notice of project commencement
Transcription
notice of project commencement
NOVA Chemicals (Canada) Ltd. / Genesis Pipeline Extension Project NOTICE OF PROJECT COMMENCEMENT Notice of Application to the National Energy Board NOVA Chemicals (Canada) Ltd.'s Kimball Pipeline Replacement Project NOVA Chemicals (Canada) Ltd. (“NOVA Chemicals”) and its affiliates own and operate manufacturing plants and pipelines in the Sarnia, Ontario area. NOVA Chemicals' Corunna petrochemical facility has been in operation since 1977 and recently transitioned to natural gas liquids (NGLs) as its primary feedstock. In support of this transition, NOVA Chemicals is proposing to establish a second pipeline system to deliver NGLs to the Corunna facility, which is known as the “Kimball Pipeline Replacement Project” (the “Project”). The Project will replace a dormant 4” NGL pipeline with a 12” pipeline approximately 4 kilometres in length in an existing right-of-way (RoW). The replacement pipeline will be connected to Plains Midstream's Windsor-Sarnia Pipeline at an existing valve site near Kimball Road. Also, a dormant 8” pipeline will be removed from the RoW as part of the Project. The general location of the proposed replacement NGL pipeline is illustrated on the following map. As part of the planning process, NOVA Chemicals has retained Stantec Consulting Ltd. (“Stantec”) to undertake an environmental study of the construction and operation of the replacement pipeline (the “Environmental Study”). The Environmental Study will fulfill the requirements of the Ontario Energy Board's (OEB) “Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2011)”. The current schedule provides for completing the report for the Environmental Study in the spring of 2015, after which NOVA Chemicals will file an application for the proposed pipeline with the OEB. Under Section 90 of the Ontario Energy Board Act, the OEB's review and approval is required before the Project can proceed. If approved, construction of the replacement pipeline is currently expected to begin no earlier than the summer of 2016. The Environmental Study process will include consultation and engagement with landowners, Aboriginal communities, government agencies and other interested persons. Public consultation will be an integral component of the Environmental Study and related report. An Information Session regarding the Project is being planned for January 2015. Notice of the session will be mailed to those on the Project mailing list, and advertised in the following local newspapers: Sarnia Observer, Sarnia & Lambton County This Week, Wallaceburg Courier Press and The Independent. Representatives from NOVA Chemicals and Stantec will be available to explain the Project and answer questions regarding routing, design and scheduling. Input received will be used to confirm both the existing environmental conditions and the preliminary preferred pipeline route and to develop site specific protection or mitigation measures for the Project. To learn more about NOVA Chemicals and the Kimball Pipeline Replacement Project you can call the project contact line directly at 1888-220-5880. Information is also available by visiting the 'News Room' on the NOVA Chemicals Sarnia-Lambton webpage (www.novachem.com/SarniaLambton). You can provide your comments and input through the Contact Us link on the webpage. \\cd1220-f02\01609\active\60960940\Drawing\Corel\NewspaperNotice\2014-11_NoticeOf_Commencement\160960940_NoC_Notice_2014-11.cdr