Schofields Road
Transcription
Schofields Road
Community Update august 2012 Schofields Road upgrade Windsor Road, Rouse Hill to Tallawong Road, Schofields Roads and Maritime Services (RMS) is widening Schofields Road from a two-lane road to a four-lane divided road, between Windsor Road, Rouse Hill and Tallawong Road, Schofields. Tenders for construction were invited on 30 April 2012. Construction will commence in late 2012. This project is funded by the NSW Government. Background Schofields Road is currently a two lane rural road, linking Windsor Road at Rouse Hill with Railway Terrace at Schofields. It is proposed that Schofields Road will be upgraded in three stages: • Stage 1 of the Schofields Road upgrade is between Windsor Road and Tallawong Road. This upgrade was approved in 2009. • Stage 2 of the Schofields Road upgrade is between Tallawong Road and Veron Road. A concept design and a review of environmental factors is planned for display in late 2012. t as dE N An na gro Ro ve ad location map oa dR ROUSE HILL el d d d e Drive Ridgelin Road Hambledon s Pond The arde v Boule e a Ro oa gR a Ro oad elds R Schofi SCHOFIELDS Alex Ave nu r so on ng ad Ro ad Ro d on Roa Towns ad Ro ry da un s Bo eld hofi ad Sc m Ro Far Street tion South ace Avenue c Jun ond hm Ric Grange Veron Road y Road Fermo d on Roa Carnarv est Road W Garfield er r yT ilwa Ra o law Tal RIVERSTONE MARSDEN PARK eg dg nd Wi Cu rfi Ga KELLYVILLE Stage 1 - Approved upgrade to commence late 2012 Stages 2 and 3 currently being planned North West Rail Link Schofields Road upgrade – Stage 1 Windsor Road to Tallawong Road N KEY Road Shared path Median and islands Bus priority lane North West Rail Link ink ail L est R rth W No CUDGEGONG ROAD Twin bridges over Second Ponds Creek NG AWO L TAL Tallawong Road/Ridgeline Road: proposed realignment to a four way intersection with traffic lights ROA OAD D F CHO SR IELD S Cudgegong Road: proposed T-intersection with traffic lights E ELIN RIDG ROAD © AAM PTY LTD (2011). AAM AERIAL PHOTOGRAPHY UNDER LICENCE TO ROADS AND MARITIME SERVICES BY AAM PTY LTD. • Stage 3 is between Veron Road and Richmond Road. A concept design is currently underway. The upgrade of Schofields Road, when extended to Richmond Road, would be a major east-west connection between Windsor Road and Richmond Road. A transit boulevard would meet the future transport needs of the North West Growth Centre with room for pedestrians, bicycles, public transport and vehicles. It would service the new Schofields Railway Station and the adjacent town centre. Features of stage 1 of Schofields Road Upgrade – Windsor Road to Tallawong Road • An upgrade from a two-lane to a four-lane divided road with a wide central median to allow for widening to six lanes in the future. • A posted vehicle speed limit of 60km/h. • Three new signalised intersections at The Ponds Boulevard/Terry Road, Cudgegong Road and Tallawong Road/Ridgeline Drive. • Tallawong Road to be realigned to match up with Ridgeline Drive. RO ERRY RE T FUTU The Ponds Boulevarde/Terry Road: Four way intersection with traffic lights Retaining wall OAD AD SR IELD OF ULE VARDE SCH BO CASTLEBROOK MEMORIAL LAWN CEMETERY E TH S ND PO typical cross section SHARED USE PATH MEDIAN FOR FUTURE ROAD WIDENING SHARED USE PATH 43m • Cudgegong Road to be realigned to accommodate the future work associated with the North West Rail Line. • Twin bridges over Second Ponds Creek. • Designated turning lanes at the signalised intersections. • A tree-lined corridor. • Bus priority capability at traffic lights and one indented bus bay east of Cudgegong Road. • An off-road shared path on both sides of the corridor for cyclists and pedestrians. • Provision of street lighting. Benefits • Improved safety for motorists by: - Constructing a central median to separate opposing traffic flows. - Constructing turning lanes at intersections. - Constructing new intersections with traffic lights to access precincts. • Improved capacity along Schofields Road catering for predicted increased traffic volumes. • Access to the future North West Rail Line. • Improved safety for cyclists and pedestrians by providing an off-road shared path. • Improved future travel times when development occurs. What happens next? • Access to future North West Growth Centre precincts along the Schofields Road corridor. Construction is scheduled to commence in late 2012 and is expected to be complete late 2014, weather permitting. • Improved access and travel times for road freight in Sydney’s North West. • Bus priority capability at traffic lights. • Improved landscaping. What’s happening now? Stage 1 of the Schofields Road upgrade between Windsor Road and Tallawong Road was approved in May 2009. Tenders for construction were invited in April 2012. RMS will continue to update the community throughout the project. For further enquiries Susan Bestwick Project Manager Roads and Maritime Services PO Box 973, PARRAMATTA NSW 2124 T 02 8849 2696 E [email protected] North West Rail Link This project supports the North West Rail Link, a priority rail project for the NSW Government. For more information on the North West Rail Link you can visit the project website at northwestrail.com.au. This paper is • carbon neutral • Australian-made • recycled fibre • elemental chlorine free • pulp derived from sustainably managed sources. © Roads and Maritime Services Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (or PPIP Act) which requires that we comply with the Information Protection Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting in the assessment of this proposal. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at 27 Argyle Street, Parramatta NSW 2150. You have the right to access and correct the information if you believe that it is incorrect. For further enquiries Susan Bestwick, Project Manager, Project Management, Roads and Maritime Services PO Box 973, Parramatta NSW 2024 T 02 8849 2696 | E [email protected] www.rms.nsw.gov.au August 2012 RMS 12.212