Untitled
Transcription
Untitled
Parmly Billings Library Feasibility Study May 18, 2009 Parmly Billings Library Primary Contact • Bill Cochran, Director Parmly Billings Library 510 N. Broadway Billings, MT 59101 Gainan’s Floral Primary Contact • Chuck Gainan Gainan’s Floral 502 N. 30th Street Billings, MT 59101 CTA, Inc. • • • Keith Rupert, Principal in Charge Karl DeCock, Project Manager Mike Tuss, Designer Parmly Billings Library Billings, Montana Feasibility Study i Parmly Billings Library Feasibility Study Table of Contents Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 1 Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages 2-5 Narrative • Parmly Billings Library Program • Gainan’s Floral Program Building Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6 Preliminary Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages 7-19 Narrative • Option 1 – Proposed Plan Information • Option 2 – Proposed Plan Information Cost Estimate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pages 20-28 Narrative • Cost Estimate Preliminary Project Schedule . . . . . . . . . . . . . . . . . . . . . . Pages 29-30 Narrative • Preliminary Project Schedule Appendix • Progress Drawings – Option 1 & Option 2 • Vision Notes from Parmly Billing Library Board Meeting 3/12/09 Parmly Billings Library Billings, Montana Feasibility Study ii Parmly Billings Library Feasibility Study Executive Summary: At the request of Bill Cochran of Billings Parmly Library, CTA performed a feasibility study to relocate the Parmly Billings Library into the existing downtown Gainan’s building. The extents of the feasibility study included creating a new library program, building assessment of the existing Gainan’s building, preliminary plans, 3D massing model, and cost estimate. Because Gainan’s wishes to maintain a downtown presence on the same site, CTA also included a program and cost estimate of their needs in the study. This feasibility study is intended to help determine if relocating the existing Parmly Billings Library to the existing downtown Gainan’s building is both feasible and beneficial for all parties involved. This study will provide useful information to both parties to help facilitate discussions for this potential project. *Vision notes from Parmly Billings Library Board Meeting held March 12, 2009 are located in the Appendix at the end of this study. Parmly Billings Library Billings, Montana Feasibility Study 1 Program: Library - Programming meetings with the Library included reviewing previous studies conducted for the Library and meeting with key staff members to discuss specific needs. Possible future Library branches were also discussed and taken into account in the final program. Once finalized, the new Libraries program showed that the size of the existing Gainan’s building would be inadequate without expansion. The current Gainan’s building has approximately 33,500 sf of space including the greenhouse located on the South side of the building. An addition of approximately 27,000 sf would be required to fulfill the libraries programmatic needs. This addition would be added to the North side of the existing building and would include expanding the basement, main and second floor. This new addition would also require redesigning the North end of the site to provide access and parking. Gainan’s - Programming meetings were also held with Gainan’s. Early discussions with Gainan’s revealed the need to explore two separate options of where the Gainan’s retail space would be located. The first option provides retail space for Gainan’s within the extents of the Library. The second option provides a separate building to the North of the Library. Gainan’s program needs for either option remained the same along with their need to have a distinct identity to set it apart from the Library. Parmly Billings Library Billings, Montana Feasibility Study 2 PARMLY BILLINGS LIBRARY PROPOSED PROGRAM BILLINGS, MONTANA Program Comparison Allocated Spaces Public Areas Existing Public Entrance/Lobby Proposed Access Services Workroom 515 sf 744 sf 1,656 sf 1,930 sf Youth Services 4,959 sf 6,565 sf Circulation Desk Area -- Listening/Viewing Area Proposed Notes Proposed w/ Branches Potential Location 600 sf 600 sf Main Floor 600 sf 600 sf Main Floor Potential Decrease of 565sf for Branch Libraries 1,930 sf Basement 6,000 sf Main Floor sf 240 sf 6 Stations - 40sf each (Carol Layout) 240 sf Main Floor Young Adult 1,152 sf 1,500 sf Includes Computer Section & Diner Seating 1,500 sf 2nd Floor Adult Fiction Collection 2,939 sf 3,000 sf Potential Decrease of 1000sf for Branch Libraries 2,000 sf Basement A/V Collection Area (Non-Print) 1,746 sf 1,500 sf Potential Decrease of 400sf for Branch Libraries 1,100 sf Main Floor 358 sf 300 sf 15 Stations (2/3 Standup) 300 sf Dispersed Throughout 300 sf Adjacent to Montana Rm. 300 sf 2nd Floor Public Access Catalog Computers Non-Fiction Collection (Includes Biography) 288 sf 2,155 sf 415 sf 4,020 sf General Public Seating Reference Collection Genealogy Montana Room Magazine/Newspaper Area Reference Services Computer Lab (25 Computers) Computer Teaching Space (12 Computers) New Release Area General Display Area Reserve Area Large Meeting Room (100p) Conference Room (15-20p) Total Public Allocated Space m:\jobs\plibfs09\pre\Programs_03-06-09.xls 250 sf 1,500 sf 2nd Floor 250 sf Anywhere Potential Decrease of 3,300sf for Branch Libraries 2,500 sf 2nd Floor 4,065 sf 9,000 sf Potential Decrease of 3,000sf for Branch Libraries 6,000 sf Dispersed Throughout 654 sf -sf 1,224 sf 850 sf -sf 716 sf -sf 2,520 sf -sf Study Rooms (3ea @ 150sf) Adjacent to Genealogy 5,800 sf 812 sf -sf -sf Large Type Area 1,500 sf 30,938 sf 850 sf Basement 150 sf 150 sf 2nd Floor 1,000 sf 1,000 sf 2nd Floor 500 sf 500 sf 2nd Floor 500 sf Main Floor 800 sf Potential Decrease of 300sf for Branch Libraries 800 sf 800 sf Main Floor 200 sf 200 sf Main Floor 100 sf 100 sf Main Floor 450 sf 450 sf Anywhere 1,500 sf Main Floor 500 sf 500 sf Anywhere 39,935 sf 31,370 sf 1,500 sf Dividable 5/22/200912:33 PM PARMLY BILLINGS LIBRARY PROPOSED PROGRAM BILLINGS, MONTANA Allocated Spaces Non-Public Areas Existing Mending & Technical Service Area Computer Service Area Custodial Supply/Work & Office Area Garage/Loading Dock Outreach Services - Offices Outreach Services - Bookmobile Loading Garage Bike Storage Receiving Area Vehicle Storage Meeting Area Lobby & Expanded Restrooms Directors Office Assistant Director Administrator Tech. Manager Reference Staff (4staff) Children's Staff (2 Offices) Admin. Workspace Retail Space 1,488 sf 1,290 sf 1,200 sf 0 sf 0 sf sf 1,469 sf -sf 200 sf 200 sf Basement - Above Included 1,188 sf Staff Break Room (10p) Shower/Locker Room Total Non-Public Allocated Space TOTAL ASSIGNABLE AREA Including Closets for Network Equip. 1,500 sf Basement 700 sf Basement 1,200 sf Basement 800 sf 800 sf Main Floor 200 sf 200 sf Main Floor 350 sf 350 sf Main Floor 200 sf 200 sf Main Floor 0 sf Off Site Vehicle Storage 0 sf 0 sf Included in Non-/Assignable Area 0 sf 200 sf 200 sf 2nd Floor - Above Included - Above Included 150 sf 150 sf 2nd Floor 150 sf 150 sf 2nd Floor - Above Included - Above Included 150 sf 150 sf Basement 320 sf 320 sf Basement - Above Included -sf 350 sf 350 sf Main Floor 200 2nd Floor 200 sf 200 sf Main Floor 400 sf 400 sf Anywhere sf 400 sf 400 sf Anywhere sf 250 sf 250 sf Anywhere -sf 14,354 sf 200 sf 200 sf Anywhere 8,120 sf 8,120 sf 45,292 sf 48,055 sf 39,490 sf --- Conference Rm. (12-15p) Location 700 sf - Work Space Potential 1,500 sf 4,925 sf - "Friends" Space/Office Proposed w/ Branches 633 sf 1,219 sf - Above Included Library Staff Offices (30 Staff Total) Proposed Notes 2,142 sf - Above Included - Above Included Equipment Storage NON-ASSIGNABLE AREA Proposed 8,280 sf * (Including Walls, Hallways, Stairs, Restrooms, Etc.) (Actual Area) TOTAL GROSS AREA 53,572 sf 200 sf Attached/Adjacent to Children's Offices 16,018 sf (25% of Gross Area) 64,073 sf 13,163 sf (25% of Gross Area) 52,653 sf * Comparable non-assignable ratio using 1st & 2nd floor only plus their share of mechanical space approximately 20%. m:\jobs\plibfs09\pre\Programs_03-06-09.xls 5/22/200912:33 PM GAINAN'S FLOWERS AND GIFTS PROPOSED PROGRAM BILLINGS, MONTANA Gainan's Downtown Store Spaces Number MAIN FLOOR General Retail Space Cooler Utility/Workroom ADA Restrooms Small Conference Room Loading Bay 1 1 1 2 1 1 Area @ @ @ TOTAL ASSIGNABLE AREA NON-ASSIGNABLE AREA TOTAL GROSS AREA Greenhouse Area Pop-Out m:\jobs\plibfs09\pre\Programs_03-06-09.xls 1,400 100 100 45 150 350 Total SF sf sf sf sf sf sf 1,400 100 100 90 150 350 sf sf sf sf sf sf 2,190 sf 10% of gross area 219 sf 2,409 sf 300 sf 5/22/200912:34 PM Building Assessment: A building assessment of the existing Gainan’s building was done in order to understand the extents of the work needed for the change in building function. The existing building is wood construction and structurally designed for floor loading of 100 lbs/sf. This is a higher floor loading capacity than standard office buildings but is not adequate for high stack loading. Book stacks located in the existing building would be limited in height to remain under the design load capacity. The proposed addition’s structure would be steel with concrete floors to allow for the additional floor load required for library stacks. The existing mechanical and electrical systems are not adequate for the size of the new building and would need to be replaced with the exception of a few electrical panels. The proposed new mechanical system would be a VAV system with a rooftop air-handler contained within a penthouse on the roof. A new electrical transformer would be needed for the power requirement of the new building along with new light fixtures and layout to better accommodate the new building layout. The existing site will need to be modified in order to accommodate the new building function and layout. The Southern portion of the site will be able to stay primarily intact with the majority of the major site work being done on the North side of the existing building. Parmly Billings Library Billings, Montana Feasibility Study 6 Preliminary Design: Library - The preliminary design of the new Library was back and forth effort between the Library and CTA. One larger factor in the design was loading and storage of the Bookmobile. One option was to have the Bookmobile be stored off site and loaded on the South side of the building using an inflatable rail seal for protection from the elements. The other option utilized a garage on the North side of the building for both loading and storage of the Bookmobile. The greenhouse space was given careful consideration given its existing use. Early on, Chuck Gainan expressed his concern that the greenhouse space may need to be addressed mechanically to maintain a comfortable temperature level. A large component of the greenhouse’s environmental quality is its roof structure. After looking at several options, it was decided that in order to provide a comfortable space with still maintaining the openness of the greenhouse, the existing greenhouse roof would need to be replaced. The new roof would implement a ridge skylight down the entire length of the roof. This would allow large amounts of natural light to penetrate into the space while better controlling heat gain and allowing for better light control in the large meeting space on the West end of the greenhouse. Replacing the greenhouse roof is also the least expensive alternative to address drift loading which was not required to be addressed when this building was originally designed. The floor layouts for the programmed Library spaces were determined from various meetings with the Library. The Main Floor would consist of spaces such as the A/V Collection and New Release which are high traffic spaces, Large Type which needs to be easily located by the visually impaired and Youth Services which holds numerous public programs. The main Circulation Desk would be located adjacent to the main entrance to control pedestrian flow and overall building security. A large Reading Space would be located just inside the greenhouse with “Friends” Retail and a potential coffee space. A Large Public Meeting Room would be located at the West end of the greenhouse with public toilets serving the entire greenhouse space to allow for use during off Library hours. The Basement would house a large portion of the Non-Public spaces such as Access Services, Reference Services & Offices, Mending & Technical Services, Custodial Supply/Work Area and the “Friends” Work Space. The main Mechanical and Electrical Rooms would be located in the basement as well. Adult Fiction, Reading Space and a smaller public Conference Room would account for the public areas located in the Basement. The Second Floor would primarily accommodate the research portion of the Library program. Spaces such as Non-Fiction, Newspaper/Magazine, and the Montana & Genealogy Room would make up a large portion of the second floor public space along with the majority of the computer services such as the Computer Lab and Computer Teaching Area. The Young Adult Area is located on this floor to allow separation Parmly Billings Library Billings, Montana Feasibility Study 7 between the teen and youth areas and would be designed to allow for public exposure while providing a sense of privacy. The Library Staff Offices would be located on the second floor as well as an Administrative Workspace, a small Circulation Desk and additional Reading Space. All floors are connected by an open staircase which allows natural daylight to penetrate into each floor. This staircase would be the main circulation of the building with a new elevator located just North of the staircase. Public restrooms would also be located on each floor along with Public Access Catalog Computers and General Public Seating. Gainan’s - The Gainan’s layout was done as two separate options. The first option has Gainan’s located within the Library shell with Library space extending above and below. Gainan’s would be located on the North side of the building extending towards 6th Street which would allow for more design opportunity for creating it’s own identity while also allowing for prominent public exposure. The greenhouse space would extend off the North side further defining Gainan’s presence on the site. The main entrance and parking would be off the East side with delivery access off the alley to the West. Gainan’s mechanical service would be fed off the Library’s mechanical system served by individual zones. Electrical service could be separately metered and billed. The second option is a freestanding Gainan’s building located on the North side of the site. This option would allow Gainan’s design to be completely independent of the Library including its mechanical and electrical systems. The main entrance and parking would be located on the South side of the building with delivery access off the alley to the West. The greenhouse space is shown directly connected to the main entrance on the North side creating a natural separation between public and non-public space while also drawing attention due to its prominent exposure to the street. Parmly Billings Library Billings, Montana Feasibility Study 8 Option 1 - SE Aerial Parmly Billings Library Billings, Montana Feasibility Study 9 Option 1 - NE Aerial Parmly Billings Library Billings, Montana Feasibility Study 10 Option 1 - Library Main Floor Parmly Billings Library Billings, Montana Feasibility Study 11 Option 1 - Library Basement Parmly Billings Library Billings, Montana Feasibility Study 12 Option 1 - Library Upper Floor Parmly Billings Library Billings, Montana Feasibility Study 13 Option 2 - SE Aerial Parmly Billings Library Billings, Montana Feasibility Study 14 Option 2- NE Aerial Parmly Billings Library Billings, Montana Feasibility Study 15 Option 2 - Library Main Floor Parmly Billings Library Billings, Montana Feasibility Study 16 Option 2 - Gainan's Main Floor Parmly Billings Library Billings, Montana Feasibility Study 17 Option 2 - Library Basement Parmly Billings Library Billings, Montana Feasibility Study 18 Option 2 - Library Upper Floor Parmly Billings Library Billings, Montana Feasibility Study 19 Cost Estimate: The cost estimate for this feasibility study is divided into two separate options with those options being separated into four individual pieces. The four pieces of each option included construction of the New Addition Shell and Site, Infrastructure Upgrades to Existing Gainan’s Building, Library Tenant Improvements and either Gainan’s Tenant Improvements or Gainan’s Building & Site depending on the option. Research for the cost estimate information for this project was a combination of methods. Information from Means building cost square foot number, past project cost and pricing information from a local contractor all played a role in determining our final square footage costs. Taking all this information into account, we derived division square footage costs which were then used to help compose the cost of each piece of the option. The cost for each piece is broken down on a separate sheet showing the square foot numbers used along with any lump sum amounts needed for items specific to that piece. In both the New Addition Shell and the Infrastructure Upgrades to Existing Building it was assumed that the space would be finished to leasable shell standards. Because specific information as to which party would be financing the cost of the infrastructure upgrades to the existing building, these costs were broken out separate. The cost to upgrade the infrastructure remains the same in both options as the total square footage remains the same. The Library Tenant Improvements is the cost for the Library to fit out both the existing building and new addition to fit its needs. This number remains the same in both options as the total square footage of Library space remains the same. Option 1 includes the Gainan’s building within the Library building shell. Costs for the New Addition Shell and Site was slightly more in this option due to the additional square footage of exterior wall needed to include Gainan’s within the shell of the building. Since this option includes Gainan’s within the building shell, the Gainan’s Tenant Improvements is the cost for Gainan’s to fit out their space to fit their needs. Option 2 separates Gainan’s into their own building on the North end of the site. Costs for the New Addition and Shell are slightly less in this option since only the Library is contained within the addition shell. All construction costs for the separate Gainan’s building and associated site are included in the Gainan’s Building & Site number. Parmly Billings Library Billings, Montana Feasibility Study 20 Billings Parmly Library Billings, MT May 18, 2009 Option Cost Comparision OPTION 1: GAINAN'S RETAIL IN LIBRARY BUILDING SHELL NEW ADDITION SHELL AND SITE $ 3,945,306 INFRASTRUCTURE UPGRADES TO EXISTING BUILDING $ 2,371,503 LIBRARY TENANT IMPROVEMENTS $ 4,332,698 GAINAN'S TENANT IMPROVEMENTS $ 172,098 $ 10,821,606 NEW ADDITION SHELL AND SITE $ 3,544,194 INFRASTRUCTURE UPGRADES TO EXISTING BUILDING $ 2,371,503 LIBRARY TENANT IMPROVEMENTS $ 4,332,698 GAINAN'S BUILDING & SITE $ 678,390 $ 10,926,785 TOTAL OPTION 1 OPTION 2: GAINAN'S FREE STANDING BUILDING TOTAL OPTION 2 m:\jobs\plib09\cost\costs-div costs.xls Billings Parmly Library Billings, MT May 14, 2009 Project Cost Estimate Project: OPTION 1-OWNER ADDITION TO GAINAN'S FOR NEW LIBRARY & GAINAN'S RETAIL Description: A. Add 2 stories + basement to north finished to leasable shell standards. 2,709 sf Gainan's retail on 1st floor. sf existing 26,904 sf new Land & Offsite Development 1. Land Purchase 2. Off Site Development 3. = = = ea sf x $ $ $ 20,000 - Subtotal Land & Development B. C. Construction 1. Site Development 2. New Construction 3. Book Drop Tunnel 4. Reno, Demo + Infrastructure 5. Tenant Improvements 6. Addl Exterior Wall vs Option 2 8,000 26,904 70 0 2,000 sf x sf x lf x sf x sf x sf x $ $ $ $ $ $ 10.00 113.00 970.00 51.00 51.00 25.00 Architect Engineer Fees & Expenses 1. New Construction 9% 2. Renovation 12% 3. Reimbursibles 0.50% = = = = = = $ 80,000 $ 3,040,152 $ 67,900 $ $ $ 50,000 Subtotal Construction Costs $ 120 /sf = = = $ $ $ Equipment & Furnishings 1. Furniture 2. Computers/AV/Office Equipment 3. Equip 4. Misc & Contingency sta x sta x $ $ 1,200 500 sta x $ 100 = = = = $ $ $ $ Miscellaneous Expenses 1. Soils Investigation/Survey 2. Testing/ Special Insp 3. Commissioning 4. Moving/ Final Cleaning 5. 0.50% 57,615 sf x sf x $ 3.00 = = = = = $ $ Contingency 15% $ 303,115 $ - $ 31,190 15,000 16,190 $ Subtotal Misc. Expenses Subtotal Project Cost F. $ 3,238,052 - Subtotal Equip. & Furnishings E. 20,000 286,925 16,190 Subtotal A/E Fees & Expenses D. $ $ 3,592,357 $ 538,854 TOTAL PROJECT COST - 4/09 $ 4,131,211 G. Escalation to Mid Point Const - 1.5 years @ -3.0% per year $ (185,904) TOTAL PROJECT COST - Bid 3/11 $ 3,945,306 M:\jobs\ashelemstudy\cost\const div cost.xls Page 2 Costs-Div Costs.xls Billings Parmly Library Billings, MT May 14, 2009 Project Cost Estimate Project: OPTION 1-INFRASTRUCTURE UPGRADES TO EXISTING GAINAN'S FOR NEW LIBRARY & GAINAN's Description: A. Demolish interiors and systems, rebuild infrastructure to leaseable shell standards. Replace greenhouse roof structure and roofing. 33,420 sf existing sf new Land & Offsite Development 1. Land Purchase 2. Off Site Development 3. = = = ea sf x $ - $ - Subtotal Land & Development B. C. Construction 1. Site Development 2. New Construction 3. Reno, Demo + Infrastructure 4. Tenant Improvements 5. New Greenhse Roof, Skylight & Struct 6. Relocate Brace Frame 33,420 3,500 1 sf x sf x sf x sf x sf x ea $ $ $ $ $ $ 10.00 113.00 51.00 51.00 50.00 40,000 Architect Engineer Fees & Expenses 1. New Construction 9% 2. Renovation 12% 3. Reimbursibles 0.50% = = = = = = $ 175,000 $ 40,000 Subtotal Construction Costs $ 57 /sf = = = Equipment & Furnishings 1. Furniture 2. Computers/AV/Office Equipment 3. Equip 4. Misc & Contingency sta x sta x $ $ 1,200 500 sta x $ 100 $ $ $ = = = = $ $ $ $ Miscellaneous Expenses 1. Soils Investigation/Survey 2. Testing/ Special Insp 3. Commissioning 4. Moving/ Final Cleaning 5. 0.50% 57,615 sf x sf x $ 3.00 = = = = = Contingency 15% $ 239,928 - $ Subtotal Misc. Expenses Subtotal Project Cost F. $ 1,919,420 230,330 9,597 Subtotal Equip. & Furnishings E. - $ $ $ 1,704,420 Subtotal A/E Fees & Expenses D. $ $ - $ - $ 2,159,348 $ 323,902 TOTAL PROJECT COST - 4/09 $ 2,483,250 G. Escalation to Mid Point Const - 1.5 years @ -3.0% per year $ (111,746) TOTAL PROJECT COST - Bid 3/11 $ 2,371,503 M:\jobs\ashelemstudy\cost\const div cost.xls Page 3 Costs-Div Costs.xls Billings Parmly Library Billings, MT May 14, 2009 Project Cost Estimate Project: OPTION 1-LIBRARY TENANT IMPROVEMENTS Description: A. Tenant standard improvements + Library upgrades sf 33,420 sf existing Land & Offsite Development 1. Land Purchase 2. Off Site Development 3. 24,195 sf new = = = ea sf x $ $ $ - Subtotal Land & Development B. C. Construction 1. Site Development 2. New Construction 3. Reno, Demo + Infrastructure 4. Tenant Improvements 5. Paging System 6. Emergency Generator 57,615 57,615 1 sf x sf x sf x sf x sf x ea $ 10.00 $ 113.00 $ 51.00 $ 51.00 $ 1.00 $ 70,000.00 Architect Engineer Fees & Expenses 1. New Construction 9% 2. Renovation 12% 3. Reimbursibles 0.50% = = = = = = $ $ $ $ 2,938,365 $ 57,615 $ 70,000 Subtotal Construction Costs $ 53 /sf = = = $ 275,938 $ 15,330 Subtotal A/E Fees & Expenses D. Equipment & Furnishings 1. Furniture 2. Computers/AV/Office Equipment 3. Equip 4. Misc & Contingency 300 50 sta x sta x $ $ 1,200 500 300 sta x $ 100 = = = = $ $ $ $ Miscellaneous Expenses 1. Soils Investigation/Survey 2. Testing/ Special Insp 3. Commissioning 4. Moving/ Final Cleaning 5. 0.50% 57,615 sf x sf x $ 3.00 = = = = = $ 172,845 $ Subtotal Misc. Expenses Subtotal Project Cost F. Contingency 15% - $ 3,065,980 $ 291,268 $ 415,000 $ 172,845 360,000 25,000 30,000 Subtotal Equip. & Furnishings E. $ $ 3,945,093 $ 591,764 TOTAL PROJECT COST - 4/09 $ 4,536,857 G. Escalation to Mid Point Const - 1.5 years @ -3.0% per year $ (204,159) TOTAL PROJECT COST - Bid 3/11 $ 4,332,698 M:\jobs\ashelemstudy\cost\const div cost.xls Page 4 Costs-Div Costs.xls Billings Parmly Library Billings, MT May 14, 2009 Project Cost Estimate Project: OPTION 1-GAINAN'S TENANT IMPROVEMENTS Description: A. Tenant standard improvements + Gainan's upgrades sf sf existing Land & Offsite Development 1. Land Purchase 2. Off Site Development 3. 2,709 sf new w/ greenhouse = = = ea sf x $ $ $ - Subtotal Land & Development B. C. Construction 1. Site Development 2. New Construction 3. Reno, Demo + Infrastructure 4. Tenant Improvements 2,709 sf x sf x sf x sf x $ $ $ $ 10.00 113.00 51.00 51.00 Architect Engineer Fees & Expenses 1. New Construction 9% 2. Renovation 12% 3. Reimbursibles 0.50% = = = = $ $ $ $ 138,159 Subtotal Construction Costs $ 51 /sf 138,159 $ 13,125 $ - $ 5,418 $ Subtotal Misc. Expenses $ 5,418 Subtotal Project Cost $ 156,702 $ 23,505 TOTAL PROJECT COST - 4/09 $ 180,207 = = = Equipment & Furnishings 1. Furniture 2. Computers/AV/Office Equipment 3. Equip 4. Misc & Contingency 0 0 sta x sta x $ $ 1,200 500 0 sta x $ 100 $ 12,434 $ 691 = = = = $ $ $ $ - Subtotal Equip. & Furnishings E. F. G. Miscellaneous Expenses 1. Soils Investigation/Survey 2. Testing/ Special Insp 3. Commissioning 4. Moving/ Final Cleaning 5. Contingency Escalation to Mid Point Const - 0.50% 2,709 sf x sf x $ 2.00 = = = = = 15% 1.5 years @ -3.0% per year $ TOTAL PROJECT COST - Bid 3/11 $ M:\jobs\ashelemstudy\cost\const div cost.xls Page 5 - $ Subtotal A/E Fees & Expenses D. $ (8,109) 172,098 Costs-Div Costs.xls Billings Parmly Library Billings, MT May 13, 2009 Project Cost Estimate Project: OPTION 2-OWNER ADDITION TO GAINAN'S FOR NEW LIBRARY WITH SEPARATE GAINAN'S RETAIL Description: A. Add 2 stories + basement to north finished to leasable shell standards. sf existing Land & Offsite Development 1. Land Purchase 2. Off Site Development 3. 24,195 sf new lib = = = ea sf x sf new store $ $ $ 20,000 - Subtotal Land & Development B. Construction 1. Site Development 2. Gainan's separate utilities 3. New Construction - Library Shell 4. New Construction - Gainan's Shell 5. Book Drop Tunnel 6. Reno, Demo + Infrastructure 7. Tenant Improvements 10,000 0 24,195 0 70 0 sf x ls sf x sf x lf x sf x sf x $ $ $ $ $ $ $ 10.00 6,000 113.00 194.00 970.00 51.00 51.00 = = = = = = = Architect Engineer Fees & Expenses 1. New Construction 9% 2. Renovation 12% 3. Reimbursibles 0.50% = = = $ $ $ Equipment & Furnishings 1. Furniture 2. Computers/AV/Office Equipment 3. Equip 4. Misc & Contingency sta x sta x $ $ 1,200 500 sta x $ 100 = = = = $ $ $ $ Miscellaneous Expenses 1. Soils Investigation/Survey 2. Testing/ Special Insp 3. Commissioning 4. Moving/ Final Cleaning 5. 0.50% 57,615 sf x sf x $ 3.00 = = = = = $ $ Contingency 15% 275,684 $ - $ 29,510 15,000 14,510 $ Subtotal Misc. Expenses Subtotal Project Cost F. $ - Subtotal Equip. & Furnishings E. $ 2,901,935 261,174 14,510 Subtotal A/E Fees & Expenses D. 20,000 $ 100,000 $ $ 2,734,035 $ $ 67,900 $ Subtotal Construction Costs $ 120 /sf C. $ $ 3,227,129 $ 484,069 TOTAL PROJECT COST - 4/09 $ 3,711,198 G. Escalation to Mid Point Const - 1.5 years @ -3.0% per year $ (167,004) TOTAL PROJECT COST - Bid 3/11 $ 3,544,194 M:\jobs\ashelemstudy\cost\const div cost.xls Page 6 Costs-Div Costs.xls Billings Parmly Library Billings, MT May 14, 2009 Project Cost Estimate Project: OPTION 2-OWNER ADDITION TO GAINAN'S FOR NEW LIBRARY WITH SEPARATE GAINAN'S RETAIL Description: A. 2,709 sf Gainan's separate retail on corner. sf existing Land & Offsite Development 1. Land Purchase 2. Off Site Development 3. - sf new lib = = = ea sf x 2,709 sf new store $ $ $ - Subtotal Land & Development B. Construction 1. Site Development 2. Gainan's separate utilities 3. New Construction - Library Shell 4. New Construction - Gainan's Building 5. Book Drop Tunnel 6. Reno, Demo + Infrastructure 7. Tenant Improvements 3,000 1 0 2,709 0 0 sf x ls sf x sf x lf x sf x sf x $ $ $ $ $ $ $ 10.00 6,000 120.00 194.00 970.00 51.00 51.00 = = = = = = = $ $ $ $ $ $ Architect Engineer Fees & Expenses 1. New Construction 9% 2. Renovation 12% 3. Reimbursibles 0.50% $ 561,546 $ 53,347 $ - $ Subtotal Misc. Expenses $ 2,808 Subtotal Project Cost $ 617,701 $ 92,655 TOTAL PROJECT COST - 4/09 $ 710,356 = = = $ $ $ 50,539 2,808 Subtotal A/E Fees & Expenses D. Equipment & Furnishings 1. Furniture 2. Computers/AV/Office Equipment 3. Equip 4. Misc & Contingency sta x sta x $ $ 1,200 500 sta x $ 100 = = = = $ $ $ $ - Subtotal Equip. & Furnishings E. F. G. Miscellaneous Expenses 1. Soils Investigation/Survey 2. Testing/ Special Insp 3. Commissioning 4. Moving/ Final Cleaning 5. Contingency Escalation to Mid Point Const - 0.50% 2,709 sf x sf x $ 3.00 = = = = = 15% 1.5 years @ -3.0% per year $ $ 2,808 $ TOTAL PROJECT COST - Bid 3/11 $ M:\jobs\ashelemstudy\cost\const div cost.xls Page 7 - 30,000 6,000 525,546 - Subtotal Construction Costs $ 207 /sf C. $ (31,966) 678,390 Costs-Div Costs.xls Billings Parmly Library Billings, MT Date Last Updated: Apr-09 101,245 16.5 BUILDING AREA SITE AREA DIVISION 2 3 4 5 6 7 8 9 10 11 12 13 14 15.1 15.2 16 General Conditions Demo/Site Work Concrete Masonry Metal Wood Thermal & Moisture Doors & Windows Finish Specialties Equipment Furnishings Special Constr/ FP Conveying Systems Plumbing HVAC Electrical GC/CM Fee (6%) TOTAL: $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4761 ENR WORLAND MIDDLE SCHOOL 1 Rev 5/14/09 Library Facility Cost Benchmarks 17.08 26.21 8.94 6.47 12.20 2.90 11.23 5.61 23.79 1.47 7.73 1.10 8.08 16.77 15.32 9.73 GREEN RIVER HIGH SCHOOL 262,000 45 SF AC SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 174.62 $ SKYVIEW HIGH SCHOOL 255,000 38 SF AC 9.08 19.56 12.95 12.84 15.87 3.58 6.81 3.40 10.93 1.10 3.32 1.57 0.26 0.49 22.45 16.47 8.98 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 149.65 $ R. S. MEANS 2009 2 STORY LIBRARY 22,000 0 SF AC 4.83 15.35 5.17 13.18 11.59 3.11 3.63 4.43 12.67 1.93 8.25 0.05 0.45 0.16 24.85 13.10 7.79 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 130.54 $ CODY LIBRARY RENO 44,435 1.5 SF AC 11.00 0.13 25.26 15.95 0.83 2.46 5.03 15.34 2.46 3.83 2.66 19.30 13.00 12.00 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 129.00 $ NEW GAINAN'S SHELL 26,904 0..2 SF AC 13.10 20.62 2.36 1.65 1.79 3.19 6.33 20.38 1.44 1.68 2.27 2.85 6.49 10.51 16.63 7.23 SF SF SF SF SF SF SF SF SF SF $ $ $ $ $ $ $ $ $ $ RENO EXIST GAINAN'SINFRAST 33,420 0 SF AC 9.50 2.00 9.00 13.00 20.00 2.00 8.00 7.00 4.00 1.00 SF SF SF TENANT IMPROVMNTS $ $ $ AC SF SF SF SF SF SF $ $ $ $ $ 57,711 0 SF 4.00 6.00 1.00 2.00 2.75 2.00 3.00 2.00 SF FREESTANDING GAINAN'S BUILDING $ AC 2.50 SF SF SF SF SF SF SF SF SF SF SF SF SF $ $ $ $ 2.00 1.00 2.00 15.00 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF $ $ $ $ $ $ 119.00 $ 3.60 3.00 3.50 10.00 10.25 7.00 SF $ $ 3.00 SF SF SF SF SF $ $ $ $ 113.00 $ 3.50 10.00 8.50 3.10 SF $ 3.00 SF SF SF SF SF SF SF SF SF $ $ $ $ 51.00 $ 0.25 14.00 8.80 2.25 SF SF SF SF 51.00 1 Division 1, General Conditions includes Direct Cost Items (bonds, permits, builder's risk, and taxes) Worland Middle School: 1 story, Steel Framing & Metal Studs with EIFS & Block/Brick Veneer Exterior. Sloped Metal Roofs. Includes Security System, Commercial Kitchen & Auditorium. High Quality Finishes. Div 13 incl. Fire Sprinkler. Green River High School: 2 story, Steel Framing. Metal Studs with Block Brick Veneer Class Wing. Block/Brick PE. Very high quality. Skyview High School: 2 story, Steel Framing. Metal Studs with Brick Veneer Class Wing. Block/Brick PE/Auditorium. High quality. Cody Library: Div 2- Demo= $5.70, Site=$15.00. Div 15.1- Selective Plumbing Reno, Div 15.2-HVAC Reno used exist central plant, Div 16- Elect Reno used exist MDP & Distribution. M:\jjobs\sd2bwstudy\costs\costbenchmarks\constdivcosts.xls 2,709 0.2 SF SF AC $ $ $ $ $ $ $ $ $ $ 15.00 4.00 10.00 25.00 3.00 25.00 14.00 30.00 12.00 3.00 $ $ $ $ $ $ $ 3.00 5.00 10.00 10.50 12.00 12.00 SF SF SF SF SF SF SF SF SF SF SF $ SF SF SF SF SF SF SF 194.00 Preliminary Project Schedule: A preliminary project schedule was created for this project to illustrate the difference between a Fast Track project schedule and a Conventional project schedule. The Fast Track schedule assumes construction of the New Shell to start approximately a year prior to Gainan’s vacating the existing building. The Conventional schedule assumes construction of the New Shell to start possibly a month before Gainan’s vacating the existing building. While the Fast Track schedule has the project being completed approximately five months earlier than the Conventional, it’s overall construction time is approximately four months longer which means additional costs for General Conditions for the contractor. It would also add costs due to the contractor having to work around the existing mechanical space located on the NW side of the existing building. Discussions with a local contractor confirmed that doing the project in the Conventional manner would be much cleaner, easier and more cost effective for everyone. *All cost estimates illustrated in this study have assumed the Conventional approach to this project. Parmly Billings Library Billings, Montana Feasibility Study 29 Parmly Billings Library / Gainan's Schedule May 18, 2009 FAST TRACK M J 2009 2010 2011 2012 J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A Design Price Construct Shell Reno. Exist. Infra. Tenant Finishes Move In Jan. 2012 Gainan's Move Out CONVENTIONAL M J 2009 2010 2011 2012 J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A Design Price Construct Shell Reno. Exist. Infra. Tenant Finishes Move In June. 2012 Gainan's Move Out m:\jobs\plibfs09\cost\tentative schedule.xls Parmly Billings Library Board Meeting Vision • • • • • • • • Viable, vital community space Attractive, competitive environment Building literacy – with bold print and elec. Media Improve children/youth services and teen environment Provide adequate space for expanding programs Better outreach to business Improve physical image – both inside and outside Free and convenient parking Goals 1. Public Presence: • Environment sustainable – LEED • Efficient workflow • After hour meetings • Technologically current • God signage and reader board 2. Evolution of Services • Flexibility – systems, furniture • Flow • Increase self service 3. Budget • Open • Mill Levy • Lease Payments • 4. Time • Mesh with Gainan’s 2 year +/- schedule 5. Unique Goals • Lease – easier to sell • Building stays on tax roll • Library stays downtown • 25 year “reset” opportunity March 12, 2009