company brochure - Finnertys Plant Hire Ltd.

Transcription

company brochure - Finnertys Plant Hire Ltd.
 CIVIC & PUBLIC AMENITY
CIVIL & STRUCTURAL ENGINEERING
HOUSING & RESIDENTIAL
COMPANY BROCHURE
CIVIL & STRUCTURAL ENGINEERING
AGRICULTURAL
CIVIC & PUBLIC AMENITY
FINNERTY
CLOUGH WEST
GURTEEN
BALLINASLOE
COUNTY GALWAY
TEL. 090 9677047 | FAX. 090 9677012
FINNERTY CLOUGH WEST, GURTEEN, BALINASLOE, CO. GALWAY TEL. 090 9677047 | FAX. (090) 9677012 HTTP:WWW.FINNERTYPLANTHIRE.COM CIVIL & STRUCTURAL ENGINEERING
AGRICULTURAL
CIVIC & PUBLIC AMENITY
INTRODUCTION Finnerty are a Civil & Structural Engineering Company based 8 miles from Athenry, employing 150 staff, operating predominantly in the North Western Region of Ireland. The company was formed in 1973 by Michael Finnerty who operates the business with his sons Shane & Cathal Finnerty. FINNERTY QUALITY We acknowledge our customer and clients expectations to provide high quality products and solutions on time and on budget. To this end Finnerty continually review operations in line with industrial standard and best practice. Our dedication to provide high quality service in both the administration and delivery of our projects is reflected by our achievements and ongoing client relationships. FINNERTY SAFETY, PEOPLE & THE ENVIRONMENT Finnerty successfully deliver projects by employing competent, qualified, experienced and long standing management staff and operatives. We encourage inclusion of people at all levels. We believe that the continual success of our organisation is dependent on improvement. We rely on our highly skilled staff, the training and qualifications they have obtained, and the knowledge they retain from previous contracts and experiences. As a company we encourage our staff to enrich their experience with Finnerty by providing training and Continuing Professional Development (CPD) opportunities. Finnerty operate strict policies for Health & Safety and is dedicated to the provision safe systems of work and providing a safe place to work for all Finnerty employees, which is reflected in our exemplary safety record. Our operational procedures encourage environmental responsibility at all levels throughout the company and operate strict environmental management plans for all contracts. FINNERTY PROJECTS & PROJECT MANAGEMENT Finnerty are a diverse multi-­disciplined company providing scalable solutions from large scale civil engineering projects to housing developments and agricultural contracts. The Finnerty Company encompasses four main elements x
FINNERTY CIVIL ENGINEERING ƒ
FINNERTY STRUCTURAL ENGINEERING ƒ
FINNERTY CIVIC & PUBLIC AMENITY ƒ
FINNERTY AGRICULTURAL FINNERTY| CLOUGH WEST, GURTEEN, BALINASLOE, CO. GALWAY TEL. 090 9677047 | FAX. (090) 9677012 HTTP:WWW.FINNERTYPLANTHIRE.COM PROJECT OVERVIEW
The main construction elements on the N6 Galway to East Ballinasloe project encompassed the construction of 2.1Km of high quality new motorway, construction of 18 new access roads, construction of 20 number farm access roads consisting of 15Km, construction of 20Km motorway embankments and realignment and excavation of unsuitable material from rivers. ROAD CONSTRUCTION & EARTHWORKS
ELEMENTS
x
x
x
x
x
x
x
x
x
N6 GALWAY TO EAST BALLINASLOE EARTHWORKS CONTRACT CLIENT: Sacyr, FCC, Hegarty
PROJECT DURATION: January 2009 -­ December 2010 PROJECT VALUE: ¼0LOOLRQ 20Km of Motorway Embankments 18Km of Access Roads 20No. Of Farm Access Road (15Km) 55000m3 of excavation and haulage of Peat Material 515552m3 of excavation, Haul and place & compact of C2 material 22790m2 of Strip topsoil 44680m2 of place topsoil 4380m2 of placing terraim/geotextile material Reinstatement of 580 acres of land from construction tips back to agricultural lands. PROJECT OVERVIEW
The N6 Galway to East Ballinasloe Drainage project included the construction of 60Km of new surface water sewer systems, pipes ranging in diameter from 100mm to 600mm. 60Km of new service utility ducting, 2000m of vertical drainage, construction 92 number drainage culverts, mammal underpasses and headwalls and the realignment and removal of unacceptable material from rivers. DRAINAGE ELEMENTS
N6 GALWAY TO EAST
BALLINASLOE
DRAINANGE CONTRACT
CLIENT: Sacyr, FCC, Hegarty
PROJECT DURATION: January 2009 -­ December 2009 PROJECT VALUE: ¼0LOOLRQ x
x
x
x
x
x
x
x
x
x
x
x
x
PVCu Carrier Drainage 150mm ± 375mm 4548 Lin(m) Concrete Spigot & Socket Drainage pipe 450mm ± 600mm 4407 Lin(m) 100mm ± 450mm Filter Drains 28210 Lin(m) uPVC Service Ducts 100mm 19952 Lin(m) uPVC Service Ducts 4 way 19809 Lin(m) Open Channel Drains 101,000 Lin(m) Rockbreaking 21538m3 Filling of verges 9463m3 Accommodation Works Herringbone Drainage 98 No. Headwalls 450mm ± 600mm 92 No. 124 No. Manholes 362 No. Catchpits from 1m > 6m deep STRUCTURAL ELEMENTS
Structure 7 x
x
x
x
x
798 m2 formwork 1217 m3 concrete 995 m2 of Concrete Finish 60no. Precast Beams 92 tonnes of Steel Structure 12 x
x
x
x
x
955 m2 formwork 1541 m3 concrete 1302 m2 of Concrete Finish 81no. Precast Beams 179 tonnes of Steel Structure 42 N6 GALWAY TO EAST BALLINASLOE
BRIDGE CONSTRUCTION
The main construction elements on the N6 Galway to East Ballinasloe project included 3 railway bridges, 3 over bridges, 1 architectural bridge, various farm access bridges and works to 15 structures. x
x
x
x
x
637 m2 formwork 678 m3 concrete 516 m2 of Concrete Finish 34no. Precast Beams 55 tonnes of Steel Structure 13 x
x
x
x
x
298 m2 formwork 796 m3 concrete 882 m2 of Concrete Finish 56no. Precast Beams 57 tonnes of Steel Structure 17 CLIENT: SACYR, FCC, HEGARTY
PROJECT DURATION: January 2009 -­ December 2009 PROJECT VALUE: ¼0,//,21 x
x
x
x
x
534 m2 formwork 1327 m3 concrete 1496 m2 of Concrete Finish 91no. Precast Beams 93 tonnes of Steel SCOPE OF WORKS
Finnerty Plant Hire carried out extensive Bund construction on the N6 Motorway at the Toll Plaza. This project was the most demanding in construction terms. The bund was constructed on bog land with the added difficulty of the location being a Quarry during road construction and filled with peat material. The bund construction was 600m long ranging in height from 2.5m up to 8m. DIFFICULTIES
x The bund construction was carried out when the motorway was open to the public x The ground conditions were extremely poor (bog) and works carried out during winter season. x There Steep inclines where the bund was constructed and at a time of adverse weather conditions. x Ingress of water from adjoining bog lands x The weight if the C2 material had a tendency to creep down the steep incline towards the motorway APPROACH
N6 TOLL PLAZA Finnerty Plant Hire carried out extensive Bund construction on the N6 and
the most demanding in construction terms was the extensive bund at the toll
plaza which consisted of constructing 500m of bund ranging in height from
2.5m up to 8m when the motorway was opened, the duration was 12 weeks.
x Firstly we constructed haul roads using wide pad excavators and track
dump trucks together with wide track bulldozers where we could use
them
x Terraim was used to stabilise the temporary roads
x The imported material was imported to a hard standing point where
the C2 material was loaded onto tracked dump trucks and brought to
the bund under construction
x The C2 material was then placed with long reach 55 feet excavators in
layers
x The full length of the bund was raised in sequence to monitor
movement and each situation that arose would be attended to with its
own solution.
CLIENT: N6 Construction
PROJECT DURATION: Jan 2010 -­ April 2010 PROJECT VALUE: ¼ Finnerty Plant Hire acted as Sub-­contractor over the last decade to many industrial & commercial projects. It expanded it structural wing of the company to carry out both groundwork & substructure contracts as they usually interact in the construction stage & have the machines and quality workmanship to carry out both in the most efficient sequence during a project. Finnerty Plant have constructed a range of basements, swimming pools and sub-­structure work based mostly in the west of Ireland. SITE CLEARANCE
x
x
Strip topsoil & haul off site 3400m2 Excavate to basement level and haul off site 9900m3 BASEMENT & CONCRETE WORKS
INDUSTRIAL & COMMERCIAL
x
x
x
x
x
x
x
x
x
Supply & place concrete 1430m3 Concrete Finishing 2340m2 Waterproofing 3030m2 F4 formwork 3490m2 Multiple Columns Reinforced concrete Beams ranging from 1 to 3 floor support height. Supply and tie Steel Reinforcement 230 tonnes. In-­situ spiral staircase Curved access ramp to basement car-­park OTHER
CLIENT: Ellen Construction
PROJECT DURATION: May 2008 -­ Dec 2008 x
x
PROJECT VALUE: ¼ Traffic Management during all construction of the project. De-­watering of site on a daily basis as basement below sea level which was 50m away from site entrance.(Tidal de-­watering measures) CONTRACT ELEMENTS
Finnerty Plant Hire Involvement in Housing Contracts:
x
x
x
x
x
x
x
x
x
x
x
x
HOUSING PROJECTS
Finnerty Plant Hire has carried out an extensive range of housing projects throughout the west of Ireland and beyond. Finnerty Plant Hire scope of works included from the stripping of topsoil right through to tarring of the site roads and construction up to finish floor level. The wide range of housing contractors is an indication of our company adjusting to different contractors needs. Site Set-Out Using Gps
Excavate To Formation
Hardcore To Roads & Rafts
Installation Of Rafts
Site Drainage
Site Services
Roads And Footpaths
Pumping Station
Finish Floor Screeds To Housing Units
Rising Mains And Road Jobs For Connecting
Services To Sites
Base And Finish Tar Coats
CONTRACT ELEMENTS
SITE CLEARANCE
x
Strip topsoil & haul off site 13600m2 x
Excavate to basement level and haul off site 22000m3 BASEMENT & CONCRETE WORKS
ATHLONE SPRINGS HOTEL & LEISURE CENTRE This project consisted of the construction of Athlone Springs Hotel & leisure Centre, Athlone, Co Westmeath. Contract included all Basement, Swimming Pool, all concrete Sub-­structure work and landscaping upon completion. CLIENT: OYSTER HOMES
PROJECT DURATION: May 2008 -­ Dec 2008 PROJECT VALUE: ¼ x
x
x
x
x
x
x
x
Supply & place concrete 3575m3 Concrete Finishing 5850m2 Waterproofing 7575m2 F1 formwork 8700m2 Columns (ranges in size, shape, height) Reinforced concrete Beams ranging from 1 to 3 floor support height. Supply and tie Steel Reinforcement 270 tonnes. Curved access ramp to basement car-­park SITE CLEARANCE
x Excavation & Site Clearance 1300m3 STRUCTURAL ELEMENTS
x Construction of 48No.concrete reinforced pad bases as foundations for prefabricated buildings DRAINAGE & DUCTING ELEMENTS
x PVCu Carrier Drainage 150mm ± 225mm 235 Lin(m) x PVCu Service Ducts 2 way 300 Lin(m) x PVC (class c) watermain 100mm 155Lin(m) x 6No. Sluice Valves x 8 No. Manholes x 7No. Gullies x 1No. Petrol Inceptor ROADS & PAVEMENTS
MERVUE COMMUNITY SCHOOL The construction of temporary school & all associated services For the Mervue Community CLIENT: MCINERNEY HOMES
PROJECT DURATION: June 2010 -­ August 2010 PROJECT VALUE: ¼180,000.00 x
x
x
x
x
Stone Filling 900m3 2 Course Macadam 1675m2 Kerbing 300Lin(m) Line marking Construction of 2 No. Tennis Courts & Basketball court using coloured macadam finish. x 300mm concrete slab with power float finish for skateboarding, roller blading, BMX bike course. Designed
running track around perimeter
of pitches with specialist
chippings.
Playground to rear of amenity lands with
imported climbing & slide
equipment.
Finnerty Plant Hire acted as main Contractor for this project which entailed the construction of a GAA Pitch and all associated works including, crossfalls &, drainage, surrounding embankments, goalposts & netting. Finnerty Plant Hire also constructed an all weather training area which was originally to be constructed of synthetic Astra turf surface but changed to a sand based grass finish with Wall Ball adjoining on one side. DUNIRY PITCHES
&
BALL WALL
CLIENT: TYNAGH-­ABBEY-­DUNIRY GAA Club
PROJECT DURATION: Sept 2009 ± May 2010 PROJECT VALUE: ¼ SITE CLEARANCE
x
Strip topsoil & store for on site for re-­use 18446m2 x
Cut/Fill and grade subsoil in layers & level to pitch gradients 3230m3 DRAINAGE & DUCTING
x
Pitch Drainage 150mm ± 225mm 1240Lin(m) x
Ducting 100mm 880Lin(m) x
Gravel Mole Drainage 11875Lin(m) SOWING & SEEDING OF PITCH
x
Place topsoil layer of 300mm layers in accordance with pitch finishing levels x
Sowing and seeding of 18,446m2 using specialist pitch finishing equipment. OTHER
x
Netting & Goalposts x
ESB Diversion 125mm 130Lin(m) x
Existing Sewer diversion & Construction of new Percolation area. x
Running track to perimeter of building. TRAINING PITCH
x
Training Pitch Size 70m x 40m x
Supply & Place 300mm layers of stone and topsoil to specified gradients. x
Footpaths & Kerbing x
Boundary Fencing & Netting 220Lin(m) WALL BALL
x
Construction of wall ball 40m wide & 8m High. The Construction of Car park & all associated services for Bullaun Church CAR-­PARK ELEMENTS
x Site Clearance x Excavation & Site Clearance 2000m3 DRAINAGE & DUCTING ELEMENTS
x PVCu Carrier Drainage 150mm ± 225mm 190 Lin (m) x PVCu Service Ducts 2 way 300 Lin (m) x 12 No. Manholes x 15 No. Gullies x 2 No. Soakways ROADS & PAVING ELEMENTS
BULLAUN CHURCH CAR PARK
x Stone Filling 1400m3 x Footpaths 400m2 x Foundations, Blocklaying, Plastering, Wall Capping, Stone face cladding 200 Lin (m) x 2 Course Macadam 2600m2 CLIENT: BULLAUN CHURCH COMMITTEE
x Kerbing 500 Lin (m) x Linemarking PROJECT DURATION: September 2010 -­ December 2010 PROJECT VALUE: ¼ CONTRACT ELEMENTS
SITE CLEARANCE
x
x
Strip topsoil & store for on site for re-­use 21825m2 Cut/Fill to reduced levels 9500m3 DRAINAGE & DUCTING
x
PVCu Carrier Pitch Drainage 150mm ± 225mm 1725 Lin(m) x
Whiz wheel drainage 7371Lin(m) Sowing & Seeding of Pitch
x
Sowing and seeding of 10,000m2 using specialist pitch finishing equipment. OTHER
x
x
x
Netting & Goalposts Boundary Fencing 200Lin(m) Emergency Access Road WORKS TO PITCH ENTRANCE
LIAM MELLOWS GAA PITCH
Finnerty Plant Hire acted as main Contractor for this project which entailed the construction of a GAA Pitch and all associated works including, crossfalls &, drainage, entrance & car park works, surrounding embankments, gaolposts & netting and emergency access roadways. x
x
x
x
x
x
Rock Armour & Shoreline battering Safety Ballards Front Gate Drainage to Car park Tarmac Paths & Kerbing Re alignment of entrance CLIENT: Liam Mellows GAA Club
PROJECT DURATION: May 2009 -­ Sept 2010 PROJECT VALUE: ¼ CIVIL & STRUCTURAL ENGINEERING
AGRICULTURAL
CIVIC & PUBLIC AMENITY
COMPANY VALUES
Finnerty has a unique approach that builds long-term relationships with our
customers, based on our values
Openness
Collaboration
Mutual dependency
Professional delivery
Sustainable
Profitable growth
Innovation
Today's world demands the kind of attitude to business that Finnerty has
adopted from day one, a collaborative approach that makes for easy and
effective working partnerships.
Finnerty have the skills and resources to provide a complete specialist service.
This capability can also be combined to deliver integrated solutions to meet
complex customer needs.
FINNERTY| CLOUGH, WEST GURTEEN, BALINASLOE, CO. GALWAY TEL. 090 9677047 | FAX. (090) 9677012 HTTP:WWW.FINNERTYPLANTHIRE.COM e
FINNERTY CLOUGH WEST GURTEEN BALLINASLOE COUNTY GALWAY TEL. 090 9677047 | FAX. 090 9677012 CIVIL & STRUCTURAL ENGINEERING
AGRICULTURAL
CIVIC & PUBLIC AMENITY
FINNERTY
CLOUGH
WEST GURTEEN
BALLINASLOE
COUNTY GALWAY
TEL. 090 9677047 | FAX. 090 9677012
HTTP://WWW.FINNERTYPLANTHIRE.COM