ThinkBike Workshop Team Blue Van Nuys Boulevard
Transcription
ThinkBike Workshop Team Blue Van Nuys Boulevard
ThinkBike Workshop Team Blue Van Nuys Boulevard ThinkBike Workshop, Los Angeles 1 The Team 2 ThinkBike Workshop, Los Angeles 21-23 September 2011 ThinkBike Workshop, Los Angeles 21-23 September 2011 4 ThinkBike Workshop, Los Angeles 21-23 September 2011 3 First Impressions ThinkBike Workshop, Los Angeles 21-23 September 2011 6 ThinkBike Workshop, Los Angeles 21-23 September 2011 5 7 ThinkBike Workshop, Los Angeles 21-23 September 2011 Part of a Network 3 8 ThinkBike Workshop, Los Angeles 21-23 September 2011 Process 9 ThinkBike Workshop, Los Angeles 21-23 September 2011 Area demographics Population of Arleta and Pacoima is approximately 94,000 Primarily Latino population Primarily low-income 3 Single and multi-family residences Cyclists in the area primarily cycle as a way to get to work or school 30,000 ADT (average daily traffic) on Van Nuys Boulevard 10 ThinkBike Workshop, Los Angeles 21-23 September 2011 Function Use Design 11 ThinkBike Workshop, Los Angeles 21-23 September 2011 Function of the area Connectivity Businesses Housing 3 12 ThinkBike Workshop, Los Angeles 21-23 September 2011 Function of the area Public Facilities Mass Transit 3 Trucks 13 ThinkBike Workshop, Los Angeles 21-23 September 2011 Key goals 1. For Pacoima/Arleta Area Improve livability Improve access to employment, businesses, and public facilities Create a more bike-friendly environment Encourage social cohesion 2. Transform Van Nuys Boulevard into a complete street Provide more bike facilities Integrate with bus system 14 ThinkBike Workshop, Los Angeles 21-23 September 2011 15 + Van Nuys Boulevard – Glenoaks Blvd to Plummer St: 3.1 miles ThinkBike Workshop, Los Angeles 21-23 September 2011 Van Nuys Boulevard (existing) – Glenoaks Blvd to Plummer St: 3.1 miles (0.3 (1.4 (0.2 (0.9 (0.4 mi) mi) mi) mi) mi) 16 Glenoaks to Herrick 80’ Herrick to Remick 74’ Remick to Vena 88’ [Fwy] Vena to Woodman 74’ Woodman to Plummer 80’ ThinkBike Workshop, Los Angeles 21-23 September 2011 17 Van Nuys Boulevard (planned) – Glenoaks Blvd to Plummer St 3.1 miles ThinkBike Workshop, Los Angeles 21-23 September 2011 Van Nuys Boulevard (Option 1; Implement Today) Glenoaks Blvd to Plummer St 3.1 miles 80’ Roadway 18 ThinkBike Workshop, Los Angeles 21-23 September 2011 Van Nuys Boulevard (Option 1; Implement Today) Glenoaks Blvd to Plummer St 3.1 miles 74’ Roadway 19 ThinkBike Workshop, Los Angeles 21-23 September 2011 Van Nuys Boulevard (Option 2; Implement Tomorrow) Glenoaks Blvd to Plummer St 80’ Roadway 20 ThinkBike Workshop, Los Angeles 21-23 September 2011 Van Nuys Boulevard (Option 2; Implement Tomorrow) Glenoaks Blvd to Plummer St 74’ Roadway 21 ThinkBike Workshop, Los Angeles 21-23 September 2011 Van Nuys Boulevard (Option 3; Dream Big) Glenoaks Blvd to Plummer St 22 ThinkBike Workshop, Los Angeles 21-23 September 2011 Alternate route – Pierce Street 23 ThinkBike Workshop, Los Angeles 21-23 September 2011 Bicycle Plan – Proposed Bikeways Bicycle Friendly Streets: Pierce, Telfair & Herrick Proposed Bicycle Lanes: Laurel Canyon, Woodman, Foothill (north of study area) Proposed Bike Path: San Fernando Road & Pacoima Wash 24 ThinkBike Workshop, Los Angeles 21-23 September 2011 Alternate route – Pierce Street 25 ThinkBike Workshop, Los Angeles 21-23 September 2011 Proposed Improvements for Pierce Street Sharrows Share the Road signs Wayfinding signage Bicycle Loop Detectors: Laurel Canyon, San Fernando, & Glenoaks Bicycle Crossing Signs on: Woodman, Arleta, Laurel Canyon, San Fernando, & Glenoaks 26 ThinkBike Workshop, Los Angeles 21-23 September 2011 Proposed Improvements for Pierce Street Street Trees (shade) Better Pavement (north of tunnel) Accessibility ramps and better lighting in the pedestrian tunnel Bike Parking at schools, park, and MEND center 27 ThinkBike Workshop, Los Angeles 21-23 September 2011 Proposed Capital Improvements for Pierce Mini traffic circles at Telfair & Herrick (BFS), and other intersections Curb extensions and high visibility crosswalks at schools, park, and public housing entrance 28 ThinkBike Workshop, Los Angeles 21-23 September 2011 Proposed Capital Improvements for Pierce Bike & Ped actuated signal and median refuge at Arleta Ave. crossing to complement existing crosswalk Median at Woodman for left turning cyclists 29 ThinkBike Workshop, Los Angeles 21-23 September 2011 Soft Measures – Bike parking Outreach to business owners for parking in front of businesses Evaluate existing parking at cityowned facilities Integrate with bus stops Community bike rack design competition Establish bike corrals in private parking lots 30 ThinkBike Workshop, Los Angeles 21-23 September 2011 Soft Measures – Schools 2 elementary schools, 1 middle school, and one high school along Van Nuys/Pierce Walking and biking “school buses” Bike rodeos and traffic education Provide adequate bike parking at schools 31 ThinkBike Workshop, Los Angeles 21-23 September 2011 Soft Measures – Adult outreach and education Provide adult bicycle skills education Provide bilingual information on traffic laws and safety Partner with local organizations including parent centers, faithbased groups, day labor sites, night classes, and community-based organizations Promote cycling at neighborhood events like health fairs, the swap meet, and the Pacoima Christmas parade 32 ThinkBike Workshop, Los Angeles 21-23 September 2011 Mission ThinkBike Workshop, Los Angeles 21-23 September 2011 34 ThinkBike Workshop, San Francisco 19-20 September 2011 33