Thermofoil - Thermogroup UK

Transcription

Thermofoil - Thermogroup UK
TFIG1
!
Thermofoil
Installation Guide
Your step-by-step guide to
the perfect installation
Stock no 5009
Stock no 5259
Please ensure you have read
and fully understood this
guide before installation!
TFIG1
Installation: Thermofoil
THERMOSTAT THERMOSTAT
1
!
2
!
Step 1: Plan your installation & layout
Step 2: Lay insulation and install Conduit
It is important to plan out your installation to ensure minimal
wastage and achieve a more economical result. Draw a plan
of your room and mark out the position of Thermofoil Matting,
Marshalling Box, RCD, Thermostat, Thermostat back box and
Sensor Probe/Conduit.
Before installation always check the subfloor has adequate
thermal insulation. This is particularly important where
Thermofoil is the primary heat source.
When planning, take into account that Thermofoil needs to be
laid adjacent to each other and across the width of your room.
Also for stability it is also important to lay Thermofoil at a 90
degree angle to your insulation and floor finish.
Substrate Breakdown
Floor Finish
Vapour Barrier (5415)
If inadequate insulation is in place then Thermofoil should be
laid over Econoboard (6014) to ensure economical operation.
Before laying Econoboard check your substrate is level and
secure. If floor boards are absent, 50mm Econoboard (6150)
should be used.
Lay the Conduit onto the insulation, measure, and make a
groove for the Conduit to lay in. The recess should be deep
enough so it lays flush with the top on the insulation board.
Run the Conduit inside the wall cavity and into your Thermostat
(5259) back box. Feed Sensor Probe into Conduit as part of
Thermostat installation process. Consult relevant installation
guide for more information.
Thermofoil
Rigid Insulation Board (5400) or
Econoboard (6014)
Timber substrate
PRO TIP
The Sensor Probe is supplied with 2m of connection cable. The
ideal thermostat height is 1.3m from the floor. This will ensure
your sensor connection cable can be connected easily.
The Sensor Probe needs to be located in a representative area
of floor that cannot be covered by furniture.
Step 1 & 2 checklist:
INSTALLATION PLANNED AND MEASURED
MARSHALLING BOX INSTALLED
GROOVE CHASED TO RECESS COLD TAIL
CONDUIT INSTALLED CORRECTLY
! IMPORTANT SAFETY PRECAUTIONS !
!
Lay Thermofoil AT A 90 DEGREE ANGLE to your
insulation and floor finish
!
CONDUIT & SENSOR PROBE SHOULD BE LAID UNDER
THERMOFOIL IN THE AREA RECEIVING THE MOST EVEN HEAT
!
All items of furniture placed in the heated area
should be on legs or bun feet to ensure that an air
gap is maintained
If you have any questions or queries regarding this product, or any other products or services
Call our technical helpline for free on 0800 019 5899
TFIG1
Installation: Thermofoil
3
4
!
Step 3: Lay Thermofoil and connect to an RCD
Step 4: Apply Vapour Barrier & floor finish
Ensure all electrical supply to has been switched off prior to
installation. Tape down Thermofoil and all connecting wires
to keep them secure. Run connecting wires to an accessible
Marshalling box or connection point mounted in the wall or in a
cupboard. ELEMENTS MUST BE INSTALLED IN PARALLEL.
The complete Thermofoil heating installation should be covered
with a 500g Vapour Barrier (5415) and the engineered or
laminate floor should be laid as specified by the manufacturer,
at a 90 degree angle to Thermofoil.
Wiring Schematic
RCD
Mains
Supply
F
U
S
E
Thermostat
2
3
4
5
Ensure your Sensor Probe is slotted into the Conduit and fed all
the way to the end to meet the end of the yellow cap.
1
°C
6
7
!
Marshalling
Box
Cold Tail
Thermofoil Mat
Your Thermostat can be installed at any point during the
installation. We recommend you install your Thermostat now.
See the Wiring Schematic diagram.
Thermofoil Mat
After care:
Once finished make sure all relevant contractors, in particular
bathroom and kitchen fitters know that electrical underfloor
heating is installed. This will reduce damage risk.
It is also important that adequate air circulation is maintained
at the surface of the floor. All items of furniture placed in the
heated area should be on legs or bun feet. This will ensure that
an air gap is maintained and the system does not over heat.
Use of mechanical floor fixings over the heating is prohibited.
Sensor Probe
Step 3 & 4 checklist:
VAPOUR BARRIER INSTALLED
SENSOR PROBE PUSHED TO THE END OF THE CONDUIT
CHECKED THE YELLOW CAP IS ON THE CONDUIT
CHECKED ALL CONNECTIONS ARE SAFE & SECURE
W.
WWW.
! IMPORTANT SAFETY PRECAUTIONS !
!
!
!
ALWAYS ENSURE THAT YOUR FLOORING IS SUITABLE FOR USE
WITH UNDERFLOOR HEATING. YOU CANNOT LAY THIS PRODUCT
DIRECTLY ONTO CONCRETE SUBSTRATES
ELEMENTS MUST BE INSTALLED IN PARALLEL AND AWAY
FROM ALL WET ZONES
ALL ELECTRICAL WORK MUST CONFORM TO CURRENT IEE, PART P
BUILDING REGULATIONS & CURRENT WIRING REGULATIONS AND
BE CHECKED OR CARRIED OUT BY A QUALIFIED ELECTRICIAN
WWW. If you have any questions or queries regarding this product, or any other products or services
you can view our complete range online, www.thermogroupuk.com
TFIG1
Thermofoil 150 W/m2
Thermofoil 100 W/m2
You May Also Need...
Stock Number
Output (W)
Stock Number
Output (W)
Stock Number
5350
75
5388
50
5354
150
5389
100
5358
225
5390
150
5362
300
5391
200
5366
375
5392
250
5370
450
5393
300
5374
525
5394
350
5378
600
5395
400
5382
675
5396
450
5386
750
5397
500
Thermofoil Technical Specification
Product
Parameter
Value
5400
Rigid Insulation Board
Width
500mm (430mm Heated)
5410
Cold Tail Extension Kit
Dielectric Strength
3kv min
5412
Cold Tail Extension Wire
Max Operating
Temperature
80OC (unregulated)
5415
Vapour Barrier
Max Thickness
450 microns
5418
Fixing Tape
Standards
5267
Flexible Conduit Kit
EN 60335-1/1998
EN 60335-2-30/1992
DIN VDE 0700 Part 2+1
CE
WWW.
Contact us Online
Contact us BY PHONE
Contact us BY MAIL
TFIG_A4_141212.PDF
WWW.
Browse our full product range, watch videos,
download product literature and get a quote,
all on the Thermogroup UK website.
www.ThermogroupUK.com
Got a question or query? Call our UK support
line free from your land line.
Open 07:30 – 16:30 Mon - Fri
0800 019 5899
WWW.
Need to find us or want to write a letter to say
hello? Feel free to contact us at Bridge House.
Thermogroup UK, Bridge House,
Hop Pocket Lane, Paddock Wood,
Kent. TN12 6DQ.
Thermogroup UK
Bridge House
Hop Pocket Lane
Paddock Wood
Kent
TN12 6DQ
0800 019 5899
[email protected]
www.thermogroupuk.com
E&OE © Thermogroup UK 2012