file
Transcription
file
Annual Report 2 0 1 3 Index GOBIERNO DE ESPAÑA 4 MINISTERIO DE AGRICULTURA, ALIMENTACIÓN Y MEDIO AMBIENTE 0.0 Título del capítulo acuaMed Aguas de las Cuencas Mediterráneas Informe anual 2013 Título del capitulo 5 Index 01 Corporate Information 2 0 1 3 1.1 What is Acuamed? “ The State-Owned Company Aguas de las Cuencas Mediterráneas, S.A., Acuamed, is a publicly owned company , wholly owned by the S panish S tate that depends on the M inistry of A griculture , F ood and the E nvironment . I ts purpose is to promote hydraulic infrastructures aimed at solving the challenges raised in the complex framework of water management in the S panish M editerranean basins . “ T he primary mission of the State-Owned Company Aguas de las Cuencas Mediterráneas, Acuamed, is to ensure users have access to fresh water in the long term under suitable conditions of efficiency, quality and quantity. With this, Acuamed contributes responsibly, from an economic, social and environmental perspective, to the financial boost of the Spanish Mediterranean area. It is a mission that requires business objectives and design that are up to this challenge. For this, Acuamed has established itself as an integral operator of water infrastructures, capable of covering all aspects of water management, from planning and design of projects and solutions to the construction and exploitation of water management and production facilities. But furthermore, Acuamed is an instrument of public investment, which determines its corporate performance and, above all, its commitment to society and the environment. Thus, the business model of this State-Owned Company is not only aimed at creating financial value, both its own as well as through its work in its local operating area, but also to create social and environmental added value, thus favoring the integral development of the regions in which it operates. This contributes decisively to reducing regional inequalities in Spain which are often the result of the lack of an economic growth and welfare factor in something as essential as water. The creation of these values defines the company's business model: the search for quality, the efficient and 01. Corporate Information responsible use of resources, not only financial but also human and natural, the minimization of potential impacts and thedialogue and cooperation with the social, environmental and economic environment of the areas in which Acuamed works are essential objectives for this company's management. In order to achieve these objectives, the company has adopted a comprehensive approach to its business strategy, in which technologies, solutions and processes are integrated: • Integration of hydraulic technologies: Acuamed operates in all stages of the water cycle, from increasing availability (desalination and reuse); improving the management and efficiency of the use of resources (large distribution and transfer pipelines) as well as improving the environment (improved the water quality, protection against floods and environmental restoration). • Integration of solutions: Acuamed is present in all the development stages of water infrastructures, from their design to their exploitation. • Integration of processes: Acuamed dialogues with all agents involved in the development of hydraulic infrastructures, in order to find the maximum possible consensus and transparency in its management. Acuamed right now is in a transition stage from the position of a company whose business was the construction of hydraulic infrastructures to a company that exploits such infrastructures. 11 Acuamed operates within the entire water cycle Environmental Improvement > Environmental Improvements >Decontamination > Flood Protection Return to the environment > Purification Integration of Solutions and Processes Acuamed covers all development phases of hydraulic works Resource Availability Design > System Design > Signing of agreements with users >Collections > Desalination Plants > Drinking Water Treatment Plants > Reuse of Treated Wastewater Resource Use > Distribution > Modernization of irrigation works Construction > Contracting and work supervision Operation > Signing of agreements with users > Hiring of operators 12 Acuamed's natural scope of action is focused on the Spanish Mediterranean basins, which cover a territory that extends from Girona, in the north, to Málaga, in the south, encompassing part of the inland basins of Catalonia and the Ebro river and drainage basins of the rivers Júcar and Segura and part of Mediterranean Andalusian basin. These areas are primarily dominated by highly variable weather, with historical water scarcity, but also with episodes of heavy rainfall causing flooding, with important consequences to the security of the population. This situation, far from being mitigated, may tend to worsen, according to the latest data available on climate change and official weather estimates. Table 01: Integration as a business strategy Acuamed, with a total investment of 3,600 million euros, focuses its activity on two main lines: first, the generation of new resources through purification, wastewater reuse and desalination. On the other, in improving the management of these resources, through the construction of large pipelines and distribution networks, modernization of infrastructures, environmental restoration, decontamination, such as the decontamination of the Flix reservoir in Tarragona, and flood protection measures. With regards to its financial situation, the company “ “ Technology Integration 1.2 Scope and Geographical, Social and Financial Environment of Acuamed T his, according to the climatological annual summary prepared by the Meteorological Agency, AEMET, for 2013, the whole of Spain recorded warmer than normal temperatures, 0.34 ° C above the normal mean value, especially in the second half the year. In this way, most of the western peninsular area, which is Acuamed's area of activity, recorded temperatures described as "warm" or "very warm", with average temperatures recorded above normal values (Table 02) and rainfall below normal in Valencia, Murcia, southern Aragon and southern Andalucía (Table 03). Acuamed has been reorganized for the high value of its assets, the result of its investments and works, as well as for its "know how" in water management issues. Moreover, in the last two years, corresponding to 2012 and 2013, it has made profits, while since 2012 it has secured funding for its projects thanks to the loan granted by the European Industrial Development Bank, EIB. This is met with a commitment to attain the proper management of the publicly owned funds that are provided to Acuamed. Annual Report 2013 01. Corporate Information 13 Table 02: Average Temperatures in 2013 TEMPERATURES - YEAR 2013 Table 03: Average Rainfall in 2013 Table 06: Precipitation recorded between April 2013 and April 2014 RAINFALL - YEAR 2013 euros for the Spanish economy. The main exporting provinces of fruit and vegetables are Murcia, Almería and Valencia, all in the geographical scope of supply of Acuamed’s desalination plants. The present and future development of these activities STANDARDIZED PRECIPITATION INDEX APRIL 2014 Extremely wet Very wet Table 07: Contribution to the GDP and the regional employment of some sectors with intensive water use Moderately wet Normal Moderately Dry 20% Very dry Extremely dry SOURCE: State Meteorology Agency. Ministry of Agriculture, Food, and the Environment SOURCE: State Meteorology Agency. Ministry of Agriculture, Food, and the Environment EC Extremely Hot: Temperatures that exceed the maximum value recorded in the 1971-2000 reference period MC Very hot: f < 20%. Temperatures recorded in the corresponding interval are higher than the hottest years by 20% C Hot: 20% ≤ f < 40% N Normal: 40% ≤ 60%. Temperatures recorded are within average values F Cold: 60% ≤ f < 80% MF Very cold: f ≥ 80% EF Extremely cold: Temperatures that do not reach the minimum value recorded in the 1971 – 2000 reference period EH Extremely wet: Precipitation levels exceed the maximum value recorded in the 1971 -2000 reference period MH Very wet: f < 20%. Precipitation levels in the corresponding interval are 20% higher than the wettest years H Wet: 20% ≤ f <40% N Normal: 40% ≤ f < 60%. Precipitation levels are within the average values S Dry: 60% ≤ f < 80 MS Very dry: f ≥ 80% ES Extremely dry: Precipitation levels do not reach the minimum value recorded in the 1971-2000 reference period However, it is significant that throughout 2013 the trend towards warmer temperatures and lower rainfall has increased very significantly, a trend that has continued in the early stages of 2014. Thus, AEMET points out in its autumn report for 2013, that September-November 2013 "has been a very warm period, with average temperatures over the whole of Spain of 16.4 ° C, i.e. at a level 1.0 ° C above the normal average value (reference period 1971-2000). This is the fourth autumn in descending order of average temperatures since the beginning of this century after those corresponding to the years 2006, 2009 and 2011 "(Table 04). Likewise, with regard to rainfall, AEMET confirms that "as a whole, this has been lower than the mean values for the season, with an average rainfall of 150 mm in Spain, a value which is around 20% below the average value for the quarter. So far this century, this is the second driest autumn, only wetter than 2007 and has almost equaled the autumn of 2009" (Table 05). Table 04: Average Temperatures - Fall 2013 TEMPERATURES - FALL 2013 Table 05: Average Rainfall - Fall 2013 RAINFALL - FALL 2013 SOURCE: State Meteorology Agency. Ministry of Agriculture, Food, and the Environment SOURCE: State Meteorology Agency. Ministry of Agriculture, Food, and the Environment EC Extremely Hot: Temperatures that exceed the maximum value recorded in the 1971-2000 reference period MC Very hot: f < 20%. Temperatures recorded in the corresponding interval are higher than the hottest years by 20% C Hot: 20% ≤ f < 40% N Normal: 40% ≤ 60%. Temperatures recorded are within average values F Cold: 60% ≤ f < 80% MF Very cold: f ≥ 80% EF Extremely cold: Temperatures that do not reach the minimum value recorded in the 1971 – 2000 reference period EH Extremely wet: Precipitation levels exceed the maximum value recorded in the 1971 -2000 reference period MH Very wet: f < 20%. Precipitation levels in the corresponding interval are 20% higher than the wettest years H Wet: 20% ≤ f <40% N Normal: 40% ≤ f < 60%. Precipitation levels are within the average values S Dry: 60% ≤ f < 80 MS Very dry: f ≥ 80% ES Extremely dry: Precipitation levels do not reach the minimum value recorded in the 1971-2000 reference period 14 Annual Report 2013 15% Employment 10% GDP Specifically, in areas such as the Valencian Community or Murcia the situation is particularly worrying. According to the Meteorological State Agency's delegation in this Community, in the past six months recorded rainfall has been 65% below normal values. So far this hydrological year, less than one hundred liters have been collected per square meter in 45% of the Valencian Community territory, while in other areas, the rains have accumulated less than fifty liters. The region of Murcia, on the other hand, recorded between October 2013 to April 2014 the driest period since the historical series of 1941. The risks associated with these growing climatic imbalances have been further increased by the human activity historically undertaken in these areas, and has had a significant impact on the natural environment. Thus, agricultural and mining activity in Mediterranean coastal mountains brought with it the gradual disappearance of large tracts of forest and Mediterranean scrub-land, while the subsequent abandonment of these activities has led to erosion and desertification processes. The development of tourism activities to the detriment of agricultural ones has boosted the growth of urban settlements on the coastal strip, which have radically changed the landscape and ecosystems, with effects on the capacity of rain water infiltration or water drainage, exacerbating flood risks. These factors of low rainfall and large one-off rainfalls, coupled with the impacts of human activity, have affected not only the natural environment with floods, soil erosion, loss of fertile land, aquifer depletion, but also the socio-economic activity of these regions. Not surprisingly, its economy and its future development prospects lie in areas with activities of high consumption water such as agriculture, agribusiness and tourism. These activities are an important part of the Mediterranean region's wealth: for example, up to 18.3% of the GDP and 13.6% of employment in the region of Murcia. But they are also key to the country's overall economy: the Spanish fruit and vegetable industry is the seventh in order of importance in terms of Spanish exports and has a positive trade balance, which in 2012 was, according to ICEX, a positive balance of 6.8 billion 01. Corporate Information 5% 0% Andalucía Murcia C. Valenciana Cataluña Source: Spanish Regional Accounting. National Statistics Institute. The data shown in the graphic correspond to the sum of the GDP contributions and regional employment in the primary sector (heading NACE 01-03); food, drink manufacturing, and tobacco industry (headings 10-12); and the hospitality industry (headings 55 and 56). depends on the access to this resource in sufficient safety, quality and sustainability conditions. The main water demand in the Spanish Mediterranean basins is associated with irrigation and agricultural uses. The guarantee of supply regardless of rainfall encourages the growth of high-yield agriculture which, in the absence of water restrictions, has excellent temperature conditions for its development. The fruit and vegetable industry is characterized by highly demanding water irrigation requirements to meet international distribution channels that require long-term planning of harvests and high stability in production. Additionally, operating models of our facilities allow water production to be adapted to each crop and modernization actions for irrigation contribute to the optimization of the resource's use. With regards to tourism, this sector is one of the main areas of economic development in this area and is, along with agriculture, in a full expansion phase. In order for this development to continue over time, it is necessary to modernize and complete not only transport infrastructures and communications, but also those of water, making it possible to have the necessary resources to ensure supply for both local people in the area as well as for future development projects, thus increasing the availability of the resource to meet other demands in recreational facilities such as parks, water parks and golf courses, which contribute to improving tourism. 15 1.3 Corporate Social Responsibility Values “ Acuamed, by being a public entity, is interested in the opinions, claims and expectations of users and the target groups of the infrastructures it promotes. It shares its experience with different institutions and stakeholders to contribute to the design and development of the water cycle management policy in Spain. This is all integrated into a process oriented at informing, communicating and sharing information with users and stakeholders, in addition to looking after and taking into account their needs and concerns. The values that govern the common action framework of Acuamed's workers determine how its business objectives are met, seeking social profitability, transparency and maximum corporate responsibility: • Integral view of the business: Acuamed is involved in all the stages of a project, from planning and design, to its processing, implementation and start-up. • Quality: Acuamed seeks maximum technical and scientific quality in its actions. • User orientation: Flexible projects, which cater to the needs of users and respond to the conditions of each territory. • Efficiency and responsibility: Acuamed seeks maximum efficiency, both in meeting the expectations of its users and contributors as well as in designing projects and solutions. • Improving the environmental setting: Acuamed not only works to minimize the environmental impact of its works, but also to improve the environment and water-related ecosystems. • Dialogue: Acuamed maintains open lines of communication with its users, institutions and interest groups with regard to its actions. • Collaboration: Acuamed actively collaborates with private companies and public institutions to find synergies in the development of projects. “ Acuamed's Mission, Vision and Values Mission Vision Acuamed's mission is to guarantee water availability to users in the areas in which it operates, both for supply and for irrigation and industrial use, under appropriate conditions of efficiency, quality and quantity, contributing responsibly, socially and environmentally to the economic boost of the Spanish Mediterranean area. This mission is translated into the following business objectives: • To meet the water needs of citizens and economic agents. • To contribute to the equality of regions, helping areas with higher water deficit to have the water they need to develop their agriculture and tourism, basic pillars of their economy. • To maximize the efficiency and quality in the exploitation of its facilities. • To prevent environmental impact of its actions. • To improve the environment of the areas where it operates. • To prevent risks from arising from extreme weather events. • To generate added value in institutions and companies it works with. • To maintain a constant and fluid dialogue with its groups of interest Acuamed focuses its company strategy in adding the experience and solvency of the public sector to the efficiency and agility of private management. All this, applying the knowledge and most advanced technologies to meet the great challenges of water in the Spanish Mediterranean basins. To do this, Acuamed gives priority to the social commitment that must be established among users of the infrastructure that it promotes. The actions of this State-Owned Company are the result of dialogue and consensus with the stakeholders involved, embodied in the agreements that are signed with users. Another of the challenges facing Acuamed is focused on constant research and, where appropriate, the use of the opportunities that technological development provides for the optimization of its facilities, both in the phases of construction and exploitation, therefore improving their efficiency. Examples of this concern to apply the latest technological advances are the decontamination project of the Flix Reservoir (Tarragona), where hitherto unheard of processes in this area have been used, and the R + D + i Plan produced in 2013 for all the Company's facilities. 16 Annual Report 2013 01. Corporate Information 17 1.4 Acuamed in Figures In Desalination Acuamed's main program, both in terms of strategic focus and investment, is the desalination program. Access to quality water which is permanently available is ensured through the desalination projects. This program includes the construction and exploitation of 12 desalination plants with a production capacity of 409 hm3/year. “ its area of activity, Acuamed operates a policy for hydraulic issues designed and planned by the Ministry of Agriculture, Food and the Environment. With a total investment of 3,614 million euros, Acuamed promotes five investment programs with two basic lines of action: on the one hand, the generation of new resources and, on the other, the improvement in their management and quality, as well as the environmental and flood protection. Table 09: Map of Acuamed Desalination Works “ Table 08: Breakdown of Investments in Acuamed by item Program Desalination Investment (millions of Euros and percentage of the total) 12 1,703 47% 8 173 5% 22 1,269 35% 3 51 1% Quality improvement and environmental protection and restoration 13 418 12% Total 58 3,614 100% Reuse Water management improvement – Large distribution pipelines Improvement of irrigation works 18 Number of initiatives Annual Report 2013 Six of these twelve plants have capacity to supply water for irrigation. This volume of resources means 165 hm3/year, 40% of the total capacity, which guarantees irrigation to an area of 250,000 hectares. The capacity available for supply -water consumptionis 244-hm3/year, 60% of the total capacity, which is equivalent to guaranteeing the supply of a population of 3,000,000 people. Table 10: Desalination Program in Figures Program Desalination 01. Corporate Information Investment (millions of Euros) Investment made (millions of Euros) Investment pending (millions of Euros) Degree of advancement 1,703 1,439 251 85% 19 Throughout 2014, all desalination plants are expected to be completed. At the end of 2013, a total of five plants were in operation: • El Atabal (Málaga) • Marbella (Málaga) • Carboneras (Almería) • Águilas (Murcia, entering into service in 2013) • Valdelentisco (Murcia) Table 11: Desalination Plants in service Desalination Plant Production capacity (hm3/year) El Atabal (Málaga) 60 Marbella (Málaga) 20 Carboneras (Almería) 42 Valdelentisco (Murcia) 48 Águilas (Murcia) 60 Reuse The initiatives for the reuse of water through waste water purification processes mean that a large volume of water that would otherwise be dumped can be put into circulation. This reduces the consumption of traditional sources, whose ecosystems at present are somewhat fragile, such as Mediterranean rivers and coastal aquifers. By implementing tertiary treatments in Wastewater Treatment Plants it is possible to obtain optimal water quality for uses such as agriculture, irrigation of green areas or the watering of golf courses, meeting the quality parameters required by the applicable regulations. Both El Atabal as well as Marbella and Carboneras entered into service in 2005. Valdelentisco started the operational phase in 2009 and Águilas did so in 2013. The rest of the desalination plants developed by Acuamed are in the testing stage or in advanced stages of construction, so they will enter into service shortly. Improved Water Resource Management, Environmental Protection and Restoration In relation to the improvement of water resources, we should highlight the interconnection pipelines between various sources and regulation deposits, which allow optimum distribution of the resource according to its local availability. In this area, two of the most important transfers in Spain, which are the Júcar-Vinalopó (Valencia-Alicante) and the NegratínAlmanzora (Almería), have already been completed. Furthermore, prevention projects against floods are being undertaken to ensure the safety of the populations located in the flood plains of the Mediterranean rivers from potential overflow episodes resulting from heavy rains. These flood prevention projects are associated with a number of re-vegetation activities that enhance the value of the river ecosystem and promote their landscape impact. Table 12: Acuamed Desalination Plants – Summary Production capacity (hm3/year) Planta desaladora Province Use Status Oropesa Castellón Supply 18 Works Underway Moncófar Castellón Supply 10 In Testing Phase Sagunto Valencia Supply 8 In Testing Phase Mutxamel Alicante Supply 18 In Testing Phase Torrevieja Alicante Supply / Irrigation 80 Finished Valdelentisco Murcia Supply / Irrigation 48 Operating Águilas Murcia Supply / Irrigation 60 Operating Bajo Almanzora Almería Irrigation 15 Works Underway Carboneras Almería Supply / Irrigation 42 Operating Campo de Dalias Almería Supply / Irrigation 30 Works Underway El Atabal Málaga Supply 60 Operating Marbella Málaga Supply 20 Operating 409 20 Annual Report 2013 01. Corporate Information 21 1.5 Company Milestones and Figures for 2013 Tables 13 and 14: Acuamed Investment Program. Degree of completion by item Financial Results at Close of 2013 Implementation of Actions Acuamed closed 2013 with a profit before tax of 2.02 million euros, representing a 30% increase over those obtained in 2012, when they reached 1.56 million euros before tax. Furthermore, at December 31, Acuamed had liquid assets available of 409 million, up from the 122 million euros for 2012, and net assets of 2326.40 million. Thus, the Company has a healthy balance sheet and improves the amounts registered in the previous year, with a strengthened position of liquidity. This has contributed to the disbursement, in March 2013, of the last installment of 150 million from the 500 million loan granted by the European Investment Bank, EIB. The improved profits over those obtained in 2012 is the result, among other factors, of the cost reduction plan implemented by the Company, of the Treasury management carried out, and of the higher revenues achieved as a result of the consolidation of the Company's operating business, thanks to which in 2013 there was a 45.07 million euros turnover, compared with 36.1 million turnover in 2012. Among other expenses, certain operating costs have decreased, such as the energy optimization item, reducing the kWh per m3 ratio of desalinated water produced. Also, the item for staff costs has been reduced due to a workforce adjustment agreed with the workers' legal representatives. Thus, the percentage of this item over the total business turnover has dropped 5 percentage points in 2013, going from 26.8% in 2011 to 20.4% in 2012 and 15.2% in 2013. Acuamed carries out works entrusted through its Direct Management Agreement. In 2013, net investment has reached a total of 150.70 million euros. By Autonomous Communities, this amount has been 53.26 million in Andalusia, with works underway or planned amounting to 329.88 million euros; 61.07 invested in the Valencian Community, with 646.35 million for works underway or planned; 28.29 in Cataluña, with 261.14 million in works underway, and 8.08 in the region of Murcia, with 112.12 million works underway (54.22 million) or pending (57.90 million). European Funds An important part of the activities carried out by Acuamed has the backing of the European Union through the concession of grants from the ERDF Community Funds and from Cohesion Funds. In the fiscal year 2013, the European funds allocated to Acuamed totaled 1,131 million euros, from the operational programs of the ERDF Funds and the Cohesion Funds for the programming periods 19932000, 2000-2006 and 2007-2013. Thanks to these grants, Spain, like other Member states of the European Union, has managed to correct a number of deficiencies suffered, especially in the infrastructure area. 22 Program Investment (millions of Euros) Investment completed (millions of Euros) Degree of advancement 1,703 1,439 85% 172 103 60% 1,269 1,023 81% 51 40 78% 418 285 68% 3,614 2,890 80% Desalination Reuse Water management improvement – large distribution pipelines Improvement of irrigation works Quality improvement and environmental protection and restoration Total 100% 90% 80% 70% 60% The implementation 50% 40% of the entrusted actions in terms of efficiency and sustainability, as well as the achieving of an adequate financial balance to ensure Acuamed's feasibility as a public investment tool are two priority aims for this company Annual Report 2013 30% 20% 10% 0% Desalination Reuse Management Improvement Irrigation Improvement Environmental Initiatives Total Investment (%) Degree of Investment Completion (%) 01. Corporate Information 23 1.4.2 Highlights Reprogramming of Actions In 2013 Acuamed carried out a major effort of reprogramming its actions, in order to adapt to new circumstances and surroundings and to achieve further optimization of its investment program. There were several specific reasons which prompted this reprogramming, among them: a) The absorption by Acuamed of former state-owned companies Acusur, AcuaSegura and AcuaJúcar meant that Acuamed assumed their actions. They should be analyzed together, once the benefit of maintaining each of them has been determined. b) The new budget situation required a review of the Company's total investments, due to the limited possibilities of obtaining external funds to finance users' contributions. c) The need to reduce, as far as technically feasible, investments without the recovery of costs. Therefore, the Council of Ministers agreement took place on December 21, 2012 which authorized the signing of the sixth addendum to the modified No. 2 of Acuamed's Direct Management Agreement which established that this aforementioned revision of the proceedings pending enforcement by Acuamed should be carried out. These were subjected to a strict prioritization process based on: a. Necessity and urgency of their implementation. b. Economic profitability. c. Financial solvency and the interest of the users. d. Capacity of the actions in the absorption of EU funds within statutory deadlines. Work on the preparation of this document for Acuamed's rescheduling and prioritizing began in January 2013. After review by different administrative authorities, the document was sent to the General Directorate of Water (DGA) for its review and processing. The document was agreed and approved by the Council of Ministers of December 13, 2013. This reprogramming is the first step to formalize the new Direct Management Agreement between Acuamed and the Ministry of Agriculture, Food and the Environment. As a result of this review process, 54 actions to be carried out have been proposed for indefinite suspension and 3 new actions and 7 sub-actions have been proposed for inclusion. The resulting investment of this reprogramming is: Of this investment, 826 M €, 23%, is still pending execution. A priority of the investment pending 24 Internal Reorganization execution has been carried out based on the combination of two investment criteria: degree of implementation and impact on economic results planned for the Company. The result of these reprogramming actions serve to articulate the basic pillars that as a result thereof, shall serve to articulate the Company's new Direct Management Agreement: Total Foreseen Investments (€M) Direct Management Agreements in force 4,579.3 Renewal of investment in initiatives that remain 493.6 Initiatives to be canceled -1,663.2 Investment made in initiatives to be canceled 47.2 Investment in sub-initiatives related to initiatives that are already complete 86.4 Investment in preparatory activity for projects of new initiatives 10.0 Investment in new initiatives proposed by users 43.5 Contingencies 16.8 Total Investment 3,613.6 This reprogramming proposal does not exceed the Company's funding sources and is balanced between the limitations that prudence advises in view of funding sources available and the need to have, within five years, a volume of operating assets with enough profitability to meet the Company´s financial commitments. Change in Acuamed's Presidency In May 2013, the Secretary of State for the Environment, Federico Ramos, became Acuamed's President at this State-Owned Company Board of Directors meeting held on May 29. As part of the public sector's rationalization process, in 2010 there was the merger of AcuaJúcar and AcuaSegura by Acuamed. Likewise, following the merger of Acuanorte, Acuaebro and Acuasur, Acuaes–Aguas de las Cuencas de España was created, thus leaving two State-Owned companies engaged in water management, both under the chairmanship of the Secretary of State. Annual Report 2013 Acuamed, has been awarded a project in Ecuador financed by the Inter-American Development Bank. In line with these changes, both in the presidency and in the reprogramming actions, and in order to increase the efficiency of the Company and adapt its management model to the strategic objectives set, Acuamed proceeded in the second quarter of 2013, to a review of the Company's processes and the internal organization then prevailing, and which had been approved at the Board of Directors meeting of June 2011 (more information in section 2.1 of this report). Milestones in Works In the construction area, the work started in previous years has continued in 2013, with the implementation of 132 construction contracts, 92 of which have been completed, 9 of them in 2013. Of the remaining contracts, 33 were underway in 2013 and the 7 remaining ones were under drafting of the construction project, expropriation of land or awaiting the signature for the readiness for construction. Another 7 construction contracts were at tender stage at the end this year. In the exploitation area, the operation of the infrastructures already implemented in previous years has continued. Throughout 2013 Acuamed has launched the exploitation of 4 new initiatives, among which are highlighted the following: Energy Efficiency Plan Acuamed, consistent with its commitment to a management based on environmental responsibility and sustainability, investigates the use and implementation of improvements, both methodological as well as in processes aimed at achieving this strategic objective. Therefore, throughout 2013 this company has worked on developing a "Strategic Energy Saving and Efficiency Plan 2014-2017", whose overall aim is to make • Start of the dredging works of the Flix reservoir (March) Acuamed a reference in energy savings and efficiency in the national water sector. In March 2013, Acuamed ended the testing phase In This boost from the Company's management body March 2013 the dredging works for the contaminated to this Plan demonstrates commitment to improving sludge in the Flix reservoir (Tarragona) were started. energy efficiency, whose development tool is For this decontamination work, a total of 165 million systematized and structured in the said Plan. euros have been invested, the largest investment With this, Acuamed also wants to meet made in Spain for decontamination work. the European Directive 2012/27/UE, With this project, more 800,000 so that its energy-management m3 of contaminated sludge will be eliminated. This sludge system, reflecting Acuamed's he year has been has accumulated for more commitment to sustainable especially rich when referring than a century as a result development, be awarded of industrial activity in the the ISO 50001 certification. to milestones and progress in riverbed of the Ebro. The Plan was approved works he advanced degree of The works will improve by Acuamed's Board of the quality of water that Directors in early 2014 completion of many of these supplies more than one (more on the "Strategic initiatives the start of new ones million people and irrigates Energy Saving and 50,000 hectares of land. Efficiency Plan 2014-2017" and the commissioning of major The action features a triple in point 3.2. of this report). infrastructures have marked safety system that covers all possible contingencies the development of a key year that may occur during the for cuamed International Presence course of the works. On the one hand, an ecological dredging Foreign countries are one of the major system incorporating an anti-turbidity axes for Acuamed’s future expansion. system has been taken into account. This is a The State-Owned Company wants to open double sheet piling wall that isolates the area to be up to new international markets. This has changed decontaminated from the rest of the river, as well as a its business perspective, making it more modern, network of sensors to monitor, in real time, the quality efficient and outward-looking. of Ebro waters nearby. The first steps in that direction have already taken Also, the Ebro Hydrographic Confederation and the place with several international projects, in order Catalan Water Agency will conduct periodic checks of to collaborate and support Spanish companies in the water quality. Finally, the Emergency Plan, approved obtaining international contracts by providing them by Civil Protection in 2008 and updated in 2013, references, knowledge and experience in different guarantees, in the unlikely event of an incident, that there areas of hydraulic works. will be normal water supply to affected populations. Recently a Spanish company, in collaboration with T 2013 .T , A 01. Corporate Information . 25 • Completion and commissioning of the desalination plant of Águilas /Guadalentín (Murcia) • Performance testing of the new stormwater interceptors in Cartagena (Murcia) In March 2013, Acuamed ended the testing phase of the desalination plant in Águilas (Murcia). The plant represents an investment of over 238 million euros, it has a production capacity of 180,000 m3 of water per day (60 hm3 expandable to 70 hm3 per year), which will be supplied to the Irrigation Communities of Águilas, Lorca, Puerto Lumbreras and Pulpí. During the testing period, between the months of May 2012 and February 2013, the plant has produced a total of 2 hm3 of water, which has been distributed to these three Communities of Irrigators, while in the last month the desalination plant has reached 50% of its capacity. In June 2013, the Secretary of State for the Environment and Acuamed´s President, Federico Ramos, signed an agreement with the Irrigation Communities of Lorca and Puerto Lumbreras (Murcia) for the development of new distribution infrastructures for desalinated water from the Águilas plant to Valle del Alto Guadalentín in Murcia. The works, which will require an investment of 16.8 million euros, 80% financed by European funds, will improve and complete the distribution network of the water produced at the Águilas plant, in service since last February. The infrastructures in the agreement include the implementation, among other elements, of a total of 16 kilometers of pipeline, which will carry all the flows assigned to both users (28 hm3/year) from the Cerro Colorado Reservoir to the center of the Consolidated Irrigation of the Communities of Irrigators of Lorca and the surroundings of the irrigable area of Puerto Lumbreras. In June 2013 the test runs for the new stormwater interceptors, which Acuamed executed in Cartagena, Murcia, were satisfactorily undertaken. The stormwater interceptors of Cartagena are an action that, as a whole, has meant an investment of 30 million euros, VAT included. Their objective was to definitively solve the old problem of flooding in the neighborhoods of Los Dolores, Cuatro Santos and the Mediterráneo residential area, benefiting more than 38,000 inhabitants. Thus, the historical problem of floods affecting the northern and western neighborhoods of Cartagena has been solved. This situation stems from the development of the urban area of the city itself, which has been made by occupying the lower lagoon or Almarjal (boggy ground) after it dried out, as well as the banks of the watercourses that drained into it, in such a way that they have become high risk areas. In fact, during quite intense rainy seasons, situations of serious danger to the population have occurred in the past, which from now on will not happen again. The work has consisted of three complementary actions, involving the improvement of the sewerage network of the district of Los Dolores, on the one hand, of the Mediterráneo residential area and the neighborhood of Cuatro Santos on another and, finally, the Concepcion district and the right bank of the channeling of the Benipila watercourse. A complementary collector system has been adopted as a solution in the three cases to improve network capacity with two storm tanks at the end. • Development of the testing phase of the desalination plant in Torrevieja (Alicante) The Torrevieja plant began its testing phase in April 2013. The tests from the facility's framework were completed successfully. This plant is one of the most efficient infrastructures for desalination in the world because after the testing phase, consumption has been adjusted to 3KWh/m3 for the complete desalination process. 26 Annual Report 2013 02 The company and its people 2 0 1 3 2.1 Internal Structure Nature and Origin of the Company The revised Water Law, approved by Legislative Royal Decree 1/2001, authorized the Council of Ministers to constitute state companies whose corporate purpose is the construction, operation or execution of hydraulic works, and whose relationship with the General Administration of the State is regulated through agreements. These state-owned companies complemented in this way the functions of the Basin Organizations, such as the design, construction and operation of the works carried out using the own funds of the StateOwned Companies and those that were assigned to them by the State. Within this framework, in December 2001, the incorporation of the State Owned company Infraestructuras del Trasvase was authorized, under the then Ministry of the Environment, now the Ministry of Agriculture, Food and the Environment, With this Ministry the corresponding Direct Management Agreement was signed in May 2002 to govern the actions of the State-Owned Company. Royal Legislative Decree 2/2004, of June 18 modified Law 10/2001 of July 5 for the National Hydrological Plan repealing, among other measures, its article 13, later covered in Law 11/2005 of June 22. This abolition affected the State-Owned Company Infraestructuras del Trasvase S.A which changed its corporate name to Aguas de las Cuencas Mediterráneas, S.A. (Acuamed). Its guardianship was also modified in favor of the Ministry of the Environment (now the 02. The Company and its People Ministry of Agriculture, Food and the Environment), pursuant to the provisions of Article 176.1 of Law 33/2003 of November 27, for the Public Authority Property Act. Acuamed’s corporate purpose, as drafted by the resolution of the Council of Ministers on July 22, 2005, is the following: The Company’s purpose will be the contracting, construction, acquisition and exploitation of all kinds of hydraulic works, and especially those works of general interest which, in compliance with Law 11/2005, which modified the Law for the National Hydrological Plan, are made to replace those provided at the time for the transfer of water resources. The management of contracts for studies, projects, construction, acquisition or operation of the works cited in the first paragraph, and the exercise of those activities that are preparatory, complementary or resulting from the above is also included. The company’s purpose may be made directly or through participation in the capital of companies incorporated or which could be incorporated for any of the purposes mentioned in the previous sections. Aguas de las Cuencas Mediterráneas, S.A. is a stateowned company under the Ministry of Agriculture, Food and the Environment. Its social capital amounts to 1,530 million euros and is completely subscribed to and paid for by the Spanish Government, the only founder member and title holder of its shares. 31 • Mr. Ángel Álvarez Capón, National Auditor. Department Head. Ministry of Finance and Public Administrations. General Intervention of the State Administration. • Mr. Ricardo de Alfonso Lopez, Deputy Director General of Service Statistics. Ministry of Finance and Public Administrations. • Mr. Alberto Valdivielso Cañas, Secretary General of State Assets. Ministry of Finance and Public Administrations. • Ms. Pilar Vázquez Millán, State Attorney in Valencia. Secretary of the Board • Ms. Isabel Bonelli Jaudenes, State Attorney. Chief of the Environment Area. Ministry of Agriculture, Food and the Environment. Deputy Secretary of the Board • Mr. Javier Moya Lámbarri, State Attorney. Company’s Legal Director Aguas de las Cuencas Mediterráneas, S.A. (Acuamed) Audit Committee Composition Chairman • Mr. Ángel Álvarez Capón, National Auditor, Department Head. Ministry of Finance and Public Administrations. General Audit of the State Administration. Members: • Ms. Elisa Carbonell Martín, Advisor to the Ministry of Economy and Competitiveness. Ministry of Economy and Competitiveness. • Mr. Carlos Muñoz Bellido, Deputy General Director of Financial Planning. Ministry of Agriculture, Food and the Environment. Secretary • Ms. Isabel Bonelli Jaudenes, State Attorney, Environment Area Manager. Ministry of Agriculture, Food and the Environment. Table 16 Mergers The State-Owned Company Aguas de las Cuencas Mediterráneas is the result, at present, of the mergers by absorption of four state-owned companies. Therefore on June 23, 2006, and pursuant to article 169 section f) of Law 33/2003, of November 3, of the Public Authority Property Act, the Council of Ministers approved the merger by absorption between the companies “Aguas de las Cuencas Mediterráneas, S.A.” as merging company and “Aguas de la Cuenca del Sur, S.A.U.” ACUSUR, as merged company. Subsequently, in accordance with the provisions of art. 39 of Law 3/2009 of April 3, the merger project for the Companies Aguas de las Cuencas Mediterráneas, S.A. (ACUAMED), Aguas de la Cuenca del Segura, S.A. (ACUASEGURA) and Aguas del Júcar S.A. (ACUAJUCAR) was completed. This merger is the result of the agreement reached at the Council of Ministers of April 30, 2010. On this date, the Council adopted the “rationalization agreement of the public business sector” that reflects the will of the Government to undertake a major restructuring of the public business sector in order to increase its efficiency and effectiveness and to reduce public expenditure. Board of Directors The Governing Council, the highest governing body of Acuamed, has vast power and authority to govern, direct, manage, represent and bind the Company. The Council is composed mainly of representatives from the responsible ministry (Ministry of Finance) and the 32 Ministry in Charge and bodies dependent on these, also including representatives from other ministries and bodies of the State Administration. The company’s By-Laws define the composition and functioning of the General Shareholders Meeting and the Board of Directors, in which the Audit and Control Committee, integrated by four members of the Board, undertake the main functions of monitoring the contracting. The Chairman of the Board of Directors does not occupy an executive position. PRESIDENT MR. FEDERICO RAMOS DE ARMAS Composition Chairman • Mr. Federico Ramos de Armas, Secretary of State for the Environment. Ministry of Agriculture, Food and the Environment. Members: • Ms. Liana Ardiles López, Director General of Water. Ministry of Agriculture, Food and the Environment. • Ms. M.ª José de Mariano Sánchez‐Jáuregui, Head of the Network Content Management Unit. Ministry of Finance and Public Administrations. • Ms. Elisa Carbonell Martín, Advisor to the Secretary of State for Economy and Competitiveness. • Mr. Carlos Muñoz Bellido, Deputy General Director of Financial Planning. Ministry of Agriculture, Food and the Environment. • Ms. Rosario Cayuela Castells, Advisor of the LegalInstitutional Affairs Department of the Government’s Cabinet Office. Ministry of the Presidency. • Mr. Eduardo Ribas Steegmann, Director of the Secretary of State’s Cabinet for State Parliamentary Relations. Ministry of the Presidency. • Mr. Daniel Sanz Jimenez, Directorate General of Water. Ministry of Agriculture, Food and the Environment Annual Report 2013 PRESIDENT MS. LIANA ARDILES LÓPEZ MANAGING DIRECTOR MR. ARCADIO MATEO DEL PUERTO DIRECTOR OF ADMINISTRATION AND FINANCE MR. CARLOS ANIBARRO MARTÍN DIRECTOR OF ENGINEERING AND CONSTRUCTION MS. M.ª GABRIELA MAÑUECO PFEIFFER DIRECTOR OF EXPLOTATION MR. FERMÍN LÓPEZ UNZÚ DIRECTOR OF THE LEGAL DEPARTMENT MR. JAVIER MOYA LAMBARRI Table 17: Organization chart 02. The Company and its People 33 Internal Structure 2.2 Relationship with Stakeholders Acuamed’s operation is structured geographically around the hydrographic basins in which it operates. In order to increase the Company’s efficiency and adapt its management model to the strategic objectives set, in the second quarter of 2013, Acuamed proceeded to review the Company’s processes and the internal organization then prevailing, and which had been approved by the Board of Directors meeting of June 2011 (more information in section 2.1 of this report). Based on the conclusions reached in this review process, Acuamed’s management took the following decisions: 1. Place business responsibility where it occurs. Consequently, three area managers were appointed, with responsibility for the income statement of the relevant area. 2.Corporate managers still have the role of spreading best practices in their area of responsibility, their recommendations being binding to all areas. 3.To reinforce the idea of management in all of the Company’s areas, the name of deputy director was changed to manager. 4.Three area managers were appointed and there were, in some cases, changes in the project management of some strategic actions. 5.The project manager becomes responsible for end to end business associated with the work, that is, to finish it on time and on cost, exploit it efficiently, obtain customers, negotiate or renegotiate agreements and, ultimately, make the initiative profitable. T hroughout its activities and processes, such as project design, construction, environmental protection measures and exploitation, many and different groups, both internal and external, are in contact with or influenced by the company’s activities. Each of them, as part of this relationship, contains specific expectations regarding behavior and the solutions offered by the company. Responding effectively to them, creating the necessary communication lines, providing these groups with the information they need and establishing the policies needed to improve the performance of its activity are key pillars of Acuamed’s sustainability policy. 34 02. The Company and its People 35 2.3 Acuamed’s Main Value: Its People Table 18: Acuamed’s Main Groups of Interest Group of Interest Expectations regarding the Company Existing lines of communication Satisfaction with their job Professional development Health and Safety at work Works Council Meetings with union representatives of the absorbed companies Work Health and Safety Committee Construction and operation of infrastructures included in the Commission for viable technical, economic, and environmental management of the initiatives Board of Directors Contacts for daily operations Institutional events Aspects of the works related to their skills (environment, fire prevention, cooperation, labor law, international business, etc.) Bilateral meetings during the design and construction process of the infrastructures Job satisfaction Professional development Health and Safety at work Works Council Meetings with union representatives of the absorbed companies Work Health and Safety Committee Construction and operation of infrastructures included in the Commission for viable technical, economic, and environmental management of the initiatives Board of Directors Contacts for daily operations Institutional events Other Ministries Aspects of the works related to their skills (environment, fire prevention, cooperation, labor law, international business, etc.) Bilateral meetings during the design and construction process of the infrastructures European Union (Administration that funds projects) Efficient use of funding awarded Socio-economic return of the works Prevention of environmental impacts associated with the works Control procedures of investments from European funds GRECO-AGE Group Meetings (Monitoring of communication actions) Access to the resource in terms of quality and sufficient quantity Meetings for the creation and monitoring of collaboration agreements On-line customer management system Field staff of the company in initiatives under exploitation Information on new tenders Compliance of contracts in relation to the execution of the works Specific section for tenders on the website Meetings to monitor the projects Local Communities Socio-economic return of the works Prevention of environmental impacts and ecosystem improvement Communication actions and institutional relationship (visits to works, openings) Specific publications Press releases Leaflets Public, Regional, and Local Administrations Socio-economic return of the works Prevention of environmental impacts and ecosystem improvement Cooperation Agreement Land restoration plans Bilateral meetings (technical, administrative procedures, agreement development, etc.) Communication and institutional relationship activities (visits to works, openings) Society Efficient management of the water cycle Prevention of environmental impacts and ecosystem improvement Publications Press releases Leaflets Media Efficient management of the water cycle Prevention of environmental impacts and ecosystem improvement Socio-economic return of the works Employees Ministries of Finance (Shareholder) and Agriculture, Food, and the Environment (Guardianship) Other Ministries Employees Ministries of Finance (Shareholder) and Agriculture, Food, and the Environment (Guardianship) Resource Users Direct Contracts A cuamed employees are its main value and the most important stakeholder group of the company. Thanks to the work they do and their high level of training and experience, they carry out the actions required for the design, construction and operation of the infrastructures developed by the company. Therefore, achieving a satisfactory working environment is a crucial aspect with direct impact on the performance of Acuamed’s mission. The human resources strategy of the company is based on mutual respect and commitment, creating a good environment for personal and professional development. For this, the company in recent years has set up various policies aimed at: • Ensuring a fair negotiation with employees over the course of their employment. • Ensuring diversity and equal opportunities. • Preventing unacceptable behavior, such as bullying. • Remunerating their effort fairly and facilitating work reconciliation. • Contributing to training and professional development. • Preventing risks in health and safety at work. Highlights Organization 36 Press releases Invitation to institutional events Annual Report 2013 An assessment of the organizational structure of the Company was carried out during 2013 and the findings have led to the definition of a new organization chart for the company based on the following key areas: • Changing business focus at all levels, to a view oriented towards the company’s efficiency and profitability. • Establishing regional managers with sufficient autonomy so that economic goals set a priori can be achieved. • High degree of responsibility at all levels in the company. The organizational change has led to a new functional organization structure. A job manual has also been drafted that determines the competencies of each of the professionals at all levels in the company. For the future, the possibility of determining and defining a procedure map is being assessed as a medium term objective. 02. The Company and its People Collective Bargaining There are currently three agreements in force for staff that came from the companies Acuamed, AcuaJúcar and AcuaSegura before the merger. The Homogenization Agreement in force since August 2012 is still being applied. Following the agreement in principle reached in late 2012 with the workers’ legal representatives in the drafting of the Collective Bargaining Agreement I of Aguas de las Cuencas Mediterráneas S.A., the approval process with the shareholder has begun. This implies modifying many aspects contained in the Agreement. The final draft of the First Agreement of Aguas de las Cuencas Mediterráneas S.A. is pending approval at year end. In any case, we understand that despite the defense of different company positions and workers’ legal representation, the understanding and good relationship between them has strengthened. Towards a More Balanced Workforce During 2012 the company applied an Employment Regulation Order. In 2013 the company continued moderating its staff structure, with the composition of its workforce going from 104 employees to 99 on December 31, 2013. Due to the existing wage gap differences between the staff that came from the three companies, during 2013, there was a salary adjustment process that ended with 8 workers agreeing to a salary reduction and another 4 to an increase. This negotiation process has led to an important reduction in the wages bill, while higher wages have tried to be adjusted and efforts rewarded. Objectives for 2014 Amongst the objectives for staff in 2014, the company has set tasks such as defining an array of skills and establishing operating procedures at administrative level. Acuamed will also create a process map and procedures manual that will allow a general optimization of the company. Diversity and Equal Opportunities Acuamed guarantees equal opportunities. It promotes and respects diversity, constituting a key commitment to its employees. It fights all forms 37 Table 19: Breakdown of employees by work center Preventing Unacceptable Behavior Men Women Madrid 23 32 55 Valencia 11 6 17 Murcia 10 2 12 Almería 4 1 5 Málaga 3 4 7 Tarragona 2 1 3 53 46 99 Table 20: Employees by category Empleados 31/12/2013 Men Women DIRECTOR* 5 0 MANAGEMENT 6 5 TECHNICIANS 37 17 5 24 53 46 ADMINISTRATIVE STAFF of discrimination, direct or indirect, due to gender, promoting real equality between men and women. Acuamed’s staff composition by gender is overall balanced. However, this balance is not reflected in categories, with the representation of women being lower than men in the categories of Management, Deputy Management and Technicians and Graduates. However, recent developments have been positive in this area, increasing the presence of women in senior executive positions and on the Board of Directors. Acuamed’s objective is to reduce this gap by incorporating measures to ensure equality between women and men in access to employment, training, career development and work conditions. For this, the Company’s Collective Bargaining Agreement I includes an Equality Plan in its additional clause three which guarantees equal opportunities and nondiscrimination between individuals. Acuamed meets the legal requirements regarding the social integration of people with disabilities by promoting their direct recruitment through the Special Employment Centre INTEGRA. Acuamed strives to maintain a balanced workforce of professionals with the highest qualifications to work in the best working environment to achieve business objectives in the current macroeconomic circumstances, focusing human resource management towards efficiency and profitability. 38 *Note: In May 2014, this changed to 4 men and 1 woman Table 21: Breakdown of employees by age group Men Women TOTAL 0 3 3 30-50 40 38 78 OVER 50 13 5 18 53 46 99 UNDER 30 Table 22: Breakdown of employees by type of working day Men Women PART-TIME WORK 0 11 FULL-TIME WORK 53 35 53 46 Acuamed does not currently have a code of conduct that comprehensively addresses the risks of corruption, money laundering or confidentiality, because the Internal Procurement Instructions include sufficient mechanisms to prevent such risks. Human Rights and Ethics All bidding processes for works and exploitations that Acuamed promotes are subject to the procurement rules of the Public Administration, so in these processes the necessary transparency, competition, advertising and objectivity in awarding contracts is ensured. During 2013 the Company was not aware of any incident with regards to corruption. The mechanisms planned for the prevention of risks related to corruption, money laundering, discrimination and confidentiality are integrated into the Internal Procurement Instructions, including the principles of openness, competition, equality and non-discrimination, transparency and confidentiality which are transferred to the contracting models. Likewise, during 2013 the Company was not aware of any incident relating to the violation of human rights. Acuamed does not consider this as a material risk to the Company. However, Acuamed asks its certified contractors for proof that they are up to date with their tax obligations and have registered their employees on the social security system, with the intention of not having illegal workers or people working in unfair conditions. All initiatives have health and safety contracts in the works that monitor compliance with the conditions of the workers employed there. Wages and Labor Conciliation In Acuamed reconciling work and family life is a crucial pillar, so it has several measures that apply to all our staff: • Service for subsidized meals through the handover of restaurant tickets per working day. • Healthcare Insurance and Accident Insurance for all workers. • Flexible hours during the working day • Extension of paid leave for maternity or paternity leave. • Obtaining unpaid leave after being on the staff for one year. preventive measures. Quarterly meetings are being held between Acuamed and the company staff managing the evaluation. Training in prevention is key to ensuring a low level of workplace accidents. So in 2012 staff received training and information regarding the occupational hazards of their job. Likewise training has also been provided to all staff involved in the projects through a basic training course in risk prevention. Training is mandatory for these positions. In relation to actions in construction, subcontractors are required to have a safety plan and provide Acuamed managers with the data needed to track accident rates of their workers. Training Throughout 2013, Acuamed has carried out a training plan designed to meet the training needs of the Company’s staff in order to improve both their professional preparation and the performance of their duties in the company. This plan has two approaches. On the one hand, the development of skills by achieving accurate expert skills for operating performance in the labor force and on the other, improving the conditions for personal and career development, through the worker’s increased knowledge and understanding. The training activities conducted by Acuamed consist of three large blocks. On the one hand, those that benefit from allowances of the Tripartite Foundation, whose planning is agreed between the company and the workers’ legal representation. The subjects taught in this context include, among others, European Funds 2014-2020, public-private concessions and computing courses. In addition, Acuamed funds individual courses requested privately by employees. These courses must be approved by the Training Committee, made up of company representatives and the RLT. Finally, the company offers language courses, especially English, which are taught throughout the year on a regular basis to all employees. Health and Safety at Work Table 23: Breakdown of employees by type of contract Men Women PERMANENT 52 45 TEMPORARY 1 1 53 46 Annual Report 2013 To ensure the appropriate and safe working conditions in order to prevent and detect risky situations is the company’s main priority in terms of Occupational Health and Safety. With the primary aim of ensuring the health and safety of workers in their jobs, Acuamed has a Preventative Management System implemented at all its offices since 2011. Under the system, a risk assessment is carried out every year to update, if necessary, the 02. The Company and its People 39 Table 24: Courses given in 2013 Number of courses given Number of students Total cost in Euros Actual cost (without discount) 9 58 16.290 3.330 Individual courses 48 55 18.700 -- Language -- -- 87.214 -- Type of course Fundación Tripartita Data Protection In terms of Data Protection, there is a need to review the Security Document, to analyze the registration status of the files and to verify the suitability, adequacy and effectiveness of the security measures in place. The purpose is to ensure compliance with required safety levels of the Security Document in accordance with Law 15/1999 of December 13, of Protection of Personal Data (hereinafter LOPD) and its statutory regulation, expressed in the Regulation on Security Measures developed in the LOPD (Royal Decree 1720/2007 of December 21, hereinafter RLOPD). These rules establish the formal obligations that entities must meet for the treatment of personal data and to regulate the material and personal organization of the security and the measures that should be taken to ensure the protection of the fundamental right to data protection in accordance with the requirements of the RLOPD. This project began to be managed in 2013 and will be implemented and audited throughout 2014. Quality Control Management One of Acuamed’s short-term priorities focuses on the implementation of an Integrated Quality Management System EN ISO 9001:2008 and EN ISO 14001:2004. This integrated system will ensure the efficiency in the development, management and control of the activities implemented by Acuamed in contracting, project management and management of hydraulic public works and management of desalination plants. Improving the efficiency of the processes developed by Acuamed in the design and drafting of projects, supervision of works, monitoring the implementation, operation and maintenance of desalination plants, control of suppliers, customer satisfaction, training, HR. etc., is important to ensure the compliance with the requirements. This project began in 2013 and will be implemented and audited throughout 2014, in order to gain these ISO certificates. Information Systems. Systems Plan (SIGA Program) A systems plan was set up during 2013, aimed at providing the Company with information systems that adapt to Acuamed’s current and future needs and that provide the Company with an increased efficiency of its processes. 40 To do this there was a review of processes, analyzing the existing support and future needs of information systems. This review process analyzed Acuamed’s value chain, starting with the primary activities, before moving on to support activities, all while encouraging participation and in alignment with Acuamed’s objectives. In 2013 the implementation of Phase I of this plan was completed, with the following developments: 1)Implementation of Microsoft Dynamics NAV ERP which acts as the Company’s management system, allowing a seamless integration with other Company applications. This ERP can be extended with future functionalities. 2) Unification of the Company’s information systems. Following the merger of Acuamed, AcuaJúcar and AcuaSegura, it was necessary to carry out the standardization of the information systems of the three companies. So in 2013 and based on Microsoft Dynamics NAV, three major integrations took place with the main objective of promoting the Company’s financial management and obtaining an overview of the information. The three integrations were as follows: • GesMed-NAV integration. The main integration has occurred between Acuamed’s information and management system of the last few years (GesMed) and the current information system. (NAV). The result is a management and information system with greater potential, greater functionality, technologically up to date and flexible to be able to adapt to the Company’s future needs. With such integration, information is supplied by a single pathway, thus providing it with reliability, immediacy, flexibility and accessibility when creating reports. • Prepaid-NAV invoicing. The prepaid billing process in the Valdelentisco desalination plant and Microsoft Dynamics NAV have been integrated so that all the information collected by the terminals of the desalination plant enter automatically into NAV, in the same way as payments. • GesEcoEx-NAV. A new application for the financial management of expropriations has been developed to serve as the basis for a full and comprehensive management system for expropriations fully integrated with NAV. With this new satellite application integrated with NAV, a greater and better control of the financial Annual Report 2013 management of expropriations is achieved, automating their operation and providing high reliability and accessibility of information. 3)Technological updating of the Company’s information systems, undertaking the migration from the GesMed application to a SQL Server environment, thus giving it more stability while increasing its functionalities and adjusting to the requirements of a company like Acuamed. Computing Acuamed has renewed all the Company’s computer equipment through centralized procurement using the Sub-Directorate General for Procurement, under the Directorate General for State Assets, achieving greater efficiency and cost rationality. In total, the purchase of 97 computers and 10 monitors has been managed. 02. The Company and its People Video-Conferencing In order to limit travel expenses between the headquarters and regional offices, Acuamed’s internal and external communications have been improved, enabling a videoconferencing connection with all the delegations, even all of them at once, using “Spontania”, a software solution that provides interactive text, audio and video services as well as collaboration tools for multiple users who can be connected from remote locations, making possible to hold meetings and training at a distance and thus reducing travel costs. 41 2.4 Transparency and Social Commitment I nformation transparency is a priority commitment for Acuamed. To publicize our activities Acuamed periodically prepares press releases, publications, brochures and audio-visual material available for both consultation and download from the web. Throughout the year various events have also been organized, such as visits to sites or signing agreements, in which representatives of public and private institutions, both national and international, have taken part. Visits to Works and Inaugurations: - Flix (Tarragona): A delegation from the Parliament of Catalonia, national and international journalists, representatives from the scientific and educational communities visited the decontamination works at the Flix reservoir (September 2013). -The Minister for Agriculture, Food and the Environment, Miguel Arias Cañete, attended in Lorca (Murcia) the start of the works of the new irrigation infrastructures for the distribution of water from the desalination plant of Águilas to the valley of Alto Guadalentín. This is the first infrastructure planned under this agreement: the pipeline from Cerro Colorado to the vicinity of the irrigated areas of both communities, with an investment of nearly 10 million euros. - The Secretary of State for the Environment, Federico Ramos, signed an agreement with the irrigators of Lorca and Puerto Lumbrera for the works for desalinated water distribution to the Valley of Alto Guadalentín in Murcia (June 28, 2013). - A South African government delegation visited the desalination plant in Torrevieja, Alicante (October 31, 2013). -To mark the start of the dredging works of the contaminated sludge of the Flix reservoir (Tarragona), the Secretary of State for the Environment, Federico Ramos, and the Minister of Territory and Sustainability of Catalonia, Santi Vila i Vicente, visited the works together with the Government’s Sub-delegate in Tarragona, Jordi Sierra Viu. The event was also attended by the Mayor of Flix, Marc Mur, and several councilors of the municipalities of the riverside area downstream of the Ebro river, who have been informed about the development of the works. The work represents an investment of 165 million euros, the largest amount provided for decontamination works in Spain. Congresses and Events - Acuamed joined the celebration for World Water Day with an event organized for school groups in the Delta del Ebro (Tarragona). - Acuamed’s participation in the International Desalination (IDA) World Congress 2013, held in Tianjin, China, from October 20 to 25. The Company took part with a representative stand, the presence of a delegation headed by its Managing Director, Arcadio Mateo del Puerto, presentation of specialized conferences as well as the distribution of brochures and merchandising material. 2.5 The Ethical Commitment: Legal Area, Contracting and Expropriations T he actions to prevent conflicts of interest in procurement processes applied by Acuamed are confined to the provisions contained in the legislation on contracts for Public Administrations. Acuamed’s contractual regime comes from its position of trading company in the public sector, with adjudicating power. Acuamed’s contracts are private and are governed, with regards to their preparation and adjudication, by Law 30/2007, of Public Sector Contracts. This Act establishes the assumptions of prohibition in recruitment that anticipate conflicts of interest: 42 • Prohibition of contracting with the public sector for those individuals or representatives of legal persons included in any of the cases of Law 5/2006, of April 10, of the regulation of conflicts of interest of members of the Government and senior officials of the State Administration, of Law 53/1984 of December 26, of the incompatibility of staff at the service of Public Administrations or for any of the elected positions regulated by the Organic Law 5/1985 of June 19, of the General Electoral System, under the terms established therein. • The prohibition extends to legal persons in whose Annual Report 2013 capital participate staff and senior officials as well as to any public administration and elected officials serving them. • The prohibition also extends, in both cases, to spouses, persons associated with a relationship akin to emotional coexistence and descendants of the persons referred to above. Contracting During 2013 contracts were signed with a total of 29 different companies, four of them being awarded to Joint Ventures. Contracts subject to harmonized regulation In the financial year 2013 a total of 14 contracts subject to harmonized regulation were awarded, six of them were tendered for in 2012 and eight in 2013. The total tender amount of such contracts was 65,041,661.46€ against a total allocation of 48,185,509.82€ and an average deregistration of 25.9%. The contracts can be broken down according to their type as: three contracts for works, nine for services and two for supplies. Expropriations The Direct Management Agreement governing relations between the state-owned company and the Ministry of Agriculture, Food and the Environment includes, among the powers reserved to the Ministry, “the expropriation of the assets and rights necessary for the execution of the actions, in accordance with the Law of December 16, 1954, on Forceful Expropriation, and its development regulations.” Article 132.4 of the revised Water Law gives state water companies the condition of beneficiaries, as a public utility, in proceedings of forceful expropriation of the actions carried out within the framework of the Agreement. Acuamed, as beneficiary of the expropriations, pursuant to Article 5.2 of the Rules of the Law of Forceful Expropriation, shall have the following powers and duties: • As part of the expropriation procedure, push on the proceedings and inform, at its discretion, on their incidences and pronouncements. • Draw up the list of assets and rights referred to in Article 17 of the Law. • Agree freely with the expropriated party on the friendly acquisition referred to in Article 24 of the Law. • Act on the fair price compensation, to present the appraisal statement referred to in Article 30 of the Law, and to accept or reject the valuation given by the owners. • Pay or deposit, if applicable, the amount determined as fair price. • Pay for delay compensation legally due. 02. The Company and its People To carry out these and other functions and obtain land for works, Acuamed created the Expropriations Department, which is currently integrated in the Company’s Legal Department. In compliance of the aforementioned powers and obligations, Acuamed Expropriations Department collaborates with the expropriating administration, represented by the Expropriations Service of the Hydrographic Confederations of the Ebro, Júcar and Segura, in the actions entrusted to Acuamed in their respective territorial demarcations, or directly by the Directorate General of Water, in the territories of the Autonomous Communities of Catalonia and Andalusia. Acuamed’s Expropriations Department has its own staff which complements the human and material resources provided by five technical assistance contracts, one signed in 2008, another signed in 2009, another in 2012 and two signed in 2013. These five contracts, at the end of 2013, are certified by an average of 60%. By December 31, 2013 Acuamed had open the expropriation process for achieving the necessary land for a total of 61 works, four of which started in 2013. These actions have resulted in the processing of approximately 14,000 individual files for forceful expropriation including, after the merger, the actions of the Júcar-Vinalopó and Valdelentisco desalination plant. 43 03 Sustainability Commitment with the Environment and 2 0 1 3 3.1 Strategy for the Creation of Environmental Value company belonging completely to the Spanish State. It depends on the Ministry of Agriculture, Food and the Environment, and its purpose is to promote hydraulic infrastructures aimed at solving challenges arising from the complex framework of water management in the Spanish mediterranean basins. “ The environment, its conservation and recovery is one of the priorities in Acuamed’s business strategy. The strategic objectives in this matter are oriented at: -Preventing, minimizing and correcting the environmental impact generated during the construction and operation of our facilities, extending to our suppliers the environmental criteria with which we work. -Promoting, through our infrastructures, the management of risks posed in the water cycle in Spain due to climate change associated to global warming. “ The State-Owned Company Aguas de las Cuencas Mediterráneas, s.A., Acuamed, is a publicly owned Acuamed’s Commitment Acuamed carries out two types of initiatives on environmental issues. On the one hand, it promotes improvement projects in cases where as the result of human action or natural causes like erosion, specific environment has been damaged. Furthermore, Acuamed works to prevent and minimize potential impacts generated both in the implementation phase as well as in the exploitation of their initiatives, thereby reducing as much as possible the potential risks associated with the development of water infrastructures. The achievement of this objective is approached in two ways, which include the construction or implementation phase of new initiatives and later, their exploitation. • Execution of works with the utmost respect for environmental regulations, providing the necessary training and support to all employees involved. • Continuous training of staff in environmental matters and in relation to the conceptual, technological and methodological issues related to water projects. • Fluid relationship with environmental administrations and other social agents in order to reach commitments 03. Sustainability and Commitment with the Environment to achieve our goals of environmental protection and minimize social impacts. • Continuous improvement of internal and external communication to publicize Acuamed’s action lines and the most representative projects through participation in conferences and other forums and the publication of articles in professional journals. Environment Office The Environment Office (formerly the Environmental sub-directorate) ensures environmental protection in the development of the different stages of all the actions entrusted to Acuamed. This is its aim, making intervention in the territory compatible with the execution of the works and their natural value. In the design phase of projects, the Environment Office is responsible for: • Preparation of necessary documentation, managing and supervising the procedures relating to the Environmental Impact Assessment of actions to find the mandatory environmental solutions with the General Directorate of Water, Ministry of Agriculture, Food and the Environment. 47 • Analysis of project alternatives to choose the most environmentally friendly. • Definition of preventive and corrective measures to be applied during the execution of the works. • Comprehensive compliance of environmental legislation (sectorial, regional, national and European community) from this initial phase. During the works, the Office’s responsibility is to ensure their appropriate environmental execution through initiatives such as: • Obtaining the environmental authorizations demanded by the regulations for the execution of the works. • Analysis and assessment in the process of awarding the works of the technical proposals that have plans for the rational use of natural resources during the construction and operation stages, as well as minimization plans and assessment of resources. • Requiring contractors to apply all environmental measures raised in the project. • Environmental monitoring of works, through site visits, to ensure implementation of the Environmental Monitoring Program defined in the attachment for the Project’s Environmental Integration. • Procurement of specialized technical assistance for each project to help ensure adequate environmental execution, carrying out a more frequent and thorough monitoring. • Environmental restoration of all areas affected by the project, which in general is performed using revegetation. Monitoring of the environmental aspects of infrastructure operations, mainly in the case of the desalination plants which are under Acuamed, comprising of: • Coordination and preparation of documentation required for the application of the Integrated Environmental Authorizations and / or Disposal Authorizations, as well as the statements and extensions for information required throughout the process to obtain such authorizations. • Undertaking the modifications of the Discharge Authorizations granted to optimize the monitoring to be carried out in the operation phase. • Coordination, planning and monitoring of the Environmental Monitoring Program in the marine environment. • Meetings with the monitoring operator and/or companies in the marine environment to analyze results, adjustments or changes to the monitoring, as well as special communications with the competent authority for events that occur during the exploitation involving situations not covered in the resolutions. 48 Another constant of this Office is the continuous training of the workforce, seeking expansion and updating knowledge to keep abreast of the latest technical advances. Proof of this is the participation in multiple conferences and congresses held in 2013, highlighting the National Congress for Environmental Impact Assessment (CONEIA2013) in which two papers were presented by the Office. Main Objectives and Environmental Achievements Acuamed has set itself, in Environmental issues, a number of strategic objectives, designed to ensure sustainable management in all its actions. These objectives for 2013 are specified in five points: • To carry out the works with maximum respect for the environment and in strict compliance with environmental legislation and the requirements contained in the projects. • To give priority to companies that have environmental efficiency plans (use of resources, waste minimization, etc...) when selecting companies for the construction and exploitation of our initiatives. • To provide all necessary environmental permits for the construction and exploitation of the initiatives. • To have all the human, financial and material resources to ensure compliance with the objectives above. • To improve or rehabilitate the environment affected by our works, so that we can return them to the original state as far as possible. To do this, in 2013 the control of the works execution has been maintained ensuring compliance with the requirements established in the environmental resolutions, authorizations and permits necessary for the execution of the initiatives. All the initiatives have had the permits and sectorial authorizations prior to their start. Thus, none of the works in operation during 2013 have been reported or penalized for environmental issues. Furthermore, to ensure the correct application of these criteria for environmental efficiency on site, beyond any possible proposals made by companies in their bids that would condition their subsequent application, the requirement of having a system for an environmental management certificate must be in place to be able to bid for the tender. The works completed in 2013 have been subject to an environmental and landscape integration, the control being extended during the warranty period of the works to ensure this objective is achieved. Annual Report 2013 The Government of the Region of Murcia Grants Acuamed the “Eco-Management Award” for the Desalination Plant of Valdelentisco (April 2013) In April 2013 the Government of the Region of Murcia granted Acuamed the “Eco-Management Award” for the Valdelentisco desalination plant, developed by the State-Owned Company and operated by Cadagua. The award is given in recognition of being the first desalination plant in Europe to achieve certification in the EMAS Register, the EU regulation that certifies good environmental management. This award, which is part of the “5th Sustainable Development Awards”, has been given in recognition of the commitment to the environment and to the continuous improvement of sustainable management systems that Acuamed, a State-owned company under the Ministry of Agriculture, Food and the Environment (MAGRAMA) has made in this infrastructure. The Valdelentisco plant, in operation since January 2008, is the first desalination plant in Europe to achieve certification under the EMAS Register, Eco-Management and Audit Scheme (European Community EcoManagement and Audit Scheme), a voluntary eco-management system of the European Union, involving the adoption of rigorous measures to improve the sustainable management based on environmental commitment and transparency. In addition to this award, and as a result of the implementation of the EMAS eco-management system, the Valdelentisco desalination plant was also a finalist for the EMAS Awards 2012, in which a total of 27 organizations took part and where Acuamed’s plant was one of the 3 nominations submitted by MAGRAMA. Specifically, the EMAS registration requires the publication of an environmental statement that sets out the aspects of direct and indirect environmental impacts of the facility, objectives and targets related to important aspects of the plant, environmental performance indicators and related permits and authorizations necessary and available for the activity. On July 13, 2013, the Directorate General for the Environment of the Regional Government issued a resolution that registered the plant in the EMAS register. 03. Sustainability and Commitment with the Environment 49 3.2 Towards Greater Energy Efficiency Electric The desalination plant of Torrevieja in Alicante is one of the most efficient infrastructures for desalination in the world, because after the testing phase, consumption has been reduced to 3KWh/m3 for the complete desalination process (except for the distribution of the water product). There are two main factors that have made these efficiency levels possible: - It features some of the most technologically advanced equipment that optimizes energy efficiency. - The process designed for commissioning of the desalination plant has also been key. This testing process has been meticulously developed with the primary goal of minimizing energy consumption in all processes. Calibrations carried out at this stage have made it possible to reduce the specific fuel consumption of the design by 10%. The plant also has a bioclimatic architectural design, with architectural integration of photovoltaic panels in the main unit and acoustic insulation of all its buildings. The implemented project has meant the extension of the original site to create a linear park linked to the interpretation center that acts as a barrier and transition to the Natural Park of Las Salinas de Torrevieja, integrating elements related to the territory and nearby equipment. This plant was listed in 2012 among the 100 most innovative infrastructures in the world, according to the “Infrastructure 100: World Cities Edition” report prepared by the international consulting firm KPMG. “ Torrevieja, One of the Most Efficient Desalination Plants. “ power, together with sea water, is the basic raw material for desalination and represents its main consumption, as well as the main production cost. Due to this, energy efficiency initiatives are essential to increase the profitability of these actions, thus allowing the final tariffs for the user to be adjusted. Thanks to the increased efficiency in the facilities, the improvement of the equipment and the technological progress, the infrastructures are increasingly more sustainable, both from the financial as well as the environmental point of view. Improvement of Energy Consumption Ratios Acuamed works in line with European directives in this sector, which pose increasingly stringent requirements for environmental and economic sustainability of the facilities and to improve their energy efficiency. Therefore, in anticipation of these requirements, in several desalination plants that it manages, Acuamed is launching a series of energy audits designed to identify areas of potential improvement and implement corresponding changes in both processes as well as the equipment itself, in order to improve their energy efficiency. Following the entry into service of new infrastructures, the total energy consumption of hydraulic installations managed by Acuamed has increased significantly in recent years. And so has its cost. It is therefore a priority for Acuamed to optimize that cost, in order to ensure the Company’s profitability. 50 03. Sustainability and Commitment with the Environment 51 Table 25: Electricity consumption in Acuamed infrastructures 2011 2012 2013 100 GWh 132 GWh 240 GWh 2014 2025 (estimated) (estimated) 325 GWh 1.700 GWh This continuous improvement in efficiency ratios of the facilities is reflected in the figures for electricity consumption per cubic meter achieved in the most modern plants developed by Acuamed. Thus, the most recent and efficient energy consumption facilities may be about 1 KWh/m3 lower than other older ones. For example, at the plant in Carboneras, Almería, which entered into service in 2005, the current consumption is 4.9 KWh/m3. Far below this consumption is Águilas (Murcia), recently put into operation and which achieves ratios of 4.01 KWh/m3. The plant of Torrevieja in Alicante is one of the most efficient infrastructures for desalination in the world, because after the testing phase, consumption has been reduced to 3KWh/m3 for the complete desalination process (except for the distribution of the water product). Acuamed also works on the modernization of the facilities that have been in operation for a longer period, with considerable success when it comes to improving their energy efficiency. An example of this is the Valdelentisco plant in Murcia, in service since 2008. This plant, which maintains a current consumption of 4.82 KWh/m3, has initiated the pilot phase in which two beaters have been replaced with the latest energy recuperators (ERI), thereby achieving significant savings on its electricity consumption which already at this stage has reached 0.4 KWh/m3. With these infrastructure modernization processes already in operation- focusing on installing energy recuperators and changing membranes for newer and more efficient ones-Acuamed estimates to achieve a reduction in the consumption at these plants of around 0.5 KWh/m3. Optimization in Purchasing Energy The electricity market is a complex market that offers different ways to contract energy characterized by a reduction in the average price in return for the assumption of risk by the consumer. The energy cost may be broken down into: - Fixed Cost, on which he cannot act. - Variable Cost, on which other beneficial contracting formulas can be negotiated by Acuamed. Acuamed currently has 145 electric supply points throughout its facilities, 25 of which account for 99% of consumption. These supply points total 146 MW of the installed capacity. Since four years ago, Acuamed contracts energy from 100% renewable sources. The electricity supply contract awarded by Acuamed, in 52 addition to grouping all supply points into a single batch, which optimizes the purchase, also includes a number of requirements in the flexibility of demand so as to achieve significant savings in energy costs, taking advantage of the ability of many of the infrastructures managed by Acuamed, such as desalination plants, to modulate their consumption and concentrate it during the hours when the price of energy in the electricity market is lower. Looking ahead to 2014, and in order to adapt to the new structure and regulation of the electricity market, Acuamed works to change the contracting system of this energy, which will join together various forms of purchasing energy. Energy Efficiency Plan Throughout 2013 Acuamed has created a “Strategic Energy Saving and Efficiency Plan 2014-2017” which was approved by Acuamed’s Board of Directors in early 2014. This impulse by the Company’s management body demonstrates the management’s commitment to improving the Company’s energy efficiency, whose development instrument is the said plan. The plan’s overall objective is to make Acuamed a leader in savings and energy efficiency in the water sector at national level, in compliance with European Directive 2012/27/UE, and achieving that its energy management system, a reflection of Acuamed’s commitment with sustainable development, is recognized with the ISO 50001 certification. This strategic objective is divided into two specific goals: improving energy efficiency by 10% and establishing in the Company a culture of analysis and continuous improvement of energy processes. In order to achieve these specific objectives, six lines of action have been established with specific measures to structure the guiding model of the Company’s works in this matter. When planning these lines, the experiences accumulated to date by Acuamed on energy efficiency were taken as the starting point, unifying them under the overall objective pursued with this strategic plan. Each line of action includes a set of measures that should be completed over the same time horizon to achieve the desired overall objective. These lines of action are as follows: • Development of an energy efficiency control system through continuous monitoring and recording of the specific energy consumption. • Establishing an internal procedure to create energy reviews and proposals to improve facilities. • Improved processes linked to the purchase of energy. • Modernization and optimization of the water treatment line in desalination plants by using more efficient technologies. • Improved performance of the distribution pumps. • Efficient management of energy consumption in office buildings Annual Report 2013 03. Sustainability and Commitment with the Environment 53 3.3 Performance Indicators Production and Management of Water Both in desalination as well as water transport and distribution, the volumes managed or produced in 2013 have recorded significant increases with regard to 2012. Desalination In desalination, the production of the five plants in operation - Valdelentisco (Murcia), Águilas (Murcia), Carboneras (Almería), Atabal (Málaga) and Marbella (Málaga) - throughout the year has been above the registers of 2012, with larger increases at the end of the year. Table 26: Volumes of water produced. Comparison between 2013 and 2012 Transport and Distribution Water volumes transported and distributed in the following infrastructures: -Turia-Sagunto - Rabasa-Fenollar-Amadoiro - Negratín Almanzora connection - Carboneras-Almanzora interconnection Table 28: Volumes of water under management. Breakdown by use of transported/distributed water. Table 27: Volumes of water produced. Breakdown by use Purification and Reuse Volumes of treated water, both drinkable and wastewater reuse. Table 29: Volumes of treated water. Comparison between 2013 and 2012 54 Annual Report 2013 03. Sustainability and Commitment with the Environment 55 3.4 R+D+i. Commitment to Innovation A cuamed’s operating activity will be developed primarily in two large areas: On the one hand, in infrastructures generating new resources through desalination of seawater and, on the other hand, in large transfers of inland surface water between basins with a surplus and those with a deficit. In this context, given the high dependence on the technological development of systems for water treatment and consideration of inland water as a scarce resource, the need arose to develop a Strategic Plan to guide the development of R+D+i in Acuamed according to its needs in the medium term. This plan must create an appropriate framework so that the different research centers, universities or companies with common interests with Acuamed in innovation developments can find support to advance these developments and that these ultimately result in an economic benefit for the Company. The Strategic Plan of I+D+i 2014-2017 should be a reflection of Acuamed’s interest to participate in the development of technological innovation that could improve the service provided by the Company and the management of the integrated water cycle, considering it as a scarce resource. In addition to the tangible benefit to Acuamed, it intends to promote the investment in R + D + i in the water sector, which would also cause an indirect benefit to this sector. Acuamed’s involvement in innovation is summarized in the three basic objectives of the Strategic Plan of I+D+i 2014-2017: 1.Improving the management of the integrated water cycle, through continuous innovation of efficiency of Acuamed’s operations and commitment to the diffusion of innovations developed. 2.Promotion of R & D+i in the water sector, taking advantage of the unique opportunity in terms of funding provided by the start of the Horizon 2020 Europe Program. 3.Making the transition from the current state of innovation in the Company, characterized by isolated individual projects and initiatives, to a defined process with a structured portfolio of projects and initiatives that seek improvement opportunities and find innovative solutions for the Company’s needs. In order to achieve these objectives, five lines of action will be worked on with specific measures that should guide the Company’s works in these matters: • Improvements in desalination and membrane systems. • Development of tools and models to support operational decision making. • Improvement in quality and environmental protection. • Reducing losses in distribution and regulation. • Establish internal procedures for the development of Innovative Public Purchase Contracts (CPI) and to regulate the participation in research consortia. 3.5 Main Actions in Environmental Issues Preventive and Corrective Measures in Works Water Allocation System from Cerro Colorado Reservoir to the Valle del Guadalentín (Murcia) In 2013, a project was implemented to make water resources from the Valle del Guadalentín arrive at the desalination plant of Águilas, from the existing reservoir of Cerro Colorado. For this, a characterization study of the Greek tortoise populations (Testudo graeca) was first carried out using specialized personnel. This study was based on a preliminary survey to determine the actual presence of this species and establish measures to minimize their possible impact, since the Greek tortoise is a sensitive species due to their low mobility and escape response against clearing and earthworks. Several searches were conducted in order to find specimens of Greek tortoises and to rescue them and move them to places away from the works, but no live specimens or biological remains of individuals were found. Finding no specimens of the species, and since the inventoried areas did not have a favorable and well preserved ecosystem for their development, the scope of the execution of the works was considered to have a sparse density of Greek tortoises, although their potential presence was not excluded, so preventive measures were carried out to avoid the species being affected (specific staking out, searches prior to excavation, signaling and informational talks). Supply on High from the Llosa del Cavall Reservoir to the Regions of Solsonés, Anoia and Bages (Lleida and Barcelona) The construction works during this period focused on the Drinking Water Treatment Plant (DWTP) and Pumping Station and the control of the vegetation restoration was undertaken in December 2012, monitoring its status during the fall, after the summer season had passed. Rolling Works and Drainage of the Basin of the Gallinera Watercourse (Valencia) The rolling and drainage works of the Gallinera Watercourse, in the town of Oliva (Valencia), namely in undertaking a rolling mill and channeling for flood prevention in this municipality, has required the implementation of two specific projects with protective and corrective measures for wildlife species. These measures refer specifically to the habitat of the European pond turtle (Emys orbicularis) and a pair of Bonelli’s 56 Annual Report 2013 03. Sustainability and Commitment with the Environment eagles (Aquila fasciata). They had started in previous years but are still current in 2013. Detailed below are the steps taken and the work performed in 2013. - Integration, Generation and Connection of Habitats of European Pond Turtle (Emys orbicularis) During execution of the works at the mouth of the watercourse, the Protected Areas Service of the Department of Infrastructure, Planning and the Environment of the Generalitat Valenciana reported the presence of a habitat of European pond turtles (Emys orbicularis) in the area known as the Riuet del Gorgs, which had been detected during an inventory of wetlands in the Valencian Community. Measures Applied In coordination with the Protected Areas Service, in order to harmonize the execution of the work with the protection and improvement of this habitat, the following measures were agreed to be applied: • Determining the colony size of the European pond turtle in Riuet dels Gorgs. • Capture and quarantine of specimens by specialized staff at facilities of the Generalitat Valenciana until completion of the works. • Protection during construction of the existing wetland and adaptation and improvement of their natural conditions. • Creation of new wetlands, reproducing the natural characteristics of the Riuet del Gorgs on the right bank of the watercourse and connecting both areas to expand the potential habitat of the European pond turtle. During 2013, works for the morphological adaptation and re-vegetation of new wetlands were carried out. The colony of European pond turtles that is at the quarantine facilities of the El Palmar fish farm, under staff supervision of the Generalitat Valenciana, bred in captivity this year, thus increasing the number of individuals reintroduced in Riuet dels Gorgs after completion of the works. - Additional measures for the protection of a pair of Bonelli’s eagles (Aquila fasciata) The occupancy for breeding and rearing of a nesting platform closest to the location of the dam by a pair of Bonelli’s eagles at the beginning of the works of the dam involves running additional monitoring and protective measures to minimize the effects on this pair. 57 Measures Applied In coordination, as in the previous case, with the staff of the Protected Areas Service, the following actions took place: • Capture and marking of the pair with a GPS device, in order to know their range and identify possible alternative nesting locations. • Installing nesting platforms and priming these areas to promote the use of these new platforms. • GPS tracking of the pair during the period of work to understand its behavior and set the appropriate additional safeguards in work. After the labeling of the pair in December 2011, the GPS tracking began in January 2012. Soon afterwards, the female died of causes unrelated to the activities listed here. After this episode, the male has continued to be tracked in 2012 and 2013, with the measures relating to the installation of alternative platforms not being applied as it moved into the area between the towns of Bocairent and Ontinyent. During 2013, the transmission of the location data obtained was maintained with the Protected Areas Service of the Generalitat Valenciana. Additional Measures Associated with Rolling and Flood Control Works in the Basin of the Serpis river (Valencia). The presence of protected flora was detected in the environment of the rolling dam for flood control on the Vernissa river. More specifically, populations of Biarum dispar (742 specimens) were found which could be affected by flooding due to the commissioning of the dam. This taxon is included in the Valencian Catalog of Endangered Species of Flora in the vulnerable category. Given the evidence that some specimens of B. dispar near the dam have already suffered some flooding without appreciable effect on their vitality, and taking into account that the ideal translocation method of this species is unknown, a mass transplant of all specimens was ruled out; however, since the response of the plants to these two processes (periodic flooding and translocation) is unknown, it is necessary to determine the effect of flooding (hours submerged and annual frequency of flooding) on the vitality of the specimens of B. dispar (flowering, fruiting, leaf number ...), as well as the viability of the specimens translocated to an area outside any probable flooding. Therefore, a life cycle of both study areas is being undertaken to study the response of one and the other group of individuals. Measures in Desalination Torrevieja Desalination Plant In 2013, the integrated environmental authorization was obtained for the Torrevieja desalination plant, provided by the General Directorate of Environmental 58 Quality of the Generalitat Valenciana. In compliance with the conditions included in this authorization, continuous control equipment of the discharge was installed. In parallel to the operating tests carried out for the facility, measurement tests of these autonomous conductivity meters were carried out to control the saline discharge and avoid them affecting the seagrass meadows. Desalination and Additional Works for Marina Baja. Municipal Area of Mutxamel (Alicante) The expansion of pre-operational characterization for the receiving environment of the discharge of the desalination plant in Marina Baja (Mutxamel, Alicante) was carried out aimed at obtaining the integrated environmental authorization for this facility. This study, as well as the conditions that will be included in this authorization, aim to ensure that the seagrass meadows present in the area are not affected. Furthermore, the construction of the distribution network for desalinated water from this plant to the municipalities of San Juan de Alicante, San Vicente del Raspeig and Alicante began. the end of the year re-vegetation work was carried out, focused primarily in integrating the reservoirs (executed in height) by planting shrubs on the slopes, while contributing to their stabilization, and defining a visual tree screen along the perimeter of the reservoirs. Elimination of Chemical Contamination from the Flix Reservoir In 2013, the dredging works for the contaminated sludge of the Flix reservoir began once confined in a sealed enclosure by piled walls for subsequent decontamination treatment. Following the decontamination, using different industrial processes, depending on the contaminants present in the material, the sludge is deposited in a landfill for inert waste, built and fitted for this purpose in the place of Racó of Pubilla, which will subsequently be closed and integrated using landscaping. Reuse Measures Provision of General Infrastructures for Irrigation with Reclaimed Wastewater from the WWTP of Cerro del Águila and La Víbora (two actions) The aim of this work is to provide reclaimed wastewater from the WWTP Cerro del Águila and La Víbora (Málaga) to different golf courses and public gardens of the Costa del Sol, in order to reduce the consumption of water from reservoirs and aquifers in the area, responding to the water demands of these facilities through improving tertiary treatment of the aforementioned waste water treatment plants and building the necessary pipeline networks. These initiatives are carried out under the criteria of Royal Decree 1620/2007 of December 7, which sets up the legal fr amework for the reuse of treated water, determines the requirements needed to carry out the activity using reclaimed water and covers the applicable mandatory minimum standards for the use of these waters according to their uses. The implementation of the aforementioned reuse initiatives began in early 2013 and were completed in 2014. Flix Reservoir Actions to Improve Environmental Quality Water Quality Program for the Waters of the Ebro Delta Feeding the Bays with Fresh Water from the Irrigation Channels Phase I: Conditioning of Irrigation Channels to Deliver Surplus to the Two Bays (Tarragona) The project aims to improve the ecological and chemical status of the bays, which will impact directly and positively on the quality and protection of the Ebro Delta. This project involves the redirection of the irrigation water from canals to the bays, when it is no longer needed in the rice fields (they enter the drying or seeding phase). This is one of the most critical moments of the hydrological cycle and when problems resulting from anoxia usually occur. Thus, a significant volume of water is re-used, making fresh water pass through the delta system. The certificate of non-affectation on the Natura 2000 network of this project sets out that the execution of the works must be carried out ensuring that the periods of breeding and reproduction of the species of nesting birds in the SPA “Delta de l’Ebre” are respected. These, together with the area of high ecological value in which it has worked (the Ebro Delta, in particular, in the vicinity of the lagoons) were the conditions that have prevailed in monitoring the Environmental Monitoring Plan in this work. So on the one hand, communication with the management of the Ebro Delta Natural Park, as competent authority, has been continuous, keeping them informed at all times and in advance of the places where we were going to work, so as to always have their authorization and recommendations. Furthermore, Acuamed’s Environmental Management with the Environmental Assistance dismissed, while already in work, the presence of protected species of birds that may nest in the project area. The work was monitored so that nesting periods set out in the Natural Park authorizations to perform the work in each of the actions was respected and, accordingly, was adapted from the work plan. Efforts to prevent the spread of “apple snail,” an invasive species found throughout much of Northern hemidelta channels, were also added to the execution of this work. Improvement Initiatives in the Management of Water Resources Reservoirs of El Cañuelo and La Redonda (Almería) The work began in early 2013 for the implementation of two groups of reservoirs to store both desalinated water, as well as water from the aquifer and a mixture of both, for subsequent distribution to the various irrigation sectors of Campo de Dalías. Thanks to the rapid completion of the works, at Annual Report 2013 03. Sustainability and Commitment with the Environment 59 3.6 Projection to Society Important Milestones in Actions to Improve Environmental Quality The green filter of Tancat of Milia in L’Albufera of Valencia, gathers four species of endangered waterfowl Since its completion, the green filter of Tancat of Milia, in the Valencian town of Sollana, takes in specimens of a total of four waterbird species listed as endangered species. In particular, re-naturalised specimens of Marbled Duck (Marmaro-netta angustirostris), White-headed Duck (Oxyura leucocephala), Ferruginous Duck (Aythya nyroca) and Red-Knobbed Coot (Fulica cristata) can be seen in this area. The green filter created by Acuamed has given rise to a privileged environment where these and many other animal species have found a quiet and secure place to feed, rest and, in many cases, nest. After the first re-introduction of six European freshwater turtles in the filter, in June 2012, the population has been strengthened throughout 2013 with the release of 12 new specimens, consolidating the population of this species listed as vulnerable, according to the catalog of the Valencia Threatened Species of Fauna. Also, eight specimens of Crested Coot (Fulica cristata), endangered species according to the National Catalog of Threatened Species, were released. Collaboration Agreement with the Centre for Public Works Studies and Experimentation (CEDEX) This year, as part of the collaboration agreement with the CEDEX (aimed at advice on the discharge of effluents into the sea from desalination plants and wastewater treatment plants, environmental monitoring programs and discharge authorizations), works carried out have focused mainly on the operation of the desalination plant in Torrevieja. Some of the case studies carried out in this regard were: - Implementation of the mathematical model CORMIX and CEDEX formulas to study dilution close to the specific case of dumping at sea from the desalination plant of Torrevieja, taking into account different operational scenarios in terms of production rate and different number of spray nozzles for evacuation into the sea of reject waters from the plant. -Estimated load losses of the terrestrial and marine sections of the discharge pipeline of reject waters, taking into account the operational scenarios and calculating the height needed to discharge using gravity. Participation in Conferences and Institutional Collaboration National Congress of Environmental Impact Assessment 2013 (CONEIA 2013) Acuamed’s Environmental Office participated in the presentation, by their technicians, of two papers at the 7th National Congress of Environmental Impact Assessment (CONEIA), held in mid-March in Oviedo. Papers, which form part of the minutes book of the seventh edition of CONEIA were: -The environmental monitoring programs for implementing desalination projects. - Environmental impact and techniques in the emergence of unidentified impacts in the evaluation process. 60 Annual Report 2013 04 Acuamed wealth Generation: works status 2 0 1 3 4.1 General Information “ The engineering and construction department projects and materilizes the implementation of the works planned in the initiatives entrusted to acuamed by the ministry of agriculture, food and the environment and carries out the works to operate the facilities through three regional offices. The works cover a wide range of types, from plants for the desalination of seawater or brackish water to environmental restoration of rivers, through to the modernisation of irrigation systems, supplies, waste treatment plants, and initiatives to improve water quality or flood prevention. The engineering and construction department works closely with the environmental department to ensure acuamed’s commitment to environmental protection, in compliance with the different state and regional regulations in the matter. To do this, all works are subject to a detailed environmental monitoring from their start until their conclusion. “ T hroughout 2013, the Engineering Department has continued the drafting and processing of the projects for the initiatives assigned. The construction work undertaken in previous years has continued, with the execution of 132 works contracts. Ninetytwo contracts have been completed, nine of which throughout this year. Of the remaining contracts, 33 were underway during 2013 and the seven remaining ones were under drafting of the construction project, expropriation of land or awaiting the signature for the readiness for construction. Another seven construction contracts were at tender stage at the end of this year. In the area of exploitation, throughout 2013 the operation of the infrastructures already implemented in previous years has continued and the exploitation of four new actions has begun. Below is the list of all initiatives in which there has been some engineering and construction work, including a brief description and their administrative status. 04. Acuamed Wealth Generation: Works Status Associated Contracts All of the Construction works are undertaken by looking after technical, environmental and health and safety features, with overall sustainability criteria. For this, each initiative is associated with three assistance contracts with specialist consulting firms, one for site management, a second for the coordination of health and safety, and the third on environmental issues, with the latter being responsible for the environmental area. Throughout 2013 there were thirty-five technical assistance contracts for project management underway and twelve consultancy and assistance contracts for health and safety coordination. On the other hand, to cover new works started this year four contracts were awarded to assist the project management together with another four draft projects. 65 4.2 Infrastructures in Operation Hydrographic Demarcation of the Andalusian Mediterranean Basins Complementary Actions for Reuse of Waste Water in the Campo de Dalías The works involve the implementation of tertiary treatment of the WWTP of Roquetas de Mar, El Ejido and Adra, and the construction of pipelines and pumps needed to later take water to end users. In addition, a reservoir of loose materials has been built to store reclaimed water that will be consumed by the Community Irrigation of Sol y Arena. Works underway. Sewage Pipe La Ventanilla (Roquetas de Mar) The works include the construction of a sewage pipe of more than four kilometers in length for a peak flow of 520.00 l/s. The sewage pipe has been fully operational since November 2009, solving the existing problems related to the discharge of effluent from secondary treatment from the waste water treatment plant of Roquetas de Mar, which in summer periods discharged into the watercourse due the lack of capacity of the existing sewage pipe. Pipeline from the Carboneras Desalination Plant to Valle del Almanzora. Phase I The purpose of the project is to define the necessary works to connect the Carboneras desalination plant with the future Bajo Almanzora desalination plant. The line is divided into two sections, including the Sopalmo deposit. Volumes to meet with the works are 15 Hm3/year. With the works undertaken, water is taken from the existing pipeline that carries treated water in the IDAM of Carboneras, from its product water reservoir to the Venta del Pobre reservoir, built with welded steel pipes with a 1,400 mm diameter and an impulsion of 18.4 km length A connection in said pipe is made for the intake. The pipeline starts from this point. From the intake, the pipeline has a total length of 43.8 km welded steel pipe of 900 mm in diameter. This pipeline consists of two sections divided by a tank, called the Sopalmo tank as it is located in a farmhouse with that name. The purpose of this tank is to break a minimum load and to reduce the impulsion length. The first section of the pipeline is an impulsion to the Sopalmo tank, using the current EBAP of Carboneras which has proven its ability to meet its current and future demands in the Venta del Pobre reservoir and those of this infrastructure. The length of this first section of pipeline is 14.4 km, divided by a surge tank in an initial stretch of pure impulsion and 10.7 km long, followed by a final 66 section that reaches Sopalmo and is 3.7 km long. In this first impulsions section, a 660 m long section is highlighted where the pipeline goes into a tunnel, excavated with a wall chaser and open shield and covered by concrete pipe jacking 2 m in diameter. The tank is made in situ from reinforced concrete, which is rectangular with an inside measurement of 100 x 59 m and chamfered corners (trimming the last 5 meters of each side wall) to fit it into the ground so that the foundations at these points are distanced further away from the altered areas of the ground where the foundations would have worse conditions. The tank is divided into two compartments so that inspection work, cleaning and any repairs are carried out without interrupting service. No small walls are provided to force internal circulation of water without leaving dead areas as a total daily renewal is supposed. Figure 4.2.1: Depósito de Sopalmo Finally, from Sopalmo the water is carried by gravity to facilities of Galasa and an irrigation reservoir near to the Cuevas de Almanzora reservoir, but in this Phase I, this gravity pipeline only runs until it crosses the channel of the Almanzora river, near to its emptying into the Mediterranean Sea, in a collection box located within the site of the Bajo Almanzora desalination plant leaving the rest of the pipeline for Phase II. This second section of pipeline has a length of 29.4 km and ends in a collection box on the left bank of the existing channeling of the Almanzora river. In the final collection box of the project there are three blind flanges: one to continue with Phase II and two in two deviations to connect to the IDAM of the Bajo Almanzora, currently in its final testing phase. This will allow water to be supplied from this IDAM either through the future pipeline of Phase II or by the gravity section of Phase I to Sopalmo, allowing this section to be able to work in reverse. Along the route, 10 collection boxes have been arranged with a blind flange to connect to new pipelines for future supply to the various tanks of the villages next to the project: Carboneras, Garrucha, Mojácar and Vera (beach). The entry into service occurred in November 2011. Volume distributed in 2013: 3,475,272 m3. Annual Report 2013 Pipeline of the Carboneras Desalination Plant to Valle de Almanzora Phase II The works include the infrastructures needed to continue the gravity pipeline of Phase I to the pipeline linking the Carboneras desalination plant with the future Bajo Almanzora desalination plant, up to a new supply tank in the vicinity of the drinking water treatment plant (DWTP) of Cuevas de Almanzora of Galasa. The origin of this new section is located in a connecting collection box, also projected in Phase I, in which three blind flanges had been planned, one in the main pipeline to continue it in this Phase II and two in two deviations to connect to the reservoir of the IDAM of Bajo Almanzora and connect in turn to the pipeline subject of this project, a pump from said IDAM. The pipeline to the supply reservoir is made of ductile iron pipe with a 900mm diameter. It is 15,087 meters long. The works carried out also include the connection to an existing irrigation reservoir system in the Community of Irrigators of Cuevas del Almanzora, which originates in the PK 13 +488,6 of the pipeline to the supply tank. The deviation to the irrigation reservoir is also executed in ductile iron, with its length being 300 meters. It has a 900 mm diameter. The entry into service occurred in November 2011 and the volume distributed in 2013 was 3,475,272 m3. Reuse of Waste Water in the Western Costa del Sol, Mijas and Manilva WWTP EThese works have been carried out according to regulatory agreement for the financing and operation of systems for tertiary treatment of the waste water treatment plants of Manilva and Cala de Mijas (Málaga) between the state-owned company Acuamed and the trading entity Acosol SA, dated November 22, 2006. On September 2, 2009, the certificate of acceptance for the works was signed, fixing that date as the beginning of the exploitation of the works carried out at the Mijas and Manilva WWTP for the purpose of applying the tariffs and guarantees. For work done at the WWTP of Estepona and Marbella on December 15, 2009, the certificate of acceptance of the works was signed, fixing that date as the beginning of the operation. The works of the tertiary treatments executed are intended to ensure necessary water quality as required according to use, for this case in golf courses, as provided in the RD 1620/07. The works carried out have included the completion of a tertiary treatment system at the WWTP of Manilva and Cala de Mijas that can treat up to 12,000 m3/day. These tertiary units comprise of a coagulation chamber, flocculation chamber, micro-sieves with a 10 micron mesh weight and ultraviolet disinfection equipment ensuring disinfection lower than 10 coli/ 100 ml. The production of La Cala de Mijas in 2013 was 450,538 m3 while in Manilva it was 760,121 m3. Tertiary production is linked to the water needs of the golf courses that it caters to. 04. Acuamed Wealth Generation: Works Status Reuse of Waste Water in the Western Costa del Sol, Estepona and Marbella WWTP These works have been carried out according to regulatory agreement for the financing and operation of systems for tertiary treatment of the waste water treatment plants of Estepona and Marbella (Málaga) between the state-owned company Acuamed and the trading entity Acosol S.A., dated November 22, 2006. On December 15, 2009 the certificate for the acceptance of the works was signed, fixing that date as the beginning of the exploitation of the works carried out at the WWTP of Estepona and Marbella. The works carried out by tertiary units are intended to ensure necessary water quality as required according to use, in this case for golf courses, as provided in the RD 1620/07. The works carried out have completed a tertiary treatment system at the WWTP of Marbella (La Víbora) that can treat up to 520 m3/day. This tertiary unit includes a coagulation chamber, a flocculation chamber, micro-sieves of a 10 micron mesh weight and ultraviolet disinfection equipment ensuring disinfection lower than 10 colis/ 100 ml. In the WWTP of Estepona (Guadalmansa), to ease the burden of secondary treatment, a ballast lamellar settling has been carried out, allowing water of adequate quality to enter the existing tertiary unit. Marbella production in 2013 was 426 549 m3 of. Tertiary production is linked to the water needs of the golf courses that it caters to. Reuse of Waters of the Arroyo de la Miel WWTP On December 15, 2009, the addendum to the agreement of December 22, 2006 was signed which covers the undertaking of “The General Infrastructures for the Irrigation with Reclaimed Wastewaters from the Arroyo de la Miel WWTP (1.2.g. 7) (TM Benalmádena) “ between Acuamed and Acosol. On April 12, 2012, the certificate for the acceptance of the works was signed, fixing that date as the beginning of the exploitation of the works. The project consists of a pumping station, located on the existing regulator tank for reclaimed water. It works with vertical submersible pumps and four impulsions to the irrigation sectors-especially golf courses. The transfers of reclaimed water in 2013 have been 434,903 m3. Operation of the Marbella Desalination Plant On July 4, 2005 Acuamed signed a purchase and sale agreement with the Association of Municipalities of the Costa del Sol for the acquisition of the Marbella desalination plant. This desalination plant has a nominal capacity of 20 hm3 per year. On October 27, 2011, the purchase contract for the desalination plant was made effective. The plant, whose purpose is to supplement the supply to the Western Costa del Sol (Málaga), has a production capacity of 56,400 m3 / d. Some elements to be highlighted are: • Open intake at -10 meters with a 2,000 mm diameter 67 PRFV pipe. • Physical pre-treatment with 24 closed sand filters and 16 cartridge filters. • Chemical pre-treatment. • 8 membrane housings. • 9 Pelton turbines coupled to the nine high pressure pump engines for the energy recovery of the rejected water pressure. • Post-treatment with lime, CO2 and sodium hypochlorite. Since it became operational in 2005, the plant has produced a total of 48.5 hm3 of desalinated water to the end of 2012. In 2013, it produced 2,130,598 m3. Almanzora - Western Almería Connection Phase I This pipeline starts from the Venta del Pobre reservoirs (2x 95,000 m3) and distributes the water from the Carboneras desalination plant through the impulsion of the IDAM. There is a main pipeline and four branches. Three additional reservoirs are also included, one at the end of the main pipeline and another two at the end of the branches 1 to 4. Main Pipeline: It is carried out using a pressure pipe, whose type is of reinforced concrete pipe with steel cylinder, welded joint and the granular material wedge at 90º. The inside diameter is 1,400 mm and the length is 18,236 m. The design flow of 2.66 m3/sec and working pressures range from 2 to 8 atm. The service road along the pipeline has a minimum section of 5.00 m width and allows quick access to any point of the installation. In all sections of the pipeline there are collection boxes at each level change, located at different distances depending on the needs of the terrain. They are equipped with vent and drain equipment depending on whether the design describes a maximum or a minimum. Throughout the entire main pipeline there are remote stations equipped to allow the entire system to be activated or controlled, and to communicate with service points located in the different branches. At kilometer 13 +294 of the general pipeline there is an intake providing desalinated water to the tank of the network supply of the municipality of Níjar. Branches: Interspersed in the main pipeline are four branches that allow desalinated water to be carried to the entire field of Níjar through the irrigation network of the Community of Users of the Region of Níjar (CUCN). - Branch 1: Starts at km 3 +920 of the main pipe line and ends on a water storage basin with 95,000 m3 capacity and a water depth of 9 meters. This is a ductile iron 500 mm diameter pipeline with a total length of 7,562 m. - Branch 2: Starts at km 7 +874 of the main pipeline and ends at an existing reservoir next to the Marsh’s watercourse about 400 meters upstream from 68 the A-7 highway. This is a ductile iron 500 mm diameter pipeline with a total length of 1,487 m. -Branch 3: Starts at kilometer 13 +694 of the main pipeline and ends at an existing reservoir in the vicinity of the A-7 at kilometer 481. This is a ductile iron 500 mm diameter pipeline with a total length of 465 m. - Branch 4: This pipeline starts at the water storage basin of the main pipeline located in the hamlet of Inox and ends in a water storage basin of 89,000 m3 of capacity and 9 meters of water depth. This is a ductile iron 600 mm diameter pipeline with a total length of 8,858 m. The Venta del Pobre reservoirs as the well as the other three water storage basins are classified as type C. It entered the operational phase in 2005. The users are the Níjar Town Council through the joint venture with Emanagua and the Community of Water Users of the Region of Níjar (CUCN). In 2013, the volumes delivered were 1.3 hm3 for supply to Emanagua and 6.5 hm3 for irrigation to CUCN. Operation of the Carboneras Desalination Plant The desalination plant in Carboneras, with 42 hm3/ year production capacity and the technology of reverse osmosis, began its operation in May 2005 being the largest desalination plant in Europe at the time. The desalination plant has an open inlet originally located within the port of Carboneras at height -15 m. In 2010 the intake was renovated, removing it from the port and placing it at a depth of -35 m. The original intake has remained in service, as an emergency intake until the port is expanded with a new dock, when it will be demolished. The plant has a physical pre-treatment consisting of a lattice, desander channels, pressure filtration on a bed of silica and micro-filtration. The chemical pre-treatment is a conventional treatment with hypochlorite, acid, coagulant, bisulfite and antifouling. After the desander channels, the plant is set up in two twin lines with a production capacity of 60,000 m3/day each. The plant has six frames through the R.O. line with 10,000 m3 of daily production capacity each. Prior to distribution, the water is post-treated by direct injection of CO2 and whitewash. Of the total production of the plant, 27 hm3 are distributed through the impulsion to the Venta del Pobre (24.5 hm3 for irrigation and 2. Hm3 to supply the town of Níjar) and 15 Hm3 through the Carboneras-Cuevas del Almanzora pipeline to supply Eastern Almería. The volumes produced and distributed in 2013 were 13.14hm3 and 12.9 hm3 respectively. The annual electricity consumption in 2013 was 54,563,316 KWh. Annual Report 2013 Impulsion Exploitation IDAM of Carboneras This infrastructure allows the distribution of most of the production of the Carboneras desalination plant to the users. The pumping station is located on the slope of the north side of the outlet tank and allows desalinated water to be propelled to the Venta del Pobre tank, located in the axis of the Almanzora- Western Almería pipeline. The reservoir of the impulsion has a storage capacity of 120,000 m3. It is made entirely of concrete, housed in an egg excavated 100% with no filler, giving it a very high security against breakage. An elastomeric gasket with polyurethane coating was used to waterproof the concrete joints. The reservoir is covered by a sheet of special floating polypropylene which prevents water contact with the atmosphere given the proximity to the port of Carboneras and the facilities of the coal power plant. The building of the pumping station is rectangular measuring 34x8.5 m. It contains 5 +1 vertical multistage pumps with displaced impeller. Each pump can impulse 2,300 m3/h, giving a power of 2400 KW. Thus, the complete installation can transfer up to 240,000 m3/day, maintaining a reserve pump. The system is equipped with flow control valves, flow meters, pressure transmitters, local CCM for maneuvering, cathodic protection equipment, etc… These elements are necessary for the proper functioning of the entire system. The control building is located in Cuestas de Trujillo in the municipality of Carboneras and approximately 1 km from the desalination plant. The water transport pipeline from the outlet of the pump station to the point of delivery in the discharge tank in the Venta del Pobre has a total length of 18.4 km and consists of a1.400 mm diameter welded steel pipe. The volume impulsed in 2013 was 11,280,084 m3 of which 7,804,812 m3 h were sent to the Venta del Pobre reservoirs and 3,475,272 m3 through the Carboneras,-Cuevas del Almanzora pipeline for the public company Galasa. The electricity consumption of the facility in 2013 was 7,976,045 KWh. Images of the elements that make up pretreatment: sediment removal channels (upper left), sand filters (lower left), microfiltration (upper center), and storage deposits for sulfuric acid and sodium hypochlorite (right). Operation of the Negratín-Almanzora Connection This is 120 km pipeline in welded steel with a 1,200 mm diameter linking the Pantano de Negratín (Granada) with the Valle del Almanzora (Almería), ending in a transfer control center in the municipality of HuercalOvera (Almería). Interspersed in this pipeline are seven reservoirs in diversion (three of which are double) that allow superb control capacity. There are also two power plants that allow the generation of electricity using the water jump in two points of the system, thus greatly reducing the specific consumption of the facility whose forte is the pumping station in the marsh itself. The facility is designed to transfer a total of 50 Hm3/year, which is the existing concession at present, of which 43 Hm3/year are intended for irrigation through Aguas del Almanzora (a company created by the Central Board of Users of the Valle del Almanzora Panoramic view of the Carboneras desalination plant 04. Acuamed Wealth Generation: Works Status 69 to manage the facility) and 7 Hm3/year are intended for supply. It should be noted that these 43 hm3 allow 24,000 Has to be irrigated, which belong to 17 irrigation communities integrated into Aguas del Almanzora. Although historically the only user of the water supply had been the public company Galasa, in recent years the town of Olula del Río has also benefited and soon, the town of Albox will also be included. Currently there is no distribution based on concessions from the old Andalusian Water Agency of these 7 hm3 of water supply. The facility starts with capture in the Negratín Reservoir, with an impulsion along the slopes of Cerro del Jabalcón and that ends in a system of regulation reservoirs on its hillside (reservoir - 1). From this point the pipeline starts again, all with gravity. After crossing the Hoya de Baza and going through the pass of Hijate (boundary of basins and provinces), it descends to the Tíjola station, ending with a hydroelectric plant (CH-1) and then another system of regulating reservoirs and irrigation (reservoir - 4). In the section there are also two sets of diversion reservoirs, for regulation and irrigation (reservoir - 2 and reservoir-3). In reservoir No. 4 a new section of pipeline starts that goes up to the Los Manuels area in Huercal-Overa, with a second hydroelectric power station (CH - 2) and then another system of regulation reservoirs and irrigation (reservoir - 6) . In the section there is also another regulation and irrigation pool (reservoir- 5). Finally from reservoir No. 6 another section of the pipeline starts to Partidor del Saltador in the Tajo-Segura Transfer. In the section there is another regulation and irrigation pool (reservoir- 7). Included within the facility are two mini hydro power plants that generate electricity using the water jump at two points. Specifically, they are the hydro power plant of Tíjola, located in the municipality of Tíjola, with a rated power of 5,320 kW and the hydro power plant Los Manuels located in the municipality of HuercalOvera, with a rated power of 2,955 kW. These two facilities are key to the viability of the facility. Parallel to the pipeline, there is a network of 120 km of optical fiber and 40 remote stations that allow the entire system to be controlled, even remotely, from the control building of the transfer located at the crossroads of San Francisco in the town of El Saltador 70 in the municipality of Huercal-Overa. Integrated into the control system is a set of IP cameras that allow better control of the key points of the system, such as the pumping building, located in the Negratín Marsh (province of Granada), all and every one of the reservoirs, the two hydroelectric power plants and the control building itself. A special mention should be made of reservoir No. 7, since due to its capacity (400,000 m3) it is classified as type B and therefore has an emergency plan implemented as it is considered a large dam. The rest of the installation reservoirs are classified as type C. The electricity consumption for pumping in 2013 was 81.77 GWh, while the production from the hydro-power plants was 48.21 GWh. The transferred volume in 2013 was 53,781,300 m3. It was therefore the third consecutive year that the transferred volume exceeds 50 hm3. Exploitation of the Desalination Plant of El Atabal (Málaga) On November 30, 2000, a regulatory agreement for the implementation and operation of the works for water supply to the town of Málaga was signed with the Municipal Water Company of Málaga (EMASA), which is part of the desalination plant in El Atabal. This facility was commissioned in February 2005. Since its inception, it has produced more than 307 hm3 to supply the city of Málaga. In 2013, production was 34.27 hm3. The desalination plant facilities are located next to the current site of the Drinking Water Treatment Plant (DWTP) El Atabal, serving existing facilities once refurbished as pre-treatment to the reverse osmosis process. The maximum daily output is 165,000 m3 of osmotized water, with less than 250 mg / l salinity and a conversion factor of 80%, which represents a water use in the header of the DWTP of 206,400 m3/day. The untreated water entering the plant header comes primarily from the Guadalhorce reservoirs (Guadalhorce, Conde de Guadalhorce Guadalteba) where water entering for pre-treatment can have as much as 6.47g/l. The water is distributed to three settling tanks, where sodium hypochlorite, ferric chloride (coagulant) and polyelectrolyte (flocculant) is dosed. From here, the water is taken to the filtration step made up of two lines, which have10 sand filters Annual Report 2013 each, from where it is driven into the pumping tank, consisting of 12 pumps each capable of raising 717 m3 to 5.7 Kg / cm2 pressure, which is enough to enter into the next process, micro-filtration. This process is composed of 10 cartridge filters, with 20μm effective flow abs. The reverse osmosis process is divided into a first stage of high pressure pumping, in which 100% of the water is propelled through 12 centrifugal pumps, one per frame. It can raise 717 m3 / h with pressures between 4.9 and 23.7 Kg/cm2. In the second stage, booster pumps come in raising the pressure to between 4.5 and 11 bars. Each one of the frames holds 117 pressure boxes (68 in the first +32 in the second) with seven membranes for each box (700 membranes per frame). To harness the energy that the high pressure reject water holds, two turbines that can work with flow rates between 432 and 864 m3 / h are provided as well as a generator that can develop a power of 614 kW at 750 r.p.m. The desalinated water is stored in a water tank with 500 m3 capacity. Using gravity, this water is incorporated into the water distribution network of the city once the after-treatment is completed. On May 3, 2010 the treatment plant for sludge in the ETAP of El Atabal entered into service. It treats sludge from the settling produced by pre-treatment of the plant. 04. Acuamed Wealth Generation: Works Status 71 Hydrographic Demarcation of the Segura Desalination Plant of Campo de Cartagena. Valdelentisco Desalination Plant The project aims to implement the works of the desalination plant for seawater with a production capacity of 27 hm3/year (six reverse osmosis frames). It has been extended with five additional frames and has a maximum actual capacity of 50 hm3/year (11 frames) that allows supply to the region of Murcia through the Mancommunity of the Canales del Taibilla and urban supply for tourism-residential uses in the Campo de Cartagena. The Valdelentisco desalination plant became operational in April 2008, having produced until December 2012 a total of 52,039,944 m3. During 2013 the most important data of the plant’s operation were: - Production: 17,628,495 m3 - Electricity consumption production: 68,464,764 kWh - Electricity consumption production ratio: 3.88 kWh - Electricity consumption impulsion: 16,188,833 kWh - Electricity consumption impulsion ratio: 0.92 kWh - kWh generated by the Francis turbine (brine): 611,256 kWh (1% of the energy consumed in production) - KWh generated by solar photovoltaic installation (covered): 1,307,272 kWh - Net income through photovoltaic solar installation production: 225,912 € - Reagents: Dispersant: 54,580 kg CO2 remineralization: 458,965 kg Lime remineralization: 495,520 kg Ferric chloride: 39,499 kg Sodium hypochlorite: 990 kg Caustic soda (pH modification for boron <1 ppm): 165,746 kg Hydrochloric, sulfuric, oxalic acid: 1,095 kg - Sludge removed: 151,120 kg - Filtration cartridges: 48 pc - Osmosis membranes: 18 pc Operation of the Águilas Desalination Plant The project aims to define the works for a seawater desalination plant by reverse osmosis with a production capacity of 70 hm3 year. The initiative includes the construction of the desalination plant, facilities for collection and transport of seawater, a 25 kilometer network for the distribution, a regulation reservoir for product water and a pipeline for reject water. The desalinated water will be used for irrigation by both the Águilas and the Pulpí and Bajo Guadalentín communities, besides supplying the Mancommunity of Canales del Taibilla and securing supplies for the municipality of Pulpí. On February 27, 2013 the “Certificate for the completion of performance tests and acceptance of works” was signed, with the plant from that date entering the stage of operation and maintenance stated in the contract. During the months of March 72 to December 2013, the most important data of desalination plant’s functioning were: - Production: 17,411,815 m3 - Electricity Consumption: 69,796,682 kWh - Electricity consumption ratio: 4.01 kWh/m3 (includes the impulsion to the various delivery points). -Reagents: Dispersant: 31,836 kg CO2 remineralization: 654,905 kg Lime remineralization: 633,568 kg - Filtration cartridges: 0 pc - Osmosis membranes: 0 pc Distribution Operation of the Águilas Desalination Plant The operation and maintenance of the distribution network of the IDAM of Águilas, including the Cerro Colorado reservoir, is contained within the scope of the contract (operation phase) of the desalination plant. Operation of the Distribution Network. Valdelentisco Desalination Plant The action involves the operation of distribution works executed from the desalination plant. It allows desalinated drinking water to be supplied for irrigation and urban supply to part of the region of Murcia, (areas of Sucina, Los Martínez del Puerto, Alhama and Fuente Álamo, bordering and adjacent areas and to the north of the Tajo-Segura transfer area.) The distribution network of the Valdelentisco desalination plant has impulsion and regulating reservoirs to place the desalinated water at a height of 290 m., distribution head of the hydraulic system, pipelines of 100 km long and four annual regulation reservoirs with a total volume of approximately 2.60 Hm3. Over 2013 the remote control facilities of the distribution network and multiple connections to multiple network users have been put into operation. Improvement of the Water Quality for Urban Supply from the Tajo-Segura Tálave – Cenajo Pipeline. In Service. The purpose of the work is to facilitate the contribution to the Cenajo reservoir of the supply water from the Tajo-Segura transfer and the floods of the high basin of the Mundo river. A tunnel has been built for this that is 7,513.67 m long and has a 3.50 m interior diameter. This tunnel takes the water pipeline from the Tálave reservoir to the water storage basin of the Cenajo. The tunnel drains into a regulation reservoir and from there a pipe has been built that empties into the Cenajo reservoir. Acuamed made available these facilities for operation and maintenance on November 21, 2012 at the request of the Hydrographic Confederation of Segura due to the “urgent operational needs of the header reservoirs”. The facilities were put into operation in December 2012. Between February 26, and March 11, 2013, 5,788 Annual Report 2013 million m3 were transferred through the pipeline. The day when most water was transferred was on March 4, with a total of 480,000 m3. Hellín Supply (Albacete) The WWTP of La Losilla in Hellín had become obsolete and had limited treatment capacity. The purpose of these initiatives is to improve the reliability and security of the supply and the quality of the water supplied to the town of Hellín. With that in mind, a DWTP has been built to treat water at a flow rate of 850 m3 / h. The works also include two tanks of 5,000 m3 capacity and connection pipelines to the existing drinking water supply networks in the municipality of Hellín. In February 2010, the Town Council of Hellín signed the transfer protocol for the use of the facilities, which then passed to be operated by the company managing the integrated water cycle in the town. During 2013, 2,600,000 m3 of drinking water was produced, with a consumption of 1,140,000 kWh (0.43 kWh/m3). Hydrographic Demarcation of the Júcar Albacete Supply from the Aqueduct of the TajoSegura Transfer In order to avoid over-exploitation of the aquifer of the Eastern Mancha, Albacete’s supply source, an intake has been built in the Tajo-Segura aqueduct with a capacity of 1 m3 / s of water from the Júcar river. Through a pipeline that is approximately 13 km long, the water is taken to the DWTP of Albacete, which is located next to the header tanks used for water distribution to the city. The basic data of the facility, designed for a continuous flow of 1.0 m3/s for the year, are: • Work on the aqueduct intake of the Tajo-Segura transfer • Regulation reservoir of 980,000 m3 capacity placed in the vicinity of the transfer channel, fed by 470 meter long gravity pipeline. • Pumping station to raise the flow through an impulsion of 11,310 meters long to the untreated water regulator tank of the DWTP. • Untreated water tank capacity of 21,600 m3, located in the vicinity of Los Llanos. • Drinking water treatment plant sized to treat a continuous flow of 1.0 m3/s running 24 hours a day. • Treated water tanks of 50,000 m3 total capacity divided in four interconnected bodies of 12,500 m3 each. • Pumping station to raise the flows, through a second impulsion of 752 meters long, up to the current supply tanks to Albacete. • Electrical and auxiliary facilities. The facilities are in operation since 2003. Production during 2013 has been 12,815,680 m3. The main consumptions are as follows: • Chlorine gas: 38,757 Kg • Coagulant: 186,245 Kg • Carbon dioxide: 174,542 Kg • Flocculant sludge: 1,475 kg • The electricity consumption has been 3,693,002 kWh Waste sludge generated has been 1.022 T. The only user is the Town Council of Albacete. 04. Acuamed Wealth Generation: Works Status Denitrification Plant of L’Eliana. Completed The main objective of the work is to provide the town of L’Eliana two types of water, one suitable for human consumption, meeting the high quality requirements of Royal Decree 140/2003, and that for irrigation, with the requirements needed for this use. The plant has a capacity of 4 Hm3/year using a reversible electrodialysis procedure. It also includes a collection network from the wells and a distribution network that separates. Infrastructures for Hydroelectric Use in the Reservoir of Cortes II. Completed The initiative includes the modification of Section I of the old section of the Júcar - Vinalopó pipeline as a reversible hydroelectric pumping line. For this, a pumping station has been built in the reservoir of Cortes for a flow of 10 m3/sec at a total manometric height of 523 meters. The works also include an impulsion section to the balance chimney and a stretch of pipeline using gravity to the regulation reservoir with 550,000 m3 capacity. Elevation of Waters from Rabasa to Fenollar. This work aims to ensure the supply of the regions of L’Alicanti and Marina Baja, where an overexploitation of aquifers is occurring. The water supply system to the Marina Baja (Alicante) consists of two pumps, connected with a series of associated pipes, which allow water to be taken from the facilities of the Mancommunity of the Canales de Taibilla, in Rabasa (Alicante) to the AmadorioBenidorm pipeline, belonging to the distribution system of the Consortium for Water Supply and Sanitation in the Marina Baja. This system allows the water from the Júcar river, which comes from the reservoir of Alarcón, to reach the Marina Baja through the Tajo-Segura aqueduct, the Taibilla canal system and the pumping system of Rabasa-Fenollar-Amadorio. This pipeline, managed by Acuamed, includes infrastructures for the elevation of waters of Rabasa to Fenollar and the 73 Fenollar-Amadorio pipeline. The Ministry of the Environment commissioned Aguas del Júcar, S.A. (now Acuamed), the construction and operation of the elevation of waters of Rabasa to Fenolla, which connects the storage facilities of the Mancommunity of Canales del Taibilla located in Rabasa (Alicante ) with the Fenollar tank of the Fenollar-Amadorio pipeline. Moreover, as provided in the Direct Management Agreement and as specified in section A3 of its addendum , the Ministry of the Environment attributed to Aguas del Júcar, S.A. (now Acuamed) the maintenance and operation of the facilities already built (Fenollar-Amadorio pipeline) for the supply of waters to the Marina Baja. The construction works were carried out by the Hydrographic Confederation of Júcar, under the emergency declaration of April 17, 1996 and December 20, 1996, with the receipt of the works occurring on February 25, 1999. On August 4, 2000 the certificate of the acceptance of these facilities from the Hydrographic Confederation of Júcar to Aguas del Júcar, S.A was signed. Since 2000 Acuamed operates and maintains these two infrastructures that make up the pipeline to supply the Marina Baja (Rabasa-Fenollar-Amadorio). Currently this pipeline is in service supplying water to the municipality of El Campello. The volume supplied to El Campello in 2013 has been 1,032,674 m3 (1.03 hm3). The energy consumption of the year 2013 at the Rabasa and the Fenollar pumping stations has been 752,462 kWh (52,675 kWh for Rabasa and 699,787 kWh for Fenollar), having pumped 94% of the energy consumed in P6. Note the excellent use made of the energy periods. An energy management system is carried out in the facility avoiding the operation of the equipment during the tariff periods in which the cost of energy is higher. Turia-Sagunto Pipeline The Turia-Sagunto (Valencia) pipeline comprises of the water supply facilities to the Sagunto area (area of Camp de Morvedre), with a maximum pipeline flow of 900 l/s. The system that Acuamed manages is basically composed by an intake in the Júcar-Turia Canal, a pumping station in Paterna and a regulator tank of 150,000 m3 in Sagunto, connected by the corresponding pipelines. The initiative is estimated to benefit more than 120,000 users. The execution of the work was under the responsibility of the Hydrographic Confederation of Júcar, according to Law 14/1987, of July 30, declaring them of public interest. A flow of 1 m3/s is reserved from the regulation of the Cabriel river in the Contreras reservoir. In July 2000 the campaigns for water supply to the city of Sagunto began, and in August 4, 2000 the certificate of acceptance of the facilities from the Hydrographic Confederation of Júcar to Aguas del Júcar, S.A. (currently Acuamed) was signed. The Hydrographic Confederation of Júcar, under the emergency declaration dated March 31, 2006 and in accordance with Article 72 of the Consolidated Law on Contracts of Public Administrations (Royal Decree 2/2000 of June 16) built a pumping station at the mouth of Júcar-Turia Canal, by the Turia river, which allows Sagunto to be supplied with water from the Turia river. The fundamental purpose of the works undertaken was the construction of a pumping station, and all its ancillary works, consisting of two pumps of 22 kW that allow the transfer of a flow rate of 250 l/s each, from the Turia river to the Júcar Turia Canal, in order to guarantee supply to Sagunto in an emergency. The main user is the Town Council of Sagunto. The volume supplied to Sagunto during 2013 has been 8,422,897 m3 (8.4 hm3). The energy consumption of the year 2013 in the pumping station of the Turia-Sagunto pipeline has been 1,921,205 kWh, having pumped 68% of the energy consumed in P6. Note the excellent use made of the energy periods. An energy management system is carried out in the facility avoiding the operation of the equipment during the tariff periods in which the cost of energy is higher. 4.3 Works Underway Hydrographic Demarcation of the Andalusian Mediterranean Basins Desalination plant and complementary works in El Campo de Dalías. Works underway. The works include the construction of a desalination plant with an annual production of 30 hm3 that may be extended to 40 hm3, as well as the necessary regulation works and distribution of the desalinated water. In addition to the treatment building and the marine works to capture seawater and release the generated brine, the desalination plant is made up of a general distribution network that includes an impulsion system, a regulation reservoir of 25,000 m3, and a gravity pipeline system of more than 30 km. By December 31, 2013, 53% of the project was complete. Desalination plant and complementary works for El Campo de Dalías. Improvement of the irrigation infrastructures of the Central Board of Users of West Almería. Works underway. This project aims to improve the water transport network for agricultural use within the influence area of the Sol y Arena Irrigation Community, largely in areas where the main network is made up of open air canals. The works of this project consist of the pipelines and auxiliary elements for the regulation, protection, and control necessary to transport the three types of water used to the reservoirs and later to mix them in the load and finally carry out delivery to the coowners. By December 31, 2013, 49% of the works were completed. Complementary works at El Campo de Dalías desalination plant. El Cañuelo and La Redonda ponds (Almería). Works underway. This project includes the construction of five irrigation ponds that allow regulated and cheap use of desalinated water from the Campo de Dalías desalination plant, which when mixed in the right proportions with water from the aquifer will increase the volume and quality of water available for the irrigation of greenhouses in the area. The amount of water taken from the aquifer, currently declared to be overexploited, will therefore be reduced. Construction began on January 22, 2013 and the work is being carried out according to the approved deadlines and budgets. By December 31, 2013, 90% of the works were completed. Desalination plant in lower Almanzora. New desalination plant in lower Almanzora. Works underway. The works consist of the construction of a desalination plant with an annual production of 15 hm3 (extendable to 20 hm3) on the left bank of the Almanzora river (Cuevas de Almanzora municipality, Almería), as well as discharge and loading pipelines in the land 74 Annual Report 2013 04. Acuamed Wealth Generation: Works Status and marine areas, a work of mixed intake using 6 beach wells and one collection with open intake, the intake tower of which is located 1 km from the coast, in addition to product water storage elements, for a total volume of 84,000 m3. Complementary works include a product water pumping station to deliver water through the pipelines from the Carboneras desalination plant to the Almanzora valley, as well as a pipeline connection to the regulation pond of the Cuevas de Almanzora municipality plant, which is located next to the IDAS in Palomares. Linking the deposits from eastern Almería to the Almanzora valley (Almería) with the pipeline of the Carboneras desalination plant. Works underway. The work includes individually connecting the major deposits of the GALASA supply network with a pipeline that joins the Carboneras desalination plant to the lower Almanzora desalination plant. A total of 19 deposits are supplied by means of 11 branches, five of which are already completed. By December 31, 2013, 26% of the works were completed. General infrastructures for irrigation with recycled waste from the Waste Water Treatment Plant (WWTP) at Cerro del Águila (Málaga). Works underway. This project aims to provide recycled waste water from the WWTP to the various golf courses and public gardens in the towns of Mijas and Fuengirola. In addition to reusing the water from the Cerro del Águila WWTP, an infrastructure has been designed to connect it with La Cala de Mijas WWTP, allowing the use of recycled water from either source indiscriminately. The project will develop five pipelines and a regulation deposit to allow the recycled water to be directed to the different points of consumption. Additionally, the project includes a series of initiatives to improve the existing treated water deposit, where the main branch starts. Construction began in March 2013. By December 31, 2013, 74% of the works were completed. General infrastructures for irrigation with recycled waste water from the WWTP of La Víbora (Málaga). Works underway. The aim of the project is to provide recycled waste water from the Víbora WWTP to different golf courses and public gardens in the towns of Mijas and Marbella (Málaga). In addition to the distribution network, an extension of the tertiary treatment plant at the WWTP is planned in order to double the current capacity of recycled water to achieve a total capacity of 26,500 m3/ day. Construction began in March 2013. By December 31, 2013, 51% of the works were completed. 75 Reuse of waste water in the city of Málaga. Tertiary treatment of the WWTP at Peñón del Cuervo. Awarded. The works consist of the implementation of tertiary treatment at the WWTP of Peñón del Cuervo (Málaga). The intake work is carried out in the outlet channel for secondary decanting and the header pump is reached via a line for tertiary treatment. The adopted solution consists of two lines of treatment of 110 l/s each, carrying out the civil works of each line, and the use of electromechanical equipment in one of them. Aljaima pipeline to the El Atabal water treatment plant and complementary works. Completed. A pipeline from the Aljaima weir to the El Atabal WWTP allows water flow from the Guadalhorce river Hydrographic Demarcation at Segura Desalination plant to guarantee irrigation of the Tajo-Segura transfer (Torrevieja desalination plant). Completed. The project aims to carry out the works of the desalination plant for seawater, which uses a reverse osmosis process and has an annual capacity of 80 Hm³. The water generated is directed to three points of consumption: the Campo de Cartagena canal, La Pedrera irrigation pond, and a new deposit to supply the Tabilla Canals Association, located in the town of Jacarilla. The works include the desalination facilities, water intake using a concrete box attached to the dam west of the Torrevieja port, 21 kilometers of pipeline for product water distribution, two pumping stations, and the outlet pipe. In January of 2012, the act to redefine the works was signed for the occupation of the Public Domain of the Port and the marine area construction of the intake and discharge pipelines as well as the collection building attached to the dam west of the Torrevieja Port. By the end of 2012, system and remote management testing in the plant had begun. In 2013, system and operation testing was carried out. Land restoration project of the San Roque district, associated with the construction of the desalination plant to guarantee irrigation at the Tajo-Segura transfer. Torrevieja (Alicante). Works underway. The project aims to carry out improvements on infrastructures of the district, an area in which seawater intake and waste water discharge pipelines run. To this end, plans include the renewal and underground routing of the street lighting system and repositioning of sidewalks and asphalt paving of the streets, in order to improve security and accessibility. The curbs and pedestrian crossings have been designed to eliminate 76 to be collected for treatment at the water treatment plant in El Atabal. The ultimate purpose of this resource is urban water supply to the city of Málaga. It involves a 21-kilometer pipeline measuring 1600 mm in diameter, with a nominal transport capacity of 2 m2/sg. As complementary works, a second pipeline runs alongside the last 7 kilometers of the first pipeline, making up the first section of the line between the Pilones Drinking Water Treatment Plant (DWTP) and El Atabal DWTP, which will allow the two water treatment plants in the city of Málaga to be connected. Approval of both works was signed on February 23, 2013. architectural barriers, which will make it easier to see older and handicapped persons as well as facilitate their movement. By December 31, 2013, 90% of the works were completed. Water allocation system from the Cerro Colorado reservoir to the Guadalentin valley. Section 1. Works underway. The purpose of the project is to define the infrastructures that will cover water allocations for irrigation in the Alto Guadalentín valley. Geographically, the works are located in the Alto Guadalentín valley in the municipalities of Lorca and Puerto Lumbreras, which is near the Murcia-Almería border. The project determines the layout and dimensions of the pipeline originating in the Cerro Colorado reservoir, which forms part of the Águilas/Guadalentín desalination plant project, and leading to the different intakes of the Irrigation Community of Puerto Lumbreras and Lorca established along the Alto Guadalentín valley. The project also includes defining the intakes and the control and management systems for a centralized operating system. The project was approved in December 2011. The works were tendered in 2012. They were awarded in May 2013 and the act to redefine the works was signed on July 31. Section VI. Distribution network of the Cañarico branch of the Valdelentisco desalination plant. Completed. The aim of this project is to expand the water distribution network of the Valdelentisco desalination plant (Murcia) through a branch running close to the town of El Cañarico, which will supply the Alhama irrigation area. The branch is designed to measure a total length of 3,001 m with a diameter of 500 in soft casting. The works were completed in 2013. Annual Report 2013 Works and facilities of the remote management and remote control systems of the water distribution network of the Valdelentisco desalination plant. Completed. The aim of the initiative is the construction and implantation of a remote management and remote control system for the distribution network of the Valdelentisco desalination plant, including the 4 reservoirs of the network. The system consists of a control center located in the pumping station for treated water from the Valdelentisco desalination plant, an extensive network of automated stations connected by WiMax technology and complemented by devices for measuring and control, valves, and hydraulic instrumentation for the more than forty user intakes, as well as electric lines to feed outbuildings and switches. The works were carried out in 2013. Extension of the Mojón desalination station for brackish water and collectors (Murcia). Awarded. The aim of the planned work is to build collection and pipeline works for untreated brackish water destined for the desalination plant in El Mojón, as well as the pipeline for treated water from the plant to the Campo de Cartagena canal. At the same time, plans have been made to expand this plant with two new lines of desalinated water production with a unit capacity of 5,400 m3/day, which will attain a plant capacity of 4 Hm3. Modernization of the hydraulic infrastructures for irrigation in the main channel in Molina (Murcia). Completed. The project aims to carry out the modernization works required for localized automatic watering in the traditional irrigation areas of the Segura high plain, between the Ojós dam and La Contraparada, within the Heredamiento area of the main channel of Molina de Segura. The facilities considered are only those needed for overhead supply up to the header reservoirs in the different irrigation sectors. The project has a total of 4 reservoirs, 8.35 km of impulsion pipeline, and 10.5 km of main pipeline. The works were completed in 2013. Stormwater interceptors in the northern and western districts of Cartagena. Completed. The aim of the works is to carry out flood prevention initiatives and improvements on the basic sanitation network of the northern and western districts of the city of Cartagena. The three initiatives listed in this project consist of a network of unit collectors that exclusively collect rainwater run-off and carry it to the storm tanks. These storm waters are discharged by gravity in some cases (Initiative 1 and some collectors of Initiative 2). In other cases (tanks from Initiatives 2 and 3), they are pumped to the Benipila watercourse, thus saving the barrier effect of this channeling. The works were completed in 2013. 04. Acuamed Wealth Generation: Works Status Environmental recovery of Segura between Ojós and Contraparada. Municipal districts Alguazas, Molina del Segura, Torres of Cotillas, Lorquí, Ceutí, and Archena. Confirmed and accepted. Works are aimed at the environmental recovery of the section of the Segura river between Ojós and Contraparada in different municipal districts. In this way, an attempt has been made to encourage the inhabitants to rediscover with the world of the river system and allow them to benefit from its landscapes and historical-cultural patrimony, to maintain the collective memory of the river and to improve the quality of life in the region. Conditioning of the Benipila Watercourse in Cartagena. Completed (given to the city council for use and maintenance) The project involves extending the existing channeling in the Benipila watercourse as it passes through the town of Cartagena by about 3 km, with the aim of reducing the risk of flooding in an area historically affected by floods. Two semicircular bridges have also been constructed to create a roundabout to distribute traffic, in addition to a service road in parallel with the watercourse. Conditioning of the Canteras Watercourse in Cartagena. Completed (given to the city council for use and maintenance). The final section of the Canteras watercourse runs through an urban area of Cartagena and empties into the Benipila watercourse. The works carried out in the present initiative improve safety against floods by linking of the final section of the Canteras watercourse with the Benipila watercourse through the establishment and consolidation of the banks and riverbed of the channel. Environmental rehabilitation of Azarbe Mayor. Completed (confirmed and approved). The works of the WWTP pipeline of East Murcia to Azarbe Mayor are constructed of reinforced concrete pipe measuring 3,394 m in length with diameters of between 1,200 and 1,500 m. The pipeline runs from the WWTP of East Murcia to Azarbe Mayor, passing through the Rincón de San Antón site, the hamlet of Llano de Brujas, and the Cabecicos area before reaching Azarbe. Environmental recovery of the San Jerónimo Watercourse in Caravaca de la Cruz. Completed (given to the city council for use and maintenance). This initiative to condition the banks and riverbed of the channel aims to integrate the waterway into the urban section and rehabilitate the area, which is progressively deteriorating. With this aim, channeling of the San Jerónimo watercourse has been carried out over approximately 1,200 meters, a riverside walkway has been built, and urban furniture has been installed along its route. 77 Conditioning of the Mula river in Albudeite. Completed (given to the city council for use and maintenance). This initiative aims to prevent damage that could be caused by the overflow of the Mula river channel as it passes through Albudeite. With this aim, masonry channeling has been constructed in the urban zone, with protective groins of rock fill in the remaining sections, which allow drainage of up to 980 m3/s. It is 35 m wide and in the center there is a low water channel measuring 4 m which is able to hold volumes of up to 3 m3/s. Hydrographic Demarcation of the Júcar River. Desalination and complementary works for Marina Baja (Alicante). Mutxamel solution (Mutxamel desalination plant). Completed. The works include the implementation of a seawater desalination facility using the reverse osmosis process, which currently has a nominal production capacity of 18.5 hm3/year, as well as electromechanical equipment, civil works, urbanization, pipelines for seawater and brine, and the replacement of pavements and services affected. Strengthening the drinking water supply network in the towns Mutxamel and Campello (Alicante). In tendering process. The aim of the works is the construction of necessary infrastructures for overhead distribution from the Mutxamel desalination plant to the towns of Mutxamel and Campello. The works are currently under public bidding. Complementary works of the Mutxamel desalination project in the municipalities of Alicante, San Juan, and San Vicente del Raspeig (Alicante). Works in operation. A project has been drafted for overhead distribution from the Mutxamel desalination plant to the towns of Alicante, San Juan, and San Vicente del Raspeig. This project was approved in early 2011. Due to the variation in economic conditions of each town, the decision was made to divide it into 2 parts to accommodate the budget. Division 1 was developed, then approved by the Ministry of Agriculture, Food, and the Environment in mid-2012, bid on, and awarded. Work began on the project at the start of 2013. By December 31, 2013, 72% of the works were completed. Oropesa del Mar desalination plant and Complementary Works. Works in operation. The aim of the project is to construct the desalination plant at Oropesa del Mar and carry out complementary works to be installed in Cabanes. This plant will be capable of producing a volume of 21.50 Hm3/year. The works include collection, a desalination plant, a brine 78 New Júcar Vinalopó pipeline. Sections A/B/C/D/E. Completed. The main aim of this pipeline is the transference of surplus flows from the lower reaches of the Júcar river to the headwater basin of Vinalopó. The works for the new Júcar-Vinalopó pipeline began in Cullera, on the right bank of the Júcar river, immediately upstream from La Marquesa dam, and connect with Section V of the previous layout. A maximum of 80 hm3/ year can be circulated. The 78-km layout comprises siphon and tunnel pipelines, regulation reservoirs, and pumping stations. discharge system, and product water pipelines. By December 31, 2013, 94% of the works were completed. Moncofar desalination plant and complementary works. Works in operation. The aim of the project is the construction of a desalination plant with a daily production of 15 Hm3/year. The works include a seawater intake and pumping station, a desalination plant, brine water discharge pipeline into the sea, pumping of the product water to Moncofar and to the Chilches deposit, and distribution pipelines. By December 31, 2013, 96% of the works were completed. Oropesa Benicasim pipeline. Works in operation. A project has been drafted for overhead distribution to the town of Benicassim from the Oropesa desalination plant, as this town was incorporated after the drafting of the plant project and the distribution pipelines. This project was approved at the end of 2012. Works in operation (the act to redefine the works was signed on December 2, 2013). Regulation works to refill the winter surplus of the Belcaire river. Completed. The aim of the works is to refill the aquifer with winter surplus from the Belcaire river. The following has been constructed: a diversion dam, an intake line, a storage reservoir with a capacity of 2 hm3, and the pipelines for refilling from 2 wells. After completing the works, bidding was made on the contract to implement the emergency plan and the later put it into operation. Reuse of waste water in the Sueca WWTP. Completed. The aim of the works is to improve the management of waste water from the Sueca WWTP by expanding the existing facilities and reorganizing the purification system. Predicted initiatives are the following: work status of the following: expansion of the Sueca WWTP, reuse impulsion, and green filter in the vicinity of Estany de la Plana. Works finalized in 2011. Currently in the phase of operation and maintenance of the infrastructures. Annual Report 2013 Júcar-Vinalopó pipeline. Sections V/VI/VII. Completed. The initiative includes Sections V, VI, and VII of the Júcar-Vinalopó pipeline, which has been observed to be unaffected by the intake change. The works include a pipeline of more than 10 km (Section V) that connects Section E with a 20-hm3 reservoir, an occupied area of 1.384 km2 and a perimeter of more than 4 km (Section VII), as well as a connection between the reservoir and the Alorines power station by means of a pipeline of just under 8 km (Section VI). Management and completion of the reuse of waste water from the Pinedo plant (Valencia). Green filter pilot plant and pumping station on the Turia river. Works underway. The projected works consist of the construction of a green filter pilot plant to test the efficiency of the posttreatment of the water purified by the tertiary of the Pinedo WWTP and thus ensure that the water sent to Albufera complies with the quality parameters set out in the study for sustainable development in terms of the trophic state of the lake. This contract has been carried out and is in operation for one year. Management and completion of waste water reuse from the Pinedo plant (Valencia). Section I of the Catarroja-Benifaió pipeline. (PK 0+000 a 3+236.276) Section II of the Catarroja-Benifaió pipeline (PK 3+236.276 a PK 14+595.40). Works underway. The initiative aims to carry treated water from the Pinedo WWTP to the point of consumption. The line to distribute product water is divided into two sections and also includes the construction of a pumping station (with capacity of up to 4 m³/s) and a control building. In addition, a series of minor works is also planned, including valve manholes, anchors, remote control, the replacement of services affected, and environmental integration. It is currently in operation as part of the works corresponding to Section II, the last connection with Royal Channel of the Júcar river. Pending tests jointly with the entire impulsion. 04. Acuamed Wealth Generation: Works Status Reuse of purified waste water from L’Albufera Sur (Valencia). Works underway. The aim of the works is the construction of tertiary treatment at the South Albufera WWTP and pipelines to carry this treated water to be reused for agricultural or environmental purposes, such as clean water supply to the bodies of water in L’Albufera Natural Park. In addition to the tertiary treatment, the initiative includes a network of collectors and corresponding pipelines, a green filter at Tancat de Milia occupying 30 ha, and an irrigation pond. Works partially completed in 2011. Currently in the phase of guarantee period, which includes operation and maintenance of the infrastructures. Modification of the Favara channel and rainwater interception system in the western collection area. Phase I. In operation. The main aim of these reference works is to try as much as possible to reduce the eutrophication of L’Albufera by preventing run-off from the existing unit collectors, as well as the initial water from rain run-off that is normally highly contaminated, from reaching the lake. The adopted solution allows for the interception of each and every channel and pipeline of the east collection area that may be supplying contaminated water and, using new collectors that are sensitively parallel to the current ones, carry the intercepted waters to the deposits where the necessary processing and regulation is performed. These six (6) deposits are located on the east side of the V-31 highway (Pista de Silla) and have been proportioned, with a total volume of 100,000 m3, to retain and to regulate the run-off from the most contaminated branches of the west collector. Although a certain number of them will still be produced when the system reaches capacity, the most contaminated part of the events will be retained in the deposits. In this way, the current west collector continues to act as a collector of residual water, contaminated water, or sewage. A control of the system is ensured by remote control and control devices situated in the retention deposits. The works are 60% completed. Major repairs and automation of the main channel of Campo del Turia. Division 1: Section: BenagéberLoriguilla siphon. Division 2: Section: Loriguilla siphon-end of the canal. Completed. Since there are various problems that impede the optimal functioning of the channel, two projects have been developed to resolve them. The works of the first section include the construction of a new bypass weir downstream from the Benagéber dam for the modification of the intake works, the modification of the Romeno drain, the works downstream to support the Tiñoso siphon, and a tunnel over 1.5 km long, among other initiatives. Section 2 includes works and repairs to tunnels and the open air channel, the 79 drainage, conditioning, and marking of roads and accesses, the installation of remote operation and remote control, and the repair and maintenance of regulation works. The works were completed, received in March 2013, and confirmed by the CHJ. Sagunto Desalination plant (Valencia). Completed and received. The aim of the project is the construction of a seawater desalination plant located in the town of Sagunto (Valencia) with an annual production of 8 Hm³. The works include the following initiatives: pumping from the supply container, impulsion pipes, desalination plants using reverse osmosis, and brine output. Works received on October 31, 2013. Complementary works for the Sagunto desalination plant (Valencia). Works underway. The aim of the works is to construct a distribution network for the water produced by the Sagunto desalination plant. The works include the following initiatives: pumps from the existing deposit in the desalination plant and three impulsion pipes, a deposit with a 10,000-m3 holding capacity, and an associated pumping station with three impulsion pipes. Works began in July 2013. Lamination and improved drainage of the Gallinera river basin (Valencia and Alicante). Works underway. The work involves creating a set of measures to mitigate the effects of annual floods and allow drainage without flooding with a ten-year return period in the Gallinera watercourse. Structural projects include the construction of the Oliva dam in the Gallinera watercourse, partial channeling and conditioning of the Gallinera watercourse with improved drainage of the flood-prone area, and diverting flood water from the Alfadalí canyon to the Gallinera watercourse by means of a new channel for transferring through the Alfadalí canyon as it passes through Oliva. Currently, the planned projects in the channels are near completion; the phase for excavation of the Oliva dam is underway. By December 31, 2013, 51% of the works were completed. Infrastructures for flood prevention in the middle basin of the Serpis river. Works underway. The proposed works aim to increase the level of protection against floods in the middle basin of the Serpis river. For this aim, the following initiatives have been considered: the Terrateig dam, defense against erosion at Llocnou de Sant Jeroni, defense against flooding at Rótova, a new bridge at Rótova, defense against erosion at Rótova, walkway demolition and defense against erosion in Beniarjo, and diversion at Piles-Serpis. Works near completion. Defense and environmental modification of the middle basin of the Serpis river. Confirmed and accepted. The purpose of the initiative is to carry out works for the defense and environmental modification associated with flood control projects in the middle basin of the Serpis river (Valencia). These works are located in the town of Gandía. The initiatives include defense works against floods, overall cleaning of the project area, treatment of existing vegetation, a low water channel, a pedestrian walkway, and environmental modification of Las Ambrosías park. Flood prevention works in the Benimodo ravine (Valencia). Confirmed and accepted. The aim of the project is to prevent floods in the Benimodo ravine. The total length of the works, conditioning, and regeneration of the channel is nearly seven kilometers. Two sections have been planned for the works: a mixed breakwater, geocell and earth section, and a concrete section. As complementary works, the construction of six structures on the channel has been planned to allow the repositioning of the existing roads and a service road along the 7-m wide channel. Hydrographic District of the Ebro River Conditioning of irrigation channels to deliver surplus to the two bays (Tarragona). Completed. The works include different projects in the channels of the Ebro delta, new infrastructures, and conditioning of existing infrastructures, all with the aim of creating a system that allows a fresh water supply from different irrigation infrastructures (channels and water drainage) directly to the coastal lagoons and bays, thereby improving quality and the ecosystem. Construction of coastal protection and settling wetlands (Tarragona). Completed. The works include the construction of two surface flow wetlands in which a series of chemical, physical, and biotic processes improves the quality of water from the agricultural fields before it drains into the bays. Dredging of canals and providers that link the coastal lagoons with the bays (Tarragona). Completed (confirmed and approved). The aim of these works is to increase the useful volume of the providers by dredging them, and facilitating water renewal between the lagoons and bays. The works consist of dredging six providers: five in the south hemi-delta and one in north hemi-delta, with a total volume of 163,785 m3. Once the works are carried out, geomorphological and soil restoration will be take place. New pumping station in the area of El Castillo. Town of Amposta. Awarded. The aim of the works is to construct a pumping station to transfer water at a rate of 4 m³/s from the Ebro river to the irrigation channel of the General Irrigation Community of the right-hand side of the Ebro. This project provides new hydraulic infrastructures to guarantee supply to the General Irrigation Community and continuously contribute to the renewal of water from Alfacs bay and L’Encanyissada and Tancada lagoons. Program to implement a network of environmental indicators at the Ebro delta. Completed. The aim of the initiative is to determine the degree, size, and frequency of existing problems in the Ebro delta, in addition to the state of conservation of the ecosystems, by implementing a network of environmental indicators. With these infrastructures, it will be possible to obtain a precise understanding of the situation in order to take the appropriate measures to reduce the existing problems. Elimination of chemical contamination from the Flix reservoir. Works underway. The Flix reservoir contains some 800,000 m3 of sludge discharged by the chemical industrial activity, the site of which is on the right bank, originating in the early 20th century. The works include extraction, 80 Annual Report 2013 04. Acuamed Wealth Generation: Works Status processing, and transport of sediments to a controlled deposit. The initiative also includes emergency works for supply to the Water Consortium of Tarragona and for the town of Tortosa. By December 31, 2013, 57% of the works were completed. Land restoration plan corresponding to works for the “Elimination of Chemical Pollution from the Flix Reservoir”. Finalized, in operation, and awarded The project includes 44 works in a collaboration agreement among the Ministry of Environment, Rural, and Marine Affairs, the Council of Environment and Housing of the Generalitat de Catalunya, and the Catalan Water Agency to fund, program, and implement the initiatives needed to ensure water supply to the towns included in the land restoration plan within the project, with the purpose of eliminating chemical pollution in the Flix reservoir. In 2013 four works were completed, and there are now a total of 10 completed works. Three works are currently underway, and in the last quarter two other works have been bid on. Comprehensive restoration of the riverbank forest in the section between Tortosa and the river mouth (Tarragona). Completed (confirmed and approved). The aim of the work is to establish a continuous strip of riverbank forest on the right bank of the Ebro river. The initiative involves the elimination of existing elements in the project area as well as those incompatible with the purpose of the works, restoration of the riverbank forest, a network of paths, and various walkways with different lights. Complete restoration of the riverside forest in the different chosen areas upstream from Tortosa on river islands and the riverbank (Tarragona). Completed (confirmed and approved). The aim of works is to carry out the necessary initiatives to restore natural values and minimize the current impact on the following areas: Aubadera and the riverbank facing Subarrecs island (town of Mora d´Ebre), the riverbank forest of Les Illetes and that facing Miravet island (town of Miravet), downstream and upstream from the Xerta pier (town of Xerta), the river beach of Aldover (town of Aldover), the riverbank from the Tivenys pier to the beach of the weir (town of Tivenys), Audí island and the facing shore, Xiquina beach, and the Jesús riverbank (town of Tortosa). Restoration of different wetlands in the flood plain (Tarragona). Completed (confirmed and approved). The aim of these works is to carry out the necessary initiatives to restore the natural values and minimize the current impact on the Marjal de Campredó wetlands on the left bank of the Ebro and Los Ullals de la Carrova on the right bank. The planned initiatives include restoring the degraded slopes, 81 control of native vegetation, restoration of riverbank vegetation, the creation of a tourist itinerary and building informative platforms, wooden stairs, waste bins, benches, directional signs, informational signs, and parking lots. Construction of fish ladders in the Xerta weir (Tarragona). Completed (confirmed and approved). The works include the construction of a new fish ladder located on the ramp next to the old mill. The works are outlined in four sections: preliminary works, construction of groins and underpinning of the weir, construction of the ladder, and finishing works. Xerta: Interpretative centers of the Ebro river and environmental integration of leisure areas on the bank of the river (Tarragona). Completed (confirmed and approved). The aim of the project is to create an interpretative center, by rehabilitating and repurposing the former railway station, featuring various topics related to the Ebro river in the town of Xerta. Works also include improvement of the surrounding area and the design of interpretive content related to the different systems of irrigation, water use, and water exploitation. Included are an exhibition, an audiovisual presentation on DVD, a model of the geographical area of Xerta, a series of experiments on the effects of hydroelectric power, a visitor’s guide, and teaching material. Mora d´Ebre: Interpretative centers on the Ebro river and environmental integration of leisure areas on the bank of the river (Tarragona). The aim of the works is to create an interpretative center using a pre-existing building, the ground floor of a municipal property. The center will present various topics related to the Ebro river in the municipality of Mora d’Ebre. The following are needed for the interpretive center: an auditorium with a capacity for 102 people, with a screen for audiovisual projection, an exhibition room, a small storage room, and public toilets. Aldover: Interpretative centers of the Ebro river and environmental integration of leisure areas on the bank of the river (Tarragona). Completed (confirmed and approved). The aim of the project is to create a completely new interpretation center presenting various topics related to the Ebro river in the municipality of Aldover. It also includes the design of interpretive content related to the ecosystem of the riverbank forest (an exhibition, audiovisual presentation on DVD, a diorama of the riverbank forest, a geographical model of the Aldover area, a series of experiments on the effects of erosion and 82 river transport, a visitor’s guide, and training material) as well as modification of the surrounding area. Tivenys: Interpretative centers of the Ebro river and environmental integration of leisure areas on the bank of the river (Tarragona). Completed (confirmed and approved). The aim of the project is to create an interpretative center, by adapting and extending one level of the exhibition center building, that will present various topics related to the Ebro river in the municipality of Tivenys. In addition, the works include the design of interpretive content related to the ecosystem of the riverbank forest, including an exhibition, an audiovisual presentation on DVD, a series of aquariums, a model of the geographical area of Tivenys, an exhibition on fishing equipment, a visitor’s guide, and teaching material. Extension of the outlet collectors of the Alguaire WWTP. Completed (confirmed and approved). The aim of the project is to define the work required for the construction of an outlet connector for the WWTP in the town of Alguaire. This collector will discharge into the Reguer Gran channel, thereby eliminating the possibility of contaminating crops irrigated with water from Reguer de la Mitjana since waste water is always circulated in parallel with the channel without interfering with it. Overhead collectors and the WWTP in Horta de Sant Joan. Completed (confirmed and approved). The aim of the works is to provide the municipality of Horta de Sant Joan with a treatment system for the urban waste water it generates, thus avoiding the discharge of untreated water into the ravines. The planned works include a network of floor collectors, an impulsion section that connects the northeast pumping station with the network of existing collectors in the southwest area, a sand cleaner and degreaser using compact equipment, biological treatment by prolonged aeration, a sludge line, gravity thickener with a sixmeter interior diameter, and a centrifugal dehydrator. Ulldemolins WWTP. Works underway. The aim of these works is to implement a waste water treatment plant to treat the waste water produced by the municipality of Ulldemolins. The predicted stages of treatment will be pre-treatment, biological treatment, and sludge treatment. The works also include inlet and outlet collectors. WWTP and overhead collectors in Térmens and Menárguens. Works underway. The aim of the works is to build the Térmens and Menárguens WWTP as well as overhead collectors and a pumping station. Annual Report 2013 WWTP and overhead collectors at Sant Jaume D´Enveja. Works underway. The aim of the project is the construction of the WWTP at Sant Jaume D’Enveja and the overhead collectors that carry the water to it. WWTP at Bellver de la Cerdaña. Completed (confirmed and approved). The aim of the work is to build an overhead collector to carry sewage from the center of Pi to the Bellver WWTP in addition to the works required to connect to the sludge trap at the entrance of the plant. The work has been divided into the following areas: collector, civil work, connection to the sludge trap, manholes, and drop shafts. WWTP and overhead collectors at Alcoletge. Works underway. The works involve the construction of a network of collectors, a pumping station, and a WWTP in the center of Alcoletge in the province of Lleida. The treatment plant will have pre-treatment, two inner secondary decanters to the biological reactors, and sludge treatment. Internal Basins in Catalonia. Llosa del Cavall supply network. Calaf-Igualada section. Works underway. The aim of the works is to construct the hydraulic infrastructures necessary to bring drinking water to Igualada as well as to intermediate diversions. One of the diversions includes the section of network supply to Solsonés, Anoia, and Bagés. In addition to the supply pipeline, the project includes the extension of the drinking water station that uses water taken from the reservoir. The works are near completion but have been suspended, jointly with the section that supplies the regions of Solsonés, Anoia, and Bagés, until the drinking water station, which treats water taken from the Llosa del Cavall reservoir, is operational. By December 31, 2013, 91% of the works were completed. Supply from Llosa del Cavall. Section of Llosa de Cavall to Solsonès, Anoia, and Bagés. Works underway. The works include the necessary hydraulic infrastructures that correspond to the overhead supply to the regions of Solsonès, Anoia, and Bagés from the Llosa del Cavall reservoir. The project includes intake works in the reservoir of the Llosa of the Cavall, a pumping station, a drinking water treatment station, pipelines for the main and secondary branches, and the building of a breakage and distribution deposit. The works are underway and near completion. The drinking water treatment station that uses water taken from the Llosa del Cavall reservoir, which is currently operational, will become operational together with the Calaf-Igualada section. By December 31, 2013, 95% of the works were completed. 04. Acuamed Wealth Generation: Works Status 83 4.4 Projects Hydrographic Demarcation of the Andalusian Mediterranean Basins Hydrographic Demarcation at Segura Desalination and complementary works for El Campo de Dalías. Supply pipeline to Adra (Almería) This initiative guarantees that the water demand of the population of Adra and that of agricultural use in Vega de Adra will be met. It will improve water quality by promoting the development of agricultural activity in La Vega and thereby drive the economic and social engines of the municipality of Adra. The construction project and the corresponding study of environmental impact were publicized in June 2013, and the project is awaiting approval and the mandatory declaration of environmental impact. Land restoration in the district of San Roque and the marine front of Torrevieja associated with the construction of a desalination plant at Torrevieja. Access to Acequión beach. The initiative consists of building a promenade along Acequión beach, located inside the port of Torrevieja (Alicante), which will serve as a transitional area between the urban and beach areas. It includes urban remodeling of all the adjacent streets to this beach and building a pedestrian walkway to save the Acequión channel. It is currently in the phase of contracting services to draft the project. Drainage tunnel to the Sapo pond (Almería). On January 19, 2011 an agreement was signed between Acuamed and the Andalusian Water Agency to draft and finance a project corresponding to works on the drainage tunnel of the Sapo pond. The initiative is to define the infrastructure needed for the rapid and controlled drainage of the Sapo pond in order to prevent flooding of the riverbank populations, when there is flooding, while at the same time maintaining its current configuration of wetlands. After signing the agreement, Acuamed tendered a bid for the drafting of the aforementioned construction project. In 2013 the following works were carried out: analysis of existing information, drafting of a study of alternatives, analysis and development of the final solution adopted, and the start of environmental processing of the construction project. Alicante Land restoration in the San Roque district and the waterfront of Torrevieja associated with the construction of a desalination plant in Torrevieja: corresponding to the area from Náufragos beach to Mar Azul in the town of Torrevieja (Alicante). This initiative includes the continuation of the Acequion promenade towards the south, conserving the west dock. It involves treatment of the waterfront for approximately 2000 m consisting of remodeling of the seafront promenade, a wooden walkway supported on rocks in the sections where no space is available for the path, and a three-meter wide agglomerated resin ballast footpath in the remaining areas. This initiative is completed by placing streetlights in the promenade and at the end of the adjacent streets and footpath markers, as well as installing separation walls on the promenade. In 2013 drafting of the project was completed. Land restoration in the district of San Roque and the waterfront of Torrevieja associated with the construction of a desalination plant at Torrevieja. Alicante. Pedestrian walkway urbanization at the west dock. To carry out the intake and discharge pipeline works for the Torrevieja desalination plant, an extension of the west dock was made. This initiative includes the urbanization of this extension, consisting of a 12-meter wide pedestrian walkway paved with stones, and wood in areas with pergolas, railing on both sides, pergolas, electricity to supply lampposts, drinking water to supply fountains, benches, and waste bins. In this way, the extension of the dock is integrated into the urban area of the waterfront. The construction project was approved by the Ministry of Agriculture, Food, and the Environment on October 28, 2013. The work was bid on and is pending award. 84 Annual Report 2013 Land restoration in the San Roque district and the Torrevieja waterfront associated with the construction of a desalination plant at Torrevieja. Conditioning of the end of the west dock. This initiative involves the continuation of the urbanization of the west dock pedestrian walkway. It consists of extending this walkway to the end of the dock and building a platform with an unobstructed view of the sea. It is currently in the phase of contracting services to draft the project. Murcia Land restoration project associated with the construction of the new Águilas/Guadalentín desalination plant. PRT 1: Pedestrian walkway on the Cañarete Watercourse. The aim of this project, which is part of the land restoration project of the new Águilas/Guadalentín desalination plant, is the development of a pedestrian walkway near the mouth of the Cañarete watercourse. The selected structural typology is a lightweight wideflange beam. A structure with visual transparency is thus obtained. This allows the view of the sea and surroundings without overly emphasizing the structural form, which is instead integrated into the line of the sea horizon. The absence of intermediate supports allows the drainage characteristics of the watercourse to remain unaltered, and the minimal edge obtained because of the typology, the use of a suitable material, and the spaces that lighten the beams all permit the structure to be integrated naturally into the urban coastal site. In 2013 the construction project was drafted and at present it is awaiting administrative processing. Land restoration project associated with the construction of the new Águilas/Guadalentín desalination plant. PRT 2: Road conditioning This project, included in the land restoration project associated with construction of the new Águilas/ Guadalentín desalination plant, consists of the conditioning of two roads near the desalination works: El Camino de Los Melenchones, from the ring road RM-D24 to its intersection with the AP-7 freeway, and the access road to Collado de la Fuente del Pobre, which is to be conditioned and paved with asphalt. In 2013 the construction project of the works was drafted. At present the project is awaiting administrative processing. Pipeline project of the Águilas desalination plant for the irrigation community of Puerto Lumbreras (Murcia). This initiative is aimed at connecting the distribution network of the Águilas desalination plant with the 04. Acuamed Wealth Generation: Works Status irrigation network of the irrigation community of Puerto Lumbreras in order to correctly manage the new water resources from the desalination plant. A planned intake reservoir, in which water from Cerro Colorado flows in by gravity, sends water by impulsion to the future Beatas reservoir to be operated by the irrigation community. The initial project was approved in July 2013 by the Ministry. As requested by the irrigation community, some changes have been made, and consequently the new project was presented to the Ministry in October 2013 and is pending approval before proceeding to the bidding process of the works. Almería Distribution pipeline project for the irrigation community of Pulpí (Almería). The planned works aim to improve the integration and optimization of the resources of the new desalination plant in Águilas with the main distribution system of the Pulpí irrigation community. This system is made up of three community reservoirs that serve as headers for the distribution network: Benzal, Capellanías, and Gorreta. They play a role in storing water and providing enough pressure so that the water distribution is done by gravity, without the need for pumps. The following works are involved: • Section of connection pipeline between the entrance and exit of the Gorreta reservoirs. • Section of pipeline to reinforce the irrigation zone. Benzal-Capellanías branch. • New pipeline connecting the Negratín pipeline with the Benzal reservoir. • New Medrano reservoir, with a capacity of some 98,000 m3, connected as an offshoot with the aforementioned line. After finalizing the drafting of the project and the file for public consultation, a favorable environmental impact statement was obtained. At present, the project is on hold until the needs of the Pulpí irrigation community are determined. Supply to the coastal area of the municipality of Pulpí (Almería). The works included in the project involve for the most part a pipeline that allows water from the ÁguilasGuadalentín desalination plant to be carried to the new deposit in the coastal area of Pulpí, thus ensuring a drinking water supply to the area. This line, which originates in the supply tank of the second step of the impulsion to the Guadalentín Valley, will be positioned at a height of approximately 225, in El Cabezo del Agua, municipality of Águilas, province of Murcia. The end point of the line is a regulation reservoir of 20,000 m3 located in Pilar de Jaravía, in La Loma de los Grajos, at an elevation of 100. 85 Murcia Water allocation system for the irrigation community of Lorca from the pumping station and Los Elviras II reservoir (Murcia). The works include the construction of three new storage reservoirs and a connecting pipeline of welded DN1000 steel measuring 416 m in length, which will connect to the pipeline of the Puerto Lumbreras irrigation community that originates in the Cerro Colorado reservoir. It also includes the construction of a control center in Purias (Lorca) for the operation and control of the irrigation areas with the water supply provided by this project. The characteristics of the reservoirs are the following: -Los Elviras II reservoir: To regulate and store the volumes from the pipeline of the Puerto Lumbreras irrigation community while at the same time drive water to the other two reservoirs (Cabezo de los Trigos and Riscos Negros) by means of a pumping station built next to the reservoir. Usable volume: 51,433 m3. The pumping station consists of two pumps for each reservoir to be supplied. For Cabezo de los Trigos the pumps have been designed for a flow rate of 200+200 l/s and a manometric height of 55 m. For Riscos Negros the pumps provide a flow rate of 300+300 l/s and a manometric height of 100 m. The path from the pumping station to the reservoirs is constructed of C25 ductile cast iron pipes, one of DN700 measuring 2,249 m in length and the other of DN800 and 3,451 m in length. -Cabezo de los Trigos reservoir: Supplied by impulsion from Los Elviras II. Usable volume: 50,028.10 m3. -Riscos Negros reservoir: Supplied by impulsion from Los Elviras II. Usable volume: 65,143.50 m3. In 2013 the drafting of the project was completed. It was sent to the Ministry of Agriculture, Food, and the Environment on December 9, 2013 to begin administrative processing. Supply from Puentes to the Lorca irrigation community. The project consists for the most part of installing pipes in the Aguas Claras canal using a DN-1200 pipeline in the usable area. By using the energy created by the position of the Puentes reservoir, water can therefore travel to the Alfonso Botía reservoir for regulation, with sufficient height, and this allows it to 86 be distributed by gravity to the remaining irrigation zones. The works include: - Intake works in the Puentes reservoir -Installment of pipeline in the Aguas Claras canal: Total length of 8,248 m. A PRFV DN-1200 PN10-12.5-16 pipe (SN2500 nominal rigidity) with the necessary grafts for the installation of auxiliary elements such as vents, intakes, drainage, etc. will be installed in the canal. To fill the canal, a granular filling composed of smooth washed aggregate of 1224 mm will be used throughout the usable area. The surface will be covered with a 300 gr/m2 geo-textile sheet and a 30-cm artificial ballast layer, which will serve as an outer skin and cover the key above the pipe by at least 60 cm. - Sectioning, control, and entry to the Alfonso Botía reservoir -Widening of the pipeline for irrigation at Las Riberas dn-600: installing pipelines in the 2,129-m long channel using PEAD (PE-100) DN 600 PN-6 pipes. The filler to be used in the channel is the same described in the Aguas Claras project. In 2013 the drafting of the project was completed. It was sent to the Ministry of Agriculture, Food, and the Environment on December 27, 2013 to begin administrative processing. Hydrographic Demarcation of the Júcar River. Large-scale repairs to the Fenollar-Amadorio pipeline The Fenollar-Amadorio pipeline, which is 40 km long and 800 mm in diameter in most cases, was built by the Hydrographic Confederation of the Júcar river in 1999 to supply Marina Baja (Alicante) in situations of drought. Currently, it provides services to El Campello. It is made up of a reinforced concrete pipeline with steel metal sleeves measuring 800 mm. It works at high pressures and is heavily exposed to sulphates, and consequently experiences failures and breakage on a regular basis. In 2013 a study and diagnosis were made. Several alternatives were evaluated in order to guarantee water supply to users of the pipeline. Supply system from the Cenajo reservoir to the Taibilla Channels Association (Albacete y Murcia) This is the second phase of the general project to supply water from the Tajo-Segura transfer to the DWTP, the first phase of which was the Tálave-Cenajo tunnel. The aim of this initiative is to carry supply water via a pipeline from the Tajo-Segura transfer (130 hm3/ year) to the DWTPs, thus avoiding contamination and loss of volume along the Segura river. The project is divided into sections (9 in total), all of which were tendered and awarded with the exception of intake works at Cenajo. It consists of a trunk pipeline that transports water from Cenajo to the DWTPs near Murcia, a branch to supply the town of Moratalla, and another branch to Altiplano to supply Jumilla and Yecla. It totals 145 km of pipeline with diameters that vary between 2,300 and 800 mm, with a hydraulic tunnel of approximately 5,400 m long and 3.50 m in diameter, and a DWTP with the capacity to treat 4.15 m³/s. The construction projects are completed. Annual Report 2013 04. Acuamed Wealth Generation: Works Status 87 05 Annex: Annual accounts 2 0 1 3 5.1 External Audit Report 91 KMPG Auditors Edificio Torre Europa Paseo de la Castellana 95 28046 Madrid Audit Report of Annual Accounts To the sole shareholder of Aguas de las Cuencas Mediterráneas, S.A. We have audited the annual accounts of Cuencas Mediterráneas, S.A. (henceforth, the Company), which include the balance on December 31, 2013, the profit and loss account, the state of changes in net equity, the state of cash flow, and the report corresponding to the financial year ending on the aforementioned date. The administrators are responsible for calculating the annual accounts of the Company in accordance with the regulatory framework of the financial information applicable to the entity (identified in Note 2 of the attached report) and, in particular, the accounting principles and criteria contained in it. Our responsibility is to express an opinion on the abovementioned annual accounts as a whole, based on the work that has been carried out. Apart from the exception mentioned in the second paragraph, the work has been carried out in agreement with the regulations of the activity of account auditing in Spain, which requires the examination, by selective testing, of the justifying evidence of the annual accounts and the evaluation of whether the presentation, accounting principles and criteria used, and estimations made, are in agreement with the regulatory framework of financial information resulting from application. As indicated in Notes 4 (d) and 7 of the attached report, the Company maintains active in the stock balance heading the costs incurred from certain initiatives, classified as without recovery in the Direct Management Agreement between the Company and the Ministry of Agriculture, Food, and the Environment, totaling €350,637,000.00 and €320,185,000.00 on December 31, 2013 and December 31, 2012, respectively. These assets are associated with capital grants that on December 31, 2013 and December 31, 2012 reached €11,031,000.00 and €86,459,000.00, respectively, net of the corresponding deferred taxes. As indicated in Note 4 (d) of the attached report, the Administrators of the Company consider that these initiatives will be delivered by the State’s Public Administration for the costs activated, minus the received grants and in addition to the corresponding indirect taxes, and that the amount thus determined can be paid by the AGE or even be used to reduce capital by the abovementioned amount. As of the date of publication of this report, we have not had access to the documentation on the conformity of the AGE to deliver these initiatives, which would allow us to determine if the amounts will be paid by the AGE or if they will be applied to a reduction of capital by the referred amount. Therefore, we have not been able to verify the correct classification and evaluation of these costs on December 31, 2013. Our audit report for the 2012 financial year contained a reservation on the matter. 92 In our opinion, with the exception of the adjustments that could have been considered necessary if we had been able to verify the correct classification and evaluation of the costs activated in the stock balance heading in relation to the initiatives classified as without recovery described in the second last paragraph, the annual accounts of the attached 2013 financial year express, in all significant aspects, a true and fair view of the equity and financial situation of Aguas de las Cuencas Mediterráneas, S.A. on December 31, 2013, as well as the results of its operations and cash flow corresponding to the financial year ending on this date, in accordance with the regulation framework of financial information that results from application and, in particular, the accounting principles and criteria contained in it. The attached management report for the 2013 financial year contains explanations that the Administrators consider appropriate regarding the situation of Aguas de las Cuencas Mediterráneas S.A., the evolution of their business activities, and other matters, and does not form an integral part of the annual accounts. We have verified that the accounting information contained in this report is consistent with that of the annual accounts of the 2013 financial year. Our work as auditors is limited to the verification of the management report within the scope described in this paragraph and does not include the revision of information that may differ from that obtained from the accounting records of the Company. KPGM Auditores S.L. Manuel Martín Barbón March 19, 2014 Practicing member KPMG AUDITORES S.L. Year 2014 nº 01/14/00997 PROFESSIONAL ASSOCIATION AMOUNT. 96.00 EUR 05. Annex: Annual Accounts 93 5.2 Balance on Closing the 2013 and 2012 Financial Years Balance at the close of financial years ending on December 31, 2013 and December 31, 2012 05. Annex: Annual Accounts 95 5.3 Profits and Losses Account 5.4 Statement of Changes in Equity Profits and Losses Account for the financial years ending on December 31, 2013 and December 31, 2012 96 Annual Report 2013 Statement of changes in net equity for the financial years ending on December 31, 2013 and December 31, 2012 05. Annex: Annual Accounts 97 5.5 Statement of Cash Flow 5.6 Report Statement of cash flow for the financial years ending on December 31, 2013 and December 31, 2012 Report completed on December 31, 2013 NOTE 1 Company Activity a) Historic Overview In an agreement signed on December 7, 2001, the Council of Ministers authorized the creation of a limited company, the state company Infraestructuras del Trasvase, S.A., which was incorporated on March 7, 2002 for an indefinite period. It was created under the provisions of Article 132.1 of the revised Water Act approved by Legislative Royal Decree 1/2001 of the 20th of July, which authorized the Council of Ministers to set up public corporations as determined by Article 2 of Law 47/2003 of the 26th of November for general budgets, the corporate purpose of which is the construction, exploitation, and operation of public hydraulic works as determined by the Council of Ministers. Royal Decree 2/2004 of the 18th of June modified Law 10/2001 of the 5th of July, the National Hydrological Plan, establishing the repeal of Article 13, among others, of the same law. This revocation greatly affected the state company Infraestructuras del Trasvase S.A., as its purpose, in accordance with its creation authorized by the Council of Ministers agreement of December 7, 2001, was to contract, construct, and exploit, in this case, all the works needed to transfer hydraulic resources authorized in this article, together with any complementary activities related to these transfers. By agreement dated June 25, 2004, the Council of Ministers approved a change of the corporate name to Aguas de las Cuencas Mediterráneas, S.A. (henceforth ACUAMED or the Company). An extraordinary general shareholders meeting of the Company held on the July 12, 2004 complied with this agreement. The Company headquarters are on Calle Albasanz 11 in Madrid, but it also carries out activities through branches in Tarragona, Valencia, Murcia, Almería, and Málaga. More information on the activities and organization of the Company can be found on www. acuamed.es. b) Corporate Purpose and Initiative Framework By means of the Council of Ministers agreement of July 22, 2005, a modification of the corporate purpose of the Company was approved. This new modification was adopted by the extraordinary general meeting of the Company on September 22, 2005, and recorded in a public deed on September 27, 2005. The corporate purpose of the Company, approved as a modification, is consistent with its main activity as outlined below. 98 Annual Report 2013 05. Annex: Annual Accounts 1. The purpose of the Company is to contract, construct, acquire, and exploit, where applicable, all types of hydraulic works and especially works of general interest which, in compliance with Law 11/2005 of the 22nd of June, which modified Law 10/2001 of the 5th of July, on the National Hydrological Plan, are carried out to replace those works previously planned for the transfer of water resources as authorized by Article 13 of the aforementioned Law 10/2001. 2. Managing contracts for studies, projects, construction, acquisition, or operation of the works cited in the first paragraph, as well as carrying out any related preparatory, complementary, or derivative works. 3. The corporate purpose may be realized directly or through participation in the capital of incorporated companies or companies that may be incorporated for any of the purposes mentioned in the previous sections. On June 25, 2004, through the cited Council of Ministers agreement, the Company’s guardianship was attributed to the Ministry of the Environment, pursuant to the provisions of Articles 169.d and 176 of Law 33/2003 of the 3rd of November for the Assets of Public Administrations. The Company’s framework of initiatives is governed by a Direct Management Agreement that aims to set up relationships between the government’s general administration, represented by the Ministry of the Environment, and the Company itself. Initially, and in accordance with Article 132.2 of the consolidated text of the Water Law, “Infraestructuras del Trasvase S.A.” formalized the appropriate agreement for direct management on May 20, 2002. Following the aforementioned partial repeal of the National Hydrological Plan and name change, Amendment 1 was signed in this agreement on November 30, 2004. On September 29, 2005, with prior authorization by the agreement of the Council of Ministers on July 29, 2005, Amendment 2 was signed in the direct management agreement. Amendment 2 of the direct management agreement has been subject to six addenda, approved by the Council of Ministers on October 26, 2007, October 24, 2008, December 26, 2008, September 11, 2009, December 16, 2011, and December 21, 2012, to gather the capital contribution commitments of the State’s Public Administration, in accordance with cited Article 132.2c of the consolidated text of the Water Act, as well as to amend the addition of Company initiatives. On this basis, the Company has presented 99 to the Council of Ministers a priority report of initiatives based on the following: a. Necessity and urgency of the works b. Economic return c. Financial soundness and interest of the users d. The capacity of the initiatives to absorb EU funds within the established deadlines This priority report was approved by the Council of Ministers on December 13, 2013. In accordance with the second clause of the direct management agreement in force, the initiatives entrusted to the Company are divided into: a) Initiatives with recovery. “These are Initiatives with partial or total recovery of the investment through fees paid by the users during the commercial exploitation period.” b)Initiatives without recovery. “These are Initiatives without commercial exploitation.” In accordance with the fourth clause “prior to the awarding of contracts to carry out public hydraulic works, Acuamed should formalize a specific agreement with the users or beneficiaries, whether private or public, who are interested in the initiatives through a specific agreement.” This agreement should contain the following at the very least: a)The description of the initiative to be carried out, with reference to the project and the estimated budget for all the items. b)The parties interested in the construction or exploitation of the work. c)The determination of the financial outline of the initiative, specifying the sources of financing and the corresponding guarantees that must be agreed on. d)The rights of the parties to the information on the realization of the project and the right to be heard in relation to critical incidents affecting the works, with a suitable organization being set up whereby the parties are properly represented for the purposes of exercising these rights. c) Group of Companies An extraordinary general meeting of the sole shareholder, the State’s Public Administration, was held on March 2, 2006. Through an agreement, an increase of social capital with an issue premium by the contribution of shares was adopted to comply with the Council of Ministers agreement of the 28th of October, 2005, in which point II of the Council of Ministers agreement of July 22, 2005 was redrafted. The agreement authorized the incorporation of the entire representative shares of the social capital to the state company Aguas de la Cuenca del Sur, S.A. (ACUSUR) in favor of the state company “Aguas de las Cuencas Mediterráneas, S.A.” in accordance with Article 168 of Law 33/2003 of the 3rd of November on the assets of public administrations. Complying with the agreement made by the sole shareholder, this aforementioned increase, dated March 6, 2006, was registered in the Mercantile Register on March 22, 2006. In accordance with Article 169 section f of Law 33/2003 of the 3rd of November on the assets of 100 public administrations, the Council of Ministers approved the merger between the company Aguas de las Cuencas Mediterráneas, S.A. as the merging company and Aguas de la Cuenca del Sur, S.A.U. as the merged company on June 23, 2006. This process culminated with the registration of the relevant merger deed at the Mercantile Register of Málaga on October 16, 2006 and at the Mercantile Register of Madrid on October 19, 2006, resulting in the company “Aguas de la Cuenca del Sur, S.A.U.” losing its legal personality and the block transfer of all its assets to the company Aguas de las Cuencas Mediterráneas, S.A. For accounting purposes, the date from which the operations of the company ceased and were considered to be carried out by the merging company is January 1, 2006. This merger did not entail amendment of the corporate purpose of the company Aguas de las Cuencas Mediterráneas, S.A. because the initiatives entrusted to the new company as a result of the merger between the merging company and the merged company remain covered within the corporate purpose previously described. On January 15, 2007, an extraordinary general meeting of the sole shareholder, the State Public Administration, was held. By means of an agreement, an increase of share capital with issue premium was adopted, involving the contribution of shares to comply with the agreement of the Council of Ministers of December 29, 2006, which authorized the incorporation of all representative shares of the stock capital of the State companies Aguas del Júcar, S.A. (ACUAJUCAR) and Aguas de la Cuenca del Segura, S.A. (ACUSEGURA) into the state company Aguas de las Cuencas Mediterráneas, S.A. in accordance with Article 168 of Law 33/2003 of the 3rd of November on the assets of public administrations. Complying with the agreement made by the sole shareholder, this aforementioned increase, dated January 23, 2007, was registered in the Mercantile Register on February 9, 2007. In accordance with Article 169 section f of Law 33/2003 of the 3rd of November on assets of public administrations, the Council of Ministers approved on April 30, 2010 the “Agreement to Rationalize the Public Business Sector” and the merger process from the merger between the companies Aguas de las Cuencas Mediterráneas, S.A. as the merging company and Aguas de la Cuenca del Sur, S.A.U. and Aguas del Júcar, S.A. as the merged companies. This process culminated with the registration of the corresponding merger deed at the Mercantile Register of Madrid on December 27, 2010, although the effective date was carried back to December 1, the initial filing date. In addition, the corresponding notes were made in the Mercantile Registers of Murcia and Valencia on December 20 and 21, 2010, respectively. The merger resulted in the loss of the legal personalities of the companies Aguas de la Cuenca del Segura, S.A. and Aguas del Júcar, S.A. and the block transfer of all its assets to the company Aguas de las Cuencas Mediterráneas, S.A. For accounting purposes, the date Annual Report 2013 from which the operations of the company ceased and were considered to be carried out by the merging company is January 1, 2010. This merger did not entail any amendment to the corporate purpose of the company Aguas de las Cuencas Mediterráneas, S.A because the initiatives entrusted to the new company as a result of the merger between the merging company and the merged company remain covered within the corporate purpose previously described. 05. Annex: Annual Accounts 101 NOTE 2 Basis of the Presentation for the Annual Accounts a) Fair View The financial statements for the 2013 financial year have been prepared in accordance with current trade legislation, the regulations set out in the General Accounting Plan, and Order EHA/733 of March 25, 2010 with the aim of showing a true and fair view of the equity and the financial situation on December 31, 2013 together with its operation earnings, changes in net equity, and cash flows for the financial year ending on the abovementioned date. All figures are expressed in Euros (€), unless otherwise indicated. The annual accounts for the 2013 financial year were drawn up by the Company’s Directors in order to submit them for approval at the General Shareholders Meeting, and it is estimated that they will be approved with no modifications. b) Critical Issues Relating to the Measurement and Estimation of Uncertainty b.1) Measurement of the Hydraulic Works. Tangible Fixed Assets and Stock As outlined in Note 1, the Company carries out its activity as part of a Direct Management Agreement with the State’s Public Administration. In addition to trade legislation, other regulations should be applied to the Company, such as Article 132 of the consolidated text on the Water Act, as well as Law 33/2003 of the 3rd of November on assets of public administrations, especially Title VI (Articles 166 to 182). In this context, the Company’s assets, initiatives with or without recovery classified under the headings of tangible fixed assets and stock, respectively, are those related to the public sector, which are economically controlled by the Company. Thus, they meet the necessary conditions for classification as assets, without losing their status as assets of public and general interest pertaining to the provision of an essential public service, namely the supply and distribution of water. The pricing frameworks set up by the Company in specific agreements with users, for initiatives with cost recovery and classified under the heading “tangible fixed assets” in the attached balance sheet as indicated in Note 1 above, include an economic and financial scenario to recover the investment in accordance with the framework set up by the State’s Public Administration, taking into account economic, social, and environmental consequences as well as the geographic and climate conditions in each territory while at the same time distinguishing them from different uses of supply, whether agricultural or industrial. Furthermore, the above agreements are made over very lengthy periods of time, usually between 25 and 50 years. The initiatives or hydraulic works that are “without recovery of the costs” and classified under the heading “stock” in the attached balance sheet will, on completion, be subject to handover to the State’s Public 102 Administration for exploitation or subsequent transfer to another regional or local Public Administration. The aforementioned handover took effect through a corresponding handover and acceptance certificate from the Ministry of Agriculture, Food and the Environment. In it there is an acknowledgement of debt by the State’s Public Administration, including all capitalized costs minus the subsidies received and including applicable value added tax. The amount thus determined can then be paid by the State’s Public Administration or constitute a reduction of capital of the aforementioned amount, depending on the decision of the State’s Public Administration. On March 26, 2010 Order EHA/733/2010 was published in the BOE (Official Bulletin of the State), approving the accounting issues of public companies that operate under certain circumstances. The adopted regulations are aimed firstly to regulate the impairment of tangible fixed assets in public companies in operation that are conditioned by circumstances that prevent them from generating cash flows. To this end, the requirements to be met by a public company to apply the criteria of impairment of assets that do not generate cash flows are particularly important. Compliance of these requirements shows that through the use of non-cash generating assets, these companies in operation are not oriented toward benefits or generating economic or commercial output, but rather they seek socioeconomic flows that benefit the community through “service potential” or public utility, generally, that are associated with tangible fixed assets. To develop their activities, they must deliver goods or provide services to other entities or users without compensation, or in exchange for a fee or a price that is fixed, whether directly or indirectly, by the Public Administration as a result of the strategic quality or public utility of the activities that they carry out. The activity that the Company carries out is perfectly defined in the previous paragraph. To determine impairment, in line with International Accounting Standard for the Public Sector No. 21, Impairment of Non-cash-Generating Assets, the replacement cost that would be incurred to provide this service is taken as a reference when determining the value in use, considering the depreciation the asset would have at the time this calculation was made. The rule states that at least at year end the public company must assess whether there is any indication of impairment of any item of the tangible or intangible fixed assets or property investment, in which case the recoverable amount would have to be estimated. In assessing whether there is any indication that an asset may be impaired, the company should consider, among others, the following circumstances: 1. Significant changes in the technological, regulatory, or legal environment in which the entity operates that may have occurred during the financial year or changes that are expected to occur in the short term and have a negative impact on the entity. The actions carried out by the Company are not susceptible to Annual Report 2013 being affected by these types of changes. 2. Significant reduction in the market value of the asset, if it exists or is available, and higher than that expected market value of the asset over time or normal use. As desalinated water is a Public Hydraulic Domain, this water has no market value, and therefore this section of the ministerial order need not be applied. 3. Evidence of obsolescence or physical damage of an asset. The Company carries out the necessary works, using its own resources or by contracting third parties, to ensure that no obsolescence or physical damage to its assets is produced. 4. Significant changes in the way or the extent to which the asset is used during the past financial year, or those expected in the short term that have a negative impact on the entity. In 2013 and 2012 no changes as described above occurred, nor are they expected in the short term. 5. Stopping construction of the asset before it is commissioned to start working. This case is not considered. 6. Cessation or significant reduction in demand or need for services provided by the asset. However, a mere downward fluctuation in demand should not necessarily be an indication that an impairment of the assets has occurred because demand or need for these services may fluctuate over time. Being declared general interest initiatives, they are not at risk for cessation, reduction in demand, or need for services rendered. b.2) Financial Risk The activities of the Company are vulnerable to various financial risks: market risk, credit risk, liquidity risk, and interest rate risk in the cash flows. The minimization of such risks is derived from the following control and management measures: • Market risk. The initiatives assigned to the Company are of general interest and affect the water supply service. The Company does not operate in open markets, but rather through specific agreements with the users interested in the infrastructures. Therefore, any competition that might be encountered in the market for high capacity or raw water would be with other entities of the Ministry of the Environment or other Public Administrations and would have no impact on relations established with the users. Generally, the provision is based on rights of use granted by the competent body in charge of water. • Liquidity risk associated with the construction of hydraulic works. The task of management contained in the Direct Management Agreement involves the implicit authorization of debt by the user, and subsequently, before finalization, it must be authorized or not opposed by the Directorate General for State Assets. A previously signed, specific agreement for the development of the initiatives with cost recovery includes, among other aspects, the budget, the 05. Annex: Annual Accounts sources of financing, and the guarantees that the users must make. Therefore, even when the complexity and the construction period of the investments of the Company may present future uncertainties, they are mitigated by the fact that they are initiatives, almost always declared to be of general interest, that are authorized by a Council of Ministers Agreement. The approval of projects and changes to them are subject to administrative supervision by the Ministry in charge, which has the obligation, among other types of control, to justify the financial adequacy of any project or project modification. At the same time, when dealing with discrepancies in the treasury caused by the collection of European grants, the company should transiently rely on its own funds or alternatively use borrowed funds guaranteed by the grants requested. • Liquidity risk associated with the exploitation of works. The specific agreements with the users include both the determination of the tariffs to be passed on as well as the guarantees for their compliance. However, the tariffs issued by the Company do not have the status of public price because they are not governed by the Water Act and the Regulations of the Public Hydraulic Domain. Therefore, recovery and management fall under either civil or administrative common law depending on the legal nature of the specific agreement and whether the user is public or private. • Interest rate risk in cash flows. In all agreements in which the formalization of debt is expected in the capital market, the full impact of the financial costs and amortization charges of these operations is established in the tariffs. When external financing of the initiatives has been recovered, recovery of Company’s own funds can begin, a process that is always deferred until the previously described requirement is fulfilled. The latter part of the investment is recovered, usually updated according to the general price index. Given the public origin of such funds and their destination to works of general interest, no financial recovery assumptions based on market interest rates are made. • Commercial credit risk. The Company does not have significant concentrations of credit risk. The Company has policies to ensure that sales are made to customers with a proper credit history. Derivative transactions and cash transactions are only carried out with financial institutions with high credit ratings. The Company has policies to limit the amount of risk with any financial institution. The valuation adjustments for customer bad debt, the review of individual balances based on the creditworthiness of customers, current market trends, and historical analysis of insolvencies at aggregate level are subject to higher judgment. In relation to the valuation adjustment derived from the aggregate analysis of historical experience of bad 103 debts, a reduction in the volume of balances implies a reduction of valuation adjustments, and vice versa. The Company’s directors, as managers assigned by the State’s Public Administration, should assess and minimize the impact that these risks produce by fully complying with the Direct Management Agreement, and it is their responsibility to communicate the measures agreed upon to address those risks to both the ministry in charge and the shareholder. This holding company must be used for planning the water policy of the State’s Public Administration, which also has the powers of verification and control from both the Ministry of Agriculture, Food, and the Environment and the Ministry of Economy and Finance through instruction governing the relations of the Directorate General for State Assets with this state company, guaranteeing control and intervention a priori during the development of the activity of these risks and their management, as well as a review a posteriori of the effectiveness and efficiency of compliance in the construction, financing, and exploitation, if any, of the hydraulic works agreed upon. At the same time, both the Law for Assets of the Public Administration and the Water Act require that the Company’s initiatives are governed by a multi-year initiative program (included in the Direct Management Agreement) approved by the Council of Ministers. The General Budget Act provides for the incorporation of capital and operating budgets (Article 64) into the General State Budgets, as well as the obligation to formulate a multi-year initiative program (Article 65). Additionally, the Company is subject to supervision and subsequent review by the IGAE (General Intervention of State Administration) and the Court of Accounts, as well as constant reviews by the authorities and bodies responsible for the management of funds from the European Union. b.3) Application of Order EHA/3362/2010 of the 23rd of December Order EHA/3362/2010 of the 23rd of December from the Ministry of Economy and Finance approves the adaptation regulations of the General Accounting Plan for concessionaire companies of public infrastructures. In Article 2 on the scope of application, point 1 indicates that these rules apply to concessionaire companies that formalize concession agreements with a grantor entity. It is therefore clear that Acuamed is not a concessionaire company insofar as it has not formalized any concession agreement, but instead carries out activities based on the role of management granted by the ministry in charge (currently the Ministry of Agriculture, Food, and the Environment). This is specified in the Direct Management Agreement signed with this Ministry. As it is not governed by a concession agreement, it does not meet the essential requirements established by the Adaptation Regulations of the General Accounting Plan with regard to the aspects that should be present in all concession agreements as follows: 104 • The grantor entity entrusts a concessionaire company with the construction (including improvement) and exploitation, or exploitation alone, of infrastructures that are intended for public services of an economic nature during the period of time stipulated in the agreement, obtaining in turn the right to receive remuneration (NRV 1 PCA Concession Agreements). • The grantor entity controls or regulates the public services the concessionaire company should provide with the infrastructure, to whom it must provide them, and at what price. • In any case, the Public Administration controls the existence of the infrastructure. The Direct Management Agreement that governs the Company’s activity does not comply with the requirements stated here; therefore, Order EHA/3362/2010 of the 23rd of December is not applicable to this Company. c) Accounting Principles and Accounting and Measurement Regulations NOTE 3 Application of Results The Company has obtained profits in the financial year ending on December 31, 2013. The Directors will request approval from the Sole Shareholder to apply the result toward the compensation of losses from previous financial years. Distribution base: Financial year profit ..........................3.374.568,61 € Application: Amount to compensate losses from previous financial years ..........2.856.593,98 € Legal reserve ......................................... 337.456,86 € Voluntary reserve ................................. 180.517,77 € The distribution of profits for the financial year ending on December 31, 2012 is shown in the State of Changes in Net Equity statement. In order to prepare the attached annual financial statements, generally accepted accounting principles have been followed. No obligatory accounting principle that has a significant effect on financial statements has been left out in the preparation of the attached accounts. In the preparation of the attached annual accounts, the Company applied the General Accounting Plan set out in Royal Decree 1514/2007 of the 16th of November and Order EHA/733/2010 of the 25th of March, which approve the accounting aspects of public companies operating under specific circumstances. d) Comparison of Information In accordance with commercial legislation, each of the balance sheet items, the profit and loss account statement, the statement of changes to net equity, the cash flow statement, and the report statement, along with the figures for the 2013 financial year, should all be presented together with the corresponding figures from the previous financial year. Annual Report 2013 05. Annex: Annual Accounts 105 NOTE 4 Registration and Measurement Regulations The main registration and measurement regulations used by the Company to prepare its Annual Accounts for the 2013 financial year, in accordance with those established by the General Accounting Plan, are outlined below. a) Intangible Assets Intangible assets, which include the brands and industrial property records, acquired computer applications, and rights of use for initiatives handed over for exploitation, are measured by acquisition cost. The net amount for the corresponding accumulated amortization is presented along with the valuation adjustments for impairment, if applicable. In the particular case of right-to-use concessions, the entry records the rights of use that correspond to the 25-year use of two operations granted by the Hydrographic Confederation of Júcar. These operations are registered at their fair value. Intangible assets are amortized under the heading Allocations for the Depreciation of Fixed Assets. These assets are reduced during the same period with a credit in the heading Assignment of Grants of Non-financial Assets and Sundries. Each intangible fixed asset is examined to decide whether its useful life is finite or indefinite. The Company amortizes its intangible assets with finite useful lifes using the linear method, distributing the cost of the assets over the estimated period of utility as outlined below. Concept Years of operating life Trademarks and Registered Industrial Property 3 Software 4 Concessions in use 25 The amortization period is the period of concession of use (25 years) or the useful life of each of the elements that are integrated into the transferred operations, depending on which is shorter. The amortized amount in the 2013 and 2012 financial years reached €1,621,247 and €1,630,521, respectively (see Note 5). The Company did not carry out impairment tests of the items included in this heading because they are not considered to present problems in recovering their value, as outlined in Note 2.b.1. b) Tangible Assets Under this heading are the non-current assets of substance, mainly consisting of the initiatives with cost recovery undertaken by the Company in 106 implementing its Direct Management Agreement (see Note 1), not only for initiatives in exploitation but also in construction or in progress. Property and equipment are stated at acquisition or production cost, with the corresponding depreciation and valuation adjustments for impairment, if applicable, being deducted. The works carried out by the company for its tangible assets are measured by their production cost. Internal costs, thus determined, include staff costs, depreciation, and operating expenses directly related to the technical work for the implementation and construction of the initiatives. They are assigned in agreement with an internal cost system based on the allocation of hours for each project. The amounts activated by this item for the tangible assets in progress were €1,928,578 and €1,860,663 on December 31, 2013 and December 31, 2012, respectively. Part of the production costs of the initiatives assigned to the Company include financial expenses, provided that such expenses have been accrued prior to the start of active operating conditions and issued by the supplier, or relate to loans or other borrowed funds aimed at financing the construction of the project. The Company amortizes its property, plant, and equipment-except for desalination complexesusing the linear method, distributing the cost of the assets over their estimated useful lifetimes as outlined below. Desalination complexes, which are part of the hydraulic works, are depreciated using a systematic method in accordance with the relevant agreements they pertain to. This method distributes the cost of the asset over its estimated useful lifetime according to the estimated production volume (m3) of the facilities each year. The amount of each year is based on actual consumption. The rest of the hydraulic infrastructures that the Company exploits are amortized based on the useful life of each of the homogeneous elements they are comprised of, as seen in the following table: Concept Buildings for the Company’s Own Use Hydraulic works Years of operating life 50 See next table Technical facilities and machinery Other facilities, equipment, and furniture 10 Data processing equipment 4 Means of transport 4 Otro inmovilizado 10 Annual Report 2013 The Company amortizes its property, plant, and equipment-except for desalination complexesusing the linear method, distributing the cost of the assets over their estimated useful lifetimes as outlined below. Desalination complexes, which are part of the hydraulic works, are depreciated using a systematic method in accordance with the relevant agreements they pertain to. This method distributes the cost of the asset over its estimated useful lifetime according to the estimated production volume (m3) of the facilities each year. The amount of each year is based on actual consumption. The rest of the hydraulic infrastructures that the Company exploits are amortized based on the useful life of each of the homogeneous elements they are comprised of, as seen in the following table: Concept Years of operating life Civil Works 50 Electromechanical equipment 25 Deposits and tanks 50 Distribution networks 50 Lifting, filtering, and purification equipment 25 Complementary, mechanical, and electrical facilities 25 EThese criteria, in the opinion of the Company, respond adequately to the consumption and depreciation of the assets, without signifying allocations for depreciation according to the level of profit, but rather according to the level of activity and the ability of the assets to generate income every financial year throughout their total useful life. The amounts amortized on December 31, 2013 and December 31, 2012 came to €23,457,953 and €18,908,462, respectively (See Note 6). At the close of each financial year, or when circumstances require it, the Company assesses whether there is any indication of impairment in the value of any element of the tangible fixed assets, intangible assets, or property investment, and if so the recoverable amount is estimated. As stated in Note 2 (critical aspects of the measurement and estimation of uncertainty), the tangible fixed assets relating to hydraulic infrastructure elements are considered to be items that do not generate cash flow. The Company records a loss through impairment of an asset that does not generate cash flow, or an operating unit or service if its accounting value exceeds the recoverable amount, on the date it is determined. 05. Annex: Annual Accounts The recoverable amount is understood to be the depreciated replacement cost. The Company considers that no indication of impairment exists in any of the elements of its property that require estimating a recoverable amount, and therefore the present annual accounts do not include any impairment calculation since it is understood to be not applicable, as outlined in Note 2.b.1. c)Financial Instruments This group includes the assets and liabilities generated under the normal course of operations with a fixed maturity date and fixed or determinable receivables and payments, thus corresponding to the categories “Loans and Receivable Items” and “Debits and Income Payable”. These assets and liabilities are initially measured at fair value, which, unless there is evidence to the contrary, is the price of the transaction, equal to the fair value of the consideration given or received plus any transaction costs that might be directly attributable to them. Notwithstanding the aforementioned, credits and debits through trade transactions with a maturity of no more than 1 year are measured at their nominal value, when the effect of not adjusting the cash flows is not significant. Subsequently, they are measured by their depreciated cost using the effective interest rate method. The Company’s policy is to assess whether there is any evidence to reveal the potential impairment of the value of non-financial assets subject to amortization or depreciation, in order to verify if the book value of these assets exceeds the recoverable value, which is understood to be the fair value less sales costs or the value in use, whichever is greater. Impairment losses are recorded in the profit and loss account. Once impairment loss or reversal is recognized, the depreciation for the following financial years is adjusted, taking into account the new book value. Accounting hedges are also included in this group of assets. The Company uses the following types of hedges, which are recorded as described below: Cash flow hedges, which hedge the exposure to the variation in cash flows that are attributed to a specific risk associated with recognized assets or liabilities or to a highly probable transaction, as long as they can affect the profit and loss account. The portion of the gain or loss of the hedging instrument that is determined to be an effective hedge is recognized temporarily in the net equity of its tax effect, and is charged to the profit and loss account in the same period in which the hedged item affects the result. d)Stock The Company’s Direct Management Agreement (see Note 1) includes a series of initiatives classified as “without cost recovery”. When these initiatives are completed they are handed over to the State’s Public Administration to be exploited 107 or subsequently transferred to another regional or local public administration. This handover takes effect through a corresponding handover and acceptance certificate from the Ministry of Agriculture, Food and the Environment. In it there is an acknowledgement of debt by the State’s Public Administration, including all capitalized costs minus the subsidies received and including applicable value added tax. The amount thus determined can then be paid by the State’s Public Administration or constitute a reduction of capital of the aforementioned amount, depending on the decision of the State’s Public Administration. In the 2013 financial year there were no transfers to the State’s Public Administration (AGE), but in the 2012 financial year completed initiatives valued at €11,153,192 were handed over to the AGE. The Company awaits a reduction of its share capital in the quantity of the deliveries made until now, equaling the sum of €29,471,674 (see Notes 8.a and 13.a), or the receipt of this amount. The same criteria are used as for the tangible fixed assets (see heading b) above) for measurement until delivery to the State’s Public Administration. The amount activated by work carried out for its assets in financial years 2013 and 2012 reached €475,898.38 and €600,264, respectively. e) Grants, Donations, and Bequests In accordance with the 18th Norma de Registro y Valoración (Accounting and Measurement Rule, henceforth NRV) of the General Accounting Plan, subsidies, donations, and bequests are recorded as revenue and recognized expenses in the net equity when they are officially granted, if applicable, comply with the conditions for the grant, and there is no reasonable doubt about their receipt. The only additional provision of Order EHA/733/2010 of the 25th of March points to the same criteria to qualify a grant as non-repayable, and states that for the sole purpose of recording it, to establish that the conditions for the concession have been complied with, the following criteria will be applied: a) Grants awarded to acquire an asset: if the conditions of the grant require the investment to be held for a determinate number of years, it is considered non-refundable if on the date the financial statements are drafted the investment has been made and there is no reasonable doubt that it will be maintained during the period specified in the terms of the concession. b) Grants awarded for the construction, improvement, renewal, or expansion of an asset: if the conditions of the grant require completion of the work and initiation of its operation, it is considered non-refundable if at the date the financial statements are drafted the initiative has been carried out, either wholly or partially. In the case of partial completion, the grant will 108 be considered non-refundable in proportion to the work undertaken, provided that there is no reasonable doubt that the construction of the asset or the implementation of improvement initiatives, renewal, or extension will be completed under the conditions set in the concession agreement. c) Grants awarded to finance specific expenses for multi-year implementation: if the conditions of the grant require completion of the action plan and justification that the subsidized activities have been carried out, the grant is considered non-refundable if on the date the annual accounts are drafted the initiative has been carried out, either wholly or partially. In the case of partial completion, the grant will be considered non-refundable in proportion to the amount expended, provided that there is no reasonable doubt that the initiative will be completed according to the terms set out in the conditions under which it was granted. Therefore, in accordance with the 18th NRV mentioned above and the conditions set out, the Company: i) Recognizes the subsidies according to the eligible costs certified to the intermediate controlling body (the Ministry of the Environment and Rural and Marine Affairs) and audited by its controlling and supervision bodies, regardless of the date the payment was made. Thus, the amounts recognized and audited in the 2013 and 2012 financial years were €76,200,883 and €89,856,291, respectively. ii) In cases in which the initiatives are in the construction phase, the grants are considered non-refundable if on closure of the annual accounts, the initiative has been totally or partially carried out. In the case of partial completion, the grant is considered nonrefundable in proportion to the amount of work undertaken. iii) Grants are recorded as income recognized directly in the net equity, whether included in initiatives that are considered tangible fixed assets or in initiatives that are carried out for subsequent handover to the State’s Public Administration as stocks, and are recorded in the profit and loss account as income on a systematic basis in proportion to the depreciation charge on the assets financed or, for a single time, at the moment in which the initiative is transferred to the State’s Public Administration. The amounts transferred to profits from initiatives in operation in 2013 and 2012 were €8,786,379 and €7,687,357, respectively (see Note 11). be assessed according to the tax rate expected at the time of reversal. This is based on the approved regulations, or those in force, and the way the liability is reasonably expected to be paid, and awaits publication on the year-end date of the financial year. f) Tax on Profits The corporate tax expense for the financial year is calculated based on the economic outcome before taxes, which is increased or decreased as appropriate by the permanent differences from taxable income and reduced by rebates and tax credits, excluding tax withholdings and prepayments. The tax effect of the temporary differences is included, where appropriate, in the corresponding items of anticipated or deferred taxes in the balance sheet. The 13th NRV, under the heading 2.3 on tax credits, states that according to the principle of prudence deferred tax assets will only be recognized if the company is likely to have taxable profits in the future that will allow these assets to be applied. The Company, pursuant to the provisions of Consultation No. 10 of the Official Bulletin of the Institute for Accounting and Auditing (BOICAC) No. 80/2009, considers that the realization of the asset depends on whether future earnings will exceed those corresponding to the reversal of taxable temporary differences. As there is no certainty that sufficient future earnings will be generated, allowing these tax assets to be maintained, and based on the regulations described in the 22nd NRV, the tax credits that could be generated are not recognized. h)Information on the Environment The Company does not incur costs related to the prevention, reduction, and repair of any possible environmental impact resulting from its normal activity. However, among the initiatives listed in its Direct Management Agreement, some are classified as “water quality improvement, flood prevention, and environmental improvement” works. The amounts invested in these initiatives reached €33,540,747 and €55,930,565 in the 2013 and 2012 financial years, respectively (see Note 21). They are recorded under the heading “Stocks”. The Company considers that there are no contingencies in environmental issues that need to be covered through the creation of a corresponding provision. By December 31, 2013 and December 31, 2012 no environment-related subsidies had been received. i)Leases Leases qualify as financial leases only when the conditions show that the risks and rewards associated with ownership of the asset in question are essentially transferred to the lessee. Other leases are classified as operating leases. The income and expenditures derived from operating lease agreements are charged to the profit and loss account in the year they occur. g)Income and Expenditures As a general rule, income and expenses are recognized on an accrual basis, i.e. according to the actual flow of goods and services they represent, regardless of when the resulting monetary or financial flow occurs. However, following the principle of prudence, the Company only records income gained up to the year-end date, whereas foreseeable contingencies and losses, including possible losses, are recorded as soon as they become known. In accordance with the 12th NRV of the General Accounting Plan, the recognition of the subsidy as income attributed to equity gives rise to the recognition of a deferred tax liability, which must Annual Report 2013 05. Annex: Annual Accounts 109 NOTE 5 Intangible Assets NOTE 6 Tangible Assets Activity under this heading in the attached balance sheet for the 2013 and 2012 financial years is outlined below. Activity under this heading in the attached balance sheet for the 2013 and 2012 financial years is outlined below. Land and buildings Land and natural assets Hydraulic works: 668.850 240.095.284 53.915.021 Marbella Desalination Plant 37.290.386 Dalías WWTP 13.053.184 TOTAL 16.674.000 15.151.654 3.665.017 3.333.784 3.333.784 26.171.677 26.171.677 6.753.984 6.753.984 127.368.270 813.794 128.182.064 80.269.130 7.163.507 87.432.637 3.317.572 2.349 Arroyo de La Miel WWTP 1.929.995 (135) 1.929.860 Carboneras Interconnection Phase I 57.081.720 (95.509) 56.986.211 Carboneras Interconnection Phase II 16.572.345 118.038 16.690.383 5.504.931 69.219 5.574.150 8.508.383 0 194.044.667 194.044.667 Distribution Network of the Águilas Desalination Plant 0 39.678.274 39.678.274 L'Eliana Denitrification Plant 0 16.320.724 16.320.724 Buildings and Structures Total Cost Accumulated amortization Hydraulic works: 0 3.319.921 Águilas Desalination Plant 11.119.793 0 0 11.119.793 881.389.388 0 254.036.620 1.135.426.008 31/12/12 Additions Transfers 31/12/13 0 (114.304.526) (91.243.499) (23.061.028) Negratín-Almanzora Transfer (27.120.121) (3.527.338) (30.647.459) Carboneras Complex (14.207.744) (4.872.971) (19.080.715) El Atabal Desalination Plant (11.872.466) (2.034.939) (13.907.405) Marbella Desalination Plant (7.785.069) (1.279.835) (9.064.904) Dalías WWTP (1.558.139) (1.184.186) (373.953) Mijas Manilva WWTP (395.529) (121.701) (517.230) Estepona Marbella WWTP (350.049) (116.683) (466.732) (11.048.584) (1.149.520) (12.198.104) Rabasa - Fenollar pipeline (3.177.667) (287.246) (3.464.913) Valdelentisco Desalination Plant (5.838.570) (1.865.747) (7.704.317) Distribution Network of the Valdelentisco Desalination Plant (4.978.418) (1.665.916) (6.644.334) Water Supply to Hellín (392.770) (157.108) (549.878) La Ventilla Sewage Tunnel (221.946) (73.982) (295.928) (57.285) (76.380) (133.665) Carboneras Interconnection Phase I (2.025.335) (2.025.335) (4.050.670) Carboneras Interconnection Phase II (587.760) (587.760) (1.175.520) El Atabal Sludge Treatment Plant 0 0 0 Águilas Desalination Plant 0 (1.641.929) (1.641.929) Distribution Network of the Águilas Desalination Plant 0 (753.602) (753.602) 0 (449.082) (1.366.145) (226.981) Total accumulated amortization (92.609.644) (23.288.009) 0 (115.897.652) Net total 788.779.744 (23.288.009) 254.036.620 1.019.528.356 Buildings and structures Annual Report 2013 3.665.017 La Ventilla Land Outlet Pipe L'Eliana Denitrification Plant 110 37.290.386 2.098.470 8.508.383 Arroyo de La Miel WWTP 38.021.000 53.915.021 Water supply to Hellín Supply to Albacete Turia Sagunto Pipeline 3.809.056 1.120.497.159 239.426.434 El Atabal Sludge Treatment Plant 21.347.000 (6.857.662) 260.894.282 El Atabal Desalination Plant Distribution Network Valdelentisco Desalination Plant Fenollar Amadorio Pipeline 0 0 Carboneras Complex Valdelentisco Desalination Plant Rights of use values / Appraisal 10.666.718 859.602.877 175.453.078 Rabasa - Fenollar pipeline Exploitation 31/12/13 12.034 Supply to Albacete The statement on intangible assets that were completely amortized by December 31 is outlined below. Transfers 175.441.044 Estepona Marbella WWTP The Company plans to amortize this right to use over the 25-year concession period or during the useful life of each of the elements that make up the exploitation, whichever is less. Additions Negratín-Almanzora transfers Mijas Manilva WWTP The heading “Development” covers the costs incurred in the design and development of a computerized system for centralized control and management of the Company’s holdings, which was in the development stage when these annual accounts were drawn up. The heading “Concessions of use” covers the value of the 25-year right to use of the pipeline to supply water to Marina Baja (Rabasa-Fenollar-Amadoiro) and the Turia-Sagunto pipeline, which was received from the Júcar Hydrographic Confederation in the 2000 financial year. The value recorded for this right to use is taken from an appraisal report by an independent, reputable expert. 31/12/12 05. Annex: Annual Accounts (449.082) 0 (1.593.126) 111 Buildings and structures 31/12/11 Additions 10.666.235 483 776.165.624 2.348.262 Negratín-Almanzora Transfer 175.436.688 4.356 175.441.044 Carboneras Complex 239.425.490 944 239.426.434 Hydraulic works: Technical facilities and other tangible assets Facilities, equipment, and furniture Data processing equipment Means of transport Total Cost Accumulated amortization Facilities, equipment, and furniture Data processing equipment Means of transport Total Cost Accumulated amortization Fixed assets underway and advance payments 31/12/12 Additions Transfers 31/12/13 1.732.710 36.340 1.769.050 613.728 70.310 684.038 87.755 0 87.755 2.434.193 106.650 0 2.540.843 31/12/12 Additions Transfers 31/12/13 1.732.710 36.340 1.769.050 613.728 70.310 684.038 87.755 0 2.434.193 106.650 0 2.540.843 87.755 31/12/12 Additions Transfers 31/12/13 31/12/12 Additions Transfers 31/12/13 1.516.074.756 120.359.105 254.036.620 1.382.397.241 Desalination plant for irrigation in Murcia 236.991.755 0 (233.722.941) 3.268.814 Desalination plant to ensure the irrigation of the Tajo-Segura transfer. 238.150.414 19.070.489 Hydraulic works underway Valdelentisco Desalination Plant Cenajo pipeline to water treatment plants Talave-Cenajo tunnel Distribution system for video surveillance network Distribution Network Valdelentisco Desalination Plant Distribution network for manual intake users 257.220.903 3.677 2.275.061 24.444 2.299.505 59.678.180 320.849 59.999.029 0 7.549.285 457.420 31/12/12 10.666.718 81.088.991 0 859.602.877 53.915.021 Marbella Desalination Plant 36.555.343 735.043 37.290.386 Dalías WWTP 12.957.479 95.705 13.053.184 Mijas Manilva WWTP 3.665.017 Estepona Marbella WWTP 2.917.084 Supply to Albacete Rabasa - Fenollar pipeline Valdelentisco Desalination Plant Distribution Network for the Valdelentisco Desalination Plant 53.915.021 3.665.017 416.700 3.333.784 26.171.677 26.171.677 6.753.984 6.753.984 126.298.536 1.069.734 127.368.270 80.243.350 25.780 80.269.130 Water Supply to Hellín 8.508.383 8.508.383 La Ventilla Sewage Tunnel 3.317.572 3.317.572 Arroyo de La Miel WWTP 0 1.929.995 1.929.995 Carboneras Interconnection Phase I 0 57.081.720 57.081.720 Carboneras Interconnection Phase II 0 16.572.345 16.572.345 El Atabal Sludge Treatment Plant 0 5.504.931 5.504.931 11.119.793 Buildings and structures 10.650.506 80.562 388.725 797.482.365 2.429.307 81.477.716 0 881.389.388 31/12/11 Adiciones Traspasos Bajas 31/12/12 (72.735.382) (18.508.117) 0 0 (91.243.499) Negratín-Almanzora Transfer (23.592.782) (3.527.339) (27.120.121) Carboneras Complex (10.732.514) (3.475.230) (14.207.744) Total Cost Hydraulic works: 0 El Atabal Desalination Plant (9.837.532) (2.034.934) (11.872.466) 8.006.705 Marbella Desalination Plant (6.505.235) (1.279.834) (7.785.069) Dalías WWTP (810.232) (373.954) (1.184.186) RAR Mijas Manilva (273.827) (121.702) (395.529) Estepona Marbella WWTP (233.366) (116.683) (350.049) Supply to Albacete (9.899.122) (1.149.462) (11.048.584) Rabasa - Fenollar pipeline (2.892.390) (285.277) (3.177.667) Valdelentisco Desalination Plant (4.262.254) (1.576.316) (5.838.570) Distribution Network for the Valdelentisco Desalination Plant (3.312.502) (1.665.916) (4.978.418) Water Supply to Hellín (235.662) (157.108) (392.770) (147.964) (73.982) (221.946) 236.732 236.732 0 0 High-voltage underground power lines at the Valdelentisco desalination plant 855.453 855.453 Photovoltaic panels at the Valdelentisco desalination plant 19.133 19.133 1.255 1.255 105.463 105.463 319.008.609 319.008.609 57.242.174 57.242.174 La Ventilla Sewage Tunnel (20.313.679) 674.129.789 Arroyo de La Miel WWTP 0 (57.285) (57.285) 0 47.833 Carboneras Interconnection Phase I 0 (2.025.335) (2.025.335) Carboneras Interconnection Phase II 0 (587.760) (587.760) El Atabal Sludge Treatment Plant 0 0 0 (1.056.436) (219.133) (90.576) Total accumulated amortization (73.791.818) (18.727.250) (90.576) 0 (92.609.644) Net total 723.690.547 (16.297.943) 81.387.140 0 788.779.744 Water Supply to Hellín Distribution network discharge pump E.A. Extension Pumping Distribution Network Júcar-Vinalopó pipeline Hydroelectric power station at Cortes Remaining works Advance payments for tangible assets 593.957.565 100.485.903 47.833 Total Cost 1.516.122.589 120.359.105 (254.036.620) 1.382.445.074 TOTAL TANGIBLE ASSETS 2.305.581.648 97.007.802 0 2.402.589.451 (Data n €) 112 Retirements El Atabal Desalination Plant Accumulated amortization 3.677 Transfers Annual Report 2013 Buildings and structures 05. Annex: Annual Accounts (1.366.145) 113 The Company tendered and awarded contracts that entail a firm commitment of investment in order to develop these initiatives. Greater detail of these contracts is found in Note 19, “Other Information”, which includes a summary of the commitments made, the amount paid as of December 31, 2013, as well as the amount pending. To recover the cost of the hydraulic works, the Company formalizes specific agreements with interested users that establish the full recovery of amounts financed in the capital markets together with the financial burdens carried, in addition to the recovery of amounts funded with the Company’s own resources, updated to the general price index, with no impact on rates for the amount financed with grants from the European Union (see Note 11). Without prejudice to the abovementioned analysis, the Company has elected to apply Order EHA 733/2010 to benefit from the special regulation on the impairment of assets that do not generate cash flows with respect to the commercial assets aimed at meeting the needs of general interest. The amounts corresponding to financial expenses capitalized as tangible fixed assets as of December 31, 2013 and December 31, 2012 are outlined below. The criteria used to determine the capitalized financial expenses consisted of identifying the instruments that finance the various initiatives with a date of construction beyond one year. The statement on tangible assets that were completely amortized by December 31 is outlined below. 114 Annual Report 2013 05. Annex: Annual Accounts 115 NOTE 7 Stock This heading of the attached balance sheet covers initiatives classified as “without cost recovery” in the Company’s Direct Management Agreement (see Notes 1 and 4). Activity under this heading in the attached balance sheet for the 2013 and 2012 financial years is outlined below. Stock 31/12/12 Additions Transfers Retirements 31/12/13 Products underway 298.809.889 30.439.839 (31.708.986) 0 297.540.742 Remaining works 199.069.863 6.909.259 0 0 205.979.122 Flood prevention in the Benimodo ravine 31.095.712 613.274 (31.708.986) Elimination of chemical contamination from the Flix reservoir Stage 1 (Tarragona) 68.644.314 22.917.306 Finished products 21.972.969 1.167.188 31.708.986 (596.720) 54.252.423 Finished stock 21.376.250 10.806 31.708.986 0 53.096.042 Regrowth of the channel on the right bank of the Tajo-Segura distribution channels 5.717.620 Archena environmental recovery 1.993.443 Mula river conditioning 2.470.025 0 91.561.620 5.717.620 0 10.806 Stock 31/12/11 Additions Transfers Retirements 31/12/12 Products underway 264.449.221 59.471.156 (15.658.630) (9.451.858) 298.809.889 Remaining works 0 (9.451.858) 199.069.864 172.442.620 36.079.102 Flood prevention in the Benimodo ravine 30.641.950 453.762 31.095.712 Elimination of chemical contamination from the Flix reservoir Stage 1 (Tarragona) 45.706.021 22.938.292 68.644.313 Archena environmental recovery 1.993.443 (1.993.443) Mula river conditioning 0 2.470.025 (2.470.025) 0 Canteras Cartagena watercourse conditioning 797.828 (797.828) 0 Segura river Archena conditioning 585.784 (585.784) 0 Lining of the San Jerónimo Caravaca watercourse 1.099.188 (1.099.188) 0 Benipila Cartagena watercourse 6.070.192 (6.070.192) 0 Azarbe Mayor environmental rehabilitation 2.642.170 1.993.443 Finished products 6.893.354 20.486 15.658.630 (2.642.170) (599.501) 21.972.969 0 2.480.831 Finished stock 5.716.456 1.164 15.658.630 0 21.376.250 Regrowth of the channel on the right bank of the Tajo-Segura distribution channels 5.716.456 1.164 Canteras Cartagena watercourse conditioning 797.828 0 797.828 Segura Archena river conditioning 585.784 0 585.784 Lining the San Jerónimo Caravaca watercourse 1.099.188 0 1.099.188 Archena environmental recovery 1.993.443 1.993.443 Benipila Cartagena watercourse 6.070.192 0 6.070.192 Mula river conditioning 2.470.025 2.470.025 Azarbe Mayor environmental rehabilitation 2.642.170 0 2.642.170 Canteras Cartagena watercourse conditioning 797.828 797.828 Flood prevention in the Benimodo ravine 0 31.708.986 Water availability 596.719 1.156.382 Carboneras desalination plant water 106.677 Water for the distribution network of the Valdelentisco desalination plant Albacete supply water Turia-Sagunto pipeline water Value impairment of completed products Net total 0 31.708.986 (596.720) 1.156.381 598.138 (106.677) 598.138 613.060 997.872 (613.060) 997.872 2.614 7.349 (2.614) 7.348 16.708 18.807 (16.708) 18.807 (142.340) (465.784) 142.340 (465.784) 320.782.858 31.607.027 (596.720) 351.793.165 0 (Data in €) Segura river Archena conditioning 5.717.620 585.784 585.784 Lining of the San Jerónimo Caravaca watercourse 1.099.188 1.099.188 Benipila Cartagena watercourse 6.070.192 6.070.192 Azarbe Mayor environmental rehabilitation Water Availability Carboneras desalination plant water Water from the distribution network of the Valdelentisco desalination plant 2.642.170 1.176.898 1.381.357 Turia-Sagunto pipeline water Net Total 0 172.403 Albacete supply water Value impairment of completed products 19.322 0 596.719 (65.726) 106.677 (768.297) 613.060 2.614 2.614 16.708 16.708 (376.862) 271.342.575 2.642.170 (599.501) 59.491.642 0 234.522 (142.340) (10.051.359) 320.782.858 (Data in €) Works in progress as of December 31, 2013 and December 31, 2012 correspond to initiatives that are underway and will be handed over to the State’s Public Administration on completion before any exploitation is carried out. More significantly, a provision for impairment in value of completed works was recorded, corresponding to the difference between the production cost of water stocks and the average sales price estimated for 2013 and 2012 for the distribution networks of the 116 Annual Report 2013 05. Annex: Annual Accounts Valdelentisco desalination plant and the Carboneras desalination plant, respectively, which are included in this list. The Company tendered and awarded contracts that entail a firm commitment of investment in order to develop these initiatives. Greater detail of these contracts is found in Note 19, “Other Information”, which includes a summary of the commitments made, the amount paid as of December 31, 2013, as well as the amount pending. 117 NOTE 8 Financial Assets The breakdown of the financial assets for the financial years ending December 31, 2013 and December 31, 2012 is outlined below. a)Long-term Financial Instruments Under the heading “Credits to related companies”, the collection rights of the Company in relation to the State’s Public Administration are included for the initiatives handed over and those pending handover, or those that are paid for or produce a reduction in capital, the balance of which as of December 31, 2013 and December 31, 2012 reached €29,471,674 . In the heading “Long-term debt securities”, the Company records the purchase of strippable bonds from the State, as outlined below. Nominal value Value 31/12/2013 Purchase date Maturity date Nominal interest 91.000.000 96.911.395 25-mar-13 30-jul-26 5,9000% MEDIUM-TERM GOVERNMENT BONDS 1ST TRANCHE 5.000.000 4.577.500 27-mar-13 30-jul-40 4,9000% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 2ND TRANCHE 30.173.760 24.873.548 27-mar-13 30-jul-40 4,9000% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 3RD TRANCHE 25.179.917 20.158.680 2-abr-13 30-jul-40 4,9000% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 4TH TRANCHE 1.600.000 1.465.600 9-abr-13 30-jul-40 4,9000% CAJA LABORAL LONG-TERM STRIPS 30.327.000 30.000.220 30-jul-13 30-jul-25 4,6500% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 48.360.000 47.779.680 25-jul-13 30-jul-25 4,6500% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 10.400.000 4.345.386 12-ago-13 31-oct-23 4,4000% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 37.900.000 39.529.321 8-oct-13 31-oct-28 5,1500% UNICAJA MEDIUM-TERM GOVERNMENT BONDS 5.135.000 4.914.195 19-nov-13 30-jul-41 4,7000% BBVA LONG-TERM GOVERNMENT BONDS 25.825.000 24.624.138 21-nov-13 30-jul-41 4,7000% SANTANDER MEDIUM-TERM GOVERNMENT BONDS 700.000 719.060 8-nov-13 31-oct-23 4,4000% 311.600.677 299.898.723 INSTITUTION TYPE OF ASSET CAJA LABORAL LONG-TERM GOVERNMENT BONDS SANTANDER TOTAL 118 The heading “Other financial assets” for long-term financial investments covers the amount corresponding to guarantees deposited by the Company in relation to different leasing contracts. The financial income amounts as of December 31, 2013 and December 31, 2012 were €22,207,912 and €6,140,520, respectively. They were obtained from the returns generated by portfolio investments made by the Company and by the capital gains obtained with the partial sale of said investments. b) Customer Receivables for Sales and Services The balance statement for customer receivables for sales and services is outlined below. In compliance with Law 15/2010 of the 5th of July, modifying Law 3/2004 of the 29th of December, which sets out measures to combat late payment in commercial transactions, the Company has calculated the interest accrued for late payment from customers and debtors whose payment was made after the stipulated term, based on the legal interest rate. The amounts pending collection recorded on December 31, 2013 and December 31, 2012 were €863,415 and €900,279, respectively. The Company partially provisioned these amounts in previous financial years, and therefore they had no impact on the profit and loss account. Activity for the provision for impairment losses from customer receivable accounts is outlined below. Euros 2013 2012 448.296 0 Dotación 6.727.094 448.296 Saldo final 7.175.390 448.296 Saldo inicial Annual Report 2013 Under the heading “Customer receivables for sales and services”, a balance of €9,863,297 was recorded as of December 31, 2012. This amount corresponds to the Taibilla Canals Community (Mancomunidad de los Canales 05. Annex: Annual Accounts del Taibilla, MCT), who was invoiced based on amortization and exploitation tariffs as outlined in the regulation agreement for the operation and exploitation of the Valdelentisco desalination plant, which was approved by the Acuamed board of directors following a favorable report by the State Legal Service dated April 8, 2011. Although the MCT expressed their disagreement with regard to the calculation of the amortization tariffs and requested a report from the of the Murcia State Legal Service, on December 29, 2011 the legal service made the same conclusion as in the previous report, thus safeguarding the established regularization of the tariffs. Additionally, the State Legal Service reiterated its conclusion in a report dated March 13, 2012. On February 5, 2013 the MCT expressed their agreement in writing with regard to the exploitation tariff component for the sum of €5,187,286.40 (value-added tax not included) and demonstrated their intention to make immediate payment, without prejudice to the continuation of negotiations to reach an agreement on the amortization tariff component. The Company considers its invoicing to be legitimate for reasons outlined above, and therefore it has continued to send invoices for this item to the MCT. However, in view of the fact that negotiations relating to the collection of the amortization tariffs are presently stalled, the Company decided to provision the amount accrued for this item, totaling €5,023,367 (value-added tax not included), on December 31, 2013, until a definitive resolution can be made. 119 c) Short-term Financial Investments This heading includes interests accrued from investments made in the 2013 financial year, totaling €5,959,259, as outlined in the table below. INSTITUTION TYPE OF ASSET Nominal value Purchase value Accrued interest CAJA LABORAL MEDIUM-TERM GOVERNMENT STRIPS 50.000.000,00 51.021.023,50 2.265.276,71 CAJA LABORAL LONG-TERM GOVERNMENT BONDS 91.000.000,00 100.412.276,78 103.369,86 SANTANDER MEDIUM-TERM GOVERNMENT BONDS 1ST TRANCHE 5.000.000,00 4.738.595,89 567.070,96 SANTANDER MEDIUM-TERM GOVERNMENT BONDS 2ND TRANCHE 30.173.760,00 59.251.198,63 463.701,09 SANTANDER MEDIUM-TERM GOVERNMENT BONDS 3RD TRANCHE 25.179.917,00 54.415.392,81 33.078,36 SANTANDER MEDIUM-TERM GOVERNMENT BONDS 4TH TRANCHE 1.600.000,00 1.519.943,01 598.854,39 CAJA LABORAL LONG-TERM STRIPS 30.327.000,00 30.000.219,90 948.783,45 SANTANDER MEDIUM-TERM GOVERNMENT BONDS 48.360.000,00 47.779.680,00 33.090,41 SANTANDER MEDIUM-TERM GOVERNMENT BONDS (1) 10.400.000,00 10.270.000,00 326.199,59 Accrued coupon SANTANDER MEDIUM-TERM GOVERNMENT BONDS 37.900.000,00 39.529.321,00 28.432,42 UNICAJA MEDIUM-TERM GOVERNMENT BONDS 5.135.000,00 4.914.195,00 136.341,85 74.056,55 BBVA LONG-TERM GOVERNMENT BONDS 25.825.000,00 24.624.137,50 4.556,71 375.771,44 SANTANDER MEDIUM-TERM GOVERNMENT BONDS 700.000,00 719.061,00 5.508.755,80 € 450.503,06 € TOTAL 675,07 NOTE 10 Company Funds Activity under this heading shows the Statement of Changes in Net Equity. a) Share Capital According to an agreement in the minutes of the general shareholder’s meeting on February 20, 2013, the sole shareholder approved a capital increase of €4,608,100, which was paid on March 28, 2013 and notarized on May 21, 2013. On December 31, 2013 the share capital reflected in the financial statements was represented by 161,017,324 registered shares of €10 par value each. On December 31, 2012 the reflected share capital in the financial statements was represented by 160,556,514 registered shares of €10 par value each. Share capital is completely subscribed and disbursed by the Spanish government, the only founding shareholder and the sole owner of all shares that make up the share capital. Management of the holding in the Company is carried out through the Ministry of Finance and Public Administrations and, specifically, the Directorate General for State Assets. b) Issue Premium The issue premium of shares present in the Company’s own funds on December 31, 2013 and December 31, 2012 was €100,520,412. It is freely available, with restrictions established in the consolidated text of the Capital Company Act with respect to the increase of capital charged to reserves and the application to compensate losses. c) Reserves The heading “Reserves” includes the legal reserve amount of €1,879,776 provided by the Company. In accordance with consolidated text of the Capital Company Act, 10% of profits from the financial year must be earmarked for the legal reserve until this figure reaches at least 20% of the capital. The legal reserve cannot be distributed among the shareholders, except in the case of liquidation. The legal reserve may be used to increase capital, provided that the remaining balance is no less than 10% of the increased capital. With the exception of the purposes mentioned above and provided that the legal reserve does not exceed 20% of the share capital, this type of reserve may only be used to offset losses in the case where other reserves are not sufficiently available for this purpose. Activity from the financial year is reflected in the following table: Other reserves refer to voluntary reserves, which are freely available unless when distributed, the Company’s own funds fall below the amount of capital. NOTE 9 Cash and Cash Equivalents Cash and cash equivalents include cash on hand and demand bank deposits in credit institutions. Under the heading “Treasury” in the attached balance sheet, the balances of the current accounts held with different financial institutions are included. The average profitability for the financial years ending on December 31, 2013 and December 31, 2012 were 1.8% and 2.82%, respectively. Repayment of the balances upon closing the financial years ending on December 31, 2013 and December 31, 2012 was situated at 0.024% and 2.46%, and 0.25% and 4.75%, respectively. These balances are unrestricted. 120 Annual Report 2013 05. Annex: Annual Accounts 121 NOTE 11 Grants, Donations, and Bequests Received This heading in the attached balance sheet lists the “Official capital grants” corresponding to the aid received from the European Community (ERDF and Cohesion Funds), which is non-repayable as long as the conditions upon which they were granted, and other state administration, regional, and local conditions, are complied with. Activity under this heading for the 2013 and 2012 financial years is outlined below. 122 Annual Report 2013 05. Annex: Annual Accounts 123 NOTE 12 Financial Liabilities A breakdown of the financial liabilities for the 2013 and 2012 financial years is outlined below. a) Other Long-term Financial Liabilities The heading “Other financial liabilities” for noncurrent liabilities includes, on the one hand, the amount from subsidies received by the Company from the European Union ERDF for initiatives that were under construction as of December 31, as indicated in Note 4.e, and not yet clearly determined to meet the conditions for which the funding may be considered non-repayable. On the other hand, amounts are set out in advance to address asset replacements and repairs in the following exploitations: The Company has a pending payment as of December 31, 2013 of €82,825,618 (€21,940,366 from PO 2000-2006 and €60,885,252 from PO 2007-2013), and on December 31, 2012 this amount totaled €104,950,032 (€23,374,537 from PO 2000-2006 and €81,575,495 from PO 2007-2013) (see Note 13.a). 124 Annual Report 2013 The remaining balance of €37,714 corresponds to long-term guarantees as of December 31, 2013 and December 31, 2012. 05. Annex: Annual Accounts 125 Credit and Loans from Credit Institutions A breakdown of loans and credit from credit institutions as of December 31 is outlined below. Credit and loans from credit institutions Amount pending payment 2013 Maturity Interest rate 2012 Financial costs accrued with financial institutions 2013 2012 13.296.545 13.793.384 2035 Euribor 1 month + 1.25% 216.033 209.316 Banco Pastor (loan) 8.843.590 9.220.343 2035 Euribor 1 month + 1.15% 132.437 127.920 BBVA-DEXIA (loan) 13.494.402 14.093.943 2036 Euribor 1 month + 1.25% 211.480 712.735 BBVA (loan) 3.157.167 3.309.319 2034 Euribor 3 months + 0.09% 10.853 30.851 BBVA (loan) 0 5.946.217 2034 Euribor 3 months + 0.09% 0 55.434 1.322.372 1.429.634 2025 Euribor + 0.54 10.314 19.220 BBVA (loan) 23.672.187 24.435.806 2042 Euribor + 0.099 198.921 451.481 Banco Pastor (loan) 33.377.776 34.314.868 2040 Euribor + 1.50 701.863 1.208.102 July-2012 Euribor + 2.50 0 1.167.949 Cajamurcia (loan) Banco Santander Central Hispano (loan) Operation syndicated with BBVA-Pastor- Bankinter- Caixabank -Banesto 0 BEI (1º TRANCHE) 351.665.786 349.650.000 July-2036 Euribor + 2.31 8.168.777 4.101.913 BEI (2º TRANCHE) 149.846.324 0 July-2036 Euribor + 2.31 2.001.833 0 UNICAJA 0 0 Jan-2013 Euribor + 2.50 0 1.311.584 CAJASOL 0 3.000.000 Jan-2013 Euribor + 3.00 10.370 527.683 598.676.149 459.193.514 11.662.881 9.924.188 TOTALS On November 14, 2008, a loan was formalized with the credit institution Cajamurcia for a two-year credit subsequently convertible to a 25-year loan of €15,000,000 in order to finance the amount owed by the users of Valdelentisco desalination plant. The loan was formalized for the entire amount. Amortization of the capital began on January 1, 2011; final maturity is scheduled for December 1, 2035. The Company must pay the monthly installments comprised of principal and interest along with the other expenses incurred and fully recover these costs from the users via tariffs. November 7, 2008, a loan was formalized with the institution Banco Pastor for the amount of €10,000,000, with a two-year grace period for the capital and 25 years of amortization, in order to finance the amount owed by the users of the water distribution network of the Valdelentisco desalination plant. Amortization of the capital began on December 31, 2010; final maturity will take place on November 30, 2035. The Company must pay the monthly installments comprised of principal and interest along with the other expenses incurred and fully recover these costs from the users via tariffs. On March 17, 2009, a loan was formalized with 126 the institutions BBVA and Dexia Sabadell for €15,333,333 for 27 years, with a two-year grace period for the capital, in order to finance the amount owed by the users of the water distribution network of the Valdelentisco desalination plant. Amortization of the capital began on April 17, 2011; final maturity will take place on March 31, 2036. The Company must pay the monthly installments comprised of principal and interest along with the other expenses incurred and fully recover these costs from the users via tariffs. On the March 27, 2007, a credit was formalized with BBVA for €8,000.000 over 30 months, transformable into a 25-year loan, in order to finance the amount owed by the users of the water supply to Hellín Albacete and the delay in the receipt of European funds. This loan was formalized in the amount of €3,979,158. Amortization of the capital began on October 27, 2009; final maturity will take place on September 27, 2034. The Company must pay the monthly installments comprised of principal and interest along with the other expenses incurred and fully recover these costs from the users via tariffs. On March 27, 2007, a credit was formalized with BBVA for €40,000.000 for 30 months, transforAnnual Report 2013 mable into a 25-year loan, in order to finance the amount owed by users of the Talave-Cenajo tunnel initiative and the delay in the receipt of European funds. This loan was formalized in the amount of €33,678,811. Amortization of the capital began on October 27, 2009; final maturity will take place on September 27, 2034. The Company must pay the monthly installments comprised of principal and interest along with the other expenses incurred and fully recover these costs from the users via tariffs. In the 2010 financial year pledged European Union funds were received for this initiative and applied to reduce the balance. In January 2013 pledged European Union funds totaling €9.099.908 were received, the outstanding balance was paid, and the loan was cancelled. On July 24, 2003, Banco Santander granted a loan for the amount of €2,192,015 to finance the amount owed by the users of the Rabasa–Fenollar pipeline initiative. Final maturity will take place on July 24, 2025. The Company must pay the loan repayment installments and pass them on to the user, together with the costs incurred, through quarterly invoicing. On September 7, 2007, the Company received a credit convertible to a loan from BBVA for €35,000,000 to finance the participation of the users in the Júcar Vinalopó initiative. The credit was available for two years, and was subsequently transformed into a 35-year loan on September 7, 2009; final maturity will take place on August 7, 2042. Amortization installments paid by Aguas del Júcar will be charged in full to the users of the initiative in accordance the signed agreement. On July 30, 2010, Banco Pastor granted a loan for €35,000,000 to finance the completion and commissioning of the Júcar-Vinalopó pipeline. Amortization of this loan is carried out with 29 consecutive installments on the last day of each year. The first payment took place on December 31, 2012 and final maturity is scheduled for December 31, 2040. Amortization payments made by Aguas de las Cuencas Mediterráneas will be charged in full to the users of the initiative. On July 29, 2011 the company signed a shortterm loan agreement (bridge loan) with a pool of banks formed by BBVA, BANESTO, CAIXABANK, BANCO PASTOR, and BANKINTER for an amount totaling €165,700,000 to cover treasury needs until a long-term loan agreement could be signed, allowing management activities to be completed. On signing this short-term operation the following credit rights were discounted and pledged for security: i) Capital increase in 2011 (75.7 million), ii) European funding (66 million), and iii) accrued and unpaid VAT (24 million). Final maturity took place on July 29, 2012. Amortization installments paid by Acuamed were passed on to the initiatives that are being funded with this operation according to proportional criteria for the distribution of costs. 05. Annex: Annual Accounts On June 29, 2012 the Company received the first part of the loan granted by the European Investment Bank totaling €350,000,000. The loan period is 25 years with a five-year grace period for the capital, thus the first amortization payment will take place in July 2017. Final maturity will take place in July 2036. The interest rate is of 2.31% during the first five years. On March 14, 2013 the Company received the second part of the loan granted by the European Investment Bank totaling €150,000,000. The loan period is 25 years with a five-year grace period for the capital, thus the first amortization payment will take place in March 2018. Final maturity will take place in March 2038. The interest rate is of 1.677% during the first five years. On January 31, 2012 the Company signed a loan agreement with UNICAJA for the sum of €50.000.000 for a one-year term; credit rights for European Union funds to guarantee the operation were pledged. Amortization installments paid by Acuamed were passed on to the initiatives that are being funded with this operation according to proportional criteria for the distribution of costs. During the 2012 financial year European Union funds totaling €50.000.000 were received, and the loan was cancelled before the end of the financial year. On January 30, 2012 the Company signed a loan agreement with CAJASOL for the sum of €15,000,000 for a one-year term; credit rights for European Union funds to guarantee the operation were pledged. Amortization installments paid by Acuamed were passed on to the initiatives that are being funded with this operation according to proportional criteria for the distribution of costs. In 2012 European Union funds totaling €12,000,000 were received. Thus, the outstanding balance on December 31, 2012 was €3.000.000 and the loan was subsequently cancelled on the maturity date. A breakdown by maturity dates of the loans and credits from credit institutions as of December 31, 2013 and December 31, 2012 is outlined below. ANNUAL PAYMENT Short-term 31/12/13 31/12/12 5.502.941 8.592.567 2013 0 6.815.919 2014 5.502.941 1.776.648 593.173.208 450.600.947 3.414.601 1.798.010 2016 3.450.060 1.847.998 2017 20.982.011 9.932.998 2018 21.019.465 13.397.998 Others 544.307.071 423.623.943 TOTALS 598.676.149 459.193.514 Long-term 2015 (Data in €) 127 The Company has the following guarantees set up in compliance with the contractual obligations of loans received from financial institutions: Pledging of present or future credit rights arising from the signing of the regulatory agreement with the users to supply desalinated water for agricultural irrigation from the Valdelentisco desalination plant and its distribution network. Cession of present or future collection rights arising from agreements with the users, from cohesion funds authorized for co-financing the project and VAT of the initiative “Water Supply to Hellín, Albacete”. Cession of present or future collection rights arising from agreements with the users, from cohesion funds authorized for co-financing the project and VAT of the initiative “Talave-Cenajo Tunnel”. Pledge on the credit rights arising from the regulatory agreement for water supply from the Valdelentisco desalination plant to the Taibilla Canals Community. Pledge of present or future credit rights arising from an agreement with the Júcar Hydrographic Confederation and those Acuamed will subscribe to in the future with the end users of the JúcarVinalopó pipeline, in the amount needed to cover the installments of the bank debt. Pledge of the present or future credit rights arising from any other agreement signed by the company and the users that is not reflected in the previous items, to cover the payments of the loan with the European Investment Bank. As of December 31, 2012 and December 31, 2013 the Company has financial obligations/limitations in relation to the loan signed with the European Investment Bank that are defined in the contract signed by both parties according to the following report: 1. The debtor is obligated, at all times during the period of this Contract and on the basis of their audited financial statements, to fulfill each and every level or ratio listed in the following table (“Ratios”), which are defined afterward in this Clause: (i) A ratio of Earning Before Interest, Taxes, Depreciation, and Amortization (EBITDA) of the debt servicing for the period of twelve (12) months immediately previous to any Calculation Date, the first Calculation Date being 128 Item Classification Rate Contracted amount Interest rate swap Interest rate hedging From variable (Euribor 1 month) to fixed (3.76%) 15.333.333 December 31, 2017, of at least 1.55x. (II) A ratio of Financial Debt on Net Equity, referring to a period of twelve (12) months immediately previous to any Calculation Date, the first Calculation Date being December 31, 2012, of a maximum of 30%. For the purposes of calculating the ratio of Financial Debt on Net Equity, and according to the definition of Net Equity established in the financing contracts, Net Equity is considered to be “the Company’s own funds as well as the subsidies, in agreement with the Audited Financial statements”. In the Audited Financial statements, following Spanish accounting rules, Liabilities by Deferred Taxes (see Note 13.b.) are recorded in the amount of €210,599,373 for accrued European subventions. However, to calculate this ratio, this amount is considered to be Net Equity. As of December 31, 2013 and December 31, 2012 the Company had complied with the established financial obligations/limitations. b) Long-term Accruals The heading “Long-term accruals” of non-current liabilities covers the amount for anticipated tariffs invoiced to users in relation to the specific agreement signed by both parties. On December 31, 2013 and 2012, the amount pending payment for these tariffs with VAT included totaled €39,358,998 and €39,985,856, respectively. A breakdown as of December 31, 2012 is outlined below. Item Classification Rate Contracted amount Maturity Inefficiency recorded in 2012 results Asset Liability Interest rate swap Interest rate hedging From variable to fixed 15.333.333 17/03/36 8.871 - 3.105.810 The fair value of this financial exchange is based on market values of equivalent financial derivative instruments on the date of the balance sheet. This financial exchange on interest rates is efficient as a cash flow hedge. The fixed interest rate applied during 2013 and 2012 was 3.76%. The requirements for accounting policies to classify the financial instruments described as hedges have been met. Specifically, the hedges have been formally designated as such and verified to provide effective coverage. d) Other Short-term Financial Liabilities The balance of this item on December 31, 2013 and December 31, 2012 totaled €1,332,901 and €2,444,683, respectively, for income accrued mainly during the test phase of finished initiatives in which exploitation had not yet begun. Fair value 2012 e) Deferred Payment to Suppliers in Commercial Transactions According to the resolution of the 29th of December 2010 from the Institute of Accounting and Auditing, which refers to the information to be included in annual accounts reports in relation to deferred payments to suppliers in commercial transactions, the third additional provision (Duty to Provide Information of Law 15/2010 of the 5th of July, amended by Law 3/2004 of the 29th of December, which establishes measures to combat late payment in commercial transactions) states that “Companies should expressly publish information on the terms of payment to their suppliers in their annual accounts report.” The activity under this heading for the financial year is outlined below. c) Hedging Transactions The Company uses financial derivative instruments to hedge the risks that its activities, operations, and future cash flows are exposed to. The Company contracted a cash flow hedge for the syndicated BBVA-DEXIA loan of €15,333,333. Fair value 2013 Maturity Inefficiency recorded in 2013 results Asset Liability 17/03/36 4.010 - 2.262.842 Annual Report 2013 05. Annex: Annual Accounts 129 b) Liabilities with Public Administrations NOTE 13 Fiscal Situation A breakdown of the balances with Public Administrations is outlined below. a) Assets with Public Administrations A breakdown of the balances with Public Administrations is outlined below. The activity of “Liabilities by deferred tax” under this heading in the 2013 financial year is outlined below. The activity of “assets by deferred tax” under this heading in the 2013 financial year is outlined below. The heading “By cession of initiatives” covers the collection right that the Company holds against the State’s Public Administration for the cession of initiatives formalized on July 2, 2007 by means of a certificate entailing the handover and acceptance of initiatives, signed by the Ministry of Agriculture, Food, and the Environment and the Company, for the sum of €16,907,088. This amount, together with the rights acquired from AcuaJucar, generated in the handover of the initiative “Júcar-Vinalopó Pipeline” for the sum of €12,564,586, will constitute a reduction of capital 130 in the Company by the total amount of both balances, totaling €29,471,674, unless it is paid into the Company. This amount is covered under the heading “Long-term Investments in companies of the group and associated companies” on the asset side of the balance sheet (see Note 8.a). The collection rights for subsidies correspond to amounts that are certified and audited by the Cohesion Funds and the ERDF of the European Union, which are pending payment as of December 31, 2013 and December 31, 2012 as outlined below. Annual Report 2013 The heading “Taxes payable for subsidies” covers the balance of subsidies received during the 20002006 operative period for three specific initiatives: “Desalination Plant to guarantee irrigation of the Tajo-Segura Transfer”, “Desalination plant and complementary works for Campo de Dalías”, and “Extension of the Mojón desalination station for brackish water and collectors”. These three initiatives have not been completed within the maximum period stipulated by the European Commission in order to benefit from the aid requested, and therefore these funds must be returned. However, as the first two initiatives remain 05. Annex: Annual Accounts underway at present and have been incorporated into the 2007-2013 operative program, the Company has requested the deduction of this aid to cover the total cost of each of them, which will be much higher than initially estimated. An official report is pending. In the case of the third initiative, a formal report is pending in order to proceed to repayment. c) Tax on profits The reconciliation of the accounting profits for the 2013 and 2012 financial years with taxable corporate income is outlined below. 131 In accordance with the Corporate Tax Act, if under the rules applicable to determine the tax base there is a loss, this amount could be offset within 18 successive years from that in which the loss occurred, distributing the amount in the proportion deemed appropriate. Compensation is made when the corporate tax declaration is submitted, without prejudice to the tax authorities’ powers of inspection. Although the Company has the following tax losses to offset against future profits, it is uncertain whether enough profits can be made in the next few years to enable recovery. Thus, as outlined in Note 4.f, “Accounting and Measurement Rules. Tax on Profits”, the Company decided not to recognize the deferred taxes of recognized assets on December 31, 2013. La fusión detallada en la nota 1 se acogió al Régimen Especial de Fusiones establecido en el capítulo VIII del Título VII del R.D. Legislativo 4/2004 de 5 de marzo, regulador del Impuesto sobre Sociedades. Corporate tax expenses are composed of the following items: In April 2013 the Company received notification from the Tax Department and underwent an VAT inspection process corresponding to the 2009-2012 financial years. At the time of writing these annual accounts, no resolution or record from the tax administration had been received. However, based on the documentation required in the inspection process, the conversations held with the tax authorities, and the opinion of their tax advisers, the Company directors expect that the ongoing tax inspection will not reveal significant additional liabilities. As established by current legislation, taxes cannot be considered definitively assessed until the declarations presented have been inspected by the tax authorities, or the limitation period has elapsed. The Company is pending inspection by the tax authorities for the main applicable taxes in the financial years listed below. Tax 132 The merger described in Note 1 was covered by the Special Regime for Mergers set out in Chapter VIII, Title VII of the Royal Legislative Decree 4/2004 of the 5th of March on the regulation of corporate tax. Years open to inspection Coporate tax 2009-2013 Value Added Tax 2009-2013 Individual income tax on natural persons 2010-2013 Social Security 2010-2013 Annual Report 2013 05. Annex: Annual Accounts 133 NOTE 14 Personnel Expenses NOTE 15 Supplies and Other Operating Expenses A breakdown of the heading “Profit and Loss Account” is outlined below. An outline of the supply costs incurred in the 2013 and 2012 financial years together with a breakdown of them is shown in the chart below. The number of people employed at the close of the financial year and the average number by Company and the distribution by category is outlined below. Supplies are expenses attributable to the initiatives under exploitation and constitute direct costs associated with them. They include, among other items, the fees paid to the operators of the plants and other facilities as well as power supplies. An outline of the operating costs incurred in the 2013 and 2012 financial years together with a breakdown of them is shown in the chart below. Professional services cover, for the most part, legal advice, administration, consultancy (when not recorded in the initiatives), notary services, and recruitment. Advertising and public relations cover expenses incurred by the Company in publicity campaigns promoting the business conducted by the Company, in order to raise awareness and provide better understanding in the public realm. Other services include reprographic services for maps and satellite imagery, couriers, training expenses, and staff travel expenses. 134 Annual Report 2013 05. Annex: Annual Accounts 135 NOTE 16 Other Results NOTE 17 Net Turnover of Business Figures A breakdown for “Other Results” for the 2013 and 2012 financial years is outlined below. A breakdown for the net turnover of business figures per initiative for the 2013 financial year is outlined below. Late payment interest accrued and charged have been calculated taking in account the late payment law as described in Note 8.b). A breakdown for the net turnover of business figures per initiative for the 2012 financial year is outlined below. 136 Annual Report 2013 05. Annex: Annual Accounts 137 NOTE 19 Other Information Net sales correspond to water supplies from initiatives under exploitation during the current financial year or amortization tariffs derived from them according to the agreements signed with the users, and correspond to the works described in the table for the 2013 and 2012 financial years, respectively. a)Remuneration and Other Information about the Board of Directors and Senior Management In the years ending on December 31, 2013 and December 31, 2012 the remuneration accrued by the Board of Directors members, as allowances, totaled €131,641 and €164,720, respectively (see Note 14). They did not receive any other amount for other items. The amounts for the salaries earned as of December 31, 2013 and December 31, 2012 by Senior Management staff totaled €513,825 and €568,818, respectively, including severance payments of €81.798 in 2012. They did not receive any other amounts for allowances, pension plans, or life insurance premiums. In the 2013 and 2012 financial years no advances or loans were granted. As of December 31, 2013 and December 31, 2012, the Company does not maintain any balance with the Company’s Directors or Senior Management staff, nor does it pay for life insurance premiums, pension plans, retirement plans, or similar obligations on their behalf. The Company’s Directors and persons connected to them do not own shares or positions in companies whose corporate purpose is identical, similar, or complementary to that of the Company, in compliance with Article 229 of the Consolidated text of the Capital Company Act, with the exception of those described below. NOTE 18 Other Operating Income An outline of the operating income incurred in the 2013 and 2012 financial years together with a breakdown is shown in the chart below. b) Fees for Independent Auditors The auditing company (KPMG Auditores, S.L. ) that prepares the annual accounts of the Company invoiced on December 31, 2013 and December 31, 2012 for fees and expenses for professional services according to the outline below. Euros 2013 2012 For auditing services 28.333 28.333 For other services 34.235 62.568 28.333 The amounts in the previous table include all fees relating the services provided in the 2013 and 2012 financial years, regardless of the moment at which they were invoiced. The number of men and women that make up the Company’s Board of Directors as of December 31, 2013 is 7 men and 5 women; as of December 31, 2012 there were 6 men and 6 women. 138 Annual Report 2013 05. Annex: Annual Accounts 139 c) Litigation and Contentious Issues At the time of preparing these annual accounts, the Company Aguas de las Cuencas Mediterráneas, S.A., is party to several lawsuits, mainly appearing as co-defendant together with the State’s Public Administration, or the Ministry of Agriculture, Food, and the Environment, sued for administrative actions in relation to the duties of the Company, or the Provincial Expropriation Jury, sued for their appraisal resolutions. At the same time, the Company has filed cases and appeals, and has been sued in relation to the ordinary course of business. Given the nature of the issues, it is not possible to know the dates on which the necessity of facing possible liabilities might arise. However, resolution of the lawsuits is not expected to affect the equity situation of the company in a significant way. Therefore, the Company does not consider it necessary to establish provisions for litigation and contentious issues, with the exception of an amount to cover non-payments from private users of the reuse infrastructure at El Campo de Dalías, who could become bankrupt, as well as the total debt owed by the City council of L’ Eliana. The most relevant lawsuits and a summary of ongoing lawsuits are outlined below. 1. Lawsuits filed by Acuamed except in the matter of expropriations. Civil jurisdiction a. Complementary actions for residual water reuse in El Campo de Dalías, Initiative 1.2.a. Lawsuit filed against several users of infrastructures due to debts from invoices related to respective agreements of use. The date of the trial (proceeding from 2011) is fixed for April 2014 and the amount of the lawsuit as of December 31, 2013 totals over €1,000,000. Tax matters b. This item from 2011 is under appeal before the Spanish High Court, due to dismissal in the administrative courts, in relation to the rectification of self-assessments corresponding to corporate tax for the 1999-2002 financial years of the extinct company Aguas del Júcar for a sum of €3,669,781. Judgment has not yet been given. The lawsuit was formalized in 2012. The appeal is based on solid legal rationales, and the probability of occurrence is 50%. Contentious-administrative order c. An appeal against the resolution of an appeal against the resolution of 23.07.2010 of the Junta of Andalusia regarding discrepancies in relation to the access point and connection of the electrical supply to the Bajo Almanzora desalination plant. This issue was resolved favorably to Acuamed in 2013. d. Acuamed filed contentious-administrative appeals and civil lawsuits against the approval of budgets of Marina Baja Consortium. Undetermined amount. 140 2. Lawsuits filed by Acuamed, in the matter of expropriations, against agreements of the Provincial Expropriation Jury. These are lawsuits filed by Acuamed because they consider the appraisal of the Jury disproportionate. a. Expropriations of the purified waste water reuse project in Albufera Sur (Valencia), Initiative 3.2.e. Twelve cases in which the lawsuit amount is €431,485. Probability of occurrence ranking (probability between 15% and 50%). b. Expropriations of the construction, management, and completion project for the reuse of waste water at the Pinedo plant. Sections I and II of the Catarroja-Benifaio pipeline, Initiative 3.2.c. Fifteen cases in which the lawsuit amount is €183,226. Probability of occurrence ranking (probability between 15% and 50%). c. Expropriations of the project for the rearrangement of orchard irrigation and sewage networks in the metropolitan area of Valencia. New collector west of Albufera Favara channel (Valencia), Initiative 3.2.h.1. Thirty-four cases in which the lawsuit amount is of €669,781. Probability of occurrence ranking (probability between 15% and 50%). d. Expropriations of the project for the construction of Section E, the connection of the lower reaches of the Júcar river with Section V, and the new Júcar-Vinalopó pipeline, Initiative 3.2.h.1. One case in which the lawsuit amount is €38,321. Probability of occurrence ranking (probability between 15% and 50%). e.Expropriations of the project for the Oropesa desalination plant and complementary works (Castellón de la Plana), Initiative 3.1.e.2. Three cases in which the lawsuit amount is €23,133. Probability of occurrence ranking (probability between 15% and 50%). In addition, in 2013 a ruling was made in relation to a case, the verdict of which was in favor of the resolution of the Expropriation Jury. f. Expropriations of the project to laminate and improve drainage of the Gallinera river basin (Valencia), Initiation 3.3.d.1. Thirty-six cases in which the lawsuit amount is €652,094. Probability of occurrence ranking (probability between 15% and 50%). g. Expropriations of the project for the construction, management, and completion of purified waste water reuse facilities at the Sueca WWTP (Valencia), Initiative 3.2.d. Eight cases in which the lawsuit amount is €111,836. Probability of occurrence ranking (probability between 15% and 50%). Three cases in which the lawsuit amount is €178,022. Probability of occurrence ranking (probability of less than 15%). h. Expropriations of the project for the water quality program in the Ebro Delta. Supplying the bays with fresh water from irrigation Annual Report 2013 canals. Construction of coastal protection and settling wetlands, Initiative 4.3.e. Seven cases in which the lawsuit amount is €2,609,752.06. Probability of occurrence ranking (probability between 50% and 90%). i. Expropriations of the construction project to reinforce the supply system in the metropolitan area of Valencia and Camp de Morvedre. Sagunto desalination plant, Initiative 3.2.n. One case in which the lawsuit amount is €335,237.90. Probability of occurrence ranking (probability between 15% and 50%). j.Expropriations of the project for the construction of control works and flood abatement in the Serpis river basin, Initiative 3.3.f. One case in which the lawsuit amount is €418,607. Probability of occurrence ranking (probability between 15% and 50%). k.In addition, there are several lawsuits in which the amount is not determined. Probability of occurrence ranking (probability between 15% and 50%). 3. Lawsuits filed by the expropriated, against the agreements of the Provincial Expropriation Jury or the resolutions of the expropriating administration, in which Acuamed appears as co-defendant. There are approximately 100 lawsuits in which Acuamed adheres to the position and defense corresponding to the Provincial Expropriation Jury or the Ministry of Agriculture, Food, and the Environment, as expropriators, with representation from the State Legal Service. The legal action in jury processes is, in many cases, the claim that the ground has been assessed as developable, despite the fact that the treatment of its administrative and physical situation shows the contrary, thus indicating that the sentences will reject the claims of the plaintiffs. The total amount of these lawsuits is close to €20,000,000. Probability of occurrence ranking (probability between 0% and 15%). c. In the social order, during 2013 the pending lawsuits were resolved favorably to Acuamed. As of December 31, one dismissal procedure was underway. 5. Reference to the case of the project “elimination of chemical contamination in the Flix reservoir” (Tarragona). Case 266/1998. There is a ruling at the PC of Tarragona from 2006, sentencing Ercos to pay Acuamed 5% of the amount of the investment to eliminate pollution from the Flix reservoir, estimated according to the Direct Management Agreement at €223 m. Pending fulfillment. 6. Other lawsuits against the Ministry of Agriculture, Food, and the Environment in which Acuamed appears. a. Damage claim against MAGRAMA and the UTE contractor for damages in the work of the Jucar-Vinalopó pipeline to an individualin addition, he/she is expropriated. b. Claim of the local public administration of Balanegra against the public information and drafting of the minutes of the Dalías desalination project. d) Investment Commitments To develop its Direct Management Agreement, the Company has tendered and awarded different contracts that entail a firm commitment to carry out the work and investment. These costs are set out in the headings for fixed assets or stocks, as explained in Note 4, b) and e). The following chart shows the breakdown of the contracts awarded for the amount of €527,456,642, not including VAT, as well as the amount forfeited as of December 31, 2013 and the pending amount. 4. Lawsuits filed against Acuamed in civil and social orders. a.Action to quiet title to easement. The applicant declares that there is no easement and an obligation to reinstate the property, and quantifies the claim at approximately €600,000. The judgment is scheduled for May 2014. Probability of occurrence ranking (probability between 0% and 15%). b.Claim from a contractor for project units or units outside the project that were not certified or paid for the amount of €575,233. The proceedings began in 2012 and judgment is scheduled for June 2014. 05. Annex: Annual Accounts 141 NOTE 20 Environmental Information To finance the commitments set out here, as well as those necessary in the future in order to carry out the Direct Management Agreement, the Company relies on the following, among other resources: • The commitments to provide capital included in its Direct Management Agreement are still pending payment for an amount of €230,319,000 in relation to the 2015 and 2016 financial years. • Its net working capital convertible to cash at the end of the 2013 financial year, comprised of trade debtors and other receivables, shortterm financial investments, and cash and cash equivalents less trade creditors and other payables, reached €60,265,721. • The recourse to the capital market by entering into credit transactions with financial institutions, in accordance with the provisions of the Direct Management Agreement, for those initiatives which state this in their corresponding user agreement. • The subsidies for capital that come from the European Union, pending justification both in the 2000-2006 fund program and the 2007-2013 program. • Cash flow from operations in the coming years while the process of construction and commissioning of assigned actions lasts. The Company has requested that all users, prior to the signing of the respective agreements to supply 142 water from the Valdelentisco desalination plant and its distribution network, provide a bank guarantee, which implies a total of collateral provided, at the end of the 2013 financial year, of €10,849,982, the same amount as the previous year as there have been no new agreements backed by bank guarantee. The Company has granted the following guarantees: • With the Department of Infrastructure and Transport of the Generalitat Valenciana, €60,247.02 as a performance security for the construction of coastal intake and discharge works for the desalination plant that guarantees the irrigation of the Tajo-Segura transfer. • With the Junta of Andalusia (Environment Council), €50,790.21 to authorize the use in the protection easement zone and the discharge of process water into the maritime-terrestrial public domain of the municipality of El Ejido involving effluent from the Campo de las Dalías desalination plant in Balerma. The Company considers that it fully guarantees its compliance with all its present investment obligations through both user agreements and contracts formalized to carry out and develop the initiatives. Annual Report 2013 Within its Direct Management Agreement the Company has agreed to a series of actions listed as “Actions to improve water quality, prevent floods, and restore the environment” from those included in Annex IV of Law 11/2005 of the 22nd of June, which modified Law 10/2001 of the 5th of July, of the National Hydrological Plan. These initiatives, classified, respectively, as “without cost recovery” or or “with cost recovery” in the Company’s Direct Management Agreement, are classified in the Balance Sheet under the headings “Stock” and “Fixed Assets”, the initial balances, transactions, and final balances of the 2013 financial year, as shown in the chart below. The initial balances, transactions, and final balances of the 2012 financial year are shown in the chart below. NOTE 21 Events After Closure of Accounts After the closing of the 2013 financial year, an initial proposal was received, in collaboration with the Ministry of Agriculture, Food, and the Environment, for the Third Amendment of the Company’s Direct Management Agreement, which for the first time would integrate all the initiatives of the three companies affected by the merger in 2010. In the time period elapsed from the closing of the 2013 financial year to the date of formulation of these annual accounts, there have been no other significant events that require reporting in this section of the management report. 05. Annex: Annual Accounts 143 5.7 Signatures To comply with that set out in Article 253.2 of the Consolidated Text of the Law on Corporations (Royal Decree 1/2010), each and every member of the Board of Directors of Aguas de las Cuencas Mediterráneas, S.A signs below: Mr. Federico Ramos de Armas Ms. Liana Ardiles López Ms. Rosario Cayuela Castells Mr. Eduardo Ribas Steegman Ms. M.ª José de Mariano Sánchez-Jáuregui Mr. Carlos Muñoz Bellido Mr. Angel Alvarez Capón Mr. Ricardo de Alfonso López Mr. Alberto Valdivieso Cañas Ms. Pilar Vázquez Millán Mr. Daniel Sanz Jimenez Mr. Elisa Carbonell Martín Chairman of the Board of Directors Board Member Board Member Board Member Board Member Board Member Vice-president of the Board of Directors Board Member Board Member Board Member Board Member Board Member This Management Report has been drawn up by the Board of Directors in their meeting of March 4, 2014. This is one of the four original copies, as proven by the signature on the final page and initials on the remaining pages by the Secretary and the Chairman of the Board. Madrid, March 4, 2014 Secretary of the Board of Directors Signatures Chairman of the Board of Directors 145