Presentation by Gading Kencana Sdn Bhd
Transcription
Presentation by Gading Kencana Sdn Bhd
SEMINAR ON INVESTMENT OPPORTUNITIES IN HEALTHCARE, HOSPITALITY AND GREEN TECHNOLOGY TOPIC : SUCCESS STORY OF GADING KENCANA 20 OCTOBER 2015 COMPANY BACKGROUND GADING KENCANA SDN BHD Company ID 270511-H Address 2-06-2, Blok 2, Presint Alami, Persiaran Akuatik, Seksyen 13, 40100 Shah Alam, Selangor Telephone No 03 - 5513 9888 Incorporation Date 20 July 1993 Website www.gadingkencana.com.my Managing Director Dato’ Ir Muhamad Guntor Mansor Tobeng Authorized Capital RM25,000,000 Paid Up Capital RM 17,000,000 Ownership 100% Bumiputera ISO & OHSAS Certified Energy Service Company OVERVIEW OF GADING KENCANA SDN BHD A Renewable Energy & Energy Efficiency Company Certified Approved Photovoltaic Service Provider (APVSP) by KETTHA Registered with: CIDB – G7 Ministry of Finance Energy Commission (Electrical Contractor) Energy Commission (Energy Services Company) ISO 9001:2008 & OHSAS 18001:2007 RENEWABLE ENERGY Source : Ir. Ahmad Hadri MBIPV 8MW SOLAR SYSTEM CONNECTION TO THE GRID CONNECTIVITY TO 33KV PROJECT HIGHLIGHTS Details Solar System Capacity 8 MegaWatt Solar Modules Used 29,092 Pcs Solar Inverters Used 390 Nos Cables DC 6mm: 24 km AC Inverter to Feeder Pillar 5 Core 10mm: 26 km AC Feeder Pillar to MSB: 25km AC Switchgear to PPU 4 core 185mm: 4km Manpower 230 pax Electricity Generated Per Year 10,120 MWh Land Size 17.7 Acres Total Project Value RM84 Million Registered Address Kompleks Hijau Solar, Jalan Solar 1, Bandar Hijau, Hang Tuah Jaya, 75450 Ayer Keroh, Melaka COST OF DEVELOPMENT Infrastructure Work 2% Main Access Road 3% Land 5% Electrical and Mechanical for Main Building 1% Main Building Works Balance of System 1% 0% Preliminaries 5% Site Clearance & Earthwork 8% Solar Panel 42% Solar Inverter 10% Electrical System For Solar Panel 11% Solar PV Mounting Structure 12% PROGRESS REPORT No Description Year 2012 Q1 1 Registration of REPPA with SEDA 2 Corporate Negotiations & Agreements 3 ST Public License (Provisional) 4 Appointment of Consultant Preparation for Engineering Design 5 Engineering Design & Application for Development Order 6 Financing Agreement(s) 7 Construction Work Start 8 First Payment Contractor 9 Construction Completion 11 FiT Commencement Date (SCOD) Q2 Q3 Year 2013 Q4 Q1 Q2 Q3 Year 2014 Q4 Q1 Q2 Q3 Q4 MILESTONES OF THE PROJECT DATE MILESTONES 09 December 2011 Received Feed-In Approval from SEDA 06 November 2012 Loan Offer Issued By SME Bank 15 August 2013 Approval from MPHTJ 1 October 2013 Project Commencement 31 October 2014 Project Completion 11 December 2014 Initial Operation 23 December 2014 FIT Commencement 31 December 2014 Issuance of Completion and Compliance Certificate (CCC) 24 February 2015 First FIT Income Received INSTALLATION PROCESS BEFORE DURING INSTALLATION AFTER SYSTEM SIMULATION SYSTEM SIMULATION ACTUAL ENERGY YIELD STUDY ANALYSIS Total energy yield for 8MW 1,200,000 1,000,000 Energy (kWh) 800,000 621.81 MWh 600,000 400,000 200,000 0 • Jan Feb Mar Apr May June Jul Aug Sept Actual energy (kWh) 964,788 1,028,528 1,089,838 1,015,557 968,116 937,919 960,499 1,004,351 824,578 Expected energy (kWh) 933,700 973,800 1,011,000 953,700 888,500 870,800 877,600 889,100 895,800 Oct Nov Dec The solar farm is required to produce at least 621.81MWh per month in order to pay for monthly loan repayment AVERAGE SOLAR IRRADIANCE DATA FOR MALACCA | (2007 – 2010) kWhm-2/month 180.00 160.00 158.34 140.00 120.00 102.68 100.00 80.00 60.00 40.00 20.00 0.00 Jan Feb Mac 2007 Apr May 2008 June July Aug 2009 Sept Oct Nov Dec 2010 Source of Data: 1) Malaysia Meteorological Department ( Source :http://www.met.gov.my) 2) Photovoltaic Monitoring Centre, University Teknologi Mara (PVMC-UiTM) 3) Meteonorm ( Source: http:// www.metenorm.com) 4) NASA ( Source: http: //eosweb.larc.nasa.gov/sse/) GBI CERTIFICATION BENEFITS • Creation of 230 highly skilled and high income Jobs for Malaysian Citizens • Spin off business opportunity of RM 100.0 Million to local contractors and consultant • Reduction of Carbon emission by 136,729 tonnes • Support government policies in EPP9 in achieving 1.25GW RE connected to the grid by 2020 16 BENEFITS • Export potential for Malaysian Solar Photovoltaic Industry products & services No Country Product Quantity Amount RM(Million) 1 2 Saudi Arabia Brunei Utility Scale Solar Farm Solar Farm on Land Field 50 MW 10 MW 500.0 100.0 3 Indonesia Solar Farm In Lombok 8 MW 80.0 4 Djibouti Solar Home System for 1000 use 2 MW 20.0 5 Kenya Solar Home System for 5000 House 2 MW 20.0 6 Indonesia Solar Farm In Jakarta 2.0 MW 20.0 7 Turkey Solar BIPV 1 MW 10.0 8 Uganda Solar Home System 1000 Set 0.5 MW 5.0 9 10 Mauritius Ghana Solar Off Grid Solar Lantern Light 1000 Pcs 0.10 MW 0.10 MW 1.0 0.9 75.7 MW 756.90 TOTAL 17 PILIHAN TEKNOLOGI SOLAR PV Thin Film Mono Crystalline Poly Crystalline HIT 103.15 kWh/m2/y 170.00 kWh/m2/y 160.36 kWh/m2/y 197.63 kWh/m2/y PROSES PERLAKSANAAN PROJEK PROJEK BATAL MOHON SEMULA TOLAK MOHON ATAS TALIAN PENILAIAN AWAL OLEH SEDA PENGESAHAN SAMBUNGAN TNB LULUS PERMOHONAN LESEN FiT DAN PENYERAHAN DOKUMEN CADANGAN REKABENTUK SAMBUNGAN OLEH TNB LULUS PEMBINAAN SISTEM SOLAR TANDA TANGAN PERJANJIAN JUAL BELI TENAGA (REPPA) SEDA KELUAR SIJIL FiT CABUT UNDI TOLAK TAMAT GAGAL TAMAT PEMBELIAN METER SOLAR DARI TNB PEMASANGAN METER & UJIAN AWALAN DGN TNB PENGUJIAN & PENTAULIAHAN BERSAMA OLEH TNB, SEDA ,GKSB 6 BULAN BACAAN METER PERTAMA BAYARAN PERTAMA POTENSI RISIKO PROJEK BANGUNAN KOTA CEMERLANG, KUMPULAN MELAKA BERHAD. 10kWp TAHUN 2011 Kemalangan fizikal (pecah, retak) atau kecelakaan (bencana alam) Kecekapan sel solar dan komponen yang menurun Faktor cuaca yang mendung, hujan, jerebu, Perpindahan Perbuatan khianat seperti vandalisme dan sabotaj Terputus sambungan ke grid OTHER BENEFITS COOLING EFFECTS ON BUILDING – SOLAR PANELS ACT AS ROOF SHADE This will reduce energy consumption used by cooling mechanism such as air conditioners. THERMAL IMAGES OF A ROOF CEILING: UNDER FLAT PV ARRAY, UNDER TILTED PV ARRAY, UNDER EXPOSED ROOF Research by: University of California, San Diego KELEBIHAN KEPADA SYARIKAT Perjanjian Pembelian Tenaga Baharu (REPPA) WISMA G&P, CHERAS, KUALA LUMPUR selama 21 tahun Pulangan atas pelaburan 14% - 18% setahun Pengurangan pelepasan karbon sebanyak 391,230 tan Projek ini menyokong inisiatif kerajaan - EPP10 Meningkatkan ekuiti sektor SME dalam industri Tarif Galakan Solar Penjanaan sumber pendapatan jangka panjang yang lestari SYARAT PERMOHONAN M&A merangkumi; “menjana tenaga dari sumber Tenaga Baharu dan menjual tenaga ke talian grid” Bagi kuota <72kWp, saham berbayar minima RM20,000 Bagi kuota >72kWp, saham berbayar minima RM50,000 Pemilikan oleh warga negara Malaysia Gading Kencana Sdn Bhd sebagai “service provider” Pemasangan di bangunan komersil atau industri Premis sendiri, atau pajakan bumbung 22 tahun Mempunyai surat tawaran pembiayaan daripada institusi kewangan semasa mohon kuota INSENTIF DANA PEMBANGUNAN PROJEK SOLAR GTFS, jaminan pinjaman 60% dan diskaun 2% 2000kWp INTEGRATED PEPS-JV (M) SDN BHD, BATANG KALI, SELANGOR kadar faedah. Tax Incentives 100% for 10 years MODAL DAN PENDAPATAN PELAN TINDAKAN ITEM OCT 2015 NOV Perbentangan Cadangan Projek Taklimat Kepada Koperasi Cadangan Pindaan Perlembagaan Kelulusan Pindaan Perlembagaan Pengumpulan Dokumen Mewujudkan Profil Proses CCC & PSS oleh TNB Aplikasi Online + Bayaran Prosesan SEDA 15.10 23.10 30.10 1.11 1.11 Non Individual Quota < 425 kwp 30.10 2016 DEC 30.11 4.12 4.12 30.11 7.12 JAN 15.1 17.1 FEB 19.2 19.2 Non Individual Quota > 425 kwp i) Submit Document ii) Profile Creation iii) Technical Evaluation iv) KeTTHA Final Evaluation 23.11 30.11 4.12 4.12 7-10 Dec Jan 2016 TERIMA KASIH