CONTRACT ALLOCATION NO.
Transcription
CONTRACT ALLOCATION NO.
"Contract Allocation" CALL CT 2003 / 2013 CONTRACT ALLOCATION NO. : CT 2003/2013/5014 RD480/13 RD File No. : TM File No. : Other related files : Rev 1 CLASSIFICATION OF WORK ASSIGNMENT: RWP Ref : CA Issue Date : Level 1 CLOSING DATE : X RWP1-1012/14 Level 2 Level 3 CLOSING TIME : LOCATION FOR SUBMISSION: 1. 2. Locality and Location of Works : Construction of P/O Triq Ninu Cremona u TGF Triq Ninu Cremona, Paola (A3 Towers) Entity Requiring work : X Transport Malta Other : 3. Description of works required : Road construction 4. Delivery Period of Works : 35 calendar days (ref to cl. 1.1.11 as necessary). 5. Works Order Ref. : 6. Start Date : 7. Total "Contract Allocation" Value : € 127,602.81 8. Enclosed Documents forming part of this Works Order Contract : Site Plan: X 1 (if applicable). ____/_____/_____ End Date : ____/_____/_____ attached Construction detail(s): X Copy of works' permit and conditions: X Programme of works: X attached Traffic management plan: X attached Quality assurance programme: attached RWP1-1012/14 N/A Comments : Page 1 of 2 CT 2003 / 2013 "Contract Allocation" CALL 9. General : i. The Contract and the Works emanating from the award of this "Call-Off" shall be regulated by all the applicable Contract Conditions and Specifications defined under the Framework Agreement for the construction and maintenance of roads and for trenching and plant laying works for the extension and renewal of electricity cable, potable water and waste water pipe networks in different localities in Malta and Gozo on behalf of the Authority for Transport in Malta. ii. The appointed contractor shall enter into a Contract of Works in respect of this assignment in accordance with Appendix I of Volume 1 of the Invitation for participation in the Framework Agreement. 10. Product & Performance Guarantee : € _________________ To be submitted as per cl. 1.1.14 and Volume 2, Section 4; 10% of this Contract Allocation Value. Submission within 10 days from Notification of Award. 11. Declaration : In response to your invitation to tender for the above contract, I / we, the undersigned, hereby i. declare that: I / We have examined and accept in full the content of this “Contract Allocation" No. […….......]. I / We have inspected and familiarised myself / ourselves with the location of the Works and the corresponding site conditions. I / We hereby accept the provisions of this dossier in their ii. entirety, without reservation or restriction; I / We offer to execute and complete, in accordance with the terms of the "Contract Allocation" dossier and the conditions and time limits laid down, without reserve and restriction, the iii. required works; The price of my / our tender is to be decided in accordance with the rates tendered in the attached Schedule of Rates. It is also declared that if no other rates are indicated in this iv. Schedule of Rates our tender shall be as per maximum rate. This tender is for a period of 150 days from the final date of submission of tender. v. If my / our tender is accepted, I / we undertake to abide by all applicable contract conditions and specifications defined under this Framework Agreement that I / we have entered into with the Authority for Transport in Malta. Name & Surname : _________________________ authorised to sign obo : __________________ Signature : Date : Stamp of the company : Page 2 of 2 Rev 1 CT 2003 / 2013 Rev 1 Work Order WORK ORDER : UNDER CONTRACT ALLOCATION NO. : CT2003/2013/5014 RD File No. : Works Order No. : RD480/13 TM File No. : Other related files : Type of Works Intervention : 1. 1 Road Works Permit No. : X Level 1 RWP1-1012/14 Level 2 Level 3 Locality and Location of Works : P/O Triq Ninu Cremona u TGF Triq Ninu Cremona , Paola (A3 towers) 2. Entity Requiring work : X 3. Transport Malta Other Description of works required : Road Construction 4. Delivery Period of Works : 5. Works Required : X 6. 35 calendar days. Start Date __________ / End Date _________. between 6:00am & 8:00pm between 8:00pm & 6:00am on 24 / 7 basis Emergency "Call-Out" Roster 20% Surcharge applicable : works outside standard normal working time Emergency "Call-Out" Roster 7. Total "Contract Allocation" Value : € 127,602.81 Total "Work Order" Value : € _________________ 8. ROAD TYPE : B (series 700, table 7/3), CONSTRUCTION CLASS : VI (5) (Charts, Vol. 7) 9. Compaction Level as per sub cl. 901.18 and 927.1 10. X Enclosed Documents forming part of this Works Order Contract: X X Site Plan: Construction detail(s): Copy of works' permit and conditions: attached attached attached refer to RWP1-1012/14 X X Programme of works: Traffic management plan: Quality assurance programme: attached attached attached X Estimated Max Works Order Schedule of rates : 11. Applicable attached Traffic Management Payable as follows : STMP 01 -019 TM & Site Safety table cl 4.2.1 X Extraordinary Work Value < €500 TM & Site Safety table cl 4.2.1 TM & Site Safety Contracting Authority: Signed by : In the capacity of: Being fully authorized by and acting on behalf of: Date: 2000 1250 tm Transport Malta 2000 tm Transport Malta 1250 APPROVED PROJECT : ARCHITECT DRAWING TITLE : DESIGN MANAGER DRAWING No. : Framework Drawings FM-18 SCALE : DRAWN BY 1 : 20 File Path : p:\design\common area\public transport reform\framework.dwg tm Residential Roads TM Works Signs DATE: File No. : 1-12-2014 Revision : * Transport Malta Roads & Infrastructure Directorate SHEET SIZE : A4 * Revision Alterations Date 900 900 Warning 600 600 Keep out Construction Area Authorized Personnel only Sign 900 900 600 600 ROAD CLOSED tm Transport Malta MUST BE WORN AT ALL TIMES Construction Area Safety Wear Sign APPROVED PROJECT : Framework Drawings ARCHITECT DRAWING TITLE : Construction Area Works Signs DESIGN MANAGER DRAWING No. : FM-19 SCALE : DRAWN BY p:\design\common area\public transport reform\framework.dwg File No. : 16-1-2013 Revision : n.t.s. File Path : DATE: * Roads & Infrastructure Directorate SHEET SIZE : A3 * Revision Alterations Date FOOTPATH LEVEL 150 C20 100MM THICK IN-SITU CONCRETE MIX 500 PRECAST KERB 255 x 125 TO B.S. 7263 : PART1 C20 CONCRETE GUTTER 200MM WIDE X 150MM DEEP JOINT SEALANT - Rev : Issued drawing. Remarks : TYPE 3 Footways and Paved Areas - Type 3 ROAD CONSTRUCTION DETAILS 150 120MM TYPE 1 MATERIAL C15 IN-SITU CONCRETE MIX Transport Malta Roads & Infrastructure Directorate tm C15 IN-SITU CONCRETE MIX ACCEPTABLE MATERIAL 225 Drawn : Date : Title : PROPOSED CARRIAGEWAY LEVEL TACK COAT 40MM WEARING COURSE (PSV ≥ 53) 60MM BINDER COURSE 150MM TYPE 1 SUB-BASE MATERIAL 150MM CEMENT BOUND MATERIAL SUB-BASE NOTES: RD 263/14/RS Drawing No. : 1. ALL DIMENSIONS ARE IN MILLIMETRES. RESIDENTIAL ROAD - TYPE 3 PROJECT Triq Ninu Cremona u TGF Triq Ninu Cremona, LOCALITY Paola Item 1 2 3 Week 1 4 5 6 7 27 28 Week 5 29 30 31 32 33 WSC works Excavation works Construction of pavements and gutters Road formation works Asphalt works Item WSC works Excavation works Construction of pavements and gutters Road formation works Asphalt works 8 9 Week 2 10 11 12 13 14 15 16 Week 3 17 18 19 18 19 20 21 Week 4 22 23 24 25 26 11/13/2014 Summary FRAMEWORK AGREEMENT: SCHEDULE OF RATES 1 1 1 1 1 1 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola Contract No: CT 2003 / 2013 / 5014 1 1 1 Contract Summary Sheet Item 1 0 1 1 1 0 1 1 1 1 1 1 0 1 0 0 0 0 1 0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000 11.000 12.000 13.000 14.000 15.000 16.000 Amount (€) Amount (€) inclusive of VAT, Eco-Contribution and all other/taxes as may be applicable inclusive of VAT, Eco-Contribution and all other/taxes as may be applicable Description € 0.00 € 986.40 € 19,419.30 € 1,403.29 € 0.00 € 3,972.58 € 863.00 € 4,110.73 € 14,941.80 € 1,561.65 € 68,773.20 € 0.00 € 1,301.86 € 0.00 € 0.00 € 0.00 € 0.00 € 117,333.81 Traffic Management & Site Safety General Site Clearance & Demolition Works Earthworks & Road Formation Trench Excavation & Backfilling Works Installation of Buried Infrastructure (Electrical) Installation of Buried Infrastructure (Potable Water / Waste Water) Service Utilities Storm Water Network Kerbs & Paving Wall Construction Works Asphalt Works Traffic Lights / Pelican Crossings & Belisha Poles Structural Concrete Works Miscellenous Works Day Works Structural Repair Works Emergency Works TOTAL : 0 1 1 Traffic Management & Site Safety : % 1 As per drawings attached with this "Contract Allocation". 6 % € 7,040.03 1 1 GRAND TOTAL : Page 1 of 25 € 124,373.84 6 Print date : 11/13/2014 Traffic Management + Site Safety FRAMEWORK AGREEMENT: SCHEDULE OF RATES ITEM DESCRIPTION Expected Level of Traffic Management and its compensation, shall be as indicated in the “Contract Allocation” and subsequent “Work Orders”. Payments shall be carried out as per cl. 4.2.1 - Volume 4. The below list indicates Traffic Management and Site Safety equipment which the contractor is expected to have at his availability to accomodate the Traffic Management and Site Safety requirments requested by the Contracting Authority. 0.000 Traffic Management & Site Safety 1 A Vertical Signage : The rate shall include for the graphical design and related submissions to the requirements as described herein. The graphical design details shall comply with Note : the equivalent diagram number of the UK TSRGD / TSM (or to an equivalent reputable national traffic sign regulation of an EU member state. This equivalent 2 0.001 3 16 0.001 a. 0.001 b. 0.001 c. 0.001 d. 0.001 e. 0.001 f. 0.001 g. 0.001 h. 0.001 i. 0.001 j. 0.001 k. 0.001 l. 0.001 m. 0.001 n. 17 0.002 18 0.002 a. 0.002 b. 0.002 c. 0.002 d. 0.002 m. 0.002 n. 0.002 o. 0.002 p. 4 5 6 7 8 9 10 11 12 13 14 15 19 20 21 30 31 32 33 34 B regulation must be declared and submitted to Transport Malta for approval prior to the fabrication of the signs). Retroreflective triangular, round or octagonal traffic signs, Class RA3 (microprismatic DIN 67520-4, Table 3 or equivalent). Rate shall include for the temporary supporting posts (height as required) weighted to balance as necessary. Rate applicable to Signs as per item (a.) to (n.) below : "Men at Work" Triangular Sign Size 900mm; "No Entry" Round Sign Size 600mm; "No Entry" Round Sign Size 900mm; "No Left Turning" / "No Right Turning" Round Size 600mm; "No Left Turning" / "No Right Turning" Round Size 900mm; "White on Blue Arrow" Round Sign Size 900mm; "Loose Chippings" Triangular Sign Size 900mm; "Lane Narrows" Triangular Sign Size 900mm; "STOP" Octagonal Sign Size 900mm; "SLOW" Round Sign Size 900mm; "Speed Limit" Round Sign Size 900mm; "No U Turn" Circular Sign 900mm; "Height Limit" Round Sign 900mm; "No Parking" Circular Sign 900mm. Retroreflective rectangular / square, Class RA3 (microprismatic DIN 67520-4, Table 3 or equivalent). Rate shall include for the temporary supporting posts (height as required) weighted to balance as necessary. Rate applicable to Signs as per item (a.) to (p.) below. "25m", "50m", "100m", "200m" (supplementary plate) distance sign 0.27m x 0.80m "No Entry Except for Residents & to Render Service" Size 0.60m x 0.9m (minimum dimensions) "No Entry Except for Public Transport" Size 0.60m x 0.9m (minimum dimensions) "Road Works Ahead, Reduce Speed Now" Sign Size 0.6m x 0.9m (minimum dimensions) "Temporary Traffic Lights Ahead" Yellow Sign 0.6m x 0.9m (minimum dimensions) "Road Construction Ahead" Red Sign 0.6m x 0.9m (minimum dimensions) "Find Alternative Route" Yellow Sign 0.6m x 0.9m (minimum dimensions) "Pedestrian Crossings" white on blue Sign TRANSPORT MALTA SIGNS 2.00m x 1.25m "This Road was Resurfaced by Transport Malta" Sign, inclusive of supporting posts (height as required) weighted to balance as necessary, drawing ref FM 17. 2.00m x 1.25m "This is a Transport Malta Project" Sign, inclusive of supporting posts (height as required) weighted to balance as necessary, drawing ref FM 35 0.003 36 0.004 37 0.005 38 0.006 2.00m x 1.25m TM / Contractor Sign, inclusive of supporting posts (height as required) weighted to balance as necessary, drawing ref FM 18. 39 40 0.007 Supply, transport, install and remove Site Specific Sign to a maximum size of 2.00m x 1.25m. Wording on sign as directed by Officer in Charge. C 50 0.008 0.009 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 51 0.018 41 42 43 44 45 46 47 48 49 17. 2.00m x 1.25m "Bini ta' Toroq Residenzjali" Sign, inclusive of supporting posts (height as required) weighted to balance as necessary, drawing ref FM 18. Traffic Safety & Control Equipment Reflective Cone with base, minimum height 18". Orange Safety Fence Barrier with posts, 1.20m high minimum. Caution red and white tape (LDPE), 3" - 6" wide, fixed to posts as necessary. Parade Barricade (plastic or metal). D Cell Flasher with Battery (Amber). Temporary metal hoarding fence (minimum height 2.10m). Including supporting posts. Covering to hoarding with green netting. Rate is to include removal at completion and maintenance as necessary. Red / White (alternate) Plastic barriers. Delineator strips with reflectors. Concrete Jersey Barriers. Temporary Mobile Traffic Light Set (Red / Amber / Green) in working order including electrical supply / power source and mounting arrangement. Page 2 of 25 Print date : 11/13/2014 Traffic Management + Site Safety FRAMEWORK AGREEMENT: SCHEDULE OF RATES 52 D 56 ITEM: Note 0.019 0.020 0.021 57 0.022 58 0.023 0.024 0.025 53 54 55 59 60 61 E Horizontal Signage DESCRIPTION Measure, temporarily mark, set out, supply and lay retroreflective road markings for temporary purpose. 100mm wide white / yellow line marking temporary road tape. 100mm wide double yellow line marking. 100mm wide yellow / white line marking. Apply roadmarkings for temporary Pedestrian Crossing to the UK Zebra, Pelican and Puffin Pedestrian Crossings Regulations and General Directions (inc. Amendments) and Transport Malta specification Series 1200 to the typical layout as shown in the UK TSM 5 - Figure 15-1. Diag. 1002.1 (Stop line), 400 mm wide. "STOP", 1600mm as per UK TSRGD, Schedule 13.VI. Diag. 1022, "SLOW", 1600mm as per UK TSRGD, Schedule 13.VI. Miscellenous Temporary pedestrian bridge with railing, at least 1.0m wide. Temporary metal plate to take traffic loading, maximum dimension 2.0m x 2.0m. Light Scarify over existing surface to remove horizontal signage Paint in black over existing surface Supply and apply hazard marker paint (yellow / black) on structures (tunnel portals, columns, arches) TSRGD Diagram 530.2 in yellow (retroreflective > 65 0.026 0.027 0.028 0.029 66 0.030 100mcd) and black bands to the dimensions indicated. Rate to include for the surface preparation, minor edge repairs (infilling with proprietary high strength 67 0.031 69 i ii. 0.032 0.033 0.034 62 63 64 70 77 78 78 concrete repair mortar) priming of surface and lifting / hoisting / working platform. Portable LED VMS Sign Outdoor Usage inclusive of Electrical Supply / Power Source in either character / line and or full matrix (pictorial message) at one time to EN 12966 as below, including mounting arrangements : Single colour line or character matrix Fixed LED pictogram and text FLOOD LIGHTS including necessary hauling and lifting equipment. Cross over existing sign with red adhesive tape and remove as necessary. Safety Cover existing sign with leather bag (any size) and remove as necessary. SUB - TOTAL 0 (CARRIED TO SUMMARY SHEET) 0 Page 3 of 25 0.00 0 Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Max. Amount QTY UNIT 0.00 no. 40.00 0.00 0.00 0.00 0.00 0.00 no. no. m run m run 20.00 250.00 20.00 25.00 0.00 0.00 0.00 0.00 0.00 sq m 7.00 0.00 0.00 sq m 6.00 0.00 0.00 0.00 0.00 0.00 no. no. no. no. 20.00 50.00 350.00 20.00 0.00 0.00 0.00 0.00 0.00 cu m 18.00 0.00 0.00 cu m 7.50 0.00 cu m 4.90 0.00 m run 20.00 0.00 m run 4.01 501.25 m run 2.75 412.50 0.00 sq m 4.79 0.00 0.00 cu m 6.00 0.00 5.00 cu m 9.53 47.65 sq m 5.00 25.00 cu m 19.06 0.00 cu m 24.50 11882.50 cu m 20.66 2375.90 240.00 cu m 18.74 4497.60 5.00 cu m 15.80 79.00 1.000 General Site Clearance & Demolition Works 1.001 1.002 a. b. 1.003 1.004 1.005 1.006 1.007 a. b. c. 1.008 1.009 1.010 Disconnect/dismantle, take up and transport to store street lighting columns up to 12m in height. Take up existing street furniture including road signs and dispose of as directed : < 2.00m height. > 2.00m height. Remove existing railing and deliver to store as directed. Remove existing railing (any type) and dispose of as directed. Dismantle and remove existing fence, any material and dispose of as directed. Dismantle and remove existing fence, any material and deliver to store as directed. Uproot plants / shrubs / trees and store aside to be replanted as indicated on site. Replanting to be mesured separately. plants up to 1m height. shrubs / trees exceeding 1m but not exceeding 5 m height. trees exceeding 5m height. Cut down shrubs/trees; Maximum tree height 5.00m. Excavate any material from landscaped areas including breaking of any existing small structures/features. Excavate agricultural soil and cart away from site to store as directed. 0.00 Excavate in any type of ground to uncover existing service 1.012 pipes/ducts/cables diameter not exceeding 500mm, take up same and 0.00 dispose of as directed. Breaking up of existing concrete kerbs including concrete footing and 1.013 125.00 backing. Break up existing masonry kerb including concrete footing and backing. 1.014 150.00 1.011 Excavate agricultural soil and store on site for re-use. 1.015 1.016 1.017 Breaking up of existing concrete paving / blocks / slabs in footways. Carefully demolish dry masonry rubble wall, any thickness, and set aside for reuse. Demolition and/or Removal softstone/hollow concrete blockwalls. Dismantle existing 150mm - 230mm thick softstone/hollow concrete 5.00 blockwalls and set aside for re-use. Demolish existing masonry / concrete block wall, including removal / 1.019 0.00 cutting of reinforcement as necessary. Oversite excavation in any type of ground using planar equipment to 2.001 485.00 reduce levels . Oversite excavation in any type of ground using mechanical equipment 2.002 115.00 to reduce levels. B Filling Works Type 1 Sub-base material as per series 800, cl. 803; Nominal grain size 1.018 2.003 37.5mm, hardstone (>50KN on 10% fines value in wet condition), in filling to make up levels, leveling and compacting in layers (max. thickness 300mm) as required. Material is to be compacted at omc. Type 1D Fill Material as per series 600, cl. 601(i) Table 6/1, Table 6/2 Class 1D; Nominal grain size 37.5mm; in filling to make up levels, leveling and 2.004 compacting in layers (max. thickness 300mm) as required. Material is to be compacted at omc. Page 4 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION 2.005 2.006 2.007 2.008 2.009 C 2.010 Type 1A Fill Material as per series 600, cl. 601(i) Table 6/1, Table 6/2 Class 1A; Nominal grain size 125mm; in filling to make up levels, leveling and compacting in layers (max. thickness 300mm) as required. Material is to be compacted at omc. Level and compact existing material to achieve an EV2 value of > 150 / > 180 as required. Level and compact existing material to achieve an EV2 value of > 120 / > 100 as required. Cement Bound Material, CBM 2 as per series 1000, cl 1037 (28 day compressive strength between 7 - 12 Mpa); in filling to make up levels, leveling and compacting as required. Cement Bound Material, CBM 4 as per series 1000, cl 1037 (28 day compressive strength > 15 Mpa); in filling to make up levels, leveling and compacting as required. Miscellaneous Works Modifying &/or Raising/Lowering the level of Gratings and Manhole Covers and the respective frames. Max. Amount QTY UNIT 5.00 cu m 12.86 64.30 0.00 sq m 1.85 0.00 0.00 sq m 1.50 0.00 0.00 cu m 45.00 0.00 0.00 cu m 55.00 0.00 8.00 no. 65.00 520.00 Euro 19419.30 Total Bill 2.000 to Summary Sheet : 3.000 Trench Excavation & Backfilling Works A 3.001 3.002 3.003 3.004 3.005 3.006 B 3.006 3.007 a b c 3.008 Trench Excavation Works Excavate trench in any type of material; width exceeding 300mm, depth not exceeding 2500mm, including working around existing buried infastructure. Excavate trench in any type of material; width exceeding 300mm, depth exceeding 2500mm, including working around existing buried infastructure. Excavate trench in any type of material; width not exceeding 300mm, depth not exceeding 500mm, including working around existing buried infastructure. Excavate trench in any type of material; width not exceeding 300mm, depth exceeding 500mm and not exceeding 1000mm, including working around existing buried infastructure. Excavate pit in any type of material; depth not exceeding 2500mm, including working around existing buried infrastructure. Excavate by hand tools or compressor in any type of material, to any depth, including working around existing buried infastructure. Trench Backfilling Works Backfill trenches/pits with Type 1A / Type 1D material up to the required level, including leveling and compacting in layers. Backfill trenches/pits with concrete to the specified grade, up to the required levels, including leveling, compacting and finishing off: C 7.5 C 20 C 25 Backfill trenches/pits with Lean Mix High-Flow Trench Backfill to TM Series 2600, clause 2607 Type E (Excavatable) Mix, 1.5 N/mm2; up to the required levels, including leveling, compacting and finishing off. Backfill trenches/pits with Lean Mix High-Flow Trench Backfill to TM Series 2600, clause 2607 Type NE (Non-Excavatable) Mix, 5.0 N/mm2; up 3.009 to the required levels, including leveling, compacting and finishing off. 3.010 Dewater existing site / trench / excavation using any method deemed ideal. 8.00 cu m 33.50 268.00 5.00 cu m 37.60 188.00 0.00 cu m 35.28 0.00 0.00 cu m 38.10 0.00 2.00 cu m 35.00 70.00 5.00 cu m 68.85 344.25 2.00 cu m 16.84 33.68 8.00 0.00 0.00 cu m cu m cu m 45.00 92.91 112.42 360.00 0.00 0.00 2.00 cu m 32.50 65.00 2.00 cu m 37.18 74.36 0.00 hr 45.00 0.00 Euro 1403.29 Total Bill 3.000 to Summary Sheet : Page 5 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Max. Amount QTY UNIT 0.00 m run 2.89 0.00 0.00 m run 1.24 0.00 0.00 m run 1.24 0.00 0.00 m run 3.52 0.00 0.00 m run 3.35 0.00 0.00 m run 3.35 0.00 0.00 m run 4.12 0.00 0.00 m run 5.50 0.00 0.00 m run 2.61 0.00 0.00 m run 3.02 0.00 0.00 m run 3.02 0.00 0.00 no. 2.06 0.00 0.00 no. 6.87 0.00 0.00 m run 1.37 0.00 0.00 cu m 13.30 0.00 0.00 to 27.49 0.00 4.000 Installation of Buried Infrastructure (Electrical) A Cable Network CABLES TO BE PROVIDED BY OTHERS. 4.001 4.002 4.003 4.004 4.005 Lay Only and position properly, cable less than or equal to 35mm in diameter in trenches, including the provision and laying of two layers of 80mm thick fine hard crushed stone (sand) with particle size not exceeding 5mm as surround to cable. Rate is also applicable for cable uplifting works. Lay Only, position and tie cable equal to or less than 35mm in diameter properly on cable supports above a height of 1.5 metres from existing ground level. Lay Only and position properly, cable equal to or less than 35mm in diameter on cable supports in culvert. Lay Only and position properly, cable greater than 35mm in diameter but less than or equal to 80mm in diameter in trenches, including the provision and laying of two layers of 80mm thick fine hard crushed stone (sand) with particle size not exceeding 5mm as surround to cable. Rate is also applicable for cable uplifting works. Lay Only, position and tie, cable greater than 35mm in diameter but less than or equal to 80mm in diameter properly on cable supports above a height of 1.5 metres from existing ground level. Lay Only and position properly, cable greater than 35mm in diameter but 4.006 less than or equal to 80mm in diameter on cable supports in culvert. Lay Only and position properly, cable greater than 80mm diameter in 4.007 trenches, including the provision and laying of two layers of 80mm thick fine hard crushed stone (sand) with particle size not exceeding 5mm as surround to cable. Rate is also applicable for cable uplifiting works. Lay Only and position properly, cable greater than 80mm in diameter on 4.008 cable supports in culvert. Lay Only earth mat, including the provision and covering with 250mm thick layer of sieved soil and watering. The rate includes the cost for the laying of earth mat both along the trench and down into the earth holes as requested by the Engineer or his representative. The rate also includes 4.009 the cost for transport, mixing and pouring of low resistance earth interface such as Bentonite when required by the Engineer or his representative. The rate to lay the earth mat is per linear metre irrespective of the number cores and the plane at which it is laid. 4.010 Cable laying, extending and bolting of earth conductor in culvert. Drawing In Only cable equal to or less than 35mm diameter through 4.011 pipes. Remove and re-lay of cover slabs weighing up to 50 kilograms on top of 4.012 4.013 B 4.014 4.015 C 4.016 culvert and reinstated as prior to works and in good condition. Remove and re-lay of cover slabs weighing greater than 50 kilograms on top of culvert and to leave it as it was found. Warning Slabs Concrete or franka cable warning slabs laid in trench. The rate is per linear metre of each row of slabs laid. Additional Sand in trenches and joint bays, over and above the 160mm thickness (measured separetly with the item for the laying of cables) where required but not exceeding 300mm thickness, laid and spread evenly. Transportation Collect from store, load, transport to site and unload cables/s, not exceeding 2(two) tonne in weight. Page 6 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE DESCRIPTION QTY UNIT Collect from store, load, transport to site and unload cables/s, exceeding 2(two) tonne in weight. 0.00 to ITEM 4.017 D 4.018 4.019 E 4.018 4.019 4.020 4.021 4.022 4.023 4.024 A 27.49 0.00 Sub total (1) 4.000 c/f 0.00 Sub total (1) 4.000 b/f 0.00 Drawpits & Covers Draw pit, complete all as per details on drawings QS/DEV/00106 including but not limited to excavation in any type of ground, support, backfilling, reinforced concrete base including formwork and reinforcement, hollow concrete blockwork chamber and precst concrete cover slabs. Internal walls finished smooth. Draw pit, complete all as per details on drawings QS/DEV/00206 including but not limited to excavation in any type of ground, support, backfilling, reinforced concrete base including formwork and reinforcement, hollow concrete blockwork chamber and precst concrete cover slabs. Internal walls finished smooth. Miscellenous Lay Only 50mm or 100mm or 150mm diameter UPVC pipes including collecting from store, load, transport to site and unload, gluing, and the supply and placing of draw wire when necessary. Boring of holes for stay rods 1.2m x 5cms including grouting. Boring of earth holes for earth rods not exceeding 6m deep including grouting; earth rod to be supplied and installed by others. Boring of earth holes for earth rods exceeding 6m but equal to or less than 50m deep, including grouting; earth rod to be supplied and installed by others. Boring of earth holes for earth rods exceeding 50m deep, including grouting; earth rod to be supplied and installed by others. Install Only and level in position feeder pillar on concrete bedding / footing, including collecting from store, loading, transport to site and unloading and the construction of concrete bedding/footing as necessary, complete. Fix Only cable hangers up to 4(four) hole-fixing to vertical walls, including collecting from store, loading, transport to site and unloading; hangers to be fixed by proper approved fixtures to be supplied by contractor. 0.00 no. 467.30 0.00 0.00 no. 467.30 0.00 0.00 m run 1.24 0.00 0.00 no. 32.98 0.00 0.00 no. 76.96 0.00 0.00 m run 18.14 0.00 0.00 m run 22.54 0.00 0.00 no. 123.69 0.00 0.00 no. 9.62 0.00 Euro 0.00 2.43 4.08 4.26 6.28 7.61 9.18 11.04 11.79 12.22 16.72 16.97 0.00 0.00 68.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Bill 4.000 to Summary Sheet : 5.000 Max. Amount Installation of Buried Infrastructure (Potable Water / Waste Water) Potable Water Mains Network CEMENT LINED PIPES AND FITTINGS PROVIDED BY OTHERS. Lay Only and connect in trenches, ductile iron cement lined pipes as 5.001 instructed by the Engineer-in-Charge, including collecting from store, load, transport to site and unload; of the following diameters: a. 63mm diameter b. 80mm diameter c. 100 mm diameter d. 150 mm diameter e. 250 mm diameter f. 300 mm diameter g. 350 mm diameter h. 400 mm diameter i. 450 mm diameter j. 500 mm diameter k. 600 mm diameter 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Page 7 of 25 m run m run m run m run m run m run m run m run m run m run m run Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM 5.002 a. b. c. d. e. f. g. h. i. j. k. B DESCRIPTION QTY UNIT Lay Only and connect ductile iron fittings (sluice valves, butterfly valves, air valves, fire hydrants, control valves, flanged pipes, bends and meters etc) in trenches as instructed by the Engineer-in-Charge, including collecting from store, load, transport to site and unload; Fittings of the following diameter: 63mm diameter 80mm diameter 100 mm diameter 150 mm diameter 250 mm diameter 300 mm diameter 350 mm diameter 400 mm diameter 450 mm diameter 500 mm diameter 600 mm diameter 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 no. no. no. no. no. no. no. no. no. no. no. Max. Amount Sub total (1) 5.000 c/f 0.00 0.00 55.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 124.11 Sub total (1) 5.000 b/f 124.11 4.12 9.93 11.19 13.49 27.95 28.21 29.21 46.59 46.59 46.94 47.44 Potable Water House Services POLYETHYLENE PIPES AND FITTINGS PROVIDED BY OTHERS. Excavation around pipe perpendicular to the trench for installation of tapping. Installation of tapping to be carried out by others. 5.004 Installation of tapping ferrule on water mains. Excavate trench by pneumatic hammer for house service between water 5.003 15.00 no. 27.05 405.75 0.00 no. 2.50 0.00 98.00 m run 26.19 2566.62 15.00 no. 30.86 462.90 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 no. no. no. no. no. no. no. no. no. no. 66.25 68.75 71.25 92.50 97.50 165.00 170.00 202.50 237.50 250.00 0.00 68.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83.00 m run 4.15 344.45 main and house frontage. If applicable works are also to include for the cutting of bituminous road surface to its full depth, (on both sides of trench) with straight edges parallel to line of trench and for edge sealants for any extra length of cut. Collect pipes, fittings and stop cock covers 5.005 from store, load, transport to site and unload and lay PE (polyethylene) pipes for house service inclusive of fittings. Rate also includes for the construction of stopcock chamber complere including the fixing of cover and frame. Chase in wall along consumer's premises and plaster after installation of service pipe. Supply, ram and compact lean concrete (as per Series 2600, Clause 2603) around water main up to support pipe and to road formation level over trench/pits for house service. 5.006 Shift Only water meters, excluding pipework. 5.007 a. b. c. d. e. f. g. h. i. j. Connection to existing mains (Taghqieda). Rate covers work on pipe work only and does not include for any excavation, backfilling and the provision of fittings which shall be paid for separately under the respective items. 80mm 100mm 150mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm Extra Over the installation of house services to allow for additional work 5.008 invloved in pipe sleeving of house services, inclusive of ducting sleeve. Page 8 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION C Max. Amount QTY UNIT 0.00 no. 7.89 0.00 0.00 no. 43.55 0.00 0.00 no. 43.55 0.00 0.00 no. 19.25 0.00 Temporary Potable Water Supply POLYETHYLENE PIPES AND FITTINGS PROVIDED BY OTHERS. 5.009 5.010 5.011 5.012 Lay Only and connect temporary PE pipes and fittings above ground to existing water main, including collecting from stores, load, transport to site and unload; disconnect and remove temporary supply on completion. Excavate for connection or disconnection of existing network connection of temporary water main, backfill and reinstate in temporary reinstatement. Excavate pit, blank off existing tapping etc…. Sluice Valve chamber, complete including 5" diameter uPVC pipe over sluice valve, concrete surround and cover, all as directed by engineer. (Cast iron covers to be supplied by others and collected from stores by contractor). Sub total (2) 5.000 c/f 3972.58 Sub total (2) 5.000 b/f 3972.58 D Waste Water Network Lay Only and connect 200mm diameter pipes in trenches as directed, 5.013 including collecting from store, load, transport to site and unload, align, level and join. Connection to existing sewer manhole including all works as necessary, 5.014 including rendering/sealing of connection. Provision of a CCTV report and video evidence of the newly constructed 5.015 main sewers complete with photographs of each manhole constructed. These are to be presented to the Engineer. Repair/connect to newly laid main sewer, broken household 0.00 m run 6.56 0.00 0.00 no. 188.71 0.00 0.00 m run 7.28 0.00 0.00 no. 364.71 0.00 0.00 0.00 no. no. 37.46 51.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 m run m run m run m run m run m run m run m run m run m run m run m run 7.73 9.35 28.22 31.51 32.63 61.66 72.64 112.00 160.00 205.00 252.50 300.34 Sub total (3) 5.000 c/f 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3972.58 Sub total (3) 5.000 c/f 3972.58 5.016 connections, including all necessary fittings, accessories, pipes and 5.017 5.018 E 5.019 a. b. c. d. e. f. g. h. i. j. k. l. F supply and laying of concrete surround and backfilling. Saddles to connections including all necessary fittings. Y-branches to connections including all necessary fittings. Waste Water uPVC pipes and fittings uPVC pipes and fittings to BS EN 140-1:1998 Type UNI 303/2 and with Class Rigidity SN4 SDR 51, in trenches, laid to the proper gradient and alignment with suitable approved joints; 125mm diameter 150mm diameter 200mm diameter 250mm diameter 300mm diameter 400mm diameter 500mm diameter 600mm diameter 700mm diameter 800mm diameter 1000mm diameter 1200mm diameter Waste Water Manholes & Covers Page 9 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Max. Amount QTY UNIT 0.00 no. 725.36 0.00 0.00 no. 952.50 0.00 0.00 no. 1514.60 0.00 0.00 no. 2971.73 0.00 0.00 no. 62.50 0.00 0.00 no. 83.21 0.00 0.00 no. 100.00 0.00 0.00 no. 19.00 0.00 Euro 3972.58 Manhole – Type I, complete all as per Drawing ; including but not limited to excavation in any type of ground, support, backfilling, reinforced concrete base, walls and cover slab inlcuding formwork and 5.020 reinforcement, concrete benching to main and branch pipe; step iron. Internal walls finished smooth. Rate includes for any internal constructions and/or provision and fixing of fittings to adapt as a drop manhole. Cast iron cover and frame measured separately. Manhole – Type II, complete all as per Drawing ; including but not limited to excavation in any type of ground, support, backfilling, reinforced concrete base, walls and cover slab inlcuding formwork and 5.021 reinforcement, concrete benching to main and branch pipe; step iron. Internal walls finished smooth. Rate includes for any internal constructions and/or provision and fixing of fittings to adapt as a drop manhole. Cast iron cover and frame measured separately. Manhole – Type III, complete all as per Drawing; including but not limited to excavation in any type of ground, support, backfilling, concrete base, walls and cover slab inlcuding formwork and reinforcement, 5.022 concrete benching to main and branch pipe; step iron. Internal walls finished smooth. Rate includes for any internal constructions and/or provision and fixing of fittings to adapt as a drop manhole. Cast iron cover and frame measured separately. Manhole – Type IV, complete all as per Drawing; including but not limited to excavation in any type of ground, support, backfilling, reinforced concrete base, walls and cover slab inlcuding formwork and 5.023 reinforcement, concrete benching to main and branch pipe; step iron. Internal walls finished smooth. Rate includes for any internal constructions and/or provision and fixing of fittings to adapt as a drop manhole. Cast iron cover and frame measured separately. Install Only cast iron manhole cover and frame, including collecting from 5.024 store, load, transport to site and unload, leveling and finishing off; a. size not exceeding 600mm x 600mm, rectangular / circular. b. size exceeding 600mm x 600mm but not exceeding 1200mm x 1200mm. Modify existing house intercepting trap chamber by lowering or raising the Reinforced concrete slab to the required site levels, including all 5.025 necessary works and the provision of new precast reinforced concrete cover slabs size approximate 300mm x 600mm x 75mm thick when required. Precast reinforced concrete cover slabs, complete including 5.026 reinforcement, size approximate 300mm x 600mm x 75mm thick, including the taking up of existing broken slabs where applicable. Total Bill 5.000 to Summary Sheet : 6.000 Service Utilities A 6.001 6.002 6.003 6.004 Ducts and Culverts 1 x 50mm diameter (3mm thick) galvanised tubular steel pipe in trench including C20 concrete surround - for road crossings. 2 x 50mm diameter (3mm thick) galvanised tubular steel pipe in trench including C20 concrete surround - for road crossings. 1 x 110mm upvc pipes light gauge, in trench including C15 concrete surround. Ref drg FM - 01. 2 x 110mm upvc pipes light gauge, in trench including C15 concrete surround. Ref drg FM - 01. 0.00 m run 50.00 0.00 0.00 m run 75.00 0.00 0.00 m run 25.00 0.00 0.00 m run 28.07 0.00 Page 10 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM 6.005 6.006 6.007 6.008 6.009 6.010 6.011 6.012 6.013 6.014 B 6.015 6.016 6.017 Max. Amount DESCRIPTION QTY UNIT 3 x 110mm upvc pipes light gauge, in trench including C15 concrete surround and proprietary separators. Ref drg FM - 01. 4 x 110mm upvc pipes light gauge, in trench including C15 concrete surround and proprietary seperators. Ref drg FM - 01. 6 x 110mm upvc pipes light gauge, in trench including C15 concrete surround and proprietary separators. Ref drg FM - 02. 8 x 110mm upvc pipes light gauge, in trench including C15 concrete surround and proprietary seperators. Ref drg FM - 02. 3 x 250mm diameter uPVC pipes for crossings in trench including C20 concrete surround and proprietary separators. 1 x 50mm diameter HDPE flexible pipe cast in footpaths. 1 x 50mm diameter upvc pipe light gauge cast in footpaths. 1 x 110mm diameter upvc light gauge cast in footpaths. Precast reinforced concrete 'U' units walk through service culvert as per drawing RCD 500/61, complete. Culvert for service ducts as per drawing QS/DIS/0211, complete. Drawpits & Covers Steel B125 junction boxes including cover and frame, size 300mm x 300mm and not exceeding 750mm deep cast in footways, including all necessary excavtion in any type of ground, 150mm thick C20 concrete surround, formwork and backfilling. Steel B125 junction boxes including cover and frame, size 400mm x 400mm and not exceeding 750mm deep cast in footways, including all necessary excavtion in any type of ground, 150mm thick C20 concrete surround, formwork and backfilling. B125 cover and frame size not exceeding 400mm x 400mm to existing junction boxes, including the taking up and cart away of existing dmaged cover and making good as necessary. Draw pit, complete all as per details on drawings FM - 01 & 02, including 0.00 m run 55.00 0.00 0.00 m run 65.00 0.00 0.00 m run 80.00 0.00 0.00 m run 95.00 0.00 0.00 m run 71.75 0.00 0.00 0.00 0.00 m run m run m run 6.00 4.70 5.80 0.00 0.00 0.00 0.00 m run 500.00 0.00 0.00 m run 350.00 0.00 0.00 no. 200.00 0.00 0.00 no. 140.00 0.00 0.00 no. 60.00 0.00 Ref. 0.00 no. 250.00 0.00 Ref. 0.00 no. 350.00 0.00 Ref. 0.00 no. 500.00 0.00 Ref. 0.00 no. 570.00 0.00 2.00 2.00 0.00 0.00 no. no. no. no. 150.00 206.50 530.00 1000.00 Sub total (1) 6.000 c/f 300.00 413.00 0.00 0.00 713.00 Sub total (1) 6.000 b/f 713.00 but not limited to excavation in any type of ground, support, backfilling 6.018 and step iron. Internal walls finished smooth. Rate includes for any internal constructions and/or provision and fixing of fittings to adapt as a a. b. c. d. 6.019 a. b. c. d. drop pit. Cast iron cover and frame measured separately. size 400mm x 400mm and not exceeding 1500mm deep internally. Drwg. FM - 01 + 02. size 600mm x 600mm and not exceeding 1500mm deep internally. Drwg. FM - 01 + 02. size 900mm x 900mm and not exceeding 1500mm deep internally. Drwg. FM - 01 + 02. size 1500mm x 750mm and not exceeding 1500mm deep internally. Drwg. FM - 01 + 02. Cast Iron manhole cover and frame to draw pits, D400; size 400mm x 400mm size 600mm x 600mm size 900mm x 900mm size 1500mm x 750mm C Manholes & Covers Manholes complete as per drawings FM03 & FM04 including but not limited to all necessary excavation in any type of ground, backfilling, 6.020 internally smooth; Cast iron manhole cover and frame measured separately. Page 11 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE QTY UNIT size 900mm x 600mm and not exceeding 1000mm deep, internally 0.00 no. 250.00 0.00 size 900mm x 600mm and exceeding 1000mm but not exceeding 2000mm deep, internally size 600mm x 300mm and not exceeding 1000mm deep, internally size 600mm x 300mm and exceeding 1000mm but not exceeding 2000mm deep, internally size 450mm x 600mm and not exceeding 1000mm deep, internally size 450mm x 600mm and exceeding 1000mm but not exceeding 2000mm deep, internally Cast iron lockable cover and frame D400 for Festa poles, including all necessary excavation in any type of ground, 200mm diameter upvc sleeve x 400mm deep, C20 concrete surround and making good as necessary disturbed area. 0.00 no. 350.00 0.00 0.00 no. 200.00 0.00 0.00 no. 300.00 0.00 0.00 no. 200.00 0.00 0.00 no. 300.00 0.00 2.00 no. 75.00 150.00 Euro 863.00 ITEM DESCRIPTION a. b. c. d. e. f. 6.021 Max. Amount Total Bill 6.000 to Summary Sheet : 7.000 Storm Water Network A uPVC pipes and fittings uPVC pipes and fittings to BS EN 140-1:1998 Type UNI 303/2 and with 7.001 Class Rigidity SN4 SDR 51 in trenches, laid to the proper gradient and alignment with suitable approved joints; with the following diameters: 460.00 5.00 4.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 m run m run m run m run m run m run m run m run m run m run m run m run 6.50 7.73 9.35 28.22 31.51 32.63 61.66 71.14 120.00 160.00 205.00 250.00 2990.00 38.65 37.40 141.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.002 fixed vertically to wall, including all necessary brackets, fixtures and 0.00 m run 20.00 0.00 fittings. B Gully, Manholes, Gutters, Gratings and Covers Storm water Gully, complete all as per details on drawings FM - 03 & 04, including but not limited to excavation in any type of ground, support, 7.003 backfilling and internal walls finished smooth, including pipe branch connection to main pipe and finishing off. Gully grating and frame measured seperately. a. size 700mm x 900mm, depth not exceeding 1000mm to pipe crown. 0.00 no. 280.00 0.00 0.00 no. 650.00 0.00 0.00 no. 560.00 0.00 0.00 no. 640.00 0.00 0.00 no. 760.00 0.00 a. 110mm diameter b. 125mm diameter c. 150mm diameter d. 200mm diameter e. 250mm diameter f. 315mm diameter g. 400mm diameter h. 500mm diameter i. 630mm diameter j. 710mm diameter k. 800mm diameter l. 1000mm diameter uPVC heavy gauge storm water drains pipe 110mm diameter to EN 1401, b. 7.004 a. b. c. size 1200mm x 1050mm, depth not exceeding 1500mm to pipe crown. Type B manhole, complete as per detail RCD 500/6, including but not limited to excavation in any type of ground, support, backfilling and step iron; internal walls finished smooth, including pipe branch connection to main pipe and finishing off. Manhole grating and frame measured seperately. size 1000mm x 1050mm and not exceeding 1000mm deep to invert, internally. size 1000mm x 1050mm and exceeding 1000mm and not exceeding 1500mm deep to invert, internally. size 1000mm x 1050mm and exceeding 1500mm and not exceeding 2000mm deep to invert, internally. Page 12 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM Max. Amount QTY UNIT 0.00 no. 50.00 0.00 0.00 no. 25.00 0.00 2.00 2.00 0.00 0.00 m run no. no. no. 280.00 171.79 144.30 123.69 Sub total (1) 7.000 c/f 560.00 343.58 0.00 0.00 4110.73 Sub total (1) 7.000 b/f 4110.73 DESCRIPTION Install Only heavy duty D400 to EN 124 cast iron grating and frame, and 7.005 silt buckets/traps where applicable, including collecting from store, load, transport to site and unload, leveling and finishing off; a. Gratings and Frame any size 7.006 Install Only Galvanised steel silt bucket for gulleys to fit: a. Gratings and Frame any size 7.007 a. b. c. d. 7.008 a. b. c. d. C 7.009 Ductile Iron Grating and frame (double triangular type) heavy duty D400 to EN 124 to be hinged, lockable, sealed, and certified non-rocking, including the casting of the Logo. size 600mm wide Grating and Frame size 600mm x 600mm Grating and Frame size 450mm x 450mm Grating and Frame size 300mm x 300mm Grating and Frame Cast iron manhole cover and frame heavy duty D400 to EN 124 to be hinged, lockable, sealed, and certified non-rocking. size 300mm x 300mm size 400mm x 400mm size 600mm x 600mm size 600mm diameter Soakaways Rotary drill in any material to form open vertical shaft with diameter exceeding 500mm and not exceeding 1000mm, depth from existing ground surface not exceeding 20m, including mobilisation and 0.00 0.00 0.00 0.00 no. no. no. no. 130.00 150.00 206.50 206.50 0.00 0.00 0.00 0.00 0.00 m run 140.00 0.00 0.00 m run 138.00 0.00 0.00 cu m 9.00 0.00 0.00 cu m 8.00 0.00 0.00 sq m 2.00 0.00 0.00 no. 35.00 0.00 0.00 sum 300.00 0.00 0.00 sq m 8.00 0.00 0.00 sq m 83.33 0.00 0.00 no 300.00 0.00 demobilisation of all necessary plant. Ref Drawing FM - 16. High density polythylene pipe (HDPE) laid vertical in shaft, perforated 7.010 and suitable to retain material, in shaft diameter exceeding 500mm and 7.011 7.012 not exceeding 1000mm and suitable to fit in drilled open shaft. Graded filter material complying to series 500 table 5/5 - Type A; in pits. Graded filter material complying to series 500 table 5/5 - Type B; in pits. Geotextile material that allows water to flow through it, in either 7.013 D 7.014 7.015 7.016 7.017 direction. Geotextile should be wrapped and overlapped as directed. Miscellenous Works Ductile iron fasteners to existing grating, bolted down as a security to prevent opening of grating by others. Ref drg FM - 016. Carry out the necessary modifications to connect new storm water system to existing culvert / ducting / reservoir. Render internal surfaces of water retaining structures with a proprietary render mix ideal for acqueous waterproofing. Finish as per manufacturer's instruction. Precast reinforced concrete C25 slabs size approximately not exceeding 0.2square meters x not exceeding 150mm thick, to take pedestrian traffic, laid to levels over existing culvert, bedding and including the taking up of existing broken slabs. Precast reinforced concrete C25 manhole roofing slab size approximately not exceeding 2.50square meters x not exceeding 300mm thick, with 7.018 opening (any size) to receive manhole cover, to take vehicular traffic loading, laid to levels over existing manhole, bedding and including the taking up of existing broken slabs. Page 13 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM QTY DESCRIPTION Total Bill 7.000 to Summary Sheet : Page 14 of 25 UNIT Max. Amount Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Euro 4110.73 Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Max. Amount QTY UNIT 300.00 m run 17.05 5115.00 0.00 m run 23.02 0.00 300.00 m run 5.89 1767.00 100.00 sq m 18.50 1850.00 360.00 sq m 14.18 5104.80 0.00 sq m 55.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 sq m sq m sq m sq m sq m sq m sq m sq m sq m sq m 20.74 22.22 27.34 29.91 23.05 144.00 135.75 150.00 111.25 130.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 sq m 35.00 175.00 8.000 Footpath Works A 8.001 8.002 8.003 8.004 8.005 8.006 8.007 a. b. c. d. e. f. g. h i j 8.008 Kerbs & Paving Precast concrete kerb 255mm high x 1000mm long, laid straight or curved on plan to a radius exceeding 12m, including all necessary saw cutting and excavation or trenching as necessary in existing ground, bedding and backing with insitu unreinforced concrete grade C15, pointing of joints, complete all as per detail RCD 1100/1. Ditto, but curved on plan to a radius not exceeding 12m, ditto. Cast in-situ C20 concrete in gutter 200mm wide x 150mm deep, straight or curved to any radius including all necessary formwork and ancillary works, finished smooth. Additional width to gutter over 200mm wide. Cast insitu C20 concrete in footpaths, 100mm thick; laid to levels, falls and/or cross falls, including expansion joints at 5m centres brush surface finish and including making up levels with infill material and compacted, all as per RCD 1100/5. Cast in situ "Pattern Imprinted Concrete" Grade C30, 150mm thick with proprietary fibre reinforcement; levelling and compaction to refusal of substrate to a regularity of +/- 12mm; Supply and placing of proprietary separation membrane 1.2mm thick including vertical faces and upstands; Colour dyes (as indicated by the officer in charge) with surface hardener in 3 passes (up-down/side-side, diagonal at a min. rate of 1.5kg/m2); Release agent and colour enhancer; modular imprint mats to the pattern selected by the officer in charge; Wash-down jetting; Crack control sawcut 3mm x 45mm joints every 5.0m filled with polysulphide filler; Acrylic sealant. Spill protective sheeting and cleaning. Paving slabs, average thickness 50mm, to match existing and/or as specified, laid to proper allignment and levels, falls and/or crossfalls, bond as directed by officer in charge, including grouting, compaction, cutting and forming borders around projections, covers and fixtures. Bedding measured seperately. concrete tiles (grey type) concrete tiles (colour type red) concrete blocks (grey type) concrete blocks (colour type red) softstone franka slab hardstone paving slabs lava (pedestrian) paving slabs lava (vehicular) paving slabs; 100mm thickness porfido paving slabs porfido (vehicular) paving slabs; 100mm thickness# Tactile blister or corduroy paving buff, red or grey colours; laid to proper allignment and levels, falls and/or crossfalls, bond as directed by officer in charge, including grouting, compaction, cutting and working around projections, covers and fixtures. All ramps formed in tactile surface are to satisfy requirements set by KNPD. Ref drg RCD110 - 11 to 14. Bedding measured seperately. Sub total (1) 8.000 c/f 14011.80 Sub total (1) 8.000 b/f 14011.80 PAVING FLAGSTONES, SLABS, BLOCKS, TILES, HARDSTONE, LAVA AND PROFIDO TO BE PROVIDED BY OTHERS. Page 15 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Max. Amount QTY UNIT 0.00 sq m 12.50 0.00 0.00 0.00 0.00 0.00 sq m sq m sq m sq m 44.00 35.75 47.00 41.25 0.00 0.00 0.00 0.00 0.00 sq m 2.50 0.00 0.00 sqm 5.50 0.00 0.00 m run 4.70 0.00 0.00 m run 6.00 0.00 0.00 m run 1.50 0.00 0.00 sq m 8.00 0.00 0.00 m run 3.50 0.00 0.00 sq m 5.00 0.00 0.00 cu m 38.00 0.00 12.00 m run 35.00 420.00 3.00 no. 170.00 510.00 Euro 14941.80 65.43 0.00 Lay only footpath flagestones / slabs / blocks / tiles and reinstate to same pattern as existing footpath, including all necessary fill material to make 8.009 up levels, grouting, cutting and forming borders around projections, covers and fixtures; including collecting from store, load, transport to site and unload. Bedding measured seperately. Lay only paving slabs, including all necessary fill material to make up 8.010 levels, bedding, grouting, cutting and forming borders around projections, covers and fixtures; including collecting from store, load, transport to site and unload. Bedding measured seperately. a. hardstone paving slabs b. lava (pedestrian) paving slabs c. lava (vehicular) paving slabs d. porfido paving slabs B Bedding Natural sand, maximum sieve size 8mm (100% percentage passing) as 8.011 bedding to footpath paving, minimum thichness of sand bed after compaction 30mm, including laying to levels, falls and crossfalls. Freshly mixed, moist 1:3 cement sand mortar (proportions by Volume), using sand complying to BS EN 12620 : 2002 as bedding to footpath 8.012 paving, minimum bed thickness after laying of tile 25mm and not exceeding 100mm. Retarded, plastisized and pre-mixed mortarts may be used as an alternative. C Miscellaneous Works Take up existing kerb, any material and set aside for reuse, including 8.013 8.014 8.015 trimming and cleaning as necessary for reuse. Lay Only previously set aside kerb laid straight or curved on plan to any radius, including all necessary saw cutting and excavation or trenching as necessary in existing ground, bedding and backing with insitu unreinforced concrete grade C15, pointing of joints, complete. Paint existing kerb x 2 No. coats, white wash as directed, including cleaning, pointing and preparation as necessary to receive paint. Carefully take up existing footpath flagstones/ slabs / blocks / tiles, stack 8.016 same, store and protect for re-use. Cut existing concrete surface using rotary saw, depth less than 200mm. 8.017 Propretary epoxy surface sealant to concrete surfaces as per manufacturer's instructions, including preparation . Extra Over cast insitu concrete in footpaths for integrated colouring to 8.019 concrete mix; Colour as specified by the official in charge and mixed according to manufacturer's specifications. Galvanised steel grating class B125, 120mm wide in footpaths, including 8.020 pvc U-channel, cast in concrete and C20 concrete surround as necessary. Stainless steel / aluminum recessed cover tray and frame to EN124, 8.021 600mm x 600mm laid in footpaths. 8.018 Total Bill 8.000 to Summary Sheet : 9.000 Wall Construction Works A Oversize Block Walls Masonry softstone blocks in retaining walls to various thicknesses, 9.001 including the formation of weep holes, leveling concrete between layers 0.00 of blocks and other ancillary works, to complete the works as directed. Page 16 of 25 cu m Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Max. Amount QTY UNIT 0.00 cu m 104.50 0.00 0.00 cu m 165.00 0.00 0.00 cu m 88.00 0.00 0.00 cu m 93.50 0.00 0.00 cu m 104.50 0.00 0.00 sq m 13.60 0.00 3.20 sq m 17.30 55.36 5.40 sq m 31.20 168.48 7.80 sq m 32.00 249.60 0.00 sq m 27.30 0.00 0.00 sq m 19.23 0.00 0.00 sq m 15.20 0.00 0.00 cu m 68.00 0.00 Precast reinforced C20 concrete blocks 1000mm x 1000mm x 1000mm in 9.002 retaining walls to various thickesses, including the formation of weep holes, leveling concrete between layers of blocks and other ancillary works, to complete the works as directed. Precast reinforced concrete C20 panels with rubble wall facing to walls, 9.003 including the formation of weep holes and other ancillary works, such as B leveling concrete between layers of blocks, to complete as directed. Rubble walls Construct Only Coarse/random rubble stone walls to any thickness, 9.004 using material set aside for reuse, including for the formation of weep 9.005 9.006 C 9.007 9.008 9.009 holes and other ancillary works to complete according to trade. Upgrade and repair existing rubble stone wall, including any necessary taking down, and provision/replacement of rubble stone blocks as necessary. Coarse/random rubble stone wall to any thickness, including the formation of weep holes and other ancillary works to complete according to trade. Standard Sized Block Walls Softstone Walls 150mm/175mm thick softstone walls, quarry faced both sides, bedded and jointed in 1:1:6 cement/sand/'xahx' mortar; below DPC. 230mm thick softstone walls, quarry faced both sides, bedded and jointed in 1:1:6 cement/sand/'xahx' mortar; below DPC. 450 mm thick softstone walls, quarry faced both sides, bedded and jointed in 1:1:6 cement/sand/'xahx' mortar; below DPC. Double wall comprising 2 skins x 230mm thick softstone, tied adequately 9.010 with chainblocks as per trade, fairfaced both sides, bedded, jointed and pointed in 1:1:6 cement/sand/'xahx' mortar; above DPC. Double wall comprising 2 skins x 150mm thick softstone, tied adequately 9.011 with chainblocks as per trade, fairfaced both sides, bedded, jointed and pointed in 1:1:6 cement/sand/'xahx' mortar; above DPC. 230mm thick softstone walls fairfaced both sides, bedded, jointed and 9.012 pointed in cement:xahx mortar; above DPC. 150mm/175mm thick softstone walls fairfaced both sides, bedded, 9.013 jointed and pointed in cement:xahx mortar; above DPC. Softsone wall in header courses, fairfaced both sides, bedded, jointed 9.014 and pointed in cement:xahx mortar; above DPC. 9.015 9.016 9.017 9.018 9.019 Sub total (1) 9.000 c/f 473.44 Sub total (1) 9.000 b/f 473.44 Hollow Concrete Blockwalls 230mm thick Single Type, precast hollow concrete blockwalls bedded, jointed and pointed in cement:xahx mortar. 230mm thick Double Type, precast hollow concrete blockwalls bedded, jointed and pointed in cement:xahx mortar. 175mm thick, precast hollow concrete blockwalls bedded, jointed and pointed in cement:xahx mortar. Miscellaneous Works Extra Over softstone/Hollow concrete walls, for walls curved on plan to any radius. Extra Over softstone/Hollow concrete walls, for softsone 'sammrotti'. 6.20 sq m 22.00 136.40 4.20 sq m 23.00 96.60 0.00 sq m 18.50 0.00 0.00 sq m 8.80 0.00 0.00 no. 8.75 0.00 Page 17 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM 9.020 9.021 9.022 9.023 9.024 9.025 9.026 D DESCRIPTION QTY UNIT Extra Over softstone/Hollow concrete walls, for softstone lintel to any dimension. Construct Only 150mm/175mm/230mm Softstone walls using material set aside. Measured per skin. C15 concrete infill to precast hollow concrete blockwalls, 230mm single density. Measured per skin. C20 concrete infill to precast hollow concrete blockwalls, 230mm single density. Measured per skin. C15 concrete infill to cavities and around blocks. DPC membrane, horizontal and/or vertical to walls. Plastic sheeting - gauge 1000, horizontal and/or vertical to walls. Coping Works Cast insitu reinforced C25 concrete coping, having throuting and drip 0.00 m run 23.00 0.00 0.00 sq m 7.00 0.00 0.00 sq m 8.50 0.00 0.00 sq m 9.50 0.00 0.00 0.00 0.00 cu m sq m sq m 88.00 8.75 1.25 0.00 0.00 0.00 2.30 cu m 293.57 675.21 12.00 m run 15.00 180.00 0.00 m run 13.50 0.00 0.00 m run 7.00 0.00 0.00 sq m 3.50 0.00 0.00 sq m 4.50 0.00 0.00 sq m 4.75 0.00 0.00 sq m 7.50 0.00 0.00 sq m 4.00 0.00 0.00 sq m 5.50 0.00 0.00 sq m 9.00 0.00 Euro 1561.65 9.028 checks and smooth finish to all exposed surfaces; laid straight or curved 9.029 9.030 9.031 E 9.032 9.033 9.034 9.035 9.036 9.037 Max. Amount on plan, including all necessary formwork and reinforcement. Softstone wall coping size approximately 150mm x 255mm x 565mm, having chamfered edges, throuting, grouting key, fair faced on all exposed surfaces; laid straight or curved on plan, including bedding, grouting and pointing of all joints with cement based material. Ditto, but quarry faced. Lay Only softsone coping previously dismantled and set aside, laid straight or curved on plan, including all necessary bedding, leveling and pointing of joints. Finishings Sand-Cement pointing of joints to existing walls. Sand-Cement based rendering to horizontal and/or vertical surfaces, 4mm thick. Two coats external type paint to softsone walls, including preparing same to receive paint. Colour as specified. Extra Over softstone walls for finishing "Fuq il-Fil" including raking out joints to a depth not less than 15mm, pointing using proprietary stucco to a neath finish, rubing down and finishing. Rake out joints of exposed surfaces of hollow concrete blockwork walls to a depth of not less than 15mm, point with cement / sand mortar to a neat flush joint. Plaster existing HCB wall, in cement / sand mix to achieve a smooth finish in two coats. Render surfaces, horizontally and/or vertically, in two layers of cement 9.038 sand mortar, and including proprietary water-proofing additive. Total Bill 9.000 to Summary Sheet : Page 18 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM QTY DESCRIPTION UNIT Max. Amount Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) 10.000 Asphalt Works Note: All Road Pavement shall comply to series 700 and 900; in general, unless otherwise specified. Surface tolerances shall be according to table 7/1. Regularity and maximum permitted number of tolerances are to be read with tables 7/3 and 7/4. Construction Class and Road Type are as indicated on Works Order. Asphalt road paving works and trench reinstatement Cut existing road surface using rotary saw, depth not exceeding 100mm. 10.001 5.04 0.00 m run 0.00 A Surface cold milling over trenches/pits and general resurfacing areas, to 0.00 bring to formation level, depth not exceeding 150mm. Hot dense bituminous paving mixture in accordance to ASTM D3515 and approved mix designs, including for the necessary bitumen required as per ASTM D3515 and approved mix design, and the painting of the vertical edges of any joints with hot bitumen : 0/25 mm for Base Course 80mm thick in carriage way, hard shoulder and hardstrip, compaction degree: ≥ 97%; laid to comply to requirements 0.00 in cl. 901 and 903. 0/19 mm for Binder Course 60mm thick in carriage way, hard shoulder and hardstrip, compaction degree: ≥ 97%; laid to comply to 1610.00 requirements in cl. 901 and 904. 0/12.5 mm for Wearing Course 40mm thick in carriage way, hard shoulder and hardstrip, compaction degree: ≥ 97%; laid is to comply to 0.00 requirements in cl. 901 and 906. 0/12.5 mm for Wearing Course 40mm thick in carriage way, hard sq m 3.30 0.00 sq m 28.66 0.00 sq m 21.49 34598.90 sq m 16.94 0.00 0.00 1610.00 sq m sq m 17.46 18.33 0.00 29511.30 e. shoulder and hardstrip, compaction degree: ≥ 96%; laid to comply to 12.00 sq m 30.75 369.00 requirements in cl. 901 and 905. Regulating layer in carriage way, hard shoulder and hardstrip; laid to f. comply to requirements in cl. 901 and 907. Wearing Course 30mm thick Grass Green (RAL 6010 or approved similar), 0.00 to 162.84 0.00 sq m 65.00 0.00 no. sq m 43.23 1.86 432.30 2994.60 m run 2.99 867.10 no. 32.00 0.00 no. 10.00 0.00 to 120.00 0.00 to 165.00 0.00 m run m run 5.00 10.00 0.00 0.00 10.002 10.003 a. b. c. d. shoulder and hardstrip, compaction degree: ≥ 97%, EN 12697-6, Proc. B; laid to comply to requirements in cl. 901 and 906. i. using aggregate with a Los Angeles value ≤ 20 and PSV ≥ 45 ii. using aggregate with a Los Angeles value ≤ 20 and PSV ≥ 53 0/19 mm for Base Wearing Course 80mm thick in carriage way, hard g. 10.004 10.005 10.006 a. B 10.007 10.008 10.009 10.010 10.011 a. b. 0.00 in carriage way, hard shoulder and hardstrip; compaction degree ≥ 97%. Working around projections. 10.00 Tack coat to surfaces to receive bituminous paving mixture. 1610.00 Penetration grade bitumen as joint sealant to open joints as directed by the engineer or other approved equivalent: up to 25mm wide 290.00 Road Surface Repair Works Permanent Cold-lay pot-hole repair material to Areas up to 0.1m2 and depth not exceeding 0.1m, including sawcut, prepare, place, level and 0.00 compact to the requirements of the Specifications (Volume 3, Section 3.8). Premixed asphalt surface repair material in 25kg Bags to pot holes 0.00 exceeding 0.1m2. (Rate is per Bag) Premixed asphalt surface repair material in bulk to major pot hole 0.00 repairs. Hot asphalt, 0/12.5mm for wearing course laid in bulk to major pot hole repairs. Rate is to include for transport, lay and compaction. Other items 0.00 for completion, measured seperate. Repairs to cracks - overbanding and crack sealant repair systems as per specifications refered to in Volume 3 Section 3.7 and to TM specification Series 900.03. Clean, prime and apply overbanding ≤ 40mm (Type 1). 0.00 Clean, fill crack, prime and apply overbanding ≤ 200mm (Type 2). 0.00 Page 19 of 25 Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Cut to a regular longitudinal line, microtrench, clean, prime, infill inlaid sealing and overbanding ≤ 100mm (Type 3). Cut to a regular longitudinal line, microtrench, clean, prime, infill inlaid d. sealing and overbanding ≤ 200mm (Type 4). c. Max. Amount QTY UNIT 0.00 m run 11.00 0.00 0.00 m run 16.00 0.00 Euro 68773.20 Total Bill 10.000 to Summary Sheet : 11.000 Traffic Lights / Pelican Crossings & Belisha Poles Cast insitu reinforced concrete C25 in traffic light pole (overhead type) foundation plinth, including all necessary excavation and backfilling, formwork, reinforcement and waterproofing surround, casting in of 11.001 holding down bolts assembly (Bolts to be supplied by others) including collecting from store, load, transport to site and unload, and 50mm dia. duct. Ref. drg FM - 05. Cast insitu reinforced concrete C25 in traffic light pole (non overhead 0.00 no. 350.00 0.00 0.00 no. 150.00 0.00 50mm dia. duct. Ref. drg FM - 06. Cast insitu reinforced concrete C25 in Belisha light pole foundation plinth, including all necessary excavation and backfilling, formwork, reinforcement and waterproofing surround, casting in of holding down 11.003 bolts assembly (Bolts to be supplied by others) including collecting from store, load, transport to site and unload, and 50mm dia. duct. Ref. drgs FM - 07/08. Collect from store, transport to site and return on completion Holding 0.00 no. 150.00 0.00 11.004 Down Bolt assembly Model Template for traffic light pole/ Belisha pole 0.00 no. 20.00 0.00 foundation plinth, (Model Template is to be supplied by others). Install Only traffic light pole (overhead type), including collecting from 11.005 store, load, transport to site and unload, erect and fix to concrete foundation plinth including grouting base. Ref Drg FM - 05. Install Only traffic light pole (non overhead type), including collecting 0.00 no. 350.00 0.00 11.006 from store, load, transport to site and unload, erect and fix to concrete 0.00 no. 45.00 0.00 0.00 no. 45.00 0.00 0.00 no. 60.00 0.00 0.00 no. 40.00 0.00 Euro 0.00 61.08 83.68 104.09 127.15 134.72 145.66 0.00 209.20 395.53 305.16 0.00 0.00 type) foundation plinth, including all 11.002 necessary excavation and backfilling, formwork, reinforcement and waterproofing surround, casting in of holding down bolts assembly (Bolts to be supplied by others) including collecting from store, load, transport to site and unload, and foundation plinth including grouting base. Ref Drg FM - 06. Install Only Belisha light pole, including collecting from store, load, 11.007 transport to site and unload, erect and fix to concrete foundation plinth including grouting base. Ref Drgs FM - 07/08. Take up and transport as directed traffic light pole (overhead type), 11.008 including reinstatement of existing footpaths, in concrete or paving as necessary. Take up and transport as directed traffic light pole (non - overhead type), 11.009 including reinstatement of existing footpaths, in concrete or paving as necessary. Total Bill 11.000 to Summary Sheet : 12.000 Structural Concrete Works A 12.001 a. b. c. d. e. f. Cast insitu concrete Cast insitu concrete, generally, including laying, compacting and finishing off for the following grades: C 10 C 15 C 20 C 25 C 30 C 35 0.00 2.50 3.80 2.40 0.00 0.00 Page 20 of 25 cu.m cu.m cu.m cu.m cu.m cu.m Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM Max. Amount QTY UNIT 2.00 cu m 6.00 12.00 0.00 sq m 45.00 0.00 span not exceeding 2.50m with a minimum safe load of 10, 000 kg / m2 0.00 sq m 65.00 0.00 span not exceeding 4.50m with a minumum safe load of 4, 500 kg / m3 0.00 sq m 65.00 0.00 0.00 sq m 75.00 0.00 0.00 sq m 33.20 0.00 15.00 sq m 18.71 280.65 0.00 6.20 0.00 4.10 0.00 0.00 0.00 0.00 0.00 kg kg kg kg kg kg kg kg kg 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 0.00 8.68 0.00 5.74 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 5.00 sq m sq m sq m sq m sq m 10.26 5.20 7.72 4.00 6.58 Sub total (1) 12.000 c/f 0.00 52.00 0.00 0.00 32.90 1301.86 Sub total (1) 12.000 b/f 1301.86 DESCRIPTION Extra over cast insitu concrete of any grade for integrateded 12.002 waterproofing additive, product is to be used as per manufacturer's instructions. Quantity measured per cu m of concrete. B Precast concrete Precast prestressed hollow core concrete slabs, 1200mm wide, including 12.003 leveling and grouting between slabs; Concrete topping and reinforcement measured seperately. span not exceeding 2.50m with a minimum safe load of 5,000 kg / m2 a. b. c. d. span not exceeding 6.50m with a minumum safe load of 4,500 kg / m2 Precast prestressed slabs, including leveling; Concrete topping and 12.004 reinforcement measured seperately. a. span not exceeding 2.0m with a load of 10KN / sq m C Formwork 12.005 Formwork, generally. D Reinforement Bar reinforcement, including, cutting, bending, and fixing and all ancillary 12.006 works and materials, like tying wire and spacers; all as detailed as per specifications: a. T32 b. T25 c. T20 d. T16 e. T12 f. T10 g. T8 h. R12 i. R10 BRC Fabric Reinforcement including cuting, bending, and fixing and all 12.007 ancillary works and materials, like tying wire and spacers and all necessary lapings. a. A 503 b. A 252 c. B 503 d. A 98 e. C 503 E Worked Finishes and Miscellanous Works Surface hardening agent to concrete surface, applied as per 12.008 0.00 sq m 4.50 0.00 manufacturer's instructions, including all necessary preparatory works. 12.009 Finish off concrete surface smooth and to level (power float finish). 0.00 sq m 3.00 0.00 12.010 Chase expansion joint in concrete and infill with proprietary filler. 0.00 m run 11.00 0.00 0.00 cu m 8.00 0.00 12.011 Infill material (torba), spread and levelled to the required falls and cross falls. Page 21 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION QTY UNIT 0.00 sq m Max. Amount Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) 4.5mm thick bituminous damp proof membrane torch welded type, laid 12.012 horizontally and/or vertically, including priming coat with tar, turnups, chasing and inserting into walls (where necessary) and making good. 10.10 0.00 Euro 1301.86 Rate is to include for a minumun lapping of 150mm at joints. Total Bill 12.000 to Summary Sheet : 13.000 Miscellenous Works 13.001 a. b. c. 13.002 13.003 13.004 13.005 Excavate and back fill trial pits and carry out surface reinstatement to surface original condition when complete - size on plan 1000mm x 2000mm using hand tools and compressors, including all necessary ancillary and temporary works. Excavation and backfilling carried out on same day. up to 1000mm deep exceeding 1000mm but not exceeding 2000mm deep exceeding 2000mm deep Granular hardstone (ornamental) material in side verges as indicated, including laying to levels, falls and crossfalls. Sieve excavated material to separate stone from agricultural soil (or other useful material) by means of mechanical equipment and transport to store. Soil reinstatment measured separate. Lay Only Agricultural Soil including collecting from store, load, transport to site and unload, spreading and level as required . Agricultural Soil, including depositin, spreading and leveling as required. 0.00 0.00 0.00 no. no. no. 112.50 187.50 237.50 0.00 0.00 0.00 0.00 cu m 12.00 0.00 0.00 cu m 13.00 0.00 0.00 cu m 7.50 0.00 0.00 cu m 14.16 0.00 0.00 0.00 0.00 no. no. no. 20.00 250.00 400.00 0.00 0.00 0.00 0.00 no. 521.56 0.00 0.00 sq m 1.00 0.00 Euro 0.00 Plant plants / shrubs and trees (previously uprooted) in identified 13.006 landscaped areas, including all necessary excavations, propping and watering : a. plants up to 1m height. b. shrubs / trees exceeding 1m but not exceeding 5 m height. c. trees exceeding 5m height. Saw cutting perimeter of failed area (full-depth of asphalt layers) up to a maximum area of 1.2m x 1.2m. Break up surface and bedding material up to the supporting structure; take up manhole cover and frame and 13.007 set aside re-use. Relay and level manhole cover and frame over bedding material; cast, compact and level approved infill material and surfacing material; bedding, infill and surfacing material are to comply with Specification 3.9 Volume 3. 13.008 Sweeping of road surface of any existing overlying material. Total Bill 13.000 to Summary Sheet : 14.000 Day Works NOTE: Day works are only to be used in a situation where works are not covered in any of the other Framework Agreement items and ordered by the Architect in charge. 14.001 Labour a. unskilled labourer b. semi skilled labourer c. skilled labourer d. mason e. steel fixer f. concretor g. electrician Note: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 All below machinery is to be inclusive of operator / s as necessary : 14.002 Plant a. Asphalt Pavers Page 22 of 25 hr hr hr hr hr hr hr 11.61 12.32 15.19 13.43 15.19 13.92 18.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION i up to 3.0m screed size ii up to 6.0m screed size b. Rollers (with vibratory facility as reuquired) i 2.5t ii 4.2t iii 7.5t iv hand held compactor c. Excavators - Loaders i 2 cu m bucket capacity (approx.) ii 1.5 cu m bucket capacity (approx.) iii 1.0 cu m bucket capacity (approx.) iv mini excavator Max. Amount QTY UNIT 0.00 0.00 hr hr 102.66 125.08 0.00 0.00 0.00 0.00 0.00 0.00 hr hr hr hr 37.76 43.66 48.38 42.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 hr hr hr hr 159.30 141.60 64.90 57.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 hr hr hr hr hr hr 154.60 178.18 51.00 51.00 64.00 50.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 hr hr hr hr 27.14 59.00 27.14 14.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 hr hr hr hr hr hr hr no. ton sq m. sq m. 27.14 35.40 88.50 5.90 27.14 28.00 29.00 27.14 22.50 12.00 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Euro 0.00 100.00 0.00 d. Surface Planars i cutting with up to 1000mm ii cutting width up to 2000mm e. Concrete Mixer f. Tipper Truck up to 15 cu m capacity g. Tipper Truck over 15 cu m capacity h. Crane Rubber Tyre 25 tonnes i. Crane i. up to 15 tonnes ii. up to 30 tonnes j. Dumper capacity (1.0 cu m capacity) k. Compressor (including breaker) l. Tractor Shovel i. up to 7 tonne ii. from 8 tonne up to 30 tonne m. Concrete Pump n. Hand Jigger o. Hi - ab up to 7 tonnes p. Cherry Picker q. Pressure bowser (incl. water) r. Skip Loader s. Dumping Charges t. Supply, erect and dismantle scaffolding u. Up keep and maintain scoffolding for the period required Total Bill 14.000 to Summary Sheet : 15.000 Structural Repair Works A Concrete Repair Concrete repair (Principle 3 to EN 1504-3) Repair to spalled concrete. Remove existing damaged / spolled concrete and repair with proprietary repair product. Repair product to comply with the UK DMRB BD 27/86 and EN 1504-3 Tables 2 and 15.001 3 for Method 3.1 (manual application of mortar) and/or Method 3.2 (Re-casting). Thickness of repair not exceeding 100mm. Methodology to be approved by TM. 0.00 Protection treatment to reinforcement Brush off loose scales and rust from the existing reinforcement/strands, apply protection treatment using 15.002 proprietary repair product. Repair product to comply with UK DMRB BD 27/86 and EN 1504-7 as follows: Page 23 of 25 sq.m Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE Max. Amount QTY UNIT 0.00 0.00 sq.m sq.m 37.50 25.00 0.00 0.00 0.00 0.00 sq.m sq.m 18.00 25.00 0.00 0.00 a. Total area of intervention not exceeding 1sq.m 0.00 0.00 0.00 no sq.m 350.00 b. Total area of intervention exceeding 1sq.m 80.00 0.00 0.00 no 150.00 0.00 0.00 sq.m 35.00 0.00 0.00 no 30.00 0.00 0.00 sq.m 10.00 0.00 ITEM DESCRIPTION a. Active Coating – EN 1504-7, Table 1, 2 and 3 b. Barrier Coating – EN 1504-7, Table 1,2 and 3 Application of concrete inhibitor (Impregnation - Principle 1, EN 1504-2) Treat all exposed concrete vertical walls and columns with a 15.003 suitable proprietary concrete impregnation inhibitor paint material complying with the UK DMRB BD27/86 as follows: Methodology to be approved by Transport Malta. a. Hydrophobic Impregnation – EN 1504-2, Table 1, 2, 3 B b. Impregnation - EN 1504-2, Table 1, 2, 4 Masonry Repair 15.004 Whole block removal - Remove whole eroded/damaged stonework and replace with new stonework. Masonry plug - Cut stonework to a depth of 100mm and insert identical size masonry plug. a. Total area of intervention not exceeding 1sq.m b. Total area of intervention exceeding 1sq.m 15.005 Extra over item 15.004a & 15.005a for rusticated masonry stone 15.006 surface finish ('Gidra' etc) . Total area of intervention not exceeding 1sq.m Extra over item 15.004b & 15.005b for rusticated masonry stone 15.007 surface finish ('Gidra' etc). Total area of intervention exceeding 1sq.m Sub total (1) 15.000 c/f 0.00 Sub total (1) 15.000 b/f 0.00 Pointing Works C Carefully rake out to a depth of 30mm and open existing masonry joints (up to a maximum height of 30mm) and re-point masonry 15.008 joints with proprietary factory-mixed mortar complying to EN 9982, Class M10 (10 N/mm2) . Mortar mix to be approved specified by TM. a. Total area of intervention not exceeding 1sq.m b. Total area of intervention exceeding 1sq.m D Sacrificial Layer 15.009 Apply a sacrificial layer 8.0mm thick of rendering complying with EN 998-1 , Class II (1.5 to 5.0N/mm2) to the structure surface. E Pipework uPVC pipes and fittings with suitable approved 0.00 0.00 no sq.m 26.00 5.00 0.00 0.00 0.00 sq.m 13.00 0.00 0.00 0.00 0.00 l.m. l.m. l.m. 5.50 6.50 9.35 0.00 0.00 0.00 0.00 sq.m 3.00 0.00 joints, 15.010 manufactured to BS EN 140-1:1998 Type UNI 303/2 and with Class Rigidity SN4 SDR 51 with the following dimensions. a. 80mm diameter b. 110mm diameter F c. 150mm diameter Vegetation cleaning and removal Apply weed killer to the existing vegetation. Weed killer to be 15.011 approved by Transport Malta. Vegetation including root structures to be removed after ensuring that the vegetation has dried off and can be removed without damaging the structure. Installation of Vehicle Restraints Systems (Including, Parapets) G Page 24 of 25 Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) Print date : 11/13/2014 Framework Agreement CT 2003 / 2013 Project : Construction of P/O Triq Ninu Cremona, TGF Triq Ninu Cremona, (A3 towers roads) Paola FRAMEWORK AGREEMENT: SCHEDULE OF RATES MAX. RATE ITEM DESCRIPTION Vehicle restrain systems (including post base flange connection) complying to EN 1317: a. Containment Class N2, W2-W4 b. Containment Class H2, W2 – W4 QTY UNIT 0.00 0.00 m m Max. Amount Bid. RATE Bid . Amount (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, Eco- (inclusive of VAT, EcoContribution and all Contribution and all Contribution and all Contribution and all other/taxes as may be other/taxes as may be other/taxes as may be other/taxes as may be acceptible) acceptible) acceptible) acceptible) 15.012 Total Bill 15.000 to Summary Sheet : 70.00 98.00 0.00 0.00 Euro 0.00 16.000 Emergency Works Note: For works subject to a 20% surcharge, any encroachment into standard working hours may result in the forfeiture of the surcharge, should encroachment into standard working hours include the unavailability of the road to the general public due to traffic management setup by the provider and that encroachment was due to bad planning from the contractor's end. no. 16.001 Minimum Fee to be paid to contractor for individual call-up 16.002 Works carried out under "On Call" Roster. Works carried out between 8:00pm and 6:00am, including Sundays and 16.003 Public Holidays, (surcharge applicable as per works order) when instructed by the Contracting Authority. Allowance for "On-Call" duty payable according to Emergency Roster. 16.004 Total Bill 16.000 to Summary Sheet : Page 25 of 25 240.00 % increase of rate 20.00 % increase of rate 20.00 sum 350.00 Euro 0.00