project - rimmsa

Transcription

project - rimmsa
HISTORY AND TRAYECTORY
MEXICAN COMPANY
IN OPERATIONS
SINCE 1984
ENERGY AND
INDUSTRIAL SECTORS
ASME PRESSURE PART
MANUFACTURING/ASSEMBLY
FIELD SERVICES SUCH AS:
ERECTION, MAJOR REPAIRS
AND GENERAL POWER
PLANTS RETROFITS
ENGINEERING SERVICES
ISO 9001
CERTIFICATION
SAA WITH
FIRST EXPORT
APODACADA
PLANT
OPENING MEXICO
CITY OFFICE
START OPERATIONS
OF
ASME AND NBIC
FIRST PROJECT
FIRST FABRICATION
First Project
1984
1988
1990
1994
1997
2005
2006
2014
FUNDAMENTS
MISSION
RIMMSA is a highly specialized and qualified company that provides field services and
ASME components manufacture/assembly for the industrial and energy sectors.
QUALITY POLICY
RIMMSA is highly committed to customer service, quality and total contract
compliance.
RIMMSA continuously improves it’s QMS through the review and updating of business
processes in order to continuously and sustainably grow and strengthen as a leader
company in it’s sector.
VISION
To consolidate itself in a world class company and leader in it’s sector, with a highly
skilled committed staff, strategic alliances, the most efficient systems, good finances
and the highest commitment level with our community, employees, suppliers, clients,
partners and stakeholders.
LOCATIONS
MONTERREY
Headquarters &
Manufacturing Plant
MEXICO CITY
Engineering and
Commercial office
COATZACOALCOS
Sales presence
HEADQUARTERS
LOCATED IN THE BUILDING VAO 2 7th
FLOOR
VALLE ORIENTE, SAN PEDRO GARZA GARCÍA, NL
DEPARTMENTS:
CEO
OPERATIONS
PROJECT MANAGEMENT OFFICE
ALL THE ADMINISTRATIVE AREAS
PROCUREMENT & LOGISTICS
ENGINEERING
MANUFACTURING PLANT
Located in Santa Rosa
Industrial Park, in Apodaca,
Nuevo Leon.
DEPARTMENTS:
PRODUCTION
QUALITY ASSURANCE
MATERIAL RESOURCES
One of the biggest
industrial areas in Mexico.
Strategic location to identify
supplies and exporte products to
the USA.
MANUFACTURING PLANT
TOTALLY EQUIPPED:
LAYDOWN AREA
PATIO
TOTAL AREA: 2,154 M2
(23,186 SQ FT)
NAVE 1
SHOP FLOOR
TOTAL AREA: 2,800 M2
OFICINAS
NAVE 2
(30,128 SQ FT)
(2 BAYS)
(4) Pines Machines for bending of piping
(2) Semiautomatic welding cars of 4 heads
each one.
3 Gantry Cranes
Heat Treatment and HT equipment
SERVICES
MANUFACTURING
ASME PRESSURE PART
MANUFACTURING/ASSEMBLY
DESIGN, MANUFACTURE,
INSTALLATION, AND PUT IN
SERVICE OF HRSG‟s
WITH CGV ENERGY, SUBSIDIARY COMPANY OF
RIMMSA IN CONJUCTION WITH HAMON DELTAK
FIELD SERVICES
EMERGENCY REPAIRS/SERVICES
INDUSTRIAL CONSTRUCTION RETROFIT PROJECTS
ASSEMBLED MAJOR EQUIPMENT, PROVIDED
EMERGENT FIELD TUBE REPLACEMENTS,
INTEGRAL MAINTENANCE , MAJOR REPAIRS AND
UPGRADES IN BOILERS, HEATERS,
HEATEXCHANGERS, AND MORE.
RIMMSA PROVIDES SPECIALIZED AND HIGH-QUALITY GOODS AND SERVICES TO:
ENERGY POWER PLANTS SUCH
AS:
COMBINED CYCLES
REFINERIES
GAS PROCESSING PLANTS
THERMOELECTRICAL
CARBOELECTRIC
PETROCHEMICAL PLANT
REPAIRS ONBOARD SHIPPING TANKERS
PULP AND PAPER MILLS, STEEL MILLS, AND
MORE…
SERVICES
FIELD SERVICES
Compliance with execution times
High experienced engineers
Quality of works
Qualified labor work
Security
Aggregate value policy
SERVICES
FABRICATION
ASME “S”
Pressure Parts for steam generators, industrial, marine, and any kind of
boilers.
ASME “U”
Drums, Tanks, etc.
LOCAL
CONTENT
MORE THAN
110 CONTRACTS
HIGH QUALITY
STANDARDS
INTERNATIONAL
MARKET
ASME “H”
Heaters
SERVICES
1
Lakeland, FL
City of Lakeland
3
Valparaiso, IN
NIPSCO
5
Houston, TX
Universal Compression (Exterran)
2
Louisville, KY
Louisville Gas & Electric
4
Lena, LA
Cleco Power LLC
6
Orlando, FL
Orlando Utility Commission (OUC)
FABRICATION
FOR USA MARKET
10
3 8
12
11
7
2
4
13
5
1
6
9
7
Dumfries, VA
Dominion Generation
9
Orlando, FL
Orlando Utility Commission (OUC)
11
Manchester, OH
Dayton Power & Light (DPL)
8
Wheatfield, IN
NIPSCO
10
Yarmouth, MA
Florida Power & Light (FPL)
12
Easton, PA
PPL Generation, LLC
13
Gainesville, FLGainesville Regional
Utilities (GRU)
SERVICES
ENGINEERING
SHOP DETAILING DRAWINGS CAPABILITIES
AS REQUIRED FOR FABRICATION
FEASIBILITY ENGINEERING AND CALCULATIONS
INVERSE ENGINEERING
ASME CALCULATIONS
DETAIL ENGINEERING
3D DESIGN
SERVICES
DESIGN, MANUFACTURE, INSTALLATION, AND PUT IN SERVICE OF HRSG‟s
CGV Energy is the subsidiary company of RIMMSA that develops this service
http://cgvenergy.com
CERTIFICATIONS
RIMMSA manufactures pressure parts in compliance with A.S.M.E (American Society of Mechanical
Engineers) and it is regulated by Bureau Veritas having the following certificates of authorization . The
repairs on site are done according to NBIC. (National Board Inspection Code)
FABRICATIONS
REPAIRS
Under the ASME code (American Society of Mechanical
Engineers) Section I an are the stamps “S”, “U” & “H”.
Done according to the NBIC. (National Board Inspection
Code) they have the stamps “R” Y “NB”.
STAMPS
HEATERS
PRESSURE VESSELS
BOILERS
REPAIRS ON SITE
ORGANIZE, REGISTRY AND
CONTROL OF FABRICATIONS
CERTIFICATIONS
THE QUALITY MANAGEMENT SYSTEM OF RIMMSA IS CERTIFIED WITH THE INTERNATIONAL NORMATIVE ISO
9001:2008. RIMMSA IS REGULATED BY TüV SüD AMERICA OF MEXICO.
RIMMSA developed, implemented and formalized the
quality management system internally on April 29th,
2013 and obtained the certification on August 20th,
2014 with the purpose of:
Standardize the documentation of the operative
processes
Control the operative processes
Comprehend and satisfy more adecuately the
needs and expecations of its clients
Improve its administration
Satisfy the requirements of the international
normative ISO 9001:2008
The system includes the management of services
and products of field services and metal mechanical
manufacturind, supply of materials and any other
related services.
This includes: Sales, Development and presentation of
technical and economical proposals, metal mechanical
manufacturind, administration of field services, and
billing.
VALUE PROPOSAL
HIGHLY SPECIALIZED
ENGINEERING
HIGHLY QUALIFIED
LABOR
26 YEARS IN THE
INDUSTRY AND 6
EXPORTING TO USA
MORE THAN 450
CONTRACTS
100% MEXICAN COMPANY
STAMPS “S”,”U” Y “H”
OF ASME
STAMPS “R” Y “NB”
OF NBIC
ISO 9001
CERTIFICATION
NATIONAL
COVERAGE
CAPACITY TO INSTALL
INFRASTRUCTURE ON
SITE
STRATEGIC
ASSOCIATIONS
INTERNATIONAL
PROCUREMENT
CREDENTIALS
CLIENT: SIEMENS
(Comision Federal de Electricidad, Tula
Conventional thermal Power Plant (5 x 300
Mw))
PROJECT
CFE Tula, Unit # 3 & # 4, Pressure Part Supply, Fabrication & Installation
(2) X 300 Mw Radiant Boilers Babcock & Wilcox Canada
SCOPE
Fabrication highlights: RIMMSA Completed and shipped 120 Water
Wall Panels, 112 Economizer Elements, 156 Superheater elements,
104 Reheater Elements and 24 headers with a total weight of 886
Tons, consisting of 56 truck loads of ASME pressure part
components in 8 months.
Installation highlights: RIMMSA installed all the pressure parts, new
Howden air preheaters, ducts, insulation, refractory, Peabody
burners and supplied through T&M all the qualified labor for the
redesigned condenser works. Over 17,000 (shop & field) pressure
part welds at time of final Hydro, there were a total of 8 leeks.
CREDENTIALS
CLIENT: PEMEX REFINACION, REFINERIA
FRANCISCO I. MADERO
(Waste Heat Boiler BI-DRUM Babcock & Wilcox of
Mexico)
PROJECT
Rehabilitation of Waste Heat Boiler U-100 at Catalytic Plant 2 (FCC-2)
SCOPE
RIMMSA developed all the project detailing drawings by inverse
engineering, supply of boiler tubes, ASME Fabrication of all
pressure parts, (230 Tons) hydrostatic test, pneumatic test,
Radiographic test, PWHT, Painting, chemical cleaning,
instrumentation, expansion joints, duct work, stack paint, and
more…The installation works executed according to the National
Board Inspection Code. (-R- Stamp)
CREDENTIALS
CLIENT: SIEMENS
(PPL Electric Utilities Corporation, Martin„s Creek
Station, Bangor, PA , Unit-4)
PROJECT
Fabrication of Horizontal Reheater Replacement For an 800 Mw unit
SCOPE
RIMMSA fabricated and shipped 303 RH
Assemblies with Hanger Tubes, Terminal Tube
(partial) & Inlet Leads and SCW Panels, Door &
Sootblower Panels with a total weight of 937
Tons, consisting of more than 50 trucks loads of
ASME pressure part components.
CREDENTIALS
CLIENT: ALSTOM POWER
End user: Iberdrola
PROJECT
Monterrey Unit 41 Once- Through Cooler (OTC) Retrofit. Consists on
changing tubes with fissures and pressurizing the component air side and
water side to assure the reparations were made correctly.
SCOPE
RIMMSA completed more than 450 welding joints with 0% of rejection as
well as Non Destructive Test:
• Ultrasonic test
• Penetrant test
• Radiographic test
The result was 100% of acceptance, as well as hydro test reaching to a
pressure as per ITP specified. The retrofit was finally stamped with our –
R- Stamp according to National Board Inspection Code.
CREDENTIALS
CLIENT: ICA Fluor
(Final User: GDF Suez Tractebel Energia de Monterrey)
PROJECT
Complete reconstruction of the Air-Cooled Condenser (ACC)
CREDENTIALS
CLIENT: PEMEX REFINACION, REFINERIA
ING. ANTONIO M. AMOR (RIAMA)
(Boiler SF of 200 tons of capacity Foster Wheeler)
PROJECT
Rehabilitation of CB-9 Boiler
SCOPE
RIMMSA developed all the project detailing drawings, supply
of boiler tubes, ASME Fabrication of pressure parts, (210
Tons) hydrostatic test, pneumatic test, Radiographic test,
PWHT, Painting, chemical cleaning, instrumentation,
expansion joints, duct work, stack paint, and complete
BMS…The installation works executed according to the
National Board Inspection Code. (-R- Stamp)
CREDENTIALS
CLIENT: PEMEX GAS Y PETROQUIMICA BASICA
COMPLEJO PROCESADOR DE GAS CACTUS
Heat Recovery Boiler CH-31 Deltak
SCOPE
Complete Fabrication of the Heat Recovery
Boiler CH-31 including inverse engineering,
ASME calculations, detail drawings, supply of
all the materials and all non destructive test
according to the code.
Upper Dome (11.4 Tons)
Lower Dome (100.1 Tons)
CREDENTIALS
CLIENT: CFE CT Valle de Mexico
PROJECT
Scope: Supply and Manufcature of Economizer and
Superheater Elements
FULL SCOPE
• Supply and manufacture of 130 elements of the
upper bank of the superheater of intermediate
temperature for the steam generator of Unit 2
and 3 with an approximate weight of 95 tons.
• Supply and manufacture of the economizer bank
for the steam generator of Unit 1. Approximate
weight of the bank of 30 tons.
CREDENTIALS
CLIENT: GDF Suez Energy
Monterrey Power Plant
PROJECT
Dismounting of High and Low pressure Gas Heaters and
Mounting of new Gas Heaters HP E-450 and LP E-400.
SCOPE
• Dismounting of the current High and Low Pressure Heaters
• Mounting and connection of the new High and Low
Pressure Heaters
• Mounting of the Flash tanks and Condensate Pumps
including foundation.
• Installation of instrumentation for Gas Heaters and Flash
Tank
• Supply and Fabrication of piping lines and platform for
connection of Flash Tank.
• Installation of piping from the flash tank to the
demineralization tank.
+52(81) 83353052
www.rimmsa.com
[email protected]
¡THANKS FOR YOUR TIME!