0 274 61 9% 3 3 25% 9 9 11% 2 6 2 4 2 6 2 18 50 30 14 133 25 51 30 14 8 267 13 10 16 10 145 16 10 4 11% 25% 9% 45% 16 45% 55% 55% 12 19 12 19 12 19 289 36 15% 5 15% 40% 40% 3 9 14 5 3 9 20 21 136 14 288 61 PROPOSED MCALPIN INDUSTRIES/YOUR SPORTS DEPOT DEVELOPMENT TOWN OF WALWORTH, NY SAT PEAK LOCATION INTERSECTION DESCRIPTION NUMBER 1 2 3 NY Route 441 / Canandaigua Road SR ST SL WR WT WL NR NT NL ER ET EL NY Route 441 / Proposed Driveway SR ST SL WR WT WL NR NT NL ER ET EL NY Route 441 / Walworth Road SR ST SL WR WT WL NR NT NL ER ET EL Num of yrs Num of yrs 2 1 Total Full Proposed Your Sports Depot Bkgd Bkgd Existing Volume Volume Enter Exit Trips IN Trips OUT Site Build Volume 0.25% 0.0% Dist. % Dist. % 44 47 Trips Volumes 3 32 7 11 127 13 20 22 11 10 116 6 3 32 7 11 128 13 20 22 11 10 117 6 3 32 7 11 128 13 20 22 11 10 117 6 0 0 0 0 149 0 0 0 0 0 136 0 0 0 0 0 150 0 0 0 0 0 137 0 0 0 0 0 150 0 0 0 0 0 137 0 43 0 20 15 134 0 0 0 0 0 116 35 43 0 20 15 135 0 0 0 0 0 117 35 43 0 20 15 135 0 0 0 0 0 117 35 9% 4 4 25% 11 11 11% 5 12 4 5 5 12 4 7 32 7 11 139 13 20 22 16 15 129 10 21 20 21 150 20 21 5 11% 25% 9% 45% 20 45% 55% 55% 26 24 26 24 26 24 137 43 15% 7 15% 40% 40% 7 19 18 7 7 19 27 22 154 18 135 35 Guideline for determining left-turn Lane at a two-way stop-controlled intersection TWO LANE ROADWAY INPUT Value Route 441/Driveway - PM Pk Hr Westbound 60 10% Variable Major Approach Approach Design Speed Limit - MPH Percent of left-turns in advancing volume (VA), %: Advancing volume (VA), veh/h: 161 Opposing volume (VO), veh/h: 308 CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway, s: Average time for left-turn vehicle to clear the advancing lane, s: Opposing Volume (VO), veh/h PLOT - LINE 1 0 161 308 308 PLOT - LINE 2 161 161 Value 3.0 5.0 1.9 0 308 1000 900 800 700 600 500 400 300 200 100 0 0 100 200 300 400 500 600 700 800 900 Advancing Volume (VA), veh/h OUTPUT Value Variable Limiting advancing volume (VA), veh/h: 288 Guidance for determining the need for a major-road left-turn bay: Westbound Left-turn treatment NOT warranted at Route 441/Driveway - PM Pk Hr Intersections 1000 ρ f = Wait Time Service Rate Arrival Rate Vo 0.01 0.79 1.240 s 970 veh/h 288 veh/h Time_tw Vo Serv_rate 0 0.0 0 1200 100 0.4 100 1121 200 300 400 500 600 700 800 900 1000 0.8 1.2 1.7 2.2 2.8 3.5 4.2 5.0 5.8 200 300 400 500 600 700 800 900 1000 1046 976 910 848 789 735 683 635 590 % LT veh. Vo 0 100 200 300 400 500 600 700 800 900 1000 10% VA 412 364 325 290 261 235 212 192 174 158 143 15% VA 345 305 272 243 219 197 178 161 146 132 120 20% VA 308 273 243 217 195 176 159 143 130 118 107 10% VA 410 363 324 290 260 234 212 191 173 157 143 40% VA 251 222 198 177 159 143 130 117 106 96 87 Guideline for determining left-turn Lane at a two-way stop-controlled intersection TWO LANE ROADWAY INPUT Value Route 441/Driveway - SAT Pk Hr Westbound 60 12% Variable Major Approach Approach Design Speed Limit - MPH Percent of left-turns in advancing volume (VA), %: Advancing volume (VA), veh/h: 170 Opposing volume (VO), veh/h: 161 CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway, s: Average time for left-turn vehicle to clear the advancing lane, s: Opposing Volume (VO), veh/h PLOT - LINE 1 0 170 161 161 PLOT - LINE 2 170 170 Value 3.0 5.0 1.9 0 161 1000 900 800 700 600 500 400 300 200 100 0 0 100 200 300 400 500 600 700 800 900 1000 Advancing Volume (VA), veh/h OUTPUT Value Variable Limiting advancing volume (VA), veh/h: 315 Guidance for determining the need for a major-road left-turn bay: Westbound Left-turn treatment NOT warranted at Route 441/Driveway - SAT Pk Hr Intersections ρ f = Wait Time Service Rate Arrival Rate Vo 0.01 0.79 0.603 s 1075 veh/h 315 veh/h Time_tw Vo Serv_rate 0 0.0 0 1200 100 0.4 100 1121 200 300 400 500 600 700 800 900 1000 0.8 1.2 1.7 2.2 2.8 3.5 4.2 5.0 5.8 200 300 400 500 600 700 800 900 1000 1046 976 910 848 789 735 683 635 590 % LT veh. Vo 0 100 200 300 400 500 600 700 800 900 1000 12% VA 382 338 301 270 242 218 197 178 161 146 133 15% VA 345 305 272 243 219 197 178 161 146 132 120 20% VA 308 273 243 217 195 176 159 143 130 118 107 10% VA 410 363 324 290 260 234 212 191 173 157 143 40% VA 251 222 198 177 159 143 130 117 106 96 87 A3 Level of Service: Criteria and Definitions Level of Service Criteria Highway Capacity Manual 2010 SIGNALIZED INTERSECTIONS Level of Service is a qualitative measure describing operational conditions within a traffic stream, based on service measures such as speed and travel time, freedom to maneuver, traffic interruptions, comfort, and convenience. Level of Service for signalized intersections is defined in terms of delay specifically, average total delay per vehicle for a 15 minute analysis period. The ranges are as follows: Level of Service A B C D E F Control Delay per vehicle (seconds) < 10 10 – 20 20 – 35 35 – 55 55 – 80 >80 UNSIGNALIZED INTERSECTIONS Level of Service for unsignalized intersections is also defined in terms of delay. However, the delay criteria are different from a signalized intersection. The primary reason for this is driver expectation that a signalized intersection is designed to carry higher volumes than an unsignalized intersection. The total delay threshold for any given Level of Service is less for an unsignalized intersection than for a signalized intersection. The ranges are as follows: Level of Service A B C D E F Control Delay per vehicle (seconds) < 10 10 – 15 15 – 25 25 – 35 35 - 50 >50 A4 Level of Service Calculations: Existing Conditions Proposed McAlpin Industries/Your Sports Depot 1: Canandaigua Road & NY Route 441 Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL EBT EBR 11 261 6 0 0 0 Free Free Free - None 0 0 89 89 89 2 2 2 12 293 7 Major1 177 4.12 2.218 1399 - Approach HCM Control Delay, s HCM LOS EB 0.3 Baseline SRF & Associates 12/30/2015 5.4 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Existing Conditions - PM Peak Hour 1399 - 0 - NBLn1 EBL 540 1399 0.252 0.009 13.9 7.6 B A 1 0 0 - WBL WBT WBR 25 124 14 0 0 0 Free Free Free - None 0 0 78 78 78 2 2 2 32 159 18 Major2 300 4.12 2.218 1261 1261 - 0 - 0 - WB 1.2 NBL NBT NBR 10 30 51 0 0 0 Stop Stop Stop - None 0 0 67 67 67 2 2 2 15 45 76 SBL SBT SBR 30 50 15 0 0 0 Stop Stop Stop - None 0 0 82 82 82 2 2 2 37 61 18 Minor1 593 562 297 321 321 272 241 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 417 436 742 691 652 734 706 - Minor2 614 557 168 232 232 382 325 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 404 439 876 771 713 640 649 - 353 353 684 637 NB 13.9 B 420 420 645 686 742 - 324 324 763 529 422 422 693 643 876 - SB 17 C EBT EBR WBL WBT WBR SBLn1 - 1261 - 416 - 0.025 - 0.278 0 7.9 0 17 A A A C 0.1 1.1 Synchro 8 - Report Page 1 Proposed McAlpin Industries/Your Sports Depot 3: NY Route 441 & Walworth Road Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL EBT 61 274 0 0 Free Free - None 0 0 87 87 2 2 70 315 Major1 169 4.12 2.218 1409 - Approach HCM Control Delay, s HCM LOS EB 1.4 Baseline SRF & Associates 12/30/2015 1.4 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Existing Conditions - PM Peak Hour 1409 - EBL 1409 0.05 7.7 A 0.2 0 - WBT WBR 127 0 0 0 Free Free - None 0 0 75 75 2 2 169 0 Major2 WB 0 0 - SBL 15 0 Stop 0 0 0 75 2 20 SBR 0 0 Stop None 75 2 0 Minor2 624 169 455 6.42 5.42 5.42 3.518 449 861 639 169 6.22 3.318 875 - 422 422 861 601 875 - SB 14 B EBT WBT WBR SBLn1 - 422 - 0.047 0 14 A B 0.1 Synchro 8 - Report Page 2 Proposed McAlpin Industries/Your Sports Depot Existing Conditions - PM Peak Hour 12/30/2015 4: Walworth Road Off & Walworth Road & Walworth Road On Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1.3 WBL 0 0 Stop 0 0 0 75 2 0 WBR 18 0 Stop None 75 2 24 NBL NBT NBR 0 61 0 0 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 0 66 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 66 66 0 6.42 5.42 3.518 939 957 - 66 6.22 3.318 998 - Major1 20 - 939 939 957 - 998 - - Approach HCM Control Delay, s HCM LOS WB 8.7 A NB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBL 0 A - NBT NBRWBLn1 SBL - 998 1536 - 0.024 8.7 0 A A 0.1 0 Baseline SRF & Associates 0 - 0 - SBL SBT SBR 0 15 36 0 0 0 Free Free Free - None 0 0 0 75 75 75 2 2 2 0 20 48 Major2 66 4.12 2.218 1536 1536 - 0 - NEL 0 0 Free 0 0 92 2 0 NER 0 0 Free 92 2 0 0 - SB 0 SBT SBR - Synchro 8 - Report Page 3 Proposed McAlpin Industries/ Your Sports Depot 1: Canandaigua Road & NY Route 441 Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL EBT EBR 6 117 10 0 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 7 127 11 Major1 148 4.12 2.218 1434 - Approach HCM Control Delay, s HCM LOS EB 0.3 Baseline SRF & Associates 12/30/2015 3.7 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Existing Conditions - SAT Peak Hour 1434 - 0 - NBLn1 EBL 674 1434 0.112 0.005 11 7.5 B A 0.4 0 0 - WBL WBT WBR 13 128 11 0 0 0 Free Free Free - None 0 0 94 94 94 2 2 2 14 136 12 Major2 138 4.12 2.218 1446 1446 - 0 - 0 - WB 0.6 NBL NBT NBR 11 22 20 0 0 0 Stop Stop Stop - None 0 0 70 70 70 2 2 2 16 31 29 SBL SBT SBR 7 32 3 0 0 0 Stop Stop Stop - None 0 0 75 75 75 2 2 2 9 43 4 Minor1 339 322 133 146 146 193 176 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 615 595 916 857 776 809 753 - Minor2 346 321 142 170 170 176 151 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 608 596 906 832 758 826 772 - 571 571 853 751 NB 11 B 586 586 772 745 916 - 558 558 828 764 586 586 750 768 906 - SB 11.7 B EBT EBR WBL WBT WBR SBLn1 - 1446 - 596 - 0.01 - 0.094 0 7.5 0 - 11.7 A A A B 0 0.3 Synchro 8 - Report Page 1 Proposed McAlpin Industries/ Your Sports Depot 3: NY Route 441 & Walworth Road Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL EBT 35 117 0 0 Free Free - None 0 0 94 94 2 2 37 124 Major1 148 4.12 2.218 1434 - Approach HCM Control Delay, s HCM LOS EB 1.7 Baseline SRF & Associates 12/30/2015 1.6 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Existing Conditions - SAT Peak Hour 1434 - EBL 1434 0.026 7.6 A 0.1 0 - WBT WBR 135 0 0 0 Free Free - None 0 0 91 91 2 2 148 0 Major2 WB 0 0 - SBL 20 0 Stop 0 0 0 83 2 24 SBR 0 0 Stop None 83 2 0 Minor2 347 148 199 6.42 5.42 5.42 3.518 650 880 835 148 6.22 3.318 899 - 632 632 880 812 899 - SB 10.9 B EBT WBT WBR SBLn1 - 632 - 0.038 0 - 10.9 A B 0.1 Synchro 8 - Report Page 2 Proposed McAlpin Industries/ Your Sports Depot Existing Conditions - SAT Peak Hour 12/30/2015 4: Walworth Road Off & Walworth Road & Walworth Road On Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1.1 WBL 0 0 Stop 0 0 0 91 2 0 WBR 15 0 Stop None 91 2 16 NBL NBT NBR 0 35 0 0 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 0 38 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 38 38 0 6.42 5.42 3.518 974 984 - 38 6.22 3.318 1034 - Major1 24 - 974 974 984 - 1034 - - Approach HCM Control Delay, s HCM LOS WB 8.5 A NB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBL 0 A - NBT NBRWBLn1 SBL - 1034 1572 - 0.016 8.5 0 A A 0 0 Baseline SRF & Associates 0 - 0 - SBL SBT SBR 0 20 43 0 0 0 Free Free Free - None 0 0 0 83 83 83 2 2 2 0 24 52 Major2 38 4.12 2.218 1572 1572 - 0 - NEL 0 0 Free 0 0 92 2 0 NER 0 0 Free 92 2 0 0 - SB 0 SBT SBR - Synchro 8 - Report Page 3 A5 Level of Service Calculations: Full Development Conditions Proposed McAlpin Inudustries/Your Sports DepotFull Development Conditions - PM Peak Hour 12/30/2015 1: Canandaigua Road & NY Route 441 Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 5.6 EBL EBT EBR 13 267 8 0 0 0 Free Free Free - None 0 0 89 89 89 2 2 2 15 300 9 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 188 4.12 2.218 1386 - Approach HCM Control Delay, s HCM LOS EB 0.3 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Baseline SRF & Associates 1386 - 0 - NBLn1 EBL 513 1386 0.276 0.011 14.7 7.6 B A 1.1 0 0 - WBL WBT WBR 25 133 14 0 0 0 Free Free Free - None 0 0 78 78 78 2 2 2 32 171 18 Major2 309 4.12 2.218 1252 1252 - 0 - 0 - WB 1.2 NBL NBT NBR 14 30 51 0 0 0 Stop Stop Stop - None 0 0 67 67 67 2 2 2 21 45 76 SBL SBT SBR 30 50 18 0 0 0 Stop Stop Stop - None 0 0 82 82 82 2 2 2 37 61 22 Minor1 619 587 304 334 334 285 253 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 401 422 736 680 643 722 698 - Minor2 638 582 179 244 244 394 338 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 389 425 864 760 704 631 641 - 335 335 671 622 NB 14.7 B 404 404 635 678 736 - 309 309 750 519 407 407 684 633 864 - SB 17.5 C EBT EBR WBL WBT WBR SBLn1 - 1252 - 407 - 0.026 - 0.294 0 8 0 - 17.5 A A A C 0.1 1.2 Synchro 8 - Report Page 1 Proposed McAlpin Inudustries/Your Sports DepotFull Development Conditions - PM Peak Hour 12/30/2015 2: Proposed Driveway & NY Route 441 Intersection Int Delay, s/veh 0.8 Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 289 19 0 0 Free Free - None 0 0 89 89 2 2 325 21 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Baseline SRF & Associates NBLn1 561 0.049 11.7 B 0.2 0 - WBL WBT 16 145 0 0 Free Free - None 0 0 78 78 2 2 21 186 Major2 346 4.12 2.218 1213 1213 WB 0.8 0 - NBL 12 0 Stop 0 0 0 80 2 15 NBR 10 0 Stop None 80 2 12 Minor1 562 335 227 6.42 5.42 5.42 3.518 488 725 811 335 6.22 3.318 707 - 479 479 725 796 707 - NB 11.7 B EBT EBR WBL WBT - 1213 - 0.017 8 0 A A 0.1 - Synchro 8 - Report Page 2 Proposed McAlpin Inudustries/Your Sports DepotFull Development Conditions - PM Peak Hour 12/30/2015 3: NY Route 441 & Walworth Road Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1.5 EBL EBT 61 288 0 0 Free Free - None 0 0 87 87 2 2 70 331 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 181 4.12 2.218 1394 - Approach HCM Control Delay, s HCM LOS EB 1.3 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Baseline SRF & Associates 1394 - EBL 1394 0.05 7.7 A 0.2 0 - WBT WBR 136 0 0 0 Free Free - None 0 0 75 75 2 2 181 0 Major2 WB 0 0 - SBL 20 0 Stop 0 0 0 75 2 27 SBR 0 0 Stop None 75 2 0 Minor2 652 181 471 6.42 5.42 5.42 3.518 433 850 628 181 6.22 3.318 862 - 406 406 850 589 862 - SB 14.5 B EBT WBT WBR SBLn1 - 406 - 0.066 0 - 14.5 A B 0.2 Synchro 8 - Report Page 3 Proposed McAlpin Inudustries/Your Sports DepotFull Development Conditions - PM Peak Hour 12/30/2015 4: Walworth Road Off & Walworth Road & Walworth Road On Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1.4 WBL 0 0 Stop 0 0 0 75 2 0 WBR 21 0 Stop None 75 2 28 NBL NBT NBR 0 61 0 0 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 0 66 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 66 66 0 6.42 5.42 3.518 939 957 - 66 6.22 3.318 998 - Major1 27 - 939 939 957 - 998 - - Approach HCM Control Delay, s HCM LOS WB 8.7 A NB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBL 0 A - NBT NBRWBLn1 SBL - 998 1536 - 0.028 8.7 0 A A 0.1 0 Baseline SRF & Associates 0 - 0 - SBL SBT SBR 0 20 36 0 0 0 Free Free Free - None 0 0 0 75 75 75 2 2 2 0 27 48 Major2 66 4.12 2.218 1536 1536 - 0 - NEL 0 0 Free 0 0 92 2 0 NER 0 0 Free 92 2 0 0 - SB 0 SBT SBR - Synchro 8 - Report Page 4 Proposed McAlpin Industries/Your Sports Depot Full Development Conditions - SAT Peak Hour 12/30/2015 1: Canandaigua Road & NY Route 441 Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3.9 EBL EBT EBR 10 129 15 0 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 11 140 16 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 160 4.12 2.218 1419 - Approach HCM Control Delay, s HCM LOS EB 0.5 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Baseline SRF & Associates 1419 - 0 - NBLn1 EBL 632 1419 0.131 0.008 11.6 7.6 B A 0.5 0 0 - WBL WBT WBR 13 139 11 0 0 0 Free Free Free - None 0 0 94 94 94 2 2 2 14 148 12 Major2 157 4.12 2.218 1423 1423 - 0 - 0 - WB 0.6 NBL NBT NBR 16 22 20 0 0 0 Stop Stop Stop - None 0 0 70 70 70 2 2 2 23 31 29 SBL SBT SBR 7 32 7 0 0 0 Stop Stop Stop - None 0 0 75 75 75 2 2 2 9 43 9 Minor1 377 357 148 170 170 207 187 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 580 569 899 832 758 795 745 - Minor2 381 359 154 181 181 200 178 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 577 568 892 821 750 802 752 - 532 532 825 733 NB 11.6 B 558 558 751 737 899 - 527 527 814 737 557 557 742 745 892 - SB 11.9 B EBT EBR WBL WBT WBR SBLn1 - 1423 - 585 - 0.01 - 0.105 0 7.6 0 - 11.9 A A A B 0 0.4 Synchro 8 - Report Page 1 Proposed McAlpin Industries/Your Sports Depot Full Development Conditions - SAT Peak Hour 12/30/2015 2: Proposed Driveway & NY Route 441 Intersection Int Delay, s/veh 1.9 Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 137 24 0 0 Free Free - None 0 0 92 92 2 2 149 26 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Baseline SRF & Associates NBLn1 719 0.082 10.5 B 0.3 0 - WBL WBT 20 150 0 0 Free Free - None 0 0 94 94 2 2 21 160 Major2 175 4.12 2.218 1401 1401 WB 0.9 0 - NBL 26 0 Stop 0 0 0 80 2 32 NBR 21 0 Stop None 80 2 26 Minor1 364 162 202 6.42 5.42 5.42 3.518 635 867 832 162 6.22 3.318 883 - 625 625 867 819 883 - NB 10.5 B EBT EBR WBL WBT - 1401 - 0.015 7.6 0 A A 0 - Synchro 8 - Report Page 2 Proposed McAlpin Industries/Your Sports Depot Full Development Conditions - SAT Peak Hour 12/30/2015 3: NY Route 441 & Walworth Road Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1.7 EBL EBT 35 135 0 0 Free Free - None 0 0 94 94 2 2 37 144 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 169 4.12 2.218 1409 - Approach HCM Control Delay, s HCM LOS EB 1.6 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Baseline SRF & Associates 1409 - EBL 1409 0.026 7.6 A 0.1 0 - WBT WBR 154 0 0 0 Free Free - None 0 0 91 91 2 2 169 0 Major2 WB 0 0 - SBL 27 0 Stop 0 0 0 83 2 33 SBR 0 0 Stop None 83 2 0 Minor2 387 169 218 6.42 5.42 5.42 3.518 616 861 818 169 6.22 3.318 875 - 598 598 861 794 875 - SB 11.4 B EBT WBT WBR SBLn1 - 598 - 0.054 0 - 11.4 A B 0.2 Synchro 8 - Report Page 3 Proposed McAlpin Industries/Your Sports Depot Full Development Conditions - SAT Peak Hour 12/30/2015 4: Walworth Road Off & Walworth Road & Walworth Road On Intersection Int Delay, s/veh Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1.4 WBL 0 0 Stop 0 0 0 91 2 0 WBR 22 0 Stop None 91 2 24 NBL NBT NBR 0 35 0 0 0 0 Free Free Free - None 0 0 92 92 92 2 2 2 0 38 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Minor1 38 38 0 6.42 5.42 3.518 974 984 - 38 6.22 3.318 1034 - Major1 33 - 974 974 984 - 1034 - - Approach HCM Control Delay, s HCM LOS WB 8.6 A NB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) NBL 0 A - NBT NBRWBLn1 SBL - 1034 1572 - 0.023 8.6 0 A A 0.1 0 Baseline SRF & Associates 0 - 0 - SBL SBT SBR 0 27 43 0 0 0 Free Free Free - None 0 0 0 83 83 83 2 2 2 0 33 52 Major2 38 4.12 2.218 1572 1572 - 0 - NEL 0 0 Free 0 0 92 2 0 NER 0 0 Free 92 2 0 0 - SB 0 SBT SBR - Synchro 8 - Report Page 4 Proposed McAlpin Industries/Your Sports Depot Full Development Conditions - AM Peak Hour 1/21/2016 3: Proposed Driveway & NY 441 Intersection Int Delay, s/veh 0.3 Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 50 13 0 0 Free Free - None 0 0 78 78 0 4 64 17 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) HCM 2010 TWSC SRF & Associates NBLn1 754 0.009 9.8 A 0 0 - WBL WBT 8 276 0 0 Free Free - None 0 0 89 89 2 2 9 310 Major2 81 4.12 2.218 1517 1517 WB 0.2 0 - NBL 3 0 Stop 0 0 0 92 0 3 NBR 3 0 Stop None 92 0 3 Minor1 400 72 328 6.4 5.4 5.4 3.5 610 956 734 72 6.2 3.3 996 - 606 606 956 729 996 - NB 9.8 A EBT EBR WBL WBT - 1517 - 0.006 7.4 0 A A 0 - Synchro 8 - Report (With McAlpin Industries Component) Page 1 Proposed McAlpin Industries/Your Sports Depot Full Development Conditions - PM Peak Hour 1/21/2016 3: Proposed Driveway & NY 441 Intersection Int Delay, s/veh 1.3 Movement Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 221 24 0 0 Free Free - None 0 0 89 89 0 0 248 27 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) HCM 2010 TWSC SRF & Associates NBLn1 594 0.072 11.5 B 0.2 0 - WBL WBT 19 144 0 0 Free Free - None 0 0 78 78 0 0 24 185 Major2 275 4.1 2.2 1300 1300 WB 0.9 0 - NBL 20 0 Stop 0 0 0 80 10 25 NBR 14 0 Stop None 80 0 18 Minor1 495 262 233 6.5 5.5 5.5 3.59 520 764 787 262 6.2 3.3 782 - 509 509 764 770 782 - NB 11.5 B EBT EBR WBL WBT - 1300 - 0.019 7.8 0 A A 0.1 - Synchro 8 - Report (With McAlpin Industries Component) Page 1
Similar documents
2014-11-24 1600 West Loop TIA Final
IH 610 Southbound Frontage Road at North Driveway (minor street stop control)
More informationPICKLE BARREL RESTAURANT
it becomes Zimmerman Trail and continues to the north side of the Rimrocks where it intersects US Highway 3 west of the airport. Near the project vicinity, 32nd Street West has a three-lane cross s...
More information