eralab sdn. bhd.

Transcription

eralab sdn. bhd.
ERALAB SDN BHD
CORPORATE
PROFILE
ERALAB SDN. BHD.
(Environmental Research and Analytical Laboratory)
Environmental Research and Analytical Laboratory Sdn. Bhd., or ERALab in
short, commenced operations on 1st June 1995. The office is located at No. 21, Block
C, Jalan PJU 1A/3, Taipan Damansara 2, Ara Damansara, 47301 Petaling Jaya,
Selangor Darul Ehsan. Services offered include i) consultancy in environmental,
health and safety fields, ii) physical site sampling, and iii) analytical laboratory
services. ERALab has also obtained the Petronas License in these areas. For the
laboratory services, ERALab has acquired SAMM accreditation MS ISO/IEC
17025:2005 by the Department of Standards, Malaysia.
The ERALab organization consists of multidisciplinary personnel headed by a
Managing Director, Noor Azimah Mustafa (AMIC). She is a registered chemist with
the Malaysian Institute of Chemistry and holds a Master Degree in Environmental
Science. She also was a research chemist with the Water Supply Department, Negeri
Sembilan, prior to joining an engineering and environmental consultancy firm,
ERINCO Sdn. Bhd. Her experiences in laboratory analysis and field investigations
extend to water related projects, environmental studies, EIA reports and occupational
health related projects. Her involvement in water management and environmental
consultancy is of great benefit to the laboratory, and to the growth, training and
professional development of ERALab personnel. With a staff strength of more than 25,
of whom more than half are specialists - chemists, microbiologist, engineers and
occupational hygienist, the company is geared to.....
....... SCREEN THE ENVIRONMENT AND HELP PRESERVE
MOTHER NATURE
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
SCOPE OF SERVICES
ERALab provides Consultancy, Laboratory Testing and Field Monitoring services in
the field of Environmental, Safety .and Health (ESH).
CONSULTANCY
OCCUPATIONAL SAFETY & HEALTH
ENVIRONMENTAL








Environmental Impact Assessment (EIA)
Environmental Management Plan
Post EIA Compliance Assessment
& Environmental Auditing
Environmental Site Assessment Phase I
Wastewater Characterization Study (WWCS)
Scheduled Waste Management
ISO/IEC 17025 Consultant
Application for DOE Written Approval
( DOE Kebenaran Bertulis)





Health Risk Assessment (HRA)
Indoor Air Quality Assessment (IAQ)
Chemical Health Risk Assessment
(CHRA)
Occupational Noise Exposure
Local Exhaust Ventilation Testing and
Examination (LEV)
LABORATORY TESTING
Water Quality (River, Marine water, Domestic & Industrial Effluent, Drinking Water,
Raw water, Ground water)
 Physical parameter (pH, DO, Alkalinity, Acidity etc)
 Organic Parameters (BOD, COD, etc)
 Chemical Parameters (NH3-N, Heavy Metals etc)
 Organic Compounds (Pesticides, VOC, SVOC, TPH , BTEX etc)
 Toxicity Characteristic Leaching Procedure (TCLP) & Compositional Analysis of
Scheduled Waste (DOE & Kualiti Alam requirements)
Ambient Air Quality

Dust Particulates (TSP and PM10) and heavy metals (As, Pb, Cd, etc)

Gaseous (SO2, NO2, CO)

Oil Mist and Acid mists

Hydrocarbon, VOC

Physical parameters (Temperature, Humidity, Wind Speed)

Dioxin & Furans

Other chemical compound by request.
Stack Emission
 Dust Particulate, Total Organic Carbon, Poly aromatic Hydrocarbon (PAH). VOC,
Heavy Metals (Cd, Hg, As, Pb, Sb) BTEX, HCl, H2SO4, etc
 Dioxin & Furan
Industrial Hygiene
 BTEX, Hg, Mineral Dust, Dust Particulate, etc
Oil Testing
 Water Content, Viscosity, TAN, Wear Metals, etc
Blood and Urine Test
 Mercury Content.
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
SCOPE OF SERVICES
FIELD MONITORING
ENVIRONMENTAL
OCCUPATIONAL SAFETY & HEALTH





Water Quality (River, Marine water,
Domestic & Industrial Effluent, Drinking
Water, Raw water, Ground water)
Ambient Air Quality ( Area monitoring)
Industrial Emission (Isokinetic and nonIsokinetic Stack emission sampling,
Boiler, Chimney)
Boundary Noise Level



Chemical Exposure Monitoring (Mineral dust,
Oil Mist, BTEX and other chemicals as
specified in USECHH Regulations)
Noise mapping, Point Source, Personal
Exposure
Indoor Air Quality
Local Exhaust Ventilation (LEV) Testing
TRAINING



Health, Safety and Environment (HSE) Training
ISO/IEC 17025 Training
Oil Testing Training
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL CONSULTANCY
ERALab’s professional staff possesses academic and practical experience in the
various disciplines that are related to environmental monitoring and consultancy in
ensuring quality of services in the fields described as follows:Environmental Impact Assessment (EIA) is a process, which is used to predict
the potential environmental impact of physical development and to identify and
prescribe mitigating measures to manage the impact.
Selected Relevant Experience:

EIA for The Proposed Mixed Development Project at Pauh, Kangar, Perlis

EIA for The Proposed West Coast Highway from Muar to Gelang Patah for Highway
Development Unit, JKR Malaysia

EIA for The Proposed Recycling Plant of Plastic Material Made of Polyethylene
Terephthalate (PET) to PET Flakes at PT 8645 H.S (D) 82652, Galla Industrial Park,
Mukim Labu, Seremban, Negeri Sembilan Darul Khusus

EIA for Yard Optimization project for Malaysia Marine Heavy Engineering Sdn Bhd
(MMHE) at Pasir Gudang, Johor.

EIA for The Proposed Additional Type of Waste Materials for Incineration Process at
the Existing WTE plant of GSPP, Lot 7090, Mukim Tanjung Dua Belas, Daerah Kuala
Langat, Selangor Darul Ehsan.
.
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL CONSULTANCY
An Environmental Management Plan (EMP) describes the processes that an
organization or project proponent will follow to maximize its compliance and
minimize adverse impact to the environment. This plan also helps the project
owner map its progress toward achieving continual improvements. In Malaysia,
EMP is usually required to be prepared prior to commencement of a project and to
be revised from time to time throughout the project life.
Environmental Audits are reviews of an organization’s operations and
processes for the purpose of assessing compliance with environmental rules and
regulations. They can range from legally mandated reviews of plant safety or
emissions to voluntary inspections of environmental practices. In Malaysia,
environmental audits are perhaps best known as a means of examining the
effectiveness of the EIA recommendations for a given project and adherence to
permissible limits and standards
As part of Environmental Audit, Post EIA Compliance Monitoring is carried
out to allow for an organized assessment of relevant environmental parameters
which is then translated into environmental performance. The reports generated
allow for informed and efficient decision-making on the part of project proponents
and the regulatory authorities.
Working hands in hands with highly trained field personnel for environmental
monitoring, ERALab’s provides an efficient and comprehensive consultancy in
EMP, Environmental audits and Post-EIA Compliance Assessment.
Selected Relevant Experience:

EMP, Post EIA Compliance, Env. audit for Petronas Gas Berhad Kuantan
Compressor Station Expansion Project for SE-TMSB (2007-2009)

EMP, Post EIA Compliance, Env. audit for Petronas Gas Berhad Segamat
Compressor Station Expansion Project at SE-TMSB (2007-2009)

EMP, Post EIA Compliance EIA and Env. Audit for Yard Optimization for
Malaysia Marine Heavy Engineering (MMHE), Pasir Gudang.

Post EIA Compliance & Env. Audit for Malacca Group III (MG3) Project: Lube
Base Oil Plant, at Petronas Penapisan Melaka, Sungai Udang, Malacca for L&T –
ECC Construction (M) Sdn.Bhd. (2006 – 2008)

Post EIA Compliance & Env. Audit for Megamethanol (Labuan) at Petronas
Methanol (Labuan), for Lurgi (Malaysia) Sdn Bhd (2007-2009)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL CONSULTANCY
The Environmental Site Assessment Phase 1 (ESA) is to identify recognized
environmental conditions at the site by evaluating the presence or likely presence
of hazardous substances or petroleum products on or near the Site under
conditions that indicate an existing release, a past release, or the material threat of
a releaser into the structures at the Site or into soil, groundwater, or surface water
at the site.
The assessment is performed in accordance with American Society for Testing
and Materials (ASTM 2005) Standard Practice E 1527-05 for Phase-I ESA. In
the event no contamination is detected, the site is to be certified environmentally
clean, posing no risk for its intended use. However, if the site is contaminated, a
clear Scope of Works for a Phase II ESA is to be defined.
Selected Relevant Experience:

Site Assessment at Ex-Dumping Site, Sg. Kancis, Kelang, Selangor.

The ESA Phase 1 for Petronas Service Station Telok Kalong, Lot 5010,
Kemaman, Terengganu for Petronas Dagangan Berhad.
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL CONSULTANCY
Wastewater Characterisation Study (WWCS) is a study to determine the
physical, biological and chemical characteristics and the concentrations of
constituents in the wastewater. Via the results obtained , the best means of
treatment to reduce the pollutant concentrations is determined to comply with the
DOE Standards stipulated under Environmental Quality Act 1974, the
Environmental Quality Regulations (Sewage and Industrial Effluents) 1979.
Selected Relevant Experience:

WWCS at KLIA Wastewater Treatment Plan, Sepang for Teknik Datasaab Sdn. Bhd.

WWCS for Treatment Plant all over Malaysia for NJS Consultant Co. Ltd.

WWCS at Petronas Gas Berhad (GPP-A), Kertih, Terengganu under Tenaga
Mashhor Sdn.Bhd.

WWCS at Petronas Penapisan (Terengganu) Sdn Bhd.

WWCS for Reused Water Project at Petronas Fertilizer (Kedah) Sdn Bhd

WWCS at Wastewater treatment plant at Genting Highlands for Metropolitan
Engineers & Builders Sdn Bhd
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL CONSULTANCY
Scheduled Waste Management Study (SWMS): ERALab specializes in the
Application of Special Management of Scheduled Waste (SMSW) as provided
under Regulations 7 of the Environmental Quality (Scheduled Waste) Regulations
2005. ERALab’s combined capabilities in analytical services and environmental
consultant as well as collaboration with Makmal Bioserasi, Inbiosis UKM and
Pusat Teknologi Alam Sekitar & Bioproses, SIRIM, enable us to provide full
range of services as required under the Guidelines for the Application of Special
Management of Scheduled Waste.
Selected Relevant Experience:

Pilot Study for the Incineration of Ink Sludge at the “Waste To Energy Plant” of Genting
Sanyen Industrial Paper (GSIP) Sdn Bhd, Banting, Selangor (2008).

Application for SMSW for Ash residue of the “Waste To Energy Plant”, for GS Paper &
Packaging (GSPP) Sdn Bhd (2008-2009)

Application for Special Waste Management of Scheduled Waste for Puncak Niaga (M)
Sdn Bhd (2008-2009)

Waste Classification Study for Nitto Denko Sdn Bhd
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
OCCUPATIONAL SAFETY AND HEALTH
CONSULTANCY
ERALab has well-trained hygiene experts certified by Department of Occupational
Safety and Health of Malaysia (DOSH) to meet the growing needs of occupational
safety and health concern in Malaysia.
Health Risk Assessment Studies (HRA) involves in identifying health hazards in
the workplace and subsequently assesses its risk to human health. The health
hazards include those related to chemical, biological, physical, ergonomic and
psychosocial elements. Chemical hazards, however, is assessed separately under
the Chemical Health Risk Assessment (CHRA).
Selected Project Experience:

HRA at Miri Crude Oil Terminal (MCOT) for Petronas Carigali Sdn. Bhd., Sarawak
Operations. (2008)

HRA at Asam Paya for Petronas Carigali Sdn. Bhd., Sarawak Operations. (2008).

HRA at Bintulu Crude Oil Terminal (BCOT) for Petronas Carigali Sdn. Bhd., Sarawak
Operations. (2008)

HRA at Labuan Supply Base (LSB) for Petronas Carigali Sdn. Bhd., Sarawak Operations.
(2008)

HRA at E11RC Oil & Gas Platform for Petronas Carigali Sdn. Bhd., Sarawak Operations.
(2008).

HRA at D35 Oil & Gas Platform for Petronas Carigali Sdn. Bhd., Sarawak Operations.
(June 2008)

HRA at Baronia, Baram and Tukau platforms for Petronas Carigali Sdn. Bhd., Sarawak
Operations. (October 2008)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
OCCUPATIONAL SAFETY AND HEALTH
CONSULTANCY
Indoor Air Quality Assessment (IAQ) is conducted to assess the quality of air in
non-industrial places of work in industries as listed under Schedule 1 of the
Occupational Safety and Health Act 1994 (Act 514). Work places fall under this
category include offices, educational and training facilities, commercial
establishments, health care facilities, cafeterias and restaurants, gaming
establishments, pubs, bars, and karaoke lounges and discotheques. ERALab’s
registered IAQ Assessor conducts the assessment in accordance to the Code of
Practice (COP) on Indoor Air Quality (IAQ) as a guide to comply with the general
duties of employers prescribed under Section 15 of the Occupational Safety and
Health Act 1994 (Act 514).
Selected Relevant Experience:

IAQ Assessment at FSO Caspean Sea for Murphy Oil & Gas. (March 2007)

IAQ Assessment at Entertainment premises Hard Rock Cafe, KL. (August 2007)

IAQ Assessment at Talisman Malaysia KL Offices, Menara Citibank for Talisman
Malaysia Limited (TML). (July 2008)

IAQ Assessment at EXPRO Office, Menara UOA, Bangsar, for EXPRO Exploration
Sdn Bh.,(Nov 2008)

IAQ Assessment at FSO Cakerawala, Offshore Thailand for CarigaliHess Operating
Sdn. Bhd (Oct. 2008)

IAQ Assessment at Cakerawala Puteri Platform for Carigali Hess Sdn. Bhd (Oct.
2008)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
OCCUPATIONAL SAFETY AND HEALTH
CONSULTANCY
Chemical Health Risk Assessment (CHRA) is one of the mandatory
requirements of the Occupational Safety and Health (Use and Standards of
Exposure of Chemicals Hazardous to Health) Regulations 2000 under the
Occupational Safety and Health Act 1994.
In conducting the CHRA, ERALab adheres strictly to DOSH-recommended
methods documented in the Assessment of the Health Risks Arising from the Use
of Hazardous Chemicals in the Workplace’ (A manual of Recommended Practice
2nd Edition).
Selected Relevant Experience:

CHRA for MMHE for Pasir Gudang, Johor Darul Takzim. (2005)

CHRA for ERB West and Tembungo Platforms for PCSB-SBO. (2005)

CHRA for Angsi Platform for PCSB-PMO. (2005)

CHRA for Penara and North Lukut Platform, PCSB-PMO Kerteh, Kemaman,
Terengganu. (2006)

CHRA for PM9 Oilfield Platforms, PCSB-PMO. (2007)

CHRA at Onshore Terminals and Offshore Installations (11 sites), PCSB-SKO (2008)

CHRA for Polymatec Sdn Bhd, Shah Alam, Selangor. (2008)
.
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
OCCUPATIONAL SAFETY AND HEALTH
CONSULTANCY
Occupational Noise Exposure Monitoring is a requirement under The Factories
and Machinery (Noise Exposure) Regulations, 1989 where the employer needs to
carry out this monitoring to assess the health risk of employees due to noise
exposure in the workplace. This includes the assessment of the provision of control
measures to reduce noise levels to an acceptable level. Failing to address this issue
may result in prosecution and / or civil claims against the company.
ERALab offers services of professionally qualified and competent personnel
registered with DOSH in achieving compliance with the above regulations. Services
cover the following:


noise mapping and point noise source at static locations,
Personal noise exposure records using state-of-the-art logging equipment,
The above services allow employers to take remedial measures.
Selected Project Experience:

Initial Noise Survey at 11 sites of Oil and Gas Platforms
and Terminal for PCSB, Sarawak (May 2008 – Mar 2009)

Initial and Positive Noise Survey at KR1 and KR2 of
Petronas Penapisan Terengganu (PP(T) SB)
(2006 and 2008)


Initial Noise Survey at Ethylene and Polyethylene (M)
Sdn Bhd (2009)

Initial Noise Survey at TORAY Basf Sdn Bhd (2008)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
OCCUPATIONAL SAFETY AND HEALTH
CONSULTANCY
Local Exhaust Ventilation (LEV) testing and examination is conducted to control
worker’s exposure to harmful substances which has been one of the important
requirements of the Regulations made under Factories and Machinery Act 1967 and
the Occupational Safety and Health Act 1994. Under Regulation 17(1) of Use and
Standards of Exposure of Chemicals Hazardous to Health Regulations 2000, any
engineering control such as LEV system must be inspected at an interval of not more
than one month by the employer and examined and tested by a registered Hygiene
Technician at an interval of not more than twelve months.
Selected Project Experience:

Provision of Testing and Examination of LEV system at TML PM3 CAA Installation BUNGA RAYA for Talisman Malaysia Ltd. (2008)

Provision of Testing and Examination of LEV system at TML Offshore at South Angsi
Installations for Talisman Malaysia Ltd. (2008)

Provision of Testing and Examination of LEV system at Penjom Goldmine for Specific
Resources Sdn Bhd. (2009)

Provision of Testing and Examination of LEV system at PERHEBAT (2009)

Provision of Testing and Examination of LEV system at TNB Research Sdn Bhd (2009)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
LABORATORY TESTING
ERALab Sdn Bhd, is an accredited laboratory under SAMM (Skim Akreditasi
Makmal Malaysia) for ISO/IEC 17025 by the Department of Standards, Malaysia.
Our laboratory in Ara Damansara, Subang, Selangor DE
is equipped with the latest testing equipment handled by
trained chemists and technicians using approved
methods according to international standards. The fact
that the laboratory is accredited for a wide range of
inorganic, organic, heavy metal and other physicochemical parameters speaks volumes about its capability
and capacity to analyze various types of samples.
Water Quality Testing
(River, Marine water, Domestic & Industrial Effluent, Drinking Water, Raw water,
Ground water)







Physical parameter (pH, DO, Alkalinity, Acidity, etc)
TSS, TDS, Oil & Grease etc
Organic Parameters (BOD, COD, etc)
Chemical Parameters (NH3-N, Phosphorus, Cyanide, Heavy Metals and other
chemical related to water quality etc)
Inorganic parameter (TKN, sulphide, etc)
Organic Compounds (Pesticides, VOC, SVOC, TPH , BTEX etc)
Toxicity Characteristic Leaching Procedure (TCLP) & Compositional Analysis of
Scheduled Waste (DOE & Kualiti Alam requirements)
Ambient air quality samples
 SO2, NO2, TSP, PM10, VOC, Heavy Metals, BTEX, Ozone, HCl,
H2SO4, etc
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
LABORATORY TESTING
Stack emission samples
 Dust Particulate, Total Organic Carbon, Poly Aromatic Hydrocarbon (PAH). VOC,
Heavy Metals (Pb, Fe, Cd, Cr, Hg, As, Sb etc), BTEX, HCl, H22SO4, etc
 Dioxin & Furan
Chemical Exposure Samples
 BTEX, Mercury, Mineral Dust, Dust Particulate, Chemicals as stipulated in
USECHH Regulations
Oil Testing
 Water Content, Viscosity, TAN, Wear Metals, etc
Blood and Urine Test
 Mercury Content.
Fertilizer Samples
 N, P, K, Cu, NO3, NH3-N, Zn, Mn, Fe, B, Mo and Mg
Microbiological Tests
 Feacal Coliform, Total Coliform, Total Bacteria, Total Fungi, Heterotrophic
Plate Count, Feacal Streptococi, etc.
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
LABORATORY TESTING
ERALab has also set up a branch in Kemaman, Terengganu to provide laboratory
testing services to the East Coast of Malaysia ever growing Oil & Gas market.
ERALab (Kemaman Branch) involves in various testing activities mainly on mercury
analysis. The laboratory has acquired SAMM accreditation MS ISO/IEC 17025:2005
for analysis of mercury (Hg) in water, personal exposure samples (extracted using
hopcalite sorbent tube) and biological samples i.e. urine and blood.
The scope of accreditation is for mercury analysis:

Water Samples – Using Method USEPA 7473

Personal Exposure Samples – Using Method NMAM 6009

Biological Samples (for Medical Surveillance Testing) – Using Method
USEPA 7473
For further enquiries please contact us at :UELS Sdn. Bhd. (ERALab Kemaman Branch)
No. 6976, First Floor Bukit Kuang Business Centre
24007 Bukit Kuang, Kemaman, Terengganu
Tel: 09-858 4563, Fax: 09-858 5797
Email: [email protected] or [email protected]
Attn: Ms Noraini Shair (019-237 1025)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL
FIELD MONITORING
Environmental monitoring is an integral part of the Environmental Studies. It
comprises the monitoring of three main components of environmental resources
namely water, ambient air and noise level.
Baseline monitoring of these components provide information to reflect the existing
conditions of a particular project site and can become the rational for environmental
study areas to be carried out. Meanwhile, the environmental monitoring conducted
over a time as per DOE recommendation for each related project is to ensure that
there are no environmental hazards occurred during the construction and
operational period and all relevant regulations related to the projects are being
complied with.
Water and Wastewater Quality Monitoring
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL
FIELD MONITORING
Ambient Air Quality Monitoring
Ambient Air Quality Monitoring
Boundary Noise Level Monitoring
Since its inception in year 1995, ERALab has conducted numerous environmental
monitoring which are related to the environmental studies. ERALab provided the
environmental monitoring services to many organizations such as Environmental
Consultants, Property developers, Industries and the government authorities for the
evaluation of the environment in a particular site or region.
Selected Relevant Clients:












ERINCO Sdn Bhd
Sime Engineering –Tractors
Malaysia Airport Berhad
Perbadanan Air Melaka (PAM)
Petlin (Malaysia) Sdn Bhd.
Petronas Methanol Labuan
Petronas Carigali Snd Bhd -PMO
PNB Sdn Bhd
Perodua Manufacturing Services Sdn Bhd, Rawang, Selangor Darul Ehsan
Petronas Gas Berhad (GPP-A), Kemaman, Terengganu
Petronas Gas Berhad Kuantan and Segamat Compressor.
Petronas Penapisan (Terengganu) Sdn Bhd
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL
FIELD MONITORING
Groundwater Quality Monitoring is conducted mainly to assess and determine
if there is any contaminations to the groundwater due to the operation of any
establish facilities and its associated activities within the site. The groundwater
quality is normally recommended to be monitored on a regular basis to ensure
early detection of occurrence of any contamination in the future either by the
premises operations or the neighbouring facilities. For this, ERALab Sdn Bhd
provides professional services in the following areas:




Development of groundwater observation well
Sampling & analysis of groundwater
Assessment of groundwater quality
Recommendations for following action
Selected Relevant Experience:

Development of Permanent Observation Wells and Groundwater monitoring at
Selayang Landfill (2005)

Development of Permanent Observation Wells and Groundwater monitoring at
Petronas Methanol (Labuan) Sdn. Bhd. (2005/2006)

Development of Permanent Observation Wells and Groundwater monitoring at ExDumping Site, Sg. Kancis, Kelang, Selangor.(2005)

Development of Permanent Observation Wells and Groundwater monitoring at
MegaMethanol Project Site (2007)

Groundwater monitoring at BP Chemicals Sdn Bhd (2008-2009)

Groundwater monitoring at OGT, Kertih for PCSB PMO (2009)

Groundwater monitoring at MMHE, Pasir Gudang, Johor (2009)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
ENVIRONMENTAL
FIELD MONITORING
Stack Emission
ERALab conducts Isokinetic and non iso stack-monitoring services and has
extensive experience in stack sampling and analysis. The range of measurable
stack emission constituents include sulphur, particulate, heavy metals, inorganic
compounds, hazardous organic compounds such as dioxin, furan and polynuclear
aromatic hydrocarbons (PAH). ERALab employs approved and state of the act of
equipment and methods such as those recognized by the United States
Environmental Protection Agency (USEPA) and accepted by the Department of
Environment, Malaysia.
Accurate determination of pollutants emitted into the environment, knowledge and
familiarity of the existing legislative requirement as well as extensive experience in
the field are all essential factors towards the establishment of an air quality
management system.
Selected Relevant Experience:
 Stack emission mon. at Polyplastic Asia Pasific, Gebeng Industrial Estate, Pahang Darul
Makmur (2001)
 Stack emission monitoring at Kaneka PVC Paste Plant, Gebeng Industrial Estate,
Kuantan (2001)
 Stack Emission Monitoring at Petronas Methanol (Labuan) Sdn Bhd (2005)
 Stack Emission Monitoring at Kilang Kelapa Sawit Krau, Pahang Darul Makmur (2007).
 Stack Emission Monitoring at Kilang Kelapa Sawit Padang Piol, Pahang Darul Makmur
(2007).
 Stack Emission Monitoring at Kuantan and Segamat, Petronas Gas Berhad (2007).
 Stack Emission Monitoring at Tiong Nam for GM Consult at Sabah (2007).
 Stack Emission Monitoring at Petlin (Malaysia) Sdn Bhd. (On-going).
 Stack Emission Monitoring at TNBG Stesen Janakuasa Port Dickson(2006-On-going)
 Stack Emission Monitoring at Petronas Penapisan (T) Sdn Bhd (2008)
 Stack Emission Monitoring at Bp Chemicals (M) Sdn. Bhd., Gebeng Industrial Estate,
Pahang Darul Makmur (1998-2000, 2007-2010)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
OCCUPATIONAL SAFETY AND HEALTH
FIELD MONITORING
Chemical Exposure monitoring is conducted to assess the health risk of
personnel at workplace, which is directed towards the measurement of personal
exposure and area monitoring to airborne contaminants eg Total dust, respirable
dust, mineral dust, oil mist, Hg, BTEX etc. This is to meet DOSH requirement
under Occupational Safety and Health (Use and Standard of Exposure of
Chemicals Hazardous to Health) Regulations, 2000. ERALab offers Industrial
Hygiene Technician I registered with DOSH to conduct this monitoring.
Noise survey monitoring is conducted by ERALab Noise Competent Person
eas requirement under the Factories and Machinery (Noise Exposure)
Regulations, 1989. The monitoring includes noise mapping, point source,
personal noise exposure monitoring. Relevant experiences are as per
consultancy for Noise survey monitoring.
Indoor Air Quality Assessment and Measurement is recognized when it is
conducted by IAQ Assessor registered with DOSH. The IAQ measurement
include measurement of chemical contaminants, such as carbon dioxide, carbon
monoxide, formaldehyde, volatile organic compounds and environmental tobacco
smoke (ETS); physical conditions, such as air temperature, air velocity and
humidity; biological agents, such as mites, virus, and spores; and radiation such
as radon. Relevant experiences are as per consultancy for Indoor Air Quality
Assessment.
Selected Relevant Experience- Chemical Exposure Monitoring:

Personal Exposure and Area Monitoring for BTX at Sabah Gas Terminal, Labuan
Gas Terminal and Samarang Platform for Petronas Carigali Sdn Bhd, Sabah
Operation. (2003, 2004, 2005 and 2007)

One Year Contract of Chemical Exposure Monitoring for Petronas Penapisan
Melaka, 2006.

Mercury Exposure Monitoring during Shutdown Activities at Gas Processing Plants
for Petronas Gas Berhad, Kerteh, Terengganu (2007, 2008 and 2009).

Chemical Exposure Monitoring for BTX and Mercury (Hg) at Pulai, Bekok C, Tiong
A, Tinggi and Bekok A Platforms for Petronas Carigali Sdn Bhd-Peninsular
Malaysia Operations.(2007).

Industrial Hygiene Monitoring for Total Dust and Ammonia at BP Chemicals
Malaysia (2008).

Chemical Exposure Monitoring for BTX and Hg at Duyong Platform for HG Solution
Sdn.Bhd.(2008).

Chemical Exposure Monitoring for Zinc Oxide, Aniline, Calcium at Nakagawa
Rubber Industries Sdn.Bhd.(2008).

Chemical Exposure Monitoring for Oil Mist and Total Dust at Shin Etsu (Malaysia)
Sdn.Bhd.(2008).
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
TRAINING
ERALab provides Health, Safety and Environmental (HSE) Training which is
delivered by qualified and competent health, safety and environmental
consultants. Through our consultant vast experiences and their dedication, we can
help an organization in achieving compliance with legal health, safety and
environmental requirements, including the development of their own specific health
and safety policy statement and management system in accordance with the
Occupational Safety and Health Act, 1994 and industry best practice. We also
provide health and safety training courses and other unique management systems
developed to OHSAS 18001 and ISO 14001 standards. Trainings provided by ERALab
are:-

Health, Safety and Environmental (HSE) Training
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)

Indoor Air Quality Management for Facility Manager / Building Owner
Hazard Communication
Safety In Laboratory
Introduction of Occupational Hygiene
Effective Chemical Register
Hearing Conversation Program
Biological Hazard
Hazard Identification
Health Impact Assessment
Effective OSH Audit
Management System
-

ISO 14001:2007/
OHSAS 18001:2007
ISO/IEC 17025 Training
Oil Testing Training
-
Maintenance Philosophies
Lubrication Fundamentals
Oil Sampling – The Very Best Practice
Fluid Properties Analysis
Contamination Control and Proactive Maintenance
Understanding and Analyzing Machine Wear
Selecting Routine Test
Oil Analysis Report Interpretation
Field Tests and Inspection
Selected Project Experience:





HAZCOM Training at part of CHRA at Kemaman Supply Base (KSB) for PCSB-PMO)
HAZCOM Training at part of CHRA at FPSO Bunga Raya for PCSB-PMO
IMS (Integrated Management System) Training at PGB-TOD, Segamat
ISO/IEC 17025 Training as part of Laboratory Accreditation Program at Department of
Water Supply, Brunei Darussalam.
Oil Testing Training at Petronas Methanol (Labuan) Sdn Bhd (In collaboration with Focus
Lab, Thailand)
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my
LICENSES AND PROFESSIONAL
REGISTRATION
Ministry of Finance
(MOF)
Department of Standards
Malaysia (DSM)
PETRONAS
Department of Environmental
(DOE)
Department of Occupational,
Safety & Health
Data Entry / Software (220503)
Laboratory Furniture Supplier
(100200)
Chemical Laboratory (100101)
Marine Equipment (190300)
Training Provider (220502)
SAMM MS ISO/IEC 17025
Safety Consultancy (SC303010000)
Environment Consultancy (SC303020000)
Industrial Hygiene Survey & Services
(SC303040000)
R&D Health, Safety & Environment (HSE)
(SC309140000)
Soil
&
Groundwater
Investigation
(SH206040000)
Well Testing Equipment & Services
(SP220000000)
Laboratory Services – HSE Laboratory
(SC310010000),
Decontamination Services (SH203000000)
Non-Scheduled
Waste
Management
(SC217020000)
Monitoring, Treatment & Disposal of
Scheduled Waste (SH201050000)
Specialist Manpower – Lecturing and
Training Personnel (SM203110000)
Registered
(Individual.)
Environmental
Consultant
Competent person for Noise
Industrial Hygiene Technician 1
Industrial Hygiene Technician 2
CHRA Assessor
IAQ Assessor
Tel: 03-7842 6693/6694 Fax: 03-7842 6695 Email
: [email protected] , [email protected]
Website: www.eralab.com.my