COMPANY PROFILE DSESB.xlsx - DiPETRO SYNERGY ENG SDN
Transcription
COMPANY PROFILE DSESB.xlsx - DiPETRO SYNERGY ENG SDN
OPERATION OFFICE / WORKSHOP: PT 12510 (A-13), Kawasan Perusahaan Chacar, 23100 Dungun, Terengganu Darul Iman, MALAYSIA Tel : +609 - 827 7200 / 0201 Fax : +609 - 827 0185 Website : www.d-petro.com SECTION 1.0 INTRODUCTION Brief Summary Of Company Company Mission Statement Corporate Information Corporate Registration SECTION 2.0 ORGANISATION DiPETRO Organization Chart Profile Of Key Personnel SECTION 3.0 MANPOWER REPORT SECTION 4.0 COMPANY CAPABILITIES Plant Maintenance Services Plant Turnaround Services Blasting, Painting And Fire Proofing Works Epcc/Construction/Fabrication Works Scaffolding Supply, Delivery Erection & Dismantling Services Hot & Cold Insulation Manpower Supply SECTION 5.0 ON GOING PROJECT FLIERS Plant Maintenance/ Construction Division SECTION 6.0 COMPANY FACILITIES & PAST PROJECT FLIERS Workshop / Fabrication Yard Past Project & Fliers DiPETRO SYNERGY ENG SDN BHD (hereinafter referred to as DiPETRO) is 100% Bumiputera, company both in equity and as well as management control. The Company was formely known as HP Engineering Enterprise was incorporated in February 2009. Beginning with sub contarcting work from Main Contractor, HP Engineering Enterprise emerged forward and expand its business to become Main Contractor with the inception of newly Sendirian Berhad Company. In coping with the new business challenge, The newly formed Company (DiPETRO) was then incorporated on 8th April 2011. DiPETRO management staff and key projects supervisory personnel have vast experience in oil, gas and petrochemical industry. In addition to indirect manpower (key personnel) above, DiPETRO has been proven to be able to deploy huge amount of direct manpower of multi-discipline crews (profesional and labours forces) for its plant maintenance, construction. With technical support from both in-house and DiPETRO subcontractors, DiPETRO possess technical know-how project management experience and local knowledge to manage and engage in Plant Construction, Maintenance and Turnaround works. DiPETRO and its associates have successfully completed projects for the following work: Mechanical, Plant Civil & Steel Fabrication Works Plant Maintenance Services & Turnaround Works Statutory Tank Maintenance Scaffolding Erection, Dismantle & Rental Services Blasting & Painting Works Hot & Cold Insulation Works Manpower Supply DiPETRO is committed to maximize its business potential and is confident to render quality services to our clients as we have in-place Quality and Safety Programs which are adhered to during execution of our works. To be the leading company for the provision of : Experienced, qualified and competent manpower in their own field of expertise to our clients in the oil, gas and petrochemical industry. Uncompromised quality, safety and timely execution of Engineering Services including Mechanical & Civil Works. GENERAL Company Name : DiPETRO SYNERGY ENG SDN BHD (Formely known as HP Engineering Enterprise) Registration No. : 939710-U Date of Incorporation : 8th April 2011 Registered Address : A1-02-02, Hata Square, Jalan Mewah 1/3, Pandan Mewah, 68000 Ampang, Selangor Head Office : PT 12510 (A-13), Kawasan Perusahaan Chacar, Mukim Kuala Paka, 23100 Dungun Terengganu Darul Iman Contact No Fax No : : (609)827 7200 / 0201 (609)827 0185 E-mail : [email protected] Web Address : www.d-petro.com Company Secretary : MOHD FAIRUZ BIN A RAZAK & Auditor A1-02-02, Hata Square, Jalan Mewah 1/3, Contact No : Pandan Mewah, 68000 Ampang, Selangor Tel : (03) 4296 9694; Fax No : (603) 4296 9692 Equity Structure : 100% Bumiputera CAPITAL STRUCTURE Authorised Capital : RM 1,000,000.00 Paid Up Capital : RM 1,000,000.00 Working Capital : RM 1,000,000.00 Ahmad Fikeri Bin Mohamad : Shareholder Mohd Hanafiah Bin Darmadan : Shareholder Ahmad Fikeri Bin Mohamad : Managing Director Mohd Hanafiah Bin Darmadan : Executive/Operation Director Name of Bank Address : : Bumiputra Commerce Berhad (CIMB) Dungun, Terengganu. Current Account. No. : 8601785563 OD : : RHB BANK RM Term Loan : RM 72,000.00 BA : RM 250,000.00 BG : RM 1,500,000.00 RM 2,822,000.00 SHAREHOLDERS BOARD OF DIRECTORS BANKER BANKING FACILITIES 1. Name of Bank Total 1,000,000.00 2. Name of Bank Total : PUBLIC BANK (BG Facilities) 3. Name of Bank : SME BANK : : RM RM RM 1,000,000.00 2,500,000.00 3,500,000.00 : RM 6,822,000.00 RM OD / Trade Line BG Total GRAND TOTAL OF FACILITIES 500,000.00 1) United Kingdom Accreditation Services (UKAS) 2) Kementerian Kewangan Malaysia (MOF) 3) Construction Industri Development Board (CIDB) 4) Petroleum Nasional Berhad (PETRONAS) 5) Dewan Perniagaan Melayu Malaysia 6) Akta Kumpulan Wang Simpanan Pekerja (KWSP) 7) Others 1) United Kingdom Accreditation Service (UKAS) ISO 9001 - 2008, Quality Management System - Requirement Provision of Mechanical & Civil Services 2) KEMENTERIAN KEWANGAN MALAYSIA 140100 BAHAN BINAAN 140200 PERALATAN KESELAMATAN JALAN JAYA 220112 SAND BLASTING & MENGECAT UNTUK KAPAL 180100 MESIN DAN KELENGKAPAN BENGKEL 220501 KONTRAK BURUH 180200 PERALATAN PERINDUSTRIAN MINYAK 220802 BANGUNAN 180300 MESIN DAN KELENGKAPAN KHUSUS 221404 MEMBAIKPULIH : BARANG LOGAM STESYEN JANAKUASA LETRIK DAN PERALATAN 200300 KABEL, AKSESORI DAN KONDUKTOR 200200 220111 PERALATAN KAWALAN KESELAMATAN GENERATOR/ ALAT GANTI TARIKH LUPUT : 12/08/2017 3) LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (CIDB) G7 B PEMBINAAN BANGUNAN B04 KERJA BANGUNAN AM G7 CE PEMBINAAN KEJURUTERAAN AWAM CE21 KERJA-KERJA KEJURUTERAAN AWAM G7 ME MEKANIKAL DAN ELEKTRIKAL M15 KELENGKAPAN AM PELBAGAI TARIKH LUPUT : 28/05/2018 5) PETROLIAM NASIONAL BERHAD (PETRONAS) Code Services/ Specialist SM 2031100 SM2 SM 5010101 SM5 SM 5010102 SM5 SM 5010103 SM5 SM 5010300 SM5 SM 5010400 SM5 SM 5010700 SM5 SM 5030100 SM5 SM 5090100 SM5 SM 5090300 SM5 SQ 1060100 SQ1 SM 5120100 SM5 SM 5120200 SM5 SO 2020201 SO2 SO 2020102 SO2 SO 2020203 SO2 SP 1020300 SP1 SC 2080000 SC2 MANPOWER SUPPLY MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE MECHANICAL ENGINEERING MAINTENANCE 03 Specialist Manpower & & & & & & & & & & & & OFFSHORE FACILITIES CONSOFFSHORE FACILITIES CONSTRUCTION OFFSHORE FACILITIES CONSTRUCTION PIPELINE & ASSOCIATED SERVICES CIVIL STRUCTURAL & BUILDING MAINTENANCE SERVICES 01 Stationary Maintenance 01 Stationary Maintenance 01 Stationary Maintenance 01 Stationary Maintenance 01 Stationary Maintenance 01 Stationary Maintenance Equipment Repair & Equipment Repair & Equipment Repair & Equipment Repair & Equipment Repair & Equipment Repair & 03 Valve Repair & Maintenance 09 Structural & Piping Fabrication/ Welding Services 09 Structural & Piping Fabrication/ Welding Services 11 Lecturing & Training Personnel 01 Floating Roof Storage Tank 02 Fixed Roof Storage Tank 03 Cryrogenic Storage Tank 03 Columns, stripper & Corrugated Plate Interceptor 04 Heat Exchanger, Condensors & Cooler 07 Pressure & Unpressurized Vessel 01 Mechanical Valve 01 Metallic Structural/Piping 03 Lined Pipe 11 Coating Services 03 Painting & Coating 12 Insulation Work 01 Hot Insulation 12 Insulation Work 02 Cold Insulation 02 Onshore Fabrication 01 Minor Onshore Fabrication - Civil Work 02 Major Fabrication 03 Onshore Facilities 02 Onshore Fabrication 03 Minor Onshore Fabrication - Mechanical 02 Pipeline Construction (Fabrication & Installation) 03 Pipeline Coating 08 Scaffolding Services & Inspection Management Structure: The company is led by a strong and experienced team which includes representative drawn from various professional fields, i.e. business, engineering, maintenance, fabrication and construction in the oil, gas and petrochemical industries. This bring depth and diversity in expertise and perspectives towards leadership of the company. As of today, the key management team of DiPetro Synergy Eng Sdn Bhd (DiPETRO), consist of the following individuals:i) Ahmad Fikeri Bin Mohamad Managing Director ii) Mohd Hanafiah Darmadan Executive/Operation Director Aged 46, is the Managing Director of the company. He has a Degree in Mechanical Engineering from California State University. He has joined DiPETRO in April 2011 as Managing Director and in-charge of the overall admin, financials and operations of the company. For project purposes he acts as Project Advisor/ Manager monitoring all operation and technical matters including planning, execution, safety, quality control and procedures, etc. Ahmad Fikeri Mohamad Managing Director Prior to his appointment in DiPETRO, he had served Hse Resources Sdn Bhd as Technical Director (from May 2005 - March 2011), Technotest Sdn Bhd as a General Manager (Jan 2004 - April 2005) as well as a Director in its subsidiary EN-ES Technologies Sdn Bhd, Asaga Corporation Sdn Bhd as a General Manager and same time as Managing Director in its subsidiary Asaga Engineering & Construction Sdn Bhd (June 2003 - Dec 2003), Mushtari Maintenance Services Sdn Bhd as Operation Manager (March 1997 - May 2003) and as Project Engineer (July 1995 - Feb 1997) and Perusaahan Otomobil Nasional Sdn Bhd (PROTON) as Technical Executive (July 1990 - July 1992). His professional qualification includes as a PTS Protective Coating & Lining CORAL Committee, Institute Material of Malaysia (IMM) Qualified Blasting & Painting Inspector, Welding Inspector (CSWIP), and Qualified Project/ Turnaround Manager. Apart from that he is also member of the Board of Engineers and Institution of Engineers of Malaysia. As a highly responsible management, he had undergone various Safety Courses both onshore and offshore. Among the courses that he had attended were conducted by Terengganu Safety Training Centre Sdn Bhd (TATI) namely onshore Safety Orientation, Safety for Line Supervisor, and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and NIOSH Petronas Safety Passport (NPSP) In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a multidicipline manager which specialization is in mechanical field. During the course of his work, he has been handling various disciplines namely mechanical and maintenance work (construction including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works, Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc. Aged 46, is the Executive cum Operation Director of the Company. He has a Diploma In Electrical Engineering from Universiti Teknologi MARA (UiTM). He has joined DiPETRO in April 2011 as Executive as well as Operation Director and in-charge of the overall technical and operations of the company. For the project purposes, he acts as Project Advisor/ Manager monitoring all operation and technical; matters including planning, scheduling, execution, safety of the Mohd Hanafiah Darmadan projects and procedures, etc. Executive/Operation Director Prior to his appointment in DiPETRO, he had served HSE Resouces Sdn Bhd as Operation Director (from May 2005 - March 2011), Technotest Sdn Bhd as a Deputy General Manager (August 2003 - April 2005) as well as a Director in its subsidiary EN-ES Technologies Sdn Bhd, Mushtari Maintenance Services Sdn Bhd as Turnaroud Manager (August 1999 - June 2003) and as Superintendent (Jan 1995 - July 1999) and Warga Hikmat Kejuruteraan Sdn Bhd as Site Supervisor (Feb 1990 - Dec 1994). His profesional qualification includes as a qualified Turnaround/ Shutdown Manager, Institute Material of Malaysia (IMM) Qualified Blasting & Painting Technician and Safety Supervisor. As a highly responsible management, he had undergone various Safety Courses both onshore and offshore. Among the courses that he had attended were conducted by Terengganu Safety Training Centre Sdn Bhd (TATI) namely Onshore Safety Orientation, Safety for Line Supervisor, and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and NIOSH Petronas Safety Passport (NPSP) In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a multidicipline manager which specialization is in mechanical field. During the course of his work, he has been handling various disciplines namely mechanical and maintenance work (construction including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works, Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc. 1) PERMANENT STAFF As to date, DiPetro Synergy Eng Sdn Bhd (DiPETRO) maintained 18 numbers of permanent staff. The detailed breakdown is as follows: DIVISION a) MECHANICAL DIVISION 2) PERMANENT EMPLOYEE 12 Pax b) CIVIL / SCAFFOLDING / INSULATION DIVISION 3 Pax c) ADMIN, PROCUREMENT & FINANCE 3 Pax CONTRACT STAFF DiPetro Synergy Eng Sdn Bhd employs multi-discipline staff on contract basis depending on the prevailing workload. As to date, DiPETRO maintained 30 numbers of contract staff. The detailed breakdown is as follows: DIVISION 3) CONTRACT EMPLOYEE a) CIVIL / SCAFFOLDING / INSULATION DIVISION > 10 Pax (Long Term Contract) b) MECHANICAL DIVISION > 20 Pax (Long Term Contract) DIRECT HIRE STAFF/SUB-CONTRACT DiPetro Synergy Eng Sdn Bhd engages direct hire professional and labour forces to carry out committed projects with the client. Most of these direct hired staff are taken to compliment permanent and contract staff manning level in order to meet the peak manpower requirement of the company. This is typically required during plant turnaround and major EPCC projects.To-date, DiPETRO had proven itself to be able to mobilize some 500 direct hire staff (professional and labour forces) for its plant turnaround and EPCC during the respective projects peak construction periods. Depending on the nature and size of the project, at one time Direct Hires professionals and labours can reach as high as 1,000 person especially for turnaround work. The detailed breakdown is as follows: DIVISION a. CIVIL / SCAFFOLDING / INSULATION DIVISION b. MECHANICAL DIVISION DIRECT HIRE STAFF > 50 Pax (Short Term Contract) > 500 to 1,000 Pax (Short Term Contract) 1 Introduction DiPETRO has been active in this field since March 2009. In general, the Company provides resources of tehcnical know-how in the form of manpower, equipment, tools materials and consumables to perform the construction and maintenance services for the oil, gas and petrochemical industries. To-date a total of about RM 88.4 million worth of orders were executed by the Company. This equates to some 1,794,600 manhours being exposed and performed on orders and requisitions from the various clients. 2 Plant Maintenance and Turnaround Services From the modest beginning of providing minor plant maintenance repairs and services in 2009, the Company has since developed into renowned force in providing a more complex and integrated services, including plant turnaround works. The Company involved in the turnaround works of various plant namely, Processing Plant like Export Terminal and Compressor Compressor Stations & Gas Processing Plant i.e. GPP 1,2,3,4,5,6 Refineries (Petronas Penapisan Terengganu Sdn Bhd and Petronas Penapisan Melaka Sdn Bhd and Petrochemical Plant (MTBE, Ethylene & Optimal), etc. 3 Maintenance and Construction Works for Blasting, Painting and Fire Proofing Works The Plant Maintenance Division obtained necessary supports for the above works from in-house Construction and Minor EPCC group as well as from network of contractors who are proficient in this field. The Company has good reputation and contacts with established paint manufacturers for competitive material offers to the clients. To date the company has completed sizeable blasting & painting work for various type of plant equipment namely Storage Tanks, vessels, pipings and structures. The following are the core scope of work that we offer for our Industrial Coating Services as follows:- corrosion protection, - waterproofing, insulation, - concrete repair, - fire protection and surface preparation 4 EPCC/Construction/Fabrication Works The Company undertakes contracts from clients to carryout fabrication of piping works and structural steel for oil, gas and petrochemical plants in the area. The fabrication works is carryout in our fabrication yards located in Paka, Terengganu. The Company has been handling many projects which involved multi disciplines i.e. mechanical, civil, electrical & instrumentation works. Examples of project undertaken by the Company includes the EPCC Of The New Filter Water Seperator (FWS) at PDB Fuel & & Aviation Storage Terminal which involved blasting/painting, fabrication and installation of 5,000 dia-inch piping c/w structure as well as the Installation of Process Stipper Feed Pump Upgrading Project which involved fabrication and installation of suction and discharge piping c/w new Pump. These projects involved multi discipline i.e. mechanical, civil, electrical & instrumentation works. 5 Scaffolding Supply, Delivery Erection & Dismantling Services DiPETRO have involved in scaffolding works in construction, plant maintenance as well as plant major turnaround services in various oil & gas & petrochemical plants. DiPETRO capable of providing Conventional tube & fitting and quick erect, modular systems incompliance to BS 1139 with capacity of 30,000m3 of scaffolding materials. 5.1 a) Significant Performances : Subcontractor to HSE Resources Sdn Bhd : i) 15,000 m3 Scaffolding Erection for 2010 Plant Mini-Turnaround at KR-2, PPTSB. ii) 20,000 m3 of Scaffolding Erection at Optimal Chemical for 2011 Plant Turnaround works. 6 6.1 Statutory Tank Maintenance Above Ground Storage Tank Crude Oil Tank Product Terminals Refineries Petrochemical & Power Plants Choosing the right contractor for any project is important, but when the project is cleaning a large above ground storage tank, selecting the right vendor is essential. Our on-site supervisors are experienced veterans who know how to keep a tank cleaning project on track and avoid time consuming and costly mistakes. Our crews consist of full-time personnel trained to do their work safely and efficiently. Type of Tank Services provided are:Tank Inspection - API 653 Inspection , DOSH, NDE, etc. Tank Maintenance & Repair Tank Products Tank Fabrication Tank Engineering & Design Tank Coating and Lining Tank Cleaning Tank Calibration New Tank Construction Safe and efficient removal of tank bottom sludge Turnkey Projects, etc 7 Hot & Cold Insulation Since mid of 2009, DiPETRO has diversified its business activities into insulation Services. Our latest Insulation activities / contract are as follows:i) 8 Hot & Cold Insulation Contract for the Turnaround work at MTBE Malaysia Manpower Supply DiPETRO has managed and successfully supplied experienced and qualified manpower to various CLIENTs either directly to PETRONAS or to Main Contractors. DiPETRO has the capability of providing the following range of manpower requirements: 8.1 8.2 PROFESSIONAL/ TECHNICAL Project/Turnaround Manager Project/Turnaround Engineer Safety Officer/ Supervisor Scaffolding Inspector/ Supervisor Material Controller QA/ QC Engineer and Inspector Planner & Scheduler SKILLED & UN-SKILLED WORKERS Mechanical and Civil Supervisor Pipe Fitter Electrician Foreman Scaffolding Erector Tig Welder Scaffolding Supervisors 6G Welder Rigger Blaster Semi Skill/ General Workers Painter Insulator DiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects: No Name of Project/ contract and location Description Of Work Performed Date Client Total Estimated/ Value of Contract (RM) Estimated Total manhours 1 Engineering, Procurement, Construction and Commissioning (EPCC) of Water Cooled Heat Exchangers Installation at GPP2, GPP3 & GPP4, Gas Processing Kertih (GPK), Terengganu Shutdown July 15 - Jan 17 PETRONAS Gas Berhad 25,000,000.00 241,000 2 Heat Exchanger - E-1604 - Bottom Channel Shell Repair Shutdown Oct 15 - Dec 15 FPG Oleochemicals Sdn Bhd 150,000.00 1,200 25,150,000.00 242,200 Total Services Rendered = Name of Referees for each Project Murad Jaafar (03-2331 1329) Arumugam Balakrishnan (09-5852233) A. EPCC/ PCC FOR MECHANICAL, PIPING & CIVIL DiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects: No Name of Project/ contract and location Total Value of Contract (RM) Description Of Work Performed Date Client Project March 2009 HRSB/Petronas Dagangan Berhad Project/ Shutdown work March April 2009 TKE/ Petronas Gas Berhad 520,000.00 29,000 En Harmaini - PGB Senior Engineer 2,900 En Mohd Zainuddin Bin Awang Ahmad - Persiaran Penapisan, 76300 Sg Udang, Melaka 35,000.00 Estimated Total Manhours 1,800 Referees for each Project 1 Soap Water and Waste Water Treatment 2 Modify HPRT Control System (Mechanical Tie-in work) 3 PN660019 Refurbishment of Sand Filter Project March April 2009 HRSB/Petronas Penapisan Melaka 50,000.00 4 Manpower supply for blinding/ loading unloading Project Sept - Oct 2009 HRSB/Ethylene Malaysia 96,550.00 5,500 A Mutalib Shafiai/ En Yusof Bin Ahmad - 09-829 2530 5 Term Contract for Plant Civil & Structure Repair at Polyethlene Malaysia Term Contract Sept 09 Aug 2010 HRSB/Ethylene Malaysia 176,000.00 8,000 Roskarno Ismail - 09-829 2530 6 Recommissioning Sludge Dryer Vessels (Include Mechanical Tiein works) Project Dec 2009 HRSB/Petronas Gas Berhad 86,500.00 2,900 En M Sallehin Bin Kassim/ En Shuhaime Bin Hashim - 09831 2345 7 Installation of Drum Rotator at PP Plant Project Jan 2010 HRSB / Polypropylene Malaysia 78,000.00 2,800 Abd Rahim Mohamed 8 Metallic structural Piping (Include Mechanical Tie-in works) 549,571.00 17,000 Azhar Bin Abdullah - Tel 09831 2369 9 Fire Water Line Upgrading Project at PPTSB Project Feb 2010 May 2010 HRSB/Petronas Penapisan (T) Sdn Bhd 680,000.00 18,800 Izwan Nazim 10 The Price Agreement for the Supply, Fabrication, Galvanising, Maintenance and Delivery of 50kg LPG Cylinder Steel Pallet for PDB Project Mar 2010 Oct 2010 HRSB/Petronas Dagangan Berhad 138,000.00 12,800 Abdul Majeed K. Kunheen General Manager - Finance Division 11 Replace & rectify 12LBB45 Alloy Pipe inclusive PWHT Project 61,573.86 6,200 06 351 3048 12 Repair Floating Suction Pipe Tank T-202 Project May 2010 HRSB/Petronas Dagangan Berhad 95,000.00 8,900 A Mutalib Shafiai/ En M Shariff Hj Ibrahim (Procurement) 13 Delivery, Installation & comm of Process Stripper Feed Pump Upgrading at EMSB Project May - June 2010 HRSB/Ethylene (M) Sdn Bhd 385,000.00 10,800 A Mutalib Shafiai/ En M Shariff Hj Ibrahim (Procurement) Project / Shutdown work Feb 2010 - HRSB/Petronas Gas March 2010 Berhad March 2010 - Panglima Power Sdn Bhd May 2010 En Mohd Darail 14 Metallic Structural/ Piping (Cooling Water Piping Replacement)(Include Mechanical Tie-in works) Project / Shutdown work Oct 2010 Nov 2010 HRSB/Petronas Gas Berhad 422,000.00 16,900 Muhammad Bin Idris (Procurement) 15 Price Agreement (PA) for the Repair Work of LPG Pallet for Petronas Dagangan Berhad at Melaka LPG Terminal Project Dec 2010Mar 2011 HRSB/Petronas Dagangan Berhad 276,000.00 9,800 M Ruslan Asari - Manager, Supply Chain Mgt 16 The EPCC of the New Filter Water Separator (FWS) at PDB Fuel and Aviation Storage Terminals EPCC Dec 2010 Aug 2011 HRSB/Petronas Dagangan Berhad 4,900,000.00 68,000 En Rozaini Bin Mohd Sani General Manager 17 Mechanical Piping UCON-26-LS Configuration Project Petronas Chemical Derivatives Sdn Bhd Project Dec 2012 - Petronas Chemical Jan 2013 Derivatives Sdn Bhd 2,941,200.00 93,000 En Shamsulisam 18 Fabrication and Installation of Pipe Bridge at Kaneka Project Sept 2012 Kaneka (M) Sdn Bhd Feb 2013 4,500,000.00 25,000 En Saiful Adlee 609-583 7000 19 GPP 4 Tie In Works at Petronas Gas Berhad Complex A Project / Shutdown Oct 2012 Feb 2013 350,000.00 18,800 En Harmaini / En Azhar 20 Mechanical and Piping GPP1 Boot Level Controller Modification Project / Shutdown Feb - March Petronas Gas Berhad 2013 641,000.00 29,000 En Harmaini 21 Engineering, Design Serv-Mechanical & Piping GPP2 Boot Level Modification Petronas Gas Berhad 354,200.00 10,000 Hasanul Arifin Che Jawias 22 EPCC Of 2-PSV-1101, 2-PSV-1102, 2-PSV-1103, And 2-PSV1104 Discharge Headers To GPP-1 Project Sept - Oct Petronas Gas Berhad 2013 650,000.00 13,000 Harmainie Yahaya 23 EPCC of Fire Wall for Hydrogen Skid for Argon Plant at ASU2, CUF Kertih, Terengganu Darul Iman EPCC April - July Petronas Gas Berhad 2013 (CUF) 488,900.00 28,000 En. M Madzhir Bin Ibrahim 09 867 3677 24 Pressure Vessel Servicing Job 93,000.00 5,000 Muhamad Tirmizi 09 582 6000 25 EPCC Feb - Mar 2013 PGB / Shinryo Turnaround June 13 July 13 KANEKA EPCC For Installation And Integration Of Owners Supplied Skids For Advanced C02 Pilot at GPP3 EPCC June 13 April 14 PETRONAS Technical Services Sdn Bhd 4,982,200.00 43,900 Azmil Azim 26 New Line Of Underground Firewater and OWS for GPPA & GPPB Project June 13 April 14 PETRONAS Gas Berhad 2,050,000.00 44,800 Mohd Asmadi 03 2144 8966 27 Installation Of Fire Walls Between Transformer and Cable Celler Project Dec 14 Feb 15 PETRONAS Chemicals Derivatives Sdn Bhd 380,900.00 8,700 Nur Syazwani Amira Bt M Munir Project / EPCC 8 July 14 Apr 15 PETRONAS Gas Berhad 10,656,136.00 117,600 28 Engineering, Procurement, Construction And Commissioning (EPCC) Services For Resak Line Upgrading (RLU) Project At Gas Processing Plant (GPP) Harmaini Yahya 03 2051 5000 The above summary of experiences provides indicative measure concerning DSESB future potentials and direction. The management of DSESB is committed to providing its client best-value-for-money project deliveries. B. TANK CLEANING/ INSPECTION WORK No Name of Project/ contract and location Description Of Work Performed Date Client Total Value of Contract (RM) Estimated Total Manhours Name of two Referees for each Project 1 Repair & Refurbish Floating Suction Pipe for T-205 Project April 2009 May 2009 HRSB/Petronas Dagangan Berhad 96,000.00 5,800 En Roslan Omar/ 03-2331 6325 2 Repair & Refurbish Floating Suction Pipe for T-202 Project Oct 2009 Nov 2009 HRSB/Petronas Dagangan Berhad 95,000.00 5,800 En Roslan Omar/ 03-2331 6325 3 T901- BD Ball Tank for DOSH Inspection Project 78,000.00 5,900 En Saiful Adlee - 609-583 7000 4 Tank Cleaning & Dosh Inspection on T-0003 Spherical Tank 100,000.00 7,000 En Saiful Adlee - 609-583 7000 5 July Kaneka (M) Sdn Bhd August 2010 Tank Cleaning & Overhaul Jan - March 2012 Kaneka Paste Polymers Sdn Bhd Repair Leaking Roof ACR Building Project Oct - Nov 2012 Kerteh terminal Sdn Bhd 23,520.00 4,000 En Ahmad Fakri Mohd 09 830 5886/5788 6 Maintenance Repair of Portable Access Platform Project Dec 2012 Kerteh terminal Sdn Bhd 4,900.00 5,800 En Ahmad Fakri Mohd 09 830 5886/5788 7 Tank Internal Cleaning and DOSH Inspection on BT-0003B at Kaneka Port Storage Project Nov 2012 Feb 2013 Kaneka Paste Polymers Sdn. Bhd. 106,330.00 5,000 En Muhamad Tirmizi / En Saiful Adli (09 582 6000) 8 Tank Internal Cleaning and DOSH Inspection on BD Sperical Tank (T-901) Project June 2013 Kaneka (Malaysia) Sdn. Bhd. 86,000.00 9,830 MK Hafiz 9 Tank Internal Cleaning and DOSH Inspection on BD Sperical Tank (T-902) Project Feb - March 2014 Kaneka (Malaysia) Sdn. Bhd. 86,000.00 1,280 En Hafiz (09 582 6000) Shutdown Feb-14 Kaneka (M) Sdn Bhd 25,000.00 10 To Repair Nozzle On BD Spherical Tank (T-902) 5,000 MK Hafiz C. TURNAROUND / SHUTDOWN Total Value of Contract (RM) Estimated Total Manhours Name of two Referees for each Project No Project Title / Description Type Of Work Date Client 1 2009 Plant Turnaround Work For Utilities, Butanol And Derivatives At Optimal Petrochemical Complex, Kerteh, Terengganu Turnaround Sept 2008 June 2009 Optimal Chemical (M) Sdn Bhd 467,000.00 48,700 En Mansor Ahmad/ Kerteh Industrial Area. Km 106, Jalan Kuantan-Kuala Terengganu,Terengganu 2 The Dismantling & installation of Four(4) Nos of E 2005 AFC Bundle and its Auxiliaries During PDH shutdown October 2009 Project/Shutdown Works Aug 2009 Oct 2009 MTBE Malaysia Sdn Bhd 187,000.00 17,900 Tuan Suzira Bt Tuan Mat 3 Main Mechanical Contractor for KR2 Shutdown 2010 Project/Shutdown Works March 2010 - Petronas Penapisan April 2010 (T) Sdn Bhd 420,000.00 35,600 En Ramniza Mat Rani 4 Provision of 2011 Plant Turnaround Work for Derivatives and Utilities Package 5 Integrated Planning for Heat Exchanger Overhaul Works for MMSB Plant Shutdown Aprill 2011 6 Project/Turnaround Works Oct 2010 Feb 2011 Optimal Chemical (M) Sdn Bhd 558,000.00 46,000 Mansor bin Ahmad Maintenance Dept Project/Shutdown Works April 2011 HRSB/MTBE 785,000.00 35,000 Hj Sufian Ayob MBS Plant Shutdown At Kaneka Malaysia Shutdown May-11 Kaneka 45,000.00 7,600 En Saiful Adlee 609-583 7000 7 Polyplastic Shutdown December 2011 Shutdown Nov - Dec 2011 Polyplastic 200,000.00 28,000 En Razali & En Azlizi 09 585 8363 8 Kertih Terminal Shutdown January 2012 Shutdown January 2012 Kerteh Terminal Sdn Bhd 280,000.00 30,300 En Amir - 09 826 6463 9 CUF Defect Works Project January 2012 Kaneka/PGB/CUF/PD H 40,000.00 2,800 En Saiful Adlee 609-583 7000 Turnaround /Shutdown Jan - May 2012 Optimal Chemical (M) Sdn Bhd 12,980,000.00 211,000 Shutdown Oct 2012 Jan 2013 Flexsys Chemical (M) Sdn Bhd 600,000.00 40,000 En Shahrizan Project Sept - Jan 2013 PGB/Shinryo 350,000.00 18,000 En Harmaini / En Azhar 10 To Perform of Mechanical Shutdown work during Optimal Turnaround 2012 for Package B 11 Flexsys Chemical Annual Shutdown 12 GPP 4 Tie-In Works at Petronas Gas Berhad Complex A En M Reza Shawal 609-830 7613 13 To Perform Service At Chilled Water Tower Distributor At PGB-CUF Kerteh 14 9 Unit BOG Equipment Servicing & Inspection For DOSH 15 Provision of Labour, Tool, Equipment and Consumable in Order To Perform 2014 Plant Turnaround Mechanical Work Package For Static Equipment Turnaround June - Sept Petronas Gas Berhad 2013 (CUF) 220,000.00 22,700 Rostam Abd Ghani 98,000.00 9,400 Anuar Ali Project May 2014 Kertih Terminals Sdn Bhd Turnaround 15 May 14 31 May 14 Flexsys Chemical Sdn Bhd 327,000.00 Project Dec 14 - Jan 15 PETRONAS Penapisan (Terengganu) Sdn Bhd 210,000.00 5,600 Zakiah Bt Mat Daud 240,000.00 15,200 Surizan Khalil 09 830 5788 28,600 Mat Noor Salleh 09-585 6296 16 Construction Work For Boiler Noise @ F24101 17 To Supply Manpower, Tools, Equipment and Consumable For 2015 Turnaround For DOSH Registered Equipment at KTSB Turnaround Dec 14 Feb 15 Kertih Terminals Sdn Bhd 18 FPG 2015 Plant Turnaround Works Turnaround May 15 June 15 FPG Oleochemicals Sdn. Bhd. 6,400,000.00 120,000 19 DOSH CF Renewal For Five (5) Exchangers E120, E122, E126, E131, E225 During Mini Shutdown 2015 Shutdown June 15 Aug 15 PETRONAS Chemicals Ethylene Sdn. Bhd. 185,000.00 4,500 Azila C Omar (09-8272040) 20 DOSH Inspection - 9 Unit BOG Equipment for CF Renewal Shutdown Sept 2015 Kerteh Terminal Sdn. Bhd 98,500.00 2,500 Anuar Bin Ali (09-8305095) Azhari / Arumugam D. SCAFFOLDING No Project Title / Description Type Of Work Date Client Total Value of Contract (RM) Estimated Total Manhours Name of two Referees for each Project 1 Scaffolding Services & Inspection Project Nov - Dec 2009 Ethylene (M) Sdn Bhd 47,000.00 5,400 En Nadzir Bin Ismail - Tel 09829 2512 2 Scaffolding Services & Inspection Term Contract Dec 2009 April 2010 Optimal Chemical (M) Sdn Bhd 135,000.00 16,760 Mansor bin Ahmad Maintenance Dept 3 Scaffolding Services & Inspection Project/TA Oct 2010 Feb 2011 Optimal Chemical (M) Sdn Bhd 215,000.00 19,400 Mansor bin Ahmad Maintenance Dept 4 Scaffolding Services & Inspection Turnaround April 2015 July 2015 FPG Oleochemicals Sdn. Bhd. 500,000.00 35,000 Azhari/Arumugam E. BLASTING & PAINTING WORK No Project Title / Description Project Value (RM) Estimated Total Manhours Type Of Work Date Client Term Contract Feb 2007 Feb 2009 Petronas Fertilizer Kedah Sdn Bhd 156,800.00 Turnaround Feb 2009 June 2009 Optimal Chemical (M) Sdn Bhd 96,000.00 8,900 Name of two Referees for each Project En Zenol Arifin Mohd Sidek, KM 3, Jalan Jeniangm P.O. Box 22, 08300 Gurun, Kedah 1 Term Contract Blasting and Painting 2+1 at Petronas Fertilizer Kedah Sdn Bhd 2 Additional Work during 2009 Plant Turnaround Work For Utilities, Butanol And Derivatives At Optimal Petrochemical Complex, Kerteh, Terengganu 3 External Painting Work for Fire Water Tank At MBS Plant Project July - Aug 2011 Kaneka (M) Sdn Bhd 30,000.00 3,400 En Saiful Adlee - 609 583 7000 4 Maintenance Painting Work of Pipe Rack at KEPS Plant Project July - Aug 2011 Kaneka (M) Sdn Bhd 118,000.00 8,700 En Saiful Adlee - 609 583 7000 5 External Painting Work for VCM Tank Project Sept - Nov 2012 Kaneka (M) Sdn Bhd 95,000.00 8,000 En Saiful Adlee - 609 583 7000 9,830 Total Services Rendered = 63,420,780.86 1,553,600.00 Total On Going Services = 25,150,000.00 242,200.00 Grand Total Service Rendered = 88,570,780.86 1,795,800.00 Mansor Ahmad/ Kerteh Industrial Area. Km 106, Jalan Kuantan-Kuala Terengganu,Terengganu WORKSHOP / FABRICATION YARD 35 meters 24 meters