Country Progress Report: Mongolia - Roads
Transcription
Country Progress Report: Mongolia - Roads
MONGOLIA CURRENT STATUS OF ROAD DISTINATION CONNECTED TO ASIAN HIGHWAY NETWORK DEPUTY DIRECTOR OF DOR R.ONON 2009 1 CHAPTER 1. 2. 3. 4. GENERAL АН-3 Altanbulag-Ulaanbaatar-Zamiinuud routes АН-4 Yarant-Khovd-Ulgii-Ulaanbaashint routes АН-32 Ulaanbaashint-Ulgii-Myangad-Tsahir-Dashinchilen-LunUnderkhaan-Sumber routes 2 Åðºíõèé BASIC INFORMATION • Mongolia is one of the 44 landlocked countries in the World • Bounded by two large neighbors – the PRC and the Russian Federation – makes road transportation links significant in terms of domestic and international trade. • Government of Mongolia signed on April, 2004 in The Intergovernmental Agreement on the Asian Highway Network Asian Highway routes in Mongolia: AH-3 - 990 km AH-4 - 749 km AH-32 - 2520 km TOTAL 4 259km 3 Åðºíõèé ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD Export-Import 4 General ROAD NETWORK – CURRENT SITUATION Khankh Khandgait Khatgal ULAANGOM UVS Baga-Ilenh Ereentsav Altanbulag HUVSGUL Naranbulag MURUN ULGII SELENGE Ulgii DARKHAN BAYAN-ULGII Havirga ZAVKHAN KHOVD ERDENET BULGAN BULGAN ARHANGAI ULIASTAI Tsahir Jargalant ULAANBAATAR CHOIBALSAN Battsengel KHENTII Lun TUV TSETSERLEG ZUUN MOD Tamsagbulag Matad UNDURKHAAN Khar-Khorin ALTAI Yarantai DORNOD BARUUN- URT Uench BAYANHONGOR ARVAIHEER GOVY-ALTAI SUKHBAATAR CHOIR Bichigt MANDALGOVY BAYANHONGOR UVURHANGAI DUNDGOVY SAINSHAND Burgastai DORNOGOVY Tsogt Ovoo Tsagaan suvarga Tavantolgoi DALANZADGAD UMNUGOVY Oyutolgoi Khanbogd Shivee huren Gashuun Suhait Paved road Under consrtruction Earth road Paved road Unpaved road Total Administrati on level Concrete Asphalt Gravel Improved earth Earth road Total STATE 38.87 2 081.8 1 440.7 1 403.0 6 254.5 11 218.9 LOCAL 54.8 421.8 521.24 499.0 36 534.4 38 031.2 TOTAL 93.67 2 503.6 1 961.9 1 902.0 42 788.9 5 49 250.0 5 General ROAD INTENSE AREA IN MONGOLIA 6 ÀÍ-3 ROUTE TOWARD ALTANBULAGULAANBAATAR-TSAMIINUUD 990ÊÌ 7 ÀÍ-3 ÷èãëýë ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD 990.4КМ Khankh Khandgait Population: 1.7mln 65% Ulaanbaishint Sities: Khatgal ULAANGOM ULGII BAYAN-ULGII UVS Ulaanbaatar, Darkhan, Naranbulag Ulgii Erdenet, Sainshand, Sukhbaatar HUVSGUL MURUN SELENGE DARKHAN Havirga Yarantai ULIASTAI Tsahir Tuv, Dornogovi, Dundgovi, Khentii, Bulgan, Selenge, Darkhan-Uul Uench KHOVD ERDENET BULGAN ZAVKHAN Aimags: Ereentsav Baga-Ilbenh BULGAN ARHANGAI Jargalant CHOIBALSAN Battsengel KHENTII Lun TUV TSETSERLEG ALTAI ZUUN MOD GOVY-ALTAI BAYANHONGOR Tamsagbulag Matad UNDURKHAAN Khar-Khorin BARUUN- URT BAYANHONGOR Borders: Altanbulag, Zamiin-Uud DORNOD SUKHBAATAR CHOIR ARVAIHEER Bichigt MANDALGOVY UVURHANGAI DUNDGOVY SAINSHAND Burgastai DORNOGOVY Tsogt Ovoo DALANZADGAD Tsagaan suvarga Tavantolgoi UMNUGOVY Oyutolgoi Khanbogd Shivee huren Gashuun Suhait 8 ÀÍ-3 ÷èãëýë ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD Existing Road Condition Khankh Khandgait • Total 542km paved road with Class III ULAANGOM Khatgal UVS Baga-Ilenh Altanbulag HUVSGUL Naranbulag - Rehabilitation of Altanbulag-Darkhan-Ulaanbaatar Road Ulgii ROAD DEVELOPMENT PROJECT (1997-2000), ADB loan BAYAN-ULGII ULGII MURUN SELENGE DARKHAN ERDENET BULGAN ZAVKHAN BULGAN ARHANGAI - Construction of Nalaikh-Choir 200km road KHOVD Tsahir SECOND ROAD DEVELOPMENT PROJECT (2001-2005), ADB Loan Jargalant ULIASTAI ULAANBAATAR Battsengel TUV TSETSERLEG • Ongoing 432km road Construction Uench with Class III ZUUN MOD UNDURKHAAN Khar-Khorin ALTAI Yarantai KHENTII Lun BARUUN- URT BAYANHONGOR ARVAIHEER GOVY-ALTAI - Construction of Choir-Sainshand-Zamiin-Uud 432km road UVURHANGAI BAYANHONGOR REGIONAL ROAD DEVELOPMENT PROJECT, Loan of ADB and Exim bank of Korea. (2005-2010) Burgastai SUKHBAATAR CHOIR MANDALGOVY DUNDGOVY SAINSHAND DORNOGOVY Tsogt Ovoo • Zamiin-Uud Regional Logistic Project DALANZADGAD Tsagaan suvarga Tavantolgoi UMNUGOVY Oyutolgoi Khanbogd Shivee huren Gashuun Suhait 9 ÀÍ-3 ÷èãëýë PLAN OF ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD ROAD Highway-990.4km Khankh Khandgait Ulaanbaishint Khatgal ULAANGOM UVS Ereentsav Baga-Ilbenh HUVSGUL Naranbulag MURUN ULGII SELENGE Ulgii DARKHAN BAYAN-ULGII Havirga ZAVKHAN KHOVD ERDENET BULGAN BULGAN ARHANGAI ULIASTAI Jargalant CHOIBALSAN Tsahir Battsengel KHENTII Lun TUV TSETSERLEG ZUUN MOD Tamsagbulag Matad UNDURKHAAN Khar-Khorin ALTAI Yarantai DORNOD BARUUN- URT Uench BAYANHONGOR ARVAIHEER GOVY-ALTAI SUKHBAATAR CHOIR Bichigt MANDALGOVY BAYANHONGOR UVURHANGAI DUNDGOVY SAINSHAND Burgastai DORNOGOVY Tsogt Ovoo DALANZADGAD Tsagaan suvarga Tavantolgoi UMNUGOVY Oyutolgoi Khanbogd Shivee huren Gashuun Suhait Classification: Asian Highway Class I Design Speed: 100 km/h Route: Altanbulag – Ulaanbaatar Zamin Uud Length: 990.4km 10 No. of Lanes: 4 lanes 10 ÀÍ-3 ÷èãëýë PLAN OF ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD ROAD Key Information Project name: Altanbulag-Ulaanbaatar-Zamiin-Uud Highway project Khankh Classification: Khandgait Asian Highway network Standard - Class I Ulaanbaishint Design speed: Khatgal ULAANGOM 100km/h UVS Naranbulag 4 lanes Length: 990.4km Ulgii BAYAN-ULGII ERDENET BULGAN ZAVKHAN KHOVD Road side station: SELENGE MURUN ULGII Number of lanes: Baga-Ilbenh HUVSGUL BULGAN ARHANGAI ULIASTAI Jargalant C Tsahir Battsengel Multifunctional Road Side Station (motel, rest area, service, petrol stations etc.) TUV TSETSERLEG ALTAI Yarantai Completion period: Toll gates: KHENTII Lun ZUUN MOD UNDURKHAAN Khar-Khorin BARUUN- URT Uench SUKHBAATAR BAYANHONGOR 5 years ARVAIHEER GOVY-ALTAI MANDALGOVY BAYANHONGOR Full controlled Toll Collection System UVURHANGAI DUNDGOVY Burgastai DORNOGOVY Tsogt Ovoo DALANZADGAD Tsagaan suvarga Tavantolgoi UMNUGOVY Oyutolgoi Khanbogd Shivee huren Gashuun Suhait 11 АН-4 ROUTES TOWARD ULAANBAASHINT-ULGIIKHOVD-YARANT 12 ÀÍ-4 routes Feasibility study has been developed by the technical assistance of ADB in 2007 and preliminary estimation is $199.5 million from Yarant to Ulaanbaashint of routes ÀÍ-4 13 ÀÍ-4 routes PLANNED PACKAGES OF THE PROJECT BY THE FEASIBILITY STUDY Pack Destination Length (км) Financial resource 1 Yarant Bodonch khavzal (valley) 125.0 км State budget ( 65êì has been constructed and 60êì is on going construction 2 Bodonch khavzal – Baga ulaan davaa (pass) 112.2 км ADB grant aid /65%/, State budget /35%/ 3 Baga ulaan davaa –Mankhan 104.1 км ADB grant aid /65%/, State budget /35%/ 4 Mankhan-Khovd 90.9 км Loan of PRC, $300.0 million 5 Khovd-Khashaatiin davaa 6 Khashaatiin davaa-Ulgii 7 Ulgii-Ulaanbaashint /Tsagaannuur/ Amount 37.6 mln $ 50 mln$ 104.95 км No decision of financial resource yet but in planning to be involved on 2nd stage soft laon of ADB 109.5 км Loan of PRC, $300.0 million 50 mln$ 102.75 км State budget (has been consturcted 30êì: 40êì has been reflected on state budget and is goint to start in 2009 14 ÀÍ-4 routes 102.75êì-state budget of Mongolia Financial quotation of project packages 109.5êì PRC loan 104,5êì ADB 2nd stage soft loan. 90,9 êì PRC loan. 216.3êì State budget and ADB grant aid and tech assistance 125êì (state budget) 15 ÀÍ-4 routes Currents status ¾GOM and ADB agreement of 37.6 mln Grant aid from special development fund has been done on 18 April, 2008 for the Western region road development. ¾Geukdong Engineering Co., Ltd has been developing 307,2êì road’s detailed engineering design from Bodonch khavzal to center of Khovd aimag ¾ 205 km Road design from Khovd-Khashaatiin davaa-Ulgii is being developed by the financing of Mongolian development fund ¾Decision has been made by State Ikh Khural that $50 mln is going to be quoted from 300 mln PRC soft laon on the road financing from Mankhan soum to Khovd and from Ulgii toward Khashaatiin davaa ¾ Negotation has been done between GOM and ADB that 65% of 216,3 êì road construction financing from Bodonch khavzal to Mankhan soum will have quoted by ADB and 35% GOM (1.7 billion tugric has reflected in state budget 2009) respectively. ¾Bidding of supervising consulting service has been going in process on the 307,2êì road construction from Bodonch khavzal to center of Khovd. 16 АН-32 routes TOWARD SUMBER-UNDERKHAANULAANBAATAR-DASHINCHILEN-TSAHIRMYANGAD-ULGII-ULAANBAASHINT 17 ÀÍ-32 routes ÀÍ-32 ROUTES Khankh Khandgait Khatgal ULAANGOM UVS Baga-Ilenh Ereentsav Altanbulag HUVSGUL Naranbulag MURUN ULGII SELENGE Ulgii DARKHAN BAYAN-ULGII Havirga ZAVKHAN KHOVD ERDENET BULGAN BULGAN ARHANGAI ULIASTAI Tsahir Jargalant ULAANBAATAR CHOIBALSAN Battsengel KHENTII Lun TUV TSETSERLEG ZUUN MOD Tamsagbulag Matad UNDURKHAAN Khar-Khorin ALTAI Yarantai DORNOD BARUUN- URT Uench BAYANHONGOR ARVAIHEER GOVY-ALTAI SUKHBAATAR CHOIR Bichigt MANDALGOVY BAYANHONGOR UVURHANGAI DUNDGOVY SAINSHAND Burgastai DORNOGOVY Tsogt Ovoo DALANZADGAD Tsagaan suvarga Tavantolgoi UMNUGOVY Oyutolgoi Khanbogd Shivee huren Government of Japanese grant aid - 13êì Bayandavaa-Erdene in 1996 – on going construction to 58.5êì Baganuur-Underkhaan in 2004-350 length/metre concrete bridge 18 Gashuun Suhait Paved road Under consrtruction Earth road 65êì road construction started Khanuin bridge-Tariat in 2008 by the Government of Catar grant aid ÀÍ-32 routes List of road construction up to 2008 toward АН-32 Road construction – – – – 76êì asphalt paved road toward Lun-Dashinchilen 30êì asphalt paved road toward Ulgii-Tsagaanuur 330 êì asphalt paved road toward Ulaanbaatar-Underkhaan 50 êì asphalt paved road toward Underkhaan-Sumber Bridges – – – – – – – – Total 495 ÊÌ Total 1182 L/Ì 60 L/ì Concrete bridge of Tsenkher river of Khentii aimag 258 L/ì Concrete bridge of Kherlen river of Khentii aimag 45 L/ì Concrete bridge of Moron river of Khentii aimag 217 L/ì Concrete bridge of Kherlen river of Underkhaan 126 L/ì Concrete bridge of Zavhan river of Sairkhairkhan 145 L/m Concrete bridge of Shurgiin river of Khovd aimag 45L/ì Concrete bridge of Khongion river of Khovd aimag 286 L/ì Concrete bridge of Tuul river of Lun sum 19 ÀÍ-32 ÷èãëýë ROAD AND BRIDGE CONSTRUCTION TOWARD ROUTES АН-32 ROAD – – – – Bridge TOTAL 425.7 ÊÌ 50êì toward Underkhaan-Sumber 109.5êì toward Dashinchilen-Orkhon river 160êì toward Khanuin river-Tsahir 106.2êì toward Ulaanbaatar-Lun TOTAL 427 Ó/Ì – 258 L/ì concrete bridge of Kherlen river of Khentii aimag – 169 L/ì concrete bridge Ideriin gol Zavhan aimag 20 ÀÍ-32 routes Planned road and bridge construction in 2010-2012 toward АН-32 Road Total 360 ÊÌ – ªíäºðõààí-Ñ¿ìáýð ÷èãëýëä 100êì asphalt paved road toward UnderkhaanSumber – 80êì asphalt paved road toward Tsetsuukh-Tosontsengel – 180êì asphalt paved road toward Tsosontsengel-Uliastai 21 Current road construction profile Constructed Routes dis Total length On going construction Planned Left over (2010-2012) (up to 2009) ÀÍ-3 êì 990 559 369.2 61.8 ÀÍ-4 êì 749 95 100 554 ÀÍ-32 êì 2520 495 425.7 360 1239.3 Total êì 4259 1149 894.9 975.8 1239.3 22 THANK YOU FOR ATTENTION 23
Similar documents
Image Intensifier
Image Display Soeware UI UI contains a menu bar, toolbar, status bar, logging window, control panel and display area. Toolbar cont...
More information