Brigil Homes - City of Ottawa
Transcription
Brigil Homes - City of Ottawa
• Brigil Homes Stormwater Management & Servicing Report Type of Document Site Plan Submission Project Name Petrie’s Landing, Phase II Project Number OTT-00214935-A0 Prepared By exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada Date Submitted June 2016 Brigil Homes Stormwater Management and Servicing Report Type of Document: Site Plan Submission Project Name: Petrie’s Landing, Phase II Project Number: OTT-214935-A0 Prepared By: exp 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada T: 613 688-1899 F: 613 225-7337 www.exp.com _______________________________________ Jason Fitzpatrick, P.Eng. Project Engineer Infrastructure Services Date Submitted: June 2016 ____________________________________ Bruce Thomas, P.Eng. Senior Project Manager Infrastructure Services exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Legal Notification This report was prepared by exp Services Inc. for the account of Brigil Homes. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. Exp Services Inc. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this project. EX-i exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Table of Contents Page 1 Introduction ............................................................................................................ 1 2 Existing Conditions................................................................................................ 1 3 Development Proposal .......................................................................................... 1 4 Background Information ........................................................................................ 2 5 Watermain Servicing .............................................................................................. 2 5.1 Methodology ............................................................................................................. 3 5.2 Design Criteria .......................................................................................................... 3 5.3 Water Demands ........................................................................................................ 3 5.4 Fire Flow Requirements ............................................................................................ 4 5.5 Boundary Conditions ................................................................................................ 4 5.6 Modelling Results ..................................................................................................... 4 6 Sanitary Sewer System .......................................................................................... 5 7 Storm Sewer Servicing .......................................................................................... 6 8 9 7.1 Storm Servicing Criteria ............................................................................................ 6 7.2 Storm Sewer Design ................................................................................................. 7 Stormwater Management ....................................................................................... 7 8.1 Summary of Previous Design ................................................................................... 7 8.2 Stormwater Management Criteria ............................................................................. 8 8.3 Allowable Release Rate ............................................................................................ 8 8.4 Uncontrolled Storm Drainage Areas ......................................................................... 9 8.5 Quantity Control........................................................................................................ 9 8.6 Quality Control ........................................................................................................ 10 Erosion and Sediment Controls during Construction ...................................... 10 10 Summary ............................................................................................................... 12 i exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 List of Appendices Appendix A – Figures Appendix B – Storm Design Sheets Appendix C – Sanitary Sewer Calculation Sheets Appendix D – Hydraulic Analysis Tables Appendix E – H20Net Hydraulic Analysis Model Results Appendix F – Stormwater Management Tables List of Figures Figure 1: Site Location Plan .................................................................................. Appendix A Figure 2: Architectural Site Plan ........................................................................... Appendix A Figure 3: Sanitary Drainage Area Plan ................................................................. Appendix A Figure 4: Storm Drainage Area Plan ..................................................................... Appendix A Drawings Included Separately ii exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 List of Tables Table 3-1: Summary of Petrie’s Landing Development ........................................................ 1 Table 7-1: Summary of Post Development Conditions......................................................... 6 Table B-1: 5-year Storm Sewer Calculation Sheet ............................................... Appendix B Table B-2: 100-year Storm Sewer Calculation Sheet ........................................... Appendix B Table C-1: Sanitary Sewer Calculation Sheet....................................................... Appendix C Table D-1: Water Consumption/Demand Allocation Table ................................... Appendix D Table D-2: Sample Calculation of Fire Flow Requirements (Phase 2) ................. Appendix D Table D-3: Calculation of Fire Flow Requirements (All Buildings) ...................... Appendix D Table F-1: Pre-Development Runoff Calculations................................................ Appendix F Table F-2: Allowable Runoff Calculations ............................................................ Appendix F Table F-3: Average Runoff Coefficients (Post Development) ............................. Appendix F Table F-4: Summary of Post Development Runoff (Uncontrolled and Controlled) ........................................................... Appendix F Table F-5: Storage Volumes for 5-year and 100-year Storms .............................. Appendix F iii exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 1 Introduction Exp Services Inc. (exp) was retained by Brigil Homes to complete the site servicing and stormwater management design for the second phase of Petrie’s Landing, a high-rise condominium development. The development is located at 8900 Jeanne D’Arc Blvd North in the City of Ottawa (City). Phase II of this development will be located immediately east of Phase I. A new 16 storey high-rise will be constructed east of the existing 15 storey high-rise condominium. The site abuts the Ottawa River to the north, Regional Road 174 to the south, vacant land to the east and an existing works yard to the west. The entire development will consist of five residential high-rise condominiums buildings. The site location is shown on Figure 1 in Appendix A. 2 Existing Conditions Currently the site is occupied by an existing 15 storey residential condominium tower which was constructed in 2007 and 2008 as Phase I of this development. The total site area is 5.77 hectares, of which approximately 0.87092 hectares was developed in Phase 1. The remaining 4.67 hectares is undeveloped and consists of brush, woods and meadows. Existing municipal services were extended for Phase II as part of the servicing of Phase I. A 250mm diameter sanitary sewer, 375mm and 600mm diameter storm sewers, and two 200mm watermains were installed for the second phase of this development. An onsite stormwater management facility consisting of a dry pond and oil/grit separator was provided up-front during the construction of Phase 1 to service the entire development. Additional information on the existing services is provided in the appropriate sections of this report. 3 Development Proposal Phase II of this overall development, which will consist of a 16 storey residential condominium building. The following Table 3-1 below summarizes the breakdown of the existing, currently proposed and future phases of Petrie’s Landing development by Brigil. A site plan showing Petrie’s Landing, Phase II, is provided in Appendix A. Table 3-1: Summary of Petrie’s Landing Development Phase Status Area (hectares) No. of Storeys No. of Units Phase 1 Existing (Built 2007 & 2008) 0.871 15 89 Phase 2 Phase 3 Phase 4 Phase 5 Current Future Future Future 0.698 0.590 0.586 1.168 16 9 19 145 175 145 448 Total = 3.913 16 16 1002 This report will demonstrate that the existing infrastructure will support the proposed development. The report will identify the servicing and stormwater management requirements and provide a servicing design brief for submission with the engineering drawings for City Site Plan approval. 1 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 4 Background Information The original “Stormwater Management and Site Servicing Report” for this entire development was prepared by David McManus Engineering (DME), with the latest report revision August 2008. The report was prepared to address the following: • Determine the appropriate water, sanitary and storm sewer services for the development, • Determine; the allowable stormwater release rate based on pre-development conditions, post development runoff, and storage volume requirements, • Determine method of achieving stormwater quality objectives. Although additional information on each individual servicing requirement will be identified in Sections 5, 6 and 7, a brief summary of the results of the Phase 1 DME servicing report is as follows: 5 • Two 200mm watermains service the development. These twin (parallel) watermains are connected to the existing 400mm watermain near the west limits of Phase 1. Two watermains were installed for reliability in the event that one watermain is down for service. Additional information on the watermain servicing is provided in Section 5. • A 300mm sanitary sewer was extended from the intersection of Jeanne D’Arc Blvd and Trim Road to service the development. Please refer to Section 6 for the Sanitary Servicing. • The site is serviced by a gravity storm sewer system, dry pond and oil/grit separator which are located adjacent to Phase 1. Storm sewer stubs were left at the limits of Phase 1 for future phases. The dry pond was sized to accommodate the entire volume of the directly connected storm drainage areas. Additional information on stormwater management is provided in Section 7. Watermain Servicing The two existing 200mm diameter watermains will be extended into Phase 2 to service the second 16 storey residential high-rise building. Construction will proceed in a phased manner with the watermain being extended for each phase. As part of the original DME report, a Watercad hydraulic model was prepared based on boundary conditions provided by the City. The proposed watermain diameter was selected based on providing adequate pressures and flow to service the entire development. For Phase 2, a re-confirmation of the anticipated water system pressure and fire flows that will be available was completed based upon the latest City Design Guidelines. WaterGems modelling software was used to calculate pressures and flows under maximum day, plus fire flow and peak hour conditions. 2 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Methodology The water distribution system proposed for this development is designed in accordance with the City of Ottawa Design Guidelines (July 2010). The following steps indicate the basic methodology that was used in the hydraulic analysis: • Create the water distribution model adding junction nodes at intersections and creating watermains between junctions. • Determine demands based on populations for each junction node based on the number of contributing residential units. • Based on the populations determined above calculate water consumption rates for maximum day and maximum hour. • Set boundary conditions from information obtained from the City. • Determine the required fire flow, and • Proceed with the simulation of the proposed water distribution model and compare the results with the City of Ottawa criteria. Design Criteria A summary of design parameters used in the water distribution model were taken from Section 4.0 of the City’s Guidelines, and are as follows: • • • • • • • • • Population Density (1-bedroom) = Population Density (2-bedroom) = Average daily water consumption (Residential) = Maximum Day Factor Maximum Hour Factor C factor (200 mm – 300 mm) Minimum Allowable Pressure = Maximum Allowable Pressure = Minimum Static Pressure (Under Fire Flow Conditions) = 1.4 person/unit 2.1 person/unit 350 L/cap/day (2.5 x Avg. Day) (2.2 x Max. Day) 110 275 kPa (40 psi) 690 kPa (100 psi) 140 kPa (20 psi) Water Demands The total average, maximum day and peak hour demands were calculated at 7.38 L/sec, 18.46 L/sec and 40.60 L/sec respectively. A complete breakdown of the demand allocations for each junction is provided in Table D-1 located in Appendix D. These demands were based on the number of units as summarized in Table 3-1. 3 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Fire Flow Requirements Water for fire protection will be available utilizing the proposed fire hydrants located within the site. The Phase 2 building will have a sprinkler system as per NFPA 13, however the required fire flow for the proposed development was calculated based on typical values as established by the Fire Underwriters’ Survey 1999 (FUS), as required by the City Design Guidelines. The following equation from the FUS document “Water Supply for Public Fire Protection”, 1991, was used for calculation of the on-site supply rates required to be supplied by the hydrants: F = 200 * C * √ (A) where F= C= A= Required Fire Flow in Litres per minute Coefficient related to type of Construction Effective Floor Area in square metres Phase 2 Building F = 200 * 1.5 * √ (5,493) F = 9,783L/min or 10,000 L/min (rounded to closest 1,000) A reduction for low hazard occupancy of -25% for residential dwellings, -30% for an automatic sprinkler system, and an increase for fire area exposure of +50% results in a required fire flow of 7,875 L/min (132 L/sec). The detailed FUS calculations for the fire flow requirements for Phase II is provided in Table D-2 and a summary of the FUS fire flow requirements for all phases is provided in Table D-3 Appendix D. The fire flow requirements range from 123 L/sec to a maximum of 136 L/sec. Boundary Conditions The original boundary conditions that were provided by the City during the servicing of Phase 1 were used for the purpose of hydraulic modeling. Boundary conditions were provided at the connection point to the existing 400mm watermain, at the west limits of Phase 1. The following summarizes the boundary conditions used: Maximum Day Plus Fire Flow HGL Peak Hour HGL High Pressure Check HGL = 110.0m = 108.0m = 115.0m Modelling Results The calculated minimum and maximum working pressures anticipated within the development are 510 kPa (74 psi) and 545 kPa (79 psi) under peak hour conditions. The estimated fire flows available are in excess of 200 L/sec at all junctions, based on two watermains in service. A scenario was run to determine the available fire flows with one of the existing watermains in Phase 1 out of service. Based on this scenario an estimated 170 L/sec would be available to Phases 2 - 4. Detailed results are included in Appendix E. Based on the modelling results there is sufficient water pressures under peak hour conditions and adequate fire flows under maximum day plus fire flow conditions available under all phases of this development. 4 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 6 Sanitary Sewer System The sanitary sewer system was designed in accordance with City Sewer Design Guidelines SDG002. It is designed on a population based flow, and area based infiltration allowance as indicated below. A sanitary sewer design sheet, which is provided in Appendix C, was prepared for the entire site, and included an allowance for lands west of the site on Jeanne D’Arc Blvd. Please refer to the Sanitary Drainage Area Plan provided on Figure 4 in Appendix A. The original design sheet prepared for Phase I was updated to reflect the latest City design standards, updated unit counts, and population densities. Updated pipe lengths and slopes, based on As-Built information, were used for existing sanitary sewers in Phase 1 and along Jeanne D’Arc Blvd. Site Area (Phases 1 - 5) External Commercial Area = 3.92 hectares = 9.90 hectares Number of Residential Units Residential Unit Type Unit Density (1-bed) Unit Density (2-bed) Avg. Residential Flow = Avg. Commercial Flow = Minimum Sewer Velocity = 511 (1-bed) + 491 (2-bed) = apartments = 1.4 persons per unit = 2.1 persons per unit = 350 L/cap/day = 50,000 L/gross ha/day = 0.47 m/s Total Residential Population = (103+85+85+224) * 1.4 + (72+60+60+224) * 2.1+253** = 1822 ** This is the population for the Phase one development based on as constructed information. Residential Peaking Factor Commercial Peaking Factor = 1 + 14 / (4 + (P/1000)0.5) = 1 + 14 / (4 + (1822/1000)0.5) = 3.62 = 1.5 QDOMESTIC QCOMMERCIAL QINFILTRATION QSAN = 1822 x 350 x 3.62 x (1/86,400 sec/day) = 26.72 L/sec = 50,000 x 9.9 x 1.5 x (1/86,400 sec/day) = 8.59 L/sec = 0.28 L/ha/sec x 13.81 ha = 3.87 L/sec = 26.72 + 8.59 + 3.87 = 39.18 L/sec A total peak sewage rate of 39.18 L/sec was estimated for the entire development, with sewage flow from Phase 2 estimated at 4.49 L/sec. Please refer to Appendix C for the Sanitary Sewer Design Sheet. The minimum reserve capacity in the sanitary sewer is estimated at 1.6 L/sec within the last manhole run on Jeanne D’Arc Blvd (MH116 – ExSanMH). This is due to the flat slope of the last run at 0.18%, which is slightly under the minimum velocity of 0.60 m/s at 0.51 m/s. The City may elect to schedule regular maintenance on the sanitary sewer run on Jeanne D’Arc Blvd east of Trim Road. It should be noted that the peak sanitary flow calculated is for the ultimate condition with all Phases and additional offsite lands being serviced. 5 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 7 Storm Sewer Servicing This section will outline the storm sewer servicing requirements for Phase 2 of this development and confirm that the previously installed storm sewer infrastructure is appropriate to service this next phase. The following summarizes the steps completed: • Calculated average runoff coefficients for all phases. • Calculated the 5-year and 100-year runoff for each phase based on updated runoff coefficients. • New storm design sheets were created based on the Phase 2 Site Plan and As-Built pipe information for existing sewers in Phase 1. • Calculated 5-year and 100-year storage requirements for entire site. • Reviewed the existing SWM facility size to accommodate the storage requirements. Table 7-1: Summary of Post Development Conditions Phase Area (hectares) Average Runoff Coefficient Phase 1 1.080 0.58 Phase 2 Phase 3 Phase 4 Phase 5 Total = 0.697 0.590 0.586 0.959 3.912 0.52 0.47 0.42 0.66 0.56 0.52 Storm Servicing Criteria Currently there are no inlet control devices in catch basins within Phase 1 to control peak runoff into the minor system. All runoff is directed to the stormwater (SWM) facility located in Phase 1. The SWM facility is controlled within the outlet structure using a single orifice to control outflow. For each phase, the majority of surface runoff is captured by area drains, as the area drains are located on top of the underground parking structure. The building area drains are connected directly into the internal plumbing system and outlet to the storm sewer system north of the buildings. The access road along the south and west portion of the site has a separate storm sewer system connected to the SWM facility. A new storm sewer system will be installed to service Phase 2 of the development. It will consist of a storm sewer with a diameter of 375mm (southern) or 600mm (northern). The storm sewers were sized based on the Rational Method using average runoff coefficients based on computed areas of hard and soft surfaces. Design of the storm sewer system was completed in conformance with the City of Ottawa Design Guidelines Second Edition, 0ct 2012, specifically Section 5 “Storm and Combined Sewer Design”. A summary of the design criteria that relates to this design report is listed below. 6 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 • Storm sewers have been designed and sized based on the Rational Method and Manning’s Equation under free flow conditions for the 5-year storm using a 20-minute inlet time. • Since a detailed site plan was available for the site, including building footprints, calculations of the average runoff coefficients for each drainage area was completed. • Average runoff coefficients were calculated for each inlet drainage area using a runoff coefficient of 0.20 for pervious surfaces and 0.90 for impervious surfaces. • Minimum sewer slopes to be based on minimum velocities for storm sewers of 0.60 m/s. Storm Sewer Design Average runoff coefficients were calculated for all drainage areas for sizing of the storm sewers. Inlet times of 20 minutes were used for the street storm sewer, consistent with the original Servicing Report. The average post development runoff coefficient was calculated as 0.52 for both Phase two and the overall site. The Storm Drainage Plan is illustrated on Figure 3 in Appendix A. A total of twenty-six (26) drainage areas are shown on this drawing with average runoff coefficients calculated for each drainage area. The directlyconnected post development 5-year and 100-year peak flows (uncontrolled) from the site are 307.7 L/sec and 537.2 L/sec respectively. Under the 5-year storm event, pipe capacity is adequately provided with no overcapacity within the proposed development. Under the 100-year storm event, 7 of the 21 storm sewer runs upstream of the SWM facility would have minor surcharging (max 10% over capacity) assuming free flow conditions (no inlet restrictions). Design sheets for the 5-year sizing of the storm sewer system and the 100-year calculations for runoff are included for reference in Appendix D. 8 Stormwater Management Summary of Previous Design The following is a summary of the SWM servicing design for the previous phase. • Total directly connected drainage area = 3.77 ha • Allowable Runoff Coefficient = 0.25 • Allowable Release rate based on pre-development = 184.2 L/sec • 5-year and 100-year storage requirements = 296 m3 and 680 m3 • Post-development runoff coefficient (calculated) = 0.58 • Maximum available storage in SWM facility = 708 cubic metres • Flow Control from Pond = 270mm dia Orifice • 5-year and 100-year elevation in Pond = 49.47m & 50.07m • Overflow Elevation of Pond = 50.07m • Orifice Flow from Pond based on Maximum head =1.42m 7 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 • Quality Control Requirements (RVCA) =80% TSS • Vortech Separator. Design Treatment capacity = 240 L/sec • Vortech Separator. Design TSS removal efficiency = 83% TSS Stormwater Management Criteria A summary of the major system design is listed below. • The major system has been designed to accommodate on-site detention with sufficient capacity to attenuate the 100-year design storm. On-site storage is calculated based on the 100-year design storm with on-site detention storage provided in the SWM facility. • Calculation of the 100-year storage requirements was completed based on the Modified Rational Method as noted in the City’s Design Guidelines. • Overland flow routes are provided. • Surface ponding may occur on the surface of roadways or parking areas to a maximum depth of 0.3m as per City Guidelines. Allowable Release Rate The pre-development parameters used to determine the allowable release rates from the proposed site using the Rational Formula are re-iterated below: Q5ALL = 2.78 CAVG IT A where: Q5ALL CAVG IT = = = A = 5-year Peak Allowable Discharge (L/s) Average Runoff Coefficient (0<C<1) Average Rainfall Intensity (mm/h) for return period T (years) and time of concentration, Tc, (minutes) Drainage Area (hectares) Using a time of concentration (TC) of 20 minutes and a runoff coefficient of 0.25, the allowable release rate (Q5ALL) from the site is determined for the 5-year storm (City of Ottawa Guidelines), I5, using the IDF Curve as follows: I5 = 998.071 / (20 + 6.053)0.814 = 70.3 mm/hr Q5ALL = 2.78 (0.25) (70.25 mm/hr) (3.77 ha) = 184.2 L/sec The allowable release rate from the proposed site is 184.2 L/sec based on a 5-year storm event. The remaining runoff above the 5-year rate, up to the 100-year storm event, will be controlled on site. 8 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 The original release rate from the site, as identified in Section 7.1 of the Phase 1 Stormwater Management and Servicing Report, is 184.2 L/sec. This release rate was also based on an area of 3.77 hectares, a runoff coefficient of 0.25 and a 5-year storm intensity of 70.3 mm/hour (Tc = 20 min). Therefore, the allowable release rate of 184.2 L/sec will be maintained. Uncontrolled Storm Drainage Areas There are two drainage areas (Areas A17, A18) that will flow overland offsite. To account for this additional flow, it is necessary to subtract the quantity of uncontrolled flow from the allowable release rate. Using a post-development time of concentration (TC) of 15 minutes and a runoff coefficient of 0.20 for each area, the 100-year uncontrolled flow rate, Q100UNC, from the proposed site is determined using the Rational Method as follows: Q100UNC = 2.78 C I100 A where: Q100UNC = C = = I100 A = Peak Discharge (L/s) Runoff Coefficient [0<C<1] (C = 0.20) Average Rainfall Intensity (mm/h) for 100 year return period Drainage Area (0.024 + 0.052 hectares) I100 1735.688/ (15 + 6.014)0.820 = 142.89 mm/hr = Q100UNC = 2.78 x 0.20*1.25 x 142.89 x 0.076 ha = 7.5 L/sec Therefore, the allowable capture rate to the storm sewers (minor system) is determined from: Q100REL = = = QALL - Q100UNC 184.2 L/sec – 7.5 L/sec 176.6 L/sec Therefore, the total captured rate into the minor system from the proposed site is restricted to 176.6 L/sec, along with the uncontrolled runoff of 7.5 L/sec. Quantity Control During the establishment of the grading for Phase 1, although some surface ponding would occur, the SWM facility was sized and designed to accommodate the entire 100-year storm within the facility. A review of the stormwater drainage systems in Phase 1 indicates that flow controlled roof drains were used, however the 11 area drains did not include flow control. For Phase 2 of the development it is anticipated that a similar number of roof drains will be used by the Mechanical Consultant. These roof drains will similarly control runoff to the allowable 30gpm (1.89 L/sec) at 150mm depth as required by the Building Code. It is recommended that the new area drains in Phase 2 be controlled to ensure that ponding occurs and that capture rates are limited to the 5-year event consistent with the Building Code requirements for the sizing of plumbing. It is also recommended, and which is identified in the design, that the trench drain located at the base of the underground parking structure ramp be connected to the south storm sewer and include a backflow preventer. 9 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 As not all runoff from the 100-year storm will be captured into the storm sewer, flows in excess of the captured rate will be stored onsite within the existing dry pond. The required 5-year and 100-year storage volumes based on the Modified Rational Method is 302 and 687 cubic metres respectively. As indicated in the Phase 1 report, the pond has a maximum capacity of 708 cubic metres, and therefore has adequate volume to accommodate Phase 2, and the remaining Phases 3, 4 and 5 based on the runoff coefficients illustrated in Figure 3 in Appendix A. Quality Control During the design of Phase 1, the Rideau Valley Conservation Authority established that the water quality criteria for the site as “enhanced” protection which is an 80% total suspended solids (TSS) removal. As part of the construction of Phase 1, a hydro dynamic Vortech separator model 5000 was installed. The separator, manufactured by Contech Stormwater Solutions Inc., was designed for a maximum treatment capacity of 240 L/sec for a drainage area of 3.9 hectares and maximum runoff coefficient of 0.60. The design net annual TSS removal efficiency is 83%. Details on the design of the chamber can be found in the original Phase 1 report. Therefore quality control for the entire site is achieved using the existing Vortech separator. It is located downstream of the dry pond prior to outletting into the existing ravine. For Phase 2 no additional quality control will be required. 9 Erosion and Sediment Controls during Construction During all construction activities, erosion and sedimentation shall be controlled by the following techniques: • extent of exposed soils shall be limited at any given time, • exposed areas shall be re-vegetated as soon as possible, • filter cloth shall be installed between frame and cover on all proposed catch basins and catch basin manholes, • silt fence shall be installed 0.3 meters inside and along the site property line to locations shown on drawing (GP – Grading, Erosion and Sediment Control Plan), • visual inspection shall be completed daily on sediment control barriers and any damage repaired immediately. Care will be taken to prevent damage during construction operations, • in some cases barriers may be removed temporarily to accommodate the construction operations. The affected barriers will be reinstated at night when construction is completed, • sediment control devices will be cleaned of accumulated silt as required. The deposits will be disposed of as per the requirements of the contract, 10 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 • during the course of construction, if the engineer believes that additional prevention methods are required to control erosion and sedimentation, the contractor will install additional silt fences or other methods as required to the satisfaction of the engineer, and • construction and maintenance requirements for erosion and sediment controls are to comply with Ontario Provincial Standard Specification (OPSS) OPSS 805, and City specifications. 11 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 10 Summary This servicing design brief outlines the rationale which will be used to service the proposed development. • The storm sewer system is sized to accommodate the 5-year design storm under free flow conditions. • Runoff from the site is controlled to the allowable rate of 184.2 L/sec. This includes the controlled runoff from the SWM facility and the uncontrolled areas. No modifications are proposed to the existing orifice controls. • On-site storage is utilized to control runoff to allowable rates up to the 100-year storm. Stormwater detention is provided in one centralized SWM facility that was constructed in Phase 1. Flow controlled roof drains were used for Phase 1, however surface area drains and other surface inlets (CB’s) are not flow controlled. For new drainage works in Phase 2 it is recommended that flow controlled roof drains and flow controlled area drains be used to limit the capture rate in the internal plumbing system. • The total required 100-year storage is 687 m3, with a total storage volume of 708 m3 provided. • An overland flow route is provided for the major storm event. • The sanitary sewer from the development will discharge to the existing sanitary sewer which was left at the limits of Phase 1. The total estimated sewage flow is 39.2 L/sec from all five phases combined with an allowance for a 9.9 hectare commercial development adjacent to 8900 Jeanne D’Arc Blvd. • The estimated fireflow requirements for Phase 2 is 131 L/sec. Fire flow requirements for all phases were estimated between 123 L/sec and 136 L/sec as calculated in accordance with the Fire Underwriters Survey, 1999. • Adequate flows are available within the entire development under maximum day plus fire flow conditions. Flow in excess of 200L/sec is available at all junctions. • The calculated minimum and maximum working pressures anticipated within the development are 510 kPa (74 psi) and 545 kPa (79 psi) under peak hourly conditions. This meet the City’s design requirements. • Erosion and sediment control methods will be used during construction to limit erosion potential. 12 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Appendix A – Figures Figure 1: Site Location Plan Figure 2: Architectural Site Plan Figure 3: Sanitary Drainage Area Plan Figure 4: Storm Drainage Area Plan NOTES GÉNÉRALES General Notes 1. Ces documents d'architecture sont la propriété exclusive de NEUF architect(e)s et ne pourront être utilisés, reproduits ou copiés sans autorisation écrite préalable. / These architectural documents are the exclusive property of NEUF architect(e)s and cannot be used, copied or reproduced without written pre-authorisation 2. Les dimensions apparaissant aux documents devront être vérifiées par l'entrepreneur avant le début des travaux. / All dimensions which appear on the documents must be verify by the contractor before to start the work. 3. Veuillez aviser l'architecte de toute dimension erreur et/ou divergences entre ces documents et ceux des autres professionnels. / The architect must be notified of all errors, omissions and discrepancies between these documents and those of the others professionnals. 4. Les dimensions sur ces documents doivent être lues et non mesurées. / The dimensions on these documents must be read and not measured. ARCHITECTURE DE PAYSAGE Landscape Architect Nom de la firme Adresse de la firme Téléphone et adresse courriel CIVIL Civil Nom de la firme Adresse de la firme Téléphone et adresse courriel ARCHITECTES Architect NEUF architect(e)s 630, boul. René-Lévesque O. 32e étages, Montréal QC H3B 1S6 T 514 847 1117 NEUFarchitectes.com SCEAU / Seal CLIENT Client OUVRAGE Project C:\Fichiers Revit Locaux\10557_PHASE_2_ARCHITECTURE_Central_mdoth.rvt PETRIE'S LANDING I PHASE 2 EMPLACEMENT Location NO PROJET No. ORLEANS, ONTARIO 10557.00 NO RÉVISION I L SITE PLAN APPROVAL 4th-revision 75% COMPLETION DATE (aa-mm-jj) 2015.12.11 2016.05.06 R rirye ROU P ina F RO im S NN SEE e él IU LI TTIIOO Pr T T C C U NO S RRUU DPOA NSSTT NE CCOON DESSINÉ PAR Drawn by Auteur DATE (aa.mm.jj) 07/18/14 VÉRIFIÉ PAR Checked by Vérificateur ÉCHELLE Scale 1 : 250 TITRE DU DESSIN Drawing Title PETRIE'S LANDING 1, PHASE 2 RÉVISION Revision L Figure 2 NO. DESSIN Dwg Number A100a JE (fo ANN rm E erl D'A yN R OR C B TH LV SE D. N RV ICE RO A D) PH TO ASE 1 15 S WER A T 89 UOREYS NITS PH TO ASE 2 16 SWER B T 145 OREYS UNI TS PH TO ASE 3 19 S WER C T 175 OREYS UNI TS PH TO ASE 4 16 S WER D T 145 OREYS UNI TS PHASE 5 FUTURE RETIREMENT HOME 448 UNITS ROAD L A N IO G E R exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B 8H6 www.exp.com 174 JE (fo ANN rm E erly D'A NO RC RT BL H S VD ER . N VIC ER OA D) PH TO ASE 1 15 STWER A OREY 89 UN S ITS PH TOWASE 2 ER 16 ST B 145 OREYS UNIT S PH TO ASE 3 19 STWER C 175 OREYS UNIT S PH TOWASE 4 16 ST ER D 145 OREYS UNIT S PHASE 5 FUTURE RETIREMENT HOME 448 UNITS REGIONAL ROAD 174 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Appendix B – Storm Design Sheets Table B-1: 5-year Storm Sewer Calculation Sheet Table B-2: 100-year Storm Sewer Calculation Sheet TABLE B-1: 5-YEAR STORM SEWER CALCULATION SHEET Return Period Storm = Default Inlet Time= 5 20 Manning Coefficient = 0.013 (5-years, 100-years) (minutes) Frontyards (dimensionless) LOCATION AREA (hectares) FLOW (UNRESTRICTED) SEWER DATA Velocity (m/s) ∑ Area (ha) Average R Indiv. 2.78*A*R Accum. 2.78*A*R 0.47 0.47 0.63 0.02 0.53 0.53 0.66 0.05 0.45 0.90 0.55 0.52 0.90 0.30 0.52 0.57 0.09 0.23 0.29 0.09 0.22 0.32 0.05 0.31 0.63 0.66 0.66 0.66 1.31 1.37 1.37 1.37 1.46 1.69 1.98 2.07 2.28 2.60 2.65 2.95 Location From Node To Node Area No. Area (ha) NORTH DRAINAGE MH207 MH212 C1 C6 0.4840 0.0180 MH212 MH206 MH206 MH205 C2 C7 0.446 0.036 MH205 MH204 MH203 MH204 MH203 MH202 MH202 MH201 MH201 POND-IN 3A 3B 3C C8 C4A C4B C9 C5 0.073 0.093 0.190 0.059 0.087 0.379 0.033 0.194 0.484 0.502 0.502 0.502 0.948 0.984 0.984 0.984 1.057 1.150 1.340 1.399 1.486 1.865 1.898 2.092 MH211 MH213 MH213 MH214 C10 C12 C17B C19B C14A C14B C14C C14D 0.099 0.086 0.005 0.010 0.138 0.081 0.021 0.072 0.099 0.185 0.190 0.200 0.338 0.419 0.440 0.512 0.53 0.60 0.20 0.20 0.70 0.55 0.90 0.60 0.15 0.14 0.00 0.01 0.27 0.12 0.05 0.12 MH214 CBMH2 MH215 MH208 CBMH2 MH215 MH208 MH209 C13 C19A 0.108 0.020 0.620 0.640 0.640 0.57 0.20 0.17 0.01 TEMP CB CBMH1 CBMH1 MH209 C16 C15 0.968 0.120 0.968 1.088 0.50 0.80 1.35 0.27 MH209 POND-IN SOUTH DRAINAGE POND-OUT Vortech MH Vortech MH MH210 MH210 MH210A MH210A OUTLET TOTALS = Definitions: Q = 2.78*AIR, where Q = Peak Flow in Litres per second (L/s) A = Watershed Area (hectares) I = Rainfall Intensity (mm/h) R = Runoff Coefficients (dimensionless) 3.820 Tc (mins) I (mm/h) Return Period Q (L/s) Dia (mm) Dia (mm) Actual Nominal Type Slope (%) Length (m) Capacity (L/sec) Vf Va Time in Pipe, Tt (min) Hydraulic Ratios Qa/Qf Va/Vf 20.00 70.25 5.00 46.1 447.87 450 PVC 0.20 23.00 125.9 0.80 0.57 0.68 0.37 0.71 20.68 68.80 5.00 45.1 447.87 450 PVC 0.20 15.50 125.9 0.80 0.56 0.46 0.36 0.70 21.14 21.69 22.25 67.85 66.75 65.67 5.00 5.00 5.00 92.7 91.2 89.7 447.87 533 610 450 525 525 PVC CONC CONC 0.20 0.16 0.26 26.00 19.00 19.40 125.9 179.1 327.2 0.80 0.79 1.01 0.79 0.56 0.71 0.55 0.56 0.46 0.74 0.51 0.27 0.98 0.71 0.70 22.71 64.82 5.00 133.9 610 600 CONC 0.14 62.40 240.1 0.81 0.57 1.81 0.56 0.71 24.52 25.36 61.68 60.33 5.00 5.00 163.3 178.2 610 610 600 600 CONC CONC 0.17 0.36 41.20 5.60 264.6 385.0 0.90 1.30 0.81 0.92 0.84 0.10 0.62 0.46 0.91 0.71 0.15 0.29 0.29 0.30 0.57 0.69 0.74 0.86 0.86 1.03 1.04 1.04 20.00 70.25 5.00 10.2 366.42 375 PVC 0.25 88.50 82.4 0.79 0.45 3.26 0.12 0.57 23.26 23.85 24.63 25.02 26.12 63.83 62.79 62.79 60.86 59.17 5.00 5.00 5.00 5.00 5.00 55.1 54.2 54.2 63.6 61.8 366.42 366.42 366.42 366.42 366.42 375 375 375 375 375 PVC PVC PVC PVC PVC 0.25 0.21 0.69 0.87 2.01 26.00 33.30 21.70 69.00 17.50 82.4 75.5 136.9 153.7 233.7 0.79 0.73 1.32 1.48 2.25 0.73 0.71 0.93 1.05 1.58 0.59 0.78 0.39 1.10 0.19 0.67 0.72 0.40 0.41 0.26 0.92 0.98 0.71 0.71 0.70 1.35 1.61 20.00 20.40 70.25 69.38 5.00 5.00 94.5 111.9 299.36 299.36 300 300 PVC PVC 1.00 1.40 34.00 35.70 96.2 113.8 1.37 1.62 1.41 1.67 0.40 0.36 0.98 0.98 1.03 1.03 1.728 2.66 26.30 58.89 5.00 156.5 366.42 375 PVC 1.60 8.00 208.5 2.01 1.97 0.07 0.75 0.98 3.820 3.820 3.820 3.820 5.61 5.61 5.61 5.61 26.37 26.52 26.63 27.10 58.79 58.57 58.42 57.74 5.00 5.00 5.00 5.00 329.9 328.7 327.8 324.1 533 533 533 533 525 525 525 525 CONC CONC CONC CONC 1.56 1.31 1.37 1.00 20.50 13.00 59.30 15.00 559.3 512.5 524.1 447.8 2.48 2.27 2.33 1.99 2.23 2.09 2.12 1.95 0.15 0.10 0.47 0.13 0.59 0.64 0.63 0.72 0.90 0.92 0.91 0.98 0.54 5.61 Notes: Ottawa Rainfall Intensity Values: From Sewer Desing Guidelines, 2004 653.60 5yr a = 998.071 0.814 b= c = 6.053 Designed: 100yr A. O'Beirn, E.I.T. 1735.688 0.820 Checked: 6.014 B. Thomas, P.Eng. Dwg Reference: Storm Drainage Area Plan, Fig-3 Project: Petrie Landings Phase II Location: Ottawa, Ontario File Ref: 214935 Storm Design Sheets Sheet No: 1 of 1 TABLE B-2: 100-YEAR STORM SEWER CALCULATION SHEET Return Period Storm = Default Inlet Time= 100 20 Manning Coefficient = 0.013 (5-years, 100-years) (minutes) Frontyards (dimensionless) LOCATION AREA (hectares) FLOW (UNRESTRICTED) SEWER DATA Velocity (m/s) Location From Node To Node NORTH DRAINAGE MH207 MH212 MH212 MH206 SOUTH DRAINAGE Area No. Area (ha) C1 C6 0.4840 0.0180 ∑ Area Average (ha) R C2 C7 0.446 0.036 3A 3B 3C C8 C4A C4B C9 C5 0.073 0.093 0.190 0.059 0.087 0.379 0.033 0.194 0.484 0.502 0.502 0.502 0.948 0.984 0.984 0.984 1.057 1.150 1.340 1.399 1.486 1.865 1.898 2.092 C10 C12 C17B C19B C14A C14B C14C C14D 0.099 0.086 0.005 0.010 0.138 0.081 0.021 0.072 CBMH2 MH215 MH208 MH209 C13 C19A TEMP CB CBMH1 CBMH1 MH209 C16 C15 MH209 POND-IN MH206 MH205 MH205 MH204 MH203 MH204 MH203 MH202 MH202 MH201 MH201 POND-IN MH211 MH213 MH213 MH214 MH214 CBMH2 MH215 MH208 Accum. 2.78*A*R 0.63 0.02 0.63 0.66 0.66 0.66 1.31 1.37 1.37 1.37 1.46 1.69 1.98 2.07 2.28 2.60 2.65 2.95 0.53 0.53 0.66 0.05 0.45 0.90 0.55 0.52 0.90 0.30 0.52 0.57 0.09 0.23 0.29 0.09 0.22 0.32 0.05 0.31 0.099 0.185 0.190 0.200 0.338 0.419 0.440 0.512 0.53 0.60 0.20 0.20 0.70 0.55 0.90 0.60 0.15 0.14 0.00 0.01 0.27 0.12 0.05 0.12 0.108 0.020 0.620 0.640 0.640 0.57 0.20 0.17 0.01 0.968 0.120 0.968 1.088 0.50 0.80 1.35 0.27 POND-OUT Vortech MH Vortech MH MH210 MH210 MH210A MH210A OUTLET TOTALS = 0.47 0.47 Indiv. 2.78*A*R 3.820 Tc (mins) I (mm/h) Dia (mm) Dia (mm) Actual Nominal Type Slope (%) Length (m) Capacity (L/sec) Vf Va Time in Pipe, Tt (min) Hydraulic Ratios Qa/Qf 119.95 100.00 78.7 447.87 450 PVC 0.20 23.00 125.9 0.80 0.73 0.53 0.62 0.91 118.00 100.00 77.4 447.87 450 PVC 0.20 15.50 125.9 0.80 0.73 0.35 0.61 0.91 20.88 21.40 21.80 116.72 114.91 113.55 100.00 100.00 100.00 159.5 157.0 155.1 447.87 533 610 450 525 525 PVC CONC CONC 0.20 0.16 0.26 26.00 19.00 19.40 125.9 179.1 327.2 0.80 0.79 1.01 0.83 0.79 0.72 0.52 0.40 0.45 1.27 0.88 0.47 1.04 1.00 0.71 22.25 112.06 100.00 231.5 610 600 CONC 0.14 62.40 240.1 0.81 0.85 1.23 0.96 1.04 23.48 24.22 108.22 106.05 100.00 100.00 286.5 313.3 610 610 600 600 CONC CONC 0.17 0.36 41.20 5.60 264.6 385.0 0.90 1.30 0.93 1.28 0.74 0.07 1.08 0.81 1.04 0.98 0.15 0.29 0.29 0.30 0.57 0.69 0.74 0.86 0.86 1.03 1.04 1.04 20.00 119.95 100.00 17.5 366.42 375 PVC 0.25 88.50 82.4 0.79 0.52 2.82 0.21 0.66 22.82 23.41 24.14 24.43 25.23 63.83 108.43 108.43 105.43 103.23 100.00 100.00 100.00 100.00 100.00 55.1 93.5 93.5 110.2 107.9 366.42 366.42 366.42 366.42 366.42 375 375 375 375 375 PVC PVC PVC PVC PVC 0.25 0.21 0.69 0.87 2.01 26.00 33.30 21.70 69.00 17.50 82.4 75.5 136.9 153.7 233.7 0.79 0.73 1.32 1.48 2.25 0.73 0.76 1.24 1.45 1.59 0.59 0.73 0.29 0.79 0.18 0.67 1.24 0.68 0.72 0.46 0.92 1.04 0.94 0.98 0.71 1.35 1.61 20.00 20.40 119.95 118.47 100.00 100.00 161.4 191.0 299.36 299.36 300 300 PVC PVC 1.00 1.40 34.00 35.70 96.2 113.8 1.37 1.62 1.42 1.68 0.40 0.35 1.68 1.68 1.04 1.04 1.728 2.66 25.41 102.73 100.00 273.0 366.42 375 PVC 1.60 8.00 208.5 2.01 2.09 0.06 1.31 1.04 3.820 3.820 3.820 3.820 5.61 5.61 5.61 5.61 25.47 25.61 25.70 26.11 102.56 102.21 101.97 100.90 100.00 100.00 100.00 100.00 575.6 573.6 572.3 566.3 533 533 533 533 525 525 525 525 CONC CONC CONC CONC 1.56 1.31 1.37 1.00 20.50 13.00 59.30 15.00 559.3 512.5 524.1 447.8 2.48 2.27 2.33 1.99 2.58 2.36 2.42 2.07 0.13 0.09 0.41 0.12 1.03 1.12 1.09 1.26 1.04 1.04 1.04 1.04 0.54 5.61 Notes: Ottawa Rainfall Intensity Values: From Sewer Desing Guidelines, 2004 653.60 5yr a = 998.071 0.814 b= c = 6.053 100yr Designed: A. O'Beirn, E.I.T. Project: Petrie Landings Phase II Checked: B. Thomas, P.Eng. Location: Ottawa, Ontario Dwg Reference: Storm Drainage Area Plan, Fig-3 File Ref: 214935 Storm Design Sheets 1735.688 0.820 6.014 I = Rainfall Intensity (mm/h) R = Runoff Coefficients (dimensionless) Va/Vf 20.53 Definitions: Q = Peak Flow in Litres per second (L/s) Q (L/s) 20.00 Q = 2.78*AIR, where A = Watershed Area (hectares) Return Period Sheet No: 1 of 1 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Appendix C – Sanitary Sewer Calculation Sheets Table C-1: Sanitary Sewer Calculation Sheet TABLE C-1: SANITARY SEWER CALCULATION SHEET Petrie Landings, Phase II LOCATION Street From To Area No. Phase 5 Phase 1 104 106 106 107 107 108 108 109 ExMh109 ExMh110 ExMh110 ExMh111 ExMh111 ExMh111A ExMh111A ExMh112 ExMh112 ExMh113 ExMh113 ExMh114 ExMh114 ExMh115 ExMh115 ExMh116 ExMh116 Ex San MH POPULATION 2-bed Apart Indiv Pop 540 132 245 60 224 784 1569 3.67 23.33 1.16795 3.04 0.85 3 14 75 *253 1822 3.62 26.72 0.87092 3.91 1.10 9.90000 13.81 3.87 Pop. Densities Persons Per Unit or = 0.579 35,000 or = 0.405 (L/ha/sec) (L/ha/day) (L/ha/sec) Singles = 1-Bed Apt = 2-Bed Apt = 3.4 1.4 2.1 4.0 1.5 9.90 *Phase 1 Individual Population based on as constructed information. 8.59 TOTAL FLOW (L/s) 8.99 12.83 12.83 24.18 24.18 24.18 27.81 27.81 27.81 39.18 39.18 39.18 39.18 Dia. (mm) 250 250 250 250 250 250 250 250 300 300 300 300 300 actual 251.46 251.46 251.46 251.46 251.46 251.46 251.46 251.46 299.36 299.36 299.36 299.36 299.36 Slope Length (%) 0.30 0.30 0.29 0.24 0.50 0.54 0.63 0.29 0.15 0.32 0.22 0.22 0.22 (m) 84.7 28.4 62.9 37.9 12.0 14.9 12.6 38.2 79.4 34.7 86.0 58.5 60.5 Reserve Capacity Capacity (L/s) 33.08 33.08 32.53 29.59 42.71 44.38 47.94 32.53 37.24 54.39 45.10 45.10 45.10 491 L/cap/day) (L/ha/day) Comm Peak Factor = Peak Flow ACCU AREA PEAK FLOW AREA (L/sec) AREA (Ha) (Ha) (L/s) (ha) 8.66 1.17662 12.31 0.69811 9.90 350 50,000 Max Res Peak Factor = INFILT FLOW (L/s) 0.33 0.52 224 1822 Industrial Flow = ACCU AREA (Ha) 1.18 1.87 2 511 Average Daily Flow = Commercial Flow = Peak Factor 3.96 3.87 SEWER DATA 6, 5 4 1 Cumul Pop 540 785 INFILTRATION 1-bed Apart 188 85 Singles Phase 3, 4 Phase 2 COMMERCIAL/RETAIL RESIDENTIAL AREA AND POPULATION 9.90 Q(p) = Peak Population Flow = PqM/86.4 + Iac Q(i) = Peak Extraneous Flow = I * Ac Ai = Individual; Area (hectares) Ac = Cumulative Area (hectares) M = Peaking Factor = 1 + (14/(4+P^0.5)) P = Population (thousands) Qcap, (Manning) = 1/n S1/2 R 2/3 Ac Manning N = 0.013 I = Peak Extran Flow (L/s/ha) = 0.28 13.81360 6.670 Designed: J. Fitzpatrick, P.Eng. Project: Petrie Landings, Phase II Checked: B. Thomas, P.Eng. Location: Ottawa, Ontario Dwg Reference: File Ref: Sheet No: Figure A-3: Sanitary Drainage Area Plan 214935 Sanitary Design Sheet, April 2016 1 of 1 (L/s) 24.09 20.25 19.69 5.41 18.53 20.21 20.13 4.71 9.43 15.21 5.92 5.92 5.92 Full Velocity (m/s) 0.66 0.66 0.65 0.59 0.86 0.89 0.96 0.65 0.47 0.69 0.57 0.57 0.57 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Appendix D – Hydraulic Analysis Tables Table D-1: Water Consumption/Demand Allocation Table Table D-2: Sample Calculation of Fire Flow Requirements (Phase 2) Table D-3: Calculation of Fire Flow Requirements (All Buildings) TABLE D-1 - WATER CONSUMPTION/DEMAND ALLOCATION TABLE Location: Project No: Designed by: Checked By: Date: Petrie's Landing, Phase II 214935 A. O'Beirn J. Fitzpatrick April 2016 Water Consumption Residential = 350 Population Densities Bachelor = 1 Bedroom = 2 Bedroom = 3 Bedroom = L/cap/day 1.4 1.4 2.1 3.1 person/unit person/unit person/unit person/unit Residental No. of Units Junction Bachelor 1 Bedroom 2 bedroom J-5 J-12 J-15 J-17 J-7 1 1 1 14 84 102 84 224 75 60 72 60 224 Totals = 3 508 491 Total Persons Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Commercial Average Demand (L/day) Maximum Demand (L/day) Peak Hourly Demand (L/day) 2.5 x Avg Day 2.2 x Max Day Area (m2) Average Demand (L/day) Demands in (L/sec) Maximum Demand (L/day) Peak Hourly Demand (L/day) 1.5 x Avg Day 1.8 x Max Day Avg Max Day Day (L/s) (L/s) Max Hour (L/s) 253 245 295 245 784 88,550 85,750 103,390 85,750 274,400 221,375 214,375 258,475 214,375 686,000 487,025 471,625 568,645 471,625 1,509,200 1.02 0.99 1.20 0.99 3.18 2.56 2.48 2.99 2.48 7.94 5.64 5.46 6.58 5.46 17.47 1822 637,840 1,594,600 3,508,120 7.38 18.46 40.60 * Phase 1 was approved and constructed based on previous criteria in force at the time of review - see Stormwater Management and Servicing Report, 2008 in appendix for details 214935 Water Demand Chart, April 2016 Table D-1 Page 1 of 1 TABLE D-2: SAMPLE CALCULATION OF FIRE FLOW REQURIEMENTS (Phase 2) Calculation Based on Fire Underwriters Survey, 1999 Sample Calculation Based on Phase 2 1) An estimate of the Fire Flow required for a given fire area may be estimated by: F = 220 x C x where A F = required fire flow in litres per minute A = total floor area in m2 (including all storeys, but excluding basements at least 50% below grade) C = coefficient related to the type of construction: 1.5 1.0 0.8 0.6 for wood construction (structure essentially combustible) for ordinary construction (brick or other masonry walls, combustible floor and interior) for noncombustible construction (unprotected metal structural components, masonary or metal walls) for fire-resistive construction (fully protected frame, floors, roof) No. of Floor = 16 Area / Floor = 928.3 Area / Floor = 913 m (Floors 2 -13) 806.8 m2 (Penthouse) m2 (Ground Floor) 2 A= 12691.1 m2 Ai = C= F= 5493.3 0.6 9,783 m2 (Two Largest Floors + 50% of each floor immediateley above to a maximum of 8 floors) L/min -----------------------> Rounded to nearest 1000 = 10,000 L/min 7,500 L/min 5,250 L/min 2,625 L/min 5,250 2,625 7,875 131.3 L/min L/sec 2) The value obtained in 1. may be reduced by as much as 25% for occupancies having a low contents fire hazard. Non-combustible = Limited Combustible = Combustible = Free Burning = Rapid Burning = -25% -15% 0% 15% 25% Reduction due to low occupancy hazard = -25% x 10,000 = = 3) The value above my be reduced by up to 50% for automatic sprinlker system Reduction due to automatic sprinker system = -30% x 7,500 = 4) The value obtained in 2. may be increased for structures exposed within 45 metres by the fire area under consideration. Separation (metres) 0m to 3.0m 3.1m to 10.0m 10.1m to 20.0m 20.1m to 30.0m 30.1m to 45.0m 45.1m to Exposures Side 1 Side 2 Front Back Distance(m) 16.0 13.0 75.0 8.0 Increase due to separation = Condition 3 3 6 2 Condition 1 2 3 4 5 6 Charge 25% 20% 15% 10% 5% 0% --------> --------> --------> --------> Charge 15% 15% 0% 20% 50% 50% x 5,250 = The fire flow requirement is = Increase due to Separation = or TABLE D-3: SAMPLE CALCULATION OF FIRE FLOW REQURIEMENTS (Phase 2) Calculation Based on Fire Underwriters Survey, 1999 Floor Areas (m2) Total Effective Calculated Fire Flow Occupancy Fire Flow Reduction Fire Flow Area, Ai Const. Fire Flow Required Reduction Required Due to Required Side 1 (s.m) Coeff, C (L/min) (L/min) (%) (L/min) Sprinkler (L/min) Exposure Distance / Charge Bldg No No. Bldg of Type Floors Ground Floors PentFloor 2-13 house COL1 COL2 COL3 COL4 COL5 COL6 COL7 COL8 COL9 COL10 COL11 COL12 COL13 COL14 COL15 COL16 COL17 COL18 COL19 COL20 COL21 COL22 COL23 COL24 COL25 COL26 Phase 1 Phase 2 Phase 3 Phase 4 Res Res Res Res 15 16 16 16 928.3 928.3 928.3 928.3 913 913 913 913 806.8 806.8 806.8 806.8 12,691 12,691 12,691 12,691 5,493 5,493 5,493 5,493 0.60 0.60 0.60 0.60 9,783 9,783 9,783 9,783 10,000 10,000 10,000 10,000 -25% -25% -25% -25% 7,500 7,500 7,500 7,500 30% 30% 30% 30% 5,250 5,250 5,250 5,250 42.0 16.0 13.0 14.0 2,100 2,625 2,363 2,888 7,350 7,875 7,613 8,138 Notes COL7: All Floor Areas = No. of Floors * Total Building Footprint = COL4 + COL4 + COL6 COL8: Total Effective Area = Two largest Floors + 50% of each floor above them to a maximum of 8 floors COL9: Coefficent Related to Construction, (1.5, 1.0, 0.8, 0.6) COL10: Calcualed Fire Flow Required is based on Fire Underwriter Survey, F = 220 * C * sqrt(A), = 220 * COL7 * sqrt(COL6) COL11: Fire Flow Required is calculated Fire Flow rounded to nearest 1000 COL16 to COL23: Exposure Charges are Based on Exposure Distances Separation (m) Condtion Charge 0m to 3.0m 1 25% 3.1m to 10.0m 2 20% 10.1m to 20.0m 3 15% 20.1m to 30.0m 4 10% 30.1m to 45.0m 5 5% 45.1m to 6 0% Side 2 5% 15% 15% 15% 16.0 13.0 14.0 22.0 Front 15% 15% 15% 10% 101.0 75.0 55.0 22.0 Total Exposure Charge (%) Fire Flow Increase Due to Fire Flow Explosures Requried (L/min) L/min (L/s) Total All Floor Areas (s.m) Back 0% 0% 0% 10% 7.0 8.0 11.0 10.0 20% 20% 15% 20% 40% 50% 45% 55% (123) (131) (127) (136) exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Appendix E – WaterGems Hydraulic Analysis Model Results exp Services Inc. t: +1.613.688.1899 | f: +1.613.225.7330 2650 Queensview Drive, Unit 100 Ottawa, ON K2B 8H6 Canada www.exp.com BUILDINGS INDUSTRIAL EARTH & ENVIRONMENT INFRASTRUCTURE ENERGY SUSTAINABILITY Petrie's Landing Phase 2 Client: Brigil Construction Project: OTT-00214935-A0 Date: 20th April, 2015 Maximum Day Analysis - Junction Report ID J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 Demand (L/s) 0.00 0.00 0.00 0.00 2.56 0.00 7.94 0.00 0.00 0.00 0.00 2.48 0.00 0.00 2.99 0.00 2.48 0.00 Elevation (m) 52.6 52.6 53.44 51.8 51.8 53.44 53.5 53.3 52.62 54.77 53.3 52.15 52.28 54.18 54.48 52.28 54.8 52.28 Head (m) 110 110 109.84 109.91 109.91 109.84 109.84 109.76 109.77 109.77 109.76 109.75 109.69 109.74 109.74 109.74 109.74 109.74 Pressure (psi) 81 81 80 83 83 80 80 80 81 78 80 82 82 79 79 82 78 82 Pressure (kPa) 558 558 552 572 572 552 552 552 558 538 552 565 565 545 545 565 538 565 Maximum Day Analysis - Pipe Report ID P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-12 P-13 P-14 P-15 P-16 P-17 P-18 P-19 P-20 P-21 From Node J-1 J-1 J-2 J-4 J-4 J-6 J-3 J-3 J-6 J-9 J-9 J-11 J-8 J-8 J-11 J-14 J-14 J-16 J-16 J-18 R-1 To Node J-2 J-3 J-4 J-5 J-6 J-3 J-7 J-8 J-9 J-10 J-11 J-12 J-11 J-13 J-14 J-15 J-16 J-17 J-18 J-13 J-1 Length (m) 1.77 109.45 49.99 12.59 60.08 1.00 10.44 134.15 104.89 32.40 27.19 22.61 1.00 75.34 42.60 6.71 31.26 6.76 1.50 1.00 7.34 Diameter (mm) 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 600 Roughness 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 Flow (L/s) 9.82 8.63 9.82 2.56 7.26 3.26 7.94 3.95 4.00 0.00 4.00 2.48 1.65 2.30 3.17 2.99 0.18 2.48 -2.30 -2.30 18.45 Maximum Day Analysis - Fireflow Report ID J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 Static Static Pressure Demand (psi) (L/s) 0.00 0.00 0.00 0.00 2.56 0.00 7.94 0.00 0.00 0.00 0.00 2.48 0.00 0.00 2.99 0.00 2.48 0.00 81 81 80 83 83 80 80 80 81 78 80 82 82 79 79 82 78 82 Static Head (m) Fire-Flow Demand (L/s) Residual Pressure (psi) 110.00 110.00 109.93 109.96 109.96 109.93 109.93 109.91 109.92 109.92 109.91 109.91 109.91 109.91 109.91 109.91 109.91 109.91 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 131.3 81 72 22 20 20 22 20 22 23 20 22 20 23 20 20 24 20 23 Maximum Day Analysis - Reservoir Report ID R-1 Flow (L/s) 18.45 Head (m) 110 Available Flow at Hydrant (L/s) > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 > 200 Velocity (m/s) 0.30 0.26 0.30 0.08 0.22 0.10 0.24 0.12 0.12 0.00 0.12 0.08 0.05 0.07 0.10 0.09 0.01 0.08 0.07 0.07 0.07 Headloss (m) 0.00 0.07 0.04 0.00 0.03 0.00 0.01 0.02 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 HL/1000 (m/km) 0.778 0.614 0.779 0.064 0.445 0.102 0.525 0.144 0.148 0.000 0.148 0.061 0.028 0.053 0.096 0.086 0.000 0.062 0.050 0.056 0.013 Petrie's Landing Phase 2 Client: Brigil Construction Project: OTT-00214935-A0 Date: 20th April, 2015 Peak Hour Analysis - Junction Report ID J-1 J-2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J-15 J-16 J-17 J-18 Demand (L/s) 0.00 0.00 0.00 0.00 5.64 0.00 17.47 0.00 0.00 0.00 0.00 5.46 10.00 0.00 6.58 0.00 5.46 0.00 Elevation (m) 52.6 52.6 53.44 51.8 51.8 53.44 53.5 53.3 52.62 54.77 53.3 52.15 52.28 54.18 54.48 52.28 54.8 52.28 Head (m) 107.88 107.87 107.43 107.63 107.62 107.43 107.41 107.24 107.28 107.28 107.24 107.24 107.18 107.19 107.19 107.18 107.18 107.18 Pressure (psi) 78 78 77 79 79 77 77 77 78 75 77 78 78 75 75 78 74 78 Pressure (kPa) 538 538 531 545 545 531 531 531 538 517 531 538 538 517 517 538 510 538 Peak Hour Analysis - Pipe Report ID P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-12 P-13 P-14 P-15 P-16 P-17 P-18 P-19 P-20 P-21 From Node J-1 J-1 J-2 J-4 J-4 J-6 J-3 J-3 J-6 J-9 J-9 J-11 J-8 J-8 J-11 J-14 J-14 J-16 J-16 J-18 R-1 To Node J-2 J-3 J-4 J-5 J-6 J-3 J-7 J-8 J-9 J-10 J-11 J-12 J-11 J-13 J-14 J-15 J-16 J-17 J-18 J-13 J-1 Length (m) 1.77 109.45 49.99 12.59 60.08 1.00 10.44 134.15 104.89 32.40 27.19 22.61 1.00 75.34 42.60 6.71 31.26 6.76 1.50 1.00 7.34 Diameter (mm) 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 204 Peak Hour Analysis - Reservoir Report ID R-1 Flow (L/s) Head (m) 50.61 108 Roughness 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 Flow (L/s) 26.60 24.01 26.60 5.64 20.96 7.14 17.47 13.68 13.82 0.00 13.82 5.46 3.86 9.82 12.22 6.58 5.64 5.46 0.18 0.18 50.61 Velocity (m/s) 0.81 0.73 0.81 0.17 0.64 0.22 0.53 0.42 0.42 0.00 0.42 0.17 0.12 0.30 0.37 0.20 0.17 0.17 0.01 0.01 1.55 Headloss (m) 0.01 0.45 0.25 0.00 0.19 0.00 0.02 0.19 0.15 0.00 0.04 0.01 0.00 0.06 0.05 0.00 0.01 0.00 0.00 0.00 0.12 HL/1000 (m/km) 4.931 4.079 4.934 0.279 3.173 0.438 2.264 1.440 1.467 0.000 1.467 0.262 0.139 0.778 1.168 0.371 0.279 0.263 0.000 0.000 16.234 exp Services Inc. Brigil Homes Petrie’s Landing, Phase II OTT-00214935-A0 June 2016 Appendix F – Stormwater Management Tables Table F-1: Pre-Development Runoff Calculations Table F-2: Allowable Runoff Calculations Table F-3: Average Runoff Coefficients (Post Development) Table F-4: Summary of Post Development Runoff (Uncontrolled and Controlled) Table F-5: Storage Volumes for 5-year and 100-year Storms TABLE F-1: PRE-DEVELOPMENT RUNOFF CALCULATIONS Time of Storm = 5 yr I5 Conc, Tc (mm/hr) Cavg Area Description Area (ha) (min) Total Site 3.7700 20 70.25 0.25 0.814 1) Intensity, I = 998.071/(Tc+6.035) (5-year, City of 0ttawa) 2) Intensity, I = 1735.688/(Tc+6.014)0.820 (100-year, City of Ottawa) 3) Cavg for 100-year is increased by 25% to a maximum of 0.95 Storm = 100 yr Q5PRE (L/sec) 184.1 I5 (mm/hr) 119.95 Cavg 0.31 CGRASS = 0.20 Q100PRE (L/sec) 32.6 TABLE F-2: ALLOWABLE RUNOFF CALCULATIONS Time of Storm = 5 yr I5 QALLOW Conc, Tc Area Description Area (ha) (min) (mm/hr) Cavg (L/sec) Total Site 3.7700 20 70.29 0.25 184.2 3.7700 184.2 1) Allowable Capture Rate is based on 5-year storm at Tc=20 minutes. 0.814 2) Intensity, I = 998.071/(Tc+6.035) (5-year, City of 0ttawa) 0.820 3) Intensity, I = 1735.688/(Tc+6.014) (100-year, City of Ottawa) 4) Cavg for 100-year is increased by 25% to a maximum of 0.95 5) External area A8 will be directed through site, with no storage provided. TABLE F3: AVERAGE RUNOFF COEFFICIENTS (Post Development) CASPH = Runoff Coeffients Area No. Asphalt Areas (m2) Phase 1 Phase 2 Phase 3 Phase 4 Future Phase Total 4842 2297 1819 1300 2733 12,991 Site % IMP = 52% A * CASPH 4357.8 2067.3 1637.1 1170.0 2459.7 11,692 0.90 Roof Areas (m2) 870 928 928 928 3527 7,181 CROOF = A * CROOF 783.0 835.2 835.2 835.2 3174.3 0.90 Grassed Areas (m2) A * CGRASS 5091 1018.2 3749 749.8 3157 631.4 3631 726.2 3328 665.6 18,956 3,791 Average Runoff Coeff (All Areas) = Sum AC 6159.0 3652.3 3103.7 2731.4 6299.6 21,946 CAVG = Total Area (m2) 10803 6974 5904 5859 9588 39,128 21,946 39,128 CAVG 0.57 0.52 0.53 0.47 0.66 0.56 = 0.56 TABLE F-4: SUMMARY OF POST DEVELOPMENT RUNOFF (Uncontrolled and Controlled) Storm = 5 yr CAVG Indiv Total I5 (mm/hr) Q (L/sec) Area No Area (ha) Area (ha) 1.0803 1.0803 0.57 83.56 143.1 Phase 1 Phase 2 0.52 83.56 84.8 0.6974 0.6974 Phase 3 0.53 83.56 72.1 0.5904 0.5904 Phase 4 0.47 83.56 55.2 0.5099 0.5859 17, 18 uncontrolled 0.0760 0.20 83.56 3.5 Phase 5 0.66 83.56 146.3 0.9588 0.9588 Totals 3.9128 3.9128 0.56 505.1 Notes 1) Captured Flow from Future Phase is included with Phase 1 - 4 I5 = 998.071 / (Tc + 6.053)0.814 I100 =1735.688 / (Tc + 6.014) 0.820 Time of Concentration (min), Tc = 15 mins For Flows under column Qcap which are bold, denotes flows that are controlled Storm = 100 yr QCAP (L/sec) 176.6 3.5 Note1 180.2 CAVG (100-yr) 0.71 0.65 0.66 0.58 0.25 0.82 I100 (mm/hr) 142.89 142.89 142.89 142.89 142.89 142.89 Q (L/sec) QCAP (L/sec) 305.8 181.4 176.6 154.1 118.0 7.5 7.5 312.8 Note1 1079.7 184.2 Table F-5: Storage Volumes for 5 Year and 100 Year Storms Area No: CAVG = Time Interval = Drainage Area = Duration (min) All 0.56 5 3.913 (mins) (hectares) Release Rate = 176.6 Return Period = 5 IDF Parameters, A = 998.071 ( I = A/(Tc+C) Rainfall Intensity, I (mm/hr) (L/sec) (years) ,B= ,C= 0.814 6.053 Release Rate = 176.6 (L/sec) Return Period = 100 (years) IDF Parameters, A = 1735.688 ( I = A/(Tc+C) ,C= Rainfall Peak Flow Release Storage 3 Storage (m ) Intensity, I (L/sec) Rate (L/sec) Rate (L/sec) (mm/hr) 0.820 6.014 Peak Flow Release Storage 3 Storage (m ) (L/sec) Rate (L/sec) Rate (L/sec) 0 230.5 1406.2 176.62 1229.6 0.00 398.6 2432.1 176.624 2255.5 0.00 5 141.2 861.4 176.62 684.7 205.42 242.7 1480.8 176.624 1304.2 391.26 10 104.2 635.7 176.62 459.1 275.45 178.6 1089.4 176.624 912.8 547.69 15 83.6 509.8 176.62 333.2 299.86 142.9 871.8 176.624 695.2 625.69 666.27 20 70.3 428.6 176.62 252.0 302.40 120.0 731.9 176.624 555.2 25 60.9 371.5 176.62 194.9 292.38 103.8 633.6 176.624 457.0 685.47 30 53.9 329.0 176.62 152.4 274.33 91.9 560.5 176.624 383.9 180.16 35 48.5 296.0 176.62 119.4 250.73 82.6 503.8 176.624 327.2 687.15 40 44.2 269.6 176.62 93.0 223.10 75.1 458.5 176.624 281.9 676.46 45 40.6 247.9 176.62 71.3 192.41 69.1 421.3 176.624 244.7 660.62 50 37.7 229.7 176.62 53.1 159.33 64.0 390.2 176.624 213.6 640.74 55 35.1 214.3 176.62 37.7 124.32 59.6 363.8 176.624 187.2 617.62 60 32.9 201.0 176.62 24.4 87.74 55.9 341.0 176.624 164.4 591.86 65 31.0 189.4 176.62 12.8 49.85 52.6 321.2 176.624 144.6 563.89 70 29.4 179.2 176.62 2.6 10.85 49.8 303.8 176.624 127.2 534.06 75 27.9 170.2 176.62 -6.5 -29.11 47.3 288.3 176.624 111.7 502.63 80 26.6 162.1 176.62 -14.6 -69.89 45.0 274.5 176.624 97.9 469.82 85 25.4 154.8 176.62 -21.8 -111.40 43.0 262.1 176.624 85.5 435.80 90 24.3 148.2 176.62 -28.4 -153.54 41.1 250.8 176.624 74.2 400.71 95 23.3 142.2 176.62 -34.4 -196.25 39.4 240.6 176.624 64.0 364.68 -39.9 -239.47 302.40 37.9 231.3 176.624 54.6 327.80 687.15 100 22.4 136.7 176.62 Max = Notes 1 ) Peak flow is equal to the product of 2.78 x C x I x A 2) Rainfall Intensity, I = A/(Tc+C)B 3) Release Rate = Min (Release Rate, Peak Flow) 4 ) Storage Rate = Peak Flow - Release Rate 5) Storage = Duration x Storage Rate 6) Maximium Storage = Max Storage Over Duration 7) Parameters a,b,c are for City of Ottawa