COMPANY PROFILE DSESB.xlsx - DiPETRO SYNERGY ENG SDN

Transcription

COMPANY PROFILE DSESB.xlsx - DiPETRO SYNERGY ENG SDN
OPERATION OFFICE / WORKSHOP:
PT 12510 (A-13),
Kawasan Perusahaan Chacar,
23100 Dungun,
Terengganu Darul Iman,
MALAYSIA
Tel
: +609 - 827 7200 / 0201
Fax
: +609 - 827 0185
Website : www.d-petro.com
SECTION 1.0
INTRODUCTION
Brief Summary Of Company
Company Mission Statement
Corporate Information
Corporate Registration
SECTION 2.0
ORGANISATION
DiPETRO Organization Chart
Profile Of Key Personnel
SECTION 3.0
MANPOWER REPORT
SECTION 4.0
COMPANY CAPABILITIES
Plant Maintenance Services
Plant Turnaround Services
Blasting, Painting And Fire Proofing Works
Epcc/Construction/Fabrication Works
Scaffolding Supply, Delivery Erection & Dismantling Services
Hot & Cold Insulation
Manpower Supply
SECTION 5.0
ON GOING PROJECT FLIERS
Plant Maintenance/ Construction Division
SECTION 6.0
COMPANY FACILITIES & PAST PROJECT FLIERS
Workshop / Fabrication Yard
Past Project & Fliers
DiPETRO SYNERGY ENG SDN BHD (hereinafter referred to as DiPETRO) is 100% Bumiputera,
company both in equity and as well as management control. The Company was formely
known as HP Engineering Enterprise was incorporated in February 2009. Beginning with
sub contarcting work from Main Contractor, HP Engineering Enterprise emerged forward
and expand its business to become Main Contractor with the inception of newly Sendirian
Berhad Company. In coping with the new business challenge, The newly formed Company
(DiPETRO) was then incorporated on 8th April 2011.
DiPETRO management staff and key projects supervisory personnel have vast experience
in oil, gas and petrochemical industry. In addition to indirect manpower (key personnel)
above, DiPETRO has been proven to be able to deploy huge amount of direct manpower
of multi-discipline crews (profesional and labours forces) for its plant maintenance,
construction.
With technical support from both in-house and DiPETRO subcontractors, DiPETRO possess
technical know-how project management experience and local knowledge to manage and
engage in Plant Construction, Maintenance and Turnaround works. DiPETRO and its associates
have successfully completed projects for the following work:
Mechanical, Plant Civil & Steel Fabrication Works
Plant Maintenance Services & Turnaround Works
Statutory Tank Maintenance
Scaffolding Erection, Dismantle & Rental Services
Blasting & Painting Works
Hot & Cold Insulation Works
Manpower Supply
DiPETRO is committed to maximize its business potential and is confident to render quality
services to our clients as we have in-place Quality and Safety Programs which are adhered
to during execution of our works.
To be the leading company for the provision of :
Experienced, qualified and competent manpower in their own field of expertise
to our clients in the oil, gas and petrochemical industry.
Uncompromised quality, safety and timely execution of Engineering Services
including Mechanical & Civil Works.
GENERAL
Company Name
:
DiPETRO SYNERGY ENG SDN BHD
(Formely known as HP Engineering Enterprise)
Registration No.
:
939710-U
Date of Incorporation
:
8th April 2011
Registered Address
:
A1-02-02, Hata Square, Jalan Mewah 1/3,
Pandan Mewah, 68000 Ampang, Selangor
Head Office
:
PT 12510 (A-13), Kawasan Perusahaan Chacar,
Mukim Kuala Paka,
23100 Dungun Terengganu Darul Iman
Contact No
Fax No
:
:
(609)827 7200 / 0201
(609)827 0185
E-mail
:
[email protected]
Web Address
:
www.d-petro.com
Company Secretary
:
MOHD FAIRUZ BIN A RAZAK
& Auditor
A1-02-02, Hata Square, Jalan Mewah 1/3,
Contact No
:
Pandan Mewah, 68000 Ampang, Selangor
Tel : (03) 4296 9694; Fax No : (603) 4296 9692
Equity Structure
:
100% Bumiputera
CAPITAL STRUCTURE
Authorised Capital
:
RM
1,000,000.00
Paid Up Capital
:
RM
1,000,000.00
Working Capital
:
RM
1,000,000.00
Ahmad Fikeri Bin Mohamad
:
Shareholder
Mohd Hanafiah Bin Darmadan
:
Shareholder
Ahmad Fikeri Bin Mohamad
:
Managing Director
Mohd Hanafiah Bin Darmadan
:
Executive/Operation Director
Name of Bank
Address
:
:
Bumiputra Commerce Berhad (CIMB)
Dungun, Terengganu.
Current Account. No.
:
8601785563
OD
:
:
RHB BANK
RM
Term Loan
:
RM
72,000.00
BA
:
RM
250,000.00
BG
:
RM
1,500,000.00
RM
2,822,000.00
SHAREHOLDERS
BOARD OF DIRECTORS
BANKER
BANKING FACILITIES
1. Name of Bank
Total
1,000,000.00
2. Name of Bank
Total
:
PUBLIC BANK (BG Facilities)
3. Name of Bank
:
SME BANK
:
:
RM
RM
RM
1,000,000.00
2,500,000.00
3,500,000.00
:
RM
6,822,000.00
RM
OD / Trade Line
BG
Total
GRAND TOTAL OF FACILITIES
500,000.00
1)
United Kingdom Accreditation Services (UKAS)
2)
Kementerian Kewangan Malaysia (MOF)
3)
Construction Industri Development Board (CIDB)
4)
Petroleum Nasional Berhad (PETRONAS)
5)
Dewan Perniagaan Melayu Malaysia
6)
Akta Kumpulan Wang Simpanan Pekerja (KWSP)
7)
Others
1) United Kingdom Accreditation Service (UKAS)
ISO 9001 - 2008, Quality Management System - Requirement
Provision of Mechanical & Civil Services
2)
KEMENTERIAN KEWANGAN MALAYSIA
140100
BAHAN BINAAN
140200
PERALATAN KESELAMATAN JALAN JAYA
220112
SAND BLASTING & MENGECAT UNTUK KAPAL
180100
MESIN DAN KELENGKAPAN BENGKEL
220501
KONTRAK BURUH
180200
PERALATAN PERINDUSTRIAN MINYAK
220802
BANGUNAN
180300
MESIN DAN KELENGKAPAN KHUSUS
221404
MEMBAIKPULIH : BARANG LOGAM
STESYEN JANAKUASA LETRIK DAN PERALATAN
200300
KABEL, AKSESORI DAN KONDUKTOR
200200
220111
PERALATAN KAWALAN KESELAMATAN
GENERATOR/ ALAT GANTI
TARIKH LUPUT : 12/08/2017
3)
LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (CIDB)
G7
B
PEMBINAAN BANGUNAN
B04
KERJA BANGUNAN AM
G7
CE
PEMBINAAN KEJURUTERAAN AWAM
CE21
KERJA-KERJA KEJURUTERAAN AWAM
G7
ME
MEKANIKAL DAN ELEKTRIKAL
M15
KELENGKAPAN AM PELBAGAI
TARIKH LUPUT : 28/05/2018
5) PETROLIAM NASIONAL BERHAD (PETRONAS)
Code
Services/ Specialist
SM 2031100
SM2
SM 5010101
SM5
SM 5010102
SM5
SM 5010103
SM5
SM 5010300
SM5
SM 5010400
SM5
SM 5010700
SM5
SM 5030100
SM5
SM 5090100
SM5
SM 5090300
SM5
SQ 1060100
SQ1
SM 5120100
SM5
SM 5120200
SM5
SO 2020201
SO2
SO 2020102
SO2
SO 2020203
SO2
SP 1020300
SP1
SC 2080000
SC2
MANPOWER SUPPLY
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
MECHANICAL ENGINEERING
MAINTENANCE
03 Specialist Manpower
&
&
&
&
&
&
&
&
&
&
&
&
OFFSHORE FACILITIES CONSOFFSHORE FACILITIES
CONSTRUCTION
OFFSHORE FACILITIES
CONSTRUCTION
PIPELINE & ASSOCIATED
SERVICES
CIVIL STRUCTURAL & BUILDING
MAINTENANCE SERVICES
01 Stationary
Maintenance
01 Stationary
Maintenance
01 Stationary
Maintenance
01 Stationary
Maintenance
01 Stationary
Maintenance
01 Stationary
Maintenance
Equipment Repair &
Equipment Repair &
Equipment Repair &
Equipment Repair &
Equipment Repair &
Equipment Repair &
03 Valve Repair & Maintenance
09 Structural & Piping Fabrication/
Welding Services
09 Structural & Piping Fabrication/
Welding Services
11 Lecturing & Training Personnel
01 Floating Roof Storage Tank
02 Fixed Roof Storage Tank
03 Cryrogenic Storage Tank
03 Columns, stripper & Corrugated Plate
Interceptor
04 Heat Exchanger, Condensors & Cooler
07 Pressure & Unpressurized Vessel
01 Mechanical Valve
01 Metallic Structural/Piping
03 Lined Pipe
11 Coating Services
03 Painting & Coating
12 Insulation Work
01 Hot Insulation
12 Insulation Work
02 Cold Insulation
02 Onshore Fabrication
01 Minor Onshore Fabrication - Civil Work
02 Major Fabrication
03 Onshore Facilities
02 Onshore Fabrication
03 Minor Onshore Fabrication - Mechanical
02 Pipeline Construction (Fabrication
& Installation)
03 Pipeline Coating
08 Scaffolding Services & Inspection
Management Structure:
The company is led by a strong and experienced team which includes representative drawn
from various professional fields, i.e. business, engineering, maintenance, fabrication and
construction in the oil, gas and petrochemical industries. This bring depth and diversity in
expertise and perspectives towards leadership of the company. As of today, the key
management team of DiPetro Synergy Eng Sdn Bhd (DiPETRO), consist of the following individuals:i)
Ahmad Fikeri Bin Mohamad
Managing Director
ii)
Mohd Hanafiah Darmadan
Executive/Operation Director
Aged 46, is the Managing Director of the company. He has a Degree in
Mechanical Engineering from California State University. He has joined
DiPETRO in April 2011 as Managing Director and in-charge of the overall
admin, financials and operations of the company. For project purposes
he acts as Project Advisor/ Manager monitoring all operation and
technical matters including planning, execution, safety, quality control
and procedures, etc.
Ahmad Fikeri Mohamad
Managing Director
Prior to his appointment in DiPETRO, he had served Hse Resources Sdn Bhd
as Technical Director (from May 2005 - March 2011), Technotest Sdn Bhd
as a General Manager (Jan 2004 - April 2005) as well as a Director in
its subsidiary EN-ES Technologies Sdn Bhd, Asaga Corporation Sdn Bhd
as a General Manager and same time as Managing Director in its subsidiary Asaga Engineering &
Construction Sdn Bhd (June 2003 - Dec 2003), Mushtari Maintenance Services Sdn Bhd as
Operation Manager (March 1997 - May 2003) and as Project Engineer (July 1995 - Feb 1997) and
Perusaahan Otomobil Nasional Sdn Bhd (PROTON) as Technical Executive (July 1990 - July 1992).
His professional qualification includes as a PTS Protective Coating & Lining CORAL Committee,
Institute Material of Malaysia (IMM) Qualified Blasting & Painting Inspector, Welding Inspector
(CSWIP), and Qualified Project/ Turnaround Manager. Apart from that he is also member of the
Board of Engineers and Institution of Engineers of Malaysia.
As a highly responsible management, he had undergone various Safety Courses both onshore
and offshore. Among the courses that he had attended were conducted by Terengganu Safety
Training Centre Sdn Bhd (TATI) namely onshore Safety Orientation, Safety for Line Supervisor,
and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely
Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational
Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and
NIOSH Petronas Safety Passport (NPSP)
In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in
the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a
multidicipline manager which specialization is in mechanical field. During the course of his work,
he has been handling various disciplines namely mechanical and maintenance work (construction
including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works,
Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc.
Aged 46, is the Executive cum Operation Director of the Company.
He has a Diploma In Electrical Engineering from Universiti Teknologi
MARA (UiTM). He has joined DiPETRO in April 2011 as Executive as well
as Operation Director and in-charge of the overall technical and
operations of the company. For the project purposes, he acts as
Project Advisor/ Manager monitoring all operation and technical;
matters including planning, scheduling, execution, safety of the
Mohd Hanafiah Darmadan
projects and procedures, etc.
Executive/Operation Director
Prior to his appointment in DiPETRO, he had served HSE Resouces Sdn Bhd
as Operation Director (from May 2005 - March 2011), Technotest Sdn Bhd
as a Deputy General Manager (August 2003 - April 2005) as well as a
Director in its subsidiary EN-ES Technologies Sdn Bhd, Mushtari
Maintenance Services Sdn Bhd as Turnaroud Manager (August 1999 - June 2003) and as
Superintendent (Jan 1995 - July 1999) and Warga Hikmat Kejuruteraan Sdn Bhd as Site Supervisor
(Feb 1990 - Dec 1994).
His profesional qualification includes as a qualified Turnaround/ Shutdown Manager, Institute
Material of Malaysia (IMM) Qualified Blasting & Painting Technician and Safety Supervisor.
As a highly responsible management, he had undergone various Safety Courses both onshore
and offshore. Among the courses that he had attended were conducted by Terengganu Safety
Training Centre Sdn Bhd (TATI) namely Onshore Safety Orientation, Safety for Line Supervisor,
and Offshore Safety Training/HUET Training, conducted by OGP Technical Services namely
Turnaround Safety Passport Scheme Training, conducted by National Institute of Occupational
Safety and Health (NIOSH) namely Kursus Akta Keselamatan dan Kesihatan Pekerjaan 1994 and
NIOSH Petronas Safety Passport (NPSP)
In summary, he has more than 20 years of experience in Oil & Gas and Petrochemical industries in
the field of construction, commisioning, maintenance and turnaround/ shutdown works. He is a
multidicipline manager which specialization is in mechanical field. During the course of his work,
he has been handling various disciplines namely mechanical and maintenance work (construction
including EPCC Project), Turnaround (heat exchanger, vessel, etc), Civil & Structure works,
Electrical & Instrument works, Scaffolding and Insulations works, Blasting & Painting works, etc.
1)
PERMANENT STAFF
As to date, DiPetro Synergy Eng Sdn Bhd (DiPETRO) maintained 18 numbers of
permanent staff.
The detailed breakdown is as follows:
DIVISION
a) MECHANICAL DIVISION
2)
PERMANENT EMPLOYEE
12 Pax
b) CIVIL / SCAFFOLDING / INSULATION DIVISION
3 Pax
c) ADMIN, PROCUREMENT & FINANCE
3 Pax
CONTRACT STAFF
DiPetro Synergy Eng Sdn Bhd employs multi-discipline staff on contract basis depending
on the prevailing workload. As to date, DiPETRO maintained 30 numbers of
contract staff.
The detailed breakdown is as follows:
DIVISION
3)
CONTRACT EMPLOYEE
a) CIVIL / SCAFFOLDING / INSULATION DIVISION
> 10 Pax (Long Term Contract)
b) MECHANICAL DIVISION
> 20 Pax (Long Term Contract)
DIRECT HIRE STAFF/SUB-CONTRACT
DiPetro Synergy Eng Sdn Bhd engages direct hire professional and labour forces to carry out
committed projects with the client. Most of these direct hired staff are taken to compliment
permanent and contract staff manning level in order to meet the peak manpower requirement
of the company.
This is typically required during plant turnaround and major EPCC projects.To-date, DiPETRO
had proven itself to be able to mobilize some 500 direct hire staff (professional and labour
forces) for its plant turnaround and EPCC during the respective projects peak construction
periods. Depending on the nature and size of the project, at one time Direct Hires professionals
and labours can reach as high as 1,000 person especially for turnaround work.
The detailed breakdown is as follows:
DIVISION
a. CIVIL / SCAFFOLDING / INSULATION DIVISION
b. MECHANICAL DIVISION
DIRECT HIRE STAFF
> 50 Pax (Short Term Contract)
> 500 to 1,000 Pax (Short Term Contract)
1
Introduction
DiPETRO has been active in this field since March 2009. In general, the Company
provides resources of tehcnical know-how in the form of manpower, equipment, tools
materials and consumables to perform the construction and maintenance services
for the oil, gas and petrochemical industries.
To-date a total of about RM 88.4 million worth of orders were executed by the Company.
This equates to some 1,794,600 manhours being exposed and performed on orders and
requisitions from the various clients.
2
Plant Maintenance and Turnaround Services
From the modest beginning of providing minor plant maintenance repairs and services in
2009, the Company has since developed into renowned force in providing a more complex
and integrated services, including plant turnaround works.
The Company involved in the turnaround works of various plant
namely, Processing Plant like Export Terminal and Compressor
Compressor Stations & Gas Processing Plant i.e. GPP 1,2,3,4,5,6
Refineries (Petronas Penapisan Terengganu Sdn Bhd and
Petronas Penapisan Melaka Sdn Bhd and Petrochemical Plant
(MTBE, Ethylene & Optimal), etc.
3
Maintenance and Construction Works for Blasting, Painting and Fire Proofing Works
The Plant Maintenance Division obtained necessary supports for the above works from
in-house Construction and Minor EPCC group as well as from network of contractors who
are proficient in this field. The Company has good reputation and contacts with
established paint manufacturers for competitive material offers to the clients. To date
the company has completed sizeable blasting & painting work for various type of
plant equipment namely Storage Tanks, vessels, pipings and structures.
The following are the core scope of work that we offer for our
Industrial Coating Services as follows:- corrosion protection,
- waterproofing, insulation,
- concrete repair,
- fire protection and surface preparation
4
EPCC/Construction/Fabrication Works
The Company undertakes contracts from clients to carryout fabrication of piping
works and structural steel for oil, gas and petrochemical plants in the area. The
fabrication works is carryout in our fabrication yards located in Paka, Terengganu.
The Company has been handling many projects which involved multi disciplines
i.e. mechanical, civil, electrical & instrumentation works.
Examples of project undertaken by the Company includes the
EPCC Of The New Filter Water Seperator (FWS) at PDB Fuel &
& Aviation Storage Terminal which involved blasting/painting,
fabrication and installation of 5,000 dia-inch piping c/w
structure as well as the Installation of Process Stipper Feed Pump
Upgrading Project which involved fabrication and installation of suction
and discharge piping c/w new Pump. These projects involved multi discipline
i.e. mechanical, civil, electrical & instrumentation works.
5
Scaffolding Supply, Delivery Erection & Dismantling Services
DiPETRO have involved in scaffolding works in construction, plant maintenance as well
as plant major turnaround services in various oil & gas & petrochemical plants.
DiPETRO capable of providing Conventional tube & fitting and quick erect, modular
systems incompliance to BS 1139 with capacity of 30,000m3 of scaffolding materials.
5.1
a)
Significant Performances :
Subcontractor to HSE Resources Sdn Bhd :
i)
15,000 m3 Scaffolding Erection for 2010 Plant Mini-Turnaround at KR-2, PPTSB.
ii)
20,000 m3 of Scaffolding Erection at Optimal Chemical for 2011 Plant Turnaround works.
6
6.1
Statutory Tank Maintenance
Above Ground Storage Tank
Crude Oil Tank
Product Terminals
Refineries
Petrochemical & Power Plants
Choosing the right contractor for any project is important, but when the project is
cleaning a large above ground storage tank, selecting the right vendor is essential.
Our on-site supervisors are experienced veterans who know how to keep a tank
cleaning project on track and avoid time consuming and costly mistakes. Our crews
consist of full-time personnel trained to do their work safely and efficiently. Type of
Tank Services provided are:Tank Inspection - API 653 Inspection , DOSH, NDE, etc.
Tank Maintenance & Repair
Tank Products
Tank Fabrication
Tank Engineering & Design
Tank Coating and Lining
Tank Cleaning
Tank Calibration
New Tank Construction
Safe and efficient removal of tank bottom sludge
Turnkey Projects, etc
7
Hot & Cold Insulation
Since mid of 2009, DiPETRO has diversified its business activities into insulation
Services. Our latest Insulation activities / contract are as follows:i)
8
Hot & Cold Insulation Contract for the Turnaround
work at MTBE Malaysia
Manpower Supply
DiPETRO has managed and successfully supplied experienced and qualified
manpower to various CLIENTs either directly to PETRONAS or to Main Contractors.
DiPETRO has the capability of providing the following range of manpower requirements:
8.1
8.2
PROFESSIONAL/ TECHNICAL
Project/Turnaround Manager
Project/Turnaround Engineer
Safety Officer/ Supervisor
Scaffolding Inspector/ Supervisor
Material Controller
QA/ QC Engineer and Inspector
Planner & Scheduler
SKILLED & UN-SKILLED WORKERS
Mechanical and Civil Supervisor
Pipe Fitter
Electrician
Foreman
Scaffolding Erector
Tig Welder
Scaffolding Supervisors
6G Welder
Rigger
Blaster
Semi Skill/ General Workers
Painter
Insulator
DiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects:
No
Name of Project/ contract and location
Description Of
Work Performed
Date
Client
Total Estimated/
Value of Contract
(RM)
Estimated Total
manhours
1
Engineering, Procurement, Construction and Commissioning
(EPCC) of Water Cooled Heat Exchangers Installation at GPP2,
GPP3 & GPP4, Gas Processing Kertih (GPK), Terengganu
Shutdown
July 15 - Jan
17
PETRONAS Gas Berhad
25,000,000.00
241,000
2
Heat Exchanger - E-1604 - Bottom Channel Shell Repair
Shutdown
Oct 15 - Dec
15
FPG Oleochemicals Sdn
Bhd
150,000.00
1,200
25,150,000.00
242,200
Total Services Rendered =
Name of Referees for
each Project
Murad Jaafar (03-2331 1329)
Arumugam Balakrishnan
(09-5852233)
A. EPCC/ PCC FOR MECHANICAL, PIPING & CIVIL
DiPETRO Management personnel and its owned internal resources and expertise had experienced through the following mentioned projects:
No
Name of Project/ contract and location
Total Value of
Contract (RM)
Description Of Work
Performed
Date
Client
Project
March 2009
HRSB/Petronas
Dagangan Berhad
Project/ Shutdown
work
March April 2009
TKE/ Petronas Gas
Berhad
520,000.00
29,000
En Harmaini - PGB Senior
Engineer
2,900
En Mohd Zainuddin Bin Awang
Ahmad - Persiaran Penapisan,
76300 Sg Udang, Melaka
35,000.00
Estimated Total
Manhours
1,800
Referees for each
Project
1
Soap Water and Waste Water Treatment
2
Modify HPRT Control System (Mechanical Tie-in work)
3
PN660019 Refurbishment of Sand Filter
Project
March April 2009
HRSB/Petronas
Penapisan Melaka
50,000.00
4
Manpower supply for blinding/ loading unloading
Project
Sept - Oct
2009
HRSB/Ethylene
Malaysia
96,550.00
5,500
A Mutalib Shafiai/ En Yusof
Bin Ahmad - 09-829 2530
5
Term Contract for Plant Civil & Structure Repair at Polyethlene
Malaysia
Term Contract
Sept 09 Aug 2010
HRSB/Ethylene
Malaysia
176,000.00
8,000
Roskarno Ismail - 09-829
2530
6
Recommissioning Sludge Dryer Vessels (Include Mechanical Tiein works)
Project
Dec 2009
HRSB/Petronas Gas
Berhad
86,500.00
2,900
En M Sallehin Bin Kassim/ En
Shuhaime Bin Hashim - 09831 2345
7
Installation of Drum Rotator at PP Plant
Project
Jan 2010
HRSB /
Polypropylene
Malaysia
78,000.00
2,800
Abd Rahim Mohamed
8
Metallic structural Piping (Include Mechanical Tie-in works)
549,571.00
17,000
Azhar Bin Abdullah - Tel 09831 2369
9
Fire Water Line Upgrading Project at PPTSB
Project
Feb 2010 May 2010
HRSB/Petronas
Penapisan (T) Sdn
Bhd
680,000.00
18,800
Izwan Nazim
10
The Price Agreement for the Supply, Fabrication, Galvanising,
Maintenance and Delivery of 50kg LPG Cylinder Steel Pallet for
PDB
Project
Mar 2010 Oct 2010
HRSB/Petronas
Dagangan Berhad
138,000.00
12,800
Abdul Majeed K. Kunheen General Manager - Finance
Division
11
Replace & rectify 12LBB45 Alloy Pipe inclusive PWHT
Project
61,573.86
6,200
06 351 3048
12
Repair Floating Suction Pipe Tank T-202
Project
May 2010
HRSB/Petronas
Dagangan Berhad
95,000.00
8,900
A Mutalib Shafiai/ En M
Shariff Hj Ibrahim
(Procurement)
13
Delivery, Installation & comm of Process Stripper Feed Pump
Upgrading at EMSB
Project
May - June
2010
HRSB/Ethylene (M)
Sdn Bhd
385,000.00
10,800
A Mutalib Shafiai/ En M
Shariff Hj Ibrahim
(Procurement)
Project / Shutdown
work
Feb 2010 - HRSB/Petronas Gas
March 2010
Berhad
March 2010 - Panglima Power Sdn
Bhd
May 2010
En Mohd Darail
14
Metallic Structural/ Piping (Cooling Water Piping
Replacement)(Include Mechanical Tie-in works)
Project / Shutdown
work
Oct 2010 Nov 2010
HRSB/Petronas Gas
Berhad
422,000.00
16,900
Muhammad Bin Idris
(Procurement)
15
Price Agreement (PA) for the Repair Work of LPG Pallet for
Petronas Dagangan Berhad at Melaka LPG Terminal
Project
Dec 2010Mar 2011
HRSB/Petronas
Dagangan Berhad
276,000.00
9,800
M Ruslan Asari - Manager,
Supply Chain Mgt
16
The EPCC of the New Filter Water Separator (FWS) at PDB Fuel
and Aviation Storage Terminals
EPCC
Dec 2010 Aug 2011
HRSB/Petronas
Dagangan Berhad
4,900,000.00
68,000
En Rozaini Bin Mohd Sani General Manager
17
Mechanical Piping UCON-26-LS Configuration Project Petronas
Chemical Derivatives Sdn Bhd
Project
Dec 2012 - Petronas Chemical
Jan 2013 Derivatives Sdn Bhd
2,941,200.00
93,000
En Shamsulisam
18
Fabrication and Installation of Pipe Bridge at Kaneka
Project
Sept 2012 Kaneka (M) Sdn Bhd
Feb 2013
4,500,000.00
25,000
En Saiful Adlee 609-583 7000
19
GPP 4 Tie In Works at Petronas Gas Berhad Complex A
Project / Shutdown
Oct 2012 Feb 2013
350,000.00
18,800
En Harmaini / En Azhar
20
Mechanical and Piping GPP1 Boot Level Controller Modification
Project / Shutdown
Feb - March
Petronas Gas Berhad
2013
641,000.00
29,000
En Harmaini
21
Engineering, Design Serv-Mechanical & Piping GPP2 Boot Level
Modification
Petronas Gas Berhad
354,200.00
10,000
Hasanul Arifin Che Jawias
22
EPCC Of 2-PSV-1101, 2-PSV-1102, 2-PSV-1103, And 2-PSV1104 Discharge Headers To GPP-1
Project
Sept - Oct
Petronas Gas Berhad
2013
650,000.00
13,000
Harmainie Yahaya
23
EPCC of Fire Wall for Hydrogen Skid for Argon Plant at ASU2,
CUF Kertih, Terengganu Darul Iman
EPCC
April - July Petronas Gas Berhad
2013
(CUF)
488,900.00
28,000
En. M Madzhir Bin Ibrahim
09 867 3677
24
Pressure Vessel Servicing Job
93,000.00
5,000
Muhamad Tirmizi
09 582 6000
25
EPCC
Feb - Mar
2013
PGB / Shinryo
Turnaround
June 13 July 13
KANEKA
EPCC For Installation And Integration Of Owners Supplied Skids
For Advanced C02 Pilot at GPP3
EPCC
June 13 April 14
PETRONAS Technical
Services Sdn Bhd
4,982,200.00
43,900
Azmil Azim
26
New Line Of Underground Firewater and OWS for GPPA & GPPB
Project
June 13 April 14
PETRONAS Gas
Berhad
2,050,000.00
44,800
Mohd Asmadi
03 2144 8966
27
Installation Of Fire Walls Between Transformer and Cable Celler
Project
Dec 14 Feb 15
PETRONAS
Chemicals
Derivatives Sdn Bhd
380,900.00
8,700
Nur Syazwani Amira Bt M
Munir
Project / EPCC
8 July 14 Apr 15
PETRONAS Gas
Berhad
10,656,136.00
117,600
28
Engineering, Procurement, Construction And Commissioning
(EPCC) Services For Resak Line Upgrading (RLU) Project At Gas
Processing Plant (GPP)
Harmaini Yahya
03 2051 5000
The above summary of experiences provides indicative measure concerning DSESB future potentials and direction. The management of DSESB is
committed to providing its client best-value-for-money project deliveries.
B. TANK CLEANING/ INSPECTION WORK
No
Name of Project/ contract and location
Description Of Work
Performed
Date
Client
Total Value of
Contract (RM)
Estimated Total
Manhours
Name of two Referees
for each Project
1
Repair & Refurbish Floating Suction Pipe for T-205
Project
April 2009 May 2009
HRSB/Petronas
Dagangan Berhad
96,000.00
5,800
En Roslan Omar/ 03-2331
6325
2
Repair & Refurbish Floating Suction Pipe for T-202
Project
Oct 2009 Nov 2009
HRSB/Petronas
Dagangan Berhad
95,000.00
5,800
En Roslan Omar/ 03-2331
6325
3
T901- BD Ball Tank for DOSH Inspection
Project
78,000.00
5,900
En Saiful Adlee - 609-583
7000
4
Tank Cleaning & Dosh Inspection on T-0003 Spherical Tank
100,000.00
7,000
En Saiful Adlee - 609-583
7000
5
July Kaneka (M) Sdn Bhd
August 2010
Tank Cleaning &
Overhaul
Jan - March
2012
Kaneka Paste
Polymers Sdn Bhd
Repair Leaking Roof ACR Building
Project
Oct - Nov
2012
Kerteh terminal Sdn
Bhd
23,520.00
4,000
En Ahmad Fakri Mohd
09 830 5886/5788
6
Maintenance Repair of Portable Access Platform
Project
Dec 2012
Kerteh terminal Sdn
Bhd
4,900.00
5,800
En Ahmad Fakri Mohd
09 830 5886/5788
7
Tank Internal Cleaning and DOSH Inspection on BT-0003B at
Kaneka Port Storage
Project
Nov 2012 Feb 2013
Kaneka Paste
Polymers Sdn. Bhd.
106,330.00
5,000
En Muhamad Tirmizi / En
Saiful Adli (09 582 6000)
8
Tank Internal Cleaning and DOSH Inspection on BD Sperical
Tank (T-901)
Project
June 2013
Kaneka (Malaysia)
Sdn. Bhd.
86,000.00
9,830
MK Hafiz
9
Tank Internal Cleaning and DOSH Inspection on BD Sperical
Tank (T-902)
Project
Feb - March
2014
Kaneka (Malaysia)
Sdn. Bhd.
86,000.00
1,280
En Hafiz (09 582 6000)
Shutdown
Feb-14
Kaneka (M) Sdn Bhd
25,000.00
10
To Repair Nozzle On BD Spherical Tank (T-902)
5,000
MK Hafiz
C. TURNAROUND / SHUTDOWN
Total Value of
Contract (RM)
Estimated Total
Manhours
Name of two Referees
for each Project
No
Project Title / Description
Type Of Work
Date
Client
1
2009 Plant Turnaround Work For Utilities, Butanol And Derivatives
At Optimal Petrochemical Complex, Kerteh, Terengganu
Turnaround
Sept 2008 June 2009
Optimal Chemical
(M) Sdn Bhd
467,000.00
48,700
En Mansor Ahmad/ Kerteh
Industrial Area. Km 106, Jalan
Kuantan-Kuala
Terengganu,Terengganu
2
The Dismantling & installation of Four(4) Nos of E 2005 AFC
Bundle and its Auxiliaries During PDH shutdown October 2009
Project/Shutdown
Works
Aug 2009 Oct 2009
MTBE Malaysia Sdn
Bhd
187,000.00
17,900
Tuan Suzira Bt Tuan Mat
3
Main Mechanical Contractor for KR2 Shutdown 2010
Project/Shutdown
Works
March 2010 - Petronas Penapisan
April 2010
(T) Sdn Bhd
420,000.00
35,600
En Ramniza Mat Rani
4
Provision of 2011 Plant Turnaround Work for Derivatives and
Utilities Package
5
Integrated Planning for Heat Exchanger Overhaul Works for MMSB
Plant Shutdown Aprill 2011
6
Project/Turnaround
Works
Oct 2010 Feb 2011
Optimal Chemical
(M) Sdn Bhd
558,000.00
46,000
Mansor bin Ahmad Maintenance Dept
Project/Shutdown
Works
April 2011
HRSB/MTBE
785,000.00
35,000
Hj Sufian Ayob
MBS Plant Shutdown At Kaneka Malaysia
Shutdown
May-11
Kaneka
45,000.00
7,600
En Saiful Adlee 609-583 7000
7
Polyplastic Shutdown December 2011
Shutdown
Nov - Dec
2011
Polyplastic
200,000.00
28,000
En Razali & En Azlizi 09 585
8363
8
Kertih Terminal Shutdown January 2012
Shutdown
January
2012
Kerteh Terminal Sdn
Bhd
280,000.00
30,300
En Amir - 09 826 6463
9
CUF Defect Works
Project
January
2012
Kaneka/PGB/CUF/PD
H
40,000.00
2,800
En Saiful Adlee 609-583 7000
Turnaround /Shutdown
Jan - May
2012
Optimal Chemical
(M) Sdn Bhd
12,980,000.00
211,000
Shutdown
Oct 2012 Jan 2013
Flexsys Chemical
(M) Sdn Bhd
600,000.00
40,000
En Shahrizan
Project
Sept - Jan
2013
PGB/Shinryo
350,000.00
18,000
En Harmaini / En Azhar
10
To Perform of Mechanical Shutdown work during Optimal
Turnaround 2012 for Package B
11
Flexsys Chemical Annual Shutdown
12
GPP 4 Tie-In Works at Petronas Gas Berhad Complex A
En M Reza Shawal 609-830 7613
13
To Perform Service At Chilled Water Tower Distributor At PGB-CUF
Kerteh
14
9 Unit BOG Equipment Servicing & Inspection For DOSH
15
Provision of Labour, Tool, Equipment and Consumable in Order To
Perform 2014 Plant Turnaround Mechanical Work Package For
Static Equipment
Turnaround
June - Sept Petronas Gas Berhad
2013
(CUF)
220,000.00
22,700
Rostam Abd Ghani
98,000.00
9,400
Anuar Ali
Project
May 2014
Kertih Terminals Sdn
Bhd
Turnaround
15 May 14 31 May 14
Flexsys Chemical
Sdn Bhd
327,000.00
Project
Dec 14 - Jan
15
PETRONAS
Penapisan
(Terengganu) Sdn
Bhd
210,000.00
5,600
Zakiah Bt Mat Daud
240,000.00
15,200
Surizan Khalil
09 830 5788
28,600 Mat Noor Salleh 09-585 6296
16
Construction Work For Boiler Noise @ F24101
17
To Supply Manpower, Tools, Equipment and Consumable For 2015
Turnaround For DOSH Registered Equipment at KTSB
Turnaround
Dec 14 Feb 15
Kertih Terminals Sdn
Bhd
18
FPG 2015 Plant Turnaround Works
Turnaround
May 15 June 15
FPG Oleochemicals
Sdn. Bhd.
6,400,000.00
120,000
19
DOSH CF Renewal For Five (5) Exchangers E120, E122, E126,
E131, E225 During Mini Shutdown 2015
Shutdown
June 15 Aug 15
PETRONAS
Chemicals Ethylene
Sdn. Bhd.
185,000.00
4,500
Azila C Omar (09-8272040)
20
DOSH Inspection - 9 Unit BOG Equipment for CF Renewal
Shutdown
Sept 2015
Kerteh Terminal
Sdn. Bhd
98,500.00
2,500
Anuar Bin Ali (09-8305095)
Azhari / Arumugam
D. SCAFFOLDING
No
Project Title / Description
Type Of Work
Date
Client
Total Value of
Contract (RM)
Estimated Total
Manhours
Name of two Referees
for each Project
1
Scaffolding Services & Inspection
Project
Nov - Dec
2009
Ethylene (M) Sdn
Bhd
47,000.00
5,400
En Nadzir Bin Ismail - Tel 09829 2512
2
Scaffolding Services & Inspection
Term Contract
Dec 2009 April 2010
Optimal Chemical
(M) Sdn Bhd
135,000.00
16,760
Mansor bin Ahmad Maintenance Dept
3
Scaffolding Services & Inspection
Project/TA
Oct 2010 Feb 2011
Optimal Chemical
(M) Sdn Bhd
215,000.00
19,400
Mansor bin Ahmad Maintenance Dept
4
Scaffolding Services & Inspection
Turnaround
April 2015 July 2015
FPG Oleochemicals
Sdn. Bhd.
500,000.00
35,000
Azhari/Arumugam
E. BLASTING & PAINTING WORK
No
Project Title / Description
Project Value
(RM)
Estimated Total
Manhours
Type Of Work
Date
Client
Term Contract
Feb 2007 Feb 2009
Petronas Fertilizer
Kedah Sdn Bhd
156,800.00
Turnaround
Feb 2009 June 2009
Optimal Chemical
(M) Sdn Bhd
96,000.00
8,900
Name of two Referees
for each Project
En Zenol Arifin Mohd Sidek, KM
3, Jalan Jeniangm P.O. Box 22,
08300 Gurun, Kedah
1
Term Contract Blasting and Painting 2+1 at Petronas Fertilizer
Kedah Sdn Bhd
2
Additional Work during 2009 Plant Turnaround Work For Utilities,
Butanol And Derivatives At Optimal Petrochemical Complex,
Kerteh, Terengganu
3
External Painting Work for Fire Water Tank At MBS Plant
Project
July - Aug
2011
Kaneka (M) Sdn Bhd
30,000.00
3,400 En Saiful Adlee - 609 583 7000
4
Maintenance Painting Work of Pipe Rack at KEPS Plant
Project
July - Aug
2011
Kaneka (M) Sdn Bhd
118,000.00
8,700 En Saiful Adlee - 609 583 7000
5
External Painting Work for VCM Tank
Project
Sept - Nov
2012
Kaneka (M) Sdn Bhd
95,000.00
8,000 En Saiful Adlee - 609 583 7000
9,830
Total Services Rendered =
63,420,780.86
1,553,600.00
Total On Going Services =
25,150,000.00
242,200.00
Grand Total Service Rendered
=
88,570,780.86
1,795,800.00
Mansor Ahmad/ Kerteh
Industrial Area. Km 106, Jalan
Kuantan-Kuala
Terengganu,Terengganu
WORKSHOP / FABRICATION YARD
35 meters