ThinkBike Workshop Team Blue Van Nuys Boulevard

Transcription

ThinkBike Workshop Team Blue Van Nuys Boulevard
ThinkBike Workshop
Team Blue
Van Nuys Boulevard
ThinkBike Workshop, Los Angeles
1
The Team
2
ThinkBike Workshop, Los Angeles
21-23 September 2011
ThinkBike Workshop, Los Angeles
21-23 September 2011
4
ThinkBike Workshop, Los Angeles
21-23 September 2011
3
First Impressions
ThinkBike Workshop, Los Angeles
21-23 September 2011
6
ThinkBike Workshop, Los Angeles
21-23 September 2011
5
7
ThinkBike Workshop, Los Angeles
21-23 September 2011
Part of a Network
3
8
ThinkBike Workshop, Los Angeles
21-23 September 2011
Process
9
ThinkBike Workshop, Los Angeles
21-23 September 2011
Area demographics
‡
‡
‡
‡
‡
‡
Population of Arleta and Pacoima is
approximately 94,000
Primarily Latino population
Primarily low-income
3
Single and multi-family
residences
Cyclists in the area primarily cycle as a
way to get to work or school
30,000 ADT (average daily traffic) on Van
Nuys Boulevard
10
ThinkBike Workshop, Los Angeles
21-23 September 2011
Function
Use
Design
11
ThinkBike Workshop, Los Angeles
21-23 September 2011
Function of the area
Connectivity
Businesses
Housing
3
12
ThinkBike Workshop, Los Angeles
21-23 September 2011
Function of the area
Public Facilities
Mass Transit
3
Trucks
13
ThinkBike Workshop, Los Angeles
21-23 September 2011
Key goals
1. For Pacoima/Arleta Area
‡ Improve livability
‡ Improve access to employment, businesses, and public facilities
‡ Create a more bike-friendly environment
‡ Encourage social cohesion
2. Transform Van Nuys Boulevard into a complete street
‡ Provide more bike facilities
‡ Integrate with bus system
14
ThinkBike Workshop, Los Angeles
21-23 September 2011
15
+
‡
‡
‡
‡
‡
Van Nuys Boulevard –
Glenoaks Blvd to Plummer St: 3.1 miles
ThinkBike Workshop, Los Angeles
21-23 September 2011
Van Nuys Boulevard (existing) –
Glenoaks Blvd to Plummer St: 3.1 miles
(0.3
(1.4
(0.2
(0.9
(0.4
mi)
mi)
mi)
mi)
mi)
16
Glenoaks to Herrick 80’
Herrick to Remick 74’
Remick to Vena 88’ [Fwy]
Vena to Woodman 74’
Woodman to Plummer 80’
ThinkBike Workshop, Los Angeles
21-23 September 2011
17
Van Nuys Boulevard (planned) –
Glenoaks Blvd to Plummer St 3.1 miles
ThinkBike Workshop, Los Angeles
21-23 September 2011
Van Nuys Boulevard (Option 1; Implement Today)
Glenoaks Blvd to Plummer St 3.1 miles
80’ Roadway
18
ThinkBike Workshop, Los Angeles
21-23 September 2011
Van Nuys Boulevard (Option 1; Implement Today)
Glenoaks Blvd to Plummer St 3.1 miles
74’ Roadway
19
ThinkBike Workshop, Los Angeles
21-23 September 2011
Van Nuys Boulevard (Option 2; Implement Tomorrow)
Glenoaks Blvd to Plummer St
80’ Roadway
20
ThinkBike Workshop, Los Angeles
21-23 September 2011
Van Nuys Boulevard (Option 2; Implement Tomorrow)
Glenoaks Blvd to Plummer St
74’ Roadway
21
ThinkBike Workshop, Los Angeles
21-23 September 2011
Van Nuys Boulevard (Option 3; Dream Big)
Glenoaks Blvd to Plummer St
22
ThinkBike Workshop, Los Angeles
21-23 September 2011
Alternate route – Pierce Street
23
ThinkBike Workshop, Los Angeles
21-23 September 2011
Bicycle Plan – Proposed Bikeways
Bicycle Friendly Streets: Pierce, Telfair & Herrick
Proposed Bicycle Lanes: Laurel Canyon, Woodman, Foothill (north of study
area)
Proposed Bike Path: San Fernando Road & Pacoima Wash
24
ThinkBike Workshop, Los Angeles
21-23 September 2011
Alternate route – Pierce Street
25
ThinkBike Workshop, Los Angeles
21-23 September 2011
Proposed Improvements for Pierce Street
‡
‡
‡
‡
‡
Sharrows
Share the Road
signs
Wayfinding signage
Bicycle Loop
Detectors: Laurel
Canyon, San
Fernando, &
Glenoaks
Bicycle Crossing
Signs on: Woodman,
Arleta, Laurel
Canyon, San
Fernando, &
Glenoaks
26
ThinkBike Workshop, Los Angeles
21-23 September 2011
Proposed Improvements for Pierce Street
‡
‡
‡
‡
Street Trees (shade)
Better Pavement (north of tunnel)
Accessibility ramps and better
lighting in the pedestrian tunnel
Bike Parking at schools, park, and
MEND center
27
ThinkBike Workshop, Los Angeles
21-23 September 2011
Proposed Capital Improvements for Pierce
‡
‡
Mini traffic circles at Telfair & Herrick (BFS), and
other intersections
Curb extensions and high visibility crosswalks at
schools, park, and public housing entrance
28
ThinkBike Workshop, Los Angeles
21-23 September 2011
Proposed Capital Improvements for Pierce
‡
‡
Bike & Ped actuated signal
and median refuge at
Arleta Ave. crossing to
complement existing
crosswalk
Median at Woodman for
left turning cyclists
29
ThinkBike Workshop, Los Angeles
21-23 September 2011
Soft Measures – Bike parking
‡
‡
‡
‡
‡
Outreach to business owners for
parking in front of businesses
Evaluate existing parking at cityowned facilities
Integrate with bus stops
Community bike rack design
competition
Establish bike corrals in private
parking lots
30
ThinkBike Workshop, Los Angeles
21-23 September 2011
Soft Measures – Schools
‡
‡
‡
‡
2 elementary schools, 1
middle school, and one
high school along Van
Nuys/Pierce
Walking and biking
“school buses”
Bike rodeos and traffic
education
Provide adequate bike
parking at schools
31
ThinkBike Workshop, Los Angeles
21-23 September 2011
Soft Measures – Adult outreach and education
‡
‡
‡
‡
Provide adult bicycle skills
education
Provide bilingual
information on traffic laws
and safety
Partner with local
organizations including
parent centers, faithbased groups, day labor
sites, night classes, and
community-based
organizations
Promote cycling at
neighborhood events like
health fairs, the swap
meet, and the Pacoima
Christmas parade
32
ThinkBike Workshop, Los Angeles
21-23 September 2011
Mission
ThinkBike Workshop, Los Angeles
21-23 September 2011
34
ThinkBike Workshop, San Francisco
19-20 September 2011
33