ICE South East England Engineering Excellence Awards 2016
Transcription
ICE South East England Engineering Excellence Awards 2016
ICE South East England Engineering Excellence Awards 2016 Contents Welcome03 Programme of the evening 04 About the Engineering Excellence Awards 05 Sponsors of the Engineering Excellence Awards 07 Hosts of the evening 10 The Awards Young Professional of the Year 11 ICE Volunteer of the Year13 Best Infrastructure Project in association with Berwin Leighton Paisner LLP Broomhill Sands Coastal Defence Scheme Burham Strategic Water Main Leigh Road Bridge Peters Village and Medway Valley Crossing Purley Switches and Crossings Renewal and Upgrades Reading Pedestrian and Cycle Bridge 15 16 17 18 19 20 21 Urbanisation Award in association with Bechtel Bexhill to Hastings Link Road Bognor Regis Northern Relief Road Wokingham Rail Station and Link Road Re-Development 22 23 24 25 Best Use of Civil Engineering in a Building Project in association with Crest Nicholson26 Blavatnik School of Government 27 Bournemouth University Student Centre 28 Hasting Pier Conservation 29 Excellence in Construction in association with Colas Rail Limited A400M Maintenance Repair Overhaul Facility Bexhill to Hastings Link Road Blavatnik School of Government Burham Strategic Water Main Gade Valley Expansion Joint Replacement Scheme Grove Farm Sewage Pumping Station Thorndell Viaduct 30 31 32 33 34 35 36 37 Engineered in South East England in partnership with ICE Recruit Cowes Outer Harbour Project District Hospitals Ghana - Dodowa Hospital Jurong Tuas View Phase II Laxey Coastal Promenade Swale Sluices Refurbishment Branch Awards Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange Bexhill to Hastings Link Road Broomhill Sands Coastal Defence Scheme Burham Strategic Water Main Hoo Island Re-Engineering Works Peters Village and Medway Valley Crossing Poorhole Lane Improvement Swale Sluices Refurbishment Transforming Manston Airport 44 45 46 47 48 49 50 51 52 Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund A400M Maintenance Repair Overhaul Facility Blavatnik School of Government East West Rail Phase1 District Hospitals Ghana – Dodowa Hospital Gade Valley Expansion Joint Replacement Scheme Leigh Road Bridge Purley Switches and Crossings Renewal and Upgrades Reading Pedestrian and Cycle Bridge Wokingham Rail Station and Link Road Re-Development 53 54 55 56 57 58 59 60 61 62 South Award for Engineering Excellence in association with Trant Balcombe Rail Re-signalling Project Bognor Regis Northern Relief Road Bournemouth University Student Centre Cowes Outer Harbour Project Duver Road Bridge Strengthening Grove Farm Sewage Pumping Station Hasting Pier Conservation Jurong Tuas View Phase II Laxey Coastal Promenade Thorndell Viaduct Whyke Horizon Footbridge 63 64 65 66 67 68 69 70 71 72 73 74 South East England Engineering Excellence Award South East England Engineering Excellence Award 01 Contents 38 39 40 41 42 43 75 Contents 02 Welcome As Regional Chair for ICE South East England I would like to thank you for joining us to celebrate the best civil engineering projects completed in the region over the last year. These awards recognise how civil engineers and the projects we work on benefit our local area: Projects which improve the life of local communities Programme of the evening 19.00 Welcome drinks 19.25 Call through for dinner 19.30 Welcome 19.35 Young Professional of the Year and ICE Volunteers of the Year Awards 19.40 Dinner served 21.00 Key note speech by Sir John Armitt 21.15 Award ceremony continues 22.10 Branch Awards and South East England Engineering Excellence Award 23.00 Ceremony ends Make a positive impact on the environment and maintain Restore existing infrastructure for future generations This year for the first time, we have included two individual awards – the Young Professional and Volunteer Awards. We hope that by including these two new prizes we will be able to better celebrate the commitment and ingenuity of our 11,000 members. As always, these awards would not have been possible without the hard work of a number of people. These include the staff at the awards dinners across the region, the judges, our generous sponsors, ICE’s Regional Support Team and above all, those engineers who took time away from current projects to submit their entries and help us celebrate their work over the past year. Many thanks to you all. Tim Kermode CEng MICE Chair, ICE South East England 03 Welcome Programme of the evening 04 About the Engineering Excellence Awards The ICE South East England Engineering Excellence Awards celebrate outstanding civil engineering achievement, innovation and ingenuity in South East England. The awards have grown into the highest honour for engineering excellence in the region. The Awards Young Professional of the Year ICE Volunteer of the Year Best Infrastructure Project in association with Berwin Leighton Paisner LLP ICE South East England is divided into three branches: Urbanisation Award in association with Bechtel Kent and East Sussex Best Use of Civil Engineering in a Building Project in association with Crest Nicholson Thames Valley (Surrey, Berkshire, Oxfordshire and Buckinghamshire) Excellence in Construction Award in association with Colas Rail Limited South Branch (West Sussex, Hampshire and the Isle of Wight) Engineered in South East England in partnership with ICE Recruit An award for each branch will be presented to the project judged to be the best example of engineering excellence in that branch. Branch Awards This year we have shortlisted projects in different categories and introduced two new awards – Young Professional of the Year and ICE Volunteer of the Year. The individual awards recognise and celebrate young professionals and volunteers who have demonstrated their professionalism and dedication. Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund South Award for Engineering Excellence in association with Trant For the second year running we will be awarding the Engineered in South East England Award. This award recognises the contribution of South East England engineers in ground breaking national and international projects. South East England Engineering Excellence Award The evening will culminate in one of the project teams receiving the highest award in the region, the South East England Engineering Excellence Award. 05 About the Engineering Excellence Awards About the Engineering Excellence Awards 06 Sponsors of the Engineering Excellence Awards Bechtel Bechtel is one of the most respected global engineering, construction, and project management companies, and a cornerstone of innovation in the industry. Together with their customers, Bechtel deliver landmark projects — the modern marvels of the world — that foster sustainable progress and grow economies. The reliability of its performance, the enduring quality of projects, the strength of ethics, and the seriousness of their commitment to safety and sustainability are evident in everything they do. Berryrange Berryrange is a sub-contractor specialising in integrated steel sheet piling design and construction. It operates a fleet of the latest piling equipment including silent pilers, leader rigs, augering equipment and excavator mounted vibratory hammers. It owns and operates the only silent piler in Europe capable of installing piles to within 75mm of any obstruction. The team of engineers employed by Berryrange is skilled in the interpretation of geotechnical data for both design and construction entirely based on the requirements of the Eurocodes. It operates throughout the UK and is available to advise clients on their ground support requirements in all sectors of construction. 07 Sponsors of the Engineering Excellence Awards Berwin Leighton Paisner LLP Berwin Leighton Paisner (BLP) is an international, full service law firm with over 850 lawyers, including over 200 partners, based across 12 global offices – London, Abu Dhabi, Dubai, Beijing, Berlin, Brussels, Frankfurt, Hong Kong, Moscow, Myanmar, Paris and Singapore. BLP is currently ranked by the Financial Times as one of Europe’s top ten legal innovators and renowned for responding creatively to the challenges clients face. Infrastructure is at the core of our firm and our full service offering enables us to advice from an early feasibility stage including consenting/planning, through to development, financing and exit. We advise across all asset classes (including energy, transport and logistics, water, social and communications), both in regulated and unregulated markets. Colas Rail Colas Rail Limited is the world leading engineering, construction and rail support services. From design to delivery, construction to support, training to maintenance, Colas Rail delivers total solutions in all aspects of railway infrastructure, from high speed rail systems to light and urban rail. As award-winning specialists in the design and construction of all forms of railway, they focus on world-class performance in four key areas of rail infrastructure – track, rail services, rail systems and training. Their approach to project delivery is to challenge the status quo through value management and value engineering, offering innovative solutions, whilst ensuring that output quality is guaranteed first time every time. Crest Nicholson Crest Nicholson is firmly established as a leading developer with a passion for not only building homes, but also for creating vibrant sustainable communities. With a southern-based bias, the FTSE250 group has a track record spanning more than 50 years and a broad portfolio of developments which range in size and scale, from contemporary, large scale mixed-use developments to smaller, more traditional housing schemes. As a pioneer of its own garden village principles, the company advocates a holistic approach to development embracing social, environmental and economic factors to create homes for all segments of the community. Sponsors of the Engineering Excellence Awards 08 Trant Established for over 50 years, Trant’s main business activities include civil, mechanical, electrical and process engineering, including full EPC services for private and public sector clients. Its key sectors are water/waste, energy (hydrocarbon and renewables), power and transmission, marine/coastal, defence (UK and dependencies), pharmaceutical and petrochemical. Projects valued between £0.5m-£58m have been successfully delivered using their directly employed resources, supply chain partners and specialists. Trant operates across England, South Wales, Channel Islands and the South Atlantic. Hosts of the evening Sir John Armitt Also in partnership with: ICE Benevolent Fund The ICE Benevolent Fund is dedicated to helping ICE members in need of support. It provides help and advice to members, former members, and their loved ones, who find themselves facing hard times. Services provided include: Financial assistance and advice - Back to work support - Self-development workshops - Student support - Counselling - Telephone helpline - Online wellbeing portal - Housing in Sussex, UK. Since the Ben Fund was started it has helped over 31,500 people worldwide. You can read more about the impact of the Ben Fund’s work by visiting the ‘About us’ section of the website www.icebenfund.com ICE Recruit ICE Recruit is the UK’s number one specialist civil engineering job board. We are the official job board of the Institution of Civil Engineers (ICE), the home of UK civil engineering. Our aim is to help members and non-members find jobs and civil engineering companies and recruiters recruit appropriate staff. We cover both permanent and interim positions in all areas of civil and structural engineering from junior posts to specialist positions. Our goal is to put the right employer in touch with the right potential employee as efficiently as possible. 09 Sponsors of the Engineering Excellence Awards ICE President Sir John Armitt is the Institution’s President for 2015/16. He is a Commissioner for the National Infrastructure Commission (NIC), following his 2013 ‘Armitt Review’ into long-term infrastructure planning. Knighted in 2012 for his services to engineering and construction, Sir John has had many achievements. One of his finest was successfully delivering the 2012 Olympic Games as Chairman of the Olympic Delivery Authority (2007 - 14) and most recently, he was a member of the Davies Commission which looked at recommendations for airport capacity in the South East. Tiff Needell TV Presenter Tiff Needell is a former Grand Prix driver who spent most of his professional career racing in the World Sportscar Championship including 14 Le Mans 24-hour races where he had a best result of third in 1990. He is however, perhaps better known as a former presenter of ‘Top Gear’, starring alongside Jeremy Clarkson and Quentin Willson throughout the nineties before the show was taken off air. Tiff then helped to create ‘Fifth Gear’ which entered its fifteenth year in 2016 on ITV4. Tiff recently wrote his autobiography ‘Tiff Gear’ and still races whenever the opportunity arises. Hosts of the evening 10 Young Professional of the Year This award is designed to recognise and reward the most accomplished and promising young professional. Charlotte Allen from Opus International Consultants Young Professional of the Year Charlotte is a passionate and highly motivated young professional. She is an engineer who upholds the industry, and seeks out change and innovation. As a forward thinker, she is able to adapt to new techniques and has contributed to new research in stormwater drainage treatment which is now gaining momentum within the industry and showcasing her technical excellence. Tom Brown from BAM Nuttall ICE Volunteer of the Year Tom has been a proactive and motivated engineer in a series of tunnelling teams across four recent London Underground and Crossrail worksites. His early embrace of extensive shift working in major tunnelling projects and commitment to self-development has given him the valuable experience to establish and lead in more senior engineering roles. Katherine Jackson from Mott MacDonald Katherine is a highly accomplished young chartered civil engineer working in the Highways division of Mott MacDonald. At 25, she was selected to join the company’s prestigious Transport Management Consultancy. A driven self-starter, Katherine’s contribution to technical excellence has been key to Mott MacDonald securing global recognition as the world’s number one technical advisor, as recognised by Infrastructure Journal Global (IJGlobal) for the sixth time in 2016. 11 Hosts of the evening Young Professional of the Year 12 ICE Volunteer of the Year This award is designed to recognise and reward the ICE member who has made an outstanding contribution to ICE through volunteering. Moses Ajala from Connect Plus Services Moses Ajala is an assistant engineer/structures inspection manager responsible for the management and stewardship of Highway Structures Inspection programme for the M25 Network. He has been a STEM ambassador and enthusiastic ICE volunteer since 2014. Helen Littler from WSP | Parsons Brinckerhoff As a STEM ambassador and ICE volunteer, Helen works tirelessly to promote civil engineering to students of all ages. Outside of work she volunteers as a Sunday school teacher, Youth Club leader and does voluntary work with Sustrans and a local community rail group. Jane Birks from Black & Veatch Elizabeth Orchard from Crest Nicholson Jane has been an active STEM ambassador for ICE since 2014. She has been involved in several career and skills fairs for ICE, STEM events and externally organised events such as Guest Lecturing at Greenwich University. As an award-winning STEM ambassador and whilst working for Peter Brett Associates LLP, Elizabeth was a key team member in the setting up of University Technical College in Reading. Opened in 2013, she successfully designed and ran the first fully curriculum-integrated professional project at the college in 2014 with support from her colleagues. Matt Ennals from the University of Portsmouth Matt is a civil engineering undergraduate at the University of Portsmouth who has been volunteering on behalf of ICE since 2013. Since becoming a STEM ambassador for ICE, he has attended major STEM events such as Teen Tech Solent and Big Bang among others. 13 ICE Volunteer of the Year Kevin Tollet from Geomatic Engineering Ltd Kevin had always wanted to be a civil engineer and work in the design environment. He has attended several career fairs by himself, carrying out workshops such as designing a suspension bridge and testing its limitations. ICE Volunteer of the Year 14 Broomhill Sands Coastal Defence Scheme Environment Agency Best Infrastructure Project in association with Berwin Leighton Paisner LLP Short listed projects: > Broomhill Sands Coastal Defence Scheme > Burham Strategic Water Main > Leigh Road Bridge The £30M Broomhill Sands Coastal Defence Scheme directly protects 1,388 homes and over 100 businesses by increasing the standard of protection from 1 in 20 years to 1 in 200 years, allowing for predicted sea level rise. The improvements include 1.8km of rock revetment and new concrete wave wall, 700m beach recharge and replacement of timber groynes plus improvements to the existing promenade including access ramps and steps. The Broomhill Sands team has led on a number of innovations, many of which are ‘firsts’ for the Environment Agency, the UK and some even for the construction industry. For example the innovative approach with high-risk water sports users within the offshore rock delivery and storage area. The team have reported over £8.9m of efficiencies. Cost £30m Location Lydd Road, Camber, Kent Completed by December 2015 Project team Environment Agency, Team Van Oord Ltd, Mott MacDonald, CH2M, Arcadis Broomhill Sands is highlighted in a Cabinet briefing as an example of best practice regarding value and the delivery of large efficiencies during construction. > Peters Village and Medway Valley Crossing > Purley Switches and Crossings Renewal and Upgrades > Reading Pedestrian and Cycle Bridge 15 Best Infrastructure Project in association with Berwin Leighton Paisner LLP 16 Burham Strategic Water Main Leigh Road Bridge South East Water Geoffrey Osborne Ltd By delivering its largest and most challenging pipeline scheme to date, South East Water has secured the water supply to thousands of homes and businesses and provided infrastructure that will promote development and growth for decades to come. All this whilst enhancing the environment and reducing costs. The previous trunk main burst frequently, putting tap water at risk and damaging the sensitive site of special scientific interest (SSSI) that it crosses. With a £500,000 annual repair bill, the business case was obvious. The solution was a 6.5km replacement main with tunnelled crossings of river, rail and road, but avoiding the SSSI. Ingenuity and collaborative working lead to added benefits including improved network connectivity and resilience and was instrumental in controlling cost, time and overcoming numerous construction. 17 Cost £9.2m Location South East Water, Rocfort Road, Snodland, Kent Completed by May 2016 Project team South East Water, Jacobs UK Ltd., Farrans Construction, Ward & Burke, PF Murphy & Sons, Mouchel Best Infrastructure Project in association with Berwin Leighton Paisner LLP Leigh Road Bridge opened in October 2015, providing a vital link for the people and businesses of Slough Trading Estate over the Great Western Railway. It supplements the existing 1836 Brunel Bridge, which was sub-standard for current requirements. The client, SEGRO, appointed Osborne and Peter Brett Associates as respective contractor and design consultant. Due to concurrent Crossrail works on the route, abnormal possessions were unavailable for bridge installation. The design and build team therefore developed the half through steel girder superstructure and innovative cantilevered trailer launch method. Construction began in the summer of 2014, with the launch undertaken in February 2015. The innovative method earned keen media attention with the operation featuring on the BBC One Show and on local radio promoting interest in civil engineering. The project team consistently worked collaboratively to complete the project within programme and budget. Cost £10m Location Leigh Road (c/o Bedford Avenue), Slough Trading Estate, Slough, Berks Completed by October 2015 Project team Geoffrey Osborne Ltd, SEGRO plc, Peter Brett Associates, Tony Gee & Partners, Slough Borough Council, Network Rail Best Infrastructure Project in association with Berwin Leighton Paisner LLP 18 Peters Village and Medway Valley Crossing BAM Nuttall Limited Cost £33m Location BAM Nuttall Limited, Site Compound, Old Church Rd, Burham, Maidstone, Kent Completed by August 2016 Peters Village project is an exemplary example of engineering excellence. It brings innovation to solve complex engineering challenges, sustainable construction and economically viable solutions allowing the creation of a new village within the heart of Kent. Through the provision of infrastructure for this new community, there are also significant benefits to the local communities of Burham and Wouldham, including improved transportation links, PRoW, recreational and educational facilities. In providing these improvements BAM (D&B contractor) has worked closely with the client (Trenport Investments, Kent and Medway Councils and the Environmental Agency) to ensure creation of a place where people want to live, and the local community want to live beside. In delivering this goal the team have embraced latest technology and innovations to build new bridges and roads that provide a direct link to the A228. This eases congestion on the existing roads and providing improved access to wider motorway and rail networks. 19 Project team BAM Nuttall Limited, Trenport Investments Limited, Gleeds Cost Management, Waterman Group, WSP, David Jarvis Associates, BWA Management Limited, FGS Deacon Landscape, Environmental Scientifics Group Ltd, Forest Traffic Services Limited, Freyssinet Limited, G8 Construction, Colas, Hi Way Services Limited, Homegrown Timber Limited, J P Flynn Construction, Littlewood Fencing Limited, Ovenden Earthmoving Co Limited, P J Edwards & Co (UK) Limited, C P Dynes, Lafarge Tarmac, Vibro Menards Limited, Winjam Developments Limited, RBLI, RMD Kwikform Winjam Developments Ltd., RBLI, RMD Kwikform Best Infrastructure Project in association with Berwin Leighton Paisner LLP Purley Switches and Crossings Renewal and Upgrades S&C Alliance South (Network Rail) Cost £8m Location Purley Station, Whytecliffe Rd S, Greater London Completed by January 2016 Project team S&C Alliance South (Network Rail), S&C Alliance South (AECOM), S&C Alliance South (Colas Rail), Network Rail – Route Enhancement Management Purley Junction is one of the busiest and most important railway junctions in the UK providing the link between London, Gatwick Airport and the South East. This complex infrastructure project involved the complete redesign and installation of switches and crossings, transforming Victorian engineering into a 21st century, modern and sustainable rail system, fit for passenger and freight timetable demands. Aecom, Colas Rail and Network Rail working collaboratively within the S&C South Alliance, delivered Network Rail’s biggest Christmas project on time, to budget and with zero accidents during a 24-hour, 10-day closure between 24 December 2015 and 4 January 2016. As a direct result of their excellent and sustainable designs; strong programme management; timely stakeholder engagement; innovative construction methods; robust financial controls and industry leading health and safety management; the team ensured the area continued to function without any adverse impact on the economy and the day-to-day lives of local people and businesses. Best Infrastructure Project in association with Berwin Leighton Paisner LLP 20 THE AWAR D S Reading Pedestrian and Cycle Bridge Peter Brett Associates LLP Urbanisation Award in association with Bechtel Short listed projects: > Bexhill to Hastings Link Road The 120-metre cable stay Reading Pedestrian and Cycle Bridge over the River Thames was constructed to play a vital role in connecting Reading. It forms a sustainable transport link to provide accessible connections to employment, transport and leisure destinations. Innovative in both form and construction, the bridge embodies ingenuity in the creation of a useful addition to local communities and a visitor destination in its own right. The bridge delivers a sustainable solution that complements the local area and contributes to the well-being of the local community. The team relied on strong collaboration and communication between each other, local stakeholders and communities to meet outcomes and deliver an outstanding project. 21 > Bognor Regis Northern Relief Road Cost £7.2m > Wokingham Rail Station and Link Road Re-Development Location Friars Island, Thames Side Completed by September 2015 Project team Peter Brett Associates LLP, Reading Borough Council, Design Engine Architects Ltd, Balfour Beatty, Hollandia Infra Best Infrastructure Project in association with Berwin Leighton Paisner LLP Urbanisation Award in association with Bechtel 22 Bexhill to Hastings Link Road Bognor Regis Northern Relief Road HOCHTIEF Taylor Woodrow Joint Venture Barratt David Wilson Barratt David Wilson Homes completed the Bognor Regis Northern Relief Road connecting the A29 at Shripney with the A259 at Felpham. The relief road has been delivered as part of a package of improvements under a section 106 agreement that also includes sports facilities, parks, skate park community centre and supports 800 new homes built in the area. The viaduct structure spans the Bognor Regis to Barnham railway line, the Lidsey Rife and other watercourses as well as the flood plain and measures 0.5km in length. The Bexhill to Hastings Link Road is a catalyst for sustainable development in a highly deprived area of the South East, providing future employment opportunities. Working in collaboration with local developers, a new business park was constructed and opened simultaneously with the opening of the Link Road whilst giving the earliest possible start to these employment opportunities. Too often urbanisation has negative impact on wild life and public enjoyment of natural environments. This site was home to many species of flora and fauna, enjoyed by the community. The design enhances this diverse habitat with improved access for equestrians, walkers, cyclists and disabled. Cost £120m Location Cowhurst Road, St Leonards on Sea, East Sussex Completed by December 2015 The project has re-profiled water courses and semi-natural habitats are developing on both watercourses with Water Vole evidence. The watercourses link the new wetland habitats along the flood attenuation ponds that have developed permanent and seasonally wet areas providing a good mix of quality feeding resources for water vole and bat populations as well as numerous bird species. Cost £28m Location BNRR/Viaduct Project Office (Western Section) Shripney Road Shripney, West Sussex Completed by March 2016 Project team Barratt David Wilson, Atkins, Hochtief (UK) Construction Ltd, John Reilly Civil Engineering Limited, MJA Consulting, Millstone Landscapes, Aluco Ecology, WSP, West Sussex County Council Project team HOCHTIEF Taylor Woodrow Joint Venture, East Sussex County Council, Jacobs UK, Mott Macdonald Construction measures were taken to inform and work with the community, maintain public access and preserve existing habitats through proactive planning. It also provided opportunity for archaeological investigations that proved to be significant, providing evidence of human occupation though many periods with local interest and finds considered to be of national importance. 23 Urbanisation Award in association with Bechtel Urbanisation Award in association with Bechtel 24 Wokingham Rail Station and Link Road Re-Development Wokingham Borough Council The Wokingham Rail Station and Link Road redevelopment has been a transformational project for this busy Thames Valley interchange. Between 2011 and 2015, a collaborative working approach between Wokingham Borough Council, Network Rail and South West Trains has delivered a significant transport interchange in the town fit for the 21st century. The combined scheme cost of circa £12.68m provided three main elements to the redevelopment: A new station building and associated platform works A new access forall footbridge and lifts A new link road with major junction alterations and changes to traffic flow patterns Some of the key constructional issues the project had to overcome included: Maintaining access for the public to the rail station during all construction works Co-ordinating three main contractors, especially the railway building and footbridge andtechnical design Delivering the new “linked” road traffic signal and level crossing barrier control systems 25 Urbanisation Award in association with Bechtel Cost £13m Location Wokingham Town Centre Completed by May 2015 Project team Wokingham Borough Council, WSP|PB, Balfour Beatty Living Places, R&W Civil Engineering, Imtech Traffic & Infrastructure, DEG Signal Ltd, S&T Cover, Network Rail Infrastructure Projects South – Wessex, C Spencer Ltd., Mott MacDonald, South West Trains, Geoffrey Osborne Ltd. Best use of Civil Engineering in a Building Project in association with Crest Nicholson Short listed projects: > Blavatnik School of Government > Bournemouth University Student Centre > Hasting Pier Conservation Best Use of Civil Engineering in a Building Project in association with Crest Nicholson 26 Blavatnik School of Government Pell Frischmann Bournemouth University Student Centre WSP | Parsons Brinckerhoff Bournemouth University Student Centre (BUSC) provides students with a creative and innovative new building, which supports their social activity whilst also enabling them to engage with the students’ union. The use of materials and form, including steel staircases which fly across a six-storey octagonal atrium, encourage students to work collaboratively, whilst a link bridge connecting to the existing library boosts involvement with the students’ union. The Blavatnik School of Government is a global school pursuing a vision of a world better led, a world better served and a world better governed and with such high ambitions deserved a world class home. The building was specifically designed to support the school’s mission and provides a state-of-the-art home for its vibrant academic community. With Herzog de Meuron, the team have created a remarkable building providing a low carbon solution with landmark appeal and spectacular quality. The design and construction required close co-operation to enable such a complex form to be erected and together we refined materiality and build method to create a spectacular structure safely and effectively. 27 Cost £36m Location Radcliffe Observatory Quarter, University of Oxford, Woodstock Rd, Oxford Completed by December 2015 Excellent relationships within the delivery team, strong early engagement from the university, together with a “no-blame” culture and willingness from all to find solutions to challenges throughout the project, was paramount to the project being brought forward, delivered on time and on budget. The use of concrete for thermal mass, a large atrium for natural ventilation, together with ground source heat pumps, photo-voltaic panels, and sedum roofs have enabled BUSC to achieve a BREEAM ‘Excellent’ rating. Cost £10m Location BUSC, Talbot Campus, Fern Barrow, Poole, Dorset Completed by March 2015 Project team WSP | Parsons Brinckerhoff, Bournemouth University, Willmott Dixon, Saunders Architects, Hoare Lea Project team Pell Frischmann, University of Oxford, Herzog & de Meuron, Laing O’Rourke, Gardiner & Theobald, Hoare Lea Best use of Civil Engineering in a Building Project in association with Crest Nicholson Best use of Civil Engineering in a Building Project in association with Crest Nicholson 28 Excellence in Construction in association with Colas Rail Limited Hastings Pier Conservation THE AWAR D S Ramboll Short listed projects: > A400M Maintenance Repair Overhaul Facility > Bexhill to Hastings Link Road Only half the original Victorian pleasure piers remain and many face an uncertain future. The Hasting Pier project applied technology, research, experience and design skills innovatively to solve the pier’s conservation problems: Conserving a large heritage asset in the sea Delivering a pier with a viable, sustainable future The civil engineering solutions overcame the marine environment, constructability, and access difficulties for inspection, construction and maintenance. The works required the development of a range of typical and bespoke structural solutions and the construction methods were adapted to be suitable to the location. Close collaboration with contractors has been important in development of the design. > Blavatnik School of Government Cost £11.5m > Burham Strategic Water Main Location 1-10 White Rock, Hastings, East Sussex > Grove Farm Sewage Pumping Station Completed by March 2016 > Gade Valley Expansion Joint Replacement Scheme > Thorndell Viaduct Project team Ramboll, Hastings Pier Charity, dRMM, FPE Global Ltd, PT Projects Ltd, The Heritage Lottery Fund From a sound understanding of the original construction of the pier we have developed a strategy that is both site specific and sympathetic to the historic structure. This pier can now look forward to a bright future under the ownership of the Hasting Pier Charity. 29 Best use of Civil Engineering in a Building Project in association with Crest Nicholson Excellence in Construction 30 A400M Maintenance Repair Overhaul Facility Bexhill to Hastings Link Road Defence Infrastructure Organisation HOCHTIEF Taylor Woodrow Joint Venture Success achieved through a collaborative single team approach. The design and construction methodology satisfied specific constraints applicable working adjacent a runway/ taxiway within a high security operational RAF Base. The Bexhill to Hastings Link Road may only be 5.5km long, but it has 13 major highway structures, poor access, extremely challenging ground features and conditions, along with active flood plains. This project required an innovative approach in ground engineering to provide robust, timely and cost effective solutions. Innovation Onsite concrete batching plant to provide 11700m³ of PQC Radar absorbing panels eliminating potential interference Airfield flight systems reconfigured to accommodate the facility location Creativity Multifunction facility providing a ‘one stop shop’ for RAF transport aircraft First and second line repair managed within a single facility ‘Just in time’ management process and forward supplies are held outside the security base Cost £35m Location A400M Maintenance Repair Overhaul Facility Completed by June 2016 Project team Defence Infrastructure Organisation, Balfour Beatty, WYG, AWW, Arup, Interserve Social Value 300 additional permanent jobs created Significant benefits to the wider economy A collaborative approach was taken for each challenge and developed solutions that met all party’s needs. Solutions were not only satisfying engineering parameters, but also accommodated the poor road network from London and the South East. This network created logistical issues in achieving daily delivery of high volume imported quarry products. The site also had very high ecological and archaeological interest with the planning authority who were keen on the flora and fauna preservation as well as maximising public access during the works. These interest enhanced the project on its completion. Cost £120m Location Cowhurst Road, St Leonards on Sea, East Sussex Completed by December 2015 Project team HOCHTIEF Taylor Woodrow Joint Venture, East Sussex County Council, Jacobs UK, Mott Macdonald Final solutions pushed engineering boundaries to the limit with methods and scope rarely used in the UK. Long term local community commitment Safety Foreign Object Debris measures implemented during design and construction stage Existing services diverted into a ‘corridor’ around the site to reduce the risk of a service strike Sustainability Project on course to achieve DREAM excellent Existing hard standings were crushed and recycled 31 Excellence in Construction in association with Colas Rail Limited Excellence in Construction in association with Colas Rail Limited 32 Blavatnik School of Government Burham Strategic Water Main Pell Frischmann South East Water The Blavatnik School of Government is a global school pursuing a vision of a world better led, a world better served and a world better governed and with such high ambitions deserved a world class home. The building was specifically designed to support the school’s mission and provides a state-of-the-art home for its vibrant academic community. With Herzog de Meuron, the team have created a remarkable building providing a low carbon solution with landmark appeal and spectacular quality. The design and construction required close co-operation to enable such a complex form to be erected and together we refined materiality and build method to create a spectacular structure safely and effectively. 33 Cost £36m Location Radcliffe Observatory Quarter, University of Oxford, Woodstock Rd, Oxford Completed by December 2015 Project team Pell Frischmann, University of Oxford, Herzog & de Meuron, Laing O’Rourke, Gardiner & Theobald, Hoare Lea Excellence in Construction in association with Colas Rail Limited By delivering its largest and most challenging pipeline scheme to date, South East Water demonstrated ingenuity to secure water supply to thousands of homes and businesses. The route passes through historical sites, protected species and a solar farm. In addition to passing 20m underneath water ingress which proved extremely problematic, at one stage, eight 10-inch were required to manage the 13ml/d of water rising from the base through the rocks (enough water on a daily basis to the meet the water demands of a town the size of Hastings). Construction methods used included GPS positioning of evacuators. This precision of control reduced the amount of material evacuated and saved time and costs. The launch and reception shafts for each tunnel were constructed using in-situ reinforced concrete caisson construction. This reduced the risk of leaks in shaft and the amount of plant and labour required. Cost £9.2m Location South East Water, Rocfort Road, Snodland, Kent Completed by May 2016 Project team South East Water, Jacobs UK Ltd., Farrans Construction, Ward & Burke, PF Murphy & Sons, Mouchel The team also created a legacy of people, supplier and knowledge creation which will benefit future projects. Excellence in Construction in association with Colas Rail Limited 34 Gade Valley Expansion Joint Replacement Scheme Grove Farm Sewage Pumping Station Thames Water Jackson Civil Engineering For many years, a community on the outskirts of Fleet in Hampshire had suffered from sewer flooding. This caused when storm water overwhelmed sewage tanks which forced storm water and domestic waste to ‘back up’ in the network. To solve this problem, Thames Water embarked on a £7m plan to construct a new sewer pumping station at Hitches Lane which was very close to the affected properties. This proximity to the community meant that the construction work has had to be extremely sensitive to the needs of the community and the fact that the site is adjacent to the local secondary school has only reinforced this. Expansion joint replacement schemes on high speed roads have the potential to cause huge disruption through lane closures and speed restrictions. Until now, commercially available temporary bridging plates, which ordinarily used hinged systems, offered awkward access to the joint, and required vastly reduced traffic speeds during the day. Cost £7m Location Hitches lane (opposite Calthorpe Park school), Fleet. Hampshire Completed by May 2016 Project team Thames Water, MGJV However, an innovative construction method and very active programme of public engagement and communication has managed to turn what could have been a negative into a positive, minimising and mitigating complaints and involving local residents as much as possible in what has been a complex and challenging project. The bespoke temporary over-ramp solution developed by Connect Plus, Connect Plus Services, Jackson Civil Engineering and Flint & Neill has delivered a versatile solution. It has virtually eliminated traffic disruption, allowing traffic to flow at normal speeds throughout the duration of the project – a world first for joint replacement on this scale. Originally developed for use on the QEII Bridge, the temporary over-ramps have subsequently been used to replace the expansion joints on the Gade Valley viaduct at Junction 20. Although these structures are inherently different – the joints at Gade Valley are skewed by more than 30 degrees – the simplicity of the ramp design has allowed them to be re-used following minimal modifications. The solution has the potential to be used at a further 28 locations across the M25 network. Whilst in-situ, 30.2 million vehicles drove over the ramps at Gade Valley and their drivers were largely unaware of their presence. Considering this number in the context of delays that could have been caused by the works, the benefits for this temporary works method are unquantifiable, and in that respect, this innovation has been a triumph for the industry. 35 Cost N/A Location North Grove Cottages, Off Watford Road, Kings Lane, Hertfordshire Completed by October 2015 Project team Jackson Civil Engineering, Connect Plus & Connect Plus Services, Flint & Neill Excellence in Construction in association with Colas Rail Limited Excellence in Construction in association with Colas Rail Limited 36 Engineered in South East England in partnership with ICE Recruit Thorndell Viaduct BAM Nuttall Limited Short listed projects: > Cowes Outer Harbour Project > District Hospitals Ghana - Dodowa Hospital In October 2015, BAM Nuttall successfully delivered a highly technical and challenging £5.5 million design and build replacement of the Thorndell Viaduct within a floodplain located between Pulborough and Amberley stations. The viaduct was deemed under strength in need of being brought back to full strength with a 120-year design. This project was an all-round success which saw the handover of high quality works four hours ahead of schedule within a 75-hour possession. Rigorous health, safety, and environmental processes were instilled which resulted in zero reportable injuries or incidents and award recognition for above and beyond initiatives. BAM Nuttall invested in future talent and incorporated collaborative working with supply chain, stakeholders and the local community. > Jurong Tuas View Phase II Cost £5.5 million Location BAM Nuttall Site Compound, Bury Road, Bury, West Sussex > Laxey Coastal Promenade > Swale Sluices Refurbishment Completed by October 2015 Project team BAM Nuttall Limited, Network Rail, Cass Hayward, Mammoet, Keltbray, Macrete Newly adapted processes or techniques derived from the works have been shared company-wide for future projects. Innovative working, project management and client satisfaction were key and saw the implementation of new technologies, open communication and effective cost or programme controls. 37 Excellence in Construction in association with Colas Rail Limited Engineered in South East England 38 Cowes Outer Harbour Project District Hospitals Ghana – Dodowa Hospital Boskalis Westminster Limited Campbell Reith Hill LLP Cowes is one of the world’s premier destinations for yachting with the related business essential to the island’s economy and employment. Providing a true sheltered harbour environment is key to the future and sustainable prosperity of the harbour, local and the island’s economy. The breakwater is an important catalyst for the wider regeneration of East Cowes, which suffers comparatively lower levels of employment and investment than Cowes. The main engineering challenges were to design and construct a stable breakwater on an extremely soft clay layer and to keep within the budget. Key features of the Boskalis Westminster proposal were the integrated co-operation with the client team and the provision of in-house capabilities including: Innovative design Utilisation of the dredging fleet Sustainable re-use of dredged material from the Southampton Channel Deepening project Installation of vertical drains and compaction Installation of geotextile Supply of armour rock Project and stakeholder management Cost £7 million Location Cowes Harbour Commission, Harbour Office, Town Quay, Cowes, Isle of Wight Completed by November 2015 Project team Boskalis Westminster Limited, Cowes Harbour Commission, Atkins, Ramboll Marine surveying The Ghana District Hospitals project is an exemplary illustration of the core values of modern civil engineering. The hospitals will transform the lives of those living in each district and they have been engineered to provide an optimum solution. The solution brought together the best of modern facilities, modern construction methods, knowledge transfer of these methods, and the use of new technologies to achieve a sustainable user-friendly layout that economically addresses the site constraints. The project has involved everything from the use of satellite imagery, drones, Revit 3D, PDS 3D cut and fill analysis to sustainable drainage, solar energy, modern composite wall systems and low energy self-sufficient sewerage treatments. 39 Engineered in South East England in partnership with ICE Recruit Cost USD$25m Location Dodowa, Ghana Completed by December 2015 Project team Campbell Reith Hill LLO, NMS International Group Ltd, TP Bennett LLP, NMS Infrastructure Limited, Sprunt, Deacon and Jones LLP, John Reid & Sons (Strucsteel) Ltd Engineered in South East England in partnership with ICE Recruit 40 Jurong Tuas View Phase II Laxey Coastal Promenade Royal HaskoningDHV JBA Consulting The Laxey coastal promenade scheme’s design introduced a new approach to considerate the tolerable discharges from wave overtopping through adopting the principles of limit state design. This involved setting the ultimate and serviceability wave overtopping limits to consider the performance of the structure during both extreme and normal conditions. The traditional design approach (focussed on the reduction of wave overtopping to tolerable thresholds for the design storm event) was shown to be inadequate in this design. This is due to the failure of the structure’s performance during lower return period events and when considered against more stringent thresholds. Royal HaskoningDHV (RHDHV) was appointed to design dock (entrance) gates for all three dry-docks (Dock 5, 6 and 7) of Jurong Phase II project in Singapore. Gate 7 is the main focus as it is the largest non-propped spanning flap gate in the world. Despite being 20% larger than any previous flap gate and there were initial concerns that it might be unachievable, RHDHV continued to design an efficient, safe and fully functional gate. The gate will bring significant economic benefits to the local economy in a sustainable manner. Cost USD$12m Cost £65,000 Location The promenade, Laxey, Isle of Man Completed by December 2015 Project team JBA Consulting, Isle of Man Government The adoption of a limit state design approach at Laxey has helped ensure the performance of the structure through both normal and extreme conditions. This aided in optimising the defence geometry to provide the maximum benefits from wave overtopping protection. At the same time, not designing a structure that could negatively impact the picturesque landscape and important tourism industries. Location Sembcorp Marine, Tuas Boulevard Yard, Singapore Completed by Spring 2016 Project team Royal HaskoningDHV, Sembcorp Marine This project is in line with Singapore’s ambition to maintain its position as a highly developed trade-oriented market economy and a major hub for ship repair services. 41 Engineered in South East England in partnership with ICE Recruit Engineered in South East England in partnership with ICE Recruit 42 Swale Sluices Refurbishment Environment Agency The £1.4million Swale Tidal Sluices Refurbishment Scheme completely refurbished four tidal sluices on the North Kent coast between September 2013 and May 2016. The structures help maintain the marshes and its environmental designations. They were originally constructed following the 1953 floods but suffered with outfall siltation and were close to failure. The team saved time and public money by packaging four projects into one. They put partnership working at the heart of the project, using feedback from 360 degree stakeholder design workshops to reduce changes during the construction phase. The team incorporated the temporary cofferdam into the permanent works then solved the siltation problem by cutting a V-notch weir into the front face of each cofferdam. This increased the flow velocity, making the channel self-cleaning. By maintaining water levels in the marshes, the refurbished sluices reduce local flood risk whilst also supporting the international designations, local agriculture, and leisure interests such as bird-watching, cycling and rambling. Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange BRANCH AWA R D S Cost £1.4m Location Various locations at North Kent: Motney Hill Sluice, Motney Hill Road, Rainham; Codds Sluice, Chetney Marshes, Iwade; Crown Sluice, Ferry Marshes, Isle of Sheppey; Thorn Sluice, Nagden, Faversham Completed by June 2016 Project team Environment Agency, Team Van Oord, Royal HaskoningDHV, Lower and Upper Medway Internal Drainage Board Short listed projects: > Bexhill to Hastings Link Road > Broomhill Sands Coastal Defence Scheme > Burham Strategic Water Main > Hoo Island Re-Engineering Works > Peters Village and Medway Valley Crossing > Poorhole Lane Improvement > Swale Sluices Refurbishment > Transforming Manston Airport 43 Engineered in South East England in partnership with ICE Recruit 44 Bexhill to Hastings Link Road Broomhill Sands Coastal Defence Scheme HOCHTIEF Taylor Woodrow Joint Venture Environment Agency The Bexhill to Hastings Link Road is a catalyst for sustainable development in a highly deprived area of the South East, providing future employment opportunities. Working in collaboration with local developers, a new business park was constructed and opened simultaneously with the opening of the Link Road whilst giving the earliest possible start to these employment opportunities. Too often urbanisation has negative impact on wild life and public enjoyment of natural environments. This site was home to many species of flora and fauna, enjoyed by the community. The design enhances this diverse habitat with improved access for equestrians, walkers, cyclists and disabled. Cost £120m Location Cowhurst Road, St Leonards on Sea, East Sussex Completed by December 2015 Project team HOCHTIEF Taylor Woodrow Joint Venture, East Sussex County Council, Jacobs UK, Mott Macdonald Construction measures were taken to inform and work with the community, maintain public access and preserve existing habitats through proactive planning. It also provided opportunity for archaeological investigations that proved to be significant, providing evidence of human occupation though many periods with local interest and finds considered to be of national importance. The £30M Broomhill Sands Coastal Defence Scheme directly protects 1,388 homes and over 100 businesses by increasing the standard of protection from 1 in 20 years to 1 in 200 years, allowing for predicted sea level rise. The improvements include 1.8km of rock revetment and new concrete wave wall, 700m beach recharge and replacement of timber groynes plus improvements to the existing promenade including access ramps and steps. The Broomhill Sands team has led on a number of innovations, many of which are ‘firsts’ for the Environment Agency, the UK and some even for the construction industry. For example the innovative approach with high-risk water sports users within the offshore rock delivery and storage area. The team have reported over £8.9m of efficiencies. Cost £30m Location Lydd Road, Camber, Kent Completed by December 2015 Project team Environment Agency, Team Van Oord Ltd, Mott MacDonald, CH2M, Arcadis Broomhill Sands is highlighted in a Cabinet briefing as an example of best practice regarding value and the delivery of large efficiencies during construction. 45 Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange 46 Burham Strategic Water Main Hoo Island Re-Engineering Works South East Water Land & Water Services Hoo Island Re-Engineering works completed in 2015 has strengthened the perimeter engineered bunds of the old dredging disposal site in the River Medway to ensure its long-term integrity. It also introduced an enhanced wildlife habitat in the form of dry and wetland habitat covering some 125 acres within the River Medway. By delivering its largest and most challenging pipeline scheme to date, South East Water demonstrated ingenuity to secure water supply to thousands of homes and businesses. The route passes through historical sites, protected species and a solar farm. In addition to passing 20m underneath water ingress which proved extremely problematic, at one stage, eight 10-inch were required to manage the 13ml/d of water rising from the base through the rocks (enough water on a daily basis to the meet the water demands of a town the size of Hastings). Construction methods used included GPS positioning of evacuators. This precision of control reduced the amount of material evacuated and saved time and costs. The aunch and reception shafts for each tunnel were constructed using in-situ reinforced concrete caisson construction. This reduced the risk of leaks in shaft and the amount of plant and labour required. Access to the island was restricted to one to two hours either side of high water with all labour, plant and material mobilised to the island by pontoon and barge via Chatham Docks. Site accommodation and welfare provision were setup and maintained on the island for the 20nr site personnel 24 hours a day seven days a week. Cost £9.2m Location South East Water, Rocfort Road, Snodland, Kent Completed by May 2016 Cost £1.7m Location Hoo Island, Chatham Docks, Gillingham, Kent Completed by November 2015 Project team Land & Water Services, Peel Ports, RSK Environment Ltd Strict procedures were implemented to ensure the integrity of the perimeter bund was maintained during the construction works. Safe methods of works were adhered to, whilst earthworks plant accessed over both the unstable perimeter bunds and the soft wet dredged material lying in each dredge disposal ‘cell’. Project team South East Water, Jacobs UK Ltd., Farrans Construction, Ward & Burke, PF Murphy & Sons, Mouchel The team also created a legacy of people, supplier and knowledge creation which will benefit future projects. 47 Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange 48 Peters Village and Medway Valley Crossing BAM Nuttall Limited Poorhole Lane Improvement Kent County Council Cost £33m Location BAM Nuttall Limited, Site Compound, Old Church Rd, Burham, Maidstone, Kent Completed by August 2016 Peters Village project is an exemplary example of engineering excellence. It brings innovation to solve complex engineering challenges, sustainable construction and economically viable solutions allowing the creation of a new village within the heart of Kent. Through the provision of infrastructure for this new community, there are also significant benefits to the local communities of Burham and Wouldham, including improved transportation links, PRoW, recreational and educational facilities. In providing these improvements BAM (D&B contractor) has worked closely with the client (Trenport Investments, Kent and Medway Councils and the Environmental Agency) to ensure creation of a place where people want to live, and the local community want to live beside. In delivering this goal the team have embraced latest technology and innovations to build new bridges and roads that provide a direct link to the A228. This eases congestion on the existing roads and providing improved access to wider motorway and rail networks. 49 Project team BAM Nuttall Limited, Trenport Investments Limited, Gleeds Cost Management, Waterman Group, WSP, David Jarvis Associates, BWA Management Limited, FGS Deacon Landscape, Environmental Scientifics Group Ltd, Forest Traffic Services Limited, Freyssinet Limited, G8 Construction, Colas, Hi Way Services Limited, Homegrown Timber Limited, J P Flynn Construction, Littlewood Fencing Limited, Ovenden Earthmoving Co Limited, P J Edwards & Co (UK) Limited, C P Dynes, Lafarge Tarmac, Vibro Menards Limited, Winjam Developments Limited, RBLI, RMD Kwikform Winjam Developments Ltd., RBLI, RMD Kwikform Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange Cost £2.5m Location Poorhole Lane, Westwood Road, Broadstairs, Kent Completed by July 2015 Project team Kent County Council, Amey Consulting & Strategic Infrastructure, Jackson Civil Engineering The scheme involved the widening of Poorhole Lane at Westwood in Thanet and linked two primary roads – the A256 Westwood Road to the west and the A254 Ramsgate Road to the east. This has provided an alternative route for traffic between Margate, Westwood Cross Shopping Centre and Broadstairs. The primary purpose was a highway improvement supporting the local economy in creating an alternative route for existing and future traffic movements avoiding the severely congested Westwood roundabout. It also was to provide improved infrastructure and accessibility to support existing businesses and attract inward investment and increased employment. Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange 50 Swale Sluices Refurbishment Transforming Manston Airport Environment Agency Balfour Beatty Mott MacDonald Joint Venture The £1.4million Swale Tidal Sluices Refurbishment Scheme completely refurbished four tidal sluices on the North Kent coast between September 2013 and May 2016. The structures help maintain the marshes and its environmental designations. They were originally constructed following the 1953 floods but suffered with outfall siltation and were close to failure. The team saved time and public money by packaging four projects into one. They put partnership working at the heart of the project, using feedback from 360 degree stakeholder design workshops to reduce changes during the construction phase. The team incorporated the temporary cofferdam into the permanent works then solved the siltation problem by cutting a V-notch weir into the front face of each cofferdam. This increased the flow velocity, making the channel self-cleaning. By maintaining water levels in the marshes, the refurbished sluices reduce local flood risk whilst also supporting the international designations, local agriculture, and leisure interests such as bird-watching, cycling and rambling. Cost £1.4m Location Various locations at North Kent: Motney Hill Sluice, Motney Hill Road, Rainham; Codds Sluice, Chetney Marshes, Iwade; Crown Sluice, Ferry Marshes, Isle of Sheppey; Thorn Sluice, Nagden, Faversham Completed by June 2016 Project team Environment Agency, Team Van Oord, Royal HaskoningDHV, Lower and Upper Medway Internal Drainage Board In July 2015, Operation Stack managed by Balfour Beatty Mott MacDonald (BBMM) made headline news due to the disruption being caused across Kent and on Highways England’s Area 4 Network. The M20 effectively became a giant lorry park on a weekly basis and as stack continued, the team were challenged to find a different way of holding lorries. BBMM and its supply chain partners made a huge effort to lay markings on the airfield to make it suitable as a lorry park. Coordinated by BBMM, 17 companies were involved in the operation. Over a 50-hour period, capacity for 4,500 lorries over 36 lanes was marked out using 140,000 metres of lining, 5,000 studs and 95 arrows. All of this was done with no compromise on the team’s standards for safety, the environment and quality. Cost £600,000 Location Balfour Beatty Mott MacDonald, Area 4, 10 Kings Hill Avenue, Kings Hill, Kent Completed by August 2015 Project team Balfour Beatty Mott MacDonald, Highways England, Hi-Way Services, Aggregate Industries, HW Martin This was a massive achievement brought together by an astounding team effort from everyone at BBMM and their supply chains. 51 Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange Brassey Award (Kent and East Sussex) for Engineering Excellence in association with Berryrange 52 Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund B RAN C H AWAR D S A400M Maintenance Repair Overhaul Facility Defence Infrastructure Organisation Success achieved through a collaborative single team approach. The design and construction methodology satisfied specific constraints applicable working adjacent a runway/ taxiway within a high security operational RAF Base. Innovation Onsite concrete batching plant to provide 11700m³ of PQC Radar absorbing panels eliminating potential interference Airfield flight systems reconfigured to accommodate the facility location Short listed projects: Creativity Multifunction facility providing a ‘one stop shop’ for RAF transport aircraft > A400M Maintenance Repair Overhaul Facility First and second line repair managed within a single facility ‘Just in time’ management process and forward supplies are held outside the security base > Blavatnik School of Government > District Hospitals Ghana – Dodowa Hospital > East West Rail Phase1 > Gade Valley Expansion Joint Replacement Scheme > Reading Pedestrian and Cycle Bridge > Wokingham Rail Station and Link Road Re-Development Location A400M Maintenance Repair Overhaul Facility Completed by June 2016 Project team Defence Infrastructure Organisation, Balfour Beatty, WYG, AWW, Arup, Interserve Social Value 300 additional permanent jobs created Significant benefits to the wider economy > Leigh Road Bridge > Purley Switches and Crossings Renewal and Upgrades Cost £35m Long term local community commitment Safety Foreign Object Debris measures implemented during design and construction stage Existing services diverted into a ‘corridor’ around the site to reduce the risk of a service strike Sustainability Project on course to achieve DREAM excellent Existing hard standings were crushed and recycled 53 Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund 54 Blavatnik School of Government Pell Frischmann District Hospitals Ghana – Dodowa Hospital Campbell Reith Hill LLP The Blavatnik School of Government is a global school pursuing a vision of a world better led, a world better served and a world better governed and with such high ambitions deserved a world class home. The building was specifically designed to support the school’s mission and provides a state-of-the-art home for its vibrant academic community. With Herzog de Meuron, the team have created a remarkable building providing a low carbon solution with landmark appeal and spectacular quality. The design and construction required close co-operation to enable such a complex form to be erected and together we refined materiality and build method to create a spectacular structure safely and effectively. 55 Cost £36m Location Radcliffe Observatory Quarter, University of Oxford, Woodstock Rd, Oxford Completed by December 2015 Project team Pell Frischmann, University of Oxford, Herzog & de Meuron, Laing O’Rourke, Gardiner & Theobald, Hoare Lea Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund The Ghana District Hospitals project is an exemplary illustration of the core values of modern civil engineering. The hospitals will transform the lives of those living in each district and they have been engineered to provide an optimum solution. The solution brought together the best of modern facilities, modern construction methods, knowledge transfer of these methods, and the use of new technologies to achieve a sustainable user-friendly layout that economically addresses the site constraints. The project has involved everything from the use of satellite imagery, drones, Revit 3D, PDS 3D cut and fill analysis to sustainable drainage, solar energy, modern composite wall systems and low energy self-sufficient sewerage treatments. Cost USD$25m Location Dodowa, Ghana Completed by December 2015 Project team Campbell Reith Hill LLO, NMS International Group Ltd, TP Bennett LLP, NMS Infrastructure Limited, Sprunt, Deacon and Jones LLP, John Reid & Sons (Strucsteel) Ltd Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund 56 East West Rail Phase1 Gade Valley Expansion Joint Replacement Scheme Atkins Jackson Civil Engineering East West Rail is a major project to establish a strategic railway connecting East Anglia with Central, Southern and Western England. The western section of the route will ultimately provide a modern 100mph railway between Oxford and Bedford, Milton Keynes and Aylesbury Vale. East West Rail Phase 1 represents a 20km stretch between Oxford and Bicester. The section between Oxford Parkway Station and Bicester village was opened on 26 October 2015 and the remaining section opens late autumn 2016. The project comprised the following: New Oxford Parkway station at Water Eaton Upgrade of Bicester Village and Islip stations Construction of a connecting line to the Chiltern Mainline Seven new overbridges Six reconstructed or strengthened under bridges Eight new footbridges Numerous stretches of widened earthworks and retaining walls Modification of 35 culverts Closure of 37 level crossings Cost £350m Location The Axis, 10 Holliday Street, Birmingham Completed by March 2016 Project team Atkins Plc, Chiltern Railways, Network Rail, Carillion Buckingham Joint Venture, Siemens Repair, strengthening and track formation lowering through Wolvercote Tunnel Installation of a new signaling system 57 Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund Expansion joint replacement schemes on high speed roads have the potential to cause huge disruption through lane closures and speed restrictions. Until now, commercially available temporary bridging plates, which ordinarily used hinged systems, offered awkward access to the joint, and required vastly reduced traffic speeds during the day. The bespoke temporary over-ramp solution developed by Connect Plus, Connect Plus Services, Jackson Civil Engineering and Flint & Neill has delivered a versatile solution. It has virtually eliminated traffic disruption, allowing traffic to flow at normal speeds throughout the duration of the project – a world first for joint replacement on this scale. Originally developed for use on the QEII Bridge, the temporary over-ramps have subsequently been used to replace the expansion joints on the Gade Valley viaduct at Junction 20. Although these structures are inherently different – the joints at Gade Valley are skewed by more than 30 degrees – the simplicity of the ramp design has allowed them to be re-used following minimal modifications. The solution has the potential to be used at a further 28 locations across the M25 network. Whilst in-situ, 30.2 million vehicles drove over the ramps at Gade Valley and their drivers were largely unaware of their presence. Considering this number in the context of delays that could have been caused by the works, the benefits for this temporary works method are unquantifiable, and in that respect, this innovation has been a triumph for the industry. Cost N/A Location North Grove Cottages, Off Watford Road, Kings Lane, Hertfordshire Completed by October 2015 Project team Jackson Civil Engineering, Connect Plus & Connect Plus Services, Flint & Neill Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund 58 Leigh Road Bridge Purley Switches and Crossings Renewal and Upgrades Geoffrey Osborne Ltd Leigh Road Bridge opened in October 2015, providing a vital link for the people and businesses of Slough Trading Estate over the Great Western Railway. It supplements the existing 1836 Brunel Bridge, which was sub-standard for current requirements. The client, SEGRO, appointed Osborne and Peter Brett Associates as respective contractor and design consultant. Due to concurrent Crossrail works on the route, abnormal possessions were unavailable for bridge installation. The design and build team therefore developed the half through steel girder superstructure and innovative cantilevered trailer launch method. Construction began in the summer of 2014, with the launch undertaken in February 2015. The innovative method earned keen media attention with the operation featuring on the BBC One Show and on local radio promoting interest in civil engineering. The project team consistently worked collaboratively to complete the project within programme and budget. S&C Alliance South (Network Rail) Cost £10m Location Leigh Road (c/o Bedford Avenue), Slough Trading Estate, Slough, Berks Completed by October 2015 Project team Geoffrey Osborne Ltd, SEGRO plc, Peter Brett Associates, Tony Gee & Partners, Slough Borough Council, Network Rail Purley Junction is one of the busiest and most important railway junctions in the UK providing the link between London, Gatwick Airport and the South East. This complex infrastructure project involved the complete redesign and installation of switches and crossings, transforming Victorian engineering into a 21st century, modern and sustainable rail system, fit for passenger and freight timetable demands. Aecom, Colas Rail and Network Rail, working collaboratively within the S&C South Alliance, delivered Network Rail’s biggest Christmas project on time, to budget and with zero accidents during a 24-hour, 10-day closure between 24 December 2015 and 4 January 2016. As a direct result of their excellent and sustainable designs; strong programme management; timely stakeholder engagement; innovative construction methods; robust financial controls and industry leading health and safety management; the team ensured the area continued to function without any adverse impact on the economy and the day-to-day lives of local people and businesses. 59 Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund Cost £8m Location Purley Station, Whytecliffe Rd S, Greater London Completed by January 2016 Project team S&C Alliance South (Network Rail), S&C Alliance South (AECOM), S&C Alliance South (Colas Rail), Network Rail – Route Enhancement Management Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund 60 Reading Pedestrian and Cycle Bridge Peter Brett Associates LLP Wokingham Rail Station and Link Road Re-Development Wokingham Borough Council The 120-metre cable stay Reading Pedestrian and Cycle Bridge over the River Thames was constructed to play a vital role in connecting Reading. It forms a sustainable transport link to provide accessible connections to employment, transport and leisure destinations. Innovative in both form and construction, the bridge embodies ingenuity in the creation of a useful addition to local communities and a visitor destination in its own right. The bridge delivers a sustainable solution that complements the local area and contributes to the well-being of the local community. The team relied on strong collaboration and communication between each other, local stakeholders and communities to meet outcomes and deliver an outstanding project. Cost £7.2m Location Friars Island, Thames Side, Reading Completed by March 2015 Project team Peter Brett Associates LLP, Reading Borough Council, Design Engine Architects Ltd, Balfour Beatty, Hollandia infra The Wokingham Rail Station and Link Road redevelopment has been a transformational project for this busy Thames Valley interchange. Between 2011 and 2015, a collaborative working approach between Wokingham Borough Council, Network Rail and South West Trains has delivered a significant transport interchange in the town fit for the 21st century. The combined scheme cost of circa £12.68m provided three main elements to the redevelopment: A new station building and associated platform works A new access forall footbridge and lifts A new link road with major junction alterations and changes to traffic flow patterns Some of the key constructional issues the project had to overcome included: 61 Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund Maintaining access for the public to the rail station during all construction works Co-ordinating three main contractors, especially the railway building and footbridge andtechnical design Delivering the new “linked” road traffic signal and level crossing barrier control systems Cost £13m Location Wokingham Town Centre Completed by May 2015 Project team Wokingham Borough Council, WSP|PB, Balfour Beatty Living Places, R&W Civil Engineering, Imtech Traffic & Infrastructure, DEG Signal Ltd, S&T Cover, Network Rail Infrastructure Projects South – Wessex, C Spencer Ltd., Mott MacDonald, South West Trains, Geoffrey Osborne Ltd. Thames Valley Award for Engineering Excellence in partnership with ICE Benevolent Fund 62 South Award for Engineering Excellence in association with Trant B RAN C H AWAR D S Balcombe Rail Re-signalling Project Kier Infrastructure and Overseas Limited Short listed projects: > Balcombe Rail Re-signalling Project > Bognor Regis Northern Relief Road > Bournemouth University Student Centre > Cowes Outer Harbour Project > Duver Road Bridge Strengthening > Grove Farm Sewage Pumping Station > Hasting Pier Conservation > Jurong Tuas View Phase II > Laxey Coastal Promenade > Thorndell Viaduct (Amberley, West Sussex) > Whyke Horizon Footbridge 63 Thames Valley Award for Engineering Excellence The Balcombe Re-Signalling Project involved the complex installation of bi-directional signalling to allow six trains to run per hour in either direction on each track between Balcombe Tunnel Junction and Copyhold Junction on the busy Brighton Main Line. The aim of the works was to bring greater flexibility and reliability to the line. The original contract value was circa £10 million and for Kier, working on such a busy and publicity sensitive main line, any setbacks would have been high profile. However the success of the project was secured by the collaborative spirit and close working relationships developed between each part of the team which saw the project delivered on time and within budget in November 2015. Cost £13m Location London Road, Balcombe, West Sussex Completed by November 2015 Project team Kier Infrastructure and Overseas Limited, Network Rail, Mott MacDonald Limited, TICS Limited, Global Rail Construction Limited, The TEW Group (TEW Engineering Ltd), Fonealarm, NTS Premier Services Ltd South Award for Engineering Excellence in association with Trant 64 Bognor Regis Northern Relief Road Barratt David Wilson Bournemouth University Student Centre WSP | Parsons Brinckerhoff Barratt David Wilson Homes completed the Bognor Regis Northern Relief Road connecting the A29 at Shripney with the A259 at Felpham. The relief road has been delivered as part of a package of improvements under a section 106 agreement that also includes sports facilities, parks, skate park community centre and supports 800 new homes built in the area. The viaduct structure spans the Bognor Regis to Barnham railway line, the Lidsey Rife and other watercourses as well as the flood plain and measures 0.5km in length. The project has re-profiled water courses and semi-natural habitats are developing on both watercourses with Water Vole evidence. The watercourses link the new wetland habitats along the flood attenuation ponds that have developed permanent and seasonally wet areas providing a good mix of quality feeding resources for water vole and bat populations as well as numerous bird species. 65 Cost £28m Location BNRR/Viaduct Project Office (Western Section) Shripney Road Shripney, West Sussex Completed by March 2016 Project team Barratt David Wilson, Atkins, Hochtief (UK) Construction Ltd, John Reilly Civil Engineering Limited, MJA Consulting, Millstone Landscapes, Aluco Ecology, WSP, West Sussex County Council South Award for Engineering Excellence in association with Trant Bournemouth University Student Centre (BUSC) provides students with a creative and innovative new building, which supports their social activity whilst also enabling them to engage with the students’ union. The use of materials and form, including steel staircases which fly across a six-storey octagonal atrium, encourage students to work collaboratively, whilst a link bridge connecting to the existing library boosts involvement with the students’ union. Excellent relationships within the delivery team, strong early engagement from the university, together with a “no-blame” culture and willingness from all to find solutions to challenges throughout the project, was paramount to the project being brought forward, delivered on time and on budget. The use of concrete for thermal mass, a large atrium for natural ventilation, together with ground source heat pumps, photo-voltaic panels, and sedum roofs have enabled BUSC to achieve a BREEAM ‘Excellent’ rating. Cost £10m Location BUSC, Talbot Campus, Fern Barrow, Poole, Dorset Completed by March 2015 Project team WSP | Parsons Brinckerhoff, Bournemouth University, Willmott Dixon, Saunders Architects, Hoare Lea South Award for Engineering Excellence in association with Trant 66 Cowes Outer Harbour Project Duver Road Bridge Strengthening Boskalis Westminster Limited Island Roads Cowes is one of the world’s premier destinations for yachting with the related business essential to the island’s economy and employment. Providing a true sheltered harbour environment is key to the future and sustainable prosperity of the harbour, local and the island’s economy. The breakwater is an important catalyst for the wider regeneration of East Cowes, which suffers comparatively lower levels of employment and investment than Cowes. The main engineering challenges were to design and construct a stable breakwater on an extremely soft clay layer and to keep within the budget. Key features of the Boskalis Westminster proposal were the integrated co-operation with the client team and the provision of in-house capabilities including: Innovative design Utilisation of the dredging fleet Sustainable re-use of dredged material from the Southampton Channel Deepening project Installation of vertical drains and compaction Installation of geotextile Supply of armour rock Project and stakeholder management Cost £7 million Location Cowes Harbour Commission, Harbour Office, Town Quay, Cowes, Isle of Wight Completed by November 2015 Island Roads was required to rebuild a bridge that provides the only public access to a community in one of the Isle of Wight’s most protected beauty spots. Project team Boskalis Westminster Limited, Cowes Harbour Commission, Atkins, Ramboll In doing so, it had to ensure the scheme for The Duver at St Helens did not leave residents and businesses in the area isolated. It also needed to ensure the reasons behind the existing bridge’s deterioration were tackled. Marine surveying The solution combined the required engineering expertise in providing a lasting technical solution that was in harmony with all the environmental considerations. It also involved a number of engagement and communication measures that ensured the specific needs of the local community were heard and addressed. Cost N/A Location Duver Road, St Helens, Isle of Wight Completed by April 2015 Project team Island Roads The resulting scheme was delivered on time and in budget. Not only did it restore and indeed enhance access for residents and visitors, it ensured that good community relations remained at the heart of the project. 67 South Award for Engineering Excellence in association with Trant South Award for Engineering Excellence in association with Trant 68 Grove Farm Sewage Pumping Station Hastings Pier Conservation Thames Water Ramboll For many years, a community on the outskirts of Fleet in Hampshire had suffered from sewer flooding. This caused when storm water overwhelmed sewage tanks which forced storm water and domestic waste to ‘back up’ in the network. To solve this problem, Thames Water embarked on a £7m plan to construct a new sewer pumping station at Hitches Lane which was very close to the affected properties. This proximity to the community meant that the construction work has had to be extremely sensitive to the needs of the community and the fact that the site is adjacent to the local secondary school has only reinforced this. Cost £7m Location Hitches lane (opposite Calthorpe Park school), Fleet. Hampshire Completed by May 2016 Project team Thames Water, MGJV However, an innovative construction method and very active programme of public engagement and communication has managed to turn what could have been a negative into a positive, minimising and mitigating complaints and involving local residents as much as possible in what has been a complex and challenging project. Only half the original Victorian pleasure piers remain and many face an uncertain future. The Hasting Pier project applied technology, research, experience and design skills innovatively to solve the pier’s conservation problems: Conserving a large heritage asset in the sea Delivering a pier with a viable, sustainable future The civil engineering solutions overcame the marine environment, constructability, and access difficulties for inspection, construction and maintenance. The works required the development of a range of typical and bespoke structural solutions and the construction methods were adapted to be suitable to the location. Close collaboration with contractors has been important in development of the design. Cost £11.5m Location 1-10 White Rock, Hastings, East Sussex Completed by March 2016 Project team Ramboll, Hastings Pier Charity, dRMM, FPE Global Ltd, PT Projects Ltd, The Heritage Lottery Fund From a sound understanding of the original construction of the pier we have developed a strategy that is both site specific and sympathetic to the historic structure. This pier can now look forward to a bright future under the ownership of the Hasting Pier Charity. 69 South Award for Engineering Excellence in association with Trant South Award for Engineering Excellence in association with Trant 70 Thorndell Viaduct Jurong Tuas View Phase II BAM Nuttall Limited Royal HaskoningDHV In October 2015, BAM Nuttall successfully delivered a highly technical and challenging £5.5 million design and build replacement of the Thorndell Viaduct within a floodplain located between Pulborough and Amberley stations. The viaduct was deemed under strength in need of being brought back to full strength with a 120-year design. This project was an all-round success which saw the handover of high quality works four hours ahead of schedule within a 75-hour possession. Rigorous health, safety, and environmental processes were instilled which resulted in zero reportable injuries or incidents and award recognition for above and beyond initiatives. BAM Nuttall invested in future talent and incorporated collaborative working with supply chain, stakeholders and the local community. Cost £5.5 million Location BAM Nuttall Site Compound, Bury Road, Bury, West Sussex Completed by October 2015 Project team BAM Nuttall Limited, Network Rail, Cass Hayward, Mammoet, Keltbray, Macrete Newly adapted processes or techniques derived from the works have been shared company-wide for future projects. Innovative working, project management and client satisfaction were key and saw the implementation of new technologies, open communication and effective cost or programme controls. 71 South Award for Engineering Excellence in association with Trant Royal HaskoningDHV (RHDHV) was appointed to design dock (entrance) gates for all three dry-docks (Dock 5, 6 and 7) of Jurong Phase II project in Singapore. Gate 7 is the main focus as it is the largest non-propped spanning flap gate in the world. Despite being 20% larger than any previous flap gate and there were initial concerns that it might be unachievable, RHDHV continued to design an efficient, safe and fully functional gate. The gate will bring significant economic benefits to the local economy in a sustainable manner. Cost USD$12m Location Sembcorp Marine, Tuas Boulevard Yard, Singapore Completed by Spring 2016 Project team Royal HaskoningDHV, Sembcorp Marine This project is in line with Singapore’s ambition to maintain its position as a highly developed trade-oriented market economy and a major hub for ship repair services. South Award for Engineering Excellence in association with Trant 72 Laxey Coastal Promenade Whyke Horizon Footbridge JBA Consulting Balfour Beatty Mott MacDonald Joint Venture The Laxey coastal promenade scheme’s design introduced a new approach to considerate the tolerable discharges from wave overtopping through adopting the principles of limit state design. This involved setting the ultimate and serviceability wave overtopping limits to consider the performance of the structure during both extreme and normal conditions. The traditional design approach (focussed on the reduction of wave overtopping to tolerable thresholds for the design storm event) was shown to be inadequate in this design. This is due to the failure of the structure’s performance during lower return period events and when considered against more stringent thresholds. Cost £65,000 Location The promenade, Laxey, Isle of Man Completed by December 2015 Project team JBA Consulting, Isle of Man Government The adoption of a limit state design approach at Laxey has helped ensure the performance of the structure through both normal and extreme conditions. This aided in optimising the defence geometry to provide the maximum benefits from wave overtopping protection. At the same time, not designing a structure that could negatively impact the picturesque landscape and important tourism industries. 73 South Award for Engineering Excellence in association with Trant Whyke Horizon Footbridge is a unique and innovative bridge form, best described as a hybrid box girder and U trough. The cycle or pedestrian bridge provides much needed connectivity between schools and residential communities, previously severed by the busy A27. Constructed with negligible disruption to road users, the bridge aims to embrace the flat coastal environment with a low form of structure. The gentle curved, sculped exterior is deliberately understated, whilst the brightly coloured interior has a playful, fun nature. The bridge deliberately aims to challenge preconceived ideas of what highway footbridges should be like. Whilst many bridges of this genre are designed with a more holistic approach, characterised by a respectful and measured response to context and design brief. The project demonstrates how everyday infrastructure can better and could be argued to pioneer a philosophy known as ‘beautiful ordinary’. Cost £3.2m Location Whyke Roundabout, A27, Chichester Completed by August 2015 Project team Balfour Beatty Mott MacDonald, Wilkinson Eyre Architects, Interserve Civils, Highways England, Mabey Bridge South Award for Engineering Excellence in association with Trant 74 S O U T H E A S T EN G LA N D E N G I N E E R I N G E X C ELLE N C E AWA RD The South East England Engineering Excellence Award is the highest award of the evening. The winner will be announced at the end of the ceremony and is given to the project which is judged to be the best example of engineering excellence in the region. 75 South Award for Engineering Excellence in association with Trant Sponsorship opportunities ICE South East England’s prestigious awards programme is the premier showcase for engineering excellence in the region. By sponsoring the ICE South East England Engineering Excellence Awards, your organisation aligns itself with excellence. The awards present a unique opportunity to increase awareness of your brand, boost your business profile and enable you to access a powerful, targeted audience. For more information on opportunities to support the awards and packages, please contact: Vilma Marques Business Development Executive ICE South East England t: +44 (0)20 7665 2462 e: [email protected] ICE South East England One Great George Street Westminster London SW1P 3AA t +44 (0)20 7655 2462 e [email protected] @ICE_SEEngland Registered charity number 210252 Charity registered in Scotland number SCO38629