Public Expose 2014 - PT Elnusa Tbk | Trusted Energy Services
Transcription
Public Expose 2014 - PT Elnusa Tbk | Trusted Energy Services
Public Expose 2014 PT Elnusa Tbk Bursa Efek Indonesia December 2014 1 www.elnusa.co.id ELSA Stock Price ELSA has appreciated 252% (ytd) in 2 years , from Rp172 (17 Dec 2012) to Rp605 ( 15 Dec 14). Issued Shares : 7.298.500.000 shares All Time Highest Price Aug 11, 2014 : Rp725 Market Cap as Dec 15,2014 : Rp4,4 Trillion 2 Corporate Disclosure Events 1 Market Update Roadshow (13 – 19 June 2014) to KL,SG,HK with CLSA 2 CIMB Annual Indonesia Conference, Bali (21‐22 Aug 2014) 3 9M14 Analyst Meeting (29 Oct 2014), Graha Elnusa 4 JP Morgan Rising Asia Dragon Conference (25 Nov 2014), SG 5 Deutsche Bank Indonesia Conference,Jakarta (18 Nov 2014) Average Volume in 2014 vs 2013 ( 38mn shares vs 13mn shares per day) Average Share Price in 2014 vs 2013 (Rp550 vs Rp237 per shares) 3 Company Structure PT Pertamina (Persero) Dana Pensiun Pertamina Publik 41.10% 17.80% 41.10% PT Elnusa Tbk EFK PND SCU EPN ETSA EPR 97.35% 70.00% 99.99% 99.93% 90.00% 98.00% EFK : Elnusa Fabrikasi Konstruksi PND : Patra Nusa Data SCU : Sigma Cipta Utama EPN : Elnusa Petrofin ETSA : Elnusa Trans Samudera EPR : Elnusa Patra Ritel 4 Product Line Services Land Seismic Survey Marine Seismic Survey Transition Zone Seismic Seismic Data Processing Non Seismic Services Geology Geophysics Reservoir Drilling Services* Electric Wireline Logging* Hydraulic Workover Servirces* Coiled Tubing Services* Well Testing Services Drilling Fluid Services Drilling Evaluation Services Cementing & Pumping Services Slickline Services Enhanced Oil Recovery Operation & Maintenance Well Plug & Abandon 5 Operational Area Besides Indonesia, Elnusa also experienced in covering several regional countries : Brunei, Vietnam, Myanmar & India. 6 Financial Highlights Revenue Cost of Revenue Gross Profit Operating Profit EBITDA Net Profit (Loss) EPS Rp (bn) 4.777 4.226 551 252 605 128 18 Total Assets Total Liabilities Total Equity Account Receivables Account Payables Interest Bearing Debt 4.295 2.253 2.042 1.119 369 965 Prognosa FY2014 Revenue Gross Profit Operating Profit EBITDA Net Profit (Loss) 2012 % YoY 100% 1% 88% ‐5% 12% 93% 5% 1241% 13% 98% 3% 399% 0% 400% 100% ‐2% 52% ‐9% 48% 7% 26% ‐6% 9% ‐38% 22% ‐7% Rp (bn) % 4.170 ‐ 4.195 100% ‐ 739 ‐ 769 18% ‐ 400 ‐ 429 10% ‐ 643 ‐ 673 15% ‐ 395 ‐ 428 9% ‐ Rp (bn) 4.112 3.465 647 293 599 238 33 4.371 2.086 2.285 958 306 764 2013 % YoY 100% ‐14% 84% ‐18% 16% 17% 7% 16% 15% ‐1% 6% 86% 1% 83% 100% 2% 48% ‐7% 52% 12% 22% ‐14% 7% ‐17% 17% ‐21% Rp (bn) 2.921 2.504 416 208 451 118 16 4.237 2.071 2.165 838 1.063 790 9M13 % YoY 100% ‐16% 86% ‐19% 14% 10% 7% 7% 15% ‐3% 4% 48% 1% 47% 100% ‐1% 49% ‐9% 51% 9% 20% ‐20% 25% ‐8% 19% ‐21% Rp (bn) 3.021 2.546 475 273 452 288 40 4.140 1.685 2.455 833 309 373 9M14 % YoY 100% 3% 84% 2% 16% 14% 9% 31% 15% 0% 10% 144% 1% 144% 100% ‐2% 41% ‐19% 59% 13% 20% ‐1% 7% 7% 9% ‐52% YoY 100% 1% ‐ 2% 18% 14% ‐ 19% 10% 37% ‐ 46% 16% 7% ‐ 12% 10% 66% ‐ 80% 7 Segment Profitability 25% Consolidated 1.400 700 35% Oilfield & Drilling Services 30% 600 20% 1.200 1.008 1.000 16% 15% 800 10% 600 400 161 200 400 Dec 13 Mar 14 Jun 14 25% 399 400 20% 300 15% 200 10% 106 5% 0% ‐ Sep 13 27% 500 100 5% ‐ 0% Sep 14 Sep 13 700 Seismic Services 30% 300 25% Mar 14 Jun 14 Sep 14 25% Subsidiaries 35% 350 Dec 13 600 20% 500 448 250 198 20% 200 14% 150 100 15% 400 15% 300 10% 200 5% 100 0% ‐ 10% 10% 5% 50 29 ‐ Sep 13 IDR bn Dec 13 Mar 14 Jun 14 Sep 14 Revenue 43 0% Sep 13 Gross Profit Dec 13 Mar 14 Gross Margin Jun 14 Sep 14 8 Oilfield & Drilling by Services Product Service Performance Drilling Electric Wireline Logging 390 339 228 224 15% 9M13 153 2% 9M14 9M13 Coiled Tubing Unit 147 ‐4% 9M14 9M13 Drilling Fluid 9M14 Snubbing 79 133 87 73 198% 84 ‐16% 58% 9M13 Hydraulic Workover 26 9M14 9M13 9M14 9M13 9M14 IDR bn Revenue Revenue Growth Gross Margin 9 Oilfield & Drilling by Services Product Service Performance Well Testing Operation Maintenance 128 59 59 Slickline 72% ‐57% 17 1% 9M13 30 55 9M14 9M13 Cementing & Pumping 27 131% 9M14 9M13 9M14 Drilling Evaluation 23 22 5% 11 9M13 9M14 9M13 9M14 IDR bn Revenue Revenue Growth Gross Margin 10 Seismic by Services Product Service Performance Seismic Land Seismic Marine 489 260 368 ‐70% 33% 78 9M13 9M14 9M13 Seismic Data Processing 9M14 IDR bn 64 41 9M13 57% 9M14 Revenue Revenue Growth Gross Margin 11 Contract Replacement Profile Contract in 2014 and Forward Mn USD SEGMENT CARRIED OVER A NEW CONTRACT B TOTAL CONTRACT A+B VALUE 2014 (Est) C VALUE ONWARD A+B‐C Oilfield & Drilling Seismic TOTAL 145 86 231 222 17 239 367 103 470 137 75 212 230 28 258 12 Product Line Services of Subsidiaries EFK (97.35%) EPN (99.93%) Fabrication Threading Trading EPC Transportation Depo Management Fuel Trading Chemical Trading PND (70.00%) ETSA (90.00%) Geo IT Solution Geo Data Solution Marine Support Service Supporting Fleets SCU (99.99%) EPR (98.00%) Data Management (Digital & Physichal) Investment Arm 13 Subsidiaries Performance Elnusa Petrofin 1.122 991 13% 9M13 Sigma Cipta Utama 55 9M14 Patra Nusa Data Elnusa Fabrikasi Konstruksi 76 97% 62 44 36 18 ‐19% 9M13 ‐17% 9M14 9M13 9M14 Revenue Revenue Growth Gross Margin 9M13 9M14 IDR bn 14 Investment Paid Unpaid 750 A = 227 B = 262 500 A = New Investments B = Replacements 431 150 250 489 A = 26 B = 104 A = 51 B = 59 130 110 2012 2013 A = 480 B = 28 281 0 IDR bn 2011 9M14 Area of Investment (Oilfield & Drilling Services & Seismic) : Electric Wireline Unit Portable Slickline Unit Geophones Coiled Tubing Unit Barges Refurbish Moduar Rig 15 Investment Details 2014 Figures Replacement Capex In Mio IDR Oilfield & Drilling 12.534 Seismic 15.572 Total 28.106 New Capex In Mio IDR Oilfield & Drilling Expected Add Revenue ( in $ 000) 202.956 25.804 (Triplex Pump, EWL Unit, CTU, Slickline, Modular Crane) Subsidiaries 22.655 415 Land & Building 27.813 Total 253.424 26.219 Total Cash Out Capex (9M14) 281.530 26.219 2015 Plan Capex Plan 2015 Drilling & Oilfield Services Geoscience Services Subsidiaries Land & Building Total = = = = In Mio IDR 300.475 200.334 72.941 66.000 639.750 16 Loan and Cost of Funds Thousands O/S Loan 80.000 Weighted CoF 5,00% In usd 000 70.000 4,90% 4,75% 4,80% 60.000 4,70% 50.000 4,60% 40.000 4,50% 4,31% 30.000 4,40% 4,30% 20.000 4,20% 10.000 0 62.246 37.264 Dec 13 Dec 14 (Est) 4,10% 4,00% Bank Holding per Dec 2014 (est) Bank BTMU BTMU BTMU BCA Plafond (in USD 000) 8.120 3.704 3.000 50.000 O/S (in USD 000) 8.060 3.704 500 25.000 17 Business Challenges in 2015 Oil Price Technology Elnusa Challenges In 2015 People Competition 18 Business Challenges in 2015 Oil Price Oil price is predicted to be remain at $50 ‐ $60 /bbl in 2015, hence: • Less spending on exploration (seismic & exploration well), but not on reprocessing data. • More focus on maintenance (good for oilfield services). • Technology • • Competition People • • More to lateral/horizontal drilling, impacted to lower cost (no need to drill more wells). Elnusa will make strategic partnership to improve capabilities. More advance to a down hole tools. Elnusa will focus to this new technology equipments. Become more severe, due to merging companies (HAL & BHI) which potentially be followed by others. Chinese companies penetration with lower fee and more aggressive strategy. Merger in several service companies will impact to increasing people supply. 19 Elnusa competes with other world class companies in terms of HSE equipment & system, personnel competency, management track record & commitment. HSE recognition (NO Lost Time Incident) from Pertamina EP in 3D Seismic Survey Project at Tempino Deep in Jambi, Kenali Asam & Blok Ogan South Sumetera. The Best Contractor 2013 ‐2014 from Total E&P Indonesie The Mahakam Award 2012‐2014 from Total E&P Indonesie, for High Risk Contractor Category Five Years (2008‐2013) 2 years without Lost Time The Best Performer Achievement in HSE without “DAFW” from Incident from Pertamina Performance 2013 Chevron. Hulu Energy (PHE) ONWJ from VICO 20 Thank You DISCLAIMER : The information in this document has not been independently verified. No representation or warranty expressed or implied is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of such information or opinions contained herein. None of PT Elnusa Tbk (the “Company“), nor any of its affiliates, advisers or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss whatsoever arising from the use of this document or its contents or otherwise arising in connection with this document. This document is being furnished to you solely for your information on a confidential basis and may not be reproduced, redistributed or passed on, in whole or in part, to any other person. Any failure to comply with these restrictions may constitute a violation of the laws of any such other jurisdiction. By accepting this document you agree to be bound by the foregoing limitations. This document does not constitute or form part of an offer or invitation to purchase any shares in the Company and neither shall any part of it form the basis of nor be relied upon in connection with any contract or commitment whatsoever. Any decision to purchase shares should be made solely on the basis of information contained in the prospectus. PT Elnusa Tbk. Graha Elnusa Jl. T.B. Simatupang Kav. 1B Jakarta 12560, Indonesia Tel: +62 21‐78830850 Fax: +62 21‐78830907 www.elnusa.co.id 21 Excellent logging services are fundamental in exploration and production phase. With this service, the character of your reservoir will be determined, thus increasing the precision of estimating hydrocarbon volumes and increased oil recovery Scope of Services : Open hole logging ‐ Resistivity, induction & laterog ‐ Gamma ray ‐ Micro resistivity ‐ Side wall & mechanical coring ‐ Compensated sonic ‐ Formation pressure test & sampling ‐ Formation micro imager ‐ Dipole sonic imager ‐ Density & Photoelectron factor ‐ Porosity Cased hole logging ‐ Perforation well & TCP ‐ Gamma ray ‐ Plug & packer setting ‐ Production logging ‐ Pressure, temperature & spinner ‐ C/O & sigma log ‐ Cement & casing evaluation Scope of Services: Rig Up 340K Rig Up 225K Rig Up 150K As pioneer in local provider of HWU services (more than 28 years), combined with highly skilled specialists and reliable units, Elnusa is the market leader in the hydraulic workover business in Indonesia. Elnusa currently has 9 HWU Rigs & 2 more upcoming brand new rigs for domestic & overseas market. With support of dual joint standing pipe and sliding skid, we can save more running time of the services. Washing Sand Drill out cement and bridge plugs Fishing lost tools out of tubing and casing Pumping acid Through tubing gravel packs Running and pulling completion equipment (single & dual) Spotting cement and squeezing Change out ESP (electrical submersible pump) Setting packer Gravel packing Well plugged and abandoned Scope of Services: Stimulation Pressure pumping Drilling Services Testing & Logging Services Currently we are operating 3 CTUs and 2 more upcoming brand new CTUs for new contract on hand in Indonesia market. Elnusa provides Coiled Tubing Unit with the latest technology for onshore and offshore area , and has experience for more than 6 years. EMR01 Fast Moving Deploy Modular Rig 1600 HP Our drilling & moving system eliminate non productive time caused by Rig up/down activities & ensure speed completion of the numbers of wells. Electronic drilling cabin & auto driller feature by ROP or WOB as a primary control VDF system, provides better control, faster block speed, lower fuel consumption and lower maintenance cost. Rounded bottom mud tanks, minimizes settling and eliminate the need for mud gun. By Modular Rig, we can complete 12 wells drilling onshore per year in VICO Indonesia. Drilled depth is 13,000 ft. Average moving times is 6 days per wells. Conventional Drilling Rig 3 units of 550 HP, truck mounted rig with hook load 210,000 lbs (6 wire slings) or 275,000 lbs (8 wire slings). 1 unit of 900 HP, skidding rig hook load 388,000 lbs (8 wire slings) or 410,000 lbs (10 wire slings). Cementing & Pumping 4 Cementing Units & 4 Pumping Units for covering cementing, stimulation, pipeline water pumping, well integrity , etc. Production Testing Barge 3 units fixed installed in the barge for measuring & testing wells Drilling Fluid Comprehensive services in supplying drilling mud & mud engineering services. Mud Logging & H2S 16 Mud Logging Units & 9 H2S units for full range of monitoring system to manage drilling hazards. Slickline 7 Units of slickline for supporting well intervention services and BHP/BHT Survey. Operation & Maintenance Perform routine & non routine maintenance for the pipelines and surface production facility. Surface Testing & DST 3 units of SFT and drill stem test to support testing in exploration stage Well Completion Offer completion solutions both for open and cased hole in oil & gas wells