GENERAL
АН-3
Altanbulag-Ulaanbaatar-Zamiinuud routes
АН-4
Yarant-Khovd-Ulgii-Ulaanbaashint routes
АН-32
Ulaanbaashint-Ulgii-Myangad-Tsahir-Dashinchilen-LunUnderkhaan-Sumber routes
2
Åðºíõèé
BASIC INFORMATION
• Mongolia is one of the 44 landlocked
countries in the World
• Bounded by two large neighbors –
the PRC and the Russian Federation
– makes road transportation links
significant in terms of domestic and
international trade.
• Government of Mongolia signed on April,
2004 in The Intergovernmental Agreement
on the Asian Highway Network
Asian Highway routes in Mongolia:
AH-3 -
990 km
AH-4 -
749 km
AH-32 -
2520 km
TOTAL
4 259km
3
Åðºíõèé
ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD
Export-Import
4
General
ROAD NETWORK – CURRENT SITUATION
Khankh
Khandgait
Khatgal
ULAANGOM
UVS
Baga-Ilenh
Ereentsav
Altanbulag
HUVSGUL
Naranbulag
MURUN
ULGII
SELENGE
Ulgii
DARKHAN
BAYAN-ULGII
Havirga
ZAVKHAN
KHOVD
ERDENET
BULGAN
BULGAN
ARHANGAI
ULIASTAI
Tsahir
Jargalant
ULAANBAATAR
CHOIBALSAN
Battsengel
KHENTII
Lun
TUV
TSETSERLEG
ZUUN MOD
Tamsagbulag
Matad
UNDURKHAAN
Khar-Khorin
ALTAI
Yarantai
DORNOD
BARUUN- URT
Uench
BAYANHONGOR
ARVAIHEER
GOVY-ALTAI
SUKHBAATAR
CHOIR
Bichigt
MANDALGOVY
BAYANHONGOR
UVURHANGAI
DUNDGOVY
SAINSHAND
Burgastai
DORNOGOVY
Tsogt Ovoo
Tsagaan
suvarga
Tavantolgoi
DALANZADGAD
UMNUGOVY
Oyutolgoi
Khanbogd
Shivee huren
Gashuun Suhait
Paved road
Under consrtruction
Earth road
Paved road
Unpaved road
Total
Administrati
on level
Concrete
Asphalt
Gravel
Improved earth
Earth road
Total
STATE
38.87
2 081.8
1 440.7
1 403.0
6 254.5
11 218.9
LOCAL
54.8
421.8
521.24
499.0
36 534.4
38 031.2
TOTAL
93.67
2 503.6
1 961.9
1 902.0
42 788.9
5
49 250.0
5
General
ROAD INTENSE AREA IN MONGOLIA
6
ÀÍ-3 ROUTE
TOWARD ALTANBULAGULAANBAATAR-TSAMIINUUD 990ÊÌ
7
ÀÍ-3 ÷èãëýë
ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD
990.4КМ
Khankh
Khandgait
Population:
1.7mln
65%
Ulaanbaishint
Sities:
Khatgal
ULAANGOM
ULGII
BAYAN-ULGII
UVS
Ulaanbaatar,
Darkhan,
Naranbulag
Ulgii
Erdenet,
Sainshand,
Sukhbaatar
HUVSGUL
MURUN
SELENGE
DARKHAN
Havirga
Yarantai
ULIASTAI
Tsahir
Tuv, Dornogovi, Dundgovi,
Khentii, Bulgan, Selenge,
Darkhan-Uul
Uench
KHOVD
ERDENET
BULGAN
ZAVKHAN
Aimags:
Ereentsav
Baga-Ilbenh
BULGAN
ARHANGAI
Jargalant
CHOIBALSAN
Battsengel
KHENTII
Lun
TUV
TSETSERLEG
ALTAI
ZUUN MOD
GOVY-ALTAI
BAYANHONGOR
Tamsagbulag
Matad
UNDURKHAAN
Khar-Khorin
BARUUN- URT
BAYANHONGOR
Borders: Altanbulag, Zamiin-Uud
DORNOD
SUKHBAATAR
CHOIR
ARVAIHEER
Bichigt
MANDALGOVY
UVURHANGAI
DUNDGOVY
SAINSHAND
Burgastai
DORNOGOVY
Tsogt Ovoo
DALANZADGAD
Tsagaan
suvarga
Tavantolgoi
UMNUGOVY
Oyutolgoi
Khanbogd
Shivee huren
Gashuun Suhait
8
ÀÍ-3 ÷èãëýë
ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD
Existing Road Condition
Khankh
Khandgait
• Total 542km paved road with Class III
ULAANGOM
Khatgal
UVS
Baga-Ilenh
Altanbulag
HUVSGUL
Naranbulag
- Rehabilitation of Altanbulag-Darkhan-Ulaanbaatar
Road
Ulgii
ROAD DEVELOPMENT
PROJECT (1997-2000), ADB loan
BAYAN-ULGII
ULGII
MURUN
SELENGE
DARKHAN
ERDENET
BULGAN
ZAVKHAN
BULGAN
ARHANGAI
- Construction of Nalaikh-Choir
200km road
KHOVD
Tsahir
SECOND ROAD DEVELOPMENT PROJECT (2001-2005), ADB Loan
Jargalant
ULIASTAI
ULAANBAATAR
Battsengel
TUV
TSETSERLEG
• Ongoing 432km road Construction
Uench with Class III
ZUUN MOD
UNDURKHAAN
Khar-Khorin
ALTAI
Yarantai
KHENTII
Lun
BARUUN- URT
BAYANHONGOR
ARVAIHEER
GOVY-ALTAI
- Construction of Choir-Sainshand-Zamiin-Uud 432km road
UVURHANGAI
BAYANHONGOR
REGIONAL ROAD DEVELOPMENT PROJECT, Loan
of ADB and Exim
bank of Korea. (2005-2010) Burgastai
SUKHBAATAR
CHOIR
MANDALGOVY
DUNDGOVY
SAINSHAND
DORNOGOVY
Tsogt Ovoo
• Zamiin-Uud Regional Logistic Project
DALANZADGAD
Tsagaan
suvarga
Tavantolgoi
UMNUGOVY
Oyutolgoi
Khanbogd
Shivee huren
Gashuun Suhait
9
ÀÍ-3 ÷èãëýë
PLAN OF ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD ROAD
Highway-990.4km
Khankh
Khandgait
Ulaanbaishint
Khatgal
ULAANGOM
UVS
Ereentsav
Baga-Ilbenh
HUVSGUL
Naranbulag
MURUN
ULGII
SELENGE
Ulgii
DARKHAN
BAYAN-ULGII
Havirga
ZAVKHAN
KHOVD
ERDENET
BULGAN
BULGAN
ARHANGAI
ULIASTAI
Jargalant
CHOIBALSAN
Tsahir
Battsengel
KHENTII
Lun
TUV
TSETSERLEG
ZUUN MOD
Tamsagbulag
Matad
UNDURKHAAN
Khar-Khorin
ALTAI
Yarantai
DORNOD
BARUUN- URT
Uench
BAYANHONGOR
ARVAIHEER
GOVY-ALTAI
SUKHBAATAR
CHOIR
Bichigt
MANDALGOVY
BAYANHONGOR
UVURHANGAI
DUNDGOVY
SAINSHAND
Burgastai
DORNOGOVY
Tsogt Ovoo
DALANZADGAD
Tsagaan
suvarga
Tavantolgoi
UMNUGOVY
Oyutolgoi
Khanbogd
Shivee huren
Gashuun Suhait
Classification:
Asian Highway Class I
Design Speed:
100 km/h
Route:
Altanbulag – Ulaanbaatar Zamin Uud
Length:
990.4km 10
No. of Lanes:
4 lanes 10
ÀÍ-3 ÷èãëýë
PLAN OF ALTANBULAG-ULAANBAATAR-ZAMIIN-UUD ROAD
Key Information
Project name:
Altanbulag-Ulaanbaatar-Zamiin-Uud Highway project
Khankh
Classification:
Khandgait
Asian Highway network Standard - Class I
Ulaanbaishint
Design speed:
Khatgal
ULAANGOM
100km/h
UVS
Naranbulag
4 lanes
Length:
990.4km
Ulgii
BAYAN-ULGII
ERDENET
BULGAN
ZAVKHAN
KHOVD
Road side station:
SELENGE
MURUN
ULGII
Number of lanes:
Baga-Ilbenh
HUVSGUL
BULGAN
ARHANGAI
ULIASTAI
Jargalant
C
Tsahir
Battsengel
Multifunctional Road Side Station (motel, rest
area, service, petrol stations etc.)
TUV
TSETSERLEG
ALTAI
Yarantai
Completion period:
Toll gates:
KHENTII
Lun
ZUUN MOD
UNDURKHAAN
Khar-Khorin
BARUUN- URT
Uench
SUKHBAATAR
BAYANHONGOR
5 years
ARVAIHEER
GOVY-ALTAI
MANDALGOVY
BAYANHONGOR
Full controlled Toll Collection System
UVURHANGAI
DUNDGOVY
Burgastai
DORNOGOVY
Tsogt Ovoo
DALANZADGAD
Tsagaan
suvarga
Tavantolgoi
UMNUGOVY
Oyutolgoi
Khanbogd
Shivee huren
Gashuun Suhait
11
АН-4 ROUTES
TOWARD ULAANBAASHINT-ULGIIKHOVD-YARANT
12
ÀÍ-4 routes
Feasibility study has been developed by the technical
assistance of ADB in 2007 and preliminary estimation is $199.5
million from Yarant to Ulaanbaashint of routes ÀÍ-4
13
ÀÍ-4 routes
PLANNED PACKAGES OF THE PROJECT BY THE FEASIBILITY STUDY
Pack
Destination
Length
(км)
Financial resource
1
Yarant Bodonch khavzal (valley)
125.0 км
State budget ( 65êì has been constructed
and 60êì is on going construction
2
Bodonch khavzal – Baga ulaan
davaa (pass)
112.2 км
ADB grant aid /65%/, State budget /35%/
3
Baga ulaan davaa –Mankhan
104.1 км
ADB grant aid /65%/, State budget /35%/
4
Mankhan-Khovd
90.9 км
Loan of PRC, $300.0 million
5
Khovd-Khashaatiin davaa
6
Khashaatiin davaa-Ulgii
7
Ulgii-Ulaanbaashint
/Tsagaannuur/
Amount
37.6 mln $
50 mln$
104.95 км
No decision of financial resource yet but
in planning to be involved on 2nd stage
soft laon of ADB
109.5 км
Loan of PRC, $300.0 million
50 mln$
102.75 км
State budget (has been consturcted
30êì: 40êì has been reflected on state
budget and is goint to start in 2009
14
ÀÍ-4 routes
102.75êì-state budget of
Mongolia
Financial quotation
of project packages
109.5êì PRC loan
104,5êì ADB 2nd stage soft
loan.
90,9 êì PRC loan.
216.3êì State budget and
ADB grant aid and tech
assistance
125êì (state budget)
15
ÀÍ-4 routes
Currents status
¾GOM and ADB agreement of 37.6 mln Grant aid from special development fund has been
done on 18 April, 2008 for the Western region road development.
¾Geukdong Engineering Co., Ltd has been developing 307,2êì road’s detailed engineering
design from Bodonch khavzal to center of Khovd aimag
¾ 205 km Road design from Khovd-Khashaatiin davaa-Ulgii is being developed by the
financing of Mongolian development fund
¾Decision has been made by State Ikh Khural that $50 mln is going to be quoted from 300 mln
PRC soft laon on the road financing from Mankhan soum to Khovd and from Ulgii toward
Khashaatiin davaa
¾ Negotation has been done between GOM and ADB that 65% of 216,3 êì road construction
financing from Bodonch khavzal to Mankhan soum will have quoted by ADB and 35% GOM
(1.7 billion tugric has reflected in state budget 2009) respectively.
¾Bidding of supervising consulting service has been going in process on the 307,2êì road
construction from Bodonch khavzal to center of Khovd.
16
АН-32 routes
TOWARD SUMBER-UNDERKHAANULAANBAATAR-DASHINCHILEN-TSAHIRMYANGAD-ULGII-ULAANBAASHINT
17
ÀÍ-32 routes
ÀÍ-32 ROUTES
Khankh
Khandgait
Khatgal
ULAANGOM
UVS
Baga-Ilenh
Ereentsav
Altanbulag
HUVSGUL
Naranbulag
MURUN
ULGII
SELENGE
Ulgii
DARKHAN
BAYAN-ULGII
Havirga
ZAVKHAN
KHOVD
ERDENET
BULGAN
BULGAN
ARHANGAI
ULIASTAI
Tsahir
Jargalant
ULAANBAATAR
CHOIBALSAN
Battsengel
KHENTII
Lun
TUV
TSETSERLEG
ZUUN MOD
Tamsagbulag
Matad
UNDURKHAAN
Khar-Khorin
ALTAI
Yarantai
DORNOD
BARUUN- URT
Uench
BAYANHONGOR
ARVAIHEER
GOVY-ALTAI
SUKHBAATAR
CHOIR
Bichigt
MANDALGOVY
BAYANHONGOR
UVURHANGAI
DUNDGOVY
SAINSHAND
Burgastai
DORNOGOVY
Tsogt Ovoo
DALANZADGAD
Tsagaan
suvarga
Tavantolgoi
UMNUGOVY
Oyutolgoi
Khanbogd
Shivee huren
Government of Japanese grant aid
- 13êì Bayandavaa-Erdene in 1996
– on going construction to 58.5êì
Baganuur-Underkhaan in 2004-350
length/metre concrete bridge
18
Gashuun Suhait
Paved road
Under consrtruction
Earth road
65êì road construction started
Khanuin bridge-Tariat in 2008 by
the Government of Catar grant aid
ÀÍ-32 routes
List of road construction up to 2008 toward АН-32
Road construction
–
–
–
–
76êì asphalt paved road toward Lun-Dashinchilen
30êì asphalt paved road toward Ulgii-Tsagaanuur
330 êì asphalt paved road toward Ulaanbaatar-Underkhaan
50 êì asphalt paved road toward Underkhaan-Sumber
Bridges
–
–
–
–
–
–
–
–
Total 495 ÊÌ
Total 1182 L/Ì
60 L/ì Concrete bridge of Tsenkher river of Khentii aimag
258 L/ì Concrete bridge of Kherlen river of Khentii aimag
45 L/ì Concrete bridge of Moron river of Khentii aimag
217 L/ì Concrete bridge of Kherlen river of Underkhaan
126 L/ì Concrete bridge of Zavhan river of Sairkhairkhan
145 L/m Concrete bridge of Shurgiin river of Khovd aimag
45L/ì Concrete bridge of Khongion river of Khovd aimag
286 L/ì Concrete bridge of Tuul river of Lun sum
19
ÀÍ-32 ÷èãëýë
ROAD AND BRIDGE CONSTRUCTION TOWARD
ROUTES АН-32
ROAD
–
–
–
–
Bridge
TOTAL 425.7 ÊÌ
50êì toward Underkhaan-Sumber
109.5êì toward Dashinchilen-Orkhon river
160êì toward Khanuin river-Tsahir
106.2êì toward Ulaanbaatar-Lun
TOTAL 427 Ó/Ì
– 258 L/ì concrete bridge of Kherlen river of Khentii aimag
– 169 L/ì concrete bridge Ideriin gol Zavhan aimag
20
ÀÍ-32 routes
Planned road and bridge construction in 2010-2012
toward АН-32
Road
Total 360 ÊÌ
– ªíäºðõààí-Ñ¿ìáýð ÷èãëýëä 100êì asphalt paved road toward UnderkhaanSumber
– 80êì asphalt paved road toward Tsetsuukh-Tosontsengel
– 180êì asphalt paved road toward Tsosontsengel-Uliastai
21
Current road construction profile
Constructed
Routes
dis
Total
length
On going
construction
Planned
Left over
(2010-2012)
(up to 2009)
ÀÍ-3
êì
990
559
369.2
61.8
ÀÍ-4
êì
749
95
100
554
ÀÍ-32
êì
2520
495
425.7
360
1239.3
Total
êì
4259
1149
894.9
975.8
1239.3
22
THANK YOU FOR ATTENTION
23

Similar documents

Image Intensifier

Image Intensifier Image  Display  Soeware  UI   UI  contains  a  menu  bar,  toolbar,  status  bar,  logging   window,  control  panel  and  display  area.     Toolbar  cont...

More information

asian highway route map

asian highway route map E125 AH5 E40 AH5 Kaskelen AH61 Kordai E40

More information