Project Control User Guide
Transcription
Project Control User Guide
Project Control User Guide Version 10.0.13 Table of Contents Project Control PRIOR TO THE SETUP OF PROJECT SUITE .................................................................................... 5 SETUP – PROJECT ................................................................................................................................... 8 PROJECT SETUP ....................................................................................................................................... 10 DIVISION SETUP ...................................................................................................................................... 20 DEPARTMENT SETUP ............................................................................................................................... 24 PRODUCTIVITY SETUP ............................................................................................................................. 27 CATEGORY SETUP ................................................................................................................................... 29 CLASS SETUP ........................................................................................................................................... 33 RESOURCE SETUP .................................................................................................................................... 35 RESOURCE BANK SETUP ......................................................................................................................... 41 FEES INVOICING METHOD SETUP............................................................................................................ 44 EXPENSE INVOICING METHOD SETUP ..................................................................................................... 49 INTERNAL EXPENSE METHOD SETUP ...................................................................................................... 51 TERRITORY SETUP................................................................................................................................... 54 BRANCH SETUP ....................................................................................................................................... 55 PROJECT TYPE SETUP .............................................................................................................................. 56 SERVICE TYPE SETUP .............................................................................................................................. 57 PRODUCTIVITY ID GROUP....................................................................................................................... 58 PARAMETERS OF THE BUSINESS UNITS .................................................................................................... 59 MARKET PARAMETERS ........................................................................................................................... 60 LEVEL MANAGEMENT ............................................................................................................................. 60 LEVEL MANAGEMENT ............................................................................................................................. 61 VACATION AWARD MANAGEMENT ........................................................................................................ 62 TEDI SETUP ............................................................................................................................................. 63 TIME & EXPENSE DEFINITION SETTINGS ................................................................................................ 64 TEDI GROUP MAINTENANCE.................................................................................................................. 85 GROUP COORDINATOR ............................................................................................................................ 87 UNLOCK AN EMPLOYEE’S TIMESHEET AND EXPENSE REPORT .............................................................. 88 EMPLOYEE TIMESHEET AND EXPENSE REPORT STATUS ........................................................................ 89 REPRINT TIMESHEETS ............................................................................................................................. 90 TIMESHEET STATUS BLOCKING .............................................................................................................. 92 TEDI RESTRICTIONS ............................................................................................................................... 93 CARDS – PROJECT ................................................................................................................................ 94 PROJECT MAINTENANCE ......................................................................................................................... 95 Project Maintenance: Billing ............................................................................................................ 104 Fees ................................................................................................................................................... 105 Expenses............................................................................................................................................ 107 Internal Expenses (expenses, equipment, tests) ................................................................................ 109 PROJECT MAINTENANCE: LEVEL 1 ....................................................................................................... 111 PROJECT MAINTENANCE: LEVEL 2 ....................................................................................................... 116 BUDGETS ............................................................................................................................................... 121 Budget Detail Maintenance .............................................................................................................. 123 PROJECT COPY ...................................................................................................................................... 125 PROJECT ESTIMATE ............................................................................................................................... 127 COST ITEMS ........................................................................................................................................... 129 COST ITEMS COPY ................................................................................................................................. 134 BUDGETS – COST ITEMS ........................................................................................................................ 136 © 2010 JOVACO Solutions inc. – Version 10.0.13 i Table of Contents Project Control FEES SPECIFIC RATE ............................................................................................................................. 138 EXPENSE SPECIFIC RATE ....................................................................................................................... 142 INTERNAL EXPENSE SPECIFIC RATE ..................................................................................................... 145 PROJECT ACTIVATION ........................................................................................................................... 148 CLOSING/ RE-OPENING PROJECTS ......................................................................................................... 149 MASTER PROJECTS ................................................................................................................................ 151 TEDI TRANSACTIONS ........................................................................................................................ 152 TEDI TRANSFER ................................................................................................................................... 153 IMPORT TO TEDI ................................................................................................................................... 155 TIME & EXPENSE JOURNAL TRANSFER................................................................................................. 156 TRANSACTIONS – PROJECT ............................................................................................................ 158 UPDATE DATES ..................................................................................................................................... 159 BATCH ENTRY ....................................................................................................................................... 160 TIMESHEETS TRANSACTION ENTRY ...................................................................................................... 164 EXPENSE REPORT TRX ENTRY .............................................................................................................. 169 INTERNAL EXPENSE TRANSACTION ENTRY .......................................................................................... 175 IMPORT - INTERNAL FEES...................................................................................................................... 179 ADJUSTMENT MASS ENTRY .................................................................................................................. 180 ADJUSTMENT TRANSACTION ................................................................................................................ 183 REVENUE CALCULATION ...................................................................................................................... 188 REVENUE RECOGNITION ....................................................................................................................... 190 ITEM TRANSFER .................................................................................................................................... 192 ITEM RETURN ........................................................................................................................................ 196 PROJECT PURCHASE ORDERS ................................................................................................................ 200 PROJECT PURCHASE RECEIPT ............................................................................................................... 201 CORRECTION TRANSACTIONS ............................................................................................................... 202 PROJECT PROGRESS............................................................................................................................... 204 INVOICING DETAIL MAINTENANCE....................................................................................................... 206 TRANSFER OF PROCUREMENT DOCUMENTS ......................................................................................... 209 PAYROLL CANADA - RATE TABLE ENTRY ............................................................................................ 210 DYNAMICS GP SUBSTITUTE WINDOWS ................................................................................................ 211 General Ledger Transaction Entry to Project .................................................................................. 212 Receivable Transaction Entry to Project .......................................................................................... 213 Entering collection charges to projects ............................................................................................ 214 Payables Transaction Entry to Project ............................................................................................. 215 Sales Transaction Entry to Project ................................................................................................... 216 REPORTS - PROJECT .......................................................................................................................... 217 PROJECT SETUP REPORTS ..................................................................................................................... 223 PROJECT REPORTS ................................................................................................................................. 226 TRANSACTION REPORTS ....................................................................................................................... 228 COST CONTROL REPORTS ..................................................................................................................... 231 CONTROL REPORTS – BY PROJECT ........................................................................................................ 233 CONTROL REPORTS – BY PROJECT EXECUTIVE .................................................................................... 236 CONTROL REPORTS – BY COORDINATOR .............................................................................................. 239 PRODUCTIVITY REPORT ........................................................................................................................ 242 HISTORY REGISTER ............................................................................................................................... 244 INVOICING REPORT ............................................................................................................................... 246 INACTIVE PROJECTS REPORTS .............................................................................................................. 248 © 2009 JOVACO Solutions inc. – Version 10.0.13 iii Table of Contents Project Control INACTIVE PROJECT CONTROL REPORTS – BY PROJECT ........................................................................ 250 INACTIVE PROJECT TRANSACTION REPORTS ........................................................................................ 252 CONTROL REPORTS OF INACTIVE PROJECTS – BY MANAGER ............................................................... 254 CONTROL REPORTS – MASTER PROJECTS ............................................................................................. 255 INQUIRY – PROJECT .......................................................................................................................... 256 BUDGET TRACKING INQUIRY ................................................................................................................ 257 PROJECT STATUS INQUIRY .................................................................................................................... 259 PROJECT TRANSACTION INQUIRY ......................................................................................................... 260 EMPLOYEE TRANSACTION INQUIRY ..................................................................................................... 261 VENDOR TRANSACTION INQUIRY ......................................................................................................... 262 RESOURCE TRANSACTION INQUIRY ...................................................................................................... 263 INVOICING TRANSACTION INQUIRY ...................................................................................................... 264 BILLABLE RATE BY EMPLOYEE ............................................................................................................ 265 PURCHASE ORDER TRANSACTION ........................................................................................................ 267 PROJECT VIEW ...................................................................................................................................... 268 ROUTINES - PROJECT ........................................................................................................................ 269 BANK UPDATE....................................................................................................................................... 269 YEAR-END CLOSING ............................................................................................................................. 270 RE-EVALUATION OF THE PROJECTS IN THE INVOICING CURRENCY THAT IS DIFFERENT FROM THE FUNCTIONAL CURRENCY. ...................................................................................................................... 271 MILEAGE RATE UPDATE ....................................................................................................................... 272 UTILITIES - PROJECT ........................................................................................................................ 274 RECALCULATE COMMITMENTS ............................................................................................................. 274 INACTIVE PROJECT TRANSFER .............................................................................................................. 275 PROJECT CONTROL INSTALLATION ....................................................................................................... 276 ANNEXES ................................................................................................................................................... I INTEGRATED SOLUTION ............................................................................................................................. I GENERAL OVERVIEW ............................................................................................................................... II PROJECT STRUCTURE .............................................................................................................................. III PROJECT RESPONSIBILITIES .................................................................................................................... IV ACCOUNTING RELATIONSHIP ................................................................................................................... V INTER-DEPARTMENT ............................................................................................................................... VI RELATIONSHIPS ......................................................................................................................................VII ANNEXES ..............................................................................................................................................VIII GLOSSAIRE .............................................................................................................................................XI © 2009 JOVACO Solutions inc. – Version 10.0.13 iii Project Setup Project Control Prior to the Setup of PROJECT SUITE Prior to setting up Project Suite, it is important to have the following information regarding your company’s project structure defined and available. For each level of information, you will need to determine a coding structure (i.e. numeric or alphanumeric) that your employees will use consistently across the organization. 1. Chart of Accounts –Define which accounts will be used to charge projects, resources, billable and non-billable time. You will need to understand this Chart of Accounts to successfully set up your project structure. (Note: JOVACO can provide a sample Chart of Accounts that you can use as a model). 2. Division – The number of divisions (or cost centres) if any that exist in your company. a. Division ID and name b. Account distribution IDs 3. Department within a Division – Define the departments within each division. a. Department ID and name b. Account distribution IDs 4. Productivity ID group –Classify the productivity IDs in step 5 into ten (10) groups for productivity ID reporting. 5. Productivity IDs – Define the IDs used by your company’s resources to classify the billable time, non billable time, non productive time, and employee benefits. 6. Categories – The different service and expense categories that your resources will charge for their time and expenses. For example… © 2010 JOVACO Solutions inc. – Version 10.0.13 5 Project Setup Project Control 7. Classes – Define the resource professional classifications within your organization. 8. Resources within Department/Division a. Employees and Contract workers i. Hourly rates, Department, Class ID ii. Account IDs iii. Decide whether to allow inter-department lending of resources and if yes, whether to include benefits and a mark-up. b. Equipment (i.e. Specialized equipment in which usage needs to be recorded for internal use or charged to clients) i. Hourly rates ii. Account IDs iii. Decide whether to allow inter-department lending of resources and if yes, whether to include benefits and a mark-up. 9. Territories – For reporting purposes, identify the geographical regions you wish to classify your work. 10. Branches – For reporting purposes, identify the different branches within your organization that you may need to report to. Normally, the branch identifies the office and/or resource responsible for the project’s administrative management (e.g., project invoicing). 11. Project types – For reporting purposes, identify how you wish to classify the types of projects you will undertake. This information is used to classify the project as a whole. 12. Service types – For reporting purposes, identify how you wish to classify your services. These are used to determine levels 1 and 2 of your projects. 13. Fees Method – For invoicing purposes, identify your fee structure by resource class or individual resource for Time and Material projects 14. Projects a. Billable projects as well as Administrative Non-billable projects b. Phases (level 1) and sub-phases (level 2) of each project c. Budgets for each phase © 2010 JOVACO Solutions inc. – Version 10.0.13 6 Project Setup Project Control Project Suite – Project control structure Project 1st Sublevel like Phase or Deliverable Sublevel 1 Sublevel 1 Sublevel 1 2nd Sublevel like Change Order or Deliverable (Optional) Sublevel 2 Department A Department B Sublevel 2 Sublevel 2 Budget by Department Department A Department C Department D Labor Activities and/or Direct Expenses Cost Item Cost Item Cost Item Project XYZ Level 1 Level 1 Division XXX Dept A XXX XXXX Department Category Category Category © 2010 JOVACO Solutions inc. – Version 10.0.13 7 Project Setup Project Control Setup – Project (Tools >> Setup >> Project) © 2010 JOVACO Solutions inc. – Version 10.0.13 8 Project Setup Project Control The Project Setup palette regroups the functions that define the elements used for opening projects and entering project transactions. Projects – Defines default information when a project is opened, as well as labour cost distribution options Divisions - Defines the divisions within the company and their leads Departments – Defines departments within each division of the company and their leads Productivity IDs – Defines the IDs used to analyze staff productivity Categories – Defines standard project categories for customer projects Classes – Defines employee classes and for internal classes as well for customer invoicing purposes Resources – Identifies employees and assets with internal project expenses Fees Methods – Defines labour invoicing protocol for projects (normally per customer or group of customers) Expenses Methods – Defines expense invoicing protocol for projects Internal Expense Methods – Defines internal expense invoicing protocol for projects Regions – Defines regions where projects are completed for statistical purposes Project Type – Defines project types for statistical purposes Service Type – Defines professional service types for statistical purposes Productivity Group – Establishes 10 productivity clusters for reporting purposes Business Units - defines business units that will be associated with the target markets Markets - defines the markets in which the projects are completed Level Management - defines levels of employment for personnel Vacation Award Management - defines the number of vacation days based on seniority of personnel © 2010 JOVACO Solutions inc. – Version 10.0.13 9 Project Setup Project Control Project Setup (Tools >> Setup >> Project >> Projects) In the Project Setup window, complete the fields that will allow you to configure the default values for a project. These default values will be used when new projects are created and can be modified at any time for specific project needs. To follow the company’s management rules, select the Employee Benefits Distribution and Include Employee Benefits in Inter-department Calculation boxes to enter mark-up costs for Employee Benefits. By selecting these options, you will be able to take into account the ensemble of directs costs, including benefits, can be attached to labour costs. © 2010 JOVACO Solutions inc. – Version 10.0.13 10 Project Setup Project Control Depending on the policies within the organization, check the box Enter Social Benefits and Include social benefits in the interdepartmental calculation charges if you would like to transfer the mark-up related to social benefits. By selecting these options, you are aware of the direct costs, including benefits linked to labour. © 2010 JOVACO Solutions inc. – Version 10.0.13 11 Project Setup Project Control Segments Used Divisions/Departments: Divisions and departments must be linked with segments in the chart of accounts. Segment names are defined in the Accounts Structure Setup window Setup >> Financial >> Account Segments Setup or on SBM Accounting >> Accounts. These segments represent company characteristics: Site, Division, Profit Centre, etc. This option creates a link between the General Ledger and Project Control accounts. Note that divisions and departments can be linked to the same chart of account segment if only one is used. WARNING: Once saved, these fields cannot be modified. Level 1/Level 2 Definitions: Enter the field name associated with Levels 1 and 2 in the Project Control structure. Follow the company’s management rules to determine how to identify a project’s Levels 1 and 2. The projects can have one or several Level 1. Each Level 1 can have one or more Level 2. Example: sub-project or phase, modification or deliverable … Last Project No. If you wish to use the automatic numeration in the software at the creation of a project, enter the last project sequence number; the system will automatically assign numbers to subsequent projects. Employee Benefit Distribution Check this box to calculate benefit distribution to GL according to the employee or project rate. This rate is defined in the Resource Setup – Labour Type window. If the box is not checked, and the project/level rate is 0 and the employee rate is not 0, Employee Benefits costs are calculated but are not distributed. It is preferable to check this box to obtain the most accurate cost possible. See also Employee Benefits accounts defined in the Department Setup and Categories/Cost Items Setup windows. Include Employee Benefits in Inter-department Calculations Check this box to include Employee Benefits expenses when employees from one department work for another. If this box is not checked, inter-department staff costs are calculated on the applicable hourly rate only. The box should not be checked if the staff-lending rate (Inter-department Rate) already includes an Employee Benefits mark-up. Overtime Bank at the overtime rate Check the box to calculate overtime hours at an overtime rate. If this box is not checked, overtime hours will be calculated at a normal rate. This option can be modified for each employee. Revenue Category Distribution To associate a project-invoicing distribution to specific cost categories, this box must be checked. This option is required only when projects are operated by cost, and revenue is only calculated or reported at invoicing. This element controls the availability of the Category field in the Project Invoicing Distribution Zoom window: (Transactions >> Sales >> Transaction Entry >> Allocate Projects button). © 2010 JOVACO Solutions inc. – Version 10.0.13 12 Project Setup Project Control If the Revenue Category Distribution box in the Project Setup window is checked, the Category field is active and available in the Project Invoicing Distribution Zoom window. If this box is not checked, the Category field is inactive. Display Cost Salary You can choose to display or not to display the salary costs (employee’s hourly rate) of posted transactions in the adjustment transactions and in the project inquiry windows. This option affects various windows but not the reports. Project Required in Purchase transactions You can choose all the transactions in the Accounts Payables to be applied to the projects. Transfer Expenses to AP Check this box if you want to transfer, by default, the expense reports in the Accounts Payables. Note that in the case, the TEDI transfer function will indicate automatically a transfer to AP. If the opposite is true, the expense reports will be transferred to be reimbursed by payroll. Use requisitions to suppliers Check this box if you use the Web Requisitions module. Activates the functions for receiving and handling orders (commitments to projects) generated by this product. Payroll Integration When using Great Plains’ Payroll (Canadian or US), it is possible to distribute project costs from Payroll entries, usually when distribution rates vary and distribution frequency is frequent enough (for example, the construction sector or custom manufacturing). Projects can be distributed from Project Control module and distributions can be automatically transmitted to Payroll for processing (For example: in the professional services sector). In the case of the a transfer from Payroll to Project, you will need to indicate whether the project costs transaction date will correspond to the date on the cheque or to the date of the end of the period for the timesheets. Use the information from the supplier for purchase orders and approvals Check this box if you would like to use the supplier’s name as the project cost description instead of the description within the order. Default Values The options in this section correspond with default values that are defined when a project is opened. These values can be modified at any time for a specific project and/or level. Default values accelerate the creation of new projects. Standard Categories: If this option is checked, standard categories defined in the Cost Categories Setup window will be used by the projects, Levels 1 and/or Level 2. It is not necessary to create specific categories individually, as with cost items. Cost items must be created (Cards >> Project >> Cost Items) for each department of a project, Level 1 and/or Level 2. Inter-department: If this option is checked, staff lending between departments is permitted. Otherwise, only the employees of departments budgeted at the corresponding project/level can allocate time to the project. Salary Account: If this option is checked, labour costs will be applied to the Salary Account defined in the employee card, rather than the Salary Account attached to the cost category. © 2010 JOVACO Solutions inc. – Version 10.0.13 13 Project Setup Project Control Accrued Revenue: If this option is checked, the calculated revenues at the entry of the transaction are at the same time distributed to GL and debited to the WIP accounts according to the corresponding cost types. Otherwise, the calculated revenues are not distributed to GL and serve only for reference purposes. In this case, the revenues are distributed to GL only at the moment of the processing of the revenue recognition. Professional Services firms generally choose to check this option. WIP Costs: If this option is checked, the accrued cost (rather than the revenues) is debited to the WIP accounts. In this case, you do not need to check the Accrued Revenue box. Charge to the level’s department: It is possible to ensure that charges are always made to the department indicated in the level corresponding to the project charged, even if another budgeted department is charged. If this option is checked, the user may choose this option in the selected project/level. On the other hand, if this option is not checked, the user will not have that choice available in the project/level entered. Language: You will need to select a Principal Language, in other words, your main language (for example, English) and your second language (for example, French) in your language choices defined in the software (Tools >> Setup >> System >> Language) Inter-department Rate: Enter the mark-up cost rate of a resource belonging to a department not budgeted under the project. A rate of 1.0 indicates that an employee’s salary rate will be applied to the department; a value of 1.5 indicates that a mark-up rate of 50% will be added to the distribution. Labour Cost Mark-up Check this box if you want the labour cost to increase by the Employee Benefits. Mark-up Rate: 0% indicates that the employee card percentage is used as the Employee Benefits mark-up percentage. Anything other than 0% indicates that this percentage is used as the Employee Benefits mark-up percentage. A 10% mark-up is entered as 1.10. Percentage for the Overhead Mark-up Check this box if you want to have the overhead calculated, by default, as a percentage of the labour cost mark-up. If the box is not checked, the overhead will be calculated as a fixed amount by hour allocated to project. Overhead Mark-up Rate: If you want to include overhead in the project costs analysis, indicate in this field either the default overhead percentage or amount per hour. Note that this corresponding amount is not allocate to the General Ledger, but serves only for a project costs analysis. Hourly Basis: When there is no specific rate or billing method indicated in the project and that the project productivity ID and cost category ID are identified as billable time (00), it is possible to calculate the billable value according the number of hours annually indicated here and multiply it by the appropriate mark-up rate indicated below. Invoicing – Fees Account: Enter the account for labour revenue (fees); this account will be used as a default value in the Project Management: Invoicing window. Mark-up Rate: Enter the hourly cost percentage representing the invoice mark-up cost for: © 2010 JOVACO Solutions inc. – Version 10.0.13 14 Project Setup Project Control Regular Time – A value of 2.5 indicates the hourly rate, calculated based on the hourly basis indicated above, is multiplied by 2.5. Charging $20 will result in an invoicing rate of $50. Overtime – The overtime invoicing mark-up value is calculated from the regular rate, not from the overtime rate Special Time – Identical to overtime, the Special Time invoicing mark-up is always calculated from the regular rate, not from the special rate. Project Copy Use the department of the destination project: The corresponding box in the Projects - Copy window will have the default value selected here. It allows the department indicated for the destination levels to be used in the destination project rather than the source levels. Use source parameters: The box corresponding to the window Projects – Copy will have the default value selected. It will allow you to use the default setup (check the different boxes for the level and window corresponding to invoice management), the elements configured in level 1/level 2 from the source rather than those defined in the project. The system does not refer to the invoicing methods in this procedure. Vacation Button: Click on this button to open the window that will allow you to define the set up regarding vacation banks. © 2010 JOVACO Solutions inc. – Version 10.0.13 15 Project Setup Project Control Generate timesheet transactions: mark this box if you wish to generate timesheet transactions, during the Bank Update, for all employees with accrued hours for the projects, the levels and the categories selected in this window. Depending on the employee vacation counter, this function will decrease or increase the vacation banks. Increase Employee Banks Vacation: mark this box if you want the vacation banks to be updated during the Bank Update Processing. (Tools >> Routines >> Project >> Banks Update) Apply amounts to current vacations: mark this box if you want to allocate, during the posting of timesheets, the vacation hours to the hours of the current year, rather than to those of the previous year. Use previous vacation: check this box if you want to save the information on the number of accumulated vacation hours at the time of processing year-end vacation. Maximum allowed carried over vacation hours: Enter the maximum number of hours that can be posted into the vacation bank of the previous year at the moment of the closing exercise in the Project Control module. Vacation Accrual Project: Select the project for which you wish to generate timesheet transactions for the posting of vacation. Automatic Numbering button: Click this button to open a window that will automatically generate sequential project numbers. Prefix Enter an ID (maximum 5 alphanumeric characters). © 2010 JOVACO Solutions inc. – Version 10.0.13 16 Project Setup Project Control Prefixes are useful for identifying the projects by department, branch, client or project manager. These distinct prefixes facilitate the research and consultation when a company manages a great number of projects with numerous employees processing such projects. Prefixes correspond to a company’s management rules. Last Project Number If the prefix has a specific project number sequence, enter the project number from which you would like to begin numbering. If the prefix does not have any specific project number sequence, leave this field blank. The system will then use the last project number entered in the Project Setup window. User-Defined button: Project Suite provides the following User-Defined Fields that are used to capture any additional information that you require at each level of the project definition. In this screen, enter the Field Labels that you want to see each user-defined fields at all project levels. There is no implied relation between Text Field 1, Amount Field 1 and Date Field 1 etc. unless you create a relation between them. These values affect all project levels and collect statistical data and other information on the project(s). For this version of the user manual, these fields will only be displayed during project definition and will not appear on any other standard system screen or report. Custom reports will need to be defined if you wish to view this information on a regular basis. Text Field 1 to 3 The field label may be entered in any or all three Text Fields (maximum 15 alphanumeric characters). © 2010 JOVACO Solutions inc. – Version 10.0.13 17 Project Setup Project Control Amount Field 1 to 3 The field label may be entered in any or all three Amounts Fields (maximum 15 alphanumeric characters). Date Field 1 and 2 The field label may be entered in either or all Dates Fields (maximum 15 alphanumeric characters). Types of bonuses - French & English When you are integrated with Payroll, you can define up to 5 types of hours in addition to 10 types of base hours (1-Regular, 2-Overtime, 3-Special, 4-Sickness, 5-Leave, 6-Vacation 7-Time Bank, 8-Overtime Bank, 9 Paid Time Bank, 10-Special Time Bank). Here you define the titles of these types of hours in the main language and second language of your operations. Thereafter, you can combine cost/category items for these types so that your employees can enter the quantities to be reimbursed to them through the time sheet. Note that these charges will not be considered as hours and will not therefore be able to generate revenue (i.e. cannot be used by the billing method). Trx ID button: Click on this button to define the ID associated with each transaction entered in the Project Control module. Each transaction entered has a unique transaction ID. Seven (7) transaction types can be entered in the Project Control module: Cost Adjustments Timesheets Internal Expenses Expense Report Earnings recognition Transfer of Inventory to projects Return of Inventory from projects Other transaction types available in Project Suite are: Transactions >> Purchasing >> Transactions Entry (Payables Invoicing) Transactions >> Sales >> Transactions Entry (Receivables Invoicing) Transactions >> Sales >> Sales Transactions Entry (Orders/Invoicing) Transactions >> Sales >> Cash Receipts (Receivables Cash Receipts) © 2010 JOVACO Solutions inc. – Version 10.0.13 18 Project Setup Project Control Cost Type button: Click this button to define the types of cost and revenue. The cost types can regroup costs and associate distribution accounts with the corresponding revenue. Project Suite can define eight (8) specific cost types and two (2) specific revenue types. Revenue is allocated to the General Ledger, and costs are assigned to subsidiary ledgers. The accounts Revenues – InterCo. And Costs – Interco. Are required if you are using the module Intercompany Invoicing (see the corresponding documentation). WARNING: THE FOLLOWING COST TYPES are defined in the software and CANNOT be modified by the user: Posted income (0), labour (1), material – internal expenses (2), subcontract (3) and invoicing gain & losses (9). *** Deferred income corresponds to the amount invoiced in advance for projects with costs not yet incurred. This replaces a work in progress credit. Invoicing profits/losses correspond with the difference between a project’s invoiced revenue and recorded revenue. *** Cost Type 4 to 8 You can define up to five (5) cost types can be defined: for example, they can be direct expenses, equipment, software, rental expenses, etc. Distribution accounts can be different for each cost type. Default accounts appear for invoicing distribution. Cost Type 9 For invoice distribution, the income from a fees account will show up by default at a corresponding level. This account can be modified. © 2010 JOVACO Solutions inc. – Version 10.0.13 19 Project Setup Project Control Division Setup (Tools >> Setup>> Project >> Divisions) Divisions are used for regrouping departments and/or sharing project management between companies. Divisions are linked to a segment of the chart of accounts (defined in the Project Setup window) and create a link between accounting and projects. In the Professional Invoicing module, divisions also identify the person invoicing the customer. You can also define divisions that have only one distinct invoicing ID. From this window, you can add divisions, modify division data or delete divisions. Division Define an ID (maximum 3 alphanumeric characters) for each division created. This ID may or may not be identical to the division account segment. Once created, the division ID is no longer modifiable, although the data associated with this ID can be modified. To delete a division, click on the DELETE button. © 2010 JOVACO Solutions inc. – Version 10.0.13 20 Project Setup Project Control Once defined, the division ID must be attached to an existing company number in the system if this division is used in the definition of the department(s). It is not necessary to make this association if the division is only for the billing module. Company ID Click on the magnify glass to open the window Companies and choose a company. You may directly enter a company number that will belong to that division. The company selected will need to be created within the system (Setup >> System >> Company). Name Enter a text, up to 30 alpha-numeric describing the division. This is a mandatory field. Address, City, Province (State), Postal Code (Zip code), Country, Telephone 1 and 2, Fax Enter these fields that match this division. Logo This field is used when creating documents within the Professional Invoicing module and this will allow you to include a logo when printing documents. Accounts: Wage payable Define the account for payable gross earnings. Only one account can be defined per division. This account is the counterpart of the salary expense generated by the timesheets. By clicking on the field label, the window Account Management opens: you can add an account or modify/delete the data within an existing account. Payable Contract Define the account for consultant gross earnings. Only one account is defined per division. This account is the counterpart of the expense generated from the consultant timesheet entries. By clicking on this field label, the Account Management will open: you you can add an account or modify/delete the data within an existing account. Payable expenses Define the account to pay expenses. Only one account can be defined per division. This account includes the expenses generated by entering the expense reports. When clicking on the field, the window Account Management opens: you may add an account or modify/delete the information on an existing account. Due To & Due From It is possible to generate journal entries with Due To and Due From when charges are generated between the two divisions. The system will replace the segment within the division of the destination account Due From identified in the original division and the original account Due To identified in the division of the destination. Account Segment ID Division © 2010 JOVACO Solutions inc. – Version 10.0.13 21 Project Setup Project Control Identify the segments corresponding to the division that you are in the process of defining. It will be used for journal entry transactions which will be entered for this division. GST No. Enter the tax number which is linked to this division. QST No. Enter the secondary tax number which is linked to this division. Emploi-Québec Acreditation No. If this division holds a number as a recognized trainer, enter this number. It will appear on invoices which are generated within the invoicing module. Margin This field is used for the creation of documents within the Professional Invoicing module and let you determine in centimetres the header margin for the paper used within this division. Coordinators button: Click this button to open the Division Manager Maintenance window. Resource: Choose the resource or resources responsible for the selected division. Rank: © 2010 JOVACO Solutions inc. – Version 10.0.13 22 Project Setup Project Control Choose a rank (from 0 to 9) of the responsibility level of the resource, 0 is the highest level and 9 is the lowest. These ranks could be used within the approval rules configured within the product (ex.: Web Requisitions) Department Button: Click on this button to open the department setups. © 2010 JOVACO Solutions inc. – Version 10.0.13 23 Project Setup Project Control Department Setup (Tools >> Setup >> Project >> Departments) The departments will allow you to define and the responsibilities between the different resource groups within a project. Often, the departments are divided by service sectors by different professional services. The departments are linked to a segment within the chart of accounts (that were defined within Project Setup) and this will enable the link between accounting and the projects. From this window, you could add departments, modify the data on the departments or delete the department. Division Enter the division of a department you wish to define, or click the lookup button to select one from the Divisions window. By clicking on the field prompt, the Division Setup window will open. From this window, you can enter a new division or modify/delete the data in an existing division. Department Enter an ID (maximum 7 alphanumeric characters) for each department created, or click the lookup button to select one from the Departments window. The Department ID consists of two parts: the first part that corresponds to the Division ID and the second part that corresponds to the Department ID. E.g. 00-005 signifies Division 00, Department 005. © 2010 JOVACO Solutions inc. – Version 10.0.13 24 Project Setup Project Control Once created, the Department ID can no longer be modified, although the data associated with this ID can be modified or the department can be deleted. Note: We recommend that the Department ID be the same as the corresponding Account Segment ID. Description You can enter a description for the department (maximum 30 alphanumeric characters). This field is optional. Revenue Check this box if this department generates revenues. This box lets you filter the departments available for opening the project via the Web Projects Sheet application. In this product, only the revenue departments can be used to request a project to be opened. The administrative projects should instead be opened directly in Dynamics. Minimum Budget Indicate, if applicable, the minimum budget of the projects managed in the backlog management. Account Segment ID Segment1 Identify the segment corresponding to the service defined in the department. It will be used for entries of transactions which will be charged to this department. Employee Benefits Account Enter the department’s Employee Benefits Account. This account will be used by default in the Resources file associated with this division/department. Click the field prompt to open the Account Maintenance window. Refer to this window to add an account or modify/delete the data in an existing account. Employee Benefits Account CR Enter the liability account to be credited when the Employee Benefits generate an accounting entry. This account will be the default account in the Resources file associated with the division/department. Click the prompt field to open the Account Maintenance window. Refer to this window to add an account or modify/delete the data in an existing account. Inter-department This feature lets you know the profitability of each department and accounts for revenues and full costs of each department taking into account the transactions that the resources can charge to different departments than their own. When staff-lending is permitted in the distributed level and the employee does not belong to a department with a defined budget at that level, it is mandatory to: Revenue Account Define the Revenue Account to be generated in the employee’s department. Salary (Cost) Account Define the Salary Account to be generated in the employee’s department. Employee Benefits Account Define the Employee Benefits Account to be generated in the employee’s department. Cost Mark-up Account Define the Additional Mark-up Account, which will be generated in the department responsible for the project/level, when the staff-lending mark-up rate is greater than 1. © 2010 JOVACO Solutions inc. – Version 10.0.13 25 Project Setup Project Control Coordinators Button: Click on this button to open the window Department Manager Maintenance. Resource: Select the resource(s) responsible for the selected department. Rank: Select the rank (0 to 9) of the resource’s responsibility, 0 being the highest and 9 the lowest level. These ranks can be used in the approval rules configured in various products (e.g. Web Requisitions, project files, etc.). © 2010 JOVACO Solutions inc. – Version 10.0.13 26 Project Setup Project Control Productivity Setup (Tools >> Setup >> Project >> Productivity ID) IDs should be entered to classify staff time according to productivity: productive time, non-productive time and non-worked time. Productivity of resources is defined by billable time. By creating Productivity IDs, it is possible to know what an employee’s non-billable and/or non-customer time is used for. Productivity IDs are associated with categories, cost items and Fees Invoicing methods at a project level. Refer to this window to add/delete productivity IDs and modify productivity data. Productivity: Time devoted to working on projects for customers. Billable Time Non-billable Time Non-productive Time: Time devoted to projects other than customer projects (e.g., time devoted to internal projects). Administration Business Development Research and Development Time Not Worked: This is the time corresponding to the various benefits. The hours charged to these productivity IDs will not be used in calculating the productive time of a resource for a given period. Employee Benefits Vacation Holiday Sick Timesheet adjustments Paid overtime Overtime at regular rate Overtime at mark-up rate Pay to Subcontractors © 2010 JOVACO Solutions inc. – Version 10.0.13 27 Project Setup Project Control ID Enter a productivity ID (maximum alphanumeric 10 characters), or click the lookup button to select one from Productivity IDs window. The productivity ID 00 is created by default and is used for the billable time (i.e. time worked, Client and Billable time). Once created, the Productivity ID is not modifiable, although the data associated with this ID can be modified and the Productivity ID can be deleted, except for the 00 ID. Description Enter a description (maximum alphanumeric 30 characters) for the Productivity ID. This field is optional. Check Boxes: Customer: the Customer box must be checked when the defined Productivity ID corresponds to the productive time (billable or non-billable). Billable: The Billable box must be checked so that the time charged generates accountable revenue. If not checked, the transactions associated with a billing method will have a billable value (and may thus be billed) but it will not be recognized at the accounting level. This type of transaction is typically used to calculate a loss of profits attributable to a particular situation on client projects. Worked: the Worked box must be checked when the defined Productivity ID corresponds to time worked. It is not checked for adjustment IDs, overtime bank IDs or Employee Benefits IDs. Groups Groups are defined for report creation purposes only: They organize Productivity IDs that will appear under one of the 10 report columns. Enter a group ID associating the Productivity IDs to one of the columns in the productivity report. © 2010 JOVACO Solutions inc. – Version 10.0.13 28 Project Setup Project Control Category Setup (Tools >> Setup >> Project >> Categories) The Category Setup defines tasks, activities and expenses normally found in standard customer projects. The category will produce invoice-related project cost details. Unlike project-specific cost items, a category follows particular standards and is generally applied to all regular customer projects (aside from large projects). Among other things, they allow you to open projects faster and ensure consistency across client projects. Category Features: Identify costs connected with project activities and expenses Determine the cost (Salary Account) to be distributed to a General Ledger account Analyze employee productivity for labour categories Refer to this window to add or delete categories, and modify category data. © 2010 JOVACO Solutions inc. – Version 10.0.13 29 Project Setup Project Control Category Enter a category ID (maximum 10 characters), or click the lookup button to select one from the Categories window. Once created, the category cannot be modified, although the data associated with this category can be modified and the category can be deleted. Main Enter a description for the category, maximum 50 alphanumeric characters, describing the category in the main language. This field is optional. Second Enter a description for the category, maximum 50 alphanumeric characters, describing the category in the second language. This field is optional. GroupID For customized reports, you can select a group category ID. This ID must have been predefined in the function Cost Category Groups. Cost Type Enter the cost type number (1 to 9) corresponding to the category, or click the lookup button to select one from the Cost Type Setup window (Project Setup window >> Cost Type button). Type For all cost types other than labour, define whether it is an amount or a unit. If the cost type entered is Labour, this field is greyed and inactive. © 2010 JOVACO Solutions inc. – Version 10.0.13 30 Project Setup Project Control Unit Rate If the type entered is unit, define the return rate by unit as authorized to the employee. If it is another type, the field is greyed and inactive. Hours Type If the cost type entered is Labour, specify the type of hours connected with this category. Eight choices are offered by default: Regular, Overtime, Special, Sick Leave, Holiday, Vacation, Time Bank (at regular rate), Overtime Bank (at overtime rate). You can also associate categories to the types of bonuses, defined in the configuration window of the defined fields. For all cost types other than labour, this field is greyed and inactive. Unit This field indicates the measurement unit: hour, kilometre, kilogram, dollar, etc. (maximum 5 characters). This field is optional. Warning message TEDI You can associate a warning to a standard category so that it appears in TEDI at the time of a charge. This warning will be displayed in the language used by TEDI. This warning is only informational, it does not trigger validation. Revenue Account An account must be entered in this field for all cost types except Labour. The division and department connected to this category do not have an effect on the choice made for this field: when the category is used in a particular level, the system will generate the division and department from the departments defined in the budgets. Salary (COST) Account This field is mandatory. For Labour type, this account is used if the Use Standard Categories box is checked and if the Use Salary Account box is not checked in the Project card (Project Maintenance, Project Maintenance: Level 1 and Project Maintenance: Level 2 windows). *** Important *** The productivity ID is no longer used in processing the accounting entry of the labour transaction. Thus, even if your productivity is not identified as billable, the cost account will be within the parameters of the resource if the salary account box is checked. When using a category in a particular level, the system will generate the division and department from departments defined in the budgets. Employee Benefits Account This account is used if the Use Standard Categories box is checked and if the Use Salary Account box is not checked in the Project Level. Inter-department – Cost: Mark-up Account: enter the Expense Account generated by a mark-up being applied when the stafflending rate is greater than 1. This account is used if, in the project level, you checked the Standard Categories box and you did not check the Salary Account box. Employee Benefits Account: enter the Employee Benefits Expense distribution account generated by staff-lending. This account is used if, in the project level, you checked the Standard Categories box and you did not check the Salary Account box. © 2010 JOVACO Solutions inc. – Version 10.0.13 31 Project Setup Project Control Productivity This field is mandatory for Labour Type. The Productivity associated with this category must be entered. Tax Schedule Number This field is mandatory for all cost types except Labour. Enter data here to associate a tax schedule with the category. Taxes will be extracted automatically by the system while charging an expense statement. In terms of transactions from the procurement module, taxes will be calculated according to the fee schedule associated with the supplier. You can associate several tax schedules to the same category with a cost type greater than 3. To do this, click on the arrow to access the additional “tax schedule allocation” window and insert schedules that can be used for transactions which will be entered in the category. Employees can thus themselves enter the tax schedule by TEDI which must be applied to their expense (according to where the expense was made). If no tax schedule is entered into the tax schedule allocation window, only the default will be applied and employees will not be able to change the value. *** Important *** On the time sheet, only the description of the tax schedule is shown. Make sure you have representative descriptions for your employees (Quebec vs. CTI-RTI Km) Pay ID It is now possible to link a pay ID to a standard expense type category (cost type = 4). This change allows for processing an expense as taxable (e.g. the bonus payment through the expense statement). If no pay ID is associated with the category, the one configured to the employee’s class will be used. © 2010 JOVACO Solutions inc. – Version 10.0.13 32 Project Setup Project Control Class Setup (Tools >> Setup >> Project >> Class) Classes will categorize employees according to their function within the organization, as well as their invoicing rate (for customer invoicing purposes). Classes with different invoicing rates can be defined and regrouped when invoiced under the same rate by defining a specific class. For example, three (3) classes are defined: “novice engineers”, “intermediate engineers” and “senior engineers”. A unique invoicing rate can then be defined for these three (3) classes, which will be applied to the specific class “engineers”. In this window, classes can be added or deleted, and class data can be modified. Once saved, the class ID cannot be modified; only the description can be modified. Enter a new description and click on the SAVE button. To delete a class and the data associated with it, click on the DELETE button. Calculate Button (top of screen) When you hit the calculate button, the average rate for the resources (in the resource table) within the chosen class is calculated and displayed in the Average Rate field (below). © 2010 JOVACO Solutions inc. – Version 10.0.13 33 Project Setup Project Control Class Define a class ID (maximum 10 characters), or click the lookup button to select a class in the Classes window. Main & Second Enter a description for the class (maximum 30 characters). A description can be typed in the main language on the first line; a description in the second language can be typed on the second line. Average Rate Enter the average employee cost rate for each class or use the Calculate function to define the employee cost rate of the corresponding class. The value is used to calculate the cost rate for project estimation. Pay ID In the integration of Canadian Payroll, for each class, indicate a profit ID corresponding to the hours: Regular Overtime Special Sick Holiday Vacation Time Bank Overtime Bank Expense Refund ID New possibilities for calculating vacation: It is now possible to calculate vacation according to a time accumulation rate rather than a fixed value by period. To use this new procedure, you must: Indicate for the concerned classes the types of time to be included in the calculation by checking the box next to each type of time. Insert a pay ID for paid vacation o vacation calculated on the mark-up factor for overtime and special hours will be paid automatically (e.g. for 1 hour of overtime, 1 hour will be accumulated and the mark-up (0.5) will be paid immediately). By resource, you must indicate that the calculation method is based on a rate rather than fixed and the accumulation factor should correspond to this rate (see the parameters of the resources’ banks). The hours of vacation calculated on overtime will accumulate in a new counter (overtime vacation time banks) o At year end processing, these hours will be added to the CY vacation bank to transfer to the PY vacation bank IDs defined by the user For each type of additional time that you have defined (see Tools>> Parameters>> Project>> Projects>> defined fields), you must indicate the profit ID for the Pay. © 2010 JOVACO Solutions inc. – Version 10.0.13 34 Project Setup Project Control Resource Setup (Tools >> Setup >> Project >> Resources) This function defines the human and/or physical resources distributed to the project. Human Resources: Employees Contract Employees Physical Resources: Tests Equipment Internal expenses (other internal resources) In this window, resources can be added or deleted, and data can be modified. Once saved, the resource ID cannot be modified; only the data in other fields may be modified. Enter the modifications and click the SAVE button. To delete a resource ID, click the DELETE button. © 2010 JOVACO Solutions inc. – Version 10.0.13 35 Project Setup Project Control Resource Define a resource ID (maximum 15 characters), or click on the lookup button to select a resource in the Resources window. Project Manager Mark this box to identify this resource as project manager. This identifier is used in the Project Initiation Sheet product to identify the individuals who can apply for a project initiation. Web access reports Check this box to give this resource access to the web resources (if you have this product). Description Enter a description (maximum 30 characters) for this resource. In the case of a physical resource, a second line is available for a French description of the resource. If you are connected to the payroll module, the description will be the last name of the individual followed by a comma and the first name as configured in the Payroll module. Email Enter the email address of the corresponding resource. It is used to subscribe to the web reports that can send the selected reports automatically. Domain Name Enter the domain name (internal network) to which the resource is identified. This information, combined with Windows authentication of the resource, is used by web applications to identify the resource, via network access, and make a link with its identifier in the management system. Windows Authentication Enter the ID from the network on the domain to which it is saved (internal network). This information, combined with the domain name, is used by web applications to ensure identification of the resource, via the network access, and link with its identifier in the management system. Type Choose the Resource Type: Labour Consultant Tests Equipment Internal Expenses Social benefits related Check the box Social benefits related for the calculation of social benefits, configured within the project or resource, within the project, for the labor resource type. This box will be checked by default. By Project Check the box by project so that the credit account (resource’s charge account) uses account segments of the division and the department for projects in which resources are charged. If this box is unchecked, the division and the department of the credit account will correspond to that of the resource. This rule works only with the internal costs type resources (internal costs, equipment, testing). Human resources (labour and contractual) will always be considered according to their department. © 2010 JOVACO Solutions inc. – Version 10.0.13 36 Project Setup Project Control Productive resource Check this box to indicate that the resource generates revenue. The resources thus identified will appear on the “Employee Performance” report of the suite of web reports (separate product). The resources not identified will be excluded from this report. Distribution Account For human resource type: enter the account corresponding to the distribution account (salary or contract employee) if the Use Salary Account box was checked at the project level. Normally, we use this configuration to enter the direct cost account since the Salary Account projects are normally production projects. The indirect cost accounts will be configured in the cost items involved. For other resource types: enter the credit account if the cost is associated with the resource. The account charged will be that of the assigned category. The availability of the other fields depends on the resource type that is to be entered: Labour and Contractual Types Rate Enter the regular hourly cost rate to be associated with the resource and invoiced to the customer. This field is greyed out if you are integrated with payroll. The information in this field will be updated based on the resource’s rate in payroll associated with the pay ID configured in the resource’s class. Overtime Rate Enter the hourly overtime-cost rate to be associated with this resource and invoiced to the customer. This field is greyed out if you are integrated with payroll. The information in this field will be updated based on the resource’s rate in payroll associated with the pay ID configured in the resource’s class. Special Rate Enter the special time cost rate to be associated with this resource and invoiced to the customer. This field is greyed out if you are integrated with payroll. The information in this field will be updated based on the resource’s rate in payroll associated with the pay ID configured in the resource’s class. Employee Benefits Enter the Employee Benefits percentage to be associated with this resource. Department Enter the department to be associated with this resource, or click the lookup button to select one. Class Enter the class to be associated with the resource or click the lookup button to select one. Employee Benefits Account Define the resource’s Employee Benefits Account. This account will be used if the Use Salary Account box has been checked in the Project Level. By clicking on the prompt field, the Account Maintenance window will open. Here an account can be added and data can be modified/deleted from an existing account. © 2010 JOVACO Solutions inc. – Version 10.0.13 37 Project Setup Project Control Employee Benefits Account CR Define the credit account when Employee Benefits generate an accounting entry. This will be the default account if in the project level the Salary Account box has been checked. By clicking on the prompt field, the Account Maintenance window will open. Here, an account can be added, and data can be modified/deleted from an existing account. Inter-department – Cost: Mark-up Account: enter the expense account generated by a mark-up distribution when the staff-lending rate is greater than 1. This account will be used if, in the project level, you have checked Salary Account. Employee Benefits Account: enter the Employee Benefits Expenses distribution account generated by staff lending. This account will be used if, in the project level, you have checked Salary Account. Date – Inactive Enter the date from which the resource will be inactive. It will be entered automatically if the resource is inactive in the Payroll module (if you are integrated with this module). Annual Hours Enter the number of hours worked annually for calculation purposes in projects. This value is used to calculate the annual salary if you use the billing method based on adjusted annual salary. This value may be different from the employee’s actual hours and their configuration in the payroll. You can calculate a billable value on a standardized basis (i.e. 1950 hours) and set up your temporary resources with annual hours equal to the standardized basis. This procedure avoids calculating a rate that is too low for a part-time resource (e.g. an employee paid $10 an hour based on 1000 hours annually will claim $ 5.13 an hour if one considers a base of 1950. By entering the annual hours in its resource’s parameters to 1950 hours, it will be considered at $10 an hour for the calculation methods of the billable based on the hourly basis). Date – Hired Enter the date in which this resource was hired. Credit Card When a resource is provided with a company credit card and in which the expenses are paid by the company, select the appropriate credit card. This credit card must have been configured in the Dynamics GP financial module. See Tools >> Setup >> Company >> Credit Cards. Initialize password Initialize the password of the Time & Expense Report (TEDI) application. When you press this button, the password of the resource will be changed to an empty value. It must be changed at the next login in TEDI. Other Types (Physical Resources – internal expenses, equipment or tests) © 2010 JOVACO Solutions inc. – Version 10.0.13 38 Project Setup Project Control Rate Enter the cost rate associated with the resource which will serve in the calculation of its cost. This rate may be zero if you do not want to recognize cost in projects for this resource’s charges. In this way, only a billable value will be recognized during transactions of this resource Date – Inactive Enter the date when the resource will become inactive. Additional Info You can save additional information to ensure more thorough time monitoring in TEDI. Pay Status This field allows you to differentiate between different types of resources. It is not associated with any process. Remuneration Method Used to specify the rules of remuneration for the resource. Fixed: the timesheet of the resource cannot be completed if the number of hours surpass the “regular pay hours per week” configured in the “employee monitoring” window of © 2010 JOVACO Solutions inc. – Version 10.0.13 39 Project Setup Project Control the payroll module. Moreover, these resources cannot enter hours of additional or special types. Simple: These resources cannot enter hours of additional or special types. However, they can complete a time sheet with an unlimited number of regular hours. Half time: These resources cannot complete their time sheet if they have more regular hours than the number defined in the Regular Week field. Regular Week In this field, enter the number of hours per week stipulated for the resource if his payment method is “Half time”. Assign TEDI Groups When using TEDI, you can assign groups under the Resource’s responsibility. See this topic in the section on the TEDI Parameters. Simply insert each group (available Groups) that is associated with the resource. Once inserted, the groups appear in the Assignments. Initialize Password When using TEDI, you can reset the resource’s password (to empty) by pressing this button. A confirmation message will then appear. © 2010 JOVACO Solutions inc. – Version 10.0.13 40 Project Setup Project Control Resource Bank Setup (Tools >> Setup >> Project >> Resources >> Banks Button) Banks Button: click this button to open the Resource Bank Setup window. Use the Banks window to ENTER or VIEW the number of hours accumulated and/or the corresponding financial value for this resource: Level Indicate the level ID of the resource. This ID allows you to follow the different professional levels of resources by validating their months of experience. A report shows the resources that are associated with a level that is lower than these months of experience. See the definition window for this purpose (Parameters>> Project>> Level Management). Months of Experience Indicate the number of months of experience recognized for the resource. See the definition window for this purpose (Parameters>> Project>> Level Management). Once established, this value is automatically © 2010 JOVACO Solutions inc. – Version 10.0.13 41 Project Setup Project Control increased whenever the levels are updated. See the window for this purpose (Routines>> Project>> Updating Levels) Seniority Year Indicate the seniority start date of the resource. Number of vacation days Indicate the number of days of annual vacation to which the resource is entitled. See the definition window for this purpose (Parameters>> Project>> Vacation Award Management). Calculation method: Fixed, Seniority or Rate If vacation hours are accumulated periodically by the software, you must indicate whether the calculation is fixed, based on the resource’s seniority (i.e. the number of vacation days) or if it is based on an accumulation rate on the hours. If it is a rate, the resource’s class must indicate what types of hours the calculation must be based on. Unit Check the Hourly or Monetary box for each bank. This will determine whether the bank is managed with an hourly or monetary value. Hourly / Monetary This field indicates the number of accumulated hours/or the corresponding monetary value: For time banks (accumulated hours worked) For sickness For previous year’s vacations (PY) For the current year vacation (CY) (i.e. the hours that are accumulated during the year) For earlier vacation banks if the option was selected in the project parameters. These hours correspond to the balances of vacation hours from the previous year (PY) at the time of the last year end processing period, derived from the consumption of the current year. For accumulated vacation time on overtime if you use the calculation method based on an accumulation rate. However, these hours are consumed manually. The vacation hours must be consumed in the following order: Previous vacations > PY Vacations. The deductions are never made on the current year. The balance of the previous year may however be negative (i.e. showing the anticipated consumption of hours). Vacation rate Enter the percentage of accumulation for the vacation if you use the calculation method based on a rate. Overtime Conversion Rate If the accumulated hours are defined as overtime, the rate defined in this field will be used to calculate the accumulation (normally, it is a rate of 1 or 1.5). Special Time Conversion Rate If the accumulated hours are defined as special time, the rate defined in this field will be used to calculate the accumulation. Calculation method: Fixed, Senority or Rate If vacation hours are accumulated periodically by the system, you need to indicate if the calculation is fixed, or if it is based on the senority of the resource (for example, the number of vacation days) of if it is related to the accumulation of hours rate. If it requires a rate, the resource class must establish which type of hour calculations. © 2010 JOVACO Solutions inc. – Version 10.0.13 42 Project Setup Project Control Average vacation rate Check this box Average vacation rate, if during the year-end close of the project module (see Routines>Project>Project>Closing Exercises), you would like to adjust the earnings rate code in the payroll module that allows you to pay vacation in accordance to the accumulated value in the payroll module and number of hours accumulated in the project module. This box is check by default. This procedure normally implies the vacation provision calculated within the payroll module. In this case, the number of hours previous years is adjusted according to the average calculated rate. Accumulation Rate Enter the factor for calculating sickness and vacation banks only if you use the fixed calculation method. The rate will depend on how frequently you will run the Banks Update routine (Routines>Project>Banks Update). For example, if the resource has a right to 2 weeks vacation per year and the banks are updated every week, then the rate is 0.038 (i.e. 2/52). Status This field is optional and for reference only. It defines the resource’s status. Some companies use it to simplify the verification of timesheets in the Timesheets Transactions Entry window. For example, a parttime employee has no banked hours. The data entered is specific to each company (maximum 10 characters). Level This field is optional and for reference only. It defines the level of the resource. Some companies use it to simplify the verification of timesheets in the Timesheets Transactions Entry window. The data entered is specific to each company (maximum 10 characters). Carry over from last year This field allows the display of the number of vacation hours from the previous year is the maximum number of carried over vacation hours (see Tools >> Setup >> Project >> Projects >> Vacation Button) is more than 0. Vacation Entitlement This field is optional and is a reference only. This field is not used by the software but can serve to enter data specific to vacations. © 2010 JOVACO Solutions inc. – Version 10.0.13 43 Project Setup Project Control Fees Invoicing Method Setup (Tools >> Setup >> Project >> Fees Method) Use this function to define the methods for calculating fee-invoicing rates for projects from the same customer. These rates are normally negotiated with each customer. Rates can be defined by class, category or a combination of these different factors for internal control. If a specific class is defined, it will appear on the invoice. It is also possible to define a specific class to be displayed on the invoice. Classes can be defined (in the Class Setup window) with a different invoicing rate each, and can be grouped when invoiced under the same rate by defining a specific class. For example, three classes are defined: “novice engineers”, “intermediate engineers” and “senior engineers”. A unique invoicing rate can then be defined for these three classes, which will be applied to the specific class “engineers”, and affect employees from the three defined classes (see the Specific Class field for details). In this window, invoicing methods can be added or deleted, and data can be added, modified or deleted. Once saved, invoicing methods data can be modified, except for the Class, Resource and Category fields. Enter new data, then click the SAVE button. When modifying a transaction method, previous transactions in a project that use the method will not be affected, unless they are adjustment transactions and calculation factors have been changed. To copy a Fees Invoicing method, click the Copy button: a box will appear where the name of the new method (maximum 10 characters) can be entered. Lines can then be modified or added. Again, the Class, Resource and Category fields in the copied method cannot be modified. Enter new data and click the SAVE button. You can have more than one version of the same method to know the different rate changes that occur over time (see Start Date). By doing this, you will always be assured that these transactions will be evaluated on the rate in effect when it was entered and not the latest rate. *** Important*** You may now use invoicing methods to pay your resources according to a rate specific to the project where the resource’s time is being entered. It is then possible to manage cost rates other than those pay codes outlines in the payroll module. To delete an invoicing method or a line of an invoicing method, as well as the data associated with it, click the DELETE button. © 2010 JOVACO Solutions inc. – Version 10.0.13 44 Project Setup Project Control Fees Enter a ID (maximum 10 characters) to identify the Fees Invoicing method. Description Enter a description (maximum 50 characters). Starting Date Enter a start date for the use of a method. If there are changes in rates that come into effect at a specific date, it is possible to define several start dates for use for the same method. It is possible to duplicate the billing methods to reflect rate increases over the years. To do this, you must copy a billing method by keeping the same identification ID, but indicating a new start date. In this way, if you make an adjustment transaction on a history transaction, it will be reassessed according to the method corresponding to the date indicated. Inactive Check this box to de-activate an invoicing method. If this box is checked, the method can no longer be associated with projects. Additional Mark-up Check this box to generate a budget agreed upon by the customer to cover expenses (e.g. mileage, meals, etc.) that are chargeable to the project, but that are not directly billable. (e.g.: fixed administrative costs for each hour worked). © 2010 JOVACO Solutions inc. – Version 10.0.13 45 Project Setup Project Control If the box is checked, click the Additional Information button to enter data relevant to the mark-up. See screen Fee Invoicing Method Setup – Mark-up Supplementary below. If the box is not checked, the fields associated with the mark-up are not available. Category Enter the category to which the additional mark-up is applied. Resource Enter the physical resource to which the additional mark-up is applied. If you do not enter a resource, the transaction will be identified with the (human) resource that generated the transaction. Mark-up Type Mark-up % corresponds to an invoicing rate percentage (enter 105.00 for 105%) Rate/hr corresponds to a fixed hourly rate Mark-up Rate Enter the mark-up rate If this box is not marked, all the fields related to Mark-up are greyed out. A Fees Invoicing method establishes an invoicing system from a specific class or resource, with or without a specific category. Class If the billing rate is defined by employee class, enter the employee class affected by the selected invoicing method. © 2010 JOVACO Solutions inc. – Version 10.0.13 46 Project Setup Project Control Resource If the employee defines the billing rate, enter the resource ID affected by the invoicing method. Category Enter the Category ID where the fees invoicing method is applied, or leave the field blank to apply the method by default to all categories. Type Select the type connected with the fees invoicing method: Invoicing Basis Unit Cost In the case of mark-up cost invoicing: if this type is selected, enter a unit cost – but not the actual cost – in the Regular, Overtime and/or Special fields, which will calculate invoicing rates according to the project’s mark-up rate. Monetary Mark-up The monetary mark-up is calculated by adding the rate paid to an employee, the employee benefits rate defined in an invoicing method and the fixed mark-up rate determined by the user. Restated Annual Salary In the case of mark-up cost invoicing: if this type is selected, the employee’s hourly rate – multiplied by his number of annual hours (entered in the Resources Setup window) and divided by the Hourly Basis (field at left side of screen) – will be used to calculate the invoicing rate according to the mark-up rate (i.e. a multiplier such as 2.5) specified in the Regular field. If there is no mark-up rate, the system will calculate from the mark-up rate specified in the project level. If there is a mark-up rate in both areas, the invoicing method’s mark-up rate will have priority. Invoicing Unit Rate In the case of invoicing at invoicing unit rate: if this type is selected, enter a billable hourly rate in the Regular, Overtime and/or Special fields. Time Basis If the Adjusted Annual Salary type is selected, enter the basic hourly rate to calculate the invoicing rate. Fields connected exclusively with the Restated Annual Salary type Rounding If this box is checked, the calculated cost rate will be rounded to the closest five cents (5 ¢). Maximum This field is mandatory if the Annual Adjusted Salary method is used. It determines the maximum hourly rate before mark-up. Enter a rate of 99999 if there is no maximum. Employee Benefits Enter the hourly rate percentage before the mark-up associated with Employee Benefits. Specific Class This field can allocate employees to a class different from their initial class for this specific invoicing method. ID Specific This field can allocate a resource to a specific invoicing method replacing the Resource ID in the invoicing software. © 2010 JOVACO Solutions inc. – Version 10.0.13 47 Project Setup Project Control Fixed rate In the case of a definition of base unit cost or adjusted annual salary, used to set a cost plus billing rate, it is possible to add a fixed mark-up amount over the stipulated mark-up factor. Regular, Overtime, Special If the selected type is Invoicing Unit Rate, enter the invoicing rate for Regular, Overtime and Special Time. If the type is Annual Adjusted Salary, enter specific mark-up rates (other than those entered in the project). Regular ID régulier, Overtime ID, Special ID You may configure a reference number depending on the type of hours entered by the resource. This reference could be used in modified reports on transactions or within personalized invoices. Regular Cost, Overtime Cost, Special Cost If you have checked “Paid Cost”, you need to enter into the field the anticipated cost rates for each type of hours used. The resources are identified by invoicing method (via the class or resource number) and will then be paid according to this rate rather than the one entered in the payroll module. Paid If this box is checked, the anticipated cost rates within the fields Regular Cost, Overtime Cost and Special Cost will be used as the base salary for the resource classes or resources defined by the field. This option will then take precedence over the rates defined in the Payroll module and/or within the Resource card (Projects>Parameters>Project>Resource). ***Important*** If the paid cost box has been checked and the value within the Regular Cost, Overtime Cost or Special Cost fields is equal to zero (0.00), this value will be used as the cost rate for the affected transactions. Therefore, the resources will not be paid for the hours entered according to these parameters. Buttons Display/Hide You may use the Display/Hide button, placed on the right hand side to scroll through the window, to view the addition details available. By default, only the first line is displayed. © 2010 JOVACO Solutions inc. – Version 10.0.13 48 Project Setup Project Control Expense Invoicing Method Setup (Tools >> Setup >> Project >> Expense Methods) This feature allows you to define methods for calculating the billing rate of applicable expenses at the levels of the concerned projects. The rates will be used to calculate employee expense reports and customer invoices. Invoicing methods are normally created per customer. In this window, invoicing methods can be added or deleted, and data can be modified or copied. Once saved, invoicing methods data can be modified, with the exception of the Category field. Enter new data and click the SAVE button. To copy an expense invoicing method, click on the COPY button: a box will open requesting a name for the new method (maximum 10 characters). Lines can then be modified or added. Again, the Category field in the copied method cannot be modified. Enter new data, then click the SAVE button. You can have more than one version of the same method to know the different rate changes that occur over time (see Start Date). By doing this, you will always be assured that these transactions will be evaluated on the rate in effect when it was entered and not the latest rate. To delete an invoicing method and the data associated with it, click on the DELETE button. © 2010 JOVACO Solutions inc. – Version 10.0.13 49 Project Setup Project Control Expense Enter a ID (maximum 10 characters) to identify this expense invoicing method. Description Enter a description (maximum 50 characters). Starting Date Enter a start date for the use of a method. If there are changes in rates that come into effect at a specific date, it is possible to define several start dates for use for the same method. It is thus possible to duplicate the billing methods to reflect rate increases over the years. To do this, you must copy a billing method by keeping the same identification ID, but indicating a new start date. In this way, if you make a adjustment transaction on a history transaction, it will be reassessed according to the method corresponding to the date indicated. Inactive Check this box to deactivate an invoicing method. If this box is checked, the method cannot be used. Type Select the type connected with the expense invoicing method: Mark-up Rate If this type is selected, enter a rate that increases the applied cost; for example, a mark-up rate of 1.05 corresponds to 105% of applied costs. Invoicing Unit Rate If this type is selected, enter a unit rate that calculates the corresponding billable value; for example, a rate of 0.35 corresponds to 35 cents (35 ¢) per applied unit. Paid If this box is checked, the cost rate will surpass the amount payable under the corresponding category when the expenses are paid to the resource. This function is used to manage exceptions to company policy due to a client’s request or client’s contract. Billing Rate If Mark-up Rate is selected in the Type field, enter the rate to establish the mark-up percentage. If Invoicing Unit Rate is selected in the Type field, enter the rate to calculate the billable value per unit. Cost Rate Cost rate can be entered to calculate costs for invoicing purposes or for reimbursement to the resource. Regular ID You may configure the reference number to expense category that is being used. This reference could be used within modified reports on transactions or within templates for personalized invoices. Gross Amount Check this box to indicate that the calculation is made on the total including taxes. If the box is not checked, the calculation is made on the net amount (before taxes). © 2010 JOVACO Solutions inc. – Version 10.0.13 50 Project Setup Project Control Internal Expense Method Setup (Tools >> Setup >> Project >> Int. Expense Method) This feature allows you to define methods for calculating the billing rate of expenses incurred at all the levels of the projects concerned. Normally invoicing methods are created per customer. Internal expenses are: rent, equipment rental, user licenses, photocopies, etc. In this window, invoicing methods can be added or deleted, and invoicing methods can be modified or copied. Invoicing methods data can be modified even a save, except for the Resources and Category fields. Enter new data, then click the SAVE button. To copy an invoicing method, click on the COPY button: a box will open requesting a name for the new method (maximum 10 characters). Then lines can be modified or added. Again, the Resources and Categories fields in the copied methods cannot be modified. Enter new data, then click the SAVE button. You can have more than one version of the same method to know the different rate changes that occur over time (see Start Date). By doing this, you will always be assured that these transactions will be evaluated on the rate in effect when it was entered and not the latest rate. To delete an invoicing method and the data associated with it, click the DELETE button. © 2010 JOVACO Solutions inc. – Version 10.0.13 51 Project Setup Project Control Int. Expenses Enter a ID (maximum 10 characters), identifying this internal expense invoicing method. Description Enter a description (maximum 50 characters). Starting Date Enter a start date for the use of a method. If there are changes in rates that come into effect at a specific date, it is possible to define several start dates for use for the same method. It is possible to duplicate the billing methods to reflect rate increases over the years. To do this, you must copy a billing method by keeping the same identification ID, but giving a new start date. In this way, if you make an adjustment transaction on a history transaction, it will be reassessed according to the method corresponding to the date indicated. Inactive Check this box to deactivate an invoicing method. If this box is checked, the method cannot be used. Type Select the internal expenses type among the following three options: equipment, tests and internal expenses. Category Enter the category ID to which this internal expense invoicing method is applicable, or leave the field blank to apply it by default to all categories. Type Select the type connected with the invoicing expenses method: Mark-up Rate If this type is selected, enter a rate that increases the applied cost; for example, a mark-up rate of 1.05 corresponds to 105% of applied costs. Invoicing Unit Rate If this type is selected, enter a unit rate that calculates the corresponding billable value; for example, a rate of 0.35 corresponds to 35 cents (35 ¢) per applied unit. Paid If this box is checked, the cost rate will calculate the payable amount. Billing Rate If Mark-up Rate is selected in the Type field, enter the rate that establishes the mark-up percentage. If you have selected Invoicing Unit Rate in the Type field, enter the rate that calculates the billable value per unit. Cost Rate Cost rate can be entered to calculate costs if the Paid box is checked. Regular ID You may configure the reference number to expense category that is being used. This reference could be used within modified reports on © 2010 JOVACO Solutions inc. – Version 10.0.13 52 Project Setup Project Control transactions or within templates for personalized invoices. © 2010 JOVACO Solutions inc. – Version 10.0.13 53 Project Setup Project Control Territory Setup (Tools >> Setup >> Project >> Territories) Territories define the zones in which projects are executed. Once saved, the territory ID cannot be modified; only the description can be modified. Enter the modifications, then click the SAVE button. To delete a territory ID and the data associated with it, click the DELETE button. Territory Identify a territory ID (maximum 10 characters), or click the lookup button to select one from the Territories window. Description Enter a description for the territory (maximum 50 characters). © 2010 JOVACO Solutions inc. – Version 10.0.13 54 Project Setup Project Control Branch Setup GP: (Setup >> Project >> Branches) Branches usually identify the territories in which projects are executed, from where reports are sent, and usually, where project invoicing is performed. Once saved, the branch ID cannot be modified; only the description can be modified. Enter the modifications, then click the SAVE button. To delete a branch ID and the data associated with it, click the DELETE button. Branch Identify a branch ID (maximum 10 characters), or click on the lookup button to select a branch from the Branches window. Description Enter a description for the branch (maximum 50 characters). A branch can also identify the person in charge of preparing the invoice for the project manager. Resource Enter the resource responsible for the invoicing of the branch. You can create several Branch ID for the same physical branch. © 2010 JOVACO Solutions inc. – Version 10.0.13 55 Project Setup Project Control Project Type Setup (Tools >> Setup >> Project >> Project Type) A project type defines the frame in which projects are to be executed. Thus they allow for grouping similar projects for analysis purposes. Once saved, the project type ID cannot be modified; only the description can be modified. Enter the modifications, then click the SAVE button. To delete a project type ID and the data associated with it, click the DELETE button. Project Type Identify a project type ID (maximum 10 characters), or click the lookup button to select a project type in the Project Types window. Description Enter a description for the project type (maximum 50 characters). Group ID It is possible to group several project types by associating them to the same Group ID. This group is not used in the various reports. It is only informational, but can be used in the definition of customized reports. Coordinator You can identify a coordinator by project type. Select the appropriate resource. © 2010 JOVACO Solutions inc. – Version 10.0.13 56 Project Setup Project Control Service Type Setup (Tools >> Setup >> Project >> Service Types) The service types allow you to define the nature of professional services to be provided under the various levels of the projects. Once saved, the service type ID cannot be modified; only the description can be modified. Enter the modifications, then click the SAVE button. To delete a service type ID and the data associated with it, click the DELETE button. Service Type Enter a service type ID (maximum 10 characters), or click the lookup button to select a service type from the Service Types window. Description Enter a description for the service type (maximum 50 characters). © 2010 JOVACO Solutions inc. – Version 10.0.13 57 Project Setup Project Control Productivity ID Group (Tools >> Setup >> Project >> Prod. Id Group) Groups are defined for report creation purposes only: they group together productivity IDs that appear under one of the report columns. Enter a description for each group to allow productivity IDs to be associated with a column appearing on the productivity report. This description will be used as a column header. © 2010 JOVACO Solutions inc. – Version 10.0.13 58 Project Setup Project Control Parameters of the business units (Tools>> Parameters>> Project>> Business Units) It is possible to define markets for business development and associate a specific business unit to each. This window allows you to define each business unit and to associate a leader or leaders to them. Business Unit Enter the identification ID of the business unit. Description Enter the appropriate description of this unit. Then by pressing the Coordinators Button, it is then possible to identify the resources that are the coordinators for this business unit. © 2010 JOVACO Solutions inc. – Version 10.0.13 59 Project Setup Project Control Market Parameters (Tools>> Parameters>> Project>> Markets) In the business development context, it is generally useful to identify the contracts associated with projects. This window allows you to define different markets of projects completed. Market Description Enter the market’s identification ID. Enter a description for this market. Business Unit Division Select the business unit in this market. If you wish, select the division responsible for this market Then by pressing the Coordinator Button, it is then possible [to assign] the resource or resources that are responsible for this market. © 2010 JOVACO Solutions inc. – Version 10.0.13 60 Project Setup Project Control Grade Maintenance (Tools >> Setup >> Project >> Level Management) It is possible to identify the specific grade for each resource (like Senior Engineer). This window allows you to identify the different grades and the maximum number of months of experience associated to this grade. The grades help you monitor the professional progress of your resources according to the different professional orders. After each update of the resource’s experience (see the process for “Level Updates”), a report lists the resources that are associated to a level less than their number of months of experience. Level Description Nb. of Months limit Enter the Level ID Enter the level description Enter the maximum number of months experience for this level © 2010 JOVACO Solutions inc. – Version 10.0.13 61 Project Setup Project Control Vacation Award Management (Tools>> Parameters>> Project>> Vacation Award Management) It is possible to calculate the annual number of vacation days depending on the seniority of the resource. Seniority From ... to ... The interval of months of experience which gives the annual number of vacation days must be indicated. Depending on the number of corresponding months of experience, resources will be entitled to that number of days. Number of days Indicate the number of days of annual vacation to which the resource is entitled. Type of Period The calculation period type must be indicated. © 2010 JOVACO Solutions inc. – Version 10.0.13 62 TEDI Administrator Project Control TEDI Setup The Time and Expense module (TEDI) allows employees to complete their timesheet and expense report on a weekly basis. The module is completely integrated with the Project Control module, hence accounting departments will no longer have to manually enter data from each employee. The application has various features allowing the module to be customized for more efficiency. © 2010 JOVACO Solutions inc. – Version 10.0.13 63 TEDI Administrator Project Control Time & Expense Definition Settings (Tools >> Setup >> Project >> Configuration) In a multi-company project environment, it is now possible to have the time sheets parameters by company. To do this, you must press the Make Specific button in the company that must have particular processing in TEDI. Companies that are not configured in this way will use all the common parameters. General Options © 2010 JOVACO Solutions inc. – Version 10.0.13 64 TEDI Administrator Project Control Period Type You can choose a weekly, bi-monthly, or monthly time period. 1. Weekly 2. Bi-monthly (1-15, 16-[28-31]) 3. Monthly Ending Period For weekly time-sheets, use this drop-down list to choose the day of the week that ends the week for control purposes for employee time and expense. Any day may be chosen; usually Friday, Saturday or Sunday is selected as the day to end the week. Productivity You can display the productivity rate (Client Rate) of resources. For this purpose, choose either to display the % of productivity or the % of nonproductivity or Display No Productivity. It is possible to display the client or non-client rate in the Time Sheet. This rate is based on the productivity ID of each charge and is calculated as follows: Fixed Salary Personnel (not paid for overtime OT) In this case, the productivity ID associated with the overtime hours adjustment project is identified as time worked. Example1: Example2: Client checked (Billable or not) 40.00 hours Client unchecked 10.00 hours OT adjustment (Worked) -12.50 Hours Total time paid 37.50 hours Client 106.67% (40/37.5) Client checked (Billable or not) 40.00 hours OT adjustment (Worked) - 2.50 hours Total time paid 37.50 hours Client 106.67% (40/37.5) © 2010 JOVACO Solutions inc. – Version 10.0.13 65 TEDI Administrator Example3: Project Control Client checked (Billable or not) 30.00 hours Client unchecked 5.00 hours OT adjustment (Worked) 2.50 hours Total time paid 37.50 hours Client 80.00% (30/37.5) Hourly Wage Personnel (paid for overtime) In this case, the productivity ID associated with the time bank project (Accumulated Overtime or AOT) is identified as time not worked. Example1: Example2: Example3: Client checked (Billable or not) 40.00 hours Client unchecked 10.00 hours Time bank (not worked) -12.50 hours Total time paid 37.50 hours Client 80.00% (40/50) Client checked (Billable or not) Time bank (not worked) Total time paid Client 40.00 hours - 2.50 hours 37.50 hours 100.00% (40/40) Client checked (Billable or not) 30.00 hours Client unchecked 5.00 hours Time bank (not worked) 2.50 hours Total time paid 37.50 hours Client 85.71% (30/35) Display Expense tab Entry without decimales Check this box if TEDI is used to generate employee expense statements. The Tab will be displayed next to the Time Tab. Check this box is you would require it to be mandatory to enter expenses without decimals. Multi-currency Module Check this box if the Multi-currency Module is used and it will allow staff members to create expense statements in various currencies. Expense Rate Check this box if the employee can enter themselves the conversion rate for expenses. © 2010 JOVACO Solutions inc. – Version 10.0.13 66 TEDI Administrator Project Control Internal Expenses tab Check this box if TEDI is used to enter internal expenses applied by staff members. IN/OUT Hours Choose whether or not employees will have to indicate their start and end time at work. The information represents a declaration based on an honour system basis. Hours to be completed Check this box to allow employees to indicate the number of hours required to complete the work at hand. Customer Filter This option enables employees to choose projects sorted by client order. Detailed Timesheet Report Check this box to have the total by hour type printed on the Timesheet Report. Send timesheets with entries at zero Check this box to allow employees to leave entry lines empty without having to enter hours in their timesheets. Approver cannot modify timesheet Check this box if the timesheet approver is not authorized to modify the employee’s timesheet of which he would normally approve. © 2010 JOVACO Solutions inc. – Version 10.0.13 67 TEDI Administrator Approver – Reminder of verification of expenses Project Control Displays a reminder message to the approver to tell him to not forget to check the expense statements when he does not consult this tab and give his approval. To modify transferred timesheet Check this box to allow the Administrator to modify timesheets that have been transferred to the Project Control module. Print modified field by Check this box to print on employee’s timesheet, the identification ID of the resource who has modified the timesheets which is not his/hers. Display Remaining Hours to Project Check this box to display the remaining hours available to this project (Hours budgeted – Hours to date) Display Project Status Check this box to activate the window on the project status regarding the billable value for Project Manager. (Menu Administration) Language ID Category Check this box to use a second language for your cost categories. Use Project Estimation Check this box to allow resources, who have access to projects, not to exceed the number of hours established in the estimations of the project. Default parameter - Import hours/expenses at zero Restrict import/copy change. of depart. Print clearly FDT administrative projects Print the description © 2010 JOVACO Solutions inc. – Version 10.0.13 Check this box if you want the line copy of a previous period to carry over only the coordinates of the project without the charges. Check this box so that, in the copy function of the lines of a previous period, the division is validated so that it corresponds to the resource’s division (useful when your resources change a department/division). Check this box if you want the charges to administrative projects (i.e. non client productivity ID) to print on a separate page from client projects. Check this box if you want the description entered for each charge to be printed on the report. 68 TEDI Administrator Project Control Hours Bank Choose whether to display any overtime accumulated for future payment for each employee. Sick Bank Choose whether to display the accumulated sick hours by the employee. Banks visible by employee Vacation Hours VCY, VPY, VOT and VEY Check this box if you want TEDI Group coordinator type Resources to see the cumulative of various resources under their responsibility. You will then need to specify what kind of responsibility you give this visibility (Approval Group and/or Validation Group) Check this box if you want to view the vacation hours of the current year (CY), the previous year (PY), accumulated for overtime and for earlier years. Hours Reconciliation When you request the employee to enter his start and stop time and you can select Reconciliation. The system will reconcile the number of hours entered and verify (equal) these hours at the moment when the employee sends his/her timesheet. With overtime hours With special hours Reference and Description you can choose to include overtime hours you can choose to include special hours This option will allow each employee to have the possibility to enter a short reference (30 characters) or description (256 characters) or both on their timesheet and expense report in order to provide additional information for their allocations. Mandatory Reference Check this box to force the resource to type in a description of the work done for each timesheet entry. Vacation To take and accumulated © 2010 JOVACO Solutions inc. – Version 10.0.13 Check this box to display the table Vacation Banks that is found in TEDI (Tools >> Vacation Banks) 69 TEDI Administrator Project Control Display Vacation by day Check this box to display vacation by hours and by day. Conversion Factor Hours by Day If the Display Vacation by day box is checked, enter the number that will convert hours to days. For example, if a work corresponds to 7.5 hours, enter 7.5 in the field. Custom label - Type of overtime Special You can customize the label of the type of overtime. You can customize the label of the type of special time. Prevent exceeding the time bank Check this box if you do not allow your employees to have a negative time bank (i.e., consuming more hours than those accumulated). Prevent exceeding the vacation bank Check this box if you do not allow your employees to have a negative vacation bank (i.e., consuming more hours than those accumulated in previous years). Prevent exceeding sick leave banks Check this box if you do not allow your employees to take, in a same period, more hours of sick leave than provided to the employee annually. © 2010 JOVACO Solutions inc. – Version 10.0.13 70 TEDI Administrator Project Control Input time by quarter-hours Check this box if you want to force the time to be entered in a minimum of quarter hour periods. TEDI rounds the charges of resources to make them consistent with this rule. Use the expense date Check this box if you allow your resources to enter earlier expenses in the current period by indicating the date in order to associate it to the project with the actual date. If you use the planning function, check this box if you allow your resources to enter hours through the time tab (i.e. on projects for which they were not planned) in addition to the tasks tab. Display the time tab Button – CRM Allows you to create a link to the Microsoft Dynamics CRM application and to its service incidents. CRM Integration Check this box if you are using the Microsoft CRM application and you would like to enable the interface the incidents within the Service module. JTE CRM URL Within the CRM interface, you need to enter the URL link to the website Microsoft Dynamics CRM application. Button – Cost types This window allows you to specify the types of standard cost items/categories which are available to enter data from the expense reports (See Project setup: Cost Types). © 2010 JOVACO Solutions inc. – Version 10.0.13 71 TEDI Administrator © 2010 JOVACO Solutions inc. – Version 10.0.13 Project Control 72 TEDI Administrator Project Control Button - Project Progress TEDI can be used to periodically enter the progress of projects. For this purpose, you must specify the types of flat rate projects for which this action will be necessary. Contract Price Pjct. Types You must check the types of project billing which are subject to entering the progress: Cost plus with maximum, Contract Price or Cost Percentage. Normally all these types should be checked. Percentage of mandatory progress You can indicate whether a percentage of completion is mandatory. © 2010 JOVACO Solutions inc. – Version 10.0.13 73 TEDI Administrator Project Control Minimum billable hours You can specify a minimum number of budgeted hours to identify the levels in which entering the progress is mandatory. And/Or You must select if one or the other or both the minimums must be verified. Minimum billable expenses You can indicate a minimum revenue budget to identify the levels in which entering the progress is mandatory. Furthermore, in the project form, you can include specifically designated projects to require entering Actual Progress, even if it is a cost plus project. Do not forget that these values (Billing Type and Revenue Type) defined in the project form are default values for the sub-levels, however, the specific values of the sub-level are actually taken into account during processing . © 2010 JOVACO Solutions inc. – Version 10.0.13 74 TEDI Administrator Project Control In regards to entering progress, it can be made globally by sub-level (Summary by level) or by budgeted department in each sub-level (Summary by department). © 2010 JOVACO Solutions inc. – Version 10.0.13 75 TEDI Administrator Project Control One should note that in the case of a Summary by department, the project manager defined in the budget of the corresponding level will complete the progress entry. While in the case of the Summary by level, the Execution Coordinator defined in the corresponding level will complete the progress entry. Thus, once the elements are defined in the projects/sub-levels, it is possible to identify those which are subject to an entry on the project’s Progress. The project manager or the execution coordinator, as the case may be, needs to just click on the appropriate icon in his time sheet to open the input window for the project’s Progress. © 2010 JOVACO Solutions inc. – Version 10.0.13 76 TEDI Administrator Project Control The window is divided into two sections. The upper part shows in bold the ID and title for projects whose progress is required. The lower part shows the cumulative hours to date and amounts as well as their respective budgets and their % of use of the budget. The user can choose to display only the mandatory projects/sub-levels by checking the box provided. Otherwise, all projects/sub-levels are displayed. They can then enter the % of progress at the period end date and, if necessary, an appropriate comment. © 2010 JOVACO Solutions inc. – Version 10.0.13 77 TEDI Administrator Project Control Note that the % of progress of the previous period is automatically set as the default value for the current period. Once all the required projects are completed, the user must specifically Send his project’s progress. A confirmation message then appears. Once sent, only the administrative department may amend an already entered percentage. A window for this purpose is provided within Dynamics GP. © 2010 JOVACO Solutions inc. – Version 10.0.13 78 TEDI Administrator Project Control Button - Comments Comments You can enter a comment or a message which will be displayed at the bottom of the time sheet report page for all employees. © 2010 JOVACO Solutions inc. – Version 10.0.13 79 TEDI Administrator Project Control Button - URL Connection This window is used to configure the URL connection so that the Group Coordinator can reprint the employee time sheets and expense reports. You’ll find most of the information required in the configuration file “.jnlp” of your installation of TEDI. © 2010 JOVACO Solutions inc. – Version 10.0.13 80 TEDI Administrator Project Control Button - Options Pay stub Options Print banks Bilingual Pay ID Department Format Department Lending Inter-Company © 2010 JOVACO Solutions inc. – Version 10.0.13 If the Pay stub functionality in installed, check this box if you want to include the employee bank totals on their pay stubs. Select the language of the first language ID to appear on the Pay stubs. Indicate whether employees may choose the department where they want to apply allocations from projects that allow staff lending between departments. When many companies share project data, choose whether to allow employees to apply their time and expenses to a project with no budgeted department from the company that they belong to. 81 TEDI Administrator Format Project Control When employees are allowed to apply allocations to a project with no budgeted department from the company that they belong to, indicate the segments necessary to identify the required department. Custom login error message You can create an error message which is different from the “Non-Valid Authentication” message which will be displayed when information entered into TEDI are not exact. This personalized message needs to be configured in both languages, where applicable. © 2010 JOVACO Solutions inc. – Version 10.0.13 82 TEDI Administrator Project Control Personalized labels for banks VAP Bank You can configure a different label for the Available Vacation and for Bank of Hours. This personalized label must be configured in both languages, where applicable. Button - Security Password required Check this box to make it mandatory to enter a password for each employee when entering his time sheet and his expense statement. Strengthened Validations Check this box to force the user to follow certain rules when he defines his password to prevent passwords that are too simple. © 2010 JOVACO Solutions inc. – Version 10.0.13 83 TEDI Administrator Administrator password New password Confirmation Project Control This password allows access, without restrictions, to the time sheets and expense statements for all employees. It also allows access to the modification function after transferring charges. If a new password is entered, it must be retyped in this field to confirm it. Administrator Payment Statement The Administrator password does not allow access to employee salary statements. They are protected by the resource’s password. To gain access to salary statements, you must check this box and enter a general password protecting access. New password This password allows access to salary statements of all employees. Confirmation If a new password is entered, it must be retyped in this field to confirm it. © 2010 JOVACO Solutions inc. – Version 10.0.13 84 TEDI Administrator Project Control TEDI Group Maintenance (Tools >> Setup >> Project >> TEDI Groups) Use this feature to define the person or group that will be responsible for transferring and/or approving time and expense records to the Project Control module. For example, groups may correspond to departments, branches or project manager groups in the case of a display or detailed approval of project distributions. Group Enter an ID for the group. Description Enter a description appropriate to the group. This can be the department name or branch name. Group Options *** Important *** You must not confuse the functions of the two group types (Resources and Project Managers). You must therefore create separate groups. A coordinator may however be associated with several different groups of both types. Resources You can create employee/contractor groups to enable “group coordinators” to have access to Time Sheets and expense statements of the persons selected. For this type of group, you need all the resources that are under the responsibility of the coordinator as members. © 2010 JOVACO Solutions inc. – Version 10.0.13 85 TEDI Administrator Project Control This selection allows you to complete the time sheet and the expense statement of the group's employees and to send them on their behalf. This selection allows you to complete the time sheet and the expense statement of the group's employees and to send them and reset them, if necessary. Check this box if you want the group’s coordinator concerned to approve the time sheets of employees belonging to this group Check this box if you want the transfer transactions of this group of employees into the concerned batches. Input Validation Approval Transfer It must also indicate that if no box is checked, the group coordinator may consult the time sheets and expense statements of the identified personnel without being able to modify or approve them (consultation only). Project managers You can create a group by project manager to enable the group coordinator to monitor and/or approve the charges made to their projects. Members of these groups must only be the project manager or managers. The system will enable the group coordinator to use the functions specific to this type of group on projects associated to Member(s) of the group: Visualization Project Status Detailed Approval Check this box if you want the coordinator to view the time and expense details charged to various projects. To access this function, the coordinator must go to the TEDI menu bar and choose Administration > Display. Check this box if you want the group coordinator to have access to the project status report available through TEDI. To access this function, the coordinator must go to the TEDI menu bar and choose Administration > Project Status. Check this box if you want him to approve, in detail, the time and expenses charged to the projects and the resource/level for which the identified resource is the project manager. To access this function, the coordinator must go to the TEDI menu bar and choose Administration > Approval. Inactive Resources Check this box to also display inactive resources in the user’s window. Insert Remove Click this button to add members belonging to the group. Click this button to remove members from the group. © 2010 JOVACO Solutions inc. – Version 10.0.13 86 TEDI Administrator Project Control Group Coordinator (Tools >> Setup >> Project >> Group Coordinator) This feature is used to identify the group(s) attached to a coordinator. The Group Coordinator can view and /or approve employee time sheets and expense reports. Coordinator Click the lookup button to select a coordinator. Insert Click this button to add one or more groups to the coordinator selected. Remove Click this button to remove one or more groups previously selected for the coordinator. © 2010 JOVACO Solutions inc. – Version 10.0.13 87 TEDI Administrator Project Control Unlock an Employee’s Timesheet and Expense Report (Tools >> Setup >> Project>> Unlock Timesheet) After an employee has completed a timesheet for a period, it may be necessary to make corrections in it. This feature is used to identify timesheets and expense reports completed by an employee and to reverse their status to Not Completed. However you cannot change the status of time sheets that have been transferred. © 2010 JOVACO Solutions inc. – Version 10.0.13 88 TEDI Administrator Project Control Employee Timesheet and Expense Report Status (Tools >> Setup >> Project >> Timesheet Status) This feature displays and prints employee timesheets and expense reports, for a given period, which are: Not completed Completed Under Approval Transferred and, if applicable, to display the corresponding number of hours for each timesheet and expense report. You can also include or exclude inactive resources. © 2010 JOVACO Solutions inc. – Version 10.0.13 89 TEDI Administrator Project Control Reprint Timesheets (Tools >> Setup >> Project >> Reprint Timesheet) Employee timesheets can be reprinted. You have to be sure that the URL configuration (found on the Time & Expense Definition Settings window) is set properly. Start Period End Period Enter the period’s start date of the timesheets to be reprinted. Enter the period’s end date for the timesheets to be reprinted. Customer Enter the client for which the timesheets are to be reprinted. Employee Enter the employee ID or contractual employee ID whose timesheets are to be reprinted. By default, the timesheets from All employees would be reprinted. Project Enter the specific project ID for which the timesheets are to be reprinted. By default, timesheets from All of the selected client’s projects would be reprinted. Empl. Department Enter the department ID of the employees for which you want to reprint the time sheets; by default, all departments are included in the selection. Level 1 Enter the selected project’s level 1 for which the timesheets are to be reprinted. By default, All of the selected project’s level 1 timesheets would be reprinted. Level 2 Enter the selected project’s level 2 for which the timesheets are to be reprinted. By default, All of the selected project’s level 2 timesheets would be reprinted. Include Check the reports you wish to reprint. You can thus reprint the Time Sheets, the Expense Statements and/or Internal Fees charged through TEDI corresponding to the search elements. © 2010 JOVACO Solutions inc. – Version 10.0.13 90 TEDI Administrator Project Control Specific If this option is checked, selected employees’ reports can be reprinted for the selected projects /level 1 /level 2 (regardless of which client the projects belong to). This option will reprint all completed reports that have at least one transaction and in which the selection corresponds to employee, project, level 1 and level 2 search criteria. TEDI Completed If this option is checked, you can print completed reports of selected employees. Timesheets would print out as appeared in TEDI. By customer If this option is checked, timesheet lines for selected employees, projects, level 1s and level 2s can be printed for a specific client. For this option to work, the Customer TS box must be checked for the project in the Project Maintenance window. Language Timesheets can be reprinted in French or in English. © 2010 JOVACO Solutions inc. – Version 10.0.13 91 TEDI Administrator Project Control Timesheet Status Blocking (Tools >> Setup >> Project >> Timesheet Status Blocking) This window allows you to block timesheets to limit access to them. Period: Enter the end date of which you want to block the timesheets Transferred: Check this box to mark the timesheets not completed as being transferred. Blocked: Check this box to stop the access to timesheets during the period indicated and all previous periods. © 2010 JOVACO Solutions inc. – Version 10.0.13 92 TEDI Administrator Project Control TEDI Restrictions (Tools>> Parameters>> Project>> TEDI Restrictions) You can define project restrictions in the TEDI Time Sheet, i.e. to ensure that a project cannot be used or that a warning is given for a group of employees according to the status or mode of payment thereof. Project Type of restriction Pay Status Mode of Payment French Message English Message Enter the project ID on which you want to impose a restriction. Choose the type of restriction between Warning and Block. Warning will only show the message that you specify whereas Block will not allow you to select the project Choose the pay status or mode of payment to which you want to impose this restriction. You can save as many restrictions as you want for the same project. Enter the warning message in French and the warning message in English corresponding to the restriction. © 2010 JOVACO Solutions inc. – Version 10.0.13 93 Project Cards Project Control Cards – Project © 2010 JOVACO Solutions inc. – Version 10.0.13 94 Project Cards Project Control Project Maintenance (Cards >> Project >> Projects) This feature enables the definition of projects that require a specific follow up: Client Projects Billable Not billable Administrative Projects Business development projects (Proposal - Representation) Administrative service projects (Accounting, Human Resources) Support services projects (Secretarial, Computing, Laboratory…) Service administration projects Corporate administration projects Employee benefits projects Invoiced-time adjustment projects (Hour bank, Contractual) Project Suite offers a flexible project structure, making it possible to adopt the structure that works best with the professional services offered. Moreover, projects can be structured independently from invoicing; more than one project can also be defined for invoicing in the same invoice format. © 2010 JOVACO Solutions inc. – Version 10.0.13 95 Project Cards Project Control Project Maintenance can be subdivided in two sub-levels. Each level is defined according to how the project will be managed: Sub-project Modification (modification notice) Batch Phase Deliverables Etc. © 2010 JOVACO Solutions inc. – Version 10.0.13 96 Project Cards Project Control Project Enter a project ID or select one from the Projects list by clicking the lookup button. In the case of a new project, enter the project ID directly or click on the NEW button; a project ID window will open. Short Title Enter a project name or summary description (maximum 30 alphanumeric characters). Full Title Enter a project name or detailed description (maximum 3 lines of 30 alphanumeric characters). Resource Distribution Check this box to limit some employees from applying transactions to a project, in the Time and Expense Done over the Internet (TEDI) module. By checking the box, the Resources button at the bottom of the window becomes active. Employees can be selected from the Project Allocated Resources Maintenance window. *** Important *** If you check this box, the whole project will be controlled by resource allocation. It is therefore appropriate to apply this rule only for a project level. Authorized resources may however be different from one level to another. If this box is unchecked, all employees who meet the departmental criteria (i.e. associated with one of the budgeted departments or permitted by the interdepartmental transactions) can charge their time sheets to the project and the Resources button is disabled. (See below for more details). Project Language If the project uses the standard categories, indicate which language is used for project management. The categories to be used in the project will be saved in the specified language. It is important to note that the language change during the project does not require the items that have already been used at least once to be translated. To change the description of these items, see the section on the cost items. Customer Enter a client ID or select one from the clients and prospects list by clicking the lookup button. To enter a new customer, click the Customer prompt field. The Customer Maintenance window will open. Contact Enter the name of a contact person at the client company (maximum 30 characters). Reference Enter a reference line for the client (maximum 50 characters). TS Copy to Client Check this box if the project’s employee timesheet must be provided to the client. In this case, the TEDI module will automatically print an extra copy of the employee timesheet for each project for which the box is checked. The printed timesheet will only contain the hours and expenses charged to the client’s project. © 2010 JOVACO Solutions inc. – Version 10.0.13 97 Project Cards Project Control Department Enter the department in charge of the client project. Once the department is entered, the division name is displayed automatically. This department will also be associated by default to different levels of the project. You can change the levels concerned. Invoicing Currency When using Multi-Currency, the invoicing currency must be selected to allow management report production in either the invoicing or functional currency and to assure that Revenue Recognition will occur in this currency. ***ATTENTION***: Once the project has been activated, the invoicing currency cannot be changed. Rate The conversion rate of project estimates and budgets must be entered in order to identify the estimated conversion rate and to ensure a normalized conversion of estimates and budgets. The billing methods of fees as well as the budgets are still considered in the project’s currency. The rate specified here allows you to show the budget when the reports are requested in the functional currency of the company. Branch Enter the branch responsible for invoicing of the project. Project Manager Enter, if applicable, the resource ID that will assume the project management. Project Executive Enter the project executive ID for the client. Market Enter, if applicable, the project market. Billing Method Enter the billing method that applies to the project: Contract Price – Signed contract with a fixed price. Cost Only – For internal projects that are not billed to clients. Cost Percentage – Uses the cost grid to determine billing percentage. Cost-Plus – Such as time and materials. Cost-Plus with Maximum – cost-plus with established maximum. As a first step, these types are used for information in various reports to remind those concerned how the project level must normally be charged. It does not, however, prevent another method of billing to be used. In a second step, some of these types of billing can be used to identify the levels at which the project’s progress can or must be entered (see the corresponding section in the TEDI parameters). © 2010 JOVACO Solutions inc. – Version 10.0.13 98 Project Cards Project Control Revenue Type Enter the project’s revenue recognition type by default. The majority of these types can be used by the “Recognition of revenues” function of (Transactions>> Recognition of Revenue) to adjust the revenues of the project according to the determined type: Labour and Expenses – Revenues are based on labour and expenses charged to the corresponding level. This type of revenue has no impact on the adjustment functions of the project’s revenue. Actual Progress – Revenues calculated are adjusted automatically based on the actual progress percentage entered by the Project Manager. Maximum Budgeted – Revenue is adjusted to the Maximum budgeted Amount. If Project Revenue amount exceeds the maximum budgeted Revenue, then the difference is considered a loss and it cannot be automatically adjusted. Comprehensive - it is also the Maximum budgeted amount but is comprehensive for all the project’s comprehensive sub-levels. Over 90 days - in this case, reduce the revenue of the value of current work in progress which are older than 90 days from our cut-off date. Costs Progress – Revenues calculated are automatically adjusted based on the actual cost plus percentage incurred in relation to the total cost forecasted in the budget of the corresponding level. Hours Progress – Calculated revenues are automatically adjusted based on the actual hour progress percentage incurred in relation to the total amount of hours budgeted to the corresponding level. Time Progress – Revenues calculated are automatically adjusted based on the percentage of the number of days passed in relation to the number of days planned at the corresponding level. It uses a standard “S curve” to determine, under normal circumstances, the progress of the project relative to the budget based on the total hours charged to date. Project Type Enter a project type ID or click the lookup button to select one from the Project Types window. To enter a new project type, click the Project Type prompt field. The Project Type Setup window will open. Budget Type Departments can manage budgets in the following ways: Summary: A budget that is only entered at the department level. Detailed (By category): A budget must be entered for each cost category of each department. During the launch, the program will check whether a budget balances with the departments’ categories. Progress Type Project progress is always generated by project according to the following choices: Summary by Department: Progress that is entered by the managing department. Summary by Level: Progress that is fully entered for all departments that are budgeted by the corresponding level. Detailed (By Category): Progress that must be entered for each cost category of each department. Territory Enter the Territory ID in which a project will be accomplished or click the lookup button to select one from the Territories window. To enter a new region, click on the Territory prompt field. A Territory Setup window will open. © 2010 JOVACO Solutions inc. – Version 10.0.13 99 Project Cards Project Control Status At a project creation, the default status is “NEW”. This is a project’s initial status in which no transaction can be charged. Once all project data have been entered and the budget defined, the project must be activated (Cards >> Project >> Activation) or in SBM: (Project >> Cards >> Activation) in order to charge transactions to it. Once activated, the project status changes from “NEW” to “ACTIVE.” The “NOT RECONCILED” status is assigned to a project for which a new sublevel or a new budgeted department has been added to a project. Once the project status changes to “Closed”, it is no longer possible to charge costs, but it is always possible to make adjustments, invoices and collections. Other statuses exist, but they are not displayed in this window. In order for them to function, you must use the “Web Open Project File”. It will display the different statuses of the project prior to the “New” status (e.g. creation, pending approval, approved, etc.). During this process, the status field in Dynamics will be empty. Default values displayed in the fields below originate from the Project Setup window (see Setup section). They can be modified for a particular project. Moreover, these parameters are mainly used to define the default configuration of the project’s various daughter levels. Therefore they allow you to open these levels more quickly without having to configure each of the parameters involved. You can however modify these settings at each of the various levels. Labour Costs Mark-up If this box is checked, the business benefits of the resources will be identified as “Eligible to social benefits” and saved as costs in the project. You can then evaluate them with or without these costs in the various reports. Labour Mark-up Rate If the rate is 0, the resource rate is used. If a rate other than 0 is entered, this rate takes priority over the resource rate. This rate is for information purposes and no accounting transaction will be generated. Additional window: Social Benefits: Project You may define a rate to calculate social benefits based on a specific type of hours (regular, overtime, special). This rate will take precedence over the above general rate, which has precedence over the resource rate. © 2010 JOVACO Solutions inc. – Version 10.0.13 100 Project Cards Project Control Percentage for the overhead mark-up A fixed overhead cost can be saved in the project. If you use it, you can then evaluate your project with or without these costs in the various monitoring reports. It should be noted that this cost is only indicative, no accounting charge is generated. If this box is checked, it will indicate that the overhead will be calculated on a labour cost percentage basis. If it is not checked, it will be calculated on a fixed amount per hour basis allocated to project. Overhead Mark-up Rate In the case of a mark-up percentage, indicate the mark up rate calculated on the actual labour cost. If a rate other than 0 (zero) is entered, the resource hourly rate is multiplied by this rate. If it does not involve a mark-up percentage, the rate indicated will be the amount by worked hour that will be allocated as overhead. If you leave this field at zero, no overhead cost will be recorded in the project. Standard Categories: if this box is checked, the standard category defined in the cost category setup will be used by projects, levels 1 and/or 2. Otherwise, specific cost items must be created (Cards >> Project >> Cost Items) for each budgeted department of a project, level 1 and/or level 2. Salary Account: if this box is checked, labour costs will be applied to the salary account defined in the employee card rather than to the cost account related to the cost category. Among other things, proceeding in this way allows you to associate a direct cost that is different from one resource to another (for example by resource class) rather than to generate all the costs in the same account. Normally, this option is used for client projects. Inter-department: if this box is checked, staff-lending between departments are allowed. Moreover, the “interdepartmental management” function will be accessible. It allows you to limit the non-budgeted departments which can charge time in the project. If this box is not checked, only employees from budgeted departments of a corresponding level may charge costs to the project. Inter-department Rate Enter the inter-department mark-up rate for the labour costs of resources that are applied to a project maintenance level when the department that they belong to does not have an authorized budget. For example, a rate of 1 indicates that inter-department mark-up is calculated at the employee cost rate and that equivalent revenue charges and cost mark-up are generated in the department to which an employee belongs. A 0 rate indicates that no revenue or cost has been generated in the employee’s department. Opening Date The project’s opening date is automatically registered at project creation. Modification Date A project’s last modification date is automatically registered. Closing Date A project’s closing date is automatically registered. © 2010 JOVACO Solutions inc. – Version 10.0.13 101 Project Cards Project Control Last Evaluation Date This date is currently not used by the software. Button – Interdepartment Click on this button if you want to control which departments transactions can be allocated through interdepartmental. The departments identified in this window will the only ones in which the employees are authorized to allocate to projects without having these departments be responsible for a specific part of the budget. Button – User-Defined Click on this button to enter data in the fields that have been defined by the user in the project setup. © 2010 JOVACO Solutions inc. – Version 10.0.13 102 Project Cards Project Control Button – Level 1 Click on this button to open the Project Maintenance: Level 1 window (see additional details below). Button – Invoicing Click on this button to open the Project Maintenance: Billing window (see additional details below). Button – Resources This button is accessible only if the Assign Resources box (at the top of the window) has been checked. If this is the case, select resources that will be distributed to a project by clicking on the lookup button next to the Resources field. Only selected employees from this window will be authorized to apply their timesheets to the project. You can choose to assign a resource to the whole project or just a level 1 or just a level 2 depending on how you select the WHOLE LEVEL 1 or WHOLE LEVEL 2 boxes next to the top of the screen. In order for it to be assigned to the whole project, you must click on the “All level 1” box when only the project is specified. When you define the resources by level 1, you can configure them to have equal access to all daughter levels 2 of this level 1 by checking the “All level 2” box. These authorizations are cumulative. Thus, a resource that is entitled to a single branch of the project will be added to the resources that have access to the whole project for this specific branch. © 2010 JOVACO Solutions inc. – Version 10.0.13 103 Project Cards Project Control Project Maintenance: Billing (Cards >> Project >> Projects >> Button Invoicing) This feature allows you to specify the methods to calculate the billable costs charged to each level of a project. It can also manage which types of transactions are authorized for the corresponding level: Staff time Staff expenses Vendor invoices Internal expenses Defined at the project level, these parameters will serve as the default in opening its daughter levels and are used to optimize the deployment of the project structure. Each branch of the project may however have special parameters. Project The project ID displays automatically. © 2010 JOVACO Solutions inc. – Version 10.0.13 104 Project Cards Project Control Level 1 Enter Level 1 or click the lookup button to select one. To enter a new level 1, click on the Level 1 field. The Project Maintenance: Level 1 window will open. Level 2 Enter the level 2 or click the lookup button to select one. To enter a new Level 2, click on the Level 2 field. The Project Maintenance: Level 2 window will open. TEDI Transfer – in Detail used to indicate if you want to transfer the time charged in the TEDI (Time and Expenses) module on a daily basis instead of the specific period. If the box is checked, the time charged (Project/Level/ Department/Category) will be transferred to a project day by day. If the box is not checked, only the total of all the days of the period will be transferred to a project. TEDI Mandatory Description Check this box if you want the description to be mandatory when the corresponding project/level is charged in TEDI. This test will be performed on all types of transactions charged via TEDI (time, expenses and internal costs). Mandatory reference Check this box if you want the reference to be mandatory when the corresponding project/level is charged in TEDI. This test will be performed on all types of transactions charged via TEDI (time, expenses and internal costs). The following boxes only allow exiting lists via SmartList Builder, of various levels of projects that require providing supporting documentation for billing. They are not associated to any process or test in the application. Sending the original documents Check this box if the documents sent to the client must be originals and not copies. Print Documents Check the box of the documents are to be transmitted to the client. Time sheets, expense statements, internal expenses, CF Fees Fees Revenue Account The default value displayed in this field comes from the Project Setup window (see Setup section). It can be modified for a particular project. Enter the account to which fees revenue will be distributed or click on the lookup button to select one from the Accounts window. To enter a new account, click on the Fees Revenue Account field. The Account Maintenance window will open. On TEDI If the box is checked, this means that hours can be charged to the corresponding level from the Time and Expense Report Module (TEDI). If not, it will not be possible to allocate time to the corresponding level. Billing Method Enter a fees invoicing method or click on the lookup button to select one from the Fees Methods window. To enter a new method, click on the Billing Method field. The Fees Invoicing Method Setup window will open. The selected billing method will determine the billing rate calculation and the total billing value. © 2010 JOVACO Solutions inc. – Version 10.0.13 105 Project Cards Project Control If the mark up rate is not specified in the fees method, you can configure it in the “Fees Invoicing Management” window via the expansion button. Specific Rates Click on the button to open the Fees Specific Rate Maintenance window from which the applicable invoicing rate can be defined for the corresponding level by exception to the selected billing method. (See below Cards – Fees Rate). Expand Button Click on the expand button to enter the discount rate, the productivity id and the mark-up rate connected to this fees invoicing method for the project level. If no method is used which involves the calculation of a billable value and your resources are all considered on the same hourly basis, you can define it in this window. If a billing method is used, it takes precedence over the hourly base defined here. On TEDI This option selected (check or uncheck the box), in the preceding Project Maintenance: Billing window, is displayed. The choice can be modified; if a modification is made here, it will also affect the preceding window. Billing Method The method selected in the preceding window Project Maintenance: Billing, is displayed. The selection can be modified. If the change is done here, it will also affect the preceding window. Productivity Enter the productivity ID used to register staff time. If the ID is entered 00, or another ID that indicates that it is time worked, Client and Billable, the time is billable and the revenue will be generated at the posting of the timesheets. © 2010 JOVACO Solutions inc. – Version 10.0.13 106 Project Cards Project Control If the ID entered indicates the time is not billable, a revenue account will not be generated and an invoicing deficit will be automatically associated to a transaction if a billable value is calculated for the transaction. Discount Rate If available, enter a discount percentage given to the client that will apply to the subsequent invoices. If you do not use the “Discount Rate”, the value recognized as revenue will include the discount to the General Ledger and project reports, but the transaction will indicate the amount before discount. You must configure your invoice to show the discount on a specific line and make sure that the processing thereof is in accordance with the recognized discount in the concerned level. Hourly Rate Discounted Check this box if you want to present a discounted rate in the Invoicing Module. This option will save the transaction with the discount included in its billable value. You do not need to configure anything in the billing module, since the discount will be included in the transaction. Hourly Basis When there is no specific rate or billing method indicated in the project and that the project productivity ID and cost category ID are identified as billable time (00), it is possible to calculate the billable value according the number of hours annually indicated here and multiply it by the appropriate mark-up rate indicated below. Mark-up Rate: If the Fees Billing Method used has no mark-up factor, or if you use the general hourly basis, enter the hourly cost factor that will represent the cost mark-up for invoicing purposes for: Regular Time – a factor of 2.5 indicates that the calculated hourly rate on an hourly basis will be multiplied by 2.5 for invoicing. Therefore, a cost rate of $20 will give an invoicing rate of $50. Overtime Time – the overtime mark-up factor is always calculated from the regular time rate and not from the overtime rate. Special Time – Like Overtime, the special hours mark-up factor is always calculate from the regular rate and no from the special rate. Expenses On TEDI If the box is checked, this means expenses can be charged to the corresponding level from the Time and Expense module (TEDI). PM If the box is checked, expenses can be distributed to the corresponding level from the accounts payable (Payable Module) transactions. Billing Method Enter an expense invoicing method or click on the lookup button to select one from the Expense Methods list. To enter a new method, click on the Billing Method field. The Expense Invoicing Method Setup window will open. © 2010 JOVACO Solutions inc. – Version 10.0.13 107 Project Cards Project Control Specific Rate Click this button to open the Expense Specific Rates Management window from which you can define the applicable billing rate, which differs from the billing method, used for the corresponding level. (See below: Cards – Expense Rates). Expand Button Click the expand button to enter the discount rate attached to an expense invoicing method. On TEDI The option selected (check or uncheck box) in the previous Project Maintenance: Billing window is displayed. This choice can be modified. If the change is made here, it will also affect the previous window. Billing Method The method selected in the previous window, Project Maintenance: Billing, is displayed. The choice made can be modified. If the change is done here, it will also affect the previous window. Billable Check this box if you want the revenues corresponding to these expenses be recognized for their allocation for this project level. If the box is not checked, expenses will not be billable to the client. In this case, the corresponding Revenue account will be generated and an invoicing deficit will be associated to the transaction. Discount Rate If available, enter the discount percentage given to the customer. The value recognized as revenue will include the discount to the General Ledger and project reports, but the transaction will indicate the value before discount. You will need to configure your invoice to show the discount on a specific line and make sure that the processing thereof is in accordance with the recognized discount in the concerned level. © 2010 JOVACO Solutions inc. – Version 10.0.13 108 Project Cards Project Control Internal Expenses (expenses, equipment, tests) On TEDI If the box is checked, internal expenses can be charged to the corresponding level from the Time and Expense module (TEDI). Billing Method Enter an internal expense invoicing method (fees, equipment and/or tests) or click the lookup button to select one from the Internal Expense Methods list. To enter a new method, click on the Billing Method field. The Internal Expense Methods Setup window will open. Specific Rate Click this button to open the Internal Expense Specific Rate Maintenance window from which the applicable invoicing rate for the corresponding level can be defined. (See below: Cards – Internal Expense Specific Rates). Expand Button Click the expand button to enter the discount rate attached to the internal expense invoicing method for the project. On TEDI The choice made (check or uncheck box) in the preceding Project Management: Billing window is displayed. This choice can be modified; if the modification is done here, it will also affect the preceding window. Billing Method The method selected in the preceding window, Project Maintenance: Billing, is displayed. The selection can be modified; if the modification is done here, it will also affect the preceding window. Billable Check this box to make internal expenses billable at the project level. If the box is unchecked, internal expenses will no longer be billable to the client. In this case, the corresponding revenue account will not be generated and an invoicing deficit will be associated to the transaction. © 2010 JOVACO Solutions inc. – Version 10.0.13 109 Project Cards Project Control Discount Rate If available, enter the discount percentage given to the client. The value recognized as revenue will include the discount to the General Ledger and project reports, but the transaction will indicate the value before discount. You will need to configure your invoice to show the discount on a specific line and make sure that the processing thereof is in accordance with the recognized discount in the concerned level. © 2010 JOVACO Solutions inc. – Version 10.0.13 110 Project Cards Project Control Project Maintenance: Level 1 (Cards >> Project >> Level 1) Once project data have been entered, at least one level 1 must be open in order to enter transactions to the corresponding project. The level 1 enables one or more levels such as sub-projects, phases, production batches and deliverables to be defined. As long as the project remains open, new level 1s can added. The same level 1 can be assigned to one or many departments by clicking the BUDGET button. The button opens the Budget Maintenance window, identifying departments that are financially responsible for that level, and defining budgets that must be observed. Project Enter a project ID or select one from the Projects list by clicking the lookup button. If a project ID has been entered in the Project Maintenance window and the Level 1 button has been clicked, the project ID is displayed automatically in this field and is not modifiable. Click the Project field to open the Project Maintenance window. © 2010 JOVACO Solutions inc. – Version 10.0.13 111 Project Cards Project Control Level 1 Enter a new Level 1 ID or select one from the Levels 1 list by clicking the lookup button. If a new Level 1 ID is entered, the following message is displayed: "Do you want to bring the information from the previous level?” If the answer is Yes, project data will be displayed by default in the corresponding fields. This data can be modified. Short Title Enter a name or Level 1 summary description (maximum 30 alphanumeric characters). Complete Title Enter a name or Level 1 detailed description (maximum 50 alphanumeric characters). This description is used as a description in the billing module. Status When a level is created, the default status is NEW. This is the initial status of a level to which no transaction can be applied. Once the level data have been entered and the budget defined, the project must be activated (Cards >> Project >> Activation) in order to apply transactions to it. Once the project is activated, the Level 1 status changes from NEW to ACTIVE. The “not reconciled” status is assigned to the level as soon as a budget is updated or when a department is added. You must reactivate the project to make its status active, so that resources can once again charge time. Once a level is CLOSE, it is no longer possible to apply charges to it, but it is possible to make receipts and modifications. Department Enter the department in charge of the budget for that level. Once the department is entered, the Division Name is displayed automatically. Branch Enter the branch from which the level’s invoicing will be made. Coordinator Enter the ID of the resource in charge of a particular department’s costs for the execution of a project level. Coordinators are project managers identified in a project budget. The coordinator identified here will see all the budgets under his level as well as the level 2s that will be created in the management reports. Billing Method Enter the billing method that applies to this Level 1: Contract Price – Signed contract with a fixed price. Cost Only – For internal projects that are not billed to clients Cost Percentage – Uses the cost grid to determine billing percentage. Cost-Plus – Such as time and materials Cost-Plus with Maximum – cost-plus with established maximum © 2010 JOVACO Solutions inc. – Version 10.0.13 112 Project Cards Project Control As a first step, these types are used for information in various reports to remind those concerned how the project level should normally be billed. It does not, however, prevent another method of billing to be used. Secondly, some of these types of billing can be used to identify levels at which the project’s progress can or must be entered (see the corresponding section in the TEDI parameters). Type of revenue Enter the type of revenue recognition at this level. The majority of these types can be used by the “Recognition of revenues” (Transactions>> Recognition of revenue) function to adjust the revenues of the project according to the determined type: Labour and Expenses – Revenues are based on labour and expenses charged to the corresponding level. This type of revenue has no impact on the adjustment functions of the project’s revenue. Actual Progress – Revenues calculated are adjusted automatically based on the actual progress percentage entered by the Project Manager. Maximum Budgeted – Revenue is adjusted to the Maximum budgeted Amount. If Project Revenue amount exceeds the maximum budgeted Revenue, then the difference is considered a loss. Comprehensive - it is also the Maximum budgeted but Comprehensively for all of the project’s comprehensive sub-levels Over 90 days - in this case, reduce the revenue of the value of current work in progress which are older than 90 days from our cut-off date. Costs Progress – Revenues calculated are automatically adjusted based on the actual cost plus percentage incurred in relation to the total cost forecasted in the budget of the corresponding level. Hours Progress – Calculated revenues are automatically adjusted based on the actual hour progress percentage incurred in relation to the total amount of hours budgeted to the corresponding level. Time Progress – Revenues calculated are automatically adjusted based on the percentage of the number of days passed in relation to the number of days planned at the corresponding level. It uses a standard “S curve” to determine, under normal circumstances, the progress of the project relative to the budget based on the total hours charged to date. Service Type Enter the type of professional service provided at this level or click the lookup button to select one from the Service Types window. To enter a new service type, click on the Service Type field. The Service Type Setup window will open. Default values displayed in the fields below come from the Project Setup window (see Setup section). They can be modified for a particular level. Labour Cost Mark-up If this box is checked, the cost of the Social benefits for the resources identified as “Social benefits related” (see Resource parameters) and will be saved in the project. You can then evaluate these with or without these costs in the various monitoring reports. Overhead Mark-up Rate Indicates the mark up rate calculated on the actual labour cost. If a rate other than 0 (zero) is entered, the resource hourly rate is multiplied by this rate. Note that an accounting distribution can be generated according to the project setup conditions. © 2010 JOVACO Solutions inc. – Version 10.0.13 113 Project Cards Project Control Additional window: Social Benefits: Level 1 You may define a rate to calculate social benefits based on a specific type of hours (regular, overtime, special). This rate will take precedence over the above general rate, which has precedence over the resource rate. Percentage for the overhead mark-up A fixed overhead cost can be saved in the project. If you use it, you can then evaluate your project with or without these costs in the various monitoring reports. It should be noted that this cost is only indicative, no accounting entry is generated. If this box is checked, it will indicate that the overhead will be calculated on a labour cost percentage basis. If it is not checked, it will be calculated on a fixed amount per hour basis allocated to project. Overhead Mark-up Rate In the case of a mark-up percentage, indicate the mark up rate calculated on the actual labour cost. If a rate other than 0 (zero) is entered, the resource hourly rate is multiplied by this rate. If it does not involve a mark-up percentage, the rate indicated will be the amount by worked hour that will be allocated as overhead. If you leave this field at zero, no overhead costs will be recorded in the project. Standard Categories: if this box is checked, project, level 1 and/or 2 will use standard categories, defined in the cost Category Setup window. Otherwise, cost items must be created (Cards >> Project >> Cost Items) for each budgeted department of a Project/level 1 and/or level 2. Salary Account: if this box is checked, labour costs will be applied to a defined Salary Account in the employee card instead of the Cost Account attached to the cost category. Among other things, proceeding in this way allows you to associate a direct cost account that is different from one resource to another (for example by resource class) rather than generating all the costs in the same account. Normally, this option is used for client projects. Inter-department: if this box is checked, staff lending between departments is permitted. Otherwise, only employees from budgeted departments may charge their time to a project. © 2010 JOVACO Solutions inc. – Version 10.0.13 114 Project Cards Project Control Starting Date Enter the starting date for this Level 1 activity. Ending Date Enter the ending date for this Level 1 activity. Opening Date The project’s opening date is automatically generated when a project is created. Modification Date The date of the last modification brought to a project is automatically generated. Closing Date The closing date of a project is automatically generated. Last Evaluation Date This date is currently not used by the software. Button – User-defined Click on the button to enter data in the fields defined by the user in the project setup. Button – Level 2 Click this button to open the Project Maintenance: Level 2 window (see details below). Button – Budget Click this button to open the Budget Maintenance window (see details below). Button – Invoicing Click this button to open the Project Maintenance: Billing window (see details below). © 2010 JOVACO Solutions inc. – Version 10.0.13 115 Project Cards Project Control Project Maintenance: Level 2 (Cards >> Project >> Level 2) Once the project data is completed, and at least one Level 1 is open, it is possible to open Level 2s associated to a Level 1. 2 These levels allow you to define the branches at parent level 1, such as modifications, phases, production batches or deliverables. As long as the corresponding Level 1 is open, new Level 2s may be added. A same Level 2 can, as for Level 1, be distributed to one or more departments by clicking the BUDGET button. This button enables the Budget Maintenance window to open, where departments financially responsible for that level will be identified. Project Enter a project ID or select one from the Projects list by clicking on the lookup button. If a project ID has been entered in the Project Maintenance window and the LEVEL 1 button has been clicked, this project ID will be displayed automatically in the field and cannot be modified. Click on the Project field to open the Project Maintenance window. © 2010 JOVACO Solutions inc. – Version 10.0.13 116 Project Cards Project Control Level 1 Enter a Level 1 ID or select one from the Levels 1 list by clicking on the lookup button. If the project and Level 1 IDs have been entered in the Project Maintenance: Level 1 window and the LEVEL 2 button has been clicked, these IDs will display automatically and cannot be modified. Click on the Level 1 field to open the Project Maintenance: Level 1 window. Level 2 Enter a new Level 2 ID or select one from the Levels 2 list by clicking on the lookup button. If a new Level 2 ID has been entered, the message “Do you want to bring the information from the previous level?” is displayed. If Yes, data from the Level 1 is displayed by default in the corresponding fields. This data can be modified. Short Title Enter a name or summary description of the Level 2 (maximum 30 alphanumeric characters). Complete Title Enter a name or a detailed description of the level 2 (maximum 50 alphanumeric characters). This description is used as a description in the billing module. Status At the creation of a level, the default status is New. This is the initial status of a level to which no transaction can be applied. Once all data of a level is entered and the budget is defined, the project must be activated (Cards >> Project >> Activation) in order to apply transactions. Once the project is activated, the level 2 status changes from New to Active. The “not reconciled” status is assigned to the level as soon as a budget is updated or when a department is added. You must reactivate the project to make it active, so that resources can once again charge time. Once the level is closed, it is no longer possible to apply charges to it, but receipts and modifications can still be made. Department Enter the department in charge of the budget for this level. Once the department is entered, the Division Name will display automatically. Branch Enter the branch from which invoicing of this level will be done. Coordinator Enter the ID of the resource who is responsible for carrying out the concerned level. The coordinator identified here will see all the budgets under his responsibility within the management reports. Billing Method Reference only. Enter the billing method that applies to the project: Contract Price – Signed contract with a fixed price. Cost Only – For internal projects that are not billed to clients Cost Percentage – Uses the cost grid to determine billing percentage. © 2010 JOVACO Solutions inc. – Version 10.0.13 117 Project Cards Project Control Cost-Plus – Such as time and materials. Cost-Plus with Maximum – cost-plus with established maximum. Firstly, these types are used for information in various reports to remind those persons concerned how the project level should normally be billed. It does not, however, prevent another method of billing to be used. Secondly, some of these types of billing can be used to identify the levels at which the project’s progress can or must be entered (see the corresponding section in the TEDI parameters). Revenue Type Enter the type of revenue recognition at this level. The majority of these types can be used by the “Recognition of revenues” (Transactions>> Recognition of revenue) function to adjust the revenues of the project according to the determined type: Labour and Expenses – Revenues are based on labour and expenses charged to the corresponding level. This type of revenue has no impact on the adjustment functions of the project’s revenue. Actual Progress – Revenues calculated are adjusted automatically based on the actual progress percentage entered by the Project Manager. Maximum Budgeted – Revenue is adjusted to the Maximum budgeted Amount. If Project Revenue amount exceeds the maximum budgeted Revenue, then the difference is considered a loss. Comprehensive - it is also the Maximum budgeted but comprehensively for all the project’s comprehensive sub-levels Over 90 days - in this case, reduce the revenue of the value of current work in progress which is older than 90 days from our cut-off date. Costs Progress – Revenues calculated are automatically adjusted based on the actual cost plus percentage incurred in relation to the total cost forecasted in the budget of the corresponding level. Hours Progress – Calculated revenues are automatically adjusted based on the actual hour progress percentage incurred in relation to the total amount of hours budgeted to the corresponding level. Time Progress – Revenues calculated are automatically adjusted based on the percentage of the number of days passed in relation to the number of days planned at the corresponding level. It uses a standard “S curve” to determine, under normal circumstances, the progress of the project relative to the budget based on the total hours charged to date. Service Type Enter the type of professional service that will be provided for this level or click the lookup button to select one from the Service Type window. To enter a new service type, click on the Service Type field. The Service Type Setup window will open. Default values displayed in the following fields come from the Project Setup window (see the Setup section). They can be modified for a particular level. Labour Cost Mark-up If this box is checked, the resources’ social benefits will be identified as “Eligible for Social Benefits” (See Resource paramenters) and will be saved as costs in the project. You can then evaluate these with or without these costs in the various monitoring reports. © 2010 JOVACO Solutions inc. – Version 10.0.13 118 Project Cards Project Control Overhead Mark-up Rate Indicates the mark up rate calculated on the actual labour cost. If a rate other than 0 (zero) is entered, the resource hourly rate is multiplied by this rate. Note that the accounting distribution can be generated according to the project setup conditions. Additional window: Social Benefits: Level 2 You may define a rate to calculate social benefits based on a specific type of hours (regular, overtime, special). This rate will take precedence over the above general rate, which has precedence over the resource rate. Percentage for the overhead mark-up A fixed overhead cost can be saved in the project. If you use it, you can then evaluate your project with or without these costs in the various monitoring reports. It should be noted that this cost is only indicative, no accounting entry is generated. If this box is checked, it will indicate that the overhead will be calculated on a labour cost percentage basis. If it is not checked, it will be calculated on a fixed amount per hour basis allocated to project. Overhead Mark-up Rate In the case of a mark-up percentage, indicate the mark up rate calculated on the actual labour cost. If a rate other than 0 (zero) is entered, the resource hourly rate is multiplied by this rate. If it does not involve a mark-up percentage, the rate indicated will be the amount by worked hour that will be allocated as overhead. . If you leave this field at zero, no overhead fee will be recorded in the project. Standard Category: if this box is checked, standard categories as defined in the cost Category Setup will be used by projects, Level 1s and/or Level 2s. Otherwise, specific cost items must be created (Cards >> Project >> Cost Items) for each budgeted department of a project, level 1 and/or level 2. Salary Account: if this box is checked, labour costs will be charged to the salary account defined in the employee card rather than to the cost account attached to the cost category. Among other things, proceeding in this way allows you to associate a different direct cost from one resource to another (for example by resource class) rather than to generate all the costs in the same account. Normally, this option is used for client projects. © 2010 JOVACO Solutions inc. – Version 10.0.13 119 Project Cards Project Control Inter-department: if this option is checked, staff lending between departments is permitted. If the option is not checked, only employees from budgeted departments at the corresponding level may charge their time in the project. Starting Date Enter the starting date of an activity at this Level 2. Ending Date Enter a closing date of an activity at this Level 2. Closing Date The closing date of a project is automatically generated when a project is created. Modification Date The closing date of the last modification brought to the project is automatically generated. Last Evaluation Date This date is currently not used by the software. Closing Date The closing date of a project is automatically generated. User-Defined Button Click on this button to enter data in the fields defined by the user in the project setup. Budget Button Click on this button to open the Budget Maintenance window. Invoicing Button Click on this button to open the Project Maintenance: Billing window (see details). © 2010 JOVACO Solutions inc. – Version 10.0.13 120 Project Cards Project Control Budgets (Cards >> Project >> Budgets) This feature identifies departments and project managers financially in charge of a specific budget of the corresponding level and see the total value of the budget which is allocated to them. Project Enter a project ID or select one from the Projects list by clicking the lookup button. Click the Project field to open the Project Maintenance window. Level 1 Enter a Level 1 ID or select one from the Levels 1 list by clicking the lookup button. Click the Level 1 field to open the Project Maintenance: Level 1 window. Level 2 Enter a level 2 or select one from the Levels 2 list by clicking the lookup button. Click the Level 2 field to open the Project Maintenance: Level 2 window. Budgets already entered for this level 1 and/or level 2 are displayed in the box. To modify a budget, select the line and click the expand button in the Department field. The Budget Detail Maintenance window will open where modifications can be made. © 2010 JOVACO Solutions inc. – Version 10.0.13 121 Project Cards Project Control If the BUDGET button has been clicked from the Project Maintenance : Level 1 window or from the Project Maintenance : Level 2 window, the project, level 1 and 2 IDs will display automatically and cannot be modified. Budget data attached to this level 1 and/or level 2 will also be displayed. These can be modified by selecting a line and clicking the expand button from the Department field. Click the NEW button to affect a budget to a department displayed in the previous window. Button – New Click the NEW button to access the Budget Detail Maintenance window. You can assign a budget to a new department. NOTE: If no budget has been defined when the corresponding project level, level 1 and/or level 2, is created, the message "Do you want to reset the budget?" will be displayed. If Yes, a budget line with all amounts at zero will be added to the Budget Maintenance window for the department defined at this corresponding level. The default date will correspond to the current date and the status will be New. To modify this line, select it and click the expand button in the Department field. This will open the Budget Detail Maintenance window. If the budget is not reset, no line will be added to the Budget Maintenance window. To add lines to the budget from the Budget Detail Maintenance window, click on the NEW button. The status of budgeted departments shown in the Budget Management window affects the status of the corresponding level (see the Project Management function). If, for a level whose status is Active, you make a modification to the amounts of budgets in the Budget Details Management window, the status of the level goes from Active to Not Reconciled. So that the level is again Active and that charges are reauthorized, you must activate the project again. © 2010 JOVACO Solutions inc. – Version 10.0.13 122 Project Cards Project Control Budget Detail Maintenance (Cards >> Project >> Budgets >> Button New) This feature allows for a department’s budget lines in a given project to be added or modified. Project Enter a project ID or select one from the Projects list by clicking the lookup button. If a project ID has been entered in the Budget Maintenance window and the NEW button has been clicked, the project ID will display automatically in this field and it cannot be modified. Click the Project field to open the Project Maintenance window. Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking the lookup button. If project and level 1 IDs have been entered in the Budget Maintenance window, and the NEW button has been clicked, these IDs will be displayed automatically and cannot be modified. Click the Level 1 field to open the Project Maintenance: Level 1 window. © 2010 JOVACO Solutions inc. – Version 10.0.13 123 Project Cards Project Control Level 2 If available, enter a level 2 ID or select one from the Levels 2 list by clicking the lookup button. If project, level 1 and level 2 IDs have been entered in the Budget Maintenance window and the NEW button has been clicked, the IDs will be displayed automatically and cannot be modified. Click the Level 2 field to open the Project Maintenance: Level 2 window. Department Enter the Department ID of the department in charge of performing the work, or select one from the Department list by clicking the lookup button. The corresponding costs and revenues are chargeable to this department. Click the Department field to open the Department Setup window. Project Manager Enter the project manager ID responsible for performing the work in the department entered above. Click the Project Manager field to open the Resource Setup window. Date Enter the budget authorization date. Budget Type Enter the budget type: Initial – budget initially approved by the client Subsequent Modification –budget modifications that have been approved by the client Proposal - these are budget requests submitted to the client. This type of budget will not be shown in the monitoring reports. It is only informative and can record in the project the value initially proposed for analysis. Estimation - this is a budget estimate that has not yet been submitted to the client. This type of budget will not be shown in the monitoring reports. It is only informative and can save the initially estimated value for analysis to the project. History – past annual budgets for projects managed by cost only Project Cost, Fees Revenue, Other Revenue, Hours Budgeted Enter the budgeted amount for the project/level 1/level 2 and department. It is important to note that the Revenue Budget should be entered in the Invoicing Currency. You can enter a reference pertaining to the line of the budget. For example, a customer purchase order ID can be entered. Space is limited to 30 characters. © 2010 JOVACO Solutions inc. – Version 10.0.13 124 Project Cards Project Control Project Copy (Cards >> Project >> Project Copy) To accelerate project creation, levels and budgeted departments can be copied from a project (FROM) to another project (TO). If the Cost Item box is checked, cost items associated to the source level are created automatically in the destination project (TO). If the Invoicing box is checked, billing terms for invoicing source level are also copied into the destination level. However, it is unnecessary to copy the cost items if the destination level should use the standard categories. COPY FROM Project Enter a project ID or select one from the Projects list by clicking the lookup button. COPY TO Project Enter a project ID or select one from the Projects list by clicking the lookup button. © 2010 JOVACO Solutions inc. – Version 10.0.13 125 Project Cards Project Control Click the Mark All button to select all levels and all departments. Click Unmark All to deselect all. Levels and departments may be selected individually by checking the corresponding boxes. Cost Item Check this box to copy cost items from levels that will be copied, if the destination levels do not use the standard categories. Invoicing Check this option to copy the billing terms specific to the level of origin (FROM). If the box is unchecked, the destination project’s billing conditions will be applied to the new copied level(s). Use destination project’s department Check this box if you want the department to be that of the destination project instead of the original project/level. By default, the box is checked or unchecked according to the selection corresponding to the project parameters. Use source parameters Check this box is you would like to you the default setup (check the different boxes for the level and window corresponding to invoice management) the elements configured in level 1/level 2 from the source rather than those defined in the project. The system does not refer to the invoicing methods in this procedure. By default, this box is checked or unchecked accroding to the corresponding selection within the project setup. *** IMPORTANT *** The level description, level 1 and 2 ID as well as the department ID and Project Manager can be modified. The budget for each level or department can also be entered. When you click the COPY button, the selected levels are created according to the configurations of the copy. © 2010 JOVACO Solutions inc. – Version 10.0.13 126 Project Cards Project Control Project Estimate (Cards >> Project >> Project Estimate) This feature is used to estimate costs, and if applicable, the billable value of a project. Project Level 1 Level 2 Department Category Enter the project ID. Enter the level 1 ID. Enter, if applicable, the level 2 ID. Enter the department in charge of portion of the budget for the project / level. When a project’s budget is generated in detail or by cost category, the category to be estimated must be entered. Estimation Enter the estimation element of the project/ level/ department, and if applicable, the category with a relevant description. Consequently it is possible to define at least one estimation element, as well as an unlimited number of elements, for each project, level and department. Type The cost type (1 to 8) must be identified. Resource For type 1 (Labour), it is an employee or contractual employee ID; for type 2 (Internal fees), it is a physical resource ID; for type 3 to 7, it is a vendor ID; for type 8, it is an inventory item ID. For type 1 (Labour), it is possible to identify a human resource class instead of a resource. It is possible to identify at all time an estimated start date for the estimation element. It is possible to identify at all time an estimated end date for the estimation element. Class Start End © 2010 JOVACO Solutions inc. – Version 10.0.13 127 Project Cards Day/Week Day/Total Project Control Qty/Hrs It is possible to indicate the number of days per week that is expected. From the number of Day/Week and the start and end date, the total number of days is then calculated and can be modified. For type 1, enter a number of hours. For other types, enter a quantity. Rate Cost Billable Enter the unit cost rate. Enter the billable unit rate. Budget Total Cost Billable The amount displayed in this window will come from the Budget Maintenance / Budget Detail Maintenance and corresponds to the addition of the columns Fee revenue and Other Revenue. The total cost is calculated according to a quantity or number of hours and corresponding cost rate. The billable total is calculated according to a quantity or number of hours and corresponding billable rate. However it is possible to enter the total billable amount, in which case the billable unit rate would be recalculated according to this total billable amount. © 2010 JOVACO Solutions inc. – Version 10.0.13 128 Project Cards Project Control Cost Items (Cards >> Project >> Cost Items) If you do not want to use standard cost categories for a particular project, specific cost categories can be created for the corresponding level from this window. The information required is the same as defined in the Category Setup feature, except here, instead of being general, the information is specific to a project/level/department. A cost item corresponds to a cost category assigned to a particular project. Unlike the Cost Categories, a cost item is connected to a specific project. A complete list of cost items of a project is the equivalent of a complete project description of the work and costs relating to it. Project Enter a project ID or select one from the Projects list by clicking the lookup button. © 2010 JOVACO Solutions inc. – Version 10.0.13 129 Project Cards Project Control Click on the Project field to open the Project Maintenance window. Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking on the lookup button. Click on the Level 1 field to open the Project Maintenance: Level 1 window. Level 2 Enter a level 2 ID or select one from the Levels 2 list by clicking on the lookup button. Click on the Level 2 field to open the Project Maintenance: Level 2 window. Department Enter the department ID or select one from the Budget Departments list by clicking the lookup button. Click on the Department field to open the Department Setup window. Category Enter the category ID or select one from the Categories list by clicking on the lookup button. Click on the Category field to open the Category Setup window. Description Enter or modify the description for this cost item (maximum 50 characters). The field is optional. Group ID For customized report purposes, you can select an ID grouping of categories. This ID must be defined prior in the function Cost Category Groups. Inactive Check this box if you want to have the cost item inactive so that employees will not be allowed to allocated time and expenses to this cost item. © 2010 JOVACO Solutions inc. – Version 10.0.13 130 Project Cards Project Control Cost Type Enter a cost type ID (1 to 9) corresponding with a category or click the lookup button to select one from the Cost Type Setup window (Tools >> Setup >> Project -- Cost Type button) Type For all cost types other than labour, indicate if it is an amount or unit. If the cost type entered is labour, this field is greyed and not available. Unit Rate If the type entered corresponds to unit, indicate the reimbursement rate by unit granted to the employee. If it is another type, this field is greyed and not available. Hours Type If the cost type entered is labour, indicate the hours type attached to this category. Eight options are available by default: Regular, Overtime, Special, Sick, Holiday, Vacations, Hours Bank (at regular rate), Overtime Bank (at overtime rate). You can also associate categories to the types of bonuses defined in the configuration window of the defined fields. For all cost types other than labour, this field is greyed and not available. Unit This field enables the definition of the unit of measure used: hour, kilometre, dollar, etc. (maximum 5 characters). This field is optional. TEDI Warning Message You can associate a warning to a standard category so that it is displayed in TEDI at the time of a charge. This warning will be displayed in the language used by TEDI. This warning is only informational, it does not trigger validation. Revenue Account An account must be entered in this field for all cost types other than labour. The division and department attached to a category do not affect the choice made in this field; when a category is used in a level, the system will generate the division and department from departments defined in the budgets of that level. Cost Account This field is mandatory. For the labour type, this account is used if, in the project card (the Project Maintenance, Project Maintenance: level 1, Project Maintenance: level 2 windows), the Salary Account option is unchecked. *** Important *** The productivity ID is no longer used in processing the accounting entry of the labour transaction. Thus, even if your productivity is not identified as billable, the cost account will be within the parameters of the resource if the salary account box is checked. Employee Benefits Account This account is used if, in the project card (Project Maintenance, Project Maintenance: level 1, Project Maintenance: level 2 windows), the Standard Categories and Salary Account options are unchecked. Inter-department Cost: © 2010 JOVACO Solutions inc. – Version 10.0.13 131 Project Cards Project Control Mark-up Account: enter the expense account generated by the application of the mark-up when stafflending rate is over 1. This account is used if, in the project level, you checked the Standard Categories box and you have not checked the Salary Account box. Employee Benefits Account: enter the distribution accounts for employee-benefits expenses generated by staff-lending. This account is used if, in the project level, you checked the Standard Categories box and you have not checked the Salary Account box. Productivity ID This field is mandatory for the labour type. The productivity ID associated with the cost item must be entered. Tax Schedule Number This field is mandatory for all cost types other than labour and enables the association of a tax schedule to a category. Taxes will be extracted automatically by the system when charging an expense statement. In terms of transactions from the procurement module, taxes will be calculated according to the tax schedule associated with the supplier. You can associate several tax schedules to the same cost item with a cost type greater than 3. To do this, click on the arrow to access the additional “tax schedule allocation” window and insert schedules that can be used for transactions which will be charged to the category. Employees can thus themselves enter the tax schedule through TEDI which must be applied to their expense (according to where the expense was made). If no tax schedule is entered into the tax schedule allocation window, only the default will be applied and employees cannot change the value. © 2010 JOVACO Solutions inc. – Version 10.0.13 132 Project Cards Project Control *** Important *** On the time sheet, only the description of the tax schedule is shown. Make sure you have representative descriptions for your employees (Quebec vs. CTI-RTI Km) Pay ID You can assign a pay ID to a specific expense type category (cost type = 4). This change allows for processing an expense as taxable (e.g. the bonus payment through the expense statements) or if you are using a different Pay ID than anticipated within that resource class for the hour type for that item . If no pay ID is associated with the category, the one configured to the employee’s class will be used. Budget (Billable, Cost, Hours/Qty) Amounts corresponding to a project, level 1, level 2, department and cost item, and entered in the Cost Items Budget Maintenance window are displayed, if the project is configured to use detailed budgets. Project to date (Billable, Cost, Hours/Qty) Transaction amounts to date corresponding to a project, level 1, level 2, department or cost item are displayed. Last Evaluation Date This date is currently not used by the software. When the cost item of a level is used, the system will generate the division and department from departments defined in the budgets. © 2010 JOVACO Solutions inc. – Version 10.0.13 133 Project Cards Project Control Cost Items Copy (Cards >> Project >> Cost Items Copy) This feature enables the copying of cost items (cost categories defined specifically for a project) from a project level (FROM) to another level (TO) inside a same project or from one project to another. COPY FROM Project Enter a project ID or select one from the Projects list by clicking the lookup button. Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking the lookup button. To select all level 1s defined for the project, check the option All. Level 2 Enter a level 2 or select one from the Levels 2 list by clicking the lookup button. To select all level 2s defined for the project and level 1s, check the option All. Department Enter a department ID or select one from the Department list by clicking the lookup button. To select all departments defined for the project, level 1s and 2s, check the option All. Category Enter the category ID or select one from the Categories list by clicking the lookup button. It is possible to copy only one category by entering the same ID in both fields. To copy a range of categories, enter the starting category ID and the ending category ID. To select all categories defined for the project, level 1s, 2s and departments, check the option All. © 2010 JOVACO Solutions inc. – Version 10.0.13 134 Project Cards Project Control COPY TO Project Enter a project ID or select one from the Projects list by clicking the lookup button. Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking the lookup button. To select all level 1s defined for the project, check the option All. Level 2 Enter a level 2 ID or select one from the Levels 2 list by clicking the lookup button. To select all level 2s defined for the project and level 1s, check the option All. Department Enter the department ID or select one from the Department list by clicking the lookup button. To select all departments defined for the project, level 1s and 2s, check the option All. Copy Budgets Check this box to copy budgets from selected projects and departments. Once the FROM fields are filled out, click the REFRESH button to display in the selection box data corresponding to the selected options. It is possible to select only a few categories to copy or to select all by clicking the Choose All button. The hide and display buttons enable the hiding or viewing of the category/cost item description. © 2010 JOVACO Solutions inc. – Version 10.0.13 135 Project Cards Project Control Budgets – Cost items (Cards >> Project >> Cost Items - Budgets) This window allows entry of cost item budgets once the cost items have been created. If, at project creation, the option Detailed (by category) was selected in Budget Type, the budgets of each department implicated in the project must be detailed by category/cost item. The activation process will verify if a budget in balance with categories of related departments. Project Enter a project ID or select one from the Projects list by clicking the lookup button. Click on the Project field to open the Project Maintenance window. Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking the lookup button. Click on the Level 1 field to open the Project Maintenance: level 1 window Level 2 Enter a level 2 ID or select one from the Levels 2 list by clicking the lookup button. Click on the Level 2 field to open the Project Maintenance: Level 2 window. Department Enter the department ID in charge of accomplishing the work or select one from the Budget Departments list by clicking the lookup button. Corresponding costs and revenues are chargeable to that department. © 2010 JOVACO Solutions inc. – Version 10.0.13 136 Project Cards Project Control Click on the Department field to open the Department Setup window. Budgets The total amounts corresponding to a project, level 1, level 2 and department entered in Budget Maintenance Detail are displayed. These totals don’t include amounts for which the budget type is Proposition or Estimate. The first box contains totals from the Fees Revenue and Other Revenue, the second box contains totals from the Project Cost field and the third box contains the totals from the Hours Budgeted field. If clicked, the Budgets field will open the Budget Maintenance window. You must indicate for each category, the budget (cost, billable and/or hours) associated with it. Upon activation, the sum of the budgets of the categories must be equal to the budget of the concerned level/department. Button – Update Click on this button Update to update the budget of the corresponding budget. © 2010 JOVACO Solutions inc. – Version 10.0.13 137 Project Cards Project Control Fees Specific Rate (Cards >> Project >> Fees Rate) Use this function to define invoicing rates of specific fees for a project and/or level. They are mainly used to manage exceptions to existing billing methods. Thus, a project/level can be configured to use a billing method and you can define specific rates for certain exceptions. Specific rates take precedence over the other parameters used to calculate the billable value. If this rate can be applied to more than one project from a same client, it is best to define a billing method rather than define specific invoicing rates, since a modification of the agreement with a client requires a modification to the corresponding specific rates. This window enables the definition of invoicing rates, such as those from Fees Invoicing Method Setup window, except the rates apply exclusively to a project and level(s) for which they have been defined. Project Enter a project ID or select one from the Projects list by clicking the lookup button. Click on the Project field to open the Project Maintenance window. © 2010 JOVACO Solutions inc. – Version 10.0.13 138 Project Cards Project Control Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking the lookup button. Click on the Level 1 field to open the Project Maintenance: Level 1 window. Level 2 Enter a project ID or select one from the Levels 2 list by clicking the lookup button. Click the Level 2 field to open the Project Maintenance: Level 2 window. Boxes to check: Whole Level 1, Whole Level 2 Check the option Whole Level 1 and/or Whole Level 2 to apply specific invoicing rates to all level 1s and/or level 2s. If the Whole Level 1 box is checked, the specific rate(s) will apply to the whole project. The Whole Level 2 box will apply the specific rate(s) to all daughter levels of the specified Level 1. Class Enter the ID or click the lookup button to select one from the Class list to identify the employee class affected by specific invoicing rates, when the rates have been established by employee class. Resource Enter the ID or click the lookup button to select one that identifies the resource affected by specific invoicing rates when the rates have been established per employee. Category Enter the ID or click the lookup button to select a category ID for which the specific rate for fees invoicing is applicable or leave the field blank to apply it by default to all categories. Type Select the type associated to the specific rate for fees invoicing: Invoicing Basis Unit Cost In the case of a cost-plus invoicing, if this type is selected, enter a unit cost, other than the actual costs, in the Regular, Overtime and/or Special fields, which will serve to calculate invoicing rates according to the mark-up rate defined for the project. Monetary Mark-up The monetary mark-up is calculated by adding the rate paid to an employee, the employee benefits rate defined in an invoicing method and the fixed mark-up rate determined by the user. Restated Annual Salary In the case of a cost-plus invoicing, if this type is selected, the employee’s hourly rate is multiplied by the number of Annual Hours (entered in the Resource Setup window) and divided by the Time Basis to determine the invoicing rate according to the mark-up rate specified in the Regular field. If there is no mark-up rate, the system will calculate from the mark-up rate specified at the project level. If there is a mark-up rate in both places, the mark-up rate defined in billing methods takes precedence. Invoicing Unit Rate In the case of a billing at invoicing unit rate, if this type is selected, enter a billable hourly rate in the Regular, Overtime and/or Special fields. Regular, Overtime, Special If you have selected a Unit Rate type of invoicing, enter the billable rate for regular, overtime and special hours. If you have selected the Adjusted Annual Salary, you may create a specific markup (other than those entered into the project). © 2010 JOVACO Solutions inc. – Version 10.0.13 139 Project Cards Project Control Hourly Basis If you have selected Adjusted Annual Salary, enter the base rate by hour which will be used to calculate the billable rate. Field only attached to the Adjusted Salary Type Rounding If this box is checked, the calculated cost rate will be rounded to the next 5 cents (5¢). Maximum This field is mandatory if the Adjusted Annual Salary function is used and this will allow you to determine the maximum hourly rate before markup. Specify a rate of 99999 if there is no maximum. Social Benefits Enter the percentage of the hourly rate before markup dedicated to social benefits. Specific Class This field will affect an employee of a class which differs from their original class for this particular invoicing method. This configuration will then all you to enter in the invoice, a different resource class (ex.: your resource is affected at the “Construction” class but you would like to display them within the “Technician” class). Specific ID This field will affect the resources with an identification specific to invoicing and replaces the resource code in the invoicing module. Fixed rate In the case of a definition of base unit cost or adjusted annual salary, used to set a cost plus billing rate, it is possible to add a fixed mark up amount over the stipulated mark-up factor. Regular ID, Overtime ID, Special ID You may configure a reference number specific to the type of hours entered by your resources. This reference could be used within modified transaction reports or within personalized invoice templates. Regular Cost, Overtime Cost, Special Cost If you have checked the box “Paid Cost” you need to enter the fields Cost Rates anticipated for each type of hours used. The resources are identified by the invoicing method (via the class or their resource number) they will be then paid at this rate rather than the predetermined earnings code within the Payrroll module. Paid Cost If this box is checked, the hourly rate predetermined within the Regular Cost, Overtime Cost and Special Cost fields will be used as the base salary for the resources identified by this method. This option will take precedence over the predetermined rates within the Payroll module and/or by the Resource Card. (Project>Setup>Project>Resource). ***Important*** If the box Paid Cost is checked and the value of the Regular Cost, Overtime Cost and Special Cost field is zero (0.00), this value would be used as the cost rate for the transactions affected. Therefore, the resources will not be paid for the hours entered when using these parameters. Display/Hide Button © 2010 JOVACO Solutions inc. – Version 10.0.13 140 Project Cards Project Control You may use the Display/Hide button, placed on the right hand side to scroll through the window, to view the addition details available. By default, only the first line is displayed. © 2010 JOVACO Solutions inc. – Version 10.0.13 141 Project Cards Project Control Expense Specific Rate (Cards >> Project >> Expense Rate) Use this function to define the billing rates of specific expenses to a project and/or level. They are mainly used to manage exceptions to existing billing methods. Thus, a project/level can be configured to use a billing method and you can define specific rates for certain exceptions. Specific rates take precedence over the other parameters used to calculate the billable value. If these rates can be applied to more than one project of a same client, it is preferable to define a billing method rather than specific invoicing rates. This window allows billing rates to be defined, as in the Expense Invoicing Method Setup window, except these rates applied exclusively to a project and levels for which they have been defined. © 2010 JOVACO Solutions inc. – Version 10.0.13 142 Project Cards Project Control Project Enter a project ID or select one from the Projects list by clicking the lookup button. Click the Project field to open Project Maintenance window. Level 1 Enter a level 1 ID or select one from the Levels 1 list by clicking the lookup button. Click the Level 1 field to open the Project Maintenance: Level 1 window. Level 2 Enter a level 2 ID or select one from the Levels 2 list by clicking the lookup button. Click the Level 2 filed to open the Project Maintenance: Level 2 window. Boxes to check: Whole Level 1, Whole Level 2 Check the Whole Level 1 and/or Whole Level 2 box to apply these specific invoicing rates to all level 1s and/or level 2s of the project. If the Whole Level 1 box is checked, the specific rate(s) will apply to the whole project. The Whole Level 2 box will apply the specific rate(s) to all daughter levels of the specified Level 1. Category Enter or click the lookup button to select the category ID for which specific expense invoicing rates are applicable, or leave the field blank to apply the rates by default to all categories. Type Select the type attached to the expense invoicing rates: Mark-up Rate If this type is selected, enter a rate to increase the cost applied; for example, a mark-up rate of 1.05 will correspond to 105% of the cost applied. Invoicing Unit Rate If this type is selected, enter an invoicing unit rate to calculate the corresponding billable value; for example, a 0.35 rate will correspond to 35 cents (¢35) per unit charged. Paid If this box is checked, the cost rate will be used to calculate the amount to be paid to the resource. This rate will allow you to pay the resources at a different rate from that provided by the standard category. Billing Rate If Mark-up Rate has been selected in the Type field, enter the rate to be used to establish the mark-up percentage. If Invoicing Unit Rate has been selected in the Type field, enter a rate to calculate a billable value by unit. Cost Rate A cost rate may be entered for use in calculating the billable amount. If the cost paid box [is checked], the rate will also determine the amount to be paid to resources. © 2010 JOVACO Solutions inc. – Version 10.0.13 143 Project Cards Project Control Regular ID You may configure the reference number to expense category that is being used. This reference could be used within modified reports on transactions or within templates for personalized invoices. Gross Amount Check the Paid box to indicate that calculation has been done on the amount including taxes. If the box is not checked, the calculation is done on the cost amount (before taxes). © 2010 JOVACO Solutions inc. – Version 10.0.13 144 Project Cards Project Control Internal Expense Specific Rate (Cards >> Project >> Int. Expense Rate) Use this feature to define internal expense rates specific to a project and/or level. They are mainly used to manage exceptions to existing billing methods. Thus, a project/level can be configured to use a billing method and you can define specific rates for certain exceptions. Specific rates take precedence over the other parameters used to calculate the billable value. If these rates can be applied to more than one project of a same client, it is preferable to define a billing method rather than specific invoicing rates. This window allows invoicing rates to be defined, as in the Internal Expense Methods Setup window, except here, rates are applied exclusively to a project and levels for which they have been defined. © 2010 JOVACO Solutions inc. – Version 10.0.13 145 Project Cards Project Control Project Enter a project ID or select one from the Projects list by clicking the lookup button. Click the Project field to open the Project Maintenance window. Level 1 Enter a level 1 ID or select one from the Level 1 list y clicking the lookup button. Click the Level 1 field to open the Project Maintenance L Level 1 window. Level 2 Enter a level 2 ID or select one from the Level 2 list by clicking the lookup button. Click the Level 2 field to open the Project Maintenance: Level 2 window. Boxes to check: Whole Level 1, Whole Level 2 Check the Whole Level 1 and/or Whole Level 2 box to apply invoicing rates specific to all level 1s and/or level 2s of a project. If the Whole Level 1 box is checked, the specific rate(s) will apply for the whole project. The Whole Level 2 box will apply the specific rate(s) to all daughter levels of the specified Level 1. Resource Enter or click the lookup button to select a ID of a material resource affected by the specific invoicing rates. Type Click the Resource field to open the Resource Setup window. Select the internal expense type from the following three choices: Equipment, Test, and Internal Expense. Category Enter a category ID for which the specific internal expense rates apply, or leave the field blank to apply the rates by default to all categories. Type Select the type attached to specific internal expenses rates: Mark-up Rate: If this type is selected, enter a rate increasing the cost applied; for example, a mark-up rate of 1.05 will correspond to 105% of the cost applied. Invoicing Unit Rate: If this type is selected, enter a unit rate to calculate the corresponding billable value; for example, a 0.35 rate would correspond to 35 cents (¢35) per unit charged. Paid If this box is checked, the cost rate will be used to calculate the costing. Billing Rate If Mark-up Rate is selected in the Type field, enter the rate that will used to establish the mark-up percentage. © 2010 JOVACO Solutions inc. – Version 10.0.13 146 Project Cards Project Control If Invoicing Unit Rate is selected in the Type field, enter a rate to calculate the billable value by unit. Cost Rate A cost rate may be entered for use in calculating the billable rather than the rate provided in the resource sheet. If the Paid Cost box is checked, this rate will also be counted as cost. Regular ID You may configure the reference number to expense category that is being used. This reference could be used within modified reports on transactions or within templates for personalized invoices. © 2010 JOVACO Solutions inc. – Version 10.0.13 147 Project Cards Project Control Project Activation (Cards >> Project >> Projects – Activation) Activation allows the project status to change from New or Not Reconciled to Active. To enter or apply transactions to a project, it must first be activated. This feature also verifies the budget type in the Project Maintenance window, when the type defined is Detailed (by category), to see whether budgets entered are in balance. If they are not, the project status will not be changed to Active. Budgets must be detailed by category/cost item and consistent with data entered in the Budget Maintenance window. Project Enter a project ID or select one from the Projects list by clicking the lookup button. Click on the Project field to open the Project Maintenance window. The short title is displayed as well as the full title, if available. Click on the ACTIVATION button. A message will notify that activation was successful once the process is completed. © 2010 JOVACO Solutions inc. – Version 10.0.13 148 Project Cards Project Control Closing/ Re-opening Projects (Cards >> Project >> Project – Closing) This feature allows a project to be closed. A project can be closed in part (only certain levels or departments) or in full. Once close, it is no longer possible to charge costs to the project or level, but it remains possible to make invoices, receipts and bring modifications to it. A closed project/level can be reopened through this feature in order for costs to be applied again. Closing/Re-opening Click the option box corresponding to your choice: Closing or Re-opening a project/level/department. Effective Date This date is only informative. Project Enter a project ID to be closed or re-opened, or select one from the Projects list by clicking the lookup button. Level 1, Level 2, Department Click the option All to select all level 1s, all level 2s and/or all departments attached to the project. Click the other option to select only one level 1 and/or level 2 and/or department to close or re-open. Process All Check this option box to select at once all level 1s, all level 2s and all departments attached to the project. © 2010 JOVACO Solutions inc. – Version 10.0.13 149 Project Cards Project Control Details Click this button to open the Project Closing/Re-opening – Detail window from which one or more levels/departments can be selected to be opened/closed. If the option All in the previous window has been checked, the selection box will show all level 1s, level 2s and departments attached to the project as well as their status. Check the lines to be closed/re-opened. Once the selection is done, click the OK button. In the Project Closing – Re-opening window, click the APPLY button to launch the process. Once finished, a message will be displayed to notify that the process has been successfully completed. © 2010 JOVACO Solutions inc. – Version 10.0.13 150 Project Cards Project Control Master Projects (Cards – Project – Master Projects) This function allows you to group several projects in order to produce reports as if it was one, unique project. See Reports – Control Master Projects. You can use this function to follow a framework contract or to split up a major project into several projects. Master Project Enter the Master Project ID, in other words an ID that will represent the group of projects. Description Enter the description of the master project Customer Enter the customer ID. This ID is used to diminish the number of projects displayed in the Project search window. You can still select projects that do not belong to this client. This field is not mandatory. Project Executive Project Type Enter the ID of the resource responsible for the master project. Enter the Project Type ID. Project Enter or select, with the magnifying glass, each of the projects that will be grouped in this master project. © 2010 JOVACO Solutions inc. – Version 10.0.13 151 Project Transactions Project Control TEDI Transactions © 2010 JOVACO Solutions inc. – Version 10.0.13 152 Project Transactions Project Control TEDI Transfer (Transactions >> Project >> Time v.4 Transfer) The TEDI transfer function allows you to transfer completed timesheets and expense reports for a period in order to post them. This function allows you to calculate the costs, billable, and if applicable, the tax credits on the expenses from the staff. Note also that all lines of time sheets that have been “Modified after transfer” will be transferred to the specified batches even if they are of an earlier period(s) than the specified period to be transferred. Batch ID Timesheets If the To Transfer is checked, the timesheet transaction batch ID needs to be entered. Expenses If the To Transfer is checked, the expense transaction batch ID needs to be entered. Int. Expenses If the To Transfer is checked, the internal expense transaction batch ID needs to be entered. Period Of To Enter the date of the first period to transfer. Enter the date of the last period to transfer. © 2010 JOVACO Solutions inc. – Version 10.0.13 153 Project Transactions Project Control Selection of All Selected Check this button if you want to transfer transactions of all employees. Check this button if you want to transfer transactions of a specific employee. You must indicate which employee you wish to transfer in the field provided. Group Check this button if you want to transfer transactions of a group of employees. (See TEDI Groups.) You must indicate which group you wish to transfer in the field provided for this purpose (Employee). Employee If you have selected to transfer either the transactions of a specific employee or a group of employees, indicated the employee ID or the group ID. Include Transferred Timesheets Check this box if you wish to transfer again transactions that have been transferred and that you have removed before posting. If you have already posted these transactions, you risk posting them a second time. Detail During the transfer, the project allocated lines in TEDI are normally summarized (totalled) by period. Keep this box checked if you want to have the selected projects (see Project Maintenance: Invoicing) to be transferred in detail (day by day). In Detail For All Projects Check this box if you want to transfer and post all projects in detail (day by day). This option can be very useful at month or year end. Include the sheets pending approval Check this box if you want to transfer the time sheets and expense statements even if they are pending approval. Normally, only the time sheets and expense statements in the “Completed” status (after approval) could be transferred. Approvals may be completed by the persons concerned after the transfer. © 2010 JOVACO Solutions inc. – Version 10.0.13 154 Project Transactions Project Control Import to TEDI (Transactions >> Project >> Import to TEDI) This function allows you to import timesheets in TEDI, from Comma Separated Values or Tab Delimited text files. The text file must correspond to the following format: File Resource Date Project L1 L2 Department Category Quantity Amount Reference Data Type Resource Number Date of day – by work day Project Level 1 Level 2 Department Category Number of hours or Quantity of kilometres or expenses Amount of the expense to be reimbursed plus taxes Description of the activity 15 Date 15 10 10 10 10 Whole numbers with 2 decimals Whole numbers with 2 decimals 30 The figure that appears in the Data Type column corresponds to the number of alphanumeric characters permitted. The date must correspond to the date of the day and not to the date of the period. The date must be entered according to the format yyyy-mm-dd. The period date is automatically calculated at the moment of importation. Status – Completed or Not Completed Select which status you want the sheets to be in after the import. Once imported, they must be transferred according to the normal TEDI Transfer procedure. File format Select how the columns are delimited in your text file (with commas or tabs). © 2010 JOVACO Solutions inc. – Version 10.0.13 155 Project Transactions Project Control Time & Expense Journal Transfer (Transactions >> Project >> Time & Expense Journal Transfer) The function Journal Transfer within the Time & Expense module allows the transfer within Project Control and Payroll and the completed time & expenses through the daily mass entry application (and not through TEDI). This function allows you to calculate the costs, what is billable and if applicable, tax credits on expenses. Batch Number Timesheet Expenses Internal Cost Period From To If the box Transfer To is checked, a batch ID for the timesheet transactions must be entered. If the box Transfer To is checked, a batch ID for expenses transactions must be entered. If the box Transfer To is checked, a batch ID for internal cost transactions must be entered. Enter the first day within the transfer. Enter the last day within the transfer. © 2010 JOVACO Solutions inc. – Version 10.0.13 156 Project Transactions Select from All Selection Group Employee Project Control Click this button if you would like to transfer the transactions of all employees. Click this button if you would like to transfer the transactions of specific employees. You must choose which employees you would like to transfer. Click this button if you would you like to transfer the transactions of a group of employees (see TEDI Groups). You must choose which groups you would like to transfer. In the case where you have chosen a transfer of transactions for a specific employee or group, add the Employee ID or Group ID. Include timesheets already transferred Check this box if you want to transfer new transaction to timesheets which have already been transferred and they have been reversed before posting. If you have already posted these transactions, there is the possibility that you may create a double posting, ***WARNING*** There is no validation done to check if the transaction has already been posted. Include timesheets waiting for approval Check this box if you want to transfer timesheets and expense reports even if they are awaiting approval. Normally, only timesheets and expense reports with a “Completed” status (after approval) can be transferred. The approvals can be completed for the employees after the transfer has been completed. © 2010 JOVACO Solutions inc. – Version 10.0.13 157 Project Transactions Project Control Transactions – Project © 2010 JOVACO Solutions inc. – Version 10.0.13 158 Project Transactions Project Control Update Dates (Transactions >> Project >> Date of Update) Use this window to identify the date of the last update for timesheet, expenses and internal expenses. These dates will be printed on the Web Reports to indicate the periods that are recorded and thus shown in the report. The people who consult the projects can also know the transaction cut off date. © 2010 JOVACO Solutions inc. – Version 10.0.13 159 Project Transactions Project Control Batch Entry (Transactions >> Project >> Project Batches) Use the Batch Entry window to create project batches. Also use this window to configure batch controls, approve batches for posting, modify batches for transaction groups, delete batches, or print transaction validations and posted batch lists. Activate batch approval Batch approval options will only be activated if the Require Batch Approval option has been checked and a password has been entered in the Posting Setup window (see the documentation for Microsoft Dynamics GP). Once Approved has been checked, a batch will have an Approved status in the Series Posting and Master Posting windows. If the Require Batch Approval option has not been checked and the password not entered, batches will have an Available or Marked status before being posted and no password will be required to post batches. If a batch has been marked for posting before the batch approval option is selected in the Posting Setup window, these marked batches will not require approval in order to be posted. Activate Batch Verification If a batch has been marked for posting before verification options are selected, control totals for marked batches will not be verified before posting. Add transactions to approved batches Transactions may only be added to batches that have an Available or Not approved status. Transactions cannot be added to batches that have been approved for posting. Approve a recurring batch Once a recurring batch is posted, the batch’s status will automatically change to Not Approved. To post a recurring batch again, the batch must first be approved. Approve out of balance batches It is possible to approve a batch in which control totals are out of balance. For example, a batch can be approved even if the actual number of transactions entered in the batch does equal the control total. Batch approval and control total verification are two distinct features. A batch cannot be marked for posting if control totals are out of balance. To post a batch, it must be marked as Not approved, the control total must be modified to correspond to the total number of transactions, and the batch must be approved again and then marked for posting. Batch Restrictions Even if the General Ledger batches are for a single-user (only one person can enter transactions in a batch at a time), this restriction does not apply to other modules. For example, in a multiple-user environment, © 2010 JOVACO Solutions inc. – Version 10.0.13 160 Project Transactions Project Control one or more people can enter transactions in the same batch at the same time, except in the General Ledger. Batch totals for individual posting Note that for transactions posted through posting by transaction feature, control fields will always display 0. These transactions are posted, even if 0 has been registered. If the transactions have not been posted, a message will appear in the posting journal to indicate that they have not been posted. Delete approved batches Approved batches cannot be deleted. To delete a batch that has been approved, it must first be marked Not approved. Recurring Batches Only documents originating from Internal Expenses may be included in recurring batches. Documents originating from adjustments, timesheets, expense record, revenue, transfer to projects or return to inventory must be entered in single-use batches or posted individually. Verify totals in batches containing errors If batch totals are being verified and a batch containing transaction errors is posted, control totals are adjusted to reflect transactions that have not been posted. All erroneous transactions remain in the batch after posting is done. The actual number of transactions in the batch is re-calculated and the control total is modified to 0. Once the transaction error is corrected, enter a new control total and post again. Use the Batch Entry window to create batch to regroup similar transactions when entering data and to revise transactions before posting them later. Recurring batches and single-use batches can be created. For example, a recurring batch can be created for all transactions entered monthly, such as revenues from rent. Transactions can be posted at a pre-determined date without having to be entered again. © 2010 JOVACO Solutions inc. – Version 10.0.13 161 Project Transactions Project Control Recurring batches remain in the Project Control module once posted, although they will not be posted automatically. For example, if a recurring batch has been created for all monthly transactions, these batches will not be posted automatically. To post a recurring batch, it must be marked and posted manually. Batches that have been marked as single-use will be automatically deleted once the posting process is complete. Batch ID Enter a batch ID or click the lookup button to select one from the Project Batch IDs window. If this batch ID lookup window is opened from the transaction entry window, only batches entered in that window will be displayed. Origin Select the batch origin: adjustments, timesheets, internal expense, expense record, revenue, transfer to projects or return to inventory. The batch origin will not appear automatically if the Batch Entry window is opened from the Transaction palette and an existing ID is entered manually. Because batches entered in different windows may have the same name, the appropriate origin must be selected before information corresponding to the batch can be displayed. Comments Enter comments (maximum 60 characters). This field is optional. Frequency This field allows you to create a recurrent batch and is only available for documents originating from Internal Expense. Choose the appropriate frequency from the drop-down list. For documents originating from Internal Expense, the default frequency is Single Use and the Number of Recurring Postings and Days between postings fields are greyed. Payroll Batch If you are using the Canadian Payroll module, and you have integrated the Project Control to this module, you can transfer expense and timesheet batches to Payroll. If you have checked the box Payroll Batch Transfer, it will be mandatory to enter a payroll batch in this field. Number of Recurring Postings Enter the number of recurring postings for the Frequency chosen. Days between Postings If Miscellaneous has been selected in the Frequency field and the number of recurring postings has been entered, choose the number of days between which recurring postings will be performed. Posting Date The system date is displayed automatically. You can change it. The date entered must be in the open accounting period if your posting parameters imply that the journal entry will be made on the batch posting date. This field may be mandatory depending on your posting parameters. Data registered in the Project Control module are updated when the document date is entered, regardless whether a date is entered or not in this field. © 2010 JOVACO Solutions inc. – Version 10.0.13 162 Project Transactions Project Control Transactions Button Click this button to enter transactions into a batch. An entry window corresponding to the batch origin will open. Check the accuracy of the transactions by using a transaction validation list by clicking on the printer via the transaction input window or the batch input window. Approve the batch and post it. Batch approval and password entry options are accessible before posting only if the Require Batch Approval option has been checked and a password has been entered in the Posting Setup window. If the option is not checked and no password entered, batches will be assigned the status Available or Marked before posting and no password is required. Print the posting reports (optional step). © 2010 JOVACO Solutions inc. – Version 10.0.13 163 Project Transactions Project Control Timesheets Transaction Entry (Transactions >> Project >> Timesheets) This window lets you enter the time sheet for an employee or change a time sheet entered by an employee in the Internet Expenses and Time module (TEDI) and transferred in a batch (See TEDI Transfer) and validate accounting entries, which will be generated by the transaction. Trx Each transaction entered in the Project Control module has a unique transaction ID created from the ID defined in the Trx ID Setup window. Each time a timesheet transaction is created, the ID is increased by 1. By default, the system displays the next available ID in this field. The ID can be modified but the field is no longer modifiable once an ID is entered. If an existing transaction ID is entered, the corresponding transaction will be displayed. Period Enter the end date of the period of the time sheet. This date is by default on the posting date of the time sheet if your posting parameters involve posting on the transaction date. By default, the system date or © 2010 JOVACO Solutions inc. – Version 10.0.13 164 Project Transactions Project Control that of the previous transaction date is displayed. You can click the expansion button to open the Enter dates window and change the posting date of the transaction (allowing you to defer the entries to a different date of the transaction). The posting date entered must be in an open accounting period. Batch ID To enter more than one timesheet transaction and/or print a validation report before posting all the transactions together, create a batch. To do this, enter a batch ID or click the lookup button to open the Project Batch IDs window and select a batch ID with an Available status. Click the expand button to add a new batch. A batch is a group of transactions identified under the same name or number. If a timesheet batch is created, the timesheet can be saved but not posted from this window. It can be posted from the Batch Entry window. To post only one timesheet transaction, leave this field blank. The timesheet cannot be saved but can be posted directly from this window. Employee Enter an employee number or click the magnifying class to select one from the resource list. Click the Employee field to open the Resource Setup window. Once a number is entered, the field is no longer modifiable. The data in the Description (employee name), Department, Status, Class, Level, Hours Bank, Sick Leave Bank and Vacation Bank fields are displayed. The resource department must belong to the company in which the user is working. Once the data is entered, a new timesheet can be entered for the selected employee or timesheets that have not been posted can be modified. Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. Click the Project field to open the Project Maintenance window. Once entered, the project ID cannot be modified. Level 1 Enter a level 1 ID for which the status is Active, or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: Level 1 window. Once the level 1 ID is entered, it cannot be modified. Level 2 If you have to distribute to a level 2, enter a level 2 ID that the status is Active, or click the lookup button to select one from the level 2 list. Click the Level 2 field to open the Project Maintenance: Level 2 window. Once the level 2 ID is entered, it cannot be modified. If you charge level 1 directly, leave this field blank. Department The ID of the department chargeable by an employee is displayed. To select another from the department list, click the lookup button. A department ID other than the one which the employee belongs to can be entered only if staff-lending is allowed (please see Cards - Project section). The resource department and the department entered here must belong to the same company. Click the Department field to open the Department Setup window. © 2010 JOVACO Solutions inc. – Version 10.0.13 165 Project Transactions Project Control Category Enter the category/cost item number or click the lookup button to select one from the category/cost item list. Click the Category field to open the Category Setup or Cost Items window. Type Enter the type of hours attached to this category if it is configured to be regular hours. Three choices are offered: regular, overtime and special. By default, the Regular type is displayed. For categories associated with other types of hours, it is displayed by default and cannot be changed. Earnings ID When you are integrated with the Great Plains Payroll system, you will chose the Earnings ID associated with the type of hours the employee submitted from the list provided. By default, this ID will correspond to the one configured in the resource’s class (See class Parameter). GL Account The cost account number associated with this category is displayed automatically. This field is not modifiable. Date The period date is displayed automatically after entering the category. This date can be modified. Click the expand button to open the Date Entry window. The posting date entered must be within an accounting period of an open fiscal year. In the case of Multi-Currency Projects, the exchange rate is verified against the available rates and if the rate is not found, the window, Input Exchange Rate will open automatically allowing you to enter the appropriate exchange rate. Hours Enter or modify the number of hours on this line. Depending on the type of hours entered in the preceding field, the entry or modification done in this field will affect the corresponding total displayed at the bottom of the window. Salary The hourly rate associated with this resource is displayed after entering the category. Click the expand button to open the Cost Maintenance – Labour window to modify this field. Invoicing Currency The invoicing rate in the project invoicing currency is calculated automatically and displayed. This rate comes from the billing method used in the concerned level. The billing method is always considered as being in the project’s currency. So, if the method provides an hourly rate of $100 for a given resource, its charges will be calculated at $100 an hour for projects in Canadian currency, US $100 for projects in US dollars and €100 if the project is run in Euros. Invoicing Rate By default, this field is calculated according to the corresponding Project/Level invoicing data. In the case of a project run in a currency other than the company’s functional currency, the rate shown here will correspond to the resource’s rate in the functional currency at the rate of exchange in effect. © 2010 JOVACO Solutions inc. – Version 10.0.13 166 Project Transactions Project Control Click the expand button for this field to open the Billable Maintenance – Labour window. In that window, enter or modify data in the following fields (by default they will correspond to the parameters in effect in the concerned level): Billable Mark-up Rate Enter the billable mark-up rate of the invoicing cost rate. It is the cost percentage of a transaction representing a cost mark-up for invoicing purposes. For example, a mark-up rate of 1, 05 is equivalent to a 105% mark-up of the cost rate or to a multiplier 2.05 times the cost rate. Invoicing Cost Rate The cost rate to calculate the current invoicing rate is displayed. It is by default the unit cost rate of a transaction. It can be modified. Discount Enter, if applicable, the discount percentage given to the customer. Productivity Enter the productivity ID associated with the transaction if the transaction is considered nonbillable. Once the above fields are entered, the new calculation for the Billable field is displayed. Click the OK button to close this window. The invoicing rate is displayed. Description Enter a description (maximum 30 characters). This field is optional. Interco. Rate When a project/level allows inter-department charges, this rate is automatically calculated according to a project’s inter-department rate if the department charged is not that of the employee. If the department charged is that of the employee, the rate is 0. Class This field is not accessible and is initially blank. The class is displayed when the category, number of hours or type of hours is modified. Once all lines have been entered or modified, the fields at the bottom of the window display the totals for the timesheet. Expense Button Click this button to open the Expense Report Trx Entry window. Internal Expense Button Click this button to open the Int. Expense Trx Entry window. Distribution Button Click this button to open the Distribution Entry window. Distributions must be in balance before a timesheet can be posted. © 2010 JOVACO Solutions inc. – Version 10.0.13 167 Project Transactions Project Control If distributions are in balance, click the OK button to return to the Timesheets Trx Entry window. The timesheet can then be saved or posted. If distributions are out of balance, click the DEFAULT button to return to the timesheet entry window where adjustments can be made to balance distributions. *** Important *** You can consult the distribution of each line of the time sheets. To do this, you must select the line you want and press the expansion button to the right of “GL Account” in the header of the detail section of the time sheet. This consultation allows you to target the source of incorrect distributions. Once the error line is found, you must return to the parameters of the project/level/department and/or cost item used to change the parameter at the source of this error. Once the parameter is adjusted, simply re-enter the line and delete the line in error. © 2010 JOVACO Solutions inc. – Version 10.0.13 168 Project Transactions Project Control Expense Report Trx Entry (Transactions >> Project >> Expense Report) This window lets you enter the expense statement for an employee or change an expense statement entered by an employee in the Internet Expenses and Time module (TEDI) and transferred in a batch (See TEDI Transfer) and validate the accounting entries that will be generated by the transaction. Trx Each transaction entered in the Project Control module has a unique transaction ID created from the ID defined in the Trx ID Setup window. Every time an expense report transaction is created, the ID is increased by 1. By default, the system displays the next available ID in this field. The ID can be modified but once entered; the field is no longer modifiable. If an existing transaction ID is entered, that transaction will be displayed. Employee Enter an employee ID or click the lookup button to select one from the resource list. Click the Employee field to open the Resource Setup window. Once the ID is entered, the field is no longer modifiable. Data in the Description (employee name) and Department fields are displayed. The resource department must belong to the company in which the user is currently working. © 2010 JOVACO Solutions inc. – Version 10.0.13 169 Project Transactions Project Control Once the data is entered, a new expense report can be entered for the selected employee and expense reports not yet posted can be modified. Period Enter the end date of the period of the expense statement. This date corresponds by default to the posting date of the expense statement if your posting parameters involve a posting on the date of the transaction. By default, the system date or the previous transaction date is displayed. You can click the expansion button to open the Enter dates window and change the posting date of the transaction (allowing you to defer to the entries to a different time than the transaction). The posting date entered must be in an open accounting period. Batch ID To post more than one expense report transaction and/or print a validation report before posting all transactions together, create a batch. To do this, enter a batch ID or click the lookup button to select one with an Available status from the Project Batch IDs window. Click the expand button to add a new batch. A batch is a group of transactions identified under the same name or number. If an expense report batch is created, it can only be saved but not posted from this window. It must be posted from the Batch Entry window. To enter only one expense report transaction, leave this field blank. It can be posted but not saved from this window. Transfer to Payroll Check this box to pay corresponding expenses through the Payroll module. Otherwise payments will be done by the Payables Management module. For payment by the supplier account to be possible, you must create a supplier in the procurement module, with the same number as the employee number configured in the resource’s Parameters. Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. Click the Project field to open the Project Maintenance window. Once the project ID is entered, it cannot be modified. Level 1 Enter a level 1 ID that as an Active status or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: Level 1 window. Once the ID is entered, it cannot be modified. Level 2 If you have to distribute to a level 2, enter the level 2 ID that has an Active status or click the lookup button to select one from the level 2 list. Click the Level 2 field to open the Project Maintenance: Level 2 window. Once the ID is entered, it cannot be modified. If you charge level 1 directly, leave this field blank. Department The number of the department chargeable by the employee is displayed or you can select one by clicking on the magnifying glass in the list of departments. You can enter a department number other than that © 2010 JOVACO Solutions inc. – Version 10.0.13 170 Project Transactions Project Control which belongs to the employee only if a personnel loan is allowed (see the Project Sheet section). The resource’s department and the one entered here must belong to the same company. Click the Department field to open the Department Setup window. Category Enter the category/cost item ID or click the lookup button to select one from the category/cost item list. Click the Category field to open the Category Setup or Cost Items windows. Profit ID In case you’ve integrated the Project Costs module to Canadian Payroll, the profit ID associated with the type of the employee expenses, configured in the resource’s class (See class parameter) or associated with the category/item of the cost used, is entered or may be selected from the list of profit IDs of the employee. Qty Enter the number of units for this line of expenses if the type of the cost category/item is Unit. This quantity will be multiplied by the unit rate defined for that cost category/item according to the rules (billing method with cost paid or the rate specified in the cost category/item) and the total will appear in the gross amt. field. If the category/cost item type is Amount, the quantity 1.00 is displayed automatically. Currency ID In a multiple currency environment, it is possible to select a currency ID other than the currency normally used for the company. Cost Account The account number associated with the category is automatically displayed. The field is not modifiable. Taxes If taxes are applicable to this category/cost item, the amount of taxes is displayed automatically once the gross amount is entered. Click the expand button to open the PM Expense Tax ID Entry window to view calculation details or to modify the applicable tax schedule and/or the amounts calculated by the system. © 2010 JOVACO Solutions inc. – Version 10.0.13 171 Project Transactions Project Control Credit Card If a company credit card is associated to this resource, check this case to indicate that the expense is payable to the credit card rather than the resource. Type The type associated with the category/cost item is displayed automatically. It can be an amount or a unit. Date The period date is displayed automatically once the category is entered, and it can be modified. Click the expand button to open the Date Entry window. The posting date entered must be within an accounting period of an open fiscal year. Gross Amt. If the type of the cost category is Unit, the product of the quantity multiplied by the unit rate of the category will be displayed. If the type of cost category is Amount, enter the amount of the expense according to the currency selected. The gross amount is the amount of the expense payable to the employee including taxes. © 2010 JOVACO Solutions inc. – Version 10.0.13 172 Project Transactions Project Control Billable Amount (Pjct) By default, this is calculated according to invoicing data from the corresponding project/level and the amount is in project currency. Click the expand button in this field to open the Billable Maintenance – others window. From that window, enter data in the following fields: Billable Mark-up Rate Enter or modify the billable mark-up rate of the invoicing cost rate. It is the cost plus percentage of a transaction, representing cost mark-up for invoicing purposes. For example, a mark-up rate of 0.05 is equivalent to a 5% mark-up of the cost rate or to a multiplier 1.05 times the cost rate. Invoicing Cost Rate The current invoicing cost rate is displayed. This is the unit cost rate of a transaction and can be modified. Discount Enter, if applicable, the discount percentage given to the client. Billable Check this option if the expense amount is billable to the customer. Once the fields have been filled, a new calculation will be displayed in the Billable field. Click the OK button to close the window. The billable amount is displayed. Description Enter a description (maximum 30 characters). This field is optional. Net Cost This amount is displayed automatically. It represents the difference between the gross amount and the taxes. Expense totals are displayed at the bottom of the window. The first amount is the sum of categories/cost items of type Amount and the second total is the sum of categories/cost items of type Unit. © 2010 JOVACO Solutions inc. – Version 10.0.13 173 Project Transactions Project Control Enter portions of the total that are to be transferred to the Payables Management module and/or Payroll module. By default, payments will be done by Payroll if the Transfer to Payroll box has been checked. Otherwise payments will be done by the vendor payment feature. Payments can also be issued by both modes. The amount allocated to the resource’s credit card is presented in the last line of the window. Distribution Button Click the button to open the Distribution Entry window. Distributions must be in balance before an expense report can be posted. If distributions are in balance, click the OK button to return to the Expense Report Trx Entry window. There, an expense report can be saved or posted. If distributions are out of balance, click the DEFAULT button to return to the expense report entry window where corrections may be brought to balance distributions. © 2010 JOVACO Solutions inc. – Version 10.0.13 174 Project Transactions Project Control Internal Expense Transaction Entry (Transactions >> Project >> Int. Expense) From this window, enter internal expenses for a project, modify project internal expenses entered by an employee in the Time and Expense Report (TEDI) module, or distribute costs to the General Ledger. Trx Each transaction entered in the Project Control module has a unique transaction ID created from the ID defined in the Trx ID Setup window. Every time an internal expense transaction is created, the ID is increased by 1. By default, the system displays the next available ID in this field. It can be modified, but once the ID is entered the field is no longer modifiable. If an existing transaction ID is entered, that transaction will be displayed. Resource Enter the resource ID or click the lookup button to select one from the resource list. Enter a resource type Tests, Equipment or Internal Expenses. Click the Resource field to open the Resource Setup window. Once the ID is entered, the field is no longer modifiable. Data in the Description (of the resource) field is displayed. The resource department must belong to the company in which the user is working. © 2010 JOVACO Solutions inc. – Version 10.0.13 175 Project Transactions Project Control Period Enter the period end date. This date is by default at the posting date of internal charges if your posting parameters involve a posting on the transaction date. By default, the system date or the previous transaction date appears. You can click the expansion button to open the Enter dates window and change the posting date of the transaction (allowing you to defer to the entries on a different date from the transaction). The posting date must be in an open accounting period. Batch ID To enter more than one internal expense transaction and/or print a validation report before posting all transactions together, create a batch. To do this, enter a batch ID or click the lookup button to select one with an Available status from the Project Batch IDs window. Click the expand button to add a new batch. A batch is a group of transactions identified by the same name or number. If an internal expense batch is created, internal expenses can be saved but not posted from this window. Internal expenses can be posted from the Batch Entry window. To post only one internal expense transaction, leave this field blank. Internal expenses cannot be saved but can be posted from this window. Employee Enter an employee ID or click the lookup button to select one from the resource list. Click the Employee field to open the Resource Setup window. This field is optional and allows you to specify which employee used the internal resource that is associated with the transaction. Data from the Description (employee name) and Department fields are displayed. Once the data is entered, new internal expenses can be entered for the selected resource and internal expenses not yet posted can be modified. Project Enter a project ID that has Active status or click the lookup button to select one from the project list. Click the Project field to open Project Maintenance window. Once the ID is entered, it cannot be modified. Level 1 Enter a level 1 ID that has an Active status or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: level 1 window. Once the ID is entered, it cannot be modified. Level 2 If you have to distribute to a level 2, enter a level 2 ID which an Active status or click the lookup button to select one from the level 2 list. Click the Level 2 field to open the Project Maintenance: level 2 window. Once the ID is entered, it cannot be modified. If you charge at level 1directly, leave this field blank. Department The ID of the default chargeable department is displayed. Click the lookup button to select another one from the department list. Click the Department field to open the Department Setup window. © 2010 JOVACO Solutions inc. – Version 10.0.13 176 Project Transactions Project Control Category Enter the category/cost item ID or click the lookup button to select one from the category/cost item list. Click the Category field to open the Category Setup or Cost items window. Qty Enter the number of units for the internal expense line. This quantity will be multiplied by the internal cost defined for the category/cost item and displayed in the Cost Rate field. Cost Rate The unit rate for internal costs is displayed automatically in this field. It is equivalent to the rate configured in the resource’s sheet unless you use a billing method which involves a “paid cost” for this resource. Click the expand button to open the Cost Maintenance – Int. Expense window to see the calculation details. Cost Account The account number associated with a category is displayed automatically. This field is not modifiable. Date The period date is displayed automatically after the category is entered. This date can be modified. Click the expand button to open the Date Entry window. The posting date entered must be within an accounting period of an open fiscal year. © 2010 JOVACO Solutions inc. – Version 10.0.13 177 Project Transactions Project Control Unit The billable unit mark up rate is automatically displayed in this field. Billable Rate The unit rate of billable mark-up in the project Invoicing Currency is displayed automatically in this field and can not be modified. Click the expand button to open the Billable Maintenance – Int. Expense window to see calculation details. Billable Mark-up Rate Enter or modify the billable mark-up rate of the invoicing cost rate. It is the cost plus percentage of a transaction, representing the cost mark-up for invoicing purposes. For example, a mark-up rate of 0.05 is equivalent to a 5% mark-up of the cost rate or to a multiplier 1.05 times the cost rate. Invoicing Cost Rate The current invoicing cost rate is displayed. It is the unit cost rate of a transaction and can be modified if needed. Discount Enter, if applicable, the discount percentage given to the client. Billable Check this box if the internal expense amount is billable to the client. Description Enter a description for this line (maximum 30 characters). This field is optional. Distributions Button Click this button to open the Distribution Entry window. Distributions must be in balance before internal expenses can be posted. If distributions are in balance, click the OK button to return to the Internal Expense Transaction Entry window. There, internal expenses can be saved/posted. If distributions are out of balance, click the DEFAULT button to return to the internal expense entry window where modifications may be brought to balance distributions. See Appendix for examples of distributions according to the various parameters. © 2010 JOVACO Solutions inc. – Version 10.0.13 178 Project Transactions Project Control Import - Internal Fees You can use this function to import a file containing the internal transaction costs. The text file must be in the following format: File Resource Date Project L1 L2 Department Category Quantity Resource Number Transaction Date Project Level 1 Level 2 Department Category Quantity Amount Cost Rate Reference Description of the activity Data Type 15 Date 15 10 10 10 10 Whole numbers with 2 desimals Whole numbers with 2 desimals 30 The figure appearing in the Data Type column corresponds to the number of alphanumeric characters allowed. The date should correspond to the date of the day and not to the period and should be entered in the format yyyy-mm-dd. If the unit rate is zero, the rate shown in the resource’s level will be used. File format Select how the columns are delimited in your text file (with commas or tabs). © 2010 JOVACO Solutions inc. – Version 10.0.13 179 Project Transactions Project Control Adjustment Mass Entry (Transactions >> Project >> Adjustment Mass Selection) Use this function to enter an adjustment transaction range from a project, level, department and/or category to another project, level, department and/or category. This adjustment feature enables the correction of mistakes that occurred during the entry of allocations to projects such as erroneous invoicing rates or erroneous distributions to a project, level or category. *** Important *** This function does not validate if the destination level/department contains the required cost category/item. Make sure that for the transactions that you wish to transfer, the parameters are configured to their destinations. Bad parameters or the absence of required elements can generate inappropriate entries and/or prevent the posting of transactions. © 2010 JOVACO Solutions inc. – Version 10.0.13 180 Project Transactions Project Control Posting Date The system’s date is displayed by default. Click Enter to keep this date or enter another posting date. The posting date must be within an accounting period of an open fiscal year. This date can be used to indicate the day of the accounting entry of the transactions. The transactions will, however, keep the date of the original transaction in the projects. Batch ID Enter a batch ID or click the lookup button to open the Project Batch IDs window. Click the expand button to add a new batch. A batch is a group of transactions identified by the same name or number. It is mandatory to be able to use this function. FROM: Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. Click the Project field to open the Project Maintenance window. Once the ID is entered, it cannot be modified. Level 1 Enter a level 1 ID that has an Active status or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: Level 1 window. Once the ID is entered, it cannot be modified. Level 2 If you have to adjust transactions associated to level 2, enter a level 2 ID that as an Active status or click the lookup button to select one from the level 2 list. Click the Level 2 field to open the Project Maintenance: level 2 window. Once the ID is entered, it cannot be modified. If you do not use this level, leave this field blank. Department Enter the department ID or click the lookup button to select one from the department list. Click the Department field to open the Department Setup window. Category Enter the category/cost item ID or click the lookup button the select one from the category/cost item list. Click the Category field to open the Category Setup or Cost Items window. Enter the same ID in both fields to enter only one category or enter the start and end category IDs to define a category range. If no category is selected, all transactions of the level/department concerned will be automatically selected. TO Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. It can be the same project ID, a different ID, or the ID from the FROM column. Level 1 Enter a level 1 ID or click the lookup button to select one from the level 1 list. It can be the same level 1 ID, a different ID, or the ID from the FROM column. © 2010 JOVACO Solutions inc. – Version 10.0.13 181 Project Transactions Project Control Level 2 Enter a level 2 ID or click the lookup button to select one from the level 2 list. It can be the same level 2 ID, a different ID or the ID from the FROM column. Department Enter a department ID or click the lookup button to select one from the department list. It can be the same department ID, a different ID or the ID from the FROM column. Category Enter the category/cost item ID or click the lookup button to select one from the category/cost item list, when only one start category has been selected. If multiple categories are involved, this field will be greyed out and the system will automatically use the same category as the original for the level/department of the destination project. Click the Category field to open the Category Setup or Cost Items window. This field is optional. Empl/Res/Vendor Click the Employee, Resource or Vendor option to select only one employee, resource or vendor. This function allows you to limit the number of transactions that will be shown in the bottom section of the criteria specified. Include: Check the appropriate box or boxes. You can include only billed transactions (billing date <> 0000/00/00) or just the unbilled transactions (billing date = 0000/00/00) or you can include both options. This feature allows you to limit the number of transactions that will be shown in the bottom section of the criteria specified. Period Check the All options to include all periods or enter a period range. This function allows you to limit the number of transactions that will be shown in the bottom section of those included in the specified date range. Once all fields have been filled, click the REDISPLAY button to display in the selection box the data corresponding to the options selected. Transactions may be checked individually or they can all be selected by clicking the MARK ALL button. Then click the SELECTION button to start the process. © 2010 JOVACO Solutions inc. – Version 10.0.13 182 Project Transactions Project Control Adjustment Transaction (Transactions >> Project >> Adjustments Trx) Use this function to enter adjustment transactions from a project, level, department and/or category to another project, level, department and/or category. Adjustment Trx Entry feature enables the correction of errors that occurred at the entry of allocations to projects. *** Important *** The adjustments on expense transactions (cost types greater than 2) will now allow you to enter quantities of up to 5 decimal places in all times. This allows you to adequately adjust the receipt on contracts from various procurement solutions. User ID The user ID appears by default and is not modifiable. This identifies the user who performed transaction adjustments to the projects. © 2010 JOVACO Solutions inc. – Version 10.0.13 183 Project Transactions Project Control Adjustment ID Each transaction entered in the Project Control module has a unique transaction ID created from the ID defined in the Trx ID Setup window. Each time an adjustment transaction is created, the ID is increased by 1. By default, the system displays in this field the next available ID. It can be modified, but once the ID is entered, the field is no longer modified. If an existing transaction ID is entered, that transaction is displayed. Batch ID If you want to post more adjustment transactions and/or be able to print a validation report before posting, create a batch. To do this, create a batch ID or click the lookup button to select one from the Project Batch IDs window that has an Available status. Click the expand button to add a new batch. A batch is a group of transactions identified by the same name or number. To post only one adjustment transaction, leave this field blank. Origin: Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. Click the Project field to open the Project Maintenance window. Once the ID is entered, it cannot be modified. Level 1 Enter a level 1 ID that has an Active status or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: level 1 window. Once the ID is entered, it cannot be modified. Level 2 If you have to adjust transactions associated to level 2, enter a level 2 ID that has an Active status or click the lookup button to select one from the level 2 list. Click the Level 2 field to open the Project Maintenance: level 2 window. Once the ID is entered, it cannot be modified. If you do not use this level, leave this field blank. Department Enter the department ID or click the lookup button to select one from the department list. Click the Department field to open the Department Setup window. Category Enter the category/cost item ID or click the lookup button to select one from the category/cost item list. Click the Category field to open the Category Setup or Cost Items window. Date Enter the transaction date. Data in the Resource, Class, Hours, Deliverables and Costs fields are displayed. Click the expand button of the Billable field to open the Billable Maintenance – Labour window. Click the expand button of the Cost field to open the Cost Maintenance – labour window. Details on costs in the above fields can be viewed from these windows. You can use the left and right arrows, under the original information, to view one by one all transactions made in the project and select the one you want. © 2010 JOVACO Solutions inc. – Version 10.0.13 184 Project Transactions Project Control Once the transaction to be adjusted is selected, you must, in the bottom section, indicate the destination of this correction and adjust, if necessary, the quantities or hours to be transferred. *** Important *** It is not recommended to modify the cost of expense transactions. This will cause distortions in the projects, particularly in terms of quantity. To adjust costs distributed in the project without changing the quantities for expenses or purchases, it is suggested to return to the original transactions (Transactions > Expense or Purchase Statement> Enter supplier account transactions for projects) to reverse the transaction and reassign it appropriately. Destination: You must specify the destination (Project/level 1/Level 2/department/category) of your adjustment. By default, the data entered above (in the Origin section) appears by default in the corresponding fields. You can modify it, but only when you go to the concerned field. You cannot change the information entered once you go to the next field. If you want to repeat this charge, simply click on the at top of this section. Posting Date The source transaction date is displayed by default. Click on Return to keep the date or enter another posting date. The posting date should be in an open accounting period. This date can be used to indicate the day of the accounting entry of the transactions. The transactions will, however, keep the date of the original transaction in the projects. Data in the Resources field is displayed. Class Enter a class ID or leave the field blank. Hours Enter the number of hours where an adjustment is to be made. The number entered cannot be greater than the number of hours in the source transaction. Billable Click the expand button in this field to open the Billable Maintenance – Labour window. The following window is displayed: © 2010 JOVACO Solutions inc. – Version 10.0.13 185 Project Transactions Project Control Billable Mark-up Rate Enter the billable mark-up invoicing cost rate. This is the cost percentage of a transaction representing a cost mark-up for invoicing purposes. For example, a mark-up rate of 1.05 is equal to a 105% mark-up of the cost rate. Invoicing Cost Rate The current invoicing cost rate is displayed. This is the unit rate of a transaction. It can be modified. Once both fields are filled, calculation for the Billable field is displayed. Discount Enter, if available, the discount percentage given to the customer. Productivity ID Enter the productivity ID attached to the billable transaction. Once both fields are filled, the new calculation in the Billable field is displayed. Click the OK button to close this window. Once returned to the Adjustment Trx Entry window, click the expand button in Cost field to open the Cost Maintenance- Labour window and obtain details of costs displayed in this field. © 2010 JOVACO Solutions inc. – Version 10.0.13 186 Project Transactions Project Control Click the DISTRIBUTION button to view adjustment transactions. Click the OK button to close the window. Once returned to the Adjustment Trx Entry window, click the POST button to post adjustment transactions or the Save button if you use a batch. Once adjustment transactions have been entered and posted, the adjustment transaction posting journal will be printed before this function can be closed. N.B. If the “Origin” section contains information at the time or you want to exit this function, the system will ask you if you want to Save the changes made to these adjustments. The question concerns the elements present at this time in the window. Normally, you just press Delete to close the window. © 2010 JOVACO Solutions inc. – Version 10.0.13 187 Project Transactions Project Control Revenue Calculation (Transactions >> Project >> Revenue Calculation) This window is usually used at the end of a period to calculate or adjust gained revenues from fixed price projects since their previous calculation. See Cards - Project for details on different revenue types. Batch ID Enter a revenue batch ID or click the lookup button to select one. Click the expand button to open the Batch Entry window. Cut-off Date Enter the date until which revenues will be calculated. By default, the system’s date will be displayed. Click the expand button to open the Date Entry window. The date must be within an accounting period of an open fiscal year. You can limit the projects reviewed with the following intervals: Start Branch Enter the Branch ID of the start of the projects to be calculated. End Branch Enter the end Branch ID of the projects to be calculated. Start Department Enter the department ID for the project (configured in the File> Project) of the Start of projects to be calculated. End Department Enter the department ID for the project (configured in the File> Project) of the end of the projects to be calculated. Then by clicking the Process button, it occurs on the cut-off date: © 2010 JOVACO Solutions inc. – Version 10.0.13 188 Project Transactions Project Control Real Progress, the adjustment is calculated based on the Budget to date of the project multiplied by the latest (the date nearest the cut off date) Percentage of Progress of the corresponding Project/Level to which the sum of billing and the value of Work in progress on that date is subtracted. NOTE: Only in the case of billing type, Fixed or Percentage of costs. Budgeted Maximum or if the billing type is cost plus with a maximum, if the value of Work in progress on that date is greater than zero, there are two possible cases: If the budget to date of the project minus the sum of Billing and value of work in progress on that date is less than zero, then the calculated adjustment amount is at most the value of work in progress. If the Budget of the project to date minus the sum of Billing and value of Work in progress on that date is greater than zero and the Surplus/Deficit billing on this date is less than zero, then the amount of adjustment calculated is at most the absolute value of this Surplus/Deficit billing. In other words, if a previous recognition of revenue has generated a revenue write off and since then the budgeted revenue has increased, the write off will be cancelled in whole or in part by increasing the corresponding budget. Comprehensive, in this case, the calculations are the same as those of the Maximum Budgeted except that the amounts are the sum of all sub-levels of the project which are also Comprehensive. More than 90 days, in this case, the function calculates the value of recognized Revenue on the cut off date minus 90 days and subtracts the sum of Billing on the cut off date. If this value is greater than zero, the value of the calculated adjustment is at most the value of Work in progress. Costs Progress, the calculated adjustment is the budget to date, multiplied by the Costs on the cut off date divided by the budgeted Costs from which is subtracted the sum of the Billing and value of work in progress on that date. Hours Progress, the calculated adjustment is the Budget to date, multiplied by the Total Hours on the cut off date divided by the budgeted hours from which is subtracted the sum of the Billing and value of work in progress on that date. Time Progress, the calculated adjustment is the Budget to date multiplied by the number of months elapsed in the total number of months from which is subtracted the sum of the Billing and value of work in progress on that date. The months are calculated from the start date and end date defined at the corresponding level. © 2010 JOVACO Solutions inc. – Version 10.0.13 189 Project Transactions Project Control Revenue Recognition (Transactions >> Project >> Revenue Recognition.) Use this window to adjust revenue calculated by the revenue calculation feature, or to manually enter and adjust a project/level’s revenue. Batch ID You must enter a batch ID. You must identify the batch ID, used at the calculation or create a new batch if you want to add transactions. To do this, enter a batch ID or click the lookup button to select one with an Available status from the Project Batch IDs window. Click the expand button to add a new batch. A batch is a group of transactions identified by the same name or number. Cut Off Date Enter a date. This date corresponds to the revenue posting date. By default, the system’s date is displayed. Click the expand button to open the Date Entry window. The date entered must be within an accounting period of an open fiscal year. Where there has been a revenue calculation, the result of the calculation is displayed and you can then identify the amount of adjustment required. If you want to add a revenue transaction, you must click on the corresponding button. The following window appears: © 2010 JOVACO Solutions inc. – Version 10.0.13 190 Project Transactions Project Control You must enter the Project, Level 1, Level 2, Department desired, enter the Date of the estimate, indicating the amount in more or less Revenue that you wish to recognize on the cut off date and enter, if necessary, the references appropriate for the adjustment. For revenue transactions that were generated via automatic calculation, many data items are presented (Budget, Billed to date, TEC, S/D Billing, Available Budget, % budgetary progress, % of actual progress entered by the coordinator as well as the name of the various coordinators) in the revenue recognition window to help you make the right decision. The “$ calculated Adjustment” shows the amount calculated by the system. The adjustment will however be made according to the “$ Adjustment desired”, which by default is equal to the automatically calculated amount. © 2010 JOVACO Solutions inc. – Version 10.0.13 191 Project Transactions Project Control Item Transfer (Transactions >> Project >> Item Transfer) If a company uses Inventory module, use this feature to transfer items to projects. Number Every transaction entered in the Project Control module has a unique transaction ID created from the ID defined in the Trx ID Setup window. Each time an item transfer transaction is created, the ID is increased by 1. By default, the system displays the next available ID in this field. It can be modified but once the ID is entered, the field is no longer modifiable. If an existing transaction ID is entered, that transaction will be displayed. Batch ID If you want to see more transfer transactions of transfer of items and/or be able to print a validation report before posting, create a batch. To do this, enter a batch ID or click the lookup button to select one with an Available status from the Project Batch IDs window. Click the expand button to add a new batch. A batch is a group of transactions identified by the same name or number. © 2010 JOVACO Solutions inc. – Version 10.0.13 192 Project Transactions Project Control If an item transfer batch is created, the item transfer can be saved but not posted from this window. It may be posted from the Batch Entry window. To post only one item transfer transaction, leave this field blank. In this case, the item transfer cannot be saved but can be posted directly from this window. Date Enter the date of the item transfer. This date corresponds to the transfer document’s date. By default, the date of the system is displayed. You can click the expansion button to open the Enter dates window to enter a posting date that is different from the transaction date. The date entered must be within an accounting period of an open fiscal year. Default Site ID Enter the site ID from which the item will be transferred or click the lookup button to select one from the site list. Click the Default Site ID field to open the Site Maintenance window. Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. Click the Project field to open the Project Maintenance window. Once an ID is entered it cannot be modified. Level 1 Enter a level 1 ID that has an Active status or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: level 1 window. Once an ID is entered it cannot be entered. Level 2 If you must charge a level 2, enter a level 2 number whose status is Active or select one by clicking on the magnifying glass in the list of level 2s. Click on the Level 2 field to open the Project Management window: Level 2. Once entered, the level 2 number cannot be changed. If you charge a level 1directly, leave this field blank. Department Enter the department ID or click the lookup button to select one from the department list. Click the Department field to open the Department Setup window. Category Enter a category/cost item or click the lookup button to select one from the category/cost item list. The selected category must of Cost Type 8; See the Project Setup window. Click the Category field to open the Category Setup or Cost Items window. Item Number Enter an item number or click the lookup button to select one from the item list in inventory. Click the Item Number field to open Item Maintenance window. U of M Enter a unit of measure in which a selected item is to be transferred or click the lookup button to select one from the inventory units of measure list. © 2010 JOVACO Solutions inc. – Version 10.0.13 193 Project Transactions Project Control Qty Enter the item quantity to be transferred in the selected unit of measure. This quantity will be multiplied by the unit cost displayed in the next field. Unit Cost This field is displayed automatically after a unit of measure and item number has been entered. The column displays the current cost of each item. It cannot be modified. The cost that will be credited to an inventory account will be based on the evaluation method of the item. Billable By default, the field is at 0. Click the expand button to open the Billable Maintenance: other window. In that window, enter data in the following fields: Billable Mark-up Rate Enter or modify the billable mark-up rate for the invoicing cost rate. This is the cost percentage of a transaction representing the cost mark-up for invoicing purposes. For example, a mark-up rate of 1.05 is equal to a 105% mark-up of the cost rate. Invoicing Cost Rate The current invoicing cost rate is displayed. It is the unit cost rate of a transaction. It can be modified. Discount Enter, if applicable, the discount percentage given to the client. Billable Check this option if the expense amount is billable to the client. Description The item description is displayed by default. © 2010 JOVACO Solutions inc. – Version 10.0.13 194 Project Transactions Project Control Site ID Enter the number of the location in the site used, from which the article will be transferred or click on the magnifying glass to select one from the list of locations, if you use the warehouse site. Click the Site ID field to open the Site Maintenance window. Distributions Button Click the button to open the Distribution Entry window. Distributions must be in balance before item transfers can be posted. If distributions are in balance, click the OK button to return to the Item Transfers to projects window, where transfers can be saved or posted. If distributions are not in balance, click the DEFAULT button to return to the item transfer entry window where corrections can be made to balance distributions. Serial/Lot Button Click this button to open the Item Serial Number Entry window or the Lot Number Entry window, depending on the item type selected in the Item Transfer to Projects window. This button is not accessible if the follow up for the article has not been done by serial number or batch number. © 2010 JOVACO Solutions inc. – Version 10.0.13 195 Project Transactions Project Control Item Return (Transactions >> Project >> Item Return) If a company uses the Inventory module, use this function to return unused items from a project to inventory. Number Each transaction entered in the Project Control module has a unique transaction ID created from the ID defined in the Trx ID Setup window. Every time an item return transaction is created, the ID is increased by 1. By default, the system displays the next available ID in this field. It can be modified, but once an ID is entered, the field is no longer modifiable. If an existing transaction ID is entered, that transaction is displayed. Batch ID If you want to defer several item return transactions and/or be able to print a validation report before posting, create a batch. To do this, enter a batch number or click the lookup button to select one with an Available status from the Project Batch IDs window. Click the expand button to add a new batch. A batch is a group of transactions identified by the same name or number. © 2010 JOVACO Solutions inc. – Version 10.0.13 196 Project Transactions Project Control If an item return batch is created, item returns can be saved but not posted from this window. It can only be posted from the Batch Entry window. To post only one item return transaction, leave this field blank. In this case, the item return cannot be saved but can be posted from this window. Date Enter the date of the item return. This date corresponds to the return document’s date. By default, the system’s date is displayed. You can click the expansion button to open the Enter dates window to enter a posting date that is different from the transaction date. The date entered must be within an accounting period of an open fiscal year. Project Enter the ID of a project from which an item is to be returned or click the lookup button to select one from the project list. Item Number Enter the number of an item to be returned or click the lookup button to select one from the item list. The project, and if applicable the selected item, will identify the Project/Level originally charged. Project Enter a project ID that has an Active status or click the lookup button to select one from the project list. Click the Project field to open the Project Maintenance window. Once an ID is entered, it cannot be modified. Level 1 Enter a level 1 ID that has an Active status or click the lookup button to select one from the level 1 list. Click the Level 1 field to open the Project Maintenance: level 1 window. Once an ID is entered, it cannot be modified. Level 2 If you must charge a level 2, enter a level 2 number whose status is Active or select one by clicking on the magnifying glass in the list of level 2s. Click on the Level 2 field to open the Project Management window: Level 2. Once entered, the level 2 number cannot be changed. If you charge a level 1directly, leave this field blank. Department Enter the department ID or click the lookup button to select one from the department list. Click the Department field to open the Department Setup window. Category Enter the category/cost item number or click the lookup button to select one from the category/cost item list. The selected category must be of Cost Type 8. See the Project Setup window. Click the Category field to open the Category Setup or Cost Items window. Document Date The document date of the original transfer to project is identified. © 2010 JOVACO Solutions inc. – Version 10.0.13 197 Project Transactions Project Control Item Number Enter an item number or click the lookup button to select one from the item list. Click the Item Number field to open the Item Maintenance window. U of M Enter a unit of measure in which a selected item is to be transferred or click the lookup button to select one from the inventory unit of measure list. Quantity Enter the item quantity to be transferred in the selected unit of measure. This quantity will be multiplied by the unit cost displayed in the next field. Quantity Returned Indicate the quantity to be returned to inventory. Unit Cost This field is displayed automatically after an item number and a unit of measure are entered. This column displays the initial cost of each item. It cannot be modified. The cost that will be credited to the inventory account will be based on the evaluation method of each article. Billable By default, this field is at 0. Click the expand button of this field to open the Billable Maintenance – Others window. In this window, enter data in the following fields: Billable Mark-up Rate Enter or modify the billable mark-up rate of the invoicing cost rate. It is the cost percentage of a transaction, representing the mark-up cost for invoicing purposes. For example, a mark-up rate of 1.05 is equal to a 105% mark-up of the cost rate. Invoicing Cost Rate The current invoicing cost rate is displayed. This is the unit cost rate of a transaction. It can be modified. © 2010 JOVACO Solutions inc. – Version 10.0.13 198 Project Transactions Project Control Discount Enter, if applicable, the discount percentage given to the client. Billable Check this box if the expense amount is billable to the client. Description The item description is displayed by default. Document No. Indicate the document date of the initial transaction charged to a project. Site ID Enter the site ID to which an item is to be transferred or click the lookup button to select one from the site list. Click the Site ID field to open the Site Maintenance window. Distribution Button Click the button to open the Distribution Entry window. Distributions must be in balance before item transfers can be posted. If distributions are in balance, click the OK button to return to the Project Item Transfer window. There, transfers can be saved and posted. If distributions are not in balance, click the DEFAULT button to return to the item transfer entry window where corrections may be made to balance distributions. Serial/Lot Button Click the button to open the Item Serial Number Entry window or the Lot Number Entry window, depending on the item type selected in the Project Item Transfer window. The button is not available if the item follow up has not been done by serial number or by batch number. © 2010 JOVACO Solutions inc. – Version 10.0.13 199 Project Transactions Project Control Project Purchase Orders (Transactions >> Project >> Project Purchase Order) If a company uses the Purchase Order Processing module from Microsoft Dynamics GP, it is possible to enter on each order line the project, level or category concerned. Project Level 1 Level 2 Department Inventory Category Enter the project related to the order. Enter the level 1 related to the order. Enter, if applicable, the level 2 related to the order. Enter the department associated to the level affected by the order. For an item of commercial inventory type, check this box to let the item be managed by inventory and be distributed to a project only at the desired time after the merchandise is received. If the box is unchecked, project distribution will be done immediately upon merchandise receipt. In this case, a commitment would be registered to the corresponding level. Enter the cost category related to the order. © 2010 JOVACO Solutions inc. – Version 10.0.13 200 Project Transactions Project Control Project Purchase Receipt (Transactions >> Project >> Project Purchase Receipt) When the delivery or invoicing of a purchase order item is applied to a project, the quantity delivered must be confirmed by the vendor. © 2010 JOVACO Solutions inc. – Version 10.0.13 201 Project Transactions Project Control Correction Transactions (Transactions >> Project >> Correction Trx) In project transaction reports, it is preferable not to show transactions that have been corrected, usually by adjustment functions. Use this window to identify corrected transactions (original transactions and their reversals) or to remove the identifier for certain adjusted transactions that you still want to appear in different reports. The total cost for identified transactions must be 0 before the corresponding ID can be saved. Project Enter a project ID or click the lookup button to select one from the project list. Any project can be selected in this field, regardless of their status. © 2010 JOVACO Solutions inc. – Version 10.0.13 202 Project Transactions Project Control Coordinator Once the project is selected, the coordinator ID attached to this project is displayed. It corresponds to the resource specified as the Project Coordinator in the main sheet of the project (Sheets > Project). This field is not modifiable. Level 1 Enter a level 1 ID or click the lookup button to select one from the level 1 list. Any level 1 can be selected in this field, regardless of their status. Level 2 If you must charge a level 2, enter a level 2 number or select one by clicking on the magnifying glass in the list of level 2s. Click on the Level 2 field to open the Project Management window: Level 2. Once entered, the level 2 number cannot be changed. If you charge a level 1directly, leave this field blank. Department Enter a department ID or click the lookup button to select one from the department list. A department ID can other than the one to which a coordinator belongs can be entered only if staff lending is permitted (see Project Setup section). Click the Department field to open the Department Setup window. Category Click the option box All to select all categories/cost items attached to the project. Click the other option to select only one category/cost item. Enter the category/cost item ID, or click the lookup button to select one from the category/cost item list. Click the Category field to open the Category Setup/Cost Items window. Resource Click the option All to select all employees, resources and vendors. Click the Employee, Resource or Vendor option box to select only one employee, resource or vendor. Enter the resource, employee or vendor ID, or click the lookup button to select one from the corresponding list. Periods Check the All option to include all transactions regardless of their transaction date. Once all fields are filled, click the REDISPLAY button in the selection box data corresponding to the options selected. Check only the transactions wanted or click the MARK ALL button to select all transactions. Then click the SAVE button to save the selection. © 2010 JOVACO Solutions inc. – Version 10.0.13 203 Project Transactions Project Control Project Progress (Transactions >> Project >> Project Progress) In a project with a fixed price, it is often necessary to evaluate the actual progress of the project. For example, this feature would let project managers view all projects at any given date for which the costs have reached 60% while the actual project progress is at 50%. One such evaluation allows us to anticipate cost overruns and may be combined, if the level is configured for this procedure, with the recognition of revenue. This feature is used to evaluate the actual progress percentage and / or to estimate the costs required to complete a project. Date Project Enter the project progress’ evaluation date. Enter the project concerned. For each project, the type of project progress is defined by: Summary by Level indicates that progress is evaluated by level for all budgeted departments. Summary by Department indicates that progress is evaluated by budgeted department for each level. Detailed by Cost Category indicates that progress is evaluated by department and by cost category for each project level. Depending on the selected progress type, details of each required level are displayed as well as the hours and expenses accumulated up until the evaluation date. © 2010 JOVACO Solutions inc. – Version 10.0.13 204 Project Transactions Project Control Progress % The actual progress percentage is entered for each level displayed. Time Estimate Enter an estimated number of hours required to complete all the work for the corresponding level. Enter the estimated expenses necessary to complete all the work for the corresponding level. Expenses © 2010 JOVACO Solutions inc. – Version 10.0.13 205 Project Transactions Project Control Invoicing Detail Maintenance (Transactions >> Project >> Invoicing Detail) When JOVACO’s Professional Invoicing module is not used, this window enables the selection of project transactions to identify them as Billed or Not billed. Transactions identified as non-billed will appear on the Billing Details report. Date billed associated with the transaction, indicating whether it was billed or not. If this date is different from 0000/00/00, this implies that the transaction is marked as having been billed. N.B. You can view this date by transaction, you must use the Project Transaction Consultation function (Consultation> Trx by project). Billing Date The day’s date is automatically displayed. You can change it. In the case in which you want to remove the identification of certain billed transactions, you must specify the Date billed associated with these transactions. © 2010 JOVACO Solutions inc. – Version 10.0.13 206 Project Transactions Project Control Project Enter a project ID or click the lookup button to select one from the project list. All projects can be selected in this field, regardless whether the status is Open, Not reconciled or Closed. Coordinator Once the project is selected, the number of the project’s coordinator is displayed. This field cannot be changed. It corresponds to the resource specified as Project Coordinator in the project’s main sheet (Sheets > Project). Level 1 Enter a level 1 ID or click the lookup button to select one from the level 1 list. All level 1s can be selected from this field, regardless of the status. Level 2 If you must charge a level 2, enter a level 2 number or select one by clicking on the magnifying glass in the list of level 2s. Click on the Level 2 field to open the Project Management window: Level 2. Once entered, the level 2 number cannot be changed. If you charge a level 1directly, leave this field blank. Department Enter a department ID or click the lookup button to select one from the department list. A department ID other than the one to which a coordinator belongs may be entered only if staff lending is permitted (see Project Setup section). Click the Department field to open the Department Setup window. Category Click the option box All to select all categories/cost items attached to the project. Click the other option box to select only one category/cost item. Enter the category/cost item ID or click the lookup button to select one from the category/cost item list. Click the Category field to open the Category Setup or Cost Items window. Resource Click the option box All to select all employees, resources and vendors. Click the option box Employee, Resource or Vendor to select only one employee, resource or vendor. Enter the resource, employee or vendor ID, or click the lookup button to select one from the corresponding list. Include Check the appropriate box(es) to include only transactions billed, only transactions not billed or both options. N.B. It is recommended that you include only one of two types of transactions at a time to avoid errors, since only the date billed differentiates the two types of transactions. Periods Check the option All to include all transactions regardless of transaction dates. © 2010 JOVACO Solutions inc. – Version 10.0.13 207 Project Transactions Project Control Once all fields are filled, click the REDISPLAY button to display in the selection box data corresponding to the chosen options. It is possible to check only a few transactions or to select all by clicking the MARK ALL button. Next, click the SAVE button to save the selection. If you have selected transactions that were not indicated as having been billed, their billing Date will be billed for the date indicated at the top of the window. If you have selected transactions that were indicated as having been billed, their Date billed will be changed for 0000/00/00. © 2010 JOVACO Solutions inc. – Version 10.0.13 208 Project Transactions Project Control Transfer of Procurement Documents This function is used to import transactions that were entered during a day from the JOVACO procurement Management module. The Transfer will create a batch in the SIFIA project module for receipt transactions. It will also create a batch in the procurement module for invoices entered for the receipt in question. Finally, it will automatically transfer items that have been received for stocks in the inventory module. You must check the batch(es) you wish to transfer and click the Transfer button. You can select all the batches available by pressing the Mark All button. © 2010 JOVACO Solutions inc. – Version 10.0.13 209 Project Transactions Project Control Payroll Canada - Rate Table Entry When you’re integrated with Canadian payroll from Payroll to project Costs (see Parameter>Project), the time must be entered in projects in the window of the next payroll. © 2010 JOVACO Solutions inc. – Version 10.0.13 210 Project Transactions Project Control Dynamics GP Substitute Windows Project Control offers a seamless integrated to various functions in the Microsoft Dynamics GP module. Due to this integration, you will have quick access to complete and precise information; you will save time and reduce the risk of error. Certain standard Microsoft Dynamics GP windows were modified in order to integrate the Project Control module to the financial modules. To access these substitute windows, you can go to the Extra menu of the windows for which there is a substitute window and click on the Assign projects link. You can also directly access these windows by pressing Ctrl and 1 at the same time when you are in one of the windows for which there is a substitute window. *** Important *** You can adjust the security of your users so that they use modified windows that include, for the most part, the Assign projects button (you will then have access to standard Great Plains windows in which you have changed the security settings). © 2010 JOVACO Solutions inc. – Version 10.0.13 211 Project Transactions Project Control General Ledger Transaction Entry to Project (Transactions >> Financials >> Generals) Journal entries, allocated to projects, are useful for the costs control of projects by allowing to regulation of future transactions or for re-allocation to projects. NOTE: This function must only be used if there is not revenue recognition linked to a record to a project costs transaction. © 2010 JOVACO Solutions inc. – Version 10.0.13 212 Project Transactions Project Control Receivable Transaction Entry to Project (Transactions >> Sales >> Transaction Entry) If you produce your DT/CT invoices/notes on the outside of your management system (for example, with Word or Excel), you can assign the projects in question at the time of entering these transactions in the Accounts receivable module. In this window you can also change the charges that have been generated by the Professional Billing module once the invoice is transferred to the Accounts Receivable module (see the manual on Professional Invoicing). If the Revenue Category Distribution is marked in the Project Set up, the invoice amount can be allocated in the field WIP/Revenue – Posted. If the opposite, the accrued revenue amount to project must be allocated in the field WIP/Revenue – Posted and the amount of Profit/Loss to be recognized, either as a surplus or write off, should be allocated to the corresponding field. © 2010 JOVACO Solutions inc. – Version 10.0.13 213 Project Transactions Project Control Entering collection charges to projects (Transactions>> Sales>> Collection) Enter the collections – At the allocation of collections to paid documents, the initial allocations of invoices for projects can automatically charge collections for the projects concerned. Such integration makes it possible not only to know the billing and collections in projects, but also to chronologically classify the accounts receivable by project. If it is a collection which only partially reimburses the invoice, you can decide how you want to distribute it in the project according to the allocations of the invoice. By default, the system distributes the collection in the order of the allocation lines of the invoice. © 2010 JOVACO Solutions inc. – Version 10.0.13 214 Project Transactions Project Control Payables Transaction Entry to Project (Transactions >> Purchasing >> Transaction Entry) Because many vendor documents represent specific costs to project, it is practical to be able allocated, in whole or in part, the values of these documents to the corresponding projects. If the expense method or a specific rate was specified in the allocated project/level, the billable amount will be calculated automatically. In the case in which the Use supplier requisitions box has been checked in the Project Parameters window, the boxes for managing commitments will be available. Thus, if you enter an invoice that is related to a purchase order coming from the Supplier Requisitions product, you will then be able to reduce the associated commitments up to the remaining commitment. © 2010 JOVACO Solutions inc. – Version 10.0.13 215 Project Transactions Project Control Sales Transaction Entry to Project (Transaction >> Sales >> Sales Transaction Entry) When you use the SOP module, you can allocate an invoice that corresponds to a project or a group of projects through the SOP function. In the case in which the Charging revenue categories box has been checked in the Project Parameters window, simply charge the amount in the TEC/Rev box - posted. Otherwise, the amount of revenue recognized in the project must be charged in the TEC / Rev. - posted box, and the amount of profits/losses to be recognized, in or deficit or surplus, must be charged in the corresponding box. © 2010 JOVACO Solutions inc. – Version 10.0.13 216 Project Reports Project Control Reports - Project The Project Control module offers a set of reports and options that enables the user to create complete, meaningful and detailed reports. To print a report, click the PRINT button or the Print option from the File menu from the Setup, Cards or Transaction window. With this feature, all entries for a record can be viewed and a hard copy is created to view all data entered. With the Project Control module, report options can be defined and saved in order to print reports again without having to re-define the options. In addition to accelerating report creation, this functionality allows continuity in report presentation. An option can be also created for each report to be printed and these options can be modified at all times. Steps to create, modify or delete a report option To define a report option, perform the following steps for each report available in the Project Control module: From the Project Report palette, select a report type. From the window that opens, select one among reports available for this type. Once a report is selected, create a new option or modify an existing one for this report. © 2010 JOVACO Solutions inc. – Version 10.0.13 217 Project Reports Project Control To create a new option for the selected report, click the NEW button to open the Trx Report Options window. © 2010 JOVACO Solutions inc. – Version 10.0.13 218 Project Reports Project Control After entering a name in the Options field, select the parameters wanted for the report. The parameters available in this window depend on the report being created. Once the selection is complete, click the SAVE button to register the selection (option). It is then possible to print the report at any time simply by clicking the corresponding option in the preceding window. More than one option with different parameters each can be created for the same report. To modify an option, select it in the Options box in the Transactions Reports window, then click the MODIFY button. In the options window that will open, modify the report parameters. Click SAVE to register the modifications. To delete a report option, select it in the Options box in the Transactions Reports window, then click the MODIFY button. The options window will open. Click the DELETE button. Data Range To choose the information that will appear in a report, define the data range to be included in the report. Items available in the selection list depend on the report being created. Ranges allow the specification and narrowing of information that are needed from a report. In the Selections field of the Trx Report Options window, click the arrow from the drop-down list to display items for which a range can be defined. Once a range is defined, click the INSERT button to include it in the report. More than one range can be defined for the same option. To take out a range from a report, select it from the Restrictions box and click REMOVE. © 2010 JOVACO Solutions inc. – Version 10.0.13 219 Project Reports Project Control Print Output To select a print output for the report, click the DESTINATION button from the report options window. Reports can be displayed on screen, printed and/or saved to a file (more than one print output can be printed at a time). The selected output(s) for a report can be saved by default by leaving the Ask each time box unchecked. If the box is checked, a report’s print output can be selected each time. If the File box is checked, the report will be saved in a file. Five formats are available: Text file: the report is preserved in text format only, with no formatting. This option must be used if a file needs to be readable by any application in any platform. Tab - delimited: this is the ASCII format with tabs. The format is used by spreadsheets such as Microsoft Excel among others, on any platform. Comma - delimited: this is the ASCII format with commas. The format is used by database applications among others. HTML file: this file format is used for the Web and can be displayed on the Internet and company Intranet. It is also a universal format that can be read from various platforms. Adobe PDF file: this file format enables a report’s formatting to be preserved and read from any workstation with Adobe Acrobat Reader installed. Once the box is checked, click the FOLDER button in the File Name field, and choose the directory in which the file is to be saved, type the name and select the file format. If an existing file name is entered, © 2010 JOVACO Solutions inc. – Version 10.0.13 220 Project Reports Project Control it is possible to replace data from the existing file with new report data or to attach the new data to the existing file data. Once print outputs have been selected, click the PRINT button to print the report, or simply save the newly created/modified report option, then close the Trx Report Options window. From the Transactions Reports window, multiple reports may be printed at the same time. To do this, select a line from the Options box, then click the INSERT button. Repeat the step for each option wanted. To remove an option from the Print List box, select it and click REMOVE. The graphic layout of most reports offers an easy access to information: Report header includes the company logo and name, the report title, the sorting order and the options determined by the user who produced the report. The company name and report title appear on each report page. Column header includes the name of data fields appearing on the report. This header is printed on each report page. Report detail includes the data. Footer includes the system’s date, the default hour, the date, the name of the user of created the report and the page number. The footer appears on each report page. © 2010 JOVACO Solutions inc. – Version 10.0.13 221 Project Reports Project Control Example of report layout: © 2010 JOVACO Solutions inc. – Version 10.0.13 222 Project Reports Project Control Project Setup Reports (Reports >> Project >> Settings) Project Setup Reports feature enables you to printout the Project Setup settings that were specified in the windows of the Project Setup palette. Project Setup List: this report contains information entered in the Project Setup window. Sort : None Ranges : None Options : None Project Categories List: this report contains information entered in the Category Setup window. Sort : By category Ranges : Category Options : None Project Classes List: this report contains information entered in the Class Setup window. Sort : By class ID Range : Class Options : None Productivity List: this report contains information entered in the Productivity ID Setup window. Sort : By productivity Range : Productivity Options : None Project Divisions List: this report contains information entered in the Division Setup window. Sort : By division Range : Divisions © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : None 223 Project Reports Project Control Project Department List: this report contains information entered in the Department Setup window. Sort : By department Range : Department Options : None Expense Method: this report contains information entered in the Expense Invoicing Method Setup window. Sort : By expense Range : Expense Options : None Internal Expense Methods: this report contains information entered in the Internal Expense Invoicing Method Setup window. Sort : By internal expense Range : Internal Expense Options : None Fees Methods: this report contains information entered in the Fees Invoicing Method Setup window. Sort : By fees Range : Fees Options : None Territories List: this report contains information entered in the Region Setup window. Sort : By territory Range : Territory Options : None Project Resources List: this report contains information on the material resources entered in the Resource Setup window. Sort : By resource Ranges : Resource Options : None Employees List: this report contains information on the human resources entered in the Resource Setup window. Sort : By resource Ranges : Resource Options : None Branches List: this report contains information entered in the Branch Setup window. Sort : By branch Ranges : Branches Options : None Project Types List: this report contains information entered in the Project Type Setup window. Sort : By project type Ranges : Project type © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : None 224 Project Reports Project Control Service Types List: this report contains information entered in the Service Type Setup window. Sort : By service type Ranges : Service type Options : None Billable Rate by Employee: this report contains information on billable rates by employee. The information comes from the Fees Invoicing Method Setup and Resource Setup windows. Sort : By fees Ranges : Fees © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : Mark-up rate Include only employees gone 225 Project Reports Project Control Project Reports (Reports >> Project >> Projects) Project Reports enables report creation on all projects defined in the Project Control module. Project List: this report makes a list of projects defined in the Project Control module. The report is more or less detailed depending on the options selected. Sort : By project department By executive department By project Ranges : Project departments Executive department Projects Project starting date Project closing date Customers Project Managers Options : Include active projects Include closed projects Display Level 1/ Level 2/ Department Display by customer Display options: If the Level 1 option is clicked, only the level 1 will be included in the report; If the Level 2 option is clicked, level 1 and level 2 will be included in the report; If the Department option is clicked, the level 1, level 2 and department will be included in the report. © 2010 JOVACO Solutions inc. – Version 10.0.13 226 Project Reports Project Control Projects Card: this report contains information entered in Project Maintenance window. Sort : By project department By executive department By project Ranges : Project departments Executive department Projects Level 1 Project starting dates Project closing dates Coordinator Options : Include active projects Include closed projects Projects Estimate: this report contains information entered in Project Estimate window. Sort : By project Ranges : Project Level 1 Level 2 Categories Departments © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : 227 Project Reports Project Control Transaction Reports (Reports >> Project >> Control-Admin.) Transaction Reports produces a list of transactions made for the projects. Use the report drop-down list to sort and display information differently. Note: Document Date / Posting Date In all transaction report options window, Document Date / Posting Date option boxes are accessible. These boxes are useful only if a date range has been entered in the Period field. For example, if the October 1st 2002 to October 31st 2002 range has been entered in the Period field: To obtain document transactions dated from the month of October 2002, click the Document Date option box; To obtain the list of transactions posted in the month of October 2002, click the Posting Date option box. If the All option box in the Period field is checked, the selection made at the Posting Date and Document Date boxes is no longer in effect because all transactions will appear on the report. Project Transactions: this report enables all information to be obtained for transactions made in the projects. The report can be created in graphic format or in text format. Sort : None Ranges : Periods Project Level 1 Level 2 Department © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : Invoicing Date In detail Show costs Don’t show department (option only for reports in text format) Include employee benefits 228 Project Reports Project Control Category Include overhead Include correction transaction Include invoicing transaction Transactions by Employee: this report produces a list of project transactions by employee. Sort : None Ranges : Period Employee Project Level 1 Level 2 Department Category Options : In detail Show costs Include employee benefits Include overhead Include correction transaction Include labour transaction Include expense transaction Transactions by Vendor: this report produces a list of project transactions by vendor or human resource. Sort : None Ranges : Period Vendor Resource Project Level 1 Level 2 Department Category Options : In detail Show costs Include correction transaction Transactions by Resource: this report produces a list of project transactions by material resource. Sort: None Ranges: Period Resource Project Level 1 Level 2 Department Category Options: In detail Include correction transaction Invoicing Transactions: this report produces a list of project invoicing transactions (invoices, returns, credit notes) Sort: None Ranges: Period Project Level 1 Level 2 Department © 2010 JOVACO Solutions inc. – Version 10.0.13 Options In detail Include correction transaction 229 Project Reports Project Control Project Receipts: this report produces a list of project receipt transactions. Sort: None Ranges: Period Project Level 1 Level 2 Department Options: None Summary by Employee: this report contains the number of hours distributed to projects per employee. It may or may not contain costs and billable amounts for the hours, depending on the options selected. Sort : None Ranges : Period Project Level 1 Options : In detail Include total by date Display the costing, billable or do not display any amount Level 2 Department Resource © 2010 JOVACO Solutions inc. – Version 10.0.13 230 Project Reports Project Control Cost Control Reports (Reports >> Project >> Control-Costs) These control reports provide the user with different views of project costs vs. budget vs. invoiced amounts by project, level department and cost item. Items Costs Budget: Use this report to obtain a detailed portrait (including quantity, cost and billable value) of cost items by project by level, by department. Sort: Project Level 1 Level 2 Category (Cost Item) Ranges: Project Level 1 Level 2 Department Category (Cost Item) Options: Include open projects Include closed projects Project Results: Use this report to obtain the financial picture of your project including Budgeted and Actual Cost, Remaining to bill, Invoiced, Cashed and Gross Profit. Sort: Project Ranges: Project Posting Period © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Include open projects Include closed projects 231 Project Reports Project Control Project Cost Status: Use this report to obtain a detailed portrait of your project including labour, materials, subcontractor, expenses, other expenses, Inventory, Invoiced, and net amount to Bill Sort: Project Level 1 Level 2 Ranges: Project Level 1 Level 2 Posting Period Options: Include open projects Include closed projects Project Status: Use this report to obtain a detailed portrait of your project including Commitment, Period, To Date, Budget, Variation % and Actual costs. Sort: Project Level 1 Level 2 Ranges: Project Level 1 Level 2 Period Date Options: Include open projects Include closed projects Include Posting Date Ranges: Projects Level 1 Level 2 Departments Categories Customers Project Managers Options: Include open projects Include closed projects Social Benefits General expenses Customer currency By customer Cost performance: Sort: Document Date Report Date © 2010 JOVACO Solutions inc. – Version 10.0.13 232 Project Reports Project Control Control Reports – by Project (Reports >> Project >> Control-Project) The control report feature enables the control on active projects while providing information such as the number of hours allocated to projects, costs, billable amounts, authorized budgets, available budgets, etc. Reports are produced on a regular basis during projects to ensure an efficient project management while preventing overruns. Note: Document Date/Posting Date: In all control reports option windows, the Document Date / Posting Date option boxes are accessible. These options are useful only if a date range has been entered in the Period field. For example, if the October 1st 2002 to October 31st 2002 range has been entered in the Period field: To obtain transactions dated from the month of October 2002, click the Document Date option; To obtain a list of transactions posted in the month of October 2002, click the Posting Date option. If the All option in the Period field has been checked, the option selection for Document Date and Posting Date would have no effect because all transactions will appear on the report. © 2010 JOVACO Solutions inc. – Version 10.0.13 233 Project Reports Project Control Display Option Boxes: In all control reports option windows, the Project, Level 1, Level 2, Department and Category option boxes are accessible: Click the Project option to detail only the project on the report; Click the Level 1 option to detail the project and level 1 on the report; Click the Level 2 option to detail the project, level 1 and level 2 on the report; Click the Department option to detail the project, level 1, level 2 and department on the report; Click the Category option to detail the project, level 1, level 2, department and category on the project. Complete Project Analysis – by Project: use this report to obtain a detailed portrait by project of active projects. It contains the number of budgeted hours, the number of actual hours for the period and to date, the hour cost for the period and to date, and the billable amount for the period and to date as well as the gross profit percentage. Sort: None Ranges: Period Project Level 1 Level 2 Department Customer Options: Include open projects Include closed projects Include period only Include costing Include billable Include employee benefits Include overhead Display in detail Display by customer Project Evolution – by Project: use this report to follow by project the evolution of active projects. The project information includes: the status, billing method, distribution total for the period, authorized budget, amount billed to date, work in progress, invoicing surplus/deficit, project costs to date and available budget. Sort: None Ranges: Period Project Project type Level 1 Level 2 Department Customer Branch Options: Include open projects Include closed projects Include period only Include negative available budget Include invoicing surplus/deficit Include labour supply Display by customer Project Profitability – by Project: use this report to view active projects’ profitability to date. The project information includes: the revenues (labour, others, surplus/deficit, total), costs (labour, others, total), gross profit, and gross profit percentage on labour. Sort: By projects By project type Ranges: Period Project Project type Level 1 Level 2 © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Include open projects Include closed projects Include period only Include employee benefits Include overhead 234 Project Reports Project Control Department WIP Aging – by Project: use this report to view, by project, all work in progress in chronological order from a cut-off date. The project information includes: the posted revenues, WIP total, credit balances and works in chronological order. Sort: By projects By project type Ranges: Project Level 1 Level 2 Department Customer Options: Include open projects Include les closed projects Display by customer WIP and RM Aging – by Project: use this report to view, WIP and accounts receivables in chronological order from a cut-off date. The project information includes: the posted revenues, WIP total, credit balances and accounts in chronological order. Sort: By projects By project type Ranges: Project Level 1 Level 2 Departments Customer © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Include open projects Include closed projects Display by customer 235 Project Reports Project Control Control Reports – by Project Executive (Reports >> Project >> Control – Proj. Exec.) The control report feature enables the control on active projects while providing information such as the number of hours allocated to projects, costs, billable amounts, authorized budgets, available budgets, etc. The control is performed by project. Reports are produced on a regular basis during projects to ensure an efficient project management while preventing any possible overrun. Note: Document Date/Posting Date: In all control reports option window, the Document Date / Posting Date option boxes are accessible. These options are useful only if a date range has been entered in the Period field. For example, if the October 1st 2002 to October 31st 2002 range has been entered in the Period field: To obtain transactions dated from the month of October 2002, click the Document Date option; To obtain a list of transactions posted in the month of October 2002, click the Posting Date option. If the All option in the Period field has been checked, the option selection for Document Date and Posting Date will have no effect because all transactions will appear on the report. Display Option Boxes: In all control reports option windows, the Project, Level 1, Level 2, Department and category option boxes are accessible: Click the Project option to detail only the project on the report; Click the Level option to detail the project and level 1 on the report; Click the Level 2 option to detail the project, level 1 and level 2 on the report; Click the Department option to detail the project, level 1, level 2 and department on the report; Click the Category option to detail the project, level 1, level 2, department and category on the project. © 2010 JOVACO Solutions inc. – Version 10.0.13 236 Project Reports Project Control Complete Project Analysis – by Project Executive: use this report to obtain a detailed portrait by project executive of active projects. It contains the number of budgeted hours, the number of actual hours for the period and to date, the hour cost for the period and to date, and the billable amount for the period and to date as well as the gross profit percentage. Sort: None Ranges: Period Project department Project executive Project Level 1 Level 2 Department Customer Options: Include open projects Include closed projects Include la period only Include costing Include billable Include employee benefits Include overhead Display in detail Display by customer Project Evolution – by Project Executive: use this report to follow by project executive the evolution of active projects. The project information includes: the status, billing method, distribution total for the period, authorized budget, amount billed to date, work in progress, invoicing surplus/deficit, project costs to date and available budget. Sort: None Ranges: Period Project department Project executive Project Project type Level 1 Level 2 Department Customer Options: Include open projects Include closed projects Include period only Include the negative available budget Include invoicing surplus/deficit Include labour supply Display by customer Project Profitability – by Project Executive: use this report to view, by project executive, the profitability to date of active projects. The project information includes: revenues (labour, other, surplus/deficit, total), costs (labour, other, total), gross profit, and gross profit percentage on labour. Sort: By project department de project By project executive Ranges: Period Project department Project executive Project Level 1 Level 2 Department © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Include open projects Include closed projects Include employee benefits Include overhead 237 Project Reports Project Control WIP Aging – by Project Executive: use this report to view by project executive, all work in progress in chronological order from a cut-off date. The project information includes: posted revenues, WIP total, credit balances and works in chronological order. Sort: By project department By project executive Ranges: Project Level 1 Level 2 Department Customer Project department Project executive Options: Include open projects Include closed projects Display by customer WIP and RM Aging – by Project Executive: use this report to view by project executive, WIP and accounts receivable in chronological order from a cut-off date. The project information includes: posted revenues, WIP total, credit balances and accounts in chronological order. Sort: By project department By project executive Ranges: Project Level 1 Level 2 Department Customer Project department Project executive © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Include open projects Include closed projects Display by customer 238 Project Reports Project Control Control Reports – by Coordinator (Reports >> Project >> Control – Project Manager) The control report feature enables the control on active projects by providing information such as the number of hours allocated to projects, costs, billable amounts, authorized budgets, available budgets, etc. The control is performed by project. Reports are produced on a regular basis during projects to ensure an efficient project management while preventing overruns. Note: Document Date / Report Date: In all control reports option windows, the Document Date / Posting Date option boxes are accessible. These options are useful only if a date range has been entered in the Period field. For example, if the October 1st 2002 to October 31st 2002 range has been entered in the Period field: To obtain transactions dated from the month of October 2002, click the Document Date option; To obtain a list of transactions posted in the month of October 2002, click the Posting Date option. If the All option in the Period field has been checked, the option selection for Document Date and Posting Date would have no effect because all transactions will appear on the report. Display Option Boxes: In all control reports option windows, the Project, Level 1, Level 2, Department and category option boxes are accessible: Click the Project option to detail only the project on the report; Click the Level option to detail the project and level 1 on the report; Click the Level 2 option to detail the project, level 1 and level 2 on the report; Click the Department option to detail the project, level 1, level 2 and department on the report; Click the Category option to detail the project, level 1, level 2, department and category on the project. Complete Project Analysis – by Coordinator: use this report to obtain a detailed portrait of active projects by coordinator. It contains the number of budgeted hours, the number of actual hours for the © 2010 JOVACO Solutions inc. – Version 10.0.13 239 Project Reports Project Control period and to date, the hour cost for the period and to date, and the billable amount for the period and to date as well as the gross profit percentage. Sort : None Ranges : Period Executive department Coordinator Project Level 1 Level 2 Customer Options : Include open projects Include closed projects Include period only Include costing Include billable Include employee benefits Include overhead Display in detail Display by customer Project Evolution – by Coordinator: use this report to follow the evolution of active projects by coordinator. The project information includes: status, billing method, distribution total for the period, authorized budget, amount billed to date, work in progress, invoicing surplus/deficit, project costs to date and available budget. Sort : None Ranges : Period Executive department Coordinator Project Project type Level 1 Level 2 Customer Options : include open projects Include closed projects include period only Include negative available budget Include invoicing surplus/deficit Include labour supply Display by customer Project Profitability – by Coordinator: use this report to view the profitability to date of active projects, by coordinator. The project information includes: revenues (labour, other, surplus/deficit, total), costs (labour, other, total), gross profit, and gross profit percentage on labour. Sort : By executive department By coordinator Ranges : Period Executive department Coordinator Project Level 1 Level 2 © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : Include open projects Include closed projects Include employee benefits Include overhead 240 Project Reports Project Control WIP Aging – by Coordinator: use this report to view by coordinator, all work in progress in chronological order from a cut-off date. The project information includes: posted revenues, WIP total, credit balances and works in chronological order. Sort : By executive department By coordinator Ranges : Project Level 1 Level 2 Customer Executive department Coordinator Options : Include open projects Include closed projects Display by customer WIP and RM Aging – by Coordinator: use this report to view by coordinator, all WIP and accounts receivable in chronological order from a cut-off date. The project information includes: posted revenues, WIP total, credit balances and accounts in chronological order. Sort : By executive department By coordinator Ranges : Project Level 1 Level 2 Customer Executive department Coordinator Options : Include open projects Include closed projects Display by customer Work in Progress: use this report to view work in progress by executive department from a cut-off date. The project information includes: department, project executive, status, billing (fees –method and markup rate-, expenses – method-), work in progress (fees, expenses, total). Sort : By executive department Ranges : Executive department © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : Include by posting date Include WIP to zero Display in detail 241 Project Reports Project Control Productivity Report (Reports >> Project >> Productivity) The productivity report feature helps measure staff productivity in terms of billable and not billable hours. Hours Billable by Employee: use this report to view the billable hour percentage of employees. The report details include: productive hours (hours not billable, hours billable, total hours, billable hour percentage) and amounts (billable amount, amount worked, and billable amount percentage). Sort : None Ranges : Employee division Employee department Employee Period Options : Show costs Include employee benefits Hours Not Billable by Employee: use this report to view the percentage of hours not billable, by employee, for a period or fiscal year. The report details include: hours not billable associated to productivity IDs (column headings are defined in the Group Setup window- Setup >>Project>>Prod. ID Group). Sort : None Ranges : Employee division Employee department Employee Period Fiscal year © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : none 242 Project Reports Project Control Staff Productivity: use this report to view employee productivity. The report details include: hours associated with productivity IDs (column headings are defined in the Group Setup window – Setup>>Project>>Prod. ID Group), totals by employee, department and division of hours worked and corresponding amounts, productivity and corresponding productivity percentage. Sort : None Ranges : Employee division Employee department Employee Period Options : Show costs Include employee benefits Display in detail Annual Tracking by Employee: use this report to view the number of hours worked by productivity ID, for each employee, from a cut-off date. Sort : None Ranges : Employee department Employee Period Options : Show costs Include employee benefits Display in detail Bank Time List: use this report to create a list of employee hour banks. The report details include: name and employee number, number of bank hours for each employee and the corresponding dollar amount. Sort : None Ranges : Employee department Employee Options : None Vacation Bank: use this report to create a list of employee vacation hour banks. The report details include: name and employee number, number of vacation bank hours and the dollar amount for the previous year, current year and the total of both years. Sort : None Ranges : Employee department Employees Options : none Sick Leave Bank List: use this report to create a list of employee sick leave banks. The report details include: name and employee number, number of sick leave bank hours for each employee and the corresponding dollar amount. Sort : None Ranges : Employee department Employee Options : none Hours by Employee: use this report to create a list of hours by hour types, for each employee in a given period. The report details include: total hours of regular, overtime, special, sick, holiday and vacation time, regular hour and overtime bank, and the grand total. Sort : None Ranges : Employee Period © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : Display in detail 243 Project Reports Project Control History Register (Reports >> Project >> History Register) The project history register includes information on posted transactions from timesheets, expense reports, internal expense, adjustments and revenues. Timesheets Register: use this report to obtain the history of posted timesheet transactions by audit trail ID, batch ID and/or posting date range. The report details includes: batch ID, audit trail ID, document number, transaction details (department, date, employee name and number, project, level 1, level 2, category, hour type, cost, billable, productivity ID, inter-department rate, salary), invoicing type, distributions as well as totals by department and division. Sort: By audit trail ID By batch ID By posting date Ranges: Audit trail ID Batch ID Posting date Options: None Employee Expense Register: use this report to obtain the history of posted expense transactions by audit trail ID, batch ID and/or posting date range. The report details include: batch ID, audit trail ID, document number, transaction details (department, date, employee name and number, units, expenses, amount transferred to accounts payable, amount transferred to payroll, open amount, invoice type, billable, department, project, level 1, level 2, category, expense, taxes, cost, description, date, quantity/unit, schedule, cost billable), distributions as well as totals by department and division. Sort: By audit trail ID By batch ID By posting date Ranges: Audit trail ID Batch ID Posting date © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: None 244 Project Reports Project Control Internal Expense Register: use this report to obtain the history of posted internal expense transactions by audit trail ID, Batch ID and/or posting date range. The report details include: batch ID, audit trail ID, document number, material resource name and ID, employee, date, quantity, transaction details (invoice type, billable, department, project, level 1, level 2, category, cost, description, date, and cost billable, by project), distributions as well as totals by department and division. Sort: By audit trail ID By batch ID By posting date Ranges: Audit trail ID Batch ID Posting date Options: None Adjustment Register: use this report to obtain the history of posted adjustment transactions by audit trail ID, batch ID and/or posting date range. The report details include: batch ID, audit trail ID, document number, transaction details (productivity ID, project, level 1, level 2, department category, quantity/hours, cost, billable rate, billable amount, date, posting date, resource, intercompany cost, and discount amount). Sort: By audit trail ID By batch ID By posting date Ranges: Audit trail ID Batch ID Posting date Option : None Earnings Register: use this report to obtain the history of posted earnings transactions by audit trail ID, batch ID and/or posting date range. The report details include: batch ID, audit trail ID, document number, department, date, transaction details (department, project, level 1, level 2, and amount), distributions and totals by department. Sort: By audit trail ID By batch ID By posting date Ranges: Audit trail ID Batch ID Posting date © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: None 245 Project Reports Project Control Invoicing Report (Reports >> Project >> Invoicing Detail) Invoicing Detail: use this report to obtain details on the hours to bill, by project and level, and for easy invoice tracking. The report details include: date, resource, resource name, class, quantity/hours, cost, rate, billable amount, reference, division, department, project executive, project, customer, level 1, level 2, project total, project executive’s total, and project department total. Sort : None Ranges : Project department Project executive Project Level 1 Level 2 Department Category Period Options : Include closed projects Display summary table Display reset table Process type Invoicing date Note: Process Type: three options are available to produce the invoicing detail report: Pre-list: used to obtain an overview of invoicing detail. In using this type, the user determines billable transactions and not billable transactions. Billed Detail: used to identify all transactions billed. Detail Cancellation: used to remove tags from billed transactions (cancels the Billed Detail process). © 2010 JOVACO Solutions inc. – Version 10.0.13 246 Project Reports Project Control Intercompany Invoicing detail Sort: None Range: Project department Project Manager Projects Level 1 Level 2 Departments Categories Branches Options: Display summary table Display the table at zro Project currency Closed Projects Note: Process Type: There are three options available to create detailed invoicing reports: Pre-list: allows you to obtain a detailed view of the invoices. By using this type of process, users choose the billable and non-billable transactions. Invoiced detailed: allows you to indentify all transactions which have been invoiced. Detail Cancellation: allows you to remove transactions already tagged as invoiced (cancels the Invoiced Detail process). © 2010 JOVACO Solutions inc. – Version 10.0.13 247 Project Reports Project Control Inactive Projects Reports (Reports >> Project >> Inactive Project) Inactive Projects Reports enables the creation of reports on all inactive projects defined in the Project Control module. Inactive Projects List: use this report to create a list of inactive projects defined in the Project Control module. The report will be more or less detailed, depending on the options selected. Sort : By project department Ranges : Project department By executive department By project Executive department Projects Project starting date Project closing date Coordinator Customer Options : Display level 1 / niveau2 / department Display by customer Display options: Click the Level 1 option to detail the project and level 1 on the report; Click the Level 2 option to detail the project, level 1 and level 2 on the report; Click the Department option to detail the project, level 1, level 2 and department on the report; © 2010 JOVACO Solutions inc. – Version 10.0.13 248 Project Reports Project Control Inactive Project Cards: this report provides information on inactive projects entered in the Project Maintenance window. Sort : By project department By executive department By project Ranges : Project department Executive department Projects Level 1 Project starting date Project closing date Coordinator © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : None 249 Project Reports Project Control Inactive Project Control Reports – by Project (Reports >> Project >> Inactive – Ctrl Project) Inactive project control reports provide information on past projects such as the number of hours allocated to projects, costs, billable amounts, authorized budgets, available budgets, etc. Note: Document Date/Posting Date: In all control reports option windows, the Document Date / Posting Date option boxes are accessible. These options are useful only if a date range has been entered in the Period field. For example, if the October 1st 2002 to October 31st 2002 range has been entered in the Period field: To obtain transactions dated from the month of October 2002, click the Document Date option; To obtain a list of transactions posted in the month of October 2002, click the Posting Date option. If the All option in the Period field has been checked, the option selection for Document Date and Posting Date will have no effect because all transactions will appear on the report. Display Option Boxes: In all control reports option windows, the Project, Level 1, Level 2, Department and category option boxes are accessible: Click the Project option to detail only the project on the report; Click the Level option to detail the project and level 1 on the report; Click the Level 2 option to detail the project, level 1 and level 2 on the report; Click the Department option to detail the project, level 1, level 2 and department on the report; Click the Category option to detail the project, level 1, level 2, department and category on the project. © 2010 JOVACO Solutions inc. – Version 10.0.13 250 Project Reports Project Control Complete Inactive Project Analysis – by Project: use this report to obtain a detailed portrait of inactive projects, by project. It contains the number of budgeted hours, the number of actual hours of the period and to date, the hour cost for the period and to date, and the billable amount for the period and to date as well as the gross profit percentage. Sort : None Ranges : Period Projects Level 1 Level 2 Department Options : Include period only Include costing Include billable Include employee benefits Include overhead Display in detail Display by customer Inactive Project Evolution – by Project: use this report to follow the evolution of inactive projects, by project. The project information includes: status, billing method, distribution total for the period, authorized budget, amount billed to date, work in progress, invoicing surplus/deficit, project costs to date and available budget. Sort : None Ranges : Period Projects Project type Level 1 Level 2 Department Options : Include la period only Include negative available budget include invoicing surplus/deficit Include labour supply Display by customer Inactive Project Profitability – by Project: use this report to view the profitability to date of inactive projects, by project. The project information includes: revenues (labour, other, surplus/deficit, total), costs (labour, other, total), gross profit, and gross profit percentage on labour. Sort : by project by project type Ranges : periods projects project type level 1 level 2 departments © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : include les employee benefits include les overhead 251 Project Reports Project Control Inactive Project Transaction Reports (Reports >> Project >> Inactive – Ctrl admin.) Inactive Project Transactions Reports creates a list of transactions performed in inactive projects. Note: Document Date/Posting Date: In all control reports option windows, the Document Date / Posting Date option boxes are accessible. These options are useful only if a date range has been entered in the Period field. For example, if the October 1st 2002 to October 31st 2002 range has been entered in the Period field: To obtain transactions dated from the month of October 2002, click the Document Date option; To obtain a list of transactions posted in the month of October 2002, click the Posting Date option. If the All option in the Period field has been checked, the option selection for Document Date and Posting Date will have no effect because all transactions will appear on the report. Inactive Project Transaction by Vendor: this report creates a list of inactive project transactions by vendor or human resource. Sort : none Ranges : Period Vendor Resource Projects Level 1 Level 2 Department Category © 2010 JOVACO Solutions inc. – Version 10.0.13 Options : Display detail Show costs Include correction transaction 252 Project Reports Project Control Transactions of inactive projects: this report allows you to create a list of Inactive project transactions Sort: Project Department Department Manager Projects Ranges: Project Department Department Manager Projects Project Start Date Project End Date Coordinators Customers © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: By Customer 253 Project Reports Project Control Control Reports of Inactive Projects – by Manager (Reports >> Project >> Inactive – Ctrl inactive projects) Profitability of inactive projects – by manager: This report will allow you to know, in real time, the profitability of inactive projects by manager. This report provides for a project: the Revenues (labour others, surplus/deficit, total), Costs (labour, others, total), Gross Profit, and Gross Profit % on labour. Sort: Project Department Project Executive Ranges: Project Level 1 Level 2 Department Period © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Employee Benefits Overhead 254 Project Reports Project Control Control Reports – Master Projects (Reports – Project – Control – Master Projects) These reports will allow you to produce a report on the ensemble of reports that you have grouped in the Master Project functions (Cards >> Project >> Master Projects). Transactions by Master Project: This report lists the transactions of all the reports that are part of the selected master project. Sort: Document Date Posting Date Ranges: Period Master Projects Options: Projects Levels Modifications Departments Transactions Summary by Master Project: This report lists the summary of transactions of all the reports that are part of the selected master project. Sort: Document Date Posting Date Ranges: Period Master Projects © 2010 JOVACO Solutions inc. – Version 10.0.13 Options: Projects Levels Modifications Departments 255 Project Inquiry Project Control Inquiry – Project (Inquiry >> Project) To view Project Control module data quickly, use the Project Inquiry windows. Display Arrow Use the display arrows in the lower left window corner to quickly display data viewable in these windows. Click the drop down list arrow to select the data’s order of appearance. The arrow on the extreme left is for viewing the first line of data on the list. The arrow on the extreme right is for viewing the last line of data. The two arrows in the middle are for viewing the previous or following entry. Show/Hide Buttons Use the Show/Hide buttons on the right corner of the scroll box to view more details on the line being displayed. © 2010 JOVACO Solutions inc. – Version 10.0.13 256 Project Inquiry Project Control Budget Tracking Inquiry (Inquiry >> Project >> Budget Tracking) Use the Budget Tracking Inquiry window to view amounts to date of costs, billable and hours in relation to budgeted costs, billable and hours. This information is helpful for comparing a project’s actual activity with budgeted amounts. Select a line in the scroll box and click the expand button from the Project, Level 1, Level 2 or Department field to view in more detail actual amounts and budgeted amounts for the project level or department. © 2010 JOVACO Solutions inc. – Version 10.0.13 257 Project Inquiry Project Control Select a line from the scroll box and click the Budget field to open the Budget Maintenance window and display the budget of a project level. Select a line in the scroll box and click the Costs, Billable or Hours field to open the Project Status Inquiry window to view category, amounts to date of costs, billable and hours in relation to budgeted costs, billable, and hours for a project department. © 2010 JOVACO Solutions inc. – Version 10.0.13 258 Project Inquiry Project Control Project Status Inquiry (Inquiry >> Project >> Project Status) Use the Project Status Inquiry window to view amounts to date of costs, billable and hours in relation to budgeted costs, billable and hours for each project department category. Click the Project, Level 1, Level 2 or Department field to open the Project Maintenance, Project Maintenance : Level 1, Project Maintenance : Level 2 or Department Setup window. Select a line and click the Costs, Billable, Hours or Budget field to open the Project Transaction Inquiry window and view transactions from the selected category. © 2010 JOVACO Solutions inc. – Version 10.0.13 259 Project Inquiry Project Control Project Transaction Inquiry (Inquiry >> Project >> Trx by Project) The Project Transaction Inquiry window is helpful in viewing project transactions for each category. Select a project that contains the transactions to be viewed. Different options can be selected in this window; Display active or inactive project transactions, include or not to include cost-plus and overhead, define a period or select all, define or not to define a category range. Click the Project, Level 1, Level 2 or Department field to open the Project Maintenance, Project Maintenance: Level 1, Project Maintenance : Level 2 or Department Setup window. © 2010 JOVACO Solutions inc. – Version 10.0.13 260 Project Inquiry Project Control Employee Transaction Inquiry (Inquiry >> Project >> Trx. By Employee) The Employee Transaction Inquiry window is used to display project transactions for an employee. Select an employee who is assigned to the transactions to be viewed. Different options can be selected from this window: display active or inactive project transactions, define a period or select all, define or not to define project, level 1, level 2, department and category ranges. In the scroll box, click the Project, Level 1, Level 2, Department or Category field to open the Project Maintenance, Project Maintenance: Level 1, Project Maintenance: Level 2, Department Setup, or Cost Items window. Click the Document No. field to open the Timesheets Trx Inquiry or Expense Report Transaction window to view transaction details. © 2010 JOVACO Solutions inc. – Version 10.0.13 261 Project Inquiry Project Control Vendor Transaction Inquiry (Inquiry >> Project >> Trx. By Vendor) The Vendor Transaction Inquiry window displays project transactions for a vendor. Select a vendor to which belong the transactions to be viewed. Different options can be selected in this window: display active or inactive project transactions, define a period or select all, define or not to define project, level 1, level 2, department and category ranges. In the scroll box, click the Project, Level 1, Level 2, Department or Category field to open the Project Maintenance, Project Maintenance: level 1, Project Maintenance: level 2, Department Setup or Cost Items window. Click the Document No. field to open the Payables Transaction Entry Zoom window and view transaction details. © 2010 JOVACO Solutions inc. – Version 10.0.13 262 Project Inquiry Project Control Resource Transaction Inquiry (Inquiry >> Project >> Trx. By Resource) Use the Resource Transaction Inquiry window to view project transactions for a material resource. Select a material resource to which belong the transactions to be viewed. Different options can be selected from this window: display active or inactive project transactions, define a period or select all, define or not to define project, level 1, level 2, department and category ranges. In the scroll box, click the Project, Level 1, Level 2, Department or Category field to open the Project Maintenance, Project Maintenance: Level 1, Project Maintenance : Level 2, Department, Setup or Cost Items window. Click the Document No. field to open the Int. Expense Account Trx Inquiry window and view transaction details. © 2010 JOVACO Solutions inc. – Version 10.0.13 263 Project Inquiry Project Control Invoicing Transaction Inquiry (Inquiry >> Project >> Invoicing Trx.) Use the Invoicing Transaction Inquiry window to view project invoicing transactions. Select a project that belongs to the invoicing transactions being viewed. Different options can be selected from this window: display active or inactive project transactions, define a period or select all, define or not to define project, level 1, level 2 and department ranges. In the scroll box, click the Level 1, Level 2 or Department field to open the Project Maintenance, Project Maintenance : Level 1, Project Maintenance : Level 2 or Department Setup window. Click the Document No. to open the Receivables Transaction Inquiry Zoom window and view transaction details. © 2010 JOVACO Solutions inc. – Version 10.0.13 264 Project Inquiry Project Control Billable Rate by Employee (Inquiry >> Project >> Billable Rate by Employee) In the case of Fee Method based on a mark up, whether it is by base unit cost or adjusted annual salary, this function allows you to display the fee method that will be calculated according to a specific mark up rate. Fees Method Select all or a specific fee method Employee Select all or a specific employee for which a mark up will apply. Class Select all or a specific class of employees for which a mark up will apply. Division Select all or a range of divisions for which a mark up will apply. © 2010 JOVACO Solutions inc. – Version 10.0.13 265 Project Inquiry Project Control Department Select all or a range of departments for which a mark up will apply. Employee Gone Check this box to include inactive employees. Mark-up Enter the required mark-up rate. © 2010 JOVACO Solutions inc. – Version 10.0.13 266 Project Inquiry Project Control Purchase Order Transaction (Inquiry >> Project >> Purchase Order Transaction) This function allows you to identify and consult the balance of the commitment of all purchase orders submitted for a specific project. Select a project in which you wish to view purchase order transactions. Different options can be selected in this window: display active or inactive project transactions, define all or a specific period, decide whether to define or not a range of level 1s, level 2s, departments and categories. In the scrolling window, click on the field Level 1, Level 2, Department or Category to open the Project Maintenance window: Level 1, Level 2, Department Setup, and Category Setup. Click on the field Order to open the Purchase Order Inquiry Zoom in order to view the transaction details. © 2010 JOVACO Solutions inc. – Version 10.0.13 267 Project Inquiry Project Control Project View This function will allow you to view the project setup. You can then give certain users view-only access to the Project Card, therefore will not be able to modify any of the information. Project Enter a Project ID or select one from the list of project by click on the magnify glass. © 2010 JOVACO Solutions inc. – Version 10.0.13 268 Project Routines Project Control Routines - Project (Tools>> Routines >> Project) Bank Update If your employees have a periodic accumulation factor (see Resource Bank Setup) for their sick or vacation banks, this processing will allow you include an accumulation factor to their banks. The date of the last bank update is displayed. Most Recent Bank Update Enter the current date of the update Synchronize Click on this button to synchronize the amounts that appear in the Canadian Payroll from the amounts that appear in the Project Control module. This processing is execute once; at the Payroll module implementation. Process This function allows you to add the number of hours from the corresponding bank accumulation factor. This processing is done typically at each pay period. © 2010 JOVACO Solutions inc. – Version 10.0.13 269 Project Routines Project Control Year-End Closing For the vacation bank time maintenance, you would normally have to add all the vacation hours accumulated over the course of the year to the remaining balance of the vacation hours from the previous year. For the sick bank time maintenance, you will also assure the re-initialization of these hours once a year. Closing All Sickness Vacation Check this box if you want to update both your sick and vacation hours. Check this box if you want to update only the sick hours. Check this box if you want to update only the vacation hours. Sickness Hours During the annual re-initialization of the sick hours, indicate the number of sick hours the employee has right to in a year. Report printed Check this box if you want to print a report relating to the update executed. © 2010 JOVACO Solutions inc. – Version 10.0.13 270 Project Routines Project Control Re-evaluation of the projects in the invoicing currency that is different from the functional currency. (Tools >> Routines >> Project >> Currency Re-evaluation) For projects in which the invoicing currency (see Project Maintenance) if different from the functional currency, it is necessary to proceed with a periodic re-evaluation of project to ensure an automatic posting of foreign exchange gain or loss associated to the concerned project. Results: Post Print Report Only Calculate Gain/Loss: Unrealized Realized Currency ID Rate Type ID Date Exchange Rate Select this option if you wish to proceed with the posting Select this option if you wish to visualize the re-evaluation amounts of each project without posting the transactions. Select this option if you wish to allocate the unrealized foreign exchange gain/loss account Select this option if you wish to allocated the realized foreign exchange gain/loss account Check the currencies that you wish to re-evaluate. You would typically choose all currencies available. Indicate the appropriate cut-off date for each currency. Once the date has been entered, the rate, pre-defined in the multi-currency conversion table, is displayed and can be modified. © 2010 JOVACO Solutions inc. – Version 10.0.13 271 Project Utilities Project Control Update Grades Tools>Routines>Projects>Update Grades The last Grade update is displayed Click the button Process to generate a list of resources since the last update that are in a lower grade than their number of months of experience. © 2010 JOVACO Solutions inc. – Version 10.0.13 272 Project Utilities Project Control Mileage Rate Update Tools>Routines>Projects>Rate update This function will change the reimbursement total within the Cost Items table. Example: $0.40 for $0.45 It is not possible to update the rate to 0 You can specify is there is a particular category that you would like to update © 2010 JOVACO Solutions inc. – Version 10.0.13 273 Project Utilities Project Control Utilities - Project Recalculate Commitments (Tools >> Utilities >> Project >> Recalculate Commitments) There are times when the current commitment values from purchase orders need to be adjusted. This function allows you to recalculate and adjust the values from current commitments presented in the project inquiry windows. From Project Enter the ID of the first project to be recalculated To Project Enter the ID of the last project to be recalculated © 2010 JOVACO Solutions inc. – Version 10.0.13 274 Project Utilities Project Control Inactive Project Transfer (Tools >>Utilities >> Project >> Inactive Project Transfer) Once projects are completed, it is possible to transfer data from these projects to the inactive project data tables. This function therefore allows you to reduce the volume of data in the active project tables. Transfer Select this option if you wish to transfer active project data tables to the inactive project data tables. Restore Select this option if you wish to restore the inactive project data tables and reintegrate them in the active project tables. Clear Once the data has been transfer to the inactive project tables, it is possible to clear the project data; in other words, eliminate complete the data from the system. It is therefore no longer possible to access this data. Once a project has been restored from the inactive projects, it is necessary to reopen the project if you wish to allocate new transactions to this project. © 2010 JOVACO Solutions inc. – Version 10.0.13 275 Project Utilities Project Control Project Control Installation Refer to the Project Control installation guide to know the dictionary installation procedures. Once the installation is complete, you can access the Project Control Installation to register your software and to proceed with the dictionary update. Record Button Click on this button to enter the registration keys of the Project Suite software that you possess. Initialization Button Click on this button to create a new company in Project Control to create new empty tables. © 2010 JOVACO Solutions inc. – Version 10.0.13 276 Project Utilities Project Control Posting Update Click this button, after a version migration, to recreate the audit code trails in Dynamics GP. Update Click this button, for the Project Control dictionary after every update in order to have access to the new fields within the different tables and to create stored procedures in SQL. You need to check the companies that you would require to update. The buttons Check All and Uncheck All will enable you to check or uncheck for all available companies. Once you have completed your selection, you need to click the button Update to start the process. The ststus bar will display the update’s progress. Indicator next to the company: x Red: displays the version of the database is different that the dictionary version; ! Yellow: displays the version of the database is equal to the dictionary version, but the version date is different that the build date (probably due to an SQL Stored Procedures update); √ Green: displays the version of the database is equal to the version of the dictionary and the version date is the same as the build date. View Trace Click this button to view the execution report of the update once the process has been completed or interrupted. Permission Click this button to give users the permission to access Project Control tables. © 2010 JOVACO Solutions inc. – Version 10.0.13 277 ANNEXES Project Suite Annexes Integrated Solution © 2009 JOVACO Solutions inc. – Version 10.0 I ANNEXES Project Suite General Overview Customers Billing Methods Projects Labour Billing Direct Expenses Transactions to Projects Payment Internal Charges Inventory Progress © 2009 JOVACO Solutions inc. – Version 10.0 II ANNEXES Project Suite Project Structure © 2009 JOVACO Solutions inc. – Version 10.0 III ANNEXES Project Suite Project Responsibilities © 2009 JOVACO Solutions inc. – Version 10.0 IV ANNEXES Project Suite Accounting Relationship Project XYZ Level 1 Level 1 Division XXX Dept A XXX XXXX Department Category Category Category © 2009 JOVACO Solutions inc. – Version 10.0 V ANNEXES Project Suite Inter-department Project XYZ Level 1 Level 1 Level 1 Level 2 Resources Dept A Dept B Employee 01 Dept A Employee 02 Dept A Employee 03 Dept B Inter-department © 2009 JOVACO Solutions inc. – Version 10.0 VI ANNEXES Project Suite Relationships PROJECT Job00101 User defined fields Job00111 Resources Job00203 Invoicing Methods Job40107+108+109 Job40207+208+209 Billing Job00203 Specific Rates Job00303+304+305 Level 1 Job00201 User defined fields Job00211 Invoicing Methods Job40107+108+109 Job40207+208+209 Billing Job00203 Specific Rates Job00303+304+305 Level 2 Job00301 User defined fields Job00311 Invoicing Methods Billing Job00203 Departments Budgets Job00202 + Job00302 Cost Items Job40115 © 2009 JOVACO Solutions inc. – Version 10.0 Departments Budgets Job00202 Job00302 Job40107+108+109 Job40207+208+209 Specific Rates Job00303+304+305 Categories Job40102 Cost Items Job40115 VII ANNEXES Project Suite Annexes © 2009 JOVACO Solutions inc. – Version 10.0 VIII ANNEXES © 2009 JOVACO Solutions inc. – Version 10.0 Project Suite IX ANNEXES © 2009 JOVACO Solutions inc. – Version 10.0 Project Suite X ANNEXES Project Suite Glossary Adjustment Operation which allows you to correct an error when entering a project assignment. Actual Progress Percentage of the project based on completed work. Adjusted annual salary Hourly rate calculated based on a resource's annual salary divided by the number of hours annually. Adjustment Mass Selection Operation which allows you to simultaneously select several projects Agreement Number Number assigned by Emploi-Québec to an organization to encourage the professional development of their employees (1%) by allowing the organization to be reimbursed for their training. Approval Controls Administrative functions that allow you to identify the external time and material required, to issue purchase orders and to manage purchases: price lists, payment and delivery terms, etc. Available labor Difference between the available number of billable hours versus the actual billable transactions per day. Bank of hours Number of hours present at work which surpasses the standard daily or weekly amount which are held to be used at a later date. Billable Time, expense or internal transactions which will be invoiced to a customer. Billable hours Hours that can be invoiced to the customer for work completed. Billable rate Unit rate on a invoice of a value of a transaction. Billing rate Billing rate for each expense or internal cost allocated to a particular project. Branch Creation of an organization of company, which has a certain autonomy, without being legally separate. © 2009 JOVACO Solutions inc. – Version 10.0 XI ANNEXES Project Suite Budget Tool to plan and to control the utilization of a resource on a project. The project budget includes the estimate of hours as well as the costs and direct revenue accrued. It is used to determine the objectives of the organization by comparing it to various elements within a project. Budget Type Type of budget control for a project. The possible types are separated by each category anticipated or by the project's budget summary by department. Budgeted hours Estimated number of hours for a project. Budgeting Process to create and allocate budgets. Closing date Date that a project is closed. Complete title Detailed description on a invoice. Cost Category A cost category that defines an aspect of the project or project group where the costs could be entered. The cost categories are defined by a specific activity completed by the same resource as other direct costs incurred to complete a project. Cost items Cost item corresponding to a cost category linked to a particular project. The difference from a cost category is that a cost item is linked to a particular project. A complete list of the cost items within a project has a complete description of the work and cost to the project. Cost Rate Unit cost of a transaction. Cost type The cost types are: labor, sub-contracting and up to five others defined by the organization to define other direct expenses within a project. Each project cost category is associated to a specific cost. Cost-based mark-up Established billing rate based on the mark-up of a cost. Cut-off date The saved date (the most recent) corresponding to the selected data Database relationship Database organized by function to maintain the relationship between the data. Deliverable Phase or level defined by a statement of work or contact with a customer. Detailed invoicing Invoicing type based on the detail of costs incurred within the project. © 2009 JOVACO Solutions inc. – Version 10.0 XII ANNEXES Project Suite Direct costs Expenses which could be directly associated to a project or activity which normally incurs an expense when purchasing a good or labor cost. Discount rate Applicable percentage discounted to a transaction on an invoice. Distribution General Ledger account charged Division Group of departments or company, etc. Effective date Date that the project changes status. Enterprise Resource Planning system System that allows you to manage all your organization's processes by integrating all the functions; accounting, sales, project management, customer relationship management, etc. Equipment Group of machines, equipment or devices necessary to ensure that a site is functional (local, workshop, factory, workstation, building, etc.) or to assure that an activity or project can be completed. Estimate and control Functions to allow Project Managers to identify their projects through budgeting and real-time tracking to obtain more information on their incurred costs to date. Executive department Department (or service) responsible for the execution of the project. Expense reimbursement Reimbursement of expenses incurred by an employee. Expenses Time and materials incurred by suppliers or by employees and are reimbursed by the organization. Ex.: Representation fees, travel expenses, professional fees. Fees Compensation in exchange for services for the person executing a service or activity for a particular organization. Financing Fees Organization's fees with regards to financing its operations. Fixed fee Fixed price agreed upon by both parties in advance to supply goods and/or services. Fixed fee billing with schedule Invoicing type based on a fixed fee where invoices are based on a predetermined schedule. Fixed fee invoicing with progress Invoicing type based on a fixed fee therefore the invoices are based on a percentage of work completed. © 2009 JOVACO Solutions inc. – Version 10.0 XIII ANNEXES Project Suite Fixed rate Fixed billing rate for a project. General expenses General expenses from operations that cannot be directly linked to a particular project or activity. Gross amount Amount including the applicable taxes. Hourly basis Number of regular hours which would be calculated for an employee annually Hourly rate Value for every hour entered to a project. Internal cost Cost incurred by the organization where the labor costs, incurred expenses by suppliers or employees. Internal expenses Entered expenses to the project based on actual costs these charges are usually initially entered into general expenses. Invoice Accounting piece, indicating the quantity, the type and the piece and the selling price. Invoicing Functions to assure that the invoicing to customers for professional services is done within four types of invoicing: detailed, lump sum with progress, lump sum with calendar, percentage of costs. Invoicing method Rules or procedures set for invoicing labor, expenses and internal expenses to a client and a project. Invoicing on a percentage of costs Invoicing type based on a fixed fee determined by a percentage of total costs of a project. Example: Total construction costs for a building). Invoicing schedule Predetermined dates where a customer would be invoiced in invoices on hold. Invoicing schedule by percentage Schedule with the different billable rates. Invoicing type Type of invoicing used to identify what needs to be evaluated at the appropriate invoicing level. The available invoicing types are: cost, cost plus mark-up, cost plus mark-up with maximum, fixed fee or percentage of costs. © 2009 JOVACO Solutions inc. – Version 10.0 XIV ANNEXES Project Suite Loan rate Mark-up rate for the time entered into project-department where the resource is not budgeted at the corresponding level. Marked-up cost When invoicing a customer or evaluating a project, the costs incurred will be marked up by a certain percentage to include indirect costs, general expenses and for profit. Mark-up cost with maximum Mark-up costs have pre-established maximum (like a fixed fee). Mark-up rate Percentage increase of the cost of a transaction for billing. Modified date Date that the project is modified. Opening date Date that the project is opened. Overtime hours Hours completed outside standard working hours. Overtime hours can contain a mark-up or other compensation. Overtime rate Fixed rate for every additional hour of work. Pay stub Receipt of the reimbursement of labour and expenses incurred by an employee. Percentage of costs Method established to calculate the value what was invoiced compared to the total cost. Phase Level within a project frequently defined. Productive hours Hours dedicated by a resource within an organization to completing a function for a customer (Billable or not) Productivity Measurement of the hours a resource has dedicated to a customer's project in comparison to the total number of hours worked. Productivity code Cost codes associated to labor and allows you to identify if the work completed is billable to a customer or not. Productivity group codes Up to 10 productivity codes per report Progress Project cost progression with regards to their budgets. Progress based (fixed fee invoicing) Fixed fee amount which is invoiced based on a percentage completed. Progress Type Type of control for the project progress in real-time. The possible types are separated by each budget category or summary (for all categories) within a project level. © 2009 JOVACO Solutions inc. – Version 10.0 XV ANNEXES Project Suite Project Control Primary module with Project Control allows you to follow the projects and manage its costs. Project Level Grouped cost categories or departments with a defined deliverable, phase or production batch particular to a project. Project Manager Person who manages in full or in part the projects budgets. Project Profitability Measurement of the profitability of the project by comparing the revenue against the direct costs of the project. Receipt Amount deposited, or the sum deposited, once completing an operation Region Area where the project will be situated. Regular hours Hours complete during standard business hours. Regular rate Fixed rate for every hour at the regular rate. Reimbursable expenses Expenses entered by an employee with the request to be reimbursed. Resource Required entity in order to complete a task within a project. This can be a person, equipment or financial resource. Resource loan Utilisation of an employee who does not appear in a department's budget at a particular project level Schedule based (fixed fee invoicing) Fixed fee amount which is invoiced on specific dates. Sequence The sequence corresponding the grouping of project levels, in part or in its entirety. This allows you to modify the presentation of the project structure. Service charges Fees from the bank to cover the service costs related to a particular account. Service type The type of services is defined by the organization and is used to identify the type of professional services completed within the particular project level. Short title Summary description of the project for reports. Sick Day Vacation day attributed due to a sickness or accident. Social benefits Direct or indirect compensation in addition to the compensation received for hours worked. © 2009 JOVACO Solutions inc. – Version 10.0 XVI ANNEXES Project Suite Special hours Hours other than regular or overtime Special rate Fixed rate for every hour defined at a special rate. Specific rate Specific rate used for billing a particular project or a particular level of a project. Time and Expense Function to allow employees to enter remotely or manually themselves their time, expenses and internal expenses linked to their daily activities. Transaction ID ID created for a transaction within the ERP system. Vacation Paid or unpaid day where for one reason or another salaried employees within the organization do not work. Vacation Period where salaried employees have the right to paid for time off work. Work in Progress (WIP) Work completed but not yet invoiced to a customer. © 2009 JOVACO Solutions inc. – Version 10.0 XVII