Exempla Saint Joseph Replacement Hospital
Transcription
Exempla Saint Joseph Replacement Hospital
1835 Franklin Street, Denver, CO 80218 Main Hospital Number: 303-837-7111 www.exempla.org A member of Sisters of Charity of Leavenworth Health System 21st Ave. Ronald McDonald House Kaiser Franklin Kaiser Parking Garage 20th Ave. Midtown Parking Garage Mullen Building Russell Pavilion Garage 19th Ave. Patient/Visitor Parking EMERGENCY . North Exempla Comprehensive Cancer Center and Breast Care Center NO PUBLIC ACCESS 18th Ave. 18th Ave. Russell Pavilion Lafayette St. Av e Marion St. ✱ Downing St. rk ✱ Future Saint Joseph Hospital Site and Parking Garage Tammen Hall Pa • Russell Pavilion • Emergency The Baby Place Exempla Saint Joseph Franklin Entrance Ambulance Only Medical Specialty Center Gilpin St. Midtown Office Building ENTRANCE ONE WAY Saint Christopher Inn Humboldt St. 19th Ave. Ogden St. 20th Ave. Parking Lot Exempla Saint Joseph Replacement Hospital Kaiser Permanente Franklin St. Emerson St. Entrance to Midtown garage from Ogden Kaiser Skyline For more information contact the following Mortenson Denver staff: 303-295-2511, 1621 18th Street, Suite 400 17th Ave. ONE WAY ✱ Complimentary valet parking is available at both the Russell Pavilion Garage and the Comprehensive Cancer and Breast Care Center. © 12.2011 Exempla Healthcare Maja Rosenquist Vice President and General Manager [email protected] Gene Hodge Director of Project Development [email protected] Bill Gregor Healthcare Market Leader [email protected] Exempla Saint Joseph Heritage Project Large scale prefabrication leads to significant schedule and cost savings At ESJH, prefabrication strategies shaved GJWFNPOUIT off a more traditional linear-based construction delivery. The solutions include 44 bathroom pods. At a warehouse within five miles of the project site, 25-foot above-theceiling multi-trade racks are being assembled ahead of a typical onsite installation. 44 patient bathrooms were prefabricated down to the shower curtain. Other prefab elements include head walls and exterior panels. The benefits from concurrent prefab construction, combined with the detail from Mortenson’s modeling efforts ensure these “plug and play” components are safely and efficiently installed at the site. Fast Facts • 831,327 square feet • $623 million overall project; $389 million in construction costs One of the nation’s largest hospitals - being built in less than three years Located in Denver’s urban core, the Exempla Saint Joseph replacement hospital is currently being built by Mortenson Construction. The project includes: • 360 patient beds • 21 operating rooms, including two hybrids • 40 emergency department rooms, including a dedicated emergency department for seniors • Three outpatient clinics that will remain on site: The Caritas clinic, The Bruner Family Medicine Center and The Seton Women’s Center, which manages about 40,000 patient visits each year. “The integrated approach is, without question, the way to do it. It’s precise and helps with the construction speed, without compromising quality. We are confident we are building an efficient, sustainable, 21st century health care facility that will serve our community’s needs for the next 50 years or more. Multi-trade racks + head walls are assembled at a local offsite warehouse. I’ve had a very, very positive experience with Mortenson and would highly recommend them. “ Part of the design and construction team’s efforts to ensure the new hospital will meet patient and staff needs included “Day in the Life” visits. These tours with various department staff members provided the team with a strong understanding and appreciation for how Exempla manages their hospital, what is most important to them, what defines their success as an organization, and what special needs the patients and staff have Understanding these components of a project and investing the time together helps deliver a better product best serving the needs of Exempla Saint Joseph patients, staff, and visitors well into the future. • Construction start date: December 15, 2011; Construction completion date: July 25, 2014 for 30.5 month construction schedule. • The project is expected to create 1400 construction-related jobs and contribute $340 million in labor compensation until its opening in December 2014. Bain Farris, CEO SCL Health System A Day in the Life Day in the Life: The Mortenson team observe hospital staff in action. • One of the fastest-paced projects to ever be built in Colorado (based on volume) The 25-foot racks are delivered to the job site and hoisted into place. • Peak manpower is ~850 construction workers on site. • The project is expected to infuse $8 million into Colorado in use taxes. • Exempla Saint Joseph currently employs approximately 2500 people and contributes $177 million in annual labor compensation. The rack sections are then connected for a plug and play solution.