Silverstone Communities
Transcription
Silverstone Communities
REQUEST FOR QUALIFICATIONS WHEELER PLAZA A Mixed-Use Development San Carlos, California Silverstone Communities November 7, 2008 For information, please contact: Jeff Gilman Director of Acquisitions Silverstone Communities 1733 Woodside Road, Suite 125 Redwood City, California 94061 Telephone: (650) 556-9639 Facsimile: (650) 556-0017 [email protected] TABLE OF CONTENTS I. N ARRATIVE DESCRIPTION OF THE PROJECT II. DEVELOPER IDENTIFICATION III. DEVELOPER EXPERIENCE AND QUALIFICATIONS IV. PROPOSAL FOR DISPOSITION OF SITE V. FINANCIAL CAPACITY OF DEVELOPER - NIP ip li Pt L._ aillakto 'IdliliL :PI " 07;4. iff.'114 1ii.: s -I- -1111111111, C.T.C.," \ ......,„I -411 1 411111..., 41111 I ...— 1111 %...elti , -- —41.11 41. PAIIIIIIMINIk r Itrt iuk .1;..,..! r • , .... r ., • ,.. ,-..?- , ,,... , illitialla ill n gi..ilL Nor - ,. - .4 r fig -if .4 . ;. .ir E2; WI i- A AliSi".' . 3, 4i MOP •,..... tlit...mi ip Poi zi =Ea r onfaill, ----74 - : Ord: k - — — ..S. 114.k‘s % i 1 41 - - )A -- • , .7, 1. ti • %%Ilk Vilif .." Wheeler Plaza, Silvers tone Communities I. Narrative Description of the Project Design Concept: Wheeler Plaza is proposed to be a dynamic addition to the fabric of Downtown San Carlos. In keeping with the quaint, comfortable village flavor of Downtown, our design will create vibrant pedestrian walkways accented by a community fountain plaza along San Carlos Avenue; a graceful residential condominium building that reflects the traditional architectural roots of the community; and parking for both retail and residential that is convenient, but hidden away. Design Direction: From our extensive experience building urban infill communities, there are tour major elements to be addressed in our design — the pedestrian experience, the architectural presence, the vehicular function and the utility connections. Pedestrian - Central to our design is an inviting and colorful public plaza at the corner of Walnut Street and San Carlos Avenue. There are few opportunities for such a community amenity for San Carlos and this location will punctuate the gateway to downtown from the west. A dynamic water feature, tasteful landscaping, and benches for sitting and enjoying the sun will accent the plaza. The plaza will also serve as an entrance to the project and the pedestrian network beyond. coffee house next to the plaza would add life and activity. A flower shop and This project will focus on enhancing and expanding the existing pedestrian walkways that will weave through the proposed community and connect the Laurel Street retail corridor with Walnut Street and San Carlos Avenue. Each of the existing walkways will be upgraded with landscaping and a significant hard surface walkway (brick would seem to tie best). These walks are a fabulous opportunity to create a quaint pedestrian level walking experience as shoppers meander through the downtown retail sector. Architectural — The building design will be elegantly attractive, functional for the residents and tenants and incorporate state of the art "green" features. The building will be three and four stories of residential living space with accent retail along Walnut Street and two to three levels of parking below. There will be approximately 110 - 120 living homes with a mix of one, two and three bedroom homes. The building itself will have superior architectural interest with elevation facades that meander in and out to break up the horizontal massing of the structure. It will also have significant variation in the ridgeline with varying roof heights to soften the vertical massing. Accent appeal will be provided by cobbled awnings, wooden trellises, detailed window trim, and carved eave cornices. Inside the building will be a spacious landscaped courtyard for the residents along with other amenities such as a spa, exercise facility, meeting room, BBC), and rooftop garden. We see the new retail along Walnut Street as housing smaller shops to continue the retail flavor of Walnut, but not to compete with the core retail corridor along Laurel Street. There retail spaces will add life and interest along the pedestrian sidewalks. The existing retail along San Carlos Avenue will be converted into the retail plaza with the remaining land to the east built out to house approximately two retail spaces. The building design will incorporate the latest in green construction and technology. Our architect, BDE, is recognized as one of the leading authorities on green design and we will push the green envelope as new efficiencies emerge. Given the global climate conditions, we need to build responsibly. Some of the features will include a living rooftop garden similar to the highly acclaimed one atop the newly renovated San Francisco Academy of Sciences, solar panels to augment the electrical loads, solar tube corridor lighting, tankless water heaters, ultra sealed ductwork, energy efficient heating systems, high e' value windows, recycle centers, and numerous other features. Vehicular — The building will accommodate both retail parking and separate residential parking. The existing 187 parking spaces will be replaced in their entirety with a majority of ground level parking that is hidden behind landscaping and architectural treatments. The retail parking will be easy to access and allow shoppers to readily flow between their car and destination. We think the shopping experience begins when people drive into the parking area and the design will ensure that the parking levels are enjoyable spaces. The residential parking will be below the retail parking and homeowners will access the podium level above via high-speed elevators. Utility We are experts at incorporating our structures into the existing urban infrastructure. InfiII locations are extremely challenging. It is critical first to understand the needs of our neighbors and the city. Then design a system that works with and improves the existing utility operations. In the case of Wheeler Plaza, there are utility lines to be undergrounded on the east side of the site. In addition, the retail spaces along Laurel and San Carlos Avenue all use the rear of their properties for trash pick-up so the new interior street circulation pattern will address these constraints as well And of course, we will work with PG&E, water, storm, cable TV, sewer and the city engineering department to ensure all the utility systems integrate seamlessly. Wheeler Plaza, Silverstone Communities Developer Identification DEVELOPMENT TEAM: Developer/Builder Silverstone Communities — Northern California, LLC John McMorrow, President 1733 Woodside Road, Suite 125 Redwood City CA 94061 Main: (650) 556-1700 Fax: (650) 556-0017 Email: [email protected] www.silverstonecommunities.com Legal Form: Limited Liability Company (LLC) Architect BDE Architecture 465 California Street, Suite 1200 San Francisco, CA 94104 www.bdearch.com See Appendix for Relevant Experience Landscape Architect MPA Design 414 Mason Street, Suite 700 San Francisco, CA 94102 www.mpadesign.com See Appendix for Relevant Experience Engineer BKF Engineering 255 Shoreline Drive, Suite 200 Redwood City, CA. 94065 www.bkt.com See Appendix for Relevant Experience Financial Partner See Section V Utility Consultant Robert Gray & Associates 4683 Chabot Drive, Suite 150 Pleasanton, CA 94588 Contractor — To be selected Wheeler Plaza, Silvers tone Communities III. Developer Experience & Qualifications Silverstone Communities and its principals have the most expertise building urban infill communities like Wheeler Plaza. Nobody has built more podium projects than we have in the Bay Area. Silverstone's competitive advantage comes from being extremely selective about our property locations and knowing from experience how to design and build superior residential structures. Specializing in high-density urban infill, we carefully choose pedestrian-friendly locations in exclusive city centers, such as Wheeler Plaza, where close proximity to shopping, recreation, highly rated schools and transportation is coveted. Our residents want to be part on an energetic neighborhood - a richer, more active lifestyle for the whole area is the result. We then design building forms that are in harmony with and compliment the surrounding areas. Additionally, Silverstone spends more time and resources than others on meticulous design details. Every component of our building is thoughtfully analyzed to be tasteful and functional. As a result, our projects are great additions to the community and fantastic places to live. Inside, we understand how our buyers live, and we deliver homes that fit their lifestyle. Our focus is on functional floor plans, comfortable living spaces, and a style that is timeless, not trendy. The result is a home that looks better, feels better and lives better, for years to come. Our efforts are always collaborative with neighbors, City Staff, Planning Commission and City Council. With urban infill, there is no other way to be successful. We contact each and every neighbor for their input and keep them involved throughout the process. In addition, we hold community meetings with residents at large before we crystallize any design. We have found that despite our building experience, the residents of a community have been there much longer than we have and often have insights that we would not have realized. Because of this collaborative effort, our projects get unanimous approval without opposition. Our most recent communities in Los Altos, Millbrae and Pleasanton are good examples of this approach as each was widely applauded by the council and there was no one speaking in opposition. Because the projects had been so thoroughly vetted, the council discussion centered on how well the process went - that's how we like it! Our experience is critical to many aspects of the proposed Wheeler Plaza: • We work extremely well with redevelopment agencies. In many ways, we are partners throughout on the project. Our Millbrae project is in the redevelopment district and our principal, John McMorrow, was the lead for his project with the Concord Redevelopment Agency. • • • • • We work intricately with utility companies to guarantee that the infrastructure blends with the existing system and is installed without interruption to the existing neighbors. To this end, we are creative in finding solutions to complex constraints. We know how to build parking below ground and below the water table if necessary. At our 109 home community in Millbrae, the garage is two levels deep with the lower level fully below the water table. In addition, we had to pick up an uphill stream and accommodate its seasonal flow. We have an expert environmental team. Most infill projects need some level of environmental remediation. Whether it is removing asbestos, cleaning the topsoil, or installing treatment facilities, we have done it. We work well with the regulatory agencies to come up with solutions that are enduring. We understand and embrace prevailing wage projects. Our community at Millbrae is prevailing wage even though it is 100% privately funded without any public assistance. Other notable prevailing wage communities by the principals include The Landing at Jack London Square, a 282 unit apartment complex. We can integrate retail and residential building components. This is not an easy task. From a daily operations standpoint, the residential homeowner's association and the retail association want nothing to do with each other. This reality requires each component to be designed to operate independently. Our 80 home condominium project in Cupertino is a good example of how these two uses are designed to work together. The homes sit above 19,000 square feet of retail. Each has its own garage entrance, utility system and dedicated spaces for their particular needs. Key Project Experience Relevant to Wheeler Plaza Park Broadway in Millbrae This contemporary four and five story structure with 109 condominium homes sits atop two and one half levels of parking and includes 13 live work lofts. Situated along the historic El Camino Real corridor, the project continues the retail essence of El Camino and provides much needed housing (and shoppers) to the downtown Millbrae sector. The building surrounds an extensive landscaped podium garden with BBQ's, outdoor fireplace, water fountain, sculpted artwork and a dramatic entryway. Slated for completion in February 2009, this community is well received with 25% presold. • Prevailing Wage Project: Worked closely with local union leaders for successful construction. Bill Knack of the Building Trades Council can be contacted in this regard. • • • • High water table required a two level underground garage to be water sealed, resistant to hydro-static pressure, and equipped with pump/drainage system. Worked closely with Economic Development Department to provide inclusionary housing in conjunction with city goals. Unanimous Staff, Planning Commission and City Council support. Located in the Redevelopment District. Please contact Ralph Petty, Redevelopment Director, at the City of Millbrae (415) 259-2341 as a reference in this regard. Peninsula Real in Los Altos This 78 home condominium community is located in the City of Los Altos on El Camino real and nearby retail shopping. The building itself is a two and three story structure with one level of underground parking. The community includes an abundantly landscaped podium with lap swimming pool, deck seating areas, a tot lot, and lush pedestrian walks. To be completed in March 2009, this community will be home to young families, empty-nesters and professional workers. • • • This project needed extensive community outreach as the site backed onto an existing low-density residential neighborhood. We worked tirelessly with the neighborhood to achieve a design that met their needs and the city's desires. i he project had to have a lower density residential feel on one side and a high-density urban edge on the other. To this end, the project includes 16 townhouses atop the podium that back onto the residential neighbors. The rear of the townhomes are residential in character with gable roofs while the front of the townhomes have flat roofs to transition to the adjacent taller residential building. Inclusionary Housing is provided as part of this complex. Unanimous City support and Council approval. There were no opposition speakers because we had such a successful outreach program. In this regard, please contact the Los Altos Community Development Director James Walgren, (415) 947-2635 or at [email protected] . Villaciio in Cupertino Set in the heart of Silicon Valley, Villagio Cupertino is an eighty unit condominium building with 19,000 square feet of retail along De Anza Boulevard in Cupertino. The impressive building design incorporates three levels of parking all of which is enclosed by the retail and residential spaces. A wonderful compliment to the community, this building adds needed pedestrian level walks arid shopping to the gateway of the Cupertino town center, Nearby are parks, shopping, library, theatre, community center and many high-tech employers. • This signature property was an instrumental feature to the city's community center district as it comers the entrance to the City Civic Plaza. Three level parking garage with two levels dedicated for retail use and the lowest level for exclusive residential use. Each parking element has its own entrance and operates independently from the other. This textbook solution to the mixed-use parking dilemma will serve as the prototype for the Wheeler Plaza parking garage design. COMMUNITY FACT SHEET: PARK BROADWAY Pp,rik,BroandAwEdy DESCRIPTION 96 Condominium Flats and 13 urban inspired Live-Work Lofts 665-1,854 square feet Up to 3 Bedrooms /2 Baths COMPETITIVE ADVANTAGES Close proximity to San Francisco and Silicon Valley job markets Distinguished Millbrae schools Close to \ ibrant downtown area and easy access to major transportation hubs Strategically priced lower than median home price in this desirable area L 0 CATION El Camino Real at Ludeman—Millbrae, California 4 .4 SILVERSTONE COMMUNITIES 41.1.10 COMMUNITY FACT SHEET: PENINSULA REAL DESCRIPTION 78 Townhomes and Flats 790-1,800 square feet 1 to 3 Bedrooms COMPETITIVE ADVANTAGES Prime location in the heart of Silicon Valley Access to the finest educational, dining, shopping and medical facilities Priced lower than median home price in the Los Altos area Within the prestigious Los Altos School District L 0 CATION El Camino Real near San Antonio Road—Los Altos, CA A 101-,Yf 11-g9IN COMMUN IT)" FACT SHEET: VILLAGIO DESCRIPTION 80 Mediterranean Style Condominiums &Tovvnhomes 740-1,430 square feet Up to 3 Bedrooms /2.5 Baths 19,000 square feet of retail space COMPETITIVE ADVANTAGES Premium Silicon Valley location Award-winning Cupertino School District Strategically priced lower than the median home price in this desirable area LOCATION South De Anza Boulevard at Town Center Lane—Cupertino, California ci Stevens Creek Blvd Cupertino Rodrigues Ave Iown Center lane VILLAGIO Pacifica Di Mc( 1,11, fici Padfica n"" Ciri) 8011111ger Rd Ai SILVERSTONE COMMUNITIES § FUR T IN E, Development Experience Peninsula Real Los Altos, CA 78 Condominium Homes $59.8 million revenue Completion 4/2009 Park Broadway Millbrae, CA 109 Condominium Homes $78.5 million revenue Completion 2/2009 Birch Terrace Pleasanton, CA 45 Townhomes $29.9 million revenue Completion 9/2008 The Enclave Santa Clara, CA 35 Single Family Detached $38.2 million revenue Completion 9/2008 Villagio Cupertino Cupertino, CA 80 Condominium Homes $22 million cost Completion 7/2007 Legacy Park Central 259 Apartment Units (56/ac) Concord, CA $52 million cost Managing General Partner Completion 12/2003 Finalist — Real Estate Pillar of the Industry Award - 2004 Finalist --- Real Estate Deal of the Yea r — 2002 Finalist -- Best Residential Suburban Deal of the Year - 2001 The Landing at Jack London Square 282 Apartment Units (31/ac) Oakland, CA $49 million cost Managing General Partner Completion 6/2001 Finalist — Real Estate Deal of the Yew 2002 Pinnacle City Centre Hayward, CA Managing General Partner 192 Apartment Units (29/ac) $24.5 million cost Completion 3/2000 Station Oaks Pleasant Hill, CA Managing General Partner 5.32 Acre Land Development $3.6 million cost Completion 7/1998 Waterford Place San Jose, CA 238 Apartment Units (43/ac) $33 million cost Completion 3/2000 The Carlyle San Jose, CA 132 Apartment Units (29/ac) $19 million cost Completion 2/2000 Cupertino Park Center Cupertino, CA 120 Apartment Units (63/ac) $19 million cost Completion 1995 Exeter Sunnyvale, CA 27 Single Family Homes $10.8 million cost Completion 6/1995 Park Place South Mountain View, CA 120 Apartment Units (50/ac) $18 million cost (est.) Completion 1995 Portofino Phoenix, AZ 440 Apartment Units (24/ac) $48 million cost Completion 4/1995 Bellago Scottsdale, AZ 202 Apartment Units (25/ac) $22 million cost Completion 1995 Scottsdale Somerset Scottsdale, AZ 218 Apartment Units (24/ac) $24 million cost Completion 1996 La Paloma Tucson, AZ 16 Acres for 360 Apartments $8.2 million purchase Acquired 1995 Partridge Knolls — Master Planned Community Novato, CA Kottinger Ranch - Master Planned Community Pleasanton, CA 61 Single Family Homes $21 million cost Completion 1991 147 Single Family Homes $58 million cost Completion 1991 Creekside Larkspur, CA 72 Single Family Homes $24 million cost Completion 1991 Hidden Terrace Hayward, CA 11 Single Family Homes $2.7 million cost Completion 1990 Creekview Court Hayward, CA 8 Single Family Homes $2 million cost Completion 1989 Park View Ilayward, CA 30 Single Family Homes $7.5 million cost Completion 1989 Creekside lIayward, CA 28 Single Family Homes $7 million cost Completion 1988 Springate layward, CA 13 Single Family Homes $3.2 million cost Completion 1988 Rancho Del Rey — Master Planned Community San Diego, CA 1,030 Acres — 2,600 Homes $28 million purchase Completion 1986-1987 Bonita Long Canyon — Master Planned Community San Diego, CA 128 Single Family Homes $38.4 million cost Completion 1985 Wheeler Plaza, Silvers tone Communities IV. Proposal for Disposition of Site Our expectation is to purchase the site from the Redevelopment Agency and, if possible, the adjacent property owner to the south, in fee. We have extensive experience working together in public/private partnerships with cities and redevelopment agencies. Beginning with the first discussions about project concept all the way through completion of the improvements, our partnership and excellent working relationship with the Redevelopment Agency is tremendously important to the success of a project. The principal of Silverstone, John McMorrow, recently has negotiated the following public/private partnership agreements: • City of Millbrae - City Option Agreement, Development Agreement and Affordable Housing Agreement • City of Los Altos - Affordable Housing Agreement • Town of Pleasanton - Inclusionary Housing Agreement • City of Cupertino - Development Agreement, Improvement Agreement and Housing Agreement • City of Concord Redevelopment Agency - Development Agreement, Improvement Agreement • Port of Oakland - Land Acquisition Agreement, Development Agreement Wheeler Plaza, Silverstone Communities V. Financial Capacity of Developer Silverstone Communities has superior financing capability and an excellent financial record. Silverstone Communities is unique in that Calpers and Calsters are direct partners in our company via their advisor Hearthstone Partners. All of our projects have been 100% funded by Hearthstone's dedicated $1.2 billion dollar housing fund. We do not have any debt on our properties — no acquisition loans, no construction loans — nothing. We do everything with all cash. This means we can move quickly to make decisions and perform. We also have excellent banking relationships with Wells Fargo and Bank of America. 3 years financial statements Under separate cover marked "Confidential" Litigation or Disputes None Entity or Individual Bankruptcies None • dirtiitt. • balancing allistic inspiration with leGlini• ti , S ti i iieHoe riesigriiil a custem rLsidentat. hotel, oho • CAC!, d • . :do An:tittering un context Wilh this insight. we can provide oach r Ike unapt, it leginies As mid sired film ide Ilaiat the (....rpacily lor laigei projeds v,hile maintaining ntrr'nch nation ism lit each to ject Since 193t.. 13D1 Architecture 113S Sili.lanirgt in Me design oi projects vihich invoro complex programming_ hallenging site Inialions. difficult apprilval processes, budget constraints rind demanding aristhidic .5 tutu In t he r-nmi tt e ra r i r.:,,rrrer..rn5hre tren t approiti.ti unisreli r tS .:,nigate ktecinui.i..0!;IErfis cce pride ridisei,os0 doirelaping strong cr y nneetwits trek:nen Ari n f: . .1 cloirit consullards nod ir.rillarto r . tetrich is jtaianthwit in •. , F ding in r.oliesive product thal le:tri p ods 1 trc , conoritic and cortslitu.tiatiilily of tho poijer t D..n ARCHIT6CTUfl. We have tirlifficirri inn :on ti forging 1 ,..r. g tern, 1P1;11:011Shg.s win business, innustry. Tr-rein:tient elm a firiniti and res i dentiiit acrlIntro tl'e mike it hut our !wilding; g lIV110111 ,Mtalli that sustainable airintesteret . nur ,o dwirig Finn cr , ircentrial rlesion phase During eonstrumien no mlliomin sumprelrensiite ser.ke and suport ton itiAtrai tOIS, in er,IN to maintain &sign integtily and tinsel:: lhat the initial inspitatihn onin rosier/ is Li p:tight t g calmly Out reputation and aitsaol-tiiintring projects undersiode no am itt bin mm In I WwW.EIDEARCH.COM Sur Jose, Calikania Gincy, California All1Plirair Carootri. Calik.ar OaL. waminiums it Park Anartmcat, Srri i ar FbiltS;11!/ Sunny:ale. California ktournain Sin a Cak,oilia Gallloc, n 3 Spaitment Lily Center Plata Apartments Iltaglits Redwood lily. kalikoraa San Jose. Calitor nia Er Slftet Sal/ Inatal, California Dany Hill Spar Iniankt San Jose. talikania Diable Court Apartineals Walnut Creek. f:alifornia hail Garrison la,.11 Center 1,00 , 11'1,2y. Cahn,' ilia LI i.srrtr%., Colina. Conk-milt, G • 'Irt •; Cannoi y1,1, n.e.d Urroy Lath,: kalitoraia BUI11141,) (Outcry, Calllr.nrni'r t,Oray Rainoad Budding tittuaks Nowt ro...11 Cent. r Heittuks. California Aplos. California rimilms Heinr San Frarita;:,o. Califor Jul ks,n Couilyarti Cantoomientor, Oakland. C.trilottaa Jackst,n Dine San Frannisrx. Carilainkt Jesuit Housing HPlioley. CollIer unto Main Street Hurisioq Half Moon Any. CalitrAn a Mare 15Iand thrat-t Calilornia kt :ae !Hand lovarliomes hrankn Cakiorrta Hartt.stai Grass Galley, Gali10111i0 .1111 Safi Pedro 1•_,..,er Oak ka,k Sall Jose. (AIWA via Sacramanto, Uniform:, WWW.BDEASIC I-1.0 • • tn- rd :k Apartrwrits Pa.i. Mdl 0 • T•I,M0.111 - itanyelv Lakehkuse Villas • ied,.:oofl L, 13 Sf10 San Anionio San Pedro Commons Stmioi Housing Master Han Shoot ConJmnininms 1.;1 .71 12 IN.-at:, Sourite O Itetoihy PI'ln r,f, St re. lh 5f05 Lake - 1/UP f Calilornia S., 'tat Se1 , 1,711.(Ifitt`. Ca111!ania Pnlaluma. California F:ar. Jose Cal.fornia Warson .rille. Conking' tam:Mails California flan.v1f, Oakland, Calilmni.: Sonia Clara. Carifrania Santa Clara. Calit,rnia Palo Alta, CA Colnm. California Coiati, California I.os Altos. California San Jose, Calilorn.a San Jose. Califun a frainjam. Calliarr 1a Pelaliana (.•a:.nr,1111.1 San .11iie. (131ifurr..a SOS Jos,., California CiakUid. Watsomilt,. G7difn..11151 1.10 reta i n Ste.. PAW-, ySILO 3 4- S. As ihica 12/ North ,;,1e0 050 010,10 S11061 1;111:, :- 151,010151 Street San Jo , . Calawn.a San Jose. Calilmn1a Cdlitnrrn San Slats.), Calilorn0 11.1:Aldan' Vie?, r;alit,-Anti, San Frars .1s110. Califnma Oakland, California San IIRD.7.1S.10, [011101 0151 Oakland. California oakland, Oakland, C-,11.1 wWW.BIDEARCH.COM • O. 1.11 41 2›..; _ 41 • Z • I Firm Responsibility: Principal Education :Kenyon College - BA in Studio ArIs and Physics University of Pennsylvania Master of Architecture .10nalllao I nuts. AIA jr adnated Phi Bela Kapp' Plcf.elors degrees in Fine Ails And Pli,sii;s horn ',non College and eri not his MA ,.ters degree in Afolhtehlt rr7 horn he Graduate SLhool ol Fine At Is at Ti flint1r nI F4441s ,• ,..a014. 11E14w:1h:A ais1111.:, New '641. Cit; /, s1429. Cola/ als and Mos, I-Inssi3 .10cm/hail is rt.-Agri:id 1'; IfiffljGf.ai.,a fiffildin9 1:11,N:11 as a I FED ,nct1Iit1t Prole:Isiorr,1 SfiI 1,cusEt1 on lavId4h; ifr;rloinme All In fano!: lit. eam 5f4 , 4i, dry 41.441.1 FefIngimj from allfadatfle 1:mpfrIsIcf nun pull I Fihirkfo l Ito Ins riF,e lesudellI131 isrs :idaphons rI 11151olic Landmaik I . harhail Iii in PASSMI sir fasdaptit) ah; Posit us' s: Ci4ornanihcs bili14419s, i n 111€,erg/8 ‘14s, nI throir9h the San I chaintF4 it CounmuE, At. at;live "pea vial,' s4unr4e1, Jonathan su, ..e35lull'f made a snlo acioss 04, Leglif: ItChInfifil ill YorffenTher 200;Ill nc of wfaqtil; 1.000 i,flteelf:317 ii hiEfroy I S. f!i.s Ef.,fit.ifi tIn liii 17atpltran fioq Vial'. is . c,1 n ; n lohia fru H;rul : Sluf, and iheSin If S:e:nincut JUaZallaaus e eti fTilin Icalem tflympl, I 41. 111n1 p . .I nI AVICHITIECTUAi WWW.EIDEAIRCI-1.COM Altaire Build it Green Certified - 87 Points Palo Arlo. CA Century Center Towers LEED Silver San Jose. CA Pacific Avenue LEED Gold San Francisco, CA 4 ,; Ii _------ ff )0,44111,1 rt./ San Mateo Homes Build It Green Certified - 100 Points San Mateo CA Villa Granada LEED Silver Santa Clara, CA WWW.EIDEARCH.COM MPA Design is a landscape architectural and urban design firm with a 39-year history during which it has completed over 3,000 projects. The work of' the firm is recognized by repeat clients, 110 design awards, and is featured in books and publications. Projects span a broad spectrum of conditions and climactic zones in the United States and internationally, varying from park, plaza, streetscape, lake and fountain design, to healthcare, pedestrian and bicycle circulation, parking and vehicular circulation, transportation facility, campus, and community and corporate design. Master planning, site analysis, programming, and construction documentation are provided by the San Francisco and Walnut Creek offices. Principals Michael Painter, Gerald Kawamoto, David W. Nelson, and Richard Alcina guide services for both public and private clients and incorporate the resources of a 14 person firm with supporting consultants used as required. The design approach of MPA is site specific and sensitive to people's needs and expectations, cultural traditions, art and architecture. Each client's design expectations, program. functional and economic requirements are net in a professional manner. Our approach includes truly collaborative teamwork with each client. Meeting client expectations in a creative and functional manner, balancing the budget and program with environmental qua I ity and regulatory considerations, are our guiding objectives. The firm encourages sustainability and ecologically sensitive designs that utilize indigenous and drought resistant plants, water conserving drainage and brigation systems, and recycled materials. MPA's goal is to create imaginative solutions which retain quality and beauty as they mature. Mr. Kawamoto has been with the firm for 30 years, serving as principal senior designer and project manager for a wide range of landscape architectural and urban design projects. He is responsible for reviewing contract documents and staffing requirements to assure quality control. Education Bachelor of Arts in Landscape Architecture, University of California, Berkeley, 1977, Honors Registration Landscape Architect, California (#2192) His clients include: Residential 2000 Post, San Francisco Ocean Beach Condominiums, San Francisco 1285 Sutter Street, San Francisco 1844 Market Street, San Francisco 88 Franklin, Oakland 88 South Broadway, Millbrae Acapella, Pasadena Acton Courtyards, Berkeley Allegro, Oakland Andante, Emeryville Arpeggio, Pasadena Buck Center Residential Village, Novato Canyon Rock, American Canyon Cummings Park Condominiums, East Palo Alto Delaware Court, Berkeley Domizile, Mountain View Eight Orchids, Oakland Family Housing, UC Santa Cruz Laguna Harbour, Alameda Mesa Verde, Hayward Milpitas Senior Housing, Milpitas Montelena, Pleasanton Montrachet, Napa Oak Walk, Emeryville Olive Apartments, Alameda The Regency at Skyport, San Jose The Residences at Spanish Bay, Pebble Beach Village of Marineo, San Jose Glendale Mixed Use, Glendale Park Broadway, Millbrae California San Bruno Crossing, San Bruno 485 South Monroe, San Jose Civic/Cultural/Streetscape Municipal Facilities Building, Harrisburg, PA Civic Center Plaza/Fulton Street Mall, San Francisco Great Highway/Ocean Beach Reconstruction, San Francisco Market Square/Civic Center, Harrisburg, PA San Francisco Main Library, San Francisco St. James Park, San Jose Wilson Avenue Master Plan, Vallejo Corporate Berlex Biosciences Landscape Master Plan, Berlex Buildings D & L, Richmond Buck Center for Research in Aging, Mann County Genentech Process Science Laboratory, South San Francisco Hewlett-Packard Corporate Headquarters, Palo Alto Hewlett-Packard Building 54, Santa Clara Hewlett-Packard Mayfield, Mt. View Hewlett-Packard Building 46, Cupertino Raychem Technology Center, East Campus Master Plan, Menlo Park Waterfront Great Highway/Ocean Beach Reconstruction, San Francisco Ocean Beach Condominiums, San Francisco Pebble Beach Tennis Courts, Pebble Beach River Park/Wilson Ave. Master Plan, Vallejo Shoreline Park Master Plan, San Rafael Parks and Recreation Dan Foley Park, Master Plan and Phase 1 services, Vallejo Dan Foley Park, Playground-Phase 11, Vallejo Mary B. Connolly Children's Playground, San Francisco St. James Park, Master Plan, San Jose Professional Activities Member, American Society of Landscape Architects, California Council of Landscape Architects; Selection Committee member, City of San Francisco Landscape Architect, Professional Landscape Architectural License (CLARB) exam reviewer 1983-1987 Guest Juror, University of California Extension in 2008 • I BKF Firm Profile 9O ' TARS Of Engineering Excellence! As Northern California's leading consulting firm, EcKF's goal is to establish long-term working relationships with our clients by producing accurate, cost-effective work products and delivering them on schedule and within budget. With a staff of over 245 engineers, planners, surveyors and support personnel, BO- provides excellence in design services. CIVIL ENGINEERING I it: )C \ dOP111'.:111. 'fr • • • 1,110,4140;1(1W:1y SyStelll DeS1p11 Orate Separations Pump Stations C,,ntriiciion Inspection TRANSPORTATION iC R(lilikk ay Design fr I liglovityilitterchange Design 'fr Traffic Si g nal Design fra file Circulation fr • "frank Impact Studies LAND PLANNING fr Planning Permit Application 'fr /enin g Modification ▪ ( ontract Planning to Public Agencies Environmental Review ENTITLEMENT SUPPORT • • • \ u 1%1[111 t RcqUIV:111eIlIS Scheduling third Suit Cost Estimates easibility Studies .11V11-0111TIC ill 1n ('‘ SURVEY (iPS Surveys ( 1.1.S. Base Mips R ls1-111-011 ".": I • A I .TA Surveys fr Boundary SUFV,ys 'fr Topographic 7\ lapping SPECIALTY SERVICES , • • ttiiiitiI 1:ccIarna:ion Differeniial Settlement Site Design Wetlands Permits I ly-drology Studies Poijeel Management CLIENTS OFFICES: Redwood City 650. 482.6300 San Jose 408.467.9100 Pleasanton 925.396.7700 Walnut Creek 925.940.2200 Sacramento 916.556.5800 • ICgC,1 An\ ( isitws'K-12 School Districts 'fr Cities And Counties • (iovernmental Agencies fr ( ornmercial Residential DO,clopeN 'fr I lotels I lospitals And Health Care Facilities • 1 Argc ( orporatiow, TECHNOLOGY • . fr fr A utocksk iniorporating Auto(.AI) 2007 StorinCAD. WateiCAD Auto) t1111 3 . - Oil/ machines for ( 'AD systems klicrosoft hill suite MS Project Adobe suite other graphics applications Voice net II' telephony integration for complete remote access and advanced call forwarding 1000 EL CAMINO REAL MIXED-USE: RESIDENTIAL/RETAIL DEVELOPMENT 1000 EL CAMINO REAL MIXED-USE DEVELOPMENT San Carlos, CA BKF was responsible for providing civil engineering and p1 aiming services for this mixed-use residential, condominium and retail development The 1.3 acre project site is located near downtown San Carlos bounded by Laurel Street to the west, Morse Boulevard to the north, El Camillo Real/Caltrain tracks to the east and existing commercial development to the south. Alleyway was abandoned between Morse Boulevard and Brittan Avenue requiring both wet and dry utilities to be rerouted around the project site. The project includes 90 for-sale residential condominiiiin units, approximately 6,200 s.f. of retail/office space within a four story buildinQ over one level of underground parking garage. To support the project, a portion of Cowuill Renderings courtesy of Christian' Johnson Architects BKF TEAM Todd Adair, PE Kurt Wurnitsch, PE • Principal-in-charge • Project Manager CONSTR. COST • $60 million HIGHLIGHTS • • • • 1.3 Acres 90 for-sale residential units 6,200 s.f. of resident-serving retail space One level of underground parking FRANKLIN. MIXED-USE: RESIDENTIAL/RETAIL DEVELOPMENT FRANKLIN REDEVELOPMENT AREA - MIXED-USE DEVELOPMENT Redwood City, CA improvements and a new traffic signal within Caltrans Right of Way. BKF was responsible for providing civil engineering and planning services for this mixed-use residential, apartment and retail development within the Franklin Redevelopment Area. The redevelopment area is approximately 17 acres located in central Redwood City bounded by El Camino Real to the west, Jefferson Avenue to the north. Ca'train tracks to the east and Maple Street to the south. Infrastructure Master Plan for the surrounding Franklin Redevelopment Area. 13KF also assisted the City with developing a phased The project included 506 residences, 13,000 sl of' resident-serving retail space, 32,000 s.i of office space, and over 2 acres of community open space and recreational facilities. To support the project, two city streets were reconstructed and one was realigned with frontage Rendering courtesy of Mc-la/and Vasquez, Ernsiek BKF TEAM PE Daniel Schaefer, PE Charles Humpal • Principal-in-charge • Project Manager • Project Engineer CONSTR. COST • $60 million Max Keech, & Partners HIGHLIGHTS • 17 Acres • • • 506 residences 13,000 s.f. of lesident-serving retail space 32,000 s.f. of office space 15% of the units were designated as "affordable" • BAY MEADOWS MIXED-USE: RESIDENTIAL/COMMERCIAL DEVELOPMENT BAY MEADOWS DEVELOPMENT IS AN AWARD WINNING PROJECT 2005 CELSOC Engineering Excellence Awards: BKF Received the Merit Award •• Golden Nugget Awards: BKF Received the Grand Award 200e1 BAY MEADOWS DEVELOPMENT San Mateo, California BKF prepared the Engineering Master Plan and was responsible for the civil engineering of site improvements for 90 acres of this 173-acre site. The project combined 1.1 million s.f of commercial office (including the Franklin Templeton Corporate Headquarters), 153 single-family residential units, 575 luxury apartment/condominium units, live/work units. a 240-room hotel, supermarket and retail shops in a village-style community built on the site of the former Bay Meadows practice track adjacent to Highway 101. The inlrastructure improvements included a new major arterial roadway, local public and private streets and modifications to the Highway 101/Hillsdale interchange configuration as shown on the approved PSR/PR. HIGHLIGHTS • • • • • • • • Engineering Master Plan Site improvements including grading, drainage, water, sewer, and joint trench Coordination with Caltrans for modifications to Interchange at Highway 101/Hillsdale Boulevard configuration 5,000 LI. of 4-lane divided arterial street with landscaped medians 5,400 If. of perimeter architectural wall 5,2001.f. of interior residential roadway New traffic signals Offsite intersection and signalization modifications .11K.