Untitled - KiSKA CONSTRUCTION CORPORATION
Transcription
Untitled - KiSKA CONSTRUCTION CORPORATION
Republic of Turkey AWARD OF STATE MEDAL FOR OUTSTANDING SERVICES Certificate No: 14 October 27,1997 Dear MR. Oğuz GÜRSEL In Recognition Of Your Successful Endeavors In The Global Promotion Of Our Country And advancement Of Our State, I Hereby Award You The State Medal For Outstanding Services According To Avticle 51C Of The State Medals and Decorations Ordinance. Süleyman DEMİREL PRESIDENT KiSKA CONSTRUCTION CORPORATION President O. GÜRSEL Mithatpaşa 13 Ankara Turkey Tel (312) 430 24 00 Fax (312) 431 27 76 e-mail : [email protected] internet : www.kiska.com.tr TURKEY Osmanlı Sok 23 Taksim İstanbul Tel (212) 252 53 00 Fax (212) 243 43 42 e-mail : [email protected] USA 10-34 44th Drive, Long Island City, NY 11101 Tel (718) 943 04 00 Fax (718) 943 04 01 e-mail : [email protected] Contractor Licence Class : Unlimited Founded in 1966 NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS DAMS Hakkari Dam & HEPP, Final Design HAKKARİ (35% of HC) DSİ 6.9 2001 - 03 3 736 ha 2 545 m Mapping Drilling Süreyyabey (Çekerek) Dam & HEPP YOZGAT (25% of KEE JV) DSİ 191.2 1998 - 10 102.5 7 380 000 635.65 180 000 1 920 14.4 m m3 m m3 m MW High Clay core rockfill Crest length Concrete Tunnel Installed capacity Hatap Dam ÇORUM DSİ 12.4 1995 - 08 63 2 841 000 304 18 300 2 945 000 400 m m3 m m3 m3 t High Fill (road-dam) Crest length Concrete Excavation Steel Akyar Dam ANKARA DSİ 39.0 1992 - 01 86 3 013 000 330 40 000 7 659 000 m m3 m m3 m3 High Earthfill Crest length Concrete Open excavation Erzincan Dam ERZİNCAN DSİ 34.6 1991 - 98 81 5 650 000 444 21 000 4 680 000 m m3 m m3 m3 High Earthfill Crest length Concrete Open excavation Dicle Dam & HEPP DİYARBAKIR DSİ 201.5 1986 - 01 87 3 450 000 307 585 000 7 550 000 366 000 m m3 m m3 m3 m3 High Rockfill Crest length Concrete Open excavation Tunnel excavation Mumcular Dam MUĞLA DSİ 15.6 1985 - 91 32 253 000 1 410 000 834 33 700 1 660 000 m m3 m3 m m3 m3 High Fill - road Fill - dam Crest length Concrete Excavation NAME AND LOCATION OF PROJECT Hancağız Dam GAZİANTEP Maksutlu & Yapıaltın Dams SİVAS CLIENT VALUE ($ 000 000) DATE DSİ 20.6 1985 - 89 DSİ 6.2 1975 - 77 PROJECT DETAILS 52 3 280 000 1 955 1 490 000 15 200 m m3 m m3 m3 High Earthfill Crest length Excavation Tunnel excavation Earthfill dams 380.1 TUNNELS Dolmabahçe Road Tunnels & Elevated Intersection İSTANBUL (50% of KİSMAK JV) Municipality 243.7 2006-09 8 000 901 329 57 763 210 833 13 230 3 985 m m3 m3 m3 m m Road tunnel (12 m dia.) Tunnel excavation Shotcrete Concrete Piling works (ø 100) x2 Road tunnel electromechanical works Snake - Pit PWHQ Upgrade ANKARA (60% of Kiska - ANO JV) MSB 29.0 1997 - 00 1 112 45 000 27 000 11 760 m m3 m3 m3 Tunnel (4 m dia.) Open excavation Tunnel excavation Tunnel concrete Greenbelt Route Tunnels WASHINGTON DC (40% of Kajima - Kiska JV) WMATA 105.0 1994 - 98 2 x 3 200 Lf Twin tunnels (16’8” dia.) in soft ground 9” Precast segment initial lining 16” Final lining Greenbelt Route 14TH St Tunnels WASHINGTON DC (60% of Kiska - Kajima JV) WMATA 65.0 1994 - 97 2 x 3 200 Lf Twin tunnels (16’8” dia.) in soft ground 9” Precast segment initial lining 16” Final lining Shafts 21B - 22B for Tunnel 3 Stage 2 NEW YORK NY-DEP 48.8 1992 - 94 199 m . . 178 m Municipality 206.4 1992 - 00 Subway Tunnels 2. Stage İSTANBUL (10% of Tekfen JV) 8 247 524 000 147 500 202 000 359 000 81 500 m m3 m3 m2 m3 m3 Shaft 21B : 12 - 7 m diameter (soft ground freezing) Shaft 22B : 12 - 4 m diameter (soft ground freezing) Tunnel (5.4 m dia.) Excavation Concrete Shotcrete Tunnel excavation Tunnel concrete NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS Halle Tunnel ADIYAMAN DSİ 4.1 1986 - 90 Çamlıdere Water Supply Tunnels 1 - 2 ANKARA DSİ 30.7 1981 - 88 7 100 100 000 42 000 77 000 m m3 t m3 Tunnel (3.4 m dia., in hard rock) Tunnel excavation Shotcrete Concrete Ministry of Municipal & Rural Affairs (REDEC) 88.5 1980 - 84 7 20 100 000 55 000 2 000 120 300 000 km km m3 m3 m m m3 Tunnel Canal Excavation Concrete Drilling (28” dia.) Shaft (7 m. dia.) Canal excavation with sheet piling DSİ 213.8 1974 - 87 15 742 348 500 000 982 000 270 000 m m m3 m3 m3 Tunnel (3.4 m dia., in soft rock) Shaft Tunnel excavation Open excavation Tunnel concrete ETİBANK 2.2 1975 - 77 8 000 m Tunnel (from 40 accesses) Transport Gallery KÜRE KBİ 1.3 1972 341.5 m Tunnel (completed in 3 months) Çapalı Lake Discharge Tunnel Dinar, AFYON DSİ 1.1 1970 - 72 1 108 m Water tunnel with concrete lining Pipeline Tunnel Murgul, ARTVİN KBİ 0.9 1969 - 70 2 107 m Tunnel (in mountainous area) Tutupbeli Tunnel KONYA DSİ 12.2 1969 - 71 3 500 m 90 000 m3 30 000 m3 2002 - 04 110 000 m3 44 000 m2 42 480 m Storm Water Drainage Tunnel & Canals MAKKAH Kınık Water Supply Tunnel ANKARA Phosphate Research Galleries MAZIDAĞ 33 300 m3 14 800 t 12 400 m3 Tunnel excavation Shotcrete Concrete lining Tunnel (4 m dia.) Excavation Concrete 583.6 IRRIGATION & SEWERAGE Fethiye Sewerage Network and Pump Stations MUĞLA (50% of KYM JV) FESKİ 6.1 Excavation Sheet piling HDPE - GRP Pipes (150 - 1 000 mm dia.) NAME AND LOCATION OF PROJECT Irrigation System ERZİNCAN Roads - River Rehabilitation İSTANBUL Sewerage Network TRABZON Al Khalege - Al Aali Irrigation Project BAGHDAD Sewerage Network of Al Jamiah Cont 12 JEDDAH Muqdadiya - Diyala Irrigation and Drainage Project BAGHDAD CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS DSİ 26.8 1996 - 05 59 200 95 000 690 2 715 000 115 000 m m m m3 m3 Concrete lined canal Pipe+culvert network Tunnel Excavation Concrete Municipality 7.1 1994 - 96 182 000 13 100 12 700 565 m3 m3 m t Excavation Concrete Pile Steel İLLER BANK 17.4 1988 - 04 127 000 m 20 300 m Concrete pipe (150 - 500 mm dia.) R/f conc. pipe (600 - 1 400 mm dia.) Ministry of Irrigation 7.8 1986 100 800 m Flume works W/S Dept. 14.7 1985 - 87 130 000 23 000 56 000 5 000 m3 m3 m m Excavation Concrete 300 - 100 mm dia. Pipe work GRP Ministry of Irrigation 19.6 1983 - 86 2 000 000 40 000 8 000 9 500 m3 m3 m3 ha Excavation Concrete lining Concrete Land levelling (7 000 ha Conventional Irrigation) 100 mm dia. Drainage pipe / field drain Manhole 630 km 1 200 ea Abu Ghraib Irrigation, Drainage and Road Syst. Project ISKANDARIYA BAGHDAD Ministry of Irrigation 81.4 1981 - 85 5 050 000 m3 3 660 000 m2 3 060 000 m3 576 650 m3 79 km 181.5 km Abu Ghraib Irrigation, Drainage and Road Syst. Project YUSUFIYA 1-2 BAGHDAD Ministry of Agriculture 93.2 1979 - 84 13 239 000 m3 809 000 m2 4 400 000 m3 8 826 m3 96.5 km 140 km Earthwork Concrete lining Land levelling (9 500 ha Conventional irrigation) Concrete Road with A.C. pavement Flume works Earthwork Concrete lining Land levelling (11 150 ha Conventional irrigation) Concrete Road with A.C. pavement Flume works NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS Irrigation, Drainage and Land Reclamation KONYA DSİ 42.4 1976 - 79 13 800 000 m3 1 200 000 m3 11 000 000 m3 Canal excavation Concrete lining Land levelling Oba Creek Diversion ANKARA DSİ 19.6 1968 - 69 12 951 745 156 5 221 Diversion channel Siphon Aqueduct Tunnelling m m m m 333.1 AIRPORTS & HIGHWAYS Highline Reconstruction Elevated Promenade NEW YORK NYCEDC 75.5 2006-09 Major Bloomberg : “.. an extraodinary gift to our city’s future. It really does live up to its highest expectation.” Podkova - Makaza Road Construction BULGARIA (50% of KH JV) REA 19.5 2002 - 05 20 86 000 1 945 000 1 450 000 1 2 km t m3 m3 ea ea 2 Lane road Asphaltic concrete Excavation Fill Viaduct, l=200 m Bridges, l=123 - 179 m Ankara - Pozantı Motorway, Section 8 NİĞDE (25% of NCKY JV) TCK 270.0 2000 - 05 55 21 509 000 17 043 000 1 073 000 12 538 km m3 m3 t ea m 2x3 Lane motorway Excavation Fill Asphaltic concrete Bridges Viaduct, h = 44 m Antalya Airport Const. of 2nd Runway & Parallel Taxiway, and Aprons ANTALYA (20% of KMIBE JV) DHMİ 87.5 1998 - 04 3 960 000 3 250 000 920 000 127 000 m3 m3 m2 m2 Excavation Fill Concrete pavement, 40 cm thick Concrete pavement, 30 cm thick Airfield lighting and misc. works Parallel Taxiway & POL Facilities MALATYA MSB 27.9 1995 - 97 45 000 16 500 2 500 162 000 86 000 m3 t m3 m3 m3 Concrete pavement Asphaltic concrete pavement Fuel storage tank Excavation Earthfill NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS Restoration of Taxiways and Parking Areas DİYARBAKIR MSB 11.7 1994 - 95 75 000 76 000 64 000 10 000 m3 m3 m3 t Excavation Subbase - Base Concrete pavement Asphaltic concrete pavement Runway / Taxiway / Aprons Construction Yenişehir, BURSA MSB 35.8 1989 - 92 325 000 53 950 210 000 13 m3 m3 m3 ea Excavation Concrete pavement Subbase - Base A. Storage Highways & Bridges TRABZON TCK 35.6 1987 - 95 1 138 000 26 800 11 100 120 000 441 30 m3 m3 m m3 ea ea Earthwork Tunnel excavation Foundation piles (80 - 100 cm dia.) Concrete Prestressed beams, 13 - 26 m Posttensioned beams, 26 m Municipality 38.8 1986 - 88 7 500 33 000 330 000 69 000 m m t m3 Concrete road / Jetty on : 60 cm dia. Steel pipe piles Rockfill Concrete MSB 20.0 1984 - 86 Highway & Jetty Construction İSTANBUL Çorlu Airbase TEKİRDAĞ 2 377 000 m3 100 000 m3 Çayırhan Railway & Tunnel Project Stage 5 ANKARA DLH 122.6 1979 - 94 Airfield Expansion SİNOP TUSEG 1.3 1974 - 77 1 372 m 18 cm 382 m Road Construction and Grading Divriği, SİVAS DEMİR ÇELİK 4.4 1974 - 75 12 km 1 577 000 m3 468.4 771 000 159 000 4 285 000 218 000 m3 m3 m3 t Construction of airbase & support facilities Excavation Concrete Tunnel excavation Tunnel concrete Open excavation Tunnel Shotcrete (7 km Railway tunnel & 8 km railway const.) Runway Concrete pavement Taxiway Road cons. and related structures Earthwork NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS HARBOURS Taşucu- Ağalar Harbour, Pier Construction MERSİN (80% of KC JV) MSB Alaplı Harbour ZONGULDAK DLH 6.4 1995 - 05 92 000 m3 121 t 801 545 t Concrete Steel Rockfill Harbour Construction ÇANAKKALE DLH 11.5 1995 - 99 6 640 t 208 000 t 36 000 m3 Steel pipe pile Rockfill Concrete Harbour Extension RİZE DLH 9.6 1990 - 94 793 000 t 36 000 m2 17 000 m3 Rockfill Concrete pavement Concrete blocks Dock Construction ANTALYA DLH 14.3 1988 - 92 126 000 m3 736 000 t 30 t Pell-Mell concrete blocks Rockfill Municipality 14.1 1987 - 89 3 483 000 t 600 m Rockfill Pier on piles Harbour Extension TRABZON - MERSİN DLH 15.3 1985 - 90 2 434 000 t 254 000 m2 62 000 m3 Rockfill Concrete pavement Concrete blocks Pier Construction Gölcük, İZMİT MKE 12.5 1971 - 74 Breakwater & Pier Construction Yenikapı, İSTANBUL 34.4 2000 - 03 470 m 13 400 m 58 000 m3 16 400 m Pier Steel pipe piles (966 ea, 200 mm dia.) R/f concrete Concrete piling 111.2 BRIDGES Goethals Bridge NEW YORK 3rd Ave. Bridge on East River NEW YORK Discovery Channel brd : “Mega Structures” The Port Authority of NY&NJ 62.0 2003 - 07 NYC DoT 119.5 2002 - 05 . 2 000 t . Rehabilitation of deck, structural steel and replacement of sidewalks New steel swing bridge (inc. Elect. and Mech. works) Demolishing existing bridge New foundations and approach ramps NAME AND LOCATION OF PROJECT Marine Parkway Lift Bridge NEW YORK CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS MTA 96.0 1998 - 02 3 000 lf Concrete pre-cast deck installation Replacement of major structural steel elements Viaducts and Elevated Structures NEW YORK NYS DoT 77.0 1993 - 96 . . Repair of structural steel, deck replacement, abatement, electrical works, painting, Rehabilitation of Bridges NEW YORK NYS DoT NYC DoT TBTA MTA 195.3 1991 - 02 14 ea 1985 - 96 67 730 m Rehabilitation and enlargement of bridges. Repair of structural steel, deck replacement, bearing replacement, stripping of lead paint, repainting 549.8 PIPELINES Eğrekkaya Water Supply Pipeline ANKARA DSİ 84.0 9 220 m Second Stage Water Supply Pipeline İSTANBUL DSİ 25.2 1979 - 83 21 365 m 18 170 m Çamlıdere Water Supply Pipeline ANKARA DSİ 19.3 1977 - 84 45 km 2.5 km 400 m Water Supply Pipeline İZMİT İLLER BANK 1.2 1971 - 74 . . 40 km 1995 - 00 . . Prestressed r/f conc. pipes (2 200 mm dia.) Steel pipe (2 200 mm dia.) Production and placement of prestr. r/f conc. pipes (1 600 - 1 850 mm dia.) Production and placement of steel pipes (1 200 - 1 600 mm dia.) Production and placement of prestr. r/f concrete pipe (2 200 mm dia.) Steel pipe (2 200 mm dia.) Steel pipe (3 500 mm dia.) Water collection by radial tunnels Steel pipeline 129.7 TREATMENT PLANTS Newtown Creek - NC - 26 G Water Pollution Control Plant NEW YORK DEP 59.8 Upgrading of sewage treatment plant, pump station and mechanical systems NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS m3/d m3 m3 m3 Capacity Excavation Waterproof concrete Concrete Water Treatment Plant KONYA DSI 11.5 1989 - 95 104 000 158 000 8 800 7 500 Water Treatment Plant GAZİANTEP DSI 49.8 1976 - 81 120 000 m3/d Capacity 28 800 m3 Waterproof concrete 34 000 m3 Concrete (Equipment supply: WABAG, Germany) Water Treatment Plant İSTANBUL DSI 35.7 1975 - 77 57 200 m3 Waterproof concrete 156.8 INDUSTRIAL WORKS A. Storage Construction ÇORLU MSB 11.0 1988 - 90 30 ea Turkey - Iraq Borderline MIN of FA 3.7 1988 - 91 1 500 ea Abdi İpekçi Sports Hall İSTANBUL Municipality 13.8 1985 - 89 1 600 t Infrastructure of Free Zone MERSİN DLH 9.8 1985 - 88 757 700 m3 830 000 t 165 000 m2 Construction & Technological Erection of Profile Rolling Plant İSKENDERUN İSDEMİR 77.5 1979 - 84 Coal Preparation Unit İSKENDERUN İSDEMİR 13.8 1977 - 82 7 100 t 63 200 m 2 800 t Steel Workshops Construction İSKENDERUN İSDEMİR 6.5 1977 - 81 3 750 t 18 320 21 500 1 800 000 129 000 53 300 t t m3 m3 m3 Igloo construction Reinforced concrete blocks Steel construction of 80x100 m sports hall Production and heavy lifting of space trussed steel roof Excavation Fill Concrete pavement Steel construction Technological erection Earthwork Concrete Waterproof concrete Steel construction Concrete piling Technical equipment Steel construction NAME AND LOCATION OF PROJECT Cement Factory KAHRAMANMARAŞ CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS TCS 13.0 1977 - 78 SÜMERBANK 1.3 1974 - 75 .. .. Refinery FCC Units ALIAĞA TPAO 0.9 1975 2 200 t Battleship : Yavuz - Goeben MKE 1.3 1973 - 74 12 780 t A/C Physical Protection Units (Shelters) MSB 12.2 1973 - 78 İSDEMİR 49.7 1972 - 75 EBK 2.9 1972 - 74 SÜMERBANK 1.4 1970 - 71 10 000 m2 57 ea Carpet Factory DİYARBAKIR Sinter Unit, Iron and Steel Industry İSKENDERUN Meat and Fish Packing Plant AMASYA Carpet Factory ISPARTA 65 ea 13 430 1 660 7 700 100 t t t m . . Excavation and concrete works Concrete columns and steel roofing Piping and equipment erection Vessel dismantling Marwais Steel Shells covered with BS 30 concrete Steel construction Piping Technical erection, electrical automation Concrete chimney Air cooling units for -18° C and infrastructure Reinforced concrete shed roof 218.8 RESIDENTIAL COMPLEXES & BUILDINGS Housing Complex (Wildflower Estates) New YORK Earthquake Strenthening of Buildings ERZİNCAN CPW 353 Luxury Residences NEW YORK WFD 26.1 1998 - 02 Municipality 10.2 1992 36 350 m2 2 200 m3 6 350 m3 KDI Inc. 22.5 1992 - 93 . . 3 - 4 Story town house complex Strengthening of 21 Public buildings with hydro lifts Shear wall Strengthening of columns with steel brackets 22 - Story luxury residences 18 Units - 60 000 sqft construction NAME AND LOCATION OF PROJECT CLIENT VALUE ($ 000 000) DATE PROJECT DETAILS UPDK Dwelling Complex MOSCOW (25% of MIR Contr. Inc.) TECHEX 66.8 1989 - 91 . . Design and turnkey construction of dwelling complex of 76 000 m2 for diplomatic missions Luxury Residential Buildings Ataköy İSTANBUL EMLAK BANK 34.0 1989 - 91 . . 15 - Story residential buildings 1 200 Units 1828 2nd Ave Ass 28.9 1989 - 91 . AZOT SANAYİİ 22.0 1977 - 78 . . 100 000 m2 Housing units and site infrastructure PETEK 1.5 1973 - 74 . . Exposed concrete building with 10 m cantilever floor KBİ 3.1 1971 - 74 . . 240 Housing units, 100 m2 each and site infrastructure DİLEK 1.5 1969 - 71 . .. 45 m Span lecture room 12 - Story concrete building VAKIFLAR 0.7 1968 - 70 . . 8 - Story concrete building (2 Buildings) The Huntington Luxury Condominium NEW YORK Housing Units for Fertilizer Plant Mazı - ŞIRNAK Lecture Room for Hacettepe University ANKARA Housing Units for Copper Plant MURGUL Hacettepe University F8 - F9 Building Units ANKARA Office Buildings ANKARA 167.2 . 32 - Story residential condominium 108 Units - 130 000 sqft construction Konur 2 Sokak No: 57/4 Kızılay, Ankara TURKEY Tel: +90 312 425 07 34 • Fax: + 90 312 425 07 36 www.hangarreklam.com
Similar documents
DSİ VII. BÖLGE MÜDÜRLÜĞÜ SAMSUN
Değirmendere Barajının proje ihalesi yapılmış ve proje çalışmalarına yüklenici firma tarafından devam edilmektedir. Değirmendere Barajı işletmeye alınıncaya kadar Suluova Belediyesinin 100 l/s’lik ...
More informationthe kerkenes eco-centre - Middle East Technical University
on the northern edge of the Cappadocian Plain. (b) Road map of Central Anatolia showing location of Kerkenes Dağ, the nearby town of Sorgun and provincial capital of Yozgat. (c) Directions to the v...
More informationEKOVİZYON - Gaziantep Sanayi Odası
to survive and they should improve exportation ability, consider quality, be open to branding and differentiation, and assign a budget for Research & Development and innovation. Information Activit...
More information