Questions Answer
Transcription
Questions Answer
1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 3 General C D MSRP Finance Upgrade Work Pkg Question General 3 4 General General E F Related Questions Answer Terms of Reference 6.3.5.1 Resume of proposed personnel. As signature is required then it is expected to have scanned pages as appendixes ? Terms of Reference Annex B Appendix I Technical Response Format. 6.Technical Response to RFP. "the submitted technical response must stricly adhere to the rules and format"… It does mean answers should follow the tables structure provided in the same document (like 6.3.4 overal approach an implemetation plan in a table of 5 cells) or it is enough to follow the format in terms of item content without the tavbe stucture for the responce ? 4 Page 1 of 102 Yes, scanned and attached, to be submitted along with technical proposal. It is enough to follow the format in terms of item content and sequence without the table stucture for the response. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 5 General C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Terms of Reference: page 3 6.3.4 (for all lots) application specific approach and implementation plan. Is it required to respond points 1 to 7 for each module? Meaning 29 assesments, approaches, scope of tasks and implementation plans? What is the content of the answers expected at this level? A vendor bidding for Lot 1 should submit a consolidated overall master project plan. In addition, for each application in the list, bidder must respond to points 1 to 7, with a maximum possible application-specific approach and implementation plans per Lot as follows: Lot 1 - 25 Lot 2 - 2 Lot 3 - 2 Note that a separate technical response must be submitted per Lot. Refer to Annex B - Appendix I, para 1. "Vendors are expected to write full answers for each requirement ... Additional references may be attached as necessary, however unnecessarily lengthy documents are discouraged." 5 6 General General Terms of Reference 6.4.1. Is there an specific calculation formula used to measure the technical criteria? % Weight of Project Approach compared , % Proposed Personnel , Understanding, Company qualifications, etc Yes, weighted scoring methodology will be used for each of the criteria mentioned in Cover letter 2.5.2 7 General General 8 General General Please let us know if there are any major Please refer to paragragh "Dependency" of section Statement of On depencies, see: purpose of the TOR (Annex B Section 1, para 5) inflight project that may impact the 7 83 upgrade timelines Please provide high level phase-wise Tentative Go-live by Q1 2016 See also: 8 9 30 83 time line for HCM 8.9 to 9.2 upgrade 114 115 6 7 8 Page 2 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 9 General C D MSRP Finance Upgrade Work Pkg Question General 9 10 General General E F Related Questions Answer See also: 8 9 30 83 Please let us know when is HCM9.2 114 115 upgrade is expected to go-live In reference to "Annex B - Terms of Reference" Section 4- RFP mentions 12 month of Implementation + 3 month of prod support + 3 month of implementation of new features, IT also mentions that beyond first three month of support, some support would be required for year end activities. Going by the constraint of going live maximum by Jun-2016, 3 month warranty support would end in Sep-16. Please let us know if you foresee support required beyond Sep-2016 till Jan-2017? Refer to Q&A: 8 Please let us know if you are open for any other solution option for Lot1? Yes, provided that the vendor could demonstrate that the alternative approach is better. Yes, if the proposed Go-live period goes beyond Sep 2016. Bidder may submit change order rates schedule that could be used for additional post implementation support, as needed. UNHCR has established a 12-month implementation (construction to go-live) window followed by a post go-live support for the three (3) months immediately following go-live and an additional three (3) months to be used within one year following the roll-out for other key processing milestones such as year-end support. 10 11 General General Also see QA131 See also: 11 131 11 12 General General Please confirm if you intend to convert all crystal reports to XML publisher or continue using crystal reports. See also: 12 87 128 12 13 13 Yes. Refer to Work Package 07e deliverables. General General During your assessment have you prepared any list of customization which will be potentially be removed in 9.2 upgrade OR do you want vendor to indicate that as part of RFP response Page 3 of 102 Prelimiray assessment has been conducted, it however needs further detailed analysis during the Implementation and Build phase (i.e. this RFP) 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 14 General C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer In reference to "Annex B - Appendix I Technical Response Format" Section 6.3.4 -'For all lots, for each application' Request you to please share the expectation from subsection '3 scope of task' and how it is different from '2 Assessment of need' Refer to: Technical Response, section 6.3.4, approach and implementation plan. Assessment of needs : here you describe your understanding of the requirements, including the nature of activities required in order to deliver the solution. Scope of the tasks: Describe in detail the scope of task for meeting the needs 14 15 General General In reference to "Annex B - Appendix I Technical Response Format" Section 6.3.6 - Please let us know if we can have a 3 separate stand alone documents for each lot explaining our response for each work package. These will be supplement documents of 3 main technical responses Yes. You should submit three (3) documents in this case, one per lot. For each project role (examples: Project Manager, Functional Consultant, Developer, Sr. Developer, Technical Architect), subsection 2 will be repeated/appended to include all proposed personnel for the project. Refer to Annex B - Appendix I, para 1. "A separate technical response must be submitted for each Lot." 15 16 General General In reference to "Annex B - Appendix I Technical Response Format" Section 6.3.5.2 - Please let us know what is the expectation from subsection 2- Profile 17 General General In reference to "Annex B - Appendix I Technical Response Format" Section 6.3.5.2 - We understand for each project role (e.g. Project Manager, Functional Consultant, Developer, Sr. Developer) subsection 2 will be repeated See also: 16 17 16 17 For each project role (examples: Project Manager, Functional Consultant, Developer, Sr. Developer, Technical Architect), subsection 2 will be repeated/appended to include all proposed personnel for the project. See also: 16 17 Page 4 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 18 General C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer In reference to "Annex B - Appendix I Technical Response Format" Section 6.3.4 - 'For Lot1 (Summary)' subsection 3 'Implementation Plan'. RFP states "This should incorporate work and deliverables from Lot 2 and Lot 3". We undestand this will include standalone Implementation plan for each lots in respective Technical response document. example:- Lot 1 response will have implementation plan for Lot 1 only, Lot 2 response document will have implementaion plan for Lot2 only and Lot 3 response will have implementation plan for Lot 3 only. Please confirm As specificed in the ToR, bidder for Lot1 (Prime Vendor) is responsible for coordination activities within its lot as well as with other Lots for interdependent activities. As part of the engagement, the Prime Vendor must ensure the integration of all activities, incorporate/consolidate the implementation plan for all three (3) lots into a master project plan. As such, in addition to stand-alone implementation plans for each application in Lot 1, the bidder for Lot1 must include a higher-level implementation plan. See work packages. 18 19 General General We do not see the break up of estimation required for Tech Architecture in "Annex C - RFP 2014-647 Financial Offer Form.xlsx" . Please let us know how do you want the break up of efforts for tech architecture implemementation - This cannot be divided over lots as this will be a seperate effort for all lots UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. The system integrator for each lot will be responsible for ensuring proper installation/setup/technical architecture, providing guidance is necessary, and will be responsible for the maintenance during the period of the engagement. 20 General General The RFP cover letter states UNHCR is exempt from all direct taxes and customs duties. Please confirm if vendors and its consultants deputed Onsite (under work visa) for UNHCR engagements are also exepmted to pay Income Tax in Switzerland The tax exemption relates to UNHCR payments to the supplier. For further inquiries please consult the Swiss authorities. 19 20 Page 5 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 21 General C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General The RFP cover letter states same price for 3 years, can we provide three different prices covering each of the year Financial offers are required by deliverables and the offers should remain valid for the duration of the project. 21 22 General General The RFP cover letter states other UN agencies can leverage the prices of successful bidder from UNHCR agreement, can the same be applied in the reverse context, wherein UNHCR leverages existing contract of the bidder with other UN agencies Generally speaking yes, however it is subject to the agreement between the other UN agency and the vendor. 23 General General The RFP cover letter mentions sharing of CV of core staff. Please clarify which resources to be considered as core staff for which CV need to be provided CVs of all proposed personnel 24 General General TOR states contract will be awarded to single or JV or Consortium vendor for each Lots singlely or completely. In relation to this, can a bidder provide multiple responses - Single and under JV / Consortium and still be eligible for consideration under each lot category singlely as well as under JV / Consortium No. Only one response (per lot) is needed, even if bidding as part of consortium. The responses will be evaluated per lot (as a single lot bid) in any case. In case a bidder bids for one or two lots singlely, then is it mandatory to have prior relationship with successful primary vendor For the consultants to be deputed onsite, can you confirm what kind of visa / work permit and support will be provided by UNHCR No. 22 23 See Annex B - Appendix I -Technical_Response_Format, section 6.4.1 24 25 General General 26 General General 25 26 Page 6 of 102 UNHCR will provide a Letter of Attestation for the issuance of the visa. Further requirements need to be settled by the vendor. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 27 General C D MSRP Finance Upgrade Work Pkg Question General 27 E F Related Questions Answer Is it mandatory to have French speaking consultants Supplier Registeration - RFP Letter Section 2.5.1 - Submission of Documents for supplier registeration should be done along with final submission or can be done earlier to it. Working language is English, knowledge of French an asset 28 General General Please provide them together with your submission, as stated in the Cover Letter. 29 General General Financial - RFP Letter section 2.5.2 - Can you share the current UN exchange rate for USD & Euro conversion, for our understanding and evaluation Please follow the link for the current conversion rate: http://treasury.un.org/operationalrates/Default.aspx 30 General General TOR - Section 1 - The upgrade of Peoplesoft HCM (from 8.9 to 9.2) understand is a spearate project. Please confirm the planned date of go live for same. Please let know if this is undertaken by UNHCR internal team or alternate vendor, ensuring we can prepare cooridnation plan accordingly. Tentative Go-live by Q1 2016. It's undertaken by UNHCR staff with the assistance of a consultancy firm. 28 29 30 31 General General Coordination work must be discussed/cleared via the UNHCR HCM project team. See also: 8 9 30 83 114 115 TOR - Section 1 Lots - Please confirm the bolt-ons elements to replace Peoplesoft EPM. The RFP currently states Bolt-on applications to be developed supplementing certain functionality of PS EPM, please let know depending upon feasibility can one or all of these bolt-on can be implemented in Hyperion Planning Lot-2 31 Page 7 of 102 Refer to Annex B - Appendix II - Application Overview - Lot1 - Bolton… 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 32 General C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Section 2.1 - mentions that this upgrade project will address existing deficiences and will facilitate compliance with UN financial regulations and rules. Are there any specific compliance scenarios as per IPSAS that need to be covered.Request you to please provide update on the deficiences / changes expected Refer to Annex B - Appendix II, challenges and pain points. General Section 2.1 - mentions introduction of operational and business efficiencies including the automation or elimination of a number of manual activities currently required to comply with IPSAS. Also, there is mention of centralization (regionalization) of some functions. It would if you can give some examples relating to the same Examples of challenges include: dual accrual and (modified) cash basis recording, capturing of ancillary costs/systematic inclusion of transport costs for asset and inventory purchases, centralization of payment approval at the regional level, decentralization of payments at country level, implementation of workflow approval framework across the MSRP applications suite. Section 2.3 - mentions expectation of improved donor reporting. Please specify if this reporting is expected from PS or Hyperion While most of the reporting for donors is anticipated to come from PeopleSoft, reports may have to be generated from both systems depending on the needs. 32 33 General For more information, refer to Annex B - Appendix II, challenges and pain points. 33 34 General General This is covered in Work-packages 02 and 07 e) of Lot1 and Lot2. 34 Page 8 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 35 General C D MSRP Finance Upgrade Work Pkg Question General 35 36 General General 36 37 General General E F Related Questions Answer Section 3.1 - It is mentioned that for each of the 3 requirements in scope of this RFP, Fit-Gap and Keep Drop Analysis has been prepared. It would help if the same can be provided. See also: 35 37 Section 3.3 - Is it safe to assume for Lot 2 implementation the primary work location will be Geneva, with no expected travel to Budapest. If travel to Budapest (for coordination with technical team) needs to be considered, please let know expected ratio of working between Geneva and Budapest. Also, is it safe to assume that this travel if required would be billed / Please share Fit-Gap/Keep-Drop analysis, See also: 35 37 traceability matrix or any other relevant documents that are available, that were prepared as part of the recently concluded concenptual design phase. 37 Page 9 of 102 Preliminary Fit-Gap and Keep-drop analyses have been performed and documented. This will be shared with selected bidder(s) during the due diligence process. Further detailed analysis to be performed in the RFP Work-package 02 (including but not limited to their review, revalidation, revision, finetuning, completion). As part of its proposed implementation plan, bidder must submit the expected ratio of working / coordinating with UNHCR technical team in Budapest and include this in the proposal (technical and financial). It is irrelevant to provide the details of UN travel rules at this point in time. See response to question: 35 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 38 General C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Please suggest level of documentation (business requirement documents, functional, tech specs etc) available for the current MSRP system. For the current MSRP system, the level of document varies but, in general, existing customizations (particularly those updated or applied in recent years) have sufficient related documentation/information. Following the Conceptual design phase, AS-IS business processes are also well documented along with the desired TO-BE state. Detailed business requiremetns, functional, tech specs to be prepared in the next phase of the project. 38 39 General General Please indicate the daily volume of common transactions/day (Requisitions, POs, Vouchers, Journals, etc). Also, please indicate the no. of users in the system. What is the current/expected Single SignOn setup? Refer to attached document on Users and Volume of Common Transaction. 40 General WP06 41 General WP06 What is the current production database size? For current architecture, see Annex B - Appendix III, Technical Architecture as well as attached documents on RFP 647 - QandA. 42 General WP06 No. RAC is not implemented. General General Is RAC implemented on Oracle DB? If yes, would there be a DB/cluster upgrade as part of this project? Section 4 - states the additional support of 3 months to be used within one year following the roll-out for other key processing milestones. It would help if you can provide scenarios (roll-outs) with tentative time-plan on when this support 43 39 Currently, portal is used as a gateway to all applications (HR, EP, TM and FS), and the same is expected at the minimum. In addition, UNHCR has recently implemented active directory and so integration to active directory needs to be assessed as part of the project. 40 41 42 43 Page 10 of 102 As part of its proposed overall project implementation plan, it is for the Bidder to propose rollout tentative time-plan. Support from offshore needs to be discussed with/agreed by UNHCR with clear SLA. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 44 General C D MSRP Finance Upgrade Work Pkg Question General F Related Questions Answer General In case of post go-live support, can we assume this will be pre-dominantly being provided from off-shore during UNHCR Geneva normal working hours. Please specify for each lot activity As part of its proposed overall project implementation plan, it is for the Bidder to propose rollout tentative time-plan. Support from offshore needs to be discussed with/agreed by UNHCR with clear SLA. General Annexure B-5 > Section 2-Methodology indicates five main phases (Assessment, Upgrade, Development & Test, UAT, Go Live & Support) whereas the work package definitions indicate 10 processes, please let know the adaptations (when to be used) of the two and if there is any correlation "Annexure B-5 > Section 2" methodology refers specifically to the PeopleSoft upgrade exercise itself. (It does not discuss other important activities such as project management, change management, etc...) How many resources of UNHCR will be part of the project? What is the distribution of roles between them? How will the allocation of these resources happen (full time / part time)? At present, UNHCR's core project team is composed of 3 FTE's: a project manager, a business coordinator, a senior business analyst. The extended project team includes process/subject matter experts and business analysts in the functional areas with varying degrees of involvement. 44 45 E The work packages cover all the activities under OUM Oracle Phases and Implement Focus Areas. Please refer to Oracle project methodology for more explanations. 45 46 General General The bidder is expected to propose the overall project structure and staffing, including UNHCR roles and responsibilities. Refer to 6.3.5.3. Expected UNHCR roles and staff levels of Technical Response. 46 Page 11 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 47 General C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Could you please provide editable versions (excel sheet) of customizations tables as mentioned in Annex BAppendix III-1-Customization review.pdf, specially table-Annexure 1- No. Customization overview-page no 57 & Object-wise Module-level customization inventory for major modules- page no 59 47 48 General WP03 Do you have a dedicated communication team? If yes, what are their capabilities and would they be able to support the project? 49 General WP03 What are the communication channels and mechanisms that UNHCR wants to utilize during the upgrade program: email, newsletters, information sessions, webcasts, videos, self-running product demonstrations? 48 Currently, the project team is covering all communication related to the project itself. UNHCR intends to strengthen with bidder's personnel. See work package 3 Communication mechanisms will vary according to purpose and audience. See attached documents: RFP QandA - Communication RFP QandA - Change Management 49 50 General WP03 Does "Change Planning and Execution" scope include business process redesign activities or is it restricted to analyzing the delta between AS IS and TO BE processes and develop a plan on what the impact is for users + recommendations for communication & training? 50 Page 12 of 102 Both. See attached document: RFP QandA - Change Management 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 51 General C D MSRP Finance Upgrade Work Pkg Question WP03 E F Related Questions Answer Does "Change Planning and Execution" includes organization restructuring activities, where (Oracle) vendor needs to present recommendations on how to change the organization structure, or is it restricted to recommendations and execution activities in the areas of communication and training on how to support the organization through the business and IT transition? Yes. See attached document: RFP QandA - Change Management 51 52 General WP04 Do you have particular additional See also: 52 104 If refering to consultants, no, but fluency in another UN language language requirements besides English? 137 158 242 488 (eg French) is helpful; 507 5265 537 557 577 If refering to training, main training is in English with some French; If referring to working system language (setup), no; However, some reports/descriptions are in French, Spanish; 52 53 General WP04 Do they have an internal training team See also: 53, 59, 60 that will work together with the (Oracle) vendor consultants in a blended team during the development and delivery of the training. If yes, how big is their training team. Yes but with limited capacity, UNHCR intends to strengthen with bidder's personnel. UNHCR will use internal resources to build training capabilities and capacity for post implementation; however, we anticipate that the Prime Vendor will be involved in both train-the-trainer and enduser training delivery. UNHCR team members will also be used to provide end-user training. See attached document: RFP QandA - Training 53 Page 13 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 54 General C D MSRP Finance Upgrade Work Pkg Question WP04 E F Related Questions Answer What are the different job roles that will be affected by this initiative and that require end user training? 54 To be determined. See attached documents: RFP QandA - Change Management; RFP QandA - Training See attached documents: RFP QandA - Training RFP 647 - QandA - Users and Volume of Common Transactions 55 General WP04 What are the number of users per job role and how is their geographical spread? 56 General WP04 Beside full training on newly implemented modules, is it required delta training on upgraded modules? Yes. Do you have a Learning Management System? Or how do you currently host/distribute the training materials and eLearning? What are the training team's skill set / capabilities: Buy training from supplier and/or develop your own training material? Do you have your own trainers? See also: 53, 59, 60 See attached document: RFP QandA - Training 55 See attached document: RFP QandA - Training 56 57 General WP04 58 General WP04 57 58 59 General WP04 60 General WP04 See ToR, section 3.3, Work Package 04. Also see attached document: RFP QandA - Training See response to question 53. 59 If you have your own training team, is it See also: 53, 59, 60 See response to question 53. planned to work in collaboration with Oracle's team? If yes, how much of their time will be provided? 60 Page 14 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 61 General C D MSRP Finance Upgrade Work Pkg Question WP04 E F Related Questions Answer Section 3.3 - As part of the end user training work package, it is expected that all end users will be required to be effectively trained. Request you to share the no. of users expected to be trained across each lot To be determined. See attached document: RFP QandA - Training 61 62 General WP04 Section 3.3 - Additionally for training, please let know if this needs to be conducted for all users at Geneva / each individual location / online training. Request you to share the method to be adapted across each lot Please refer to Key activities of WP-04. Section 3.3 - As part of the knowledge transfer work package, please let know the users (including no. of) for whom this needs to be accomplished across each lot. Also, is it safe to assume that this will be undertaken at one location for each lot. No, do not assume that this will be undertaken at one location. Most likely, Knowledge transfer activities will be conducted in Geneva, Budapest, and possibly UNHCR service centers responsible for production support, depending on the Lot/Applications. Section 3.3 - As part of system configuration and setup, is it safe to assume that native security would be defined for each application. Also, there is mentioned of agreed benchmarks for security, request to specify these benchmarks for understanding of expectations Yes, security should be defined for each application. Benchmark for security would be the current system. Security should be at the mimimum as good as the current system if not better. Also see attached document: RFP QandA - Training 62 63 General WP05 The (business) users to be trained include functional experts in their respective areas of responsibility. For example, procurement related to PMCS functional expert, Accounting/Financial to AFS functional expert etc... 63 64 64 General WP06 Page 15 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 65 General C D MSRP Finance Upgrade Work Pkg Question WP06 E F Related Questions Answer Section 3.3 - As part of the approval workflows, please let know the no. of levels of approval is expected to be defined In principle 1 to 2 levels but it will depend on the business process area. For example, for supply chain processes, normally one level, with potential prior technical clearance on some cases/process flows. In any new processes where plan to use workflow it is still to decide the level of approvals. 65 66 General WP08 Please specify if UNHCR is using any specific testing tool or alternately any core process that needs to be followed Please refer to WP08: For PeopleSoft, functional test cases should be developed as part of the implementation of PeopleSoft Test Framework (PTF). The System Integrator will use and provide, if necessary, the tools and agreed procedures to manage the testing activities. 66 67 Lot1-Expenses WP02 What is the payment method that is going to be used for expense payments? At the very least, the same payment methods already in use for paycycles, both electronic and manual methods. 68 Lot1-Billing WP02 Are invoices others than CD (which is interfaced from bolt-on) are manually entered in Billing? Some invoices will be entered manually, but not all. There will potentially be 3rd party interfaces from systems other than the Contributions Management bolt-on, for example generation of invoices from an Excel upload. 69 Lot1-Billing WP02 Is there a plan to use AM-BI interface? Yes, the use of AM-BI interface is in the plan. 70 General WP06 Yes, the application should be available over the internet. 71 Lot1-App.Upgrd WP06 72 General WP06 Is the application accessible from outside network? In that case what is the existing/expected setup? Is there any specific requirement of latest patch level that need to be applied on 9.2? Is the database Unicode/Non-Unicode? 67 68 69 70 71 72 Page 16 of 102 This is dependent on the latest available PUM image during the test moves and code catch-up schedule. Unicode 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 73 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP09 Is there any limitation on application down time during go-live? Minumum disruption. Only in the events of force-majeur Is there any limitation in the number of upgrade passes (w.r.t space considerations)? Are invoices other than CD are interfaced or entered in AR? In principle, no limitation but dependent on the availability of resource. Bidder to propose optimum plan with minumum disruption. Yes. Refer to Annex B - Appendix II - Billing which discusses invoices for various income related activities. 73 74 Lot1-App.Upgrd WP06 75 Lot1-Billing WP02 76 Lot1-Proj.Costing WP03 Integration is required between PeopleSoft Expenses and designated UNHCR Travel Agency for ticket reconciliation. Is it for reconciliation only or are you planning to integrate with the travel partner to leverage the reservation to create Expense Reports? To be determined/elaborated. Detailed requirements gathering and analysis is part of the engagement. 77 Lot1-Expenses WP03 See response to question: 35 78 Lot1-Expenses WP03 A high-level Fit–Gap document is available as part of the assessment report for this module. Where can we find those documents? Could you please provide example of HR Travel? 79 Lot1-Billing WP03 80 Lot1-Accounts Payable WP02 74 75 76 77 78 79 Could you please explain the acronyms MIP, LOP? Could you please explain the acronyms AFS, DESS and DFAM? 80 Page 17 of 102 HR Travel would include travels for: initial appointment, reassignment, home leave, family visit, educated grant travel/reverse education grant travel, separation, reassignment combined with home leave MIP - Medical Insurance Plan LOP - ? AFS - Accounts and Financial Service DESS - Division for Emergencies, Supply and Security DFAM - Division of Financial and Administrative Management; 1 2 A B C D RFP/2014/647 RFP/2014/647 MSRP Finance Upgrade Question Lot - Section Work Pkg Question Number 81 Lot1-Accounts Payable WP06 How do you calculate the payroll for the employees depuded to a local field office? E Related Questions Answer Payroll is calculated in the HR system, which is outside of scope of PeopleSoft FSCM. The actual formula is irrelevant for this engagement. For information on Implementing Partners, please refer to: 81 82 Lot1-Cash Management WP02 F In the cash flow overview section, what is the Implementation Partner reporting? Annex_B_-_Appendix_II_-_Application_Overview_-_Lot1_-_Bolton_-_Partnership_Management.pdf 82 83 Lot 1 In General Can UNHCR provide us with the timeline for its PeopleSoft HCM upgrade, for all the phases? This will help to understand alignment of new module implementations like Expenses with the HCM project. Please comment if any other inflight projects that will have a dependency or affect the Finance upgrade timelines HCM Timeline: See response to Q8 Depencies: See response to Q7 See also: 8 9 30 83 114 115; On depencies, see: 7 83 83 84 Lot 1 In General Section 4 of Annex B Terms of Reference indicates that UNHCR has described the timeline as twelve months. Please confirm if the vendor can propose an alternative timeline to align well with the RFP requirements. Yes. 85 Lot 1 In General Please describe if UNHCR has a prescribed minimum time window for user acceptance testing Bidder should include/propose in the overall implementation plan. 84 85 Page 18 of 102 Constraints include the year-end closure Dec-Apr time period, which should be avoided, as key SME's and business owners will have limited availability. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 86 Lot 1 C D MSRP Finance Upgrade Work Pkg Question In General E F Related Questions Answer Please clarify if UNHCR has a preference for and also licenses for specific testing tools like HP QTP for Functional testing and Loadrunner for Performance testing. Please refer to WP08: For PeopleSoft, functional test cases should be developed as part of the implementation of PeopleSoft Test Framework (PTF). The System Integrator will use and provide, if necessary, the tools and agreed procedures to manage the testing activities. 86 87 Lot 1 In General Annex B Reporting Deliverables mentions conversion of all reports to standard tools (e.g. Crystal Reports to XML Publisher). We understand that there are over 150 Crystal reports in the current PeopleSoft system. Please describe if it is necessary to convert all these Crystal reports to XML Publisher even if current Crystal reports meet the functional requirements. Yes, Crystal Report conversion to XML Publisher in in scope. At this point, UNHCR has not established the number of Crystal reports that have to be converted, but it is reasonable to assume that at least 100 reports are impacted. Alternatively, please comment if an analysis been done on how many Crystal reports necessarily need to move to XML Publisher See also: 12 87 128 87 88 Lot 1 In General For all the new modules that are being proposed to be implemented, please comment if detailed approved requirements and fit gap documents can be shared to facilitate near accurate estimates. 88 Page 19 of 102 See response to question: 35 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 89 Lot 1 C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer In General Has UNHCR finalized integration requirements with external travel agencies and credit card vendors for specific requirements like secure file transfer, file encryption, infrastructure etc. No. 89 90 Lot 1 In General Please comment on the UNHCR commitment on providing Subject Matter Expertise for UNHCR requirements for the upgrade and implementation. UNHCR is committed. 91 Lot 1 In General Please clarify if Organization Change Management is in scope for the vendor See attached document: RFP QandA - Change Management 92 Lot 1 In General For all the new modules that are being proposed to be implemented, please comment if detailed approved requirements and fit gap documents can be shared in order to propose an accurate estimate for implementation See response to question: 35 93 Lot1-App.Upgrd General Please confirm whether environment consolidation (merger of PeopleSoft Financials 8.4 and Treasury Management Systems 9.0) is within the scope of this RFP? Yes. This is a KEY deliverable. 90 91 92 93 Page 20 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 94 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General RFP mentions the project duration for a year. Are there any blackout periods when UNHCR will not be able to Go Live for business or strategic reasons? Year-end closure period is considered a go-live 'blackout period' for Lot1, upgrade and consolidation into PeopleSoft 9.2. 94 95 Lot1-App.Upgrd General Does UNHCR expect the upgrade and implementation of new modules to go in parallel or sequential? The timing of the implementation of new PeopleSoft modules vis-àvis the upgrade depends on a number of factors, including the criticality of the module. Definitely some new modules will go parallel, some later in sequential. 96 Lot1-App.Upgrd General What is the strength of the current PeopleSoft team? a) Management Resources b) Functional Resources c) Techno-Functional Resource d) Technical Resource Vendor should assume, in general, that UNHCR resources have strong knowledge in their areas of responsibility, but limited capacity. 97 Lot1-App.Upgrd General 98 Lot1-App.Upgrd General For current architecture, see Annex B - Appendix III, Technical Architecture. For changes to the project, see work package 1. 99 Lot1-App.Upgrd General What’s the actual size of current PeopleSoft Production Database? Do we have any change control mechanism in place? Do you have any restriction of sharing copy of production data with offshore? 100 Lot1-App.Upgrd General 95 96 97 98 No copy of production data will be shared. 99 Is the upgrade planned to be a “a near Vanilla” Upgrade? See also: 100 101 Mixed, in the sense that the idea is to maximize vanilla functionality, minimize intrusive customizations. UNHCR recognises the value of PeopleTools as a development environment and expect to use it for non-intrusive bolt-on modules within the PeopleSoft application. 100 Page 21 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 101 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer If the answer to the above question is “No”, then please specify the additional functionalities for each implemented module that you plan to implement in the target version (apart from the current customizations)? Most of the additional functionalities are mentioned in the appendix II documents. See also: 100 101 101 102 Lot1-App.Upgrd General With respect to implementation of additional functionalities, have you completed the scoping and estimation of effort? Please provide details. No. 103 Lot1-App.Upgrd General Is Database Installation and Maintenance part of scope for the upgrade Database installation is handled by our service provider hosting the environments. The System Integrator will be responsible for ensuring proper installation/setup, providing guidance is necessary, and will be responsible for the maintenance during the period of the engagement in collaboration with the hosting service provider. 104 Lot1-App.Upgrd General No. 105 Lot1-App.Upgrd General 106 Lot1-App.Upgrd General Is current Environment Multi lingual? If See also: 52 104 yes, let us know languages implemented. 137 158 242 488 507 5265 537 557 577 Do we need to consider addressing key challenges listed for each of the existing modules as part of the upgrade scope? Or this would be taken up post Upgrade as Phase 2? What is the duration (in weeks) you are considering for the user acceptance testing phase? Or you expect Oracle to provide you with duration based on best practices 102 103 104 105 106 Page 22 of 102 In principle, yes, the key challenges should be addressed. For vendor to propose its approach/best practice and agree with UNHCR 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 107 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question General 107 108 Lot1-App.Upgrd General 109 Lot1-App.Upgrd General 110 Lot1-App.Upgrd General 111 Lot1-App.Upgrd General 112 Lot1-App.Upgrd General 113 Lot1-App.Upgrd General 114 Lot1-App.Upgrd General 115 Lot1-App.Upgrd General 116 Lot1-App.Upgrd General 108 E F Related Questions Answer What is the duration (in weeks) you are considering for the parallel testing phase? Or you expect Oracle to provide you with duration based on best practices Are you looking for Performance testing phase in upgrade project? Do we have any tools like Load Runner for performing the Performance Testing? For vendor to propose its approach/best practice and agree with UNHCR Is there any documentation on test case plans available? Can you provide offshore access to specific instances (DEV, TEST, TRN etc.) on your servers? Can you provide copies of your nonproduction instances to our offshore facilities after sanitizing the instances of any real data (i.e. after masking the real data)? How many months of support do you See also: 113, 543, require after the upgrade go-live? 563, 583 No. If any, it would be minimal. Yes, please refer to WP08 UNHCR does not have any tools for performance testing. 109 110 111 112 Access to UNHCR servers will only be granted to official project staff accepted by UNHCR. No copy of non-production instances will be shared. Refer to Terms of reference 4. Timeline and Constraints 113 114 115 116 Are there any dependencies between the Refer to Terms of Reference - Statement of purpose - Dependency upgrade project and any other initiatives within the organization? See also: 8 9 30 83 114 115 See also: 8 9 30 83 See response to question: 8 When is the Go Live planned for HR 114 115 Upgrade which is currently in flight? When are you planning to start the Refer to Terms of reference 4. Timeline and Constraints project? Page 23 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 117 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Do we have Data Archival in place for existing PeopleSoft System? Is upgrade of Archived data in scope or out of scope as part of this upgrade? No data archiving in place for existing PeopleSoft 117 118 Lot1-App.Upgrd General Is expectation for training is only to Train the Trainer or end users as well. If end users, how many user training sessions are required to be conducted and what is the total no of end users See response to question: 53 119 Lot1-App.Upgrd General Can we assume that Train the trainer Manuals would be used to train or do you have any specific requirement on user manuals. Can we assume Application Knowledge Transfer would be only on new functionalities and can we covered during SIT and UAT Phase To be determined. 118 119 120 Lot1-App.Upgrd General See attached document: RFP QandA - Training To be determined. In principle, application KT should cover new and changed functionalities as a priority, but also provide a refresher on other functionality in the target versions. The timing of the knowledge transfer must be determined during the planning stages of the engagement. 120 121 Lot1-App.Upgrd General 122 Lot1-App.Upgrd General 121 How many resources would be part of KT sessions from current IT Team Do you have any additional requirement of documentation which need to be handed over as part of KT sessions? 122 Page 24 of 102 Approximately, 4 resources. See Work Package 5. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 123 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer What is expected from Oracle for nonOracle Bolt-ons applications? Within this engagement, the vendor is expected to perform the activities and deliver the outputs covered under the work packages, including rollout and the provision of postimplementation support. Particularly for bolt-ons (and other customizations), UNHCR expects high quality build, development and documentation. 123 124 Lot1-App.Upgrd General UNHCR has mentioned "Chartfields rationalization" as one of the key priorties, could you please describe this requirement in detail? Do you expect us to explore and identify any additional Chartfields requirements?(Annexure B- This is Key Priority (KP1) which is adressed by uNHCR relevant business owners, internally. Appendix I-Terms of Reference(TOR), Section 2.3-Key Priorties, Page no 6) 124 125 Lot1-App.Upgrd General UNHCR has mentioned "Single travel system" as one of the key priorties, could you please describe this requirement in detail? Which travel management system are you currently using?(Annexure BAppendix I-Terms of Reference(TOR), Section 2.3-Key Priorties, Page no 6) 125 Page 25 of 102 The management of travel is currently a manual process , outside of MSRP across UNHCR HQs and and UNHCR field operations. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 126 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Terms of Reference mentions that vendors would be responsible for finalization of requirements, developing the strategy for reviewing customizations, ensuring the traceability of decisions and migrate those deemed usable. In this case is the requirments gathering also in scope of this RFP or would the requirements be provided by UNHCR? (Annexure B-Appendix I-Terms Requirements gathering is also in scope. of Reference(TOR), Section 3.2.2-Build and Implementation PhaseCustomizations overview) 126 127 Lot1-App.Upgrd General As per the scope, PeopleSoft EPM 8.9 will be decommissioned and its current functionalities will be distributed across Hyperion and PeopleSoft Financials 9.2 as bolt on. During the conceptual design phase, is any decision made on what functionalities will be in PeopleSoft as bolt-ons vs what will be in Hyperion. If yes please provide details.(Annexure BAppendix I-Terms of Reference(TOR) 127 Page 26 of 102 The decision was made. Full details are in Annex B, Appendix II. Please refer to the document for Contributions Management in particular. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 128 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question General E Related Questions Answer We are assuming that all Crystal reports currently in use need to be converted to XML Publisher. Please confirm. (Annexure B-Appendix I-Terms of Reference(TOR), Section 3.2.3-Build and Implementation Phase-Customized reports and queries) 128 129 Lot1-App.Upgrd General F See response to question: 12 and 87 See also: 12 87 128 For potential implementation of additional PeopleSoft Modules of Realestate Management and Project Costing, is any preparation done at UNHCR level. If yes please provide details along with expectations from vendor? As per shared documentation, only a feasibility study to determine that the modules are capable of handling the UNHCR required functionality has been undertaken. No formal fit-gap session undertaken. (Annexure B-Appendix I-Terms of Reference(TOR), Section 3.2.1-Build and Implementation PhaseApplications overview) See also: 129 141 129 130 Lot1-App.Upgrd General We are assuming that all interfaces mentioned in Annex B-Appendix III-1customized interfaces.pdf are related to PeopleSoft FSCM only. Please confirm. Also if possible, could you please provide a diagrammatic representation /architecture of all interfaces? 130 Page 27 of 102 In the current environment, the customized interfaces may be related to FSCM v8.4 (Fin/SCM), Peoplesoft EPM v8.9 (Budget/Income) or FSCM v9.0 (Treasury). It is expected that as part of this engagement, activities will be carried out in order to identify all possible integration to other applications/systems. The current system landscape is illustrated in Annex B, Appendix IIII under section 1.3.1. heading Current System Landscape. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 131 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question WP02 E Related Questions Answer If the answer to the above question is ‘Yes’ then what would be preferred approach for environment consolidation? • Upgrade and then consolidate • Consolidate and then Upgrade 132 UNHCR prefers upgrading FSCM to 9.2 and consolidating TMS directly into 9.2. See: ToR - Appendix_IIII_-_5__Methodology_and_Options_for_Upgrade See also: 11 131 131 132 Lot1-App.Upgrd WP02 F Detailed Budgeting : • How many reports needs to be developed in Financial Reports? • How many reports from PeopleSoft queries and as well as from GFI and GFX is expected? • How many web Forms needs to be developed in Hyperion Planning? • How many users are planning to use the system? This is required for load balancing • How many years of History needs to be stored in the System? This is required for planning historical data migration • Is the historical data available in systems or excel? • What kind of security level is expected in the Hyperion Planning Web Forms? • Are they planning to host detailed budgeting and position budgeting on the same environment? Also see QA11 Some details may only be elaborated during the engagement (eg. number of web forms, number years of history, security levels, etc). Approximately 10 NVision existing detailed budgeting reports exist in the current EPM system but it is expected to have more in Hyperion. (See also Annex B - Appendix II - Application Overview Lot1 - Bolt-on - Partnership Management, "Challenges section". Current EPM Queries are provided in Annex IV section 2. Currently EPM has approximately 2500 individual users. The number of Hyperion users will have to be determined. See also: 132 305 Page 28 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 133 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question WP02 E F Related Questions Answer We understand that As-is assessment, fit gap and drop keep analysis, to be process flows and functional design for all existing PeopleSoft applications have already been completed and we are only expected to do a revalidation of the same along with build and implementation, Testing and deployment. Please confirm.(Annexure See Work Packages, particularly work packages 2. B-Appendix I-Terms of Reference(TOR), Section 3.2.1-Build and Implementation PhaseApplications overview) 133 134 Lot1-App.Upgrd WP02 We understand that As-is assessment, fitgap and drop-keep analysis, to-be process flows and functional design for all new required and potential PeopleSoft applications and bolt-ons are in scope along with build and implementation, testing and deployment. Please confirm.(Annexure B-Appendix I-Terms of Reference(TOR), Section 3.2.1-Build and Implementation PhaseApplications overview) 134 Page 29 of 102 Yes. (For potential new applications, build and Implementation, testing and deployment activities will depend on clearance/final business decisions.) 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 135 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question WP03 E F Related Questions Answer We Understand that UNHCR is willing to accomplish Oracle PeopleSoft business process improvements to be aligned with delivered/standard functionalities of Oracle/PeopleSoft and wants planning and execution of change management plan. Are you also expecting vendors to do financial process analysis and redesigning? Are you willing to align your financial business processes with Industry best practices? (Annexure B- To be determined. Before making this decision, UNHCR will work with the System Integrator to discuss other options such as available work-around or process re-design. Acceptable solutions will be determined by UNHCR in conjunction with the System Integrator and may be any of the options described under 2.2 Guiding principles of the TOR. Appendix I-Terms of Reference(TOR) Section 3.3) 135 136 Lot1-App.Upgrd WP04 Do you have UPK training modules for the existing PeopleSoft modules, that can be used as a starting point? There are some, but may be outdated. Also see attached document: RFP QandA - Training 136 137 Lot1-App.Upgrd WP04 Does UNHCR expect vendor to provide training content/documentation in different languages? Also does UNHCR expect vendor to provide training in its own toolset or would UNHCR provide their toolset? (Annexure B-Appendix I- See also: 52 104 All materials/documentation in English (UNHCR will take care of 137 158 242 488 the translation/production of material in different languagues (to 507 5265 537 557 check with GLC). 577 For additional information on training, see attached document: RFP QandA - Training Terms of Reference(TOR) Section 3.3) 137 138 Lot1-App.Upgrd WP04 As user Training is in scope, please confirm number of users of Financial management system that need to be trained. (Annexure B-Appendix I- Terms of Reference(TOR) Section 3.3) 138 Page 30 of 102 To be determined. See attached document: RFP QandA - Training 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 139 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question WP06 E F Related Questions Answer UNHCR mentions that System Integrator must develop backup and recovery plan as well as disaster recovery strategy. Please provide inputs on whether it is needed to be done for all production and non-production environments during implementation? Also during the post go live support is the system integrator expected to execute the disaster recovery test as well (Annexure B- Backup recovery and disaster recovery strategies apply to the production environment acceptable to UNHCR. The system integrator is expected to actively participate and support the disaster recovery test in collaboration with UNHCR and the hosting service provider as part of the post go live support. Appendix I-Terms of Reference(TOR) Section 3.3) 139 140 Lot1-App.Upgrd WP06 On Security: Is Single Sign-on existing between current MSRP systems of PeopleSoft HR and PeopleSoft Financials? If not is the vendor supposed to implement it? What will be the role of vendor who currently does PeopleSoft HR Upgrade in this activity. (Annexure B- Yes, through portal Appendix I-Terms of Reference(TOR) Section 3.3) 140 141 141 Lot1-App.Upgrd WP08 For potential implementation of additional PeopleSoft Modules of Realestate Management and Project Costing, is any preparation done at UNHCR level. If yes please provide details along with expectations from vendor? (Annexure B-Appendix I-Terms of Referen See answer to question: 129 See also: 129 141 Page 31 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 142 Lot1-App.Upgrd C D MSRP Finance Upgrade Work Pkg Question WP08 E F Related Questions Answer Does UNHCR use any tool (like HP Quality Center) during the testing phase to maintain test scripts, test data and defect tracking. If yes please provide details. No, UNHCR currently does not use any tool for test scripts, test data and defect tracking specifically for PeopleSoft related testing, however SpiraTeam has been used in other projects. (Annexure B-Appendix I-Terms of Reference(TOR) Section 3.3) Please refer to WP08: For PeopleSoft, functional test cases should be developed as part of the implementation of PeopleSoft Test Framework (PTF). The System Integrator will use and provide, if necessary, the tools and agreed procedures to manage the testing activities. 142 143 Lot1-App.Upgrd WP08 Please confirm if UNHCR is also looking for GL parallel test. If yes, please state preferred duration of GL parallel runs. Ambiguous question. (Annexure B-Appendix I-Terms of Reference(TOR) Section 3.3) 143 144 Lot1-App.Upgrd WP08 Can you provide the names of key processes that qualify for performance testing during the performance testing phase? (Annexure B-Appendix I-Terms of Reference(TOR) Section 3.3) 144 Page 32 of 102 To be determined. Performance testing will be performed across applications to measure response time with a single user or with multiple users using the system, e.g. procurement to pay processes, reports (nVisions), transactions against Essbase, queries, etc 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 145 Lot1-Billing C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Will this be a Vanilla Implementation? This will be assessed in this RFP (see WP02). In principle, UNHCR would like a (close to) vanilla implementation but recognizes that standard functionility may not meet all of its needs. (Refer to ToR, section 2.2 - Guiding Principles.) Example: The invoice created for CDs is likely to be complex and necessitate detailed formatting. As a bespoke invoice is a standard requirement, the implementation still falls into the category of a vanilla implementation. 145 146 Lot1-Billing WP02 147 Lot1-Billing WP02 148 Lot1-Billing WP02 146 Please let us know how many Billing systems do you have? Do you want to convert data or integrate them to new system? Please confirm if UNHCR creates AP vouchers from Billing (e.g. RMA)? 147 Please confirm if UNHCR generates interunit Invoices 148 Page 33 of 102 Currently, UNHCR does not have a Billing system per-se. Billing occurs outside of PeopleSoft with manual documents. No data conversion is anticipated. Currently, UNHCR does not have a Billing system. In the PS9.2 implementation, UNHCR might use this functionality. (To be decided.) Currently, UNHCR does not have a Billing system. In the PS9.2 implementation, UNHCR might use this functionality. (To be decided.) 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 149 Lot1-Billing C D MSRP Finance Upgrade Work Pkg Question WP02 E F Related Questions Answer Please let us know how many Invoice formats will UNHCR organization will be requiring? The final number of invoice formats will determined during the engagement. System integrator must consider that at least the following may be required: One for CDs (with complex formatting), one for staff (reimburseable loans, etc), one for third-parties (sub lease, etc), and one for the PI shop (with a nice presentation that includes links to further information, etc). The invoice for CDs will need to duplicated so as to allow for English, French and Spanish versions. 149 150 Lot1-Billing WP02 Please let us know what would be the intended Process Flow: 1. Billing > Accounts Receivable > General Ledger 2. Billing > General Ledger (for Revenue Tracking) and AR > GL (for Payments). The intended Process Flow is 1. Billing > AR > GL 151 Lot1-Billing WP02 Please confirm the Assumption: Invoices will be generated on the basis of Billing Identifiers (Charge Codes). To be determined during this engagement. 152 Lot1-Billing WP02 153 Lot1-Billing WP02 Please confirm the Assumption: There Correct. See answer to questions 149 and 440 for more detail. would be multiple Invoice Templates for various Invoicing Activities. See also: 149, 152, 440 Please let us know the Invoices raised are UNHCR is not subject to VAT. subjected to VAT/Service Tax, or, as a UN Agency, UNHCR follows its own Taxing Method or None. 154 Lot1-Billing WP02 150 151 152 153 154 Please let us know if there will be a specific Numbering Sequence for different types of Invoices. Page 34 of 102 To be determined during this engagement. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 155 Lot1-Billing C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP07 Please list the integration point to Billing (e.g. Order Management, 3rd party etc.) The Contributions Management bolt-on will function as a 3rd party integration to BI. Another 3rd party systems could be for MIP. UNHCR are not planning to implement Order Management. General Will this be a Vanilla Implementation? Very likely, some customizations will be required. However, the objective of the project is to maximize the use of standard functionalities... 155 156 Lot1-Expenses 156 157 Lot1-Expenses General Among the listed functionnalities, what are those which aleady exist in the current version ? Refer to: ToR, 2.2, Guiding Principles. Annex_B_-_Appendix_II_-_Application_Overview_-_Lot1_-_FS__Expense.pdf PeopleSoft Expense module is not currently in use. Annex_B_-_Appendix_II_-_Application_Overview_-_Lot1_-_FS__Expense.pdf 157 158 Lot1-Expenses General 159 Lot1-Expenses General 160 Lot1-Expenses WP02 Please let us know the relationship of existing Expenses business process with PeopleSoft GL Business Unit (For Ex: one to many / Many to One) UNHCR is currently using only one GL Business Unit, with subsystems having multiple Business Units. Expenses are likely to follow the same model. 161 Lot1-Expenses WP02 Please let us know what pare payment methods used (Credit Card / Bank transfer/ Salary) To be elaborated during engagement (requirement gathering activity). 158 Notifications will be in english only or will See also: 52 104 Notifications will be in English only depend on the preferred languages ? 137 158 242 488 507 5265 537 557 577 Are there reports to automatically To be determined. generate and attach to notifications ? 159 160 161 Page 35 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 162 Lot1-Expenses C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP02 Please let us know how may expenses type required to be configured To be elaborated during engagement (requirement gathering activity). Does any expenses type require questionaries’ to be answered by user? OR do you need them to be configured that way. Please let us know if barcode is to be printed on expense sheet Please confirm if you need details tracking for following expenses type? Meals & Lodging Hotel Transportation Personal Vehicle Mileage Anything else To be elaborated during engagement (requirement gathering activity). Please confirm if UNHCR requires visibility into Ongoing Activities, Requirement such as Budget vs. Actual Projected Expense Expenses In Progress Please confirm if use of pre-trip travel authorization Required (Yes/No) To be elaborated during engagement (requirement gathering activity). 162 163 Lot1-Expenses WP02 164 Lot1-Expenses WP02 165 Lot1-Expenses WP02 166 Lot1-Expenses WP02 167 Lot1-Expenses WP02 168 Lot1-Expenses WP02 169 Lot1-Expenses WP02 163 164 To be elaborated during engagement (requirement gathering activity). To be elaborated during engagement (requirement gathering activity). 165 166 167 168 169 Please confirm if use of Credit Card Charges Import Required (Yes/No) Please confirm if use of Imaging Solution Required (Yes/No) Page 36 of 102 In the organization, a travel authorization is required before any trip. To be elaborated during engagement (requirement gathering activity). To be elaborated during engagement (requirement gathering activity). To be elaborated during engagement (requirement gathering activity). 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 170 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer We see lots of controls defined in “Annexure A – GRC” for all streams like Finance, Supply chain - Have you done the control assessment of these earlier and has it been accepted by UNHCR that it will go in GRC System? We see these listed to be more of Operational Reports than controls. Most of them can be handled directly in PeopleSoft Systems and Operational Reports. Only controls related to high risk access conflicts to be monitored should be in AACG Transactions - Related to Master Data, Threshold Values, Configurations, Different states, Due dates etc that required continuous monitoring should be built in TCG and not General Operational Reports. 170 Page 37 of 102 Refer to the TOR Annex_B and appendix II_Application_GRC .The prioritisation of the controls to go in GRC has not yet been done. Re. Annex B and AppendixII-GRC, the system integrator will revalidate the list of controls that will go in GRC - out of the overall listed controls. Bidder to propose/advise based on their experience / expertise. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 171 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer The output from GRC application is a report that can be assessed by Risk Team or Business Process owners. They can do it only if they know PeopleSoft Application and GRC Control Definitions (I mean technically). Does UNNHCR have this kind of a skill set across all countries? Then the Business owners need to take action / Remediation activity in PeopleSoft Application for the changes, and then test them. It is a mix of IT teams and Business Leads to act on GRC application. GRC is new module. At this point in time, UNHCR does not have technical GRC skills. Re. WP02 and Annexure 1- GRC. Bidder to propose/advise based on their experience / expertise. 171 172 Lot1-GRC General I see that you have mentioned about US and Country teams - Are these teams just analyzing the GRC reports or they will work in GRC application individually to create controls. As a best practice in GRC, is to manage the application centrally like a shared service and requests - to create new model, enhance the existing control can come from Global US or Country teams. In adherence with best practice for GRC - UNHCR envisages to manage the GRC application centrally (creation of new models enhancement of controls etc.). However, as per annex B_Appendix II, the system integrator will assist in defining the role of UNHCR country offices in the implementation of GRC. Bidder to propose/advise based on their experience / expertise 173 Lot1-GRC General How many members will be actively working in GRC system after implementation - We need to know this to design the GRC user roles using Fusion Security Model This will be determined with the assistance of System ingrators (Annex B_ Appendix II_ GRC ). 172 173 Page 38 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 174 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General If you have already done an Inception Phase, it will great if you can share that so that we don’t need to factor that in our estimates and add more value to UNHCR. This is expected from System integrators. The most detailed information is avaialble in Annex B_ Appendix II_GRC. TOR, Annex_B, WP02 forseees that System integrator will revalidate the conclusions and reocmmendation of concpetual design; prepare final detailed business requirements documents,; functional configuration and setup documentation etc. 174 175 Lot1-GRC WP02 In relation to Oracle GRC we would like to know current pain points to Roles & Security in supply chain area? See response to question: 170 176 Lot1-GRC WP02 Key GRC challenges for Supply chain area are listed in Annex B_ Appendix II_ GRC . 177 Lot1-GRC WP02 178 Lot1-GRC In relation to Oracle GRC we would like to know the current requirements of tracking in Supply chain area? For example PO Lines, bank account numbers etc We understand that your current PeopleSoft system is having number of controls in place. Are you looking at additional controls (Access/Transaction) in Supply chain area on top of existing controls? Have the list of Models and Controls from a SoD Perspective been already frozen? From a scope point of view is the list of Models AnnexB-Appendix II Application Overview - Lot1 - GRC final? 175 176 177 178 Page 39 of 102 Yes, additional controls (Access / Transaction (GRC))shall be on top of improved control in 9.2. FSCM applications, in upgraded system. No - the list of Models and Controls from SOD perspective has not been finalised. The list of models in Annex B - Appendix 2 - GRC is not final. The Access Controls described are posssible controls that could be configured in GRC. But those controls (that will go in GRC) need to reviewed, refined, priotised and validated, with the System integrator, as per Annex B_ Appendix II_ GRC. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 179 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Similarly, have the list of Models and Controls from a Transactions Control Perspective been already frozen? From a scope point of view is the list of Models AnnexB-Appendix II Application Overview - Lot1 - GRC final? Re. response to question 178. Similarly the list of Transactions are not final. They need ot be refined and valiaded with System integrator. Who will own the GRC Project BRM/IT/Functional champions? Is Advisory services on Hardware sizing in scope for this RFP? Currently, the Office of the Controller. 179 180 Lot1-GRC 181 Lot1-GRC 182 Lot1-GRC Is Installation of required GRC Modules in scope for this RFP? 183 Lot1-GRC 184 Lot1-GRC Is Integration of GRC Modules to PeopleSoft in scope for this RFP? Is Oracle AACG going to be used to clean up Segregation of duties conflicts Inter and Intra role conflicts before Go live? 180 181 To some extent, yes. UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. Refer to work package 6. Yes. One instance of GRC has been installed at UNHCR hosting service provider. Installation of additional instances (e.g Dev, Test, Prod) will be required and will be performed in coordination with UNHCR IT team and UNHCR service provider. 182 183 184 Page 40 of 102 Definitely yes. Preferably but not mandatory. Role conflicts to be resolved before go-live, however Internal controls monitoring (continuous transaction monitoring & continuous control monitoring) is an on-going activity. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 185 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Is remediation of Segregation of duties violations in scope for this RFP? Yes. Please refer to Annex B. Appendix II - GRC. The annex includes list of Access Controls that could be configured in GRC. This list of Access Controls will refined and validated during the engagement. Including based on best practices, remediation of detected conflicts will be proposed during the build and implementation phase, and is in scope. 185 186 Lot1-GRC How many countries rollout is in scope? GRC will be centrally managed. In the long term, dashboard will be available to country office management (120+) 187 Lot1-GRC Will Business want us to builid custom objects for TCG in case the objects do not exist or will this be done as a custom report in Peoplesoft? Yes.Detailed requirements will be assessd during the Build and Implementation phase (this RFP) 188 Lot1-GRC Can we have the approximate number of current users and roles? None as it's a new application. This will be determined with the assistance of System ingrators (Annex B_ Appendix II_ GRC ). 189 Lot1-GRC Is there a plan to use implement Oracle identity manager for user provisioning? There is a tentative plan to implement an Identity Management system for user provisioning but that's not yet definite 190 Lot1-GRC What are your highest priority areas that you are looking to address with the implementation of the GRC modules Implementation of GRC is meant to prevent fraud and errors, as a priority (re. TOR, para 2.3 key priority # 9). 191 Lot1-GRC How many key controls are tested and monitored on an ongoing basis and how many controls are planned to be implemented as part of GRC Implementation See Annex B. Appendix II - GRC - the list and number of controls to be configued in GRC will be refined, validated and worked out with System integrator . 186 187 188 189 190 191 Page 41 of 102 See also answer to questions: 178, 179 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 192 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Are there any key risk areas (buisness process / modules) which management is looking at for some extra emphasis at the time of building the controls for ACG and TCG ? Refer to Annex B - Appendix II - GRC - the areas looked at for building GRC controls are Supply chain, Core finance, Treasury. No, here is no Risk and Control Matrix document available. This needs to be prepared. 192 193 Lot1-GRC Whether there is Risk and Control Matrix document available or the same need to be prepated from the scratch ? 194 Lot1-GRC Whether any instances of fraud or unauthorized access to systems / transactions have been encountered in the existing legacy systems ? 195 Lot1-GRC Are there any findings by the statutory / See also: 194 195 internal audit teams with respect to unauthorized access / SOD conflicts ? If yes please share the audit report ? Relevant information will be provided during construction. 196 Lot1-GRC At how many locations the PeopleSoft / GRC is planned to be implemented ? How many users would be using the PeopleSoft / GRC ? Are we looking at any timelines for implementation of GRC ? For timelines, see Annex B Appendix III, Methodology and Options for Upgrade; also see Annex B_TOR - para 4. timelines and constraints. 193 See also: 194 195 Relevant details to be discussed during the engagement. 194 195 196 197 Lot1-Proj.Costing General Will this be a Vanilla Implementation? 197 198 198 Lot1-Proj.Costing General Is Project budgeting in Project Costing be implemented? Page 42 of 102 GRC is currently planned to be managed centrally. The number of users will be proposed by System Integrator. This will be assessed in this RFP WP02. In principle, as much as possible, as long as main functionality requirements are supported, yes. See answer to question: 199 1 2 A B C D E RFP/2014/647 RFP/2014/647 MSRP Finance Upgrade Question Lot - Section Work Pkg Question Related Questions Number 199 Lot1-Proj.Costing WP02 Request you to please confirm if projects need to be created for Capital Projects only, and not for other types of Assets (like Software). If yes, then will these other types of Assets continue to be Captured/Capitalized as per the current UNHCR System (interfaced from Procurement System). F Answer At the very least, the current planned implementation is related to fixed assets, as a cost collector for construction and improvement/operating costs of existing fixed assets. As a new application, any additional requirement (opportunities) will be identified/elaborated during the engagement as part of the scoping and comprehensive assessment. 199 200 Lot1-Proj.Costing WP02 Request you to please provide more elaboration for the nature/relevance of capturing Serially Tracked Items as Assets (with example). STIs are mainly IT equipments. 201 Lot1-Proj.Costing WP02 See answer to question: 199 202 Lot1-Proj.Costing WP02 Please let us know if Capital Projects Budgeting be driven (initiated) from Project Costing Module, or continue to be created as per the current UNHCR System. Apart from Capital Projects, please let us know what other type of Projects might be intended to be tracked under Project Costing Module. 203 Lot1-Real State How this module will interact with other modules (GL, AM, etc.) ? Detailed to be determined/elaborated as part of this engagement. 200 201 See answer to question: 199 202 General As per shared documentation, only a feasibility study to determine that the module is capable of handling the UNHCR required functionality has been undertaken. No formal fit-gap session undertaken. 203 204 Lot1-Real State General What are the expected functionalities ? 204 Page 43 of 102 See answer to question: 203 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 205 Lot1-Real State C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP02 Please let us know what is the current process of Capturing Capital Lease Assets in the UNHCR System (Initial recordation, Lease payments, Depreciation). See answer to question: 203 205 206 Lot1-Real State WP02 Please confirm if UNHCR deals with Leases as both Lessee and Lessor. Both. 207 Lot1-Real State WP02 Please let us know, what are the Terms on which UNHCR Asset is transferred to Implementation Partner under Right of Use Agreement. In general, UNHCR 'borrows' the asset to the IP at a no cost to UNHCR (all operational costs with the IP), and the asset is subject to normal depreciation in the UNHCR Asset module (relevant chapter 8 part to be shared?). Only 'events' normally undertaken beside depreciation is annual physical verification. 208 Lot1-Real State WP02 See answer to question: 203 209 Lot1-Real State WP07 210 Lot1-Real State WP07 211 Lot1-SRM General Please confirm if UNHCR needs the functionality of creating Lease Rent Escalations. Are there data conversions to do from other applications ? Are there interfaces with other applications to realize ? Has UNHCR already procured licenses related to modules like Expense, eSupplier, Strategic Sourcing? If not when UNHCR is expected to make a final decision with respect to procurement of licenses? 212 Lot1-SRM General Whether SRM Suite be opened for Vendors over internet? Yes with proper authentication measures, e.g for supplier self registration, self-services (PO acknowledgement, advance shipment notification, Bid responses, etc) 206 207 208 209 210 To be determined, although none known at this point. Yes, at the very least, other PeopleSoft applications, such as AP, AM, Billing, Project Costing. Yes for Expenses, eSupplier and Strategic Sourcing. 211 212 Page 44 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 213 Lot1-SRM C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Can we consider Implementation of SRM Suite as Vanilla Implementation? To be assessed during WP02 of this RFP. In principle, UNHCR would prefer to have vanilla implementation, however, some minor customization might be necessary. 213 214 Lot1-SRM WP02 In relation to Strategic Sourcing has UNHCR performed high level fit-gap analysis for Strategic Sourcing module like Expense module? If so can results of Fit-Gap analysis be provided to understand potential gaps that have been identified and also to accurately estimate efforts for its implementation? To date, UNHCR has completed a high-level discussions/feasibility study to determine that the modules are capable of handling the UNHCR required functionality. No formal fit-gap session undertaken. Do you anticipate to implement the automated tool for metadata synchronization (like accounts, departments etc.) for Hyperion Planning with source systems like PeopleSoft FSCM? If yes, do you have licenses for the tool? Terms Of reference.pdf-Page9-Though implementation of Hyperion is clearly mentioned in LOT1, on this page it says "Review 7 implementation of solution replacing EPM; this seems like a contradiction? PeopleSoft FSCM remains the system of record for all chartfields from which metadata for Hyperion shall be synchronized. (Please note that Hyperion DRM is not in scope.) (Note: The statement "… for Strategic Sourcing module like Expense module..." is not very clear) 214 215 Lot2-Hyperion General 216 Lot2-Hyperion General 215 216 Page 45 of 102 Revalidation of solutions (including those that replace EPM) is part of this engagement. Refer to "Work-package 02 - Business process analysis and detailed design". It is mentioned specifically for EPM purely to emphasize that the analysis still should be done even though EPM will be decommissioned. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 217 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Terms Of reference.pdf-Page10-There should a be a detailed review of existing reports- obsolete, enhanced replaced- is this required as a separate task or can I include it in requirement gathering phase altogether? Financial reports to be developed in HFR, WebAnalysis and SmartView shall be identified during the detailed analysis and design phases of the project. General Terms Of reference.pdf-Page10-UNHCR prefers a single go-live date for PSFT9.2,GRC & Hyperion- then what is the difference between LOT1 & LOT2? It is a UNHCR internal decision to have a single go-live for PSFT9.2 (and GRC) and Hyperion, since Hyperion replaces EPM. Terms Of reference.pdf-Page11-says See also: 219, 549 preferred model is Onsite but mixed can also be considered; Are we thinking for giving Mixed mode implementation? If yes then our best practice (40% Onsite, 60% offshore model)? As clearly described in the 3.3 Statement of Work of the TOR (para 3.) Terms Of reference.pdf-Page11-Work will be in two locations- Budapest & Geneva; does it mean that these have separate setup? Or is it one integrated system accessed from different location, Are rollouts out of scope? One setup, one integrated system globally. Work location defined based on duty station core business user groups. 217 218 Lot2-Hyperion Difference between lots: The lots are divided into groups of applications. Lot 1 covers PeopleSoft (and GRC), Lot 2 covers Hyperion. Refer to ToR, p3, Requirement Groupings (Lots) 218 219 Lot2-Hyperion General "… should the proposed delivery model include work conducted offshore, the System Integrator must include the approach in the proposal..." 219 220 Lot2-Hyperion General 220 Page 46 of 102 For in-scope activities, see work packages. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 221 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Terms Of reference.pdf-Page13-Business Process revalidation only? Pls confirm that the detailed requirement gathering has already been done? This page also says that Detailed Business Requirements document is a deliverable. So what does it mean The high level business requirements already captured should be updated, refined and completed as per the Terms of Rerefence document, Workpackage 2. The detailed requirements gathering and analysis is in scope of this project. General Terms Of reference.pdf-Page16- End User Training; typically for Hyperion since it’s a small module, we provide 1 week of "Train the trainer" trg for Key Users & 1 week for Admin Users. Will that be sufficient in this case. Pls specify; We will have a custom built curriculum for the training depending upon the implementation of Hyperion at UNHCR. I am assuming thats is the Ask, Pls confirm This should be answered/assessed as part of WP04. 221 222 Lot2-Hyperion For additional information on training, see attached document: RFP QandA - Training 222 223 Lot2-Hyperion General Terms Of reference.pdf-Page18-Says Non production instances as Dev,SIT & Uat therefore there are a total of 4 instances , pls confirm For Hyperion, the appropriate number of instances has to be determined as part of this engagement. Using the currently ERP application as baseline: DEV, TST (SIT), UAT and PRD, with additional support and training environments. 224 Lot2-Hyperion General Terms Of reference.pdf-Page19-Talks about Disaster Recovery- is there a separate DR instance requirement See answer to question: 139 225 Lot2-Hyperion General Terms Of reference.pdf-Page19-DBA activities are required from SI's end? Yes. 223 224 225 Page 47 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 226 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E Related Questions Answer General Terms Of reference.pdf-Page20-Talks about PeopleSoft HCM(Personnel & Payroll) & FOCUS as the external systems? Are these the only two systems or are there any other. Pls specify Foreseen systems to interact with Hyperion: - PeopleSoft FSCM - PeopleSoft HCM - Focus (See systems interactions diagram in Annex B - Appendix II Application Overview - Lot2 - Hyperion - Position Budgeting, page 5). General Terms Of reference.pdf-Page22-Test Scripts have to be prepared by SI? This is typically done by the customer & forms basis of acceptance during Uat For UAT, test cases, scenario and related test data for will be provided by UNHCR. The technical work required to create the test scripts enabling the test execution remains the responsibility of the System Integrator. 226 227 Lot2-Hyperion F For unit testing and SIT, testing is the responsibility of the system integrator with quality and testing procedure compliance checks by UNHCR. 227 228 Lot2-Hyperion General Terms Of reference.pdf-Page22-What is configuration Testing? 229 Lot2-Hyperion General 230 Lot2-Hyperion General Terms Of reference.pdf-Page22-IS volume/stress testing required? Terms Of reference.pdf-Page24-3 months of Post go live Support+ additional 3 months of extended support is required, is the extended support optional currently or has to be estimated right away? 228 229 230 Page 48 of 102 In the context of Hyperion, this is anticipated to be a test that the recommended Hyperion configuration will work with interdependent (hardware, software, network/web setup) components. Yes Yes extended support should be estimated as part of the overall project implementation plan 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 231 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Annex B - Appendix IIII - 1 Customization Review-Page 56-Says "Existing EPM Customizations for Planning and Budgeting needs to be dropped.". Since we are always reemploying Hyperion, all the customizations will have to be recreated. Does this mean that they don’t want any of the old customizations? Hyperion has different architecture and capabilities compared to EPM. In that sense there are no EPM customizations to be ported to Hyperion to deliver the functionality required for UNHCR. General Annex B - Appendix IIII - 2 -Customized reports and queries-There are about 21 existing reports mentioned in the list; is this the final requirement for the Pracle Hyperion as well or we can expect more reports? Reports relate to Income recording are not in scope for Hyperion. Annex B - Appendix IIII - 4 Technical Architecture-page2-The technical Architecture document talks about a number of instances Dev,Test,Training, Production,Pod Support, DR. Pls can you confirm the number of the instances & the names. As a Best practice for Hyperion we have Dev->Test>Production environment See response to question: 223 231 232 Lot2-Hyperion At least 9 NVision reports for detailed budgeting in the current EPM system are in scope. UNHCR will take advantage of Hyperion reporting capabilities, and expects to have additional reports in Hyperion. (See also Annex B - Appendix II - Application Overview Lot1 - Bolt-on - Partnership Management, "Challenges section"). 232 233 Lot2-Hyperion General 233 Page 49 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 234 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer Annex B - Appendix IIII - 4 Technical Architecture-page3-Do you want High Availability on Production & DR for Hyperion as well? Pls confirm Definitely, high availability of Hyperion in Production. Lot2 - Hyperion - Detailed BudgetingPage 9-What does this line mean "There should not be any developments required in Focus for Hyperion Planning"? It is not expected that the replacement of EPM by Hyperion would require changes in other systems such as Focus. Lot2 - Hyperion - Detailed BudgetingPage 10-Says "PeopleSoft HRMS 8.9 will be upgraded to 9.2 (out of the scope of this project).Approved positions will be exported from period and created in HRMS 9.2 during planning." From Hyperion Perspective can we assume that our source will be HRMS 9.2 which would have been upgraded by UNHCR separately or shall we assume that it would be 8.9?Pls confirm Currently, HRMS is anticipated to go-live before the applications in this project. The availability in non-production enviromnment will be discussed during the engagement, but would normally follow best practice. 234 235 Lot2-Hyperion General ("Focus" is the name of the RBM planning and budgeting tool of UNHCR, see systems interactions diagram in Annex B - Appendix II Application Overview - Lot2 - Hyperion - Position Budgeting, page 5 ) 235 236 Lot2-Hyperion General 236 Page 50 of 102 Refer to Q&A: 8 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 237 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Lot2 - Hyperion - Detailed BudgetingPage 10-"Reporting from Global Focus Insight will continue. UNHCR can leverage multidimensional reporting features of Hyperion planning Budgeting". What does this mean? If If GFI is going to continue, will it be the main reporting tool? Or Are we considering HFR as the main reporting tool? GFI is a UNHCR BI tool is meant for monitoring operational information, it has access to a limited set of financial data. HFR is meant for financial analysis only with a broader scope of financial data. General Lot2 - Hyperion - Detailed BudgetingPage 9-PeopleSoft FSCM will be upgraded to 9.2. Posting of Comprehensive and position budgets will happen the same way from Hyperion . Can you elaborate on the role of FSCM in the Future State post Hyperion Implementation? Please see Annex B - Appendix II - Application Overview - Lot1 - FS General Ledger (page 7 "Standard budget maintenance"). 237 238 238 Lot2-Hyperion Page 51 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 239 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Lot2 - Hyperion - Detailed BudgetingPage 10-"Reporting from Global Focus Insight will continue. UNHCR can leverage multidimensional reporting features of Hyperion planning Budgeting". From the list of Budgeting and Planning reports, which reports will be generated from existing reporting tool in future. Also, is there any list of reports required from Hyperion available at this stage ?(Using Smart view, Web Analysis and Hyperion Financial Reports) How and when do you distribute reports within the organization ? See response to question: 232 General Lot2 - Hyperion - Detailed BudgetingHow and when do you distribute reports within the organization ? Is there any requirements for reporting books? There are currently various models for distributing reports through the organization (peridic and ad -hoc, self service, through subscription, etc.) which will be elaborated during the engagement. 239 240 Lot2-Hyperion The various possibilities offered by Hyperion for reports distribution and report books shall be evaluated against the business requirements during the analysis phase, as specified in the Workpackage 2 of the Terms of Reference. 240 241 241 Lot2-Hyperion General Lot2 - Hyperion - Detailed BudgetingWhat are the requirements for Historical reporting ? Page 52 of 102 Hystorical data shall be accessible readily from Hyperion reporting mechanisms. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 242 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General See also: 52 104 Working language is English. However, for a few reports, Lot2 - Hyperion - Detailed BudgetingIs 137 158 242 488 translations may be required for additional languages, likely to be there any requirement of Multi language 507 5265 537 557 French and/or Spanish. interface/ reports? 577 242 243 Lot2-Hyperion General Lot2 - Hyperion - Detailed BudgetingPage 10-No of Hierarchies required ? 244 Lot2-Hyperion General Lot2 - Hyperion - Detailed Budgeting-No. of Accouunts / Roll up structures? 243 244 245 Lot2-Hyperion General 246 Lot2-Hyperion General 247 Lot2-Hyperion General 248 Lot2-Hyperion General 249 Lot2-Hyperion General 250 Lot2-Hyperion General 245 246 247 Lot2 - Hyperion - Detailed BudgetingPage 8-Other than 5 Key challenges for Budgeting mentioned on Page 8, are there any pain points ?If so, can you elaborate? How do you maintain the security and workflow management ? What is the user base? Is that centralized ? No. of groups required for the system? See "Hyperion Planning High level design" section of Annex B Appendix II - Application Overview - Lot2 - Hyperion - Detailed Budgeting. To be determined/elaborated. Detailed requirements gathering and analysis is part of the engagement. Please see also Key challenges for "Position management section" of Annex B - Appendix II - Application Overview - Lot2 - Hyperion Position Budgeting. Detailed analysis and design will allow identifying additional issues and challenges. To be determined/elaborated during the engagement. See response to question: 299 See response to question: 299 248 249 Can you elaborate on the Historical data migration requirements for Hyperion ?How many years of data is required to be migrated from PSFT EPM to Oracle Hyperion? Will Actuals (Expenses) comparison with Budget be done in Hyperion ? If Yes, then what will be the source system for Actuals data?How is the comparison with Actuals being done today? What will be the process to be adopted for future ? 250 Page 53 of 102 To be determined. For reference, oldest models are from 2006. Ability to check the budget vs. existing commitments is required. Therefore, Commitment Control expenditures and closed period data shall be imported and closed period data shall be imported as well (Donor Report ledger). 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 251 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General 251 252 Lot2-Hyperion General 253 Lot2-Hyperion General 254 Lot2-Hyperion General 255 Lot2-Hyperion General 256 Lot2-Hyperion General 257 Lot2-Hyperion General E F Related Questions Answer What will be the source system for Actuals data? What are the audit trail requirements? PeopleSoft Is Hyperion Public Sector Planning in scope ? Do we have to implement Hyperion Planning with CAPEX & Workforce modules? Would there be a need for Manual Adjustments to be done ? No. Reimplementation of Hyperion & data migration is the scope for Hyperion. Pls can you elaborate on Data migration requirement? The RFP says that the inception & conception phases have been over.However, the two documents provided for Hyperion are at very high level. Pls can you provide all the detailed documents on Hyperion, it will help us to estimate better Yes, data migration is in scope. Detailed requirements will be determined as part of the engagement. Given that Salary and Grade is taken from PSoft HRMS System and Salary ID is defined in EPM, how does salaried establish a link between the salary cost and position. Please see, Annex B - Appendix II - Application Overview - Lot2 Hyperion - Position Budgeting "Calculation of estimated staff cost" section for the calculation of the position cost associated to each EPM Job code. The capability to track for each budget submission is required (i.e. when it took place, who submitted it, who approved, whether target validation was executed and whether it failed or pass) 252 253 254 No. Yes, but only for the information captured/entered/owned in Hyperion (i.e.: information owned by other systems shall cannot be altered by the users in Hyperion) 255 256 Most activities were conducted to determine high-level functional fit/gap and keep/drop. Further detailed analysis to be performed in the RFP Work-package 02, particularly for any new application implementation or functionality development. On detailed documentation, see answer to question 35. 257 258 Lot2-Hyperion General 258 Page 54 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 259 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General 259 E F Related Questions Answer How are all position parameters consolidated at the EPM Job Code ? How is the EPM Job Code defined? Can a scenario with example be provided ? Given that the frozen FOCUS position plan consists of location, grade, cost, EPM JC, HR JC, goal and eff..dates. Can an example depicting this information be provided explaining how the goals are used in position planning ? Given that FOCUS maintains only one account code (699999) per position. How can the position budget be summarized at cost center and account level ? Please see, Annex B - Appendix II - Application Overview - Lot2 Hyperion - Position Budgeting "Calculation of estimated staff cost" section. 260 Lot2-Hyperion General 261 Lot2-Hyperion General 262 Lot2-Hyperion General Given that during implementation, the 'OL' position changes (i.e. Add/Change/Delete) are directly done in PSoft HRMS, without the intervention of PSoft EPM. How is the position information related sanctivity maintained in PSoft EPM w.r.t to these changes ? EPM is used during the planning phase to calculate the cost of Positions of a particular grade and a particular location. The position requirements are determined in Focus using this information. Following decisions of a review process, approved Positions are transferred from Focus, to EPM, to HRMS. During implementation phase, cost by grade and location maintained in EPM does not change (unless exceptions). The source reference for the Positions themselves remains HRMS. 263 Lot2-Hyperion General What does "desgin revalidation" indicate ? How and when is it expected ? Is it expected to be part of the RFP? Who would be responsible for conducting the design revalidation ? The high level business requirements already captured should be updated, refined and completed as per the Terms of Rerefence document, Workpackage 2. The detailed requirements gathering and analysis is in scope of this project. 264 Lot2-Hyperion General What does the second phase of MSRP Upgrade project indicate ? when is it scheduled ? If referring to general MSRP Upgrade Project phasing, first phase refers to the "Conceptual Design", second phase is the "Build and Construct" covered by this RFP. 260 261 The Goal is currently used on the Positions themselves to carry the information determining whether it relates to programme, management or support function (in this particular case, the Goal does not relate to RBM, but the chartfield is reused for this specific purpose). The breakdown by detailed account codes is maintained in EPM. 262 263 264 Page 55 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 265 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question Lot2-Hyperion Lot2-Hyperion Related Questions Answer As part of the "Design Revalidation" can the existing design/dimension structure/model be changed, modified or deleted. Yes, adjustments can be made as part of the design revalidation as long as justified and aligned with the business requirements. General Is there a spcific reason for having a separate application for position planning as the same information would be used for computing the "STAFF" cost? Recommendations shall be reviewed during the design revalidation. 266 267 F General 265 266 E General Secondly, any specific reason for storing position information in two different cubes in the POSBUD application Though it mentions a biennial cycle, the references indicate an annual cycle for budgeting as the planning cycle involves a comprehensive operational plan for subsequent year which then is detailed to be implemented again in the subsequent year. Refer to Work Package 2 of the Terms of Reference. 2016-2017 biennium example: - In 2015: UNHCR plan activities for 2016 and for 2017. - In 2016: UNHCR implements 2016 activities and re -plan 2017 activities with more details and more accuracy. - In 2017: UNHCR reports on 2016 activities and implements 2017 activities. What would be horizon for actual budget preparation - annual or biennium ? If biennium, then how and when is the second year of biennium planned and detailed ? 267 268 Lot2-Hyperion General Is spending authority the same as budgeting ceilings ? what is the granularity for it ? The budget ceiling, also refered as Budget Target, is the total OL budget approved for a given UNHCR Operation for a given year. The spending authority represents the available budget balance to spend for a given UNHCR Operation in the current year. The spending authority is defined per budget year, Cost Center, Pillar, budget category and implementer type (Direct implementation or through partnership) 269 Lot2-Hyperion General Supplementary Budgets. Do they need to be tracked as separate budgets or an increase to the existing budgets for each pillar ? Additional resources approved resulting from Supplementary Budget requests shall be tracked in Hyperion Planning. 268 269 Page 56 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 270 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General 270 271 Lot2-Hyperion General E Related Questions Answer Understanding: A comprehensive budget consists of three categories, namely 'Operational Budget'(OPS),'Administrative Budget'(ABOD) and 'Staff Costs'(STAFF). These categories in turn are categorised as Funded Budget (OL) and Unfunded Budget (AOL) Is the above understanding correct ? Given the RBM hierarchy and budgeting cycles, is PPG and Pillar at the same level ? Can a scenario explaining the process defining a RBM hierarchy and budget by Pillar be provided ? 271 272 Lot2-Hyperion General How do the 4 budget pillars assimilate with the RBM Hierarchy? 273 Lot2-Hyperion General How do "cost center" and "outputs" relate in terms of the budget preparation as the Budgets are entered at 'Output' level and rollup the RBM hierarchy. 274 Lot2-Hyperion General Where is the implementer code used in the budget preparation/RBM hierarchy ? 275 Lot2-Hyperion General Considering that a 'situation' and an 'operation' are the same, in The given example, between codes 1115 and 4115, 1 & 4 reperesent the pillar - Please clarify what do the remaining 3 digits indicate ? 272 273 F 274 275 Page 57 of 102 These are 2 different characteristics of the budget. The budget is broken down in 3 categories (OPS, Staff and ABOD), and comprises a funded (OL) and un-funder (AOL) component. No, PPG and Pillar are 2 different dimensions with no parent-child relation. See also answer to question 272. Pillars are an orthogonal dimension to RBM hierachy. In other words, any RBM element of an Operation's plan can be linked to any of the 4 Pillars. Cost Center is an orthogonal dimension to RBM hierachy and therefore Outputs. In other words, any Output element of an Operation's plan can be linked to any Cost Center. Each OPS budget line is qualified with an implementer code. The implementer code determines whether the item/service supported by the budget line is delivered by UNHCR directly or through a partner. Situation and Operation are different. A Situation refers to a specific operational crisis or emergency, often of a regional nature, encompassing multiple countries and therefore multiple UNHCR Operations. The last 3 digits are used for distinguishing and tracking specific Situation by Pillar across UNHCR Operations. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 276 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General What are the contents of FOCUS ? Does it consists of RBM/Narratives and budgeting. Given the implementation of Hyperion Planning, would FOCUS still continue to hold the RBM hierarchy narratives ? Focus remains the primary tool fo UNHCR end users to enter planning and budgeting information (RBM plan structure definition, narratives, indicators, budgets). 276 277 Lot2-Hyperion General What is the time horizon of budget preparation? When is the approved budget exported from FOCUS and imported into EPM and what level? The planning and budgeting cycle is outline in Annex B - Appendix II - Application Overview - Lot2 - Hyperion - Detailed Budgeting, "budgeting cycle" section. See also answer to question 472. 278 Lot2-Hyperion General What is the difference between approved budget, budget targets/ceiling and summary budget ? See answer to question 268. 279 Lot2-Hyperion General Given that Budget Target Validation of only the 'OL' component is carried out for OPS and ABOD, is there similar validation for 'AOL' ? Currently, no. 280 Lot2-Hyperion General Please clarify if our understanding is correct - Correct. 277 278 279 There is no incremental update if OPS or ABOD budgets fails target validation and the entire budget load fails 280 281 Lot2-Hyperion General Staff Budgets dont undergo Budget Target Validation ? No. Only approved staff positions can be exported from Focus to Hyperion by the Operations. As the related staff costs have been approved upfront, there is no need to undergo budget target validation for staff costs. 282 Lot2-Hyperion General Given that the budget in FOCUS is entered and maintained multiple currencies, in what currency is the operational budget computed where multiple currency are involved during the implementation USD 281 282 Page 58 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 283 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E Related Questions Answer General HQ entering budgeting Targets? Arent the budget targets being entered in FOCUS, exported and imported in EPM? How are they different from the approved budget for OL. What are commited amounts? Where are they entered ? and at what level is the comparison carried out ? How and Why are multiple versions of approved budgets possible and and what purpose do they serve ? 283 284 Lot2-Hyperion General 285 Lot2-Hyperion General 284 F See 268 for budget targets definition. The details budgets are entered in Focus by the Operations then exported to EPM when they undergo budget target validation against the budget targets. Budget targets reflect the approved budgets at a more granular level. Commited amounts refer to encumbrances and pre encumbrances in this context. Within a budget year, the approved budget of the operations can be increased to allow them to address unforeseen operational emergencies. It is important to be able to keep track of these changes during the year. Details/Justification on this requirement will be provided as part of the engagement. 285 286 Lot2-Hyperion General 287 Lot2-Hyperion General 288 Lot2-Hyperion General 289 Lot2-Hyperion General 286 287 288 289 How and Why are multiple versions of target validated budgets possible and and what purpose do they serve ? If multiple version of target-validated budget exist, which version is exported and imported into Psoft Financials FOBS Ledger ? See answer to question 285 What are the existing reports from Global Focus Insight? Once hyperion planning is implemented, what are report expectations from it ? what does the statement "The budget targets are defined at the beginning of the implementation and reflect the approved initial OL." inidicate ? See response to question: 237 Page 59 of 102 The current/most recent version is exported and imported in FSCM FOBS ledger. See answer to question 268. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 290 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General 290 291 Lot2-Hyperion General 292 Lot2-Hyperion General E F Related Questions Answer Given that the Custom Dimension "Pillar Situation" is used to represent the Operational event alongwith the "Entity" Dimension, is the RBM hierarchy/Budget pertaining to an operation entered "per country" as depicted by the "Entity" dimension? How and where is the Site Code dimension used ? See answer to question 326. Is there a spcific reason for having a separate application for position planning as the same information would be used for computing the "STAFF" cost? See response to question: 266 The Site code is mainly used for planning and budgeting where it represent either a physical geographical location (a camp, a village or a region) or a mean to track specific projects or activities. 291 292 293 293 Lot2-Hyperion General Secondly, any specific reason for storing position information in two different cubes in the POSBUD application ? Can it be remodeled ? Query: The high level diagram, as well as Step 1 and Step 3 mention the FDMEE for transferring information between different systems while use of ODI is retricted to Step 2. Is there a specific reason behind use of using 2 different integration tools ? Can this model be adjusted to use only FDMEE/ODI as integrator? Page 60 of 102 To be validated during the engagement. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 294 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer The technical architecture details application stack consists of four layers Production, Training, Non-Production and DR. Additionally under nonproduction stack, six environments have been detailed. Please let know if installation and support for all these 9-10 environments need to be planned. Yes. The technical architecture details the server details / sizing for various environments. Please let know if the same is final or does the bidder needs to plan for services related to updating the same considering the final application landscape and process confirmed as part of the implementation Technical architure (future) - to be determined. As per Annexure B-5, UNHCR has proposed for two options, does that mean that bidders have to submit proposal for both options in each Lot because efforts & commericals can be different in both the options For Hyperion, only one proposal is required focusing on how Hyperion (development and implementation) should fit in the overall project delivery. Please also see response to question: 103 294 295 Lot2-Hyperion General UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. See Work Package 6. 295 296 296 Lot2-Hyperion General Page 61 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 297 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question General E F Related Questions Answer a) We assume that UNHCR has procured the licences for Hyperion Planning, Hyperion Web Analysis and Hyperion Financial Reporting. Please confirm along with version details. b) Also, please confirm what additional Hyperion and other technology tools / licenses have been procured by UNHCR ? Provide details. The following apps have been purchased: Hyperion Planning Plus, Hyperion Financial Data Quality Management, Enterprise Edition, Hyperion Financial Data Quality Management, Enterprise Edition, Adapter Suite. For additional information, refer to the attached document on target application verions 297 298 Lot2-Hyperion General Do you budget in more than one currency ? If so, please define the currencies used for data entry as well as those currencies used for reporting. Yes, detailed budgets 299 Lot2-Hyperion General What is the expected number of users / concurrent Users for Hyperion Planning ? Refer to attached document on Users and Volume of Common Transaction for best available information. 300 Lot2-Hyperion General Does UNHCR have any timelines which they have set for the implementation of Hyperion Planning ? Hyperion must go-live at the same time as PeopleSoft 9.2 (core FSCM applications). 298 299 See: ToR - 3.2.6 - Methodology and Options for Upgrade See also: 300 462 300 301 301 Lot2-Hyperion General Do you have uptime requirements that require failover, redundancy, and disaster recovery? Page 62 of 102 ToR - Appendix_IIII_-_5__Methodology_and_Options_for_Upgrade Yes, up all the time. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 302 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP02 Regarding revenue allocation and earmarking tracking, can you please elaborate on the different scenarios for ‘What-If’ analysis? While the scenarios need to be determined/elaborated they are likely to include exchange rate fluctuation and the impact of approving or denying certain programmes. Detailed requirements gathering and analysis is part of the engagement. 302 303 Lot2-Hyperion WP02 Can you please share the excel which is currently used for revenue allocation and earmarking tracking? If UNHCR wants to automate the functionality, then we would need to understand the current manual process UNHCR do not currently have a well-functioning tracking solution. Proposals should be provided following detailed requirements gathering and analysis. An example of a spreadsheet that is currently used for earmarking tracking is attached to illustrate the current manual processes. The example contains fake data. 304 Lot2-Hyperion WP02 Does UNHCR have a specific Data Integration tool for Hyperion Implementation? Please clarify whether tools like ODI or Informatica can be used for System Integration? UNHCR has acquired FDMEE/FDQM. The system integrator should advise of the best data integration tool to use, preferably using the above or any other tool delivered with Hyperion/PeopleSoft/Oracle for which it already has license. 303 304 Page 63 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 305 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question WP02 E F Related Questions Answer Position Budgeting Module : • How many reports needs to be developed in Financial Reports? • Extracting data from Source Systems is it in the Scope of the System? Or will it be provided by the Team? For Example: Extraction of Active Positions from HRMS is it under the Scope Lot 2 Hyperion Project? • How many users are planning to use the system? This is required for load balancing • Installation of Hyperion Planning System - Is it under the scope? • What kind of security level is expected in the Hyperion Planning Web Forms? • How many web Forms needs to be developed in Hyperion Planning? Some details may only be elaborated during the engagement (eg. number of web forms, number years of history, security levels, etc). Less 10 reports existing positon management reports exist in the current EPM system but it is expected to have more in Hyperion. Current EPM Queries are provided in Annex IV section 2. Interfaces with HRMS are in place to access position data. Review and analysis of these interfaces, extraction of Position data is in scope. Currently EPM has approximately 2500 individual users. The number of Hyperion users will have to be determined. See also: 132 305 305 306 Lot2-Hyperion WP02 307 Lot2-Hyperion WP02 306 Please share details of current gaps / pain areas if any on the compliance with UN System Accounting standards that requires to be addressed through this project Please share details of current gaps / pain areas if any on the compliance with International Public Accounting standards that requires to be addressed through this project 307 Page 64 of 102 Please refer to Annex B - Appendix II. Please refer to Annex B - Appendix II. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 308 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question WP02 308 309 Lot2-Hyperion WP02 E F Related Questions Answer Please share details of proposed Hyperion Planning and HFR user base and their locations In Annex – B – Appendix II – Application Overview – Lot 2 – Reporting will be met through HFR reports should be accessible to all UNHCR users which can be located in any of the HQ and 126 UNHCR Operations. (Some with limited internet connectivity) Current design recommendations will be reviewed and finalized during the detailed analysis and design phase of the project, which is in scope of this RFP. Hyperion Cubes – Are the cubes referred here are a) Est_Pos b) Est_Pln and c) Pos_Pln 309 310 Lot2-Hyperion WP02 311 Lot2-Hyperion WP02 more details be provided on this In Annex – B – Terms of Reference – Sec.2 Project Overview – 2.1 – Business Drivers & Expected Benefits - Reporting & Management Oversight – Can more details in terms of the list of reports and years of data be provided on Improve system performance through Data clean up. Taking advantage of Hyperion reporting capabilities, it is expected to have more reports in Hyperion than listed in Annex B - Appendix II - hyperion planning documents 310 In Annex B - Terms of Reference - Sec 1 Additional Activities in scope (The use of ETL and other integration tools) Is UNHCR planning to use other ETL and Integration tools other than FDQMEE ? If yes, what are they and for what purpose of they will be used in this project? 311 Page 65 of 102 To be validated during the engagement. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 312 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP02 In Annex B - Terms of Reference - Sec 1 Additional Activities in scope (Essbase installation) - Please confirm if Essbase installation is the database of planning application or additional cubes? Request you to please elaborated on this Essbase is expected to be the database of Hyperion Planning Applications. The system integrator is expected to either install and configure Essbase themselves or write the document explaining how to install and configure Essbase as required by the project to be carried out by the hosting service provider. How many years of historical data (Actual) needs to be loaded and managed in the system What is the budgeting approach – top down or bottom-up? We assume that the reports mentioned in this section are the only reports for Hyperion Planning. Please confirm and let us know if there are any additional number of reports. To be determined. For reference, oldest models are from 2006. Please share details of proposed hardware for implementation of Hyperion Planning and Hyperion Financial Reporting Please share details on version of FDMEE ,Hyperion Planning and Hyperion Financial Reporting that needs to be implemented in this project The system integrator is expected to come up with a recommendation. What is the current process through which Meta data is managed across applications (Focus , PeopleSoft , Oracle GRC) and the plan for management on implementation of Hyperion Planning Currently, data is transferred mainly using database links, XML files and messaging (integration broker). 312 313 Lot2-Hyperion WP02 314 Lot2-Hyperion WP02 315 Lot2-Hyperion WP02 316 Lot2-Hyperion WP06 317 Lot2-Hyperion WP06 318 Lot2-Hyperion WP07 313 314 The budget captured by the Operations is realized at Output level, bottom -up approach. See answer to question 431. 315 316 Refer to attached document on target application version. 317 318 Page 66 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 319 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question WP07 319 E F Related Questions Answer Please share Details of reports that needs to be achieved through HFR , Web analysis and Smart view. Can a sample of these can be provided to understand complexity As mentioned in "Annex B - Appendix IIII 4 - Technical Architecture" - Section 1..3.4 and section 1.4.1, please share "Annexure - A" See answer to question 431. 320 Lot2-Hyperion WP07 Please see attached files for "RFP 647 - QandA 320 ...". 321 Lot2-Hyperion Planning How many number of users will be accessing the Planning and Budgeting system.If possible please provide approximate spread by Geography See answer to question: 308 322 Lot2-Hyperion Planning See answer to question: 308 323 Lot2-Hyperion Planning What is the number of concurrent users accessing the Planning and Budgeting system What is the frequency of budgeting (Monthly, quarterly, half yearly etc..)? 324 Lot2-Hyperion Planning Yes, UNHCR Operation may operate in USD in combination of one or several other currencies. Hyperion should be able to handle this. 325 Lot2-Hyperion Planning Is there a situation where your transactions happen in more than one currency and does UNHCR expect planning and budgeting tool to handle Multi currency and currency translations? Which master data tool does UNHCR use currently to manage dimensions and hirarchies. Is Hyperion DRM in scope for this implementation? 320 321 322 See answer to question 472. 323 324 325 Page 67 of 102 Currently Hyperion is not implemented. Hyperion DRM is not in scope. PeopleSoft FSCM remains the system of record for all chartfields (presumably main dimensions for Hyperion) 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 326 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Planning Will there be any changes to existing People Soft EPM dimensions when implemented in Hyperion Planning Mapping of existing dimensions to Hyperion planning will be reviewed and finalized during the detailed analysis and design phase of the project, which is in scope of this RFP. 326 327 Lot2-Hyperion Planning Please provide the number of business entities which are required to be covered under the Planning and Budgeting process.Also provide the base members in account and cost center dimension Question is not clear. Most likely this question will be answered during the engagement. 328 Lot2-Hyperion Planning What are the requirements for availability of Historical Plan and actuals data in Hyperion Planning application? Question is not clear. Most likely this question will be answered during the engagement. 329 Lot2-Hyperion Planning Refer to attached document on target application version. 330 Lot2-Hyperion Planning 331 Lot2-Hyperion Planning 332 Lot2-Hyperion Planning Does UNHCR have ODI or FDMEE in current landscape which can be leveraged for data and metadata loads to Hyperion Planning (BUDPLAN) application? If not which ETL tool licenses have been purchased for Hyperion Planning What is the ETL tool that UNHCR is planning to use? What is the complexity of allocations (Simple, Medium, Complex) to be automated/defined in Hyperion Planning? What is the approximate no. of allocation rules that is required to be allocated? Is there any Driver based Planning in scope? 327 328 329 330 331 332 Page 68 of 102 See response to question: 329 Question is not clear. Most likely this question will be answered during the engagement. For best estimates, please refer to the attached Annex B - Appendix II for business requirements. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 333 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Planning Can you please share the approximate number of business/validation rules (like allocations, currency conversion etc) associated with the planning process and their complexities Please see Annex B - Appendix II. 333 334 Lot2-Hyperion Planning The document says that "for position budgeting system the replacement of PeopleSoft EPM by Hyperion Planning will have to be revalidated against the business requirements during the second phase of the MSRP upgrade project". So do we have to provide estimates for implementation of Position Budgeting in Hyperion Planning as part of estimates for "Lot 2" Yes 335 Lot2-Hyperion Planning See response to question: 232 336 Lot2-Hyperion Planning How many reports are to be developed in Hyperion Financial Reports/ Web Analysis? Is DR for Hyperion Planning in scope? 334 335 Please refer to Work Package 6. "The System Integrator must develop a back-up and recovery plan as well as a disaster recovery strategy which is appropriate for the new technical architecture to ensure high availability of the system."* CB: Carlo - to answer 336 337 Lot2-Hyperion Planning Is Hardware installation and setup for Hyperion also in scope for the vendor Please refer to Work Package 6. UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. 337 Page 69 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 338 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question Planning 338 339 Lot3-Demantra General 340 Lot3-Demantra General 341 Lot3-Demantra General E F Related Questions Answer Please confirm whether the servers for all the required environments for Hyperion Planning would be physical or virtual? We understand that implementation of demantra and SNO will be done from the ground up (no prior existence). Please confirm. The system integrator is expected to come up with a recommendation. Preference is for a full virtual solution. Has UNHCR decided the 'Versions' of the Planning applications? If yes please let us know details Please list down the actual names of the Modules to be implemented under Planning section (Demantra, SNO) Best available information is in the attached document on target application version Yes, implementation will be done from the ground up. 339 340 341 342 Lot3-Demantra General 343 Lot3-Demantra General 344 Lot3-Demantra General 342 343 344 Relevant modules/functionality in Demantra and SNO addressing the high-level requirements provided in the document. (System integrator to advise.) Refer also to the attached list of target applications and their versions. Scope: Please provide us the scope in See also: 52 104 Supply: terms of a) Geographies/Countries and b) 137 158 242 488 a) worldwide (90-120 countries) Languages 507 5265 537 557 b) English 577 Has UNHCR been using any other For supply planning, planning has been done mainy in Excel. applications for Planning in the 'As-is' World? Please provide details In both options of the program as Refer to timeline and constraints, as well as Annex B-AppendixIIImentioned in Appendix 3, Methodology and Options. In both options, the schedule of implementation of Planning applications activities should be adapted to the timeline and constraints of the is indicated after the core PS and project. Treasury work is completed. Please confirm if this understanding of ours is correct. Page 70 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 345 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Infra and Sizing: has UNHCR already done any kind of Infrastructure or Environment Sizing for the Planning applications? If yes please share details No, please submit proposal for technical architecture requirements / sizing 345 346 Lot3-Demantra General Apart from PS are there any other ERP applications from which data needs to be pulled into Demantra? If so please share the ERP application details. Data will be pulled from PeopleSoft and possibly Excel 347 Lot3-Demantra WP02 Has UNHCR performed high level fit-gap analysis/ requirement gathering for Demantra and SNO? 348 Lot3-Demantra WP02 349 Lot3-Demantra WP02 350 Lot3-Demantra WP02 Please let us know what is Demantra Version and What are Demantra Modules in Scope for this implementation? Please share the number of items, customer and approximate sales history count (Volume)? Please elaborate about UNHCR RBM (Result Based Management)Framework As per shared documentation, only a feasibility study to determine that the modules are capable of handling the UNHCR required functionality has been undertaken. No formal fit-gap session undertaken. Refer to attached QandA - Technical - Target Application Versions. 351 Lot3-Demantra WP02 346 347 348 349 There is no 'traditional' sales activity. In a nutshell RBM is UNHCR's management strategy which also includes managing the resources of the organization along a Results Framework (RF). It guides the assessment, planning, allocation of resources, implementation and reporting. The RF also guides the budgeting structure, annual plans and budgets. In the first phase implementing Demantra, the supply chain planning will not be directly linked to the budgetting process to take place in Hyperion (or similar). 350 Please let us know if UNHCE gets any Forecast from outside entities like Customers and Suppliers? 351 Page 71 of 102 UNHCR receives demand planning from internal customers (country operations) and captures production capacity and availble stocks (external suppliers) 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 352 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question WP02 352 E F Related Questions Answer Please let us know what is your planning horizon (how far in the future do you look?) Please let us know do you have Configure to Order (CTO) scenario? Please let us know which are the key functional areas (ex: Production Planning, Finance, Customer Service, etc) that currently use the output of the forecast/demand plan? One year in advance 353 Lot3-Demantra WP02 354 Lot3-Demantra WP02 355 Lot3-Demantra WP02 Please let us know if we are using constraint planning or unconstrained planning? If constraints planning then can you pls. share the different constraints used by the current planning application? Constraints (limitations) could be related capacity of production, capacity on flows (e.g. capacity and frequence of lines, closure due to raining season and delays in customs formalities) and maximum storage capacity in warehouses in the chain etc. 356 Lot3-Demantra WP02 UNHCR would like to be able to forecast need for Core Relief Items, based on number of beneficiaries and distribution key, other items based on real detected/determined needs, OK 357 Lot3-Demantra WP02 What is that you want to forecast? - Number of beneficiaries in each cach camp or quantity at item x location (camp?) x time bucket? What is the source data you want to be considered for generating the forecast? - Purchase Order history (If yes, purchase order at what level of item x location)? - Material Stock Request (MSR) history (This is supported through standard integration between demantra and PeopleSoft)? - Actual consumption at the camps? - Actual material received at camps? 353 No, UNHCR does not have any CTO. Inventory managmeent, Procurement and Country Operations are using the output of the forecast/demand plan. 354 355 356 357 Page 72 of 102 All mentioned. As per shared documentation, only a feasibility studie to determine that the modules are capable of handling the UNHCR required functionality has been undertaken. No formal fitgap session undertaken. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 358 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question WP02 358 359 Lot3-Demantra WP02 360 Lot3-Demantra WP02 361 Lot3-Demantra WP02 362 Lot3-Demantra WP02 363 Lot3-Demantra WP02 364 Lot3-Demantra WP02 365 Lot3-Demantra WP02 366 Lot3-Demantra WP02 E F Related Questions Answer We understand that planning horizon is current year + next year. What is the minimum time bucket required for forecasting / supply planning. Is it weekly, monthly ? What is the location level at which you want to generate, view and measure forecast? Is it at camp level or country level or any other location level? The different iterations of the planning will have different time horizons, the anticipation is that the plan with have monthly buckets as the lowest level. UNCHR wants to generate, view and measure forecast at camp (local locations), country, stockpile and warehouse level. 359 360 361 What is the approximate number of users expected to use demantra? Do you expect any third part (example: NGOs) to view demantra data or input any type of data? Do you have a requirement to handle multiple currencies in demantra? See also: 360 369 370 389 Supply would expect in the range of 150 users. No, only UNHCR. Yes. 362 363 364 What is the primary unit of measurement? Do you have a requirement for unit conversions? What are the KPIs for demand planning? 365 Provide some simulation scenario examples for demand planning. 366 Page 73 of 102 Whatever is assigned to the given item in the PS item master. No. Currently, no KPIs are developed for demand planning apart from timely submission of complete plans. Tbd as a part of the design and implementation. The following elements to be considered in the demand planning: no. of beneficiries, forecasted beneficiaries, the needs/ requirement of commodities, stocks, stocks in pipeline, stock reserved as safety stocks, distribution plan, elements considered as risk with time zone, sourcing options and capcity of each option (availability and delivery lead time) 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 367 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP02 High Level Design: To what extent have the High Level design for Demantra and SNO applications been done? Have any recommendations on Phasing, solution approach been made? No high level design, only a feasibility studie to determine that the modules are capable of handling the UNHCR required functionality has been undertaken. 367 368 Lot3-Demantra WP02 Has the solution design for Demantra & SNO completed? If so, share please share the design. No solution design, only a feasibility studie to determine that the modules are capable of handling the UNHCR required functionality has been undertaken. 369 Lot3-Demantra WP04 Please let us know how many end users See also: 360 369 will be accessing Demantra? Please 370 389 provide a approximate break-up by User Group.(Ex. Demand Planner, Demand Manager, Customer Planner etc). Supply would expect in the range of 150 users. Break-up has not been defined yet. 370 Lot3-Demantra WP04 Please let us know how many geographies are in Scope; users from which locations will access Demantra? Global use, equal to current use of PS. 371 Lot3-Demantra WP05 Please let us know how is the interaction between the users and the IT team taking place right now, if there is a need for an access/change in forecast? Interaction is done through DESS Business Support Section. This section validates the user requirements and create the change request to IT team. Further tests are coordinated. 372 Lot3-Demantra WP06 373 Lot3-Demantra WP06 The different iterations of the planning will have different time horizons, the anticipation is that the plan with have monthly buckets as the lowest level. We do not currently measure forecast accuracy. Would be a part of the implementation. 374 Lot3-Demantra WP06 Please let us know what is the time bucket for the forecasting process (ex: monthly, weekly, etc)? Please let us know if you measure forecast accuracy today? If yes what is the accuracy level of your forecast today? Please let us know what is your current Product Structure? 368 369 See also: 360 369 370 389 370 371 372 373 374 Page 74 of 102 Global use, equal to current use of PS. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 375 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer WP06 Please let us know what is your current Location (Customer) Structure? Global use, equal to current use of PS. Please let us know how often you want the forecast to be published? Please let us know how are the New Products introduced right now? Please let us know if you have different forecasting cycles based on the life of the product for example short life and long life products? Minimum on Monthly basis 375 376 Lot3-Demantra WP06 377 Lot3-Demantra WP06 378 Lot3-Demantra WP06 379 Lot3-Demantra WP06 Please let us know if you generate forecast by units, revenue or both? Forecasts would be based on unit demand, potentially translated to cash flow forecast based on determined lead time per item. 380 Lot3-Demantra WP06 Yes, UNHCR handles seasonality today, but the planning and management is very basic. 381 Lot3-Demantra WP06 Please let us know if you handle seasonality, Trend etc today? Do you use any Causal Factors? Please let us know at what level do you review the forecast? List a few key things which you do today to generate or manipulate the forecast number? 382 Lot3-Demantra WP06 Please let us know what is the period for which you maintain the back-dated forecast? i.e. for how many weeks do you maintain the previous weeks forecast? UNHCR is not using previous periods demand to adjust future period demand in the same plan. UNHCR would like to keep historic plans to be able to compare. 376 377 New items will be registered in the PS item master. No 378 379 380 UNHCR reviews the submission of the country operation plan twice in one year. at the beginning of the planning cycle followed by another review at the end of the planning year. at this stage UNHCR is using excel to come up with different analysis (Charts). However, during the implementaion year further review will be carried out on quartely/monthly basis to review the progress of the implementation. 381 382 Page 75 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 383 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question WP06 383 384 Lot3-Demantra WP06 385 Lot3-Demantra WP06 386 Lot3-Demantra WP06 387 Lot3-Demantra WP06 388 Lot3-Demantra WP06 389 Lot3-Demantra WP06 390 Lot3-Demantra WP07 391 Lot3-Demantra WP07 384 E F Related Questions Answer Please let us know if any kind of forecast override happens? If so at which level? Whether it is at item/org level or at a higher level. Please let us know how often is the S&OP (Sales and Operation Planning) meeting occurs? Please let us know how is the final Plan getting approved? Is this through the tool and fed back to the other systems? At item level. Scope: Please provide us the scope in terms of a) No of Products/SKUs, Locations/DCs, Replenishment Centres and b) no of planners/users Do we need to build integration from Demantra (final consensus forecast) to any other applications? Integration between Demantra and SNO would be standard (out-of-box) or any would any custom integration be required? How many estimated users will be See also: 360 369 handling Demantra/SNO? 370 389 Please let us know what level of forecasting information is required from Demantra to the source system for inventory replenishment/Detailed planning (outbound)? Potentially, the number of SKUs will be as per PS item master, locations are equal to number of high level warehouse locations, and expect number of users to be in the range of 150. Please let us know what level of forecasting information is required from Demantra to Hyperion? At the current stage no integration from Demantra to Hyperion is planned. See also answer to question: 382. Quarterly reviews, but no formal S&OP as in the commercial business. The plan will be approved in the tool, on direct (integration) feed back to other systems as PS Purchasing. 385 386 387 388 389 Supply: Most probably not, but to be determined at requirement gathering stage. Standard integration expected. UNHCR (Supply) would expect in the range of 150 users. UNHCR will most probably not require outbound integration from Demantra. 390 391 Page 76 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 392 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question WP07 392 393 Lot3-Demantra WP08 394 Lot3-Demantra WP10 E F Related Questions Answer Please let us know if Demantra will get all the necessary information to generate the forecast from People soft or any other third party systems involved (inbound)? How many test cycles are in scope for Demantra/SNO implementation? Demantra (central planning user) will generate global/regional forecast based on local plans entered in country operations. Certain data import from PS foreseen, detailed developed process and design to determine. Demantra Managed Support: a. Demantra plan processing/interfaces would be run only once a month. Do you need support only for that specific week/period? b. If yes, would you need 8*5 coverage during that week or 24*7 as you cannot proceed with further activities till these activities are completed ? c. Does the managed support include execution of all the Demantra/SNO activities during the monthly cycle OR is support required for issues faced during the monthly cycle? d. Post go-live, creation of any new worksheets/series/integration is part of the managed support scope. Please confirm For questions a, b, c, bidder is expected to propose their approach. Please explain what is the current planning tool that is used at UNHCR Currently Excel sheet is used for planning. System integrator should propose according to best practices. 393 For question d, UNHCR expects the delivery of work packages. 394 395 395 Lot3-Demantra Page 77 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 396 Lot3-Demantra 396 397 Lot3-Demantra 398 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer We understand that Demantra can only facilitate demand forecasting and SOP. Planning cannot be done with Demantra and SNO. Since the RFP does not indicate a proper planning tool, please comment if the vendor is expected to propose an optimum tool Please explain, what is the UNHCR Results Based Management framework Vendor is not expected to propose optimum tool. Demantra and SNO are expected to facilitate planning. Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", it is mentioned that "Reduce manual inputs to the planning process through one consolidated database". Demand can be changed but not supply. Planning recommendations can be brought in Demantra but supplies cannot be overridden. Actual changes have to be done in Source. All forecast streams have to be changed in demantra. Supply simulations can be done. But actual changes need to be done in Source n/a. Not a question. RBM is UNHCR's management strategy which includes managing the resources of the organization along a Results Framework (RF). It guides the assessment, planning, allocation of resources, implementation and reporting. The RF also guides the budgeting structure, annual plans and budgets. In the first phase implementing Demantra, the supply chain planning will not be directly linked to the budgetting process to take place in Hyperion (or similar). 397 398 Page 78 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 399 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", it is mentioned that "Manage, analyze and compare country-/region-/seasonspecific risk scenarios to support procurement and inventory decisions." Please provide examples about such scenarios. UNHCR plans to 'include' use of additional contingency plans (during the standard planning cycle +) for countries where an emergency is possible, and use the supply requirements from selected contingency plan(s) to simulate the impact on current flows and stock, to validate if changes to infrastucture and sourcing plan(s) has to be made. Demantra will not be used as a 'operational planning' tool as suggested in the question. 399 400 Lot3-Demantra Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", it is mentioned that "Introduce scenario and simulation planning: improve agility and reaction time to planned and unplanned events" We understand that this is more of a Rapid Planning functionality. This is not supported in Demantra. Please kindly comment. UNHCR plans to 'include' use of additional contingency plans (during the standard planning cycle +) for countries where an emergency is possible, and use the supply requirements from selected contingency plan(s) to simulate the impact on current flows and stock, to validate if changes to infrastucture and sourcing plan(s) has to be made. Demantra will not be used as a 'operational planning' tool as suggested in the question. 401 Lot3-Demantra Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", "Strengthen the bottom-up approach through the planning cycle" is mentioned. Please elaborate what is meant by a Bottom up approach The central planning and forecasting will be based on country developed plans and contingency plans. 400 401 Page 79 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 402 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", "Support a multiple reiterations approach, allowing for increasing the level of detail as information is known and implementation gets closer." is mentioned. Please kindly provide more details about this requirement. At the first iteration of planning at the budget proposal stage supply needs could be annual. At the next iteration during the detailed budget validation, the requirement could be quarterly supply forecast. And at the final iteration linked to detailed operational planning the requirement could be monthly supply forecast. 402 403 Lot3-Demantra Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", "Manage final automatic approval process for the planning cycle, monitor exceptions and adjustment." is mentioned. Please kindly describe the planning tool that will be used. The following elements to be considered in the demand planning: no. of beneficiries, forecasted beneficiaries, the needs/ requirement of commodities, stocks, stocks in pipeline, stock reserved as safety stocks, distribution plan, elements considered as risk with time zone, sourcing options and capcity of each option (availability and delivery lead time) 404 Lot3-Demantra Please explain what is the current forecasting process Currently forecasting is done in Excel. The following elements to be considered in the demand planning: no. of beneficiries, forecasted beneficiaries, the needs/ requirement of commodities, stocks, stocks in pipeline, stock reserved as safety stocks, distribution plan, elements considered as risk with time zone, sourcing options and capcity of each option (availability and delivery lead time) 405 Lot3-Demantra Please explain what is the Frequency of forecasting We request operations to submit their forecast one year in advance followed by another review of the same forecast in 8 month time. Later, the review will be on monthly/ quartely basis . 403 404 405 Page 80 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 406 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Please explain what is the Frequency of Plan run We request operations to submit their forecast one year in advance followed by another review of the same forecast in 8 month time. Later, the review will be on monthly/ quartely basis . Under High level business requirements in "Annex B - Appendix II - Application Overview - Lot3 - Demantra & SNO.pdf", "Ability to analyze market trends for certain core items (availability, price)" is mentioned. Please kindly provide more examples on the requirement and about market trends E.g analyse seasonal price fluctuations, quantity shortages, the root cause of such fluctuations, capacity of suppliers. Mainly the warehouse network (locations), number of available routings in the network, seasonal contraints per routing (e.g. closed due to rainy season), dynamic constraints (security situation blocking use of corridor). Item Price, Transportation costs, Inspection costs, Customs costs, installation costs (for ceratin items), are the most typical costs. 406 407 Lot3-Demantra 408 Lot3-SNO WP02 Request you to please list out the different constraints involved (ex: Supply constraints, Mfg constraints, etc.)? 409 Lot3-SNO WP02 410 Lot3-SNO WP02 Request you to please list out what are the different costs involved (ex: Fixed cost, Transportation, etc.)? What is the number of camps and warehouses considered for planning? 411 Lot3-SNO WP02 What are the KPIs for supply planning? 412 Lot3-SNO WP02 Provide some simulation scenario examples for supply planning. 407 408 409 UNCHR has approximately 200 warehouses. 410 411 412 Page 81 of 102 No KPIs are developed for demand planning apart from timely submission of complete plans. Tbd as a part of the design and implementation. Analyse cost vs. on time-delivery to delvier the items to different warehouses from different suppliers (via different transportation routes, hubs). By inclussion of contingency (emergency) plans, validate ability of the current structure and goods flow to manage the additional demand. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 413 Lot3-SNO C D MSRP Finance Upgrade Work Pkg Question WP02 413 E F Related Questions Answer Do you have supply network and geographical (latitude, longitude position) location of camps in your current system. This is required for calculating distances in SNO. Do you have transportation cost and capacity data available in your current system? Do you have storage cost data available in the current system? What is the level of detail required for the different areas of the process (e.g. person level headcount planning, product level planning, etc) We have, but currently not entered into PS per inventory location. 414 Lot3-SNO WP02 415 Lot3-SNO WP02 416 Lot1 Planning 417 Lot1 Planning How stable is your data model? (does the information planned change every year?) The data model, i.e. metadata dimensions, are stable. Frequent changes happen during the year on the metadata itself (e.g.: creation of a new Cost Center, a new PPG etc.) 418 Lot1 Planning What is the level of data security requirements for the budgeting process, especially for the position budgeting. There is no data sensitivity per -se for the information managed under Hyperion. 419 Lot1 Planning - Process How is your current planning process documented? Are objectives, scope, expected accuracy, time horizon, extent of scenario analysis, potential issues and review procedures documented? 414 415 For international procurements UNCHR has the transportation cost. Capacity data is not available. No, UNCHR does not have storage cost data in the PS system. Ambiguous question. Budgeting (and related planning/forecasting) is not done on PeopleSoft FSCM (Lot1). 416 417 418 419 Page 82 of 102 The internal procedures for Operations planning processes are well documented. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 420 Lot1 420 C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Planning - Process What tools/techniques Are used for budget preparation? Will the new tool be used for driver based forecasting calculation models (for detailed budgeting) or just for data entry, versioning, comparisons and workflow purposes? Planning - Process is a formal budget procedure and detailed timetable issued that states all tasks, roles and responsibilities across the organisation to prepare all aspects of the budget from beginning to publication and reporting? The budget is prepared and captured in "Focus", please see Annex B - Appendix II - Application Overview - Lot2 - Hyperion - Detailed Budgeting, "Budgeting systems" section. 421 Lot1 The internal procedures for Operations planning, internal and external reporting processes are well documented. 422 Lot1 Planning - People Are there dedicated resources and a department responsible for performing budgeting, planning and forecasting? Have these people been trained on the processes and the systems? Who else understand the day to day activities? Ambiguous question. Budgeting (and related planning/forecasting) is not done on PeopleSoft FSCM (Lot1). 423 Lot1 Planning - People Have dedicated staff and management members been trained on How to prepare and perform planning, budgeting and forecasting using the automated tools? Ambiguous question. Budgeting (and related planning/forecasting) is not done on PeopleSoft FSCM (Lot1). 424 Lot1 Planning - People How effective is the communication across the business units during the budget process? Do you know How other departments use the output of your plans? Effective, yes. 421 422 423 424 Page 83 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 425 Lot1 425 426 Lot1 427 Lot1 428 429 Lot1 Lot1 430 Lot1 431 Lot1 432 Lot1 C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Planning - People What kind of skills Do you think your team should develop in order to be more effective in their current role for budgeting process? Planning - Technology What is the level of automation in the data integration and reporting processes End user training is described in Workpackage 4 of the Terms of Reference document. Planning - Technology How many period of historical data will be loaded and maintained in the application Planning - Technology What will be number of users ? Planning - Technology Is there any performance benchmark to run business rules? Planning - Technology Is there need for what if scenario analysis? Planning - Technology How many reports need to be developed in HFR / Smartview ? Can we assume them to be the one in Annexure 2 of Annex B To be determined. For reference, oldest models are from 2006. Planning - Technology Is there a possibility of dimenison hierarchies being changed during the budget cycle ? Like new Implementor code being generated between V1 and V2? Yes, see also 417. In addition and although fairly rare, movement of a dimension member from on hierarchy branch to another could happen during the year (e.g.: A specific Cost Center is moved from one Operation to another) See also attached document RFP QandA - Training Average to low. It is expected that the manual processes currently in place, in particular in the areas of analysis and reporting, will be supported and automated to the extent possible. 426 427 428 429 430 See response to question: 299 The bechmark should be defined and finalized as part of the project Possibility to offer What if analysis should be reviewed in light of the business requirements analysis. Currently there are 9 NVision reports for detailed budgeting in the PeopleSoft EPM system. However, taking advantage of Hyperion reporting capabilities, UNHCR expects to have more reports in Hyperion. (See also Annex B - Appendix II - Application Overview Lot1 - Bolt-on - Partnership Management, "Challenges section"). 431 432 Page 84 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 433 Lot1 C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Planning - Technology For the purpose of Position Budgeting , can we assume a particular staff will be tagged to a particular job code throughout budget cycle? Please note that for planning and budgeting, staff information is less relevant than the position it is assigned to. Each position has a cost which is used for planning and budgeting. Due to operational needs, position's information, e.g.: grade or title, may change in the course of the budget year. Details will be discussed during the engagement. 433 434 Lot1 Planning - Technology Is there a need for allocating HQ costs? Ambiguous question. If referring to actuals, yes. See application overview. If referring to detailed budgeting, Focus is currently the source of information. 434 435 Lot1 436 Lot3-Demantra Planning - Technology Can we assume entity as lowest level of data submission? If referring to the "allocation" functionality of Hyperion, it will be used as appropriate. No, budget submitted and exported to FSCM have more detailed information such as Account and Output codes. Please see Annex B - Appendix II - Application Overview - Lot2 - Hyperion - Detailed Budgeting, "Chartfields (dimensions)" section for more details. 435 Is there historical data in a current system or will this need to be developed once Demantra has been implemented? If it is in a current system integration will need be to be considered however if there is no historical data it will take time to build up the relevant historical data to draw upon. 436 Page 85 of 102 If the historical data refers to previous purchasing, issues from warehouse, etc, UNHCR has the data. Concerning planning accuracy, no systemised historical data is available. OK 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 437 Lot3-Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Demantra and Strategic Network optimiser are both strategic planning tools but there is a requirement of a operational supply and demand tool. what will be the Operational planning tool as there is no mention of this? Field will use output from the strategic planning tool to support their planning, no operational tool planned. What is your current staff level, do you have developpers that you plan to leverage? No. For the implementation, the system integrator will provide the development effort to put GRC into operation. 437 438 Lot1-GRC UNHCR will use internal resources to build knowledge and capacity for post implementation; however, we anticipate that the Prime Vendor will be involved in both train-the-trainer and transfer knowledge to UNHCR. 438 439 439 Lot1-GRC It appears that that FIT gap has already completed, so you have already reviewed the new 9.2 functionality and determined what they want to implement ? Page 86 of 102 Refer to Annex B_TOR Work Package 2 - Business process analysis and detailed design will be revalidated with System integrator including detailed business requirements documents and revised fit/gap and keep /drop analysis (see deliverable). 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 440 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Billing - What countries, lamguage and currencies do you plan to invoice in ? Countries: "Invoices" for may be sent to any country. Languages: At least English, French and Spanish Currency: Can be any 440 441 Lot1-GRC Billing - What taxes (Sales, VAT) will need to be calculated on an invoice? There is currently no requirement to calculate any Sales tax or VAT. 442 Lot1-GRC 443 Lot1-GRC Project Costing: Project Security - Is it in scope or out of Scope. Billing: Whether invoices to be generated for Field specific units or for a single unit globally? To be determined/elaborated. Detailed requirements gathering and analysis is part of the engagement. Requirements vary depending on the type of invoice. In general, invoices for billing can be created in any of the Business Unit (that represent mainly countries where UNHCR operates) 441 442 This will be determined as part of WP02. 443 444 Lot1-GRC Billing: What are the Tax Calculation requirements on Customer invoices. 444 Page 87 of 102 Currently, UNHCR does not have any Tax calculation requirement. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 445 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Billing: What are the Revenue budgeting requirement on customer invoices. UNHCR does not use Revenue budgeting at the moment and no plan to use it. However, UNHCR would like to setup commitment control for certain revenue to increase Spending Authority. 445 446 Lot1-GRC Expenses: Approval process requirement for Cash Advances and Claim Settlements - Is it in scope or out of Scope. To be elaborated during engagement (requirement gathering activity). 447 Lot1-GRC To be elaborated during engagement (requirement gathering activity). 448 Lot1-GRC 449 Lot1-GRC 450 Lot1-GRC Expenses: Expense Receipt Verification and audit requirements- Is it in scope or out of Scope. What PeopleSoft instance is the HRMS system on? On average, number of users utilizing the system? Appears VAT is currently calculated and stored outside of PeopleSoft, are there any requirements / needs / desires to calculate within any PeopleSoft modules (e.g. Billing, Purchasing, Payables...) 451 Lot1-GRC For best available information, see attached RFP 647 - QandA Users and Volume of Common Transactions. 452 Lot1-GRC 453 Lot1-GRC Purchasing / eProcurment: Current See also: 52 104 number of requesters and buyers? What 137 158 242 488 language are purchase orders created in? 507 5265 537 557 577 Purchasing: Volume of requisitions and purchase orders created on a monthly basis? Payables: Volume of vouchers created on a monthly basis? 446 447 448 449 Currently, 8.9, but upgrade to 9.2 is in progress. For best available information, see attached RFP 647 - QandA Users and Volume of Common Transactions. AR is not applicable, and VATs on AP process may be subject to payment but reimbursable from the tax authority. 450 451 452 453 Page 88 of 102 For best available information, see attached RFP 647 - QandA Users and Volume of Common Transactions. For best available information, see attached RFP 647 - QandA Users and Volume of Common Transactions. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 454 Lot1-GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Payables / Receivables: How many different banks are currently utilized for payments and deposits? Field accounts approximately 350 bank accounts, 300 petty cash accounts, 30 operational cash accounts. HQ accounts approximately operational platform approx 20 accounts, FX and investment accounts approx 15. Expenses: Volume of expense reports created on a monthly basis? Expenses: Are expenses payments expected to be paid via PeopleSoft Payroll or Payables? Expenses: Are any corporate cards utilized that will need to be feed into PeopleSoft? Expenses: Number of employees and contractors projected to utilize the Expense system? Billing: Will billing be centralized to a team or rolled out to the field to enter bills and generate invoices? n/a. Expenses is currently not in use. 454 455 Lot1-GRC 456 Lot1-GRC 457 Lot1-GRC 458 Lot1-GRC 459 Lot1-GRC 455 456 457 458 459 460 Lot1-GRC General Ledger: In what capacity is PeopleSoft nVision utilized for reporting? To be elaborated during engagement (requirement gathering activity). To be elaborated during engagement (requirement gathering activity). UNHCR has 8000+ staff globally, most of whom are potential users of the Expense system. Billing will be rolled out to the field. Voluntary contribution activities will be centralized but field will generate the invoices for other types of billing activities (eg. Guesthouse sales). nVision is used for both statutory requirements (Trial Balance, Balance Sheet, P&L) and also operational budget-expenditure monitoring/control. nVisions mainly based on GL, Budget ledger and KK tables. 460 461 461 Lot1-GRC General Ledger: Are nVision reports ran online or only from the client nVision instance? Page 89 of 102 Both 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 462 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General Hyperion Planning will be implemented after Peoplesoft Upgrade is completed. Please confirm if this understanding is correct. The same go-live date for PeopleSoft and Hyperion Planning See also: 300 462 462 463 Lot2-Hyperion General Will Hyperion Plannning also be used for Financial Planning to do financial budgeting or it's limited to only Manpower and position budgeting? Scope of Hyperion Planning is described in Annex B - Appendix II Application Overview - Lot2 - Hyperion - Detailed Budgeting and Annex B - Appendix II - Application Overview - Lot2 - Hyperion Position Budgeting. 464 Lot2-Hyperion General How many entities / branches are there? In 2014, UNHCR had 126 Operations. 465 Lot2-Hyperion General Is there any difference in the calculation logics across entities based on country specific legal elements to be considered for paytoll cost, if yes, please elaborate. To be detailed during the engagement. 466 Lot2-Hyperion General The annual budget cycle and revisions is described in Annex B Appendix II - Application Overview - Lot2 - Hyperion - Detailed Budgeting, "Budgeting cycle" section 467 Lot2-Hyperion General 468 Lot2-Hyperion General Do you have provisions of monthly/quarterly forecasting or budgeting process revisions? Or will Hyperion Planning be used only for Annual Budgeting purposes? What exact information makes a position. Is it a combination of Salary scale, grade and step? As mentioned survey salary is defined in USD, so for every entity this gets converted further using exchange rate. Is this assumption correct? 463 464 465 466 467 468 Page 90 of 102 Please see attached Annex B - Appendix II for overview. Detailed requirements will be elaborated during the engagement. No, position costs for planning and budgeting purposes are handled in USD only. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 469 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General How does the cost account breakdown for position cost happpen - allocation / simple calculation ? This is the result of a calculation. For the purpose of estimation, assume that the calculation is medium to high in complexity. 469 470 Lot2-Hyperion General All FDMEE interface will be developed using flat file as extract from the source system. Is this assumption correct? The final solution needs to be determined on a case by case basis. 471 Lot2-Hyperion General We assume that UNCHR IT team will provide the data extracts from FOCUS / PeopleSoft as per the format provided by Hyperion team during implementation. Is this assumption correct? In principle, the data extracts from FOCUS will not change. Any data extract requirement must be discussed and agreed with the UNHCR IT Team. What is the frequency for the data loads? The details will be determined/elaborated during the engagement. 470 For PeopleSoft, ETL activities will need to be discussed between System Integrator (SI) for Lot 1 and SI for Lot 2. FDQM/FDMEE is expected to address most of the integration requirements. 471 472 Lot2-Hyperion General From Focus to Hyperion, one could expect 10 submissions per day, noting that there are some periods where it can peak to >50 per day. From Hyperion to FSCM: This is a nightly automated process described in Annex B - Appendix II - Application Overview - Lot2 Hyperion - Detailed Budgeting, "Target Validation in PeopleSoft EPM" section. 472 Page 91 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 473 Lot2-Hyperion C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer General What is the expected number of reports. Please share break with split of complexity by - simple/ medium/ complex Generic definition of report - Simple : Data retrieval in grid. No FR calculations, no complex formating - Medium : simple FR calculations, custom headings - Complex: Conditional fomratting, complex formulaes, multiple grids Financial reports to be developed in HFR, WebAnalysis and SmartView shall be identified during the detailed analysis and design phases of the project. General Can you please elaborate the number of users and security setup requirements? Please refer to the attached QandA - Users and Volume of Common Transactions Hardware Vendor (Sun, HP, Oracle etc) Currently, GRC is not installed in UNHCR. UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. 473 474 Lot2-Hyperion 475 Lot1 - GRC 474 Please refer to Annex B - Appendix III on Technical Overview and Work Packages. Additional information to answer technical questions have also been attached. See attached: Technical - MSRP Systems at ICC Technical - System Topology - AS IS Technical - Current MSRP Versions Technical - Target Application Versions 475 476 476 Lot1 - GRC Operating System Version and Release (32/64 bit) Page 92 of 102 See response to question: 475 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 477 Lot1 - GRC 477 C D MSRP Finance Upgrade Work Pkg Question E Related Questions Answer Provide details of hardware clustering (if any) Is there any virtual environment 478 Lot1 - GRC 479 Lot1 - GRC Is Load-Balancer being used ? Please confirm. 480 481 482 Lot1 - GRC Lot1 - GRC Lot1 - GRC Oracle DB Version to be installed Is Database clustered (RAC)? Total Database Users 483 Lot1 - GRC 484 485 Lot1 - GRC Lot1 - GRC Avg and Max Concurrent Users of Database # Number of DR sites If application layer to be in cluster mention the environment details. (e.g) UAT,PROD Total number of instance and names 478 479 480 481 482 483 484 485 486 Lot1 - GRC 487 Lot1 - GRC Data guard required ? If yes active/active or active/passive? 488 Lot1 - GRC 489 Lot1 - GRC 490 491 Lot1 - GRC Lot1 - GRC Specify the list of languages used in the See also: 52 104 current Application instance, other than 137 158 242 488 English (US) 507 5265 537 557 577 Specify the list of third party applications? Please provide the integration architecture diagram if available. Application version details Application is Clustered ? 486 487 488 489 490 491 F Page 93 of 102 See response to question: 475 No. Please also see response to question: 475 Yes. Please also see response to question: 475 See attached Target Application Versions See response to question: 475 Refer to attached document on Users and Volume of Common Transaction. Refer to attached document on Users and Volume of Common Transaction. One anticipated. Yes. Please also see response to question: 475 To be determined. Also see response to question 475 To be determined. Also see response to question 475 Currently, only English is anticipated. Integration with PeopleSoft is the the key requirement, possibly along with Hyperion, Demantra/SNO. Other 3rd party applications to be determined during the engagement. See attached Target Application Versions See response to question: 475 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 492 Lot1 - GRC C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Customization details ? "Customization" in the context of GRC has to be determined. GRC is new module. At this point in time, UNHCR has the output of the scoping sessions conducted during the conceptual design phase. Refer to Annex B - Appendix II - GRC. 492 493 493 494 Lot1 - GRC Lot2 - Hyperion Integration details Hardware Vendor (Sun, HP, Oracle etc) Main integration requirement is with PeopleSoft. Currently, Hyperion is not installed in UNHCR. UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. Please refer to Annex B - Appendix III on Technical Overview and Work Packages. Additional information to answer technical questions have also been attached. See attached: Technical - MSRP Systems at ICC Technical - System Topology - AS IS Technical - Current MSRP Versions Technical - Target Application Versions 494 495 Lot2 - Hyperion 496 Lot2 - Hyperion 497 498 Lot2 - Hyperion Lot2 - Hyperion 499 500 Lot2 - Hyperion Lot2 - Hyperion 495 496 497 498 499 500 Operating System Version and Release (32/64 bit) Provide details of hardware clustering (if any) Is there any virtual environment Is Load-Balancer being used ? Please confirm. Oracle DB Version to be installed Is Database clustered (RAC)? Page 94 of 102 See response to question: 494 See response to question: 494 See response to question: 494 See response to question: 494 See attached Target Application Versions See response to question: 494 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 501 Lot2 - Hyperion C D MSRP Finance Upgrade Work Pkg Question E Related Questions Answer Total Database Users To be determined. 501 502 502 503 504 505 Lot2 - Hyperion 503 504 Lot2 - Hyperion Lot2 - Hyperion 505 506 Lot2 - Hyperion Lot2 - Hyperion 507 Lot2 - Hyperion 508 Lot2 - Hyperion 509 510 511 Lot2 - Hyperion Lot2 - Hyperion Lot2 - Hyperion 506 507 508 509 510 F Avg and Max Concurrent Users of Database # Number of DR sites If application layer to be in cluster mention the environment details. (e.g) UAT,PROD Total number of instance and names Data guard required ? If yes active/active or active/passive? Specify the list of languages used in the See also: 52 104 current Application instance, other than 137 158 242 488 English (US) 507 5265 537 557 577 Specify the list of third party applications? Please provide the integration architecture diagram if available. Application version details Application is Clustered ? Customization details ? Refer to attached document on Users and Volume of Common Transaction. To be determined. Refer to attached document on Users and Volume of Common Transaction. One anticipated. See response to question: 494 See response to question: 494 See response to question: 494 English. High level integration diagram is presented in Annex B - Appendix II - Application Overview - Lot2 - Hyperion - Detailed Budgeting, "Budgetting systems" section where essentially EPM will be replaced by Hyperion. See attached Target Application Versions See response to question: 494 "Customization" in the context of Hyperion has to be determined. Hyperion Planning is new to UNHCR. At this point in time, UNHCR has outputs of the scoping sessions conducted during the conceptual design phase. Refer to Annex B - Appendix II. 511 512 512 Lot2 - Hyperion Integration details See response to question: 494 and 508 Page 95 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 513 Lot3 - Demantra C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer Hardware Vendor (Sun, HP, Oracle etc) Currently, Demantra is not installed in UNHCR. UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. Please refer to Annex B - Appendix III on Technical Overview and the Work Packages. Additional information to answer technical questions have also been attached. See attached: Technical - MSRP Systems at ICC Technical - System Topology - AS IS Technical - Current MSRP Versions Technical - Target Application Versions 513 514 Lot3 - Demantra 515 Lot3 - Demantra 516 517 Lot3 - Demantra Lot3 - Demantra 518 519 520 Lot3 - Demantra Lot3 - Demantra Lot3 - Demantra 514 515 516 517 518 519 Operating System Version and Release (32/64 bit) Provide details of hardware clustering (if any) Is there any virtual environment Is Load-Balancer being used ? Please confirm. Oracle DB Version to be installed Is Database clustered (RAC)? Total Database Users 520 521 521 522 522 Lot3 - Demantra Lot3 - Demantra Avg and Max Concurrent Users of Database # See response to question: 513 See response to question: 513 See response to question: 513 See response to question: 513 See attached Target Application Versions See response to question: 513 To be determined. Refer to attached document on Users and Volume of Common Transaction. To be determined. Refer to attached document on Users and Volume of Common Transaction. One anticipated. Number of DR sites Page 96 of 102 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 523 Lot3 - Demantra C D MSRP Finance Upgrade Work Pkg Question 523 E Related Questions Answer If application layer to be in cluster mention the environment details. (e.g) UAT,PROD Total number of instance and names 524 Lot3 - Demantra 525 Lot3 - Demantra Data guard required ? If yes active/active or active/passive? 526 Lot3 - Demantra To be determined. See response to question: 513 To be determined. 524 See response to question: 513 To be determined. 525 527 Lot3 - Demantra 528 Lot3 - Demantra Specify the list of languages used in the See also: 52 104 current Application instance, other than 137 158 242 488 English (US) 507 5265 537 557 577 Specify the list of third party applications? Please provide the integration architecture diagram if available. Application version details 529 530 531 532 533 Lot3 - Demantra Lot3 - Demantra Lot3 - Demantra Financials /Management Financials /Management Application is Clustered ? Customization details ? Integration details RDBMS release to be installed PSFT Tools Version to be installed 534 Financials /Management 535 Financials /Management Application Server Version To be Installed Applications Modules to be installed 536 537 Financials /Management Financials /Management Character Set to be installed Languages to be installed 526 527 528 529 530 531 532 533 534 535 536 537 F See also: 52 104 137 158 242 488 507 5265 537 557 577 Page 97 of 102 See response to question: 513 n/a. See response to question: 513 PeopleSoft and possibly Excel. No other 3rd party applications that needs to relate to Demantra are deployed (only PS). Refer to attached: RFP QandA - Target application versions. See response to question: 513 Preferably vanilla implementation. To be determined during this engagement. See response to question: 513 Please see attached: RFP 647 - QandA - Target Application Versions.docx Please see attached: RFP 647 - QandA - Target Application Versions.docx Please see attached: RFP 647 - QandA - Target Application Versions.docx Unicode English 1 2 A B C D RFP/2014/647 RFP/2014/647 MSRP Finance Upgrade Question Lot - Section Work Pkg Question Number 538 Financials /Management Number of instances to be installed including name of instances E F Related Questions Answer See Annex B - Appendix III - 4: Technical Architecture and Annex B Appendix III - 5: Methodology and Options. 538 539 Financials /Management Mention the names of instances required to be in RAC. (e.g UAT,PROD) See response to question 42 540 Financials /Management Question is not clear. 541 Financials /Management 542 Financials /Management Should the install has any custom database configured, If yes, Please provide all the details of the same Number of users accessing each Environment Total Project duration 543 Financials /Management Support duration for SIT,UAT,PROD etc 539 540 541 542 See also: 84, 542, 562, 582 For best available information, see attached RFP 647 - QandA Users and Volume of Common Transactions. See ToR, section 4, timeline and constraints. Also see answer to question: 84 See also: 113, 543, 3 months after go-live; 3 months to be used within one year for key 563, 583 processing milestones. See ToR, section 4, timeline and constraints. Fixed Price. See Technical Response and Financial Offer forms. 543 544 Financials /Management FP or T&M? 545 Financials /Management Do you need fallback to be implemented? If Y, Does fallback have to be Active-Active or Active-Passive Yes. Active-active 546 547 548 Financials /Management Financials /Management Financials /Management See response to question 487 Currently, UNHCR has 1 DR site for all applications. See response to question 42 549 Financials /Management datagaurd to be implemented ? Number of DR sites If application layer to be in cluster mention the environment details. (e.g) UAT,PROD Implementation approach ? (Offshore or Onsite or Offshore&Onsite) 544 545 546 547 548 549 Page 98 of 102 See answer to question: 219 1 2 A B C D RFP/2014/647 RFP/2014/647 MSRP Finance Upgrade Question Lot - Section Work Pkg Question Number 550 Financials /Management Please mentione Intergration requirement with other product E F Related Questions Answer Examples include homegrown Fleetwave, EFT payfiles (banking), PeopleSoft HR, Hyperion (future), Demantra/SNO (future) For additional information, refer to Annex B - Appendix III 550 551 Financials /Management 552 EPM Is Load-Balancer being used ? Please confirm. RDBMS release to be installed 553 EPM PSFT Tools Version to be installed 554 EPM 555 EPM Application Server Version To be Installed Applications Modules to be installed 556 EPM Character Set to be installed 557 EPM Languages to be installed 558 EPM 559 EPM Number of instances to be installed including name of instances Mention the names of instances required to be in RAC. (e.g UAT,PROD) n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. 560 EPM n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. 561 EPM Should the install has any custom database configured, If yes, Please provide all the details of the same Number of users accessing each Environment 551 552 553 554 555 556 See also: 52 104 137 158 242 488 507 5265 537 557 577 557 558 Yes, load balancers are used in all the current production environment. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. 559 560 561 Page 99 of 102 n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 562 EPM C D MSRP Finance Upgrade Work Pkg Question E Related Questions Answer Total Project duration See also: 84, 542, 562, 582 562 563 EPM F Support duration for SIT,UAT,PROD etc Also refer to QA: 84 See also: 113, 543, 3 months after go-live; 3 months to be used within one year for key 563, 583 processing milestones. 563 564 EPM FP or T&M? 565 EPM Do you need fallback to be implemented? If Y, Does fallback have to be Active-Active or Active-Passive 566 EPM datagaurd to be implemented ? 567 EPM Number of DR sites 568 EPM 569 EPM If application layer to be in cluster mention the environment details. (e.g) UAT,PROD Implementation approach ? (Offshore or Onsite or Offshore&Onsite) 570 EPM 571 EPM See ToR, section 4, timeline and constraints. 564 See ToR, section 4, timeline and constraints. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. 565 566 567 568 n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. Refer to 3.3 Statement of Work - Primary location of the Terms of Reference 569 570 571 Please mentione Intergration requirement with other product Is Load-Balancer being used ? Please confirm. Page 100 of 102 n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. n/a. EPM to be replaced by Hyperion or bolt-on PeopleSoft functionality. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 572 SCM Treasury C D MSRP Finance Upgrade Work Pkg Question E F Related Questions Answer RDBMS release to be installed Treasury will be consolidated into the FSCM Instance 9.2. See response to similar questions for FSCM: 532 to 551. UNHCR has a hosting service provider with whom the project should collaborate to ensure proper hardware sizing and setup. Please refer to Annex B - Appendix III on Technical Overview and the Work Packages. Additional information to answer technical questions have also been attached. See attached: Technical - MSRP Systems at ICC Technical - System Topology - AS IS Technical - Current MSRP Versions Technical - Target Application Versions 572 573 573 574 SCM Treasury SCM Treasury 575 SCM Treasury PSFT Tools Version to be installed Application Server Version To be Installed Applications Modules to be installed 576 577 SCM Treasury SCM Treasury Character Set to be installed Languages to be installed 578 SCM Treasury 579 SCM Treasury Number of instances to be installed including name of instances Mention the names of instances required to be in RAC. (e.g UAT,PROD) 574 575 576 See also: 52 104 137 158 242 488 507 5265 537 557 577 577 578 See response to question 572. See response to question 572. 579 Page 101 of 102 Please see attached: RFP 647 - QandA - Target Application Versions.docx See response to question 572. English See response to question 572. See response to question 572. 1 2 A B RFP/2014/647 RFP/2014/647 Question Lot - Section Number 580 SCM Treasury C D MSRP Finance Upgrade Work Pkg Question E Related Questions Answer 581 SCM Treasury 582 SCM Treasury Should the install has any custom database configured, If yes, Please provide all the details of the same Number of users accessing each Environment Total Project duration 583 SCM Treasury Support duration for SIT,UAT,PROD etc 580 581 F 582 See response to question 572. See response to question 572. See also: 84, 542, 562, 582 See ToR, section 4, timeline and constraints. Also refer to QA: 84 See also: 113, 543, 3 months after go-live; 3 months to be used within one year for key 563, 583 processing milestones. See ToR, section 4, timeline and constraints. Fixed Price. See Technical Response and Financial Offer forms. 583 584 SCM Treasury FP or T&M? 585 SCM Treasury Do you need fallback to be implemented? If Y, Does fallback have to be Active-Active or Active-Passive See response to question 572. 586 587 588 SCM Treasury SCM Treasury SCM Treasury See response to question 572. One anticipated. See response to question 572. 589 SCM Treasury datagaurd to be implemented ? Number of DR sites If application layer to be in cluster mention the environment details. (e.g) UAT,PROD Implementation approach ? (Offshore or Onsite or Offshore&Onsite) 590 SCM Treasury See response to question 572. 591 SCM Treasury Please mentione Intergration requirement with other product Is Load-Balancer being used ? Please confirm. 584 585 586 587 588 Refer to 3.3 Statement of Work - Primary location of the Terms of Reference 589 590 591 Page 102 of 102 See response to question 572. Build and Implementation phase of the MSRP Upgrade Project RFP 647 - Question and Answer Additional Information Extract of Change Management Strategy 1 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy This is an extract of the overall change management strategy to support the upgrade project. The strategy must be reviewed, revalidated and revised during the build and implementation phase. Organizational Change Management encompasses all activities aimed at helping it understand and successfully adopt new technologies. A comprehensive and structured approach is critical to the success of any program that will bring about significant change. In the context of MSRP Upgrade project, Change Management is a systematic set of proactive steps To ensure continued sponsorship and business engagement by the key stakeholders For a smooth and controlled system transition with minimal disruption To prepare UNHCR staff, at the HQ and field, for the new (updated) system To ensure policies, procedures/guidelines and system instructions are aligned To contribute in the management of e project risks and helping the business achieve its defined objectives for the project People Technology ObjectivesBusiness Process & Guiding Principles UNHCR CHANGE MANAGEMENT 2 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy Change management activities go hand-in-hand with the upgrade project which UNHCR has divided into two main stages: 1, the conceptual design, completed, and; 2, the actual upgrade and implementation, this RFP 1.1 Change Assessment (Stage 1 – Conceptual Design) During this stage the groundwork for the MSRP Upgrade Change Management activities is done, changes in MSRP system are assessed, organizational characteristics are reviewed, and impacts to existing procedures and UNHCR staff functions are identified to the extent possible. 1.2 Change Assessment (Stage 2) The assessment of changes continues into the actual upgrade phase of the project to determine and will cover these two main activities. Finalize Open Requirements with Business & Vendor During conceptual upgrade stage, some of the requirements are listed in Fit Gap for which decisions were yet to be taken by business. Taking a Go - No Go decision would help in preparing for subsequent steps in Change Management and would give a realistic view of quantum of change in system & business process and its impact on UNHCR staff. Revisit Policy & Business Process Change Based on finalized requirements and decisions, on which of the new modules would be part of the upgraded MSRP, assessment needs to be done on the impacted changes in Policies, Procedures and System. 1.3 Change Planning & Execution Up until this point, the Change Assessment which was defined as two stage activities, focused on laying the groundwork for change management activities and assess impact based on decision to be taken by business on the open requirements. After assessment, the actual change management activities need to be planned and executed. This section lists the plan, its approach and implementation details Prepare the Change Management Charter Form core change agent team Perform stakeholder (impacted parties) analysis Prepare the communication strategy Prepare training strategy Plan sponsor involvement 3 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy Assess people change and end-user impact Form readiness assessment group Prepare transition Plan Assess organizational readiness Revisit all inputs and dependencies of change management Prepare MSRP Upgrade Change Management Charter UNHCR would create a Change Management Charter to set the direction with following objectives It would set the stage for successful implementation of the project. Aligning with project objectives and guiding principles define critical success factors for CM efforts. Put in words the sponsor’s vision of change by providing overview on project objectives, rationale and expected state in future. Bring clarity on the roadmap to stakeholders and staff with Executive Direction and Commitment to support upgrade. It also helps in cascading information faster and alignment of objectives and vision. Reaffirmation/Formation of Core Change Management Team for MSRP Upgrade UNHCR to create a Core Change Management Team for MSRP Upgrade that would be aligned to the Signed and Approved Project Management Charter (Project Structure and Organization) whose responsibility would involve: Being key drivers of change. Coordinate & manage overall change management activities. Alleviate the concerns of UNHCR Stakeholders and End User groups to ensure that additional difficulties with perceptions about the project do not arise. This group can facilitate a review of the impact that change may have on employee skills and assigned duties in order to develop a plan to address for workforce changes. (Continue to) Perform Stakeholders Analysis (Those affected by changes in business process and technology by MSRP Upgrade Project) Direct Senior Management HQ Staff/Regional Office/Field Staff External Donors/Implementing Partners 4 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy Indirect HR, GLC, Support, Project Management/Audit & External Bodies Assess the key stakeholders and super users readiness by asking questions regarding the change, its impact etc. Stakeholder assessment helps to determine the best feedback channels for each identified stakeholder group. It is important to understand the major questions and concerns that these groups may have, so that adequate attention can be paid to correcting misunderstandings, filling in the gaps, undoing rumors, etc. If UNHCR understands, what the potential barriers to acceptance are, it will be better prepared to take proactive action to eliminate them. Determine the most effective way to reach the stakeholder groups (e.g., individual or group interviews, surveys, web site with user response capability, etc.). Recognize serious concerns or misunderstandings and be prepared to respond to them promptly. Help concerned stakeholders to see why the project is in their best interest. Be persistent and creative in approach to those influential individuals who demonstrate continued resistance. Make every effort to make them aware of how the project works in their favor. Turn them into allies. Plan to make management commitment to the project visible throughout the organization. Prepare/Revise the Communication Strategy As part of Change Management, the communication strategy and plan need to be aligned. Existing plan needs to be revalidated with respect to the results of change management assessments and the most suitable option s need to be taken forward. Prepare/Update Training Strategy Current training plan/strategy has served as a guide for the training needs of project team and Subject Matter Experts for engagement in upgrade project related activities. This plan needs to be updated to include training plan for the implementation, as per the outcomes of change management assessments and planning and the most suitable options need to be taken forward. Plan Continued Sponsor Involvement As sponsors are actively involved in the upgrade project, this is a reassessment of providing visibility to end users and staff distributed globally, on how sponsors are actively involved and it leads to faster Buy 5 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy in. It could lead to updated plan for different modes of actively involving sponsors in driving the message and communicating with end users across organization. Assess/Re-Assess People Change and End User Impact Awareness Level on Upgrade Identify lack of information & resistance Guard against complacency Identify key sponsors from UNHCR who act as positive influence driving this change. Form Readiness Assessment Group Drill further to form this group which would be an extended arm of Core Change management team that would lead in implementation and spread message across staff. This could align with the ‘Field Reference Group’ which is planned by UNHCR. Specific focus to impacted UNHCR regional & field office staff and communicate to encourage ownership and nurture acceptance of the new business processes and system. Have different forums in which the user community can interact with change agents, readiness assessment groups and sponsors to discuss project issues and potential user impacts. These meetings can be: Customized for Specific User Groups. Specific plans for business process/workflows identified for improvement. Focus group for IPSAS and compliance adherence changes. Identify training needs Change in Roles and Responsibilities, job profile. Interaction workshops. Address particular concerns the users may have. Provide timely and accurate information about upcoming events. Ensure the consistency of information passed onto the user community. Ensure project buy-in by the users. Follow up Provide potential users with a way to provide feedback, ask questions, etc. Recommendation is through the intranet portal as it would provide real time visibility to common issues and solutions Prepare Transition Plan 6 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy Develop a transition plan for people who are part of updated business process which needs change in roles and responsibilities as well as still set of impacted staff Assess Organizational Readiness Risk parameters assessment Functional Impact & Business Process Change Listing Sponsor Buy In & Involvement Plan Policy & Procedure Update plan Revisit all inputs and dependencies of Change Management Use learnings from similar past project in UNHCR Form Change group Address Staff and UNHCR organization issues specific to upgrade Finalize open requirements to be implemented along with business Propose updated organization structure based on Roles and Responsibilities, Job description Update Policy and Procedures Implement Communication Mechanism & Plan Prepare training content At the end of Planning & Execution Stage, the key expectations are: Visibility of all changes which are going to take place in the system Identification of stakeholders and audience Impact on Policy, Procedure, Technology & People Formation of Core Change Agent Group Skill Gap Analysis and Transition requirements Organizational Readiness Assessment Communication Plan aligned with its strategy Focused training plan as per training strategy Master tracker sheet aligned with upgrade lifecycle and milestones Based on the functional and business impact plan for: Regular Communication - Aligned with Communication Strategy 7 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy Focused Trainings – Aligned with Training Strategy Prepare Roles & Responsibilities Matrix Preparing roles and responsibilities of all involved users would give ownership clarity and identify gaps if any for Sponsor/Stakeholder Change Agent Team Project Management Office Business Users GLC Vendor Support teams 1.4 Change Monitoring & Verification For all the planned activities under Change management and its Execution, it is important to monitor and assess if the project is on track to meet the desired objectives set out with respect to change management. A master tracking sheet would be an overall plan on a single page which would give an overview of group of change management activities. It would help tracking the progress in a single page or a sheet and dependencies if any to be shared with sponsors and help in monitoring the progress with respect to planned milestones. Activities include but are not limited to: Forming the Change Control Board Publishing results of planned measurement Evaluation and tracking of regulatory compliance requirements Planning for testing groups and covering Review of transition plans Assessment of readiness for change Analysis of support logs and system behavior 8 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy Monitoring & Verification stage expectations are Regular communication, tracking & review Training outcome and feedback assessment Skill Set Transition Align with other related strategies for collaboration (User Acceptance testing) Evaluate system performance and user tickets from support team Lessons learned Closure and Archival Review, identify and address weakness in the processes Review, identify and address gaps in the training material or skill enhancement needs of the users 9 Build and Implementation phase of the MSRP Upgrade Project RFP 647 - Question and Answer Additional Information Extract of Change Management Strategy on Communication 1 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy on Communication This is an extract of the change management strategy to support the upgrade project. The communication strategy is developed to ensure sharing timely information about the project to all stakeholders and to receive quality feedback from them, which is equally important. This would be aligned with project communication plan. Different Modes/Medium Location Based Meetings – All Staff Newsletters, Targeted Emails and Broadcasts Intranet, Online tutorials, Content & Repository, and other web-based webcasts, videos, selfrunning demons Survey Online Training User Groups Workshops, Certifications A communication plan must be developed and/or revised to identify various audiences within this project and specify who will get what information at what time, in what format and through what means of delivery. In addition, the project team will track and record lessons learned throughout this project, so that the experience gained can be leveraged in the future. In general, the approach would include: The use brochures, fliers, white papers or other means of communication to inform those who will be affected of the benefits of the new system. Specifically, fliers can provide all end-users the opportunity to understand the new system and become aware of the benefits it provides. Creation intranet web site for upgrade project and ensure that all relevant parties are aware of : Project Status, Progress and Performance Interactive Question and Answer Communication Frequently Asked Questions (FAQ) Relevant Project Documents Glossary of Terms (for each key Module) Newsletter Tutorials Training Schedule Emails and newsletters as way of communication Build the effective communication channel after go live Use other media (see list above of different communication modes/medium) to transmit relevant information to reach the target audience 2 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy on Communication Based on the group of stakeholders/staff categorized as per location (HQ, Region & Field) and functional roles or departments the communication would be different. It is recommended that a dedicated landing page in intranet portal be the primary source of communication in UNHCR. This would help in transmitting consistent messages for all staff and different sections and FAQs could help clarify doubts and provide updates in consistent manner. Any good communication plan would need a proper tracker to monitor the progress as well as effectiveness of communication done. Based on feedback and inputs received, further follow up actions needed could be tracked to closure. 3 Application App Version PT Version Oracle Version MP Tuxedo Webserver Cobol Crystal Reports MS Office Portal 8.9 8.50.09 11.2.0.3 10gR3 11gR1 (10.3.1) Server Express 5.0 wp4 2008 SP1 2003 FSCM (Fin/SCM) 8.4 8.50.09 11.2.0.3 10gR3 11gR1 (10.3.1) Server Express 5.0 wp4 2008 SP1 2003 FSCM (TMS) 9 8.50.09 11.2.0.3 10gR3 11gR1 (10.3.1) Server Express 5.0 wp4 2008 SP1 2003 HRMS (HR/Payroll) 8.9 8.50.09 11.2.0.3 MP3 10gR3 11gR1 (10.3.1) Server Express 5.0 wp4 2008 SP1 2003 EPM 8.9 8.50.09 11.2.0.3 MP4 10gR3 11gR1 (10.3.1) Server Express 5.0 wp4 2008 SP1 2003 Operating System Linux -5 Oracle Corp Linux -5 Oracle Corp Linux -5 Oracle Corp Linux -5 Oracle Corp Linux -5 Oracle Corp The International Computing Centre (ICC) provides a managed hosting service for UNHCR’s MSRP systems which are based on PeopleSoft applications. A managed hosting service includes the following principal activities: • Hosting the hardware on which the applications reside, including networking • Managing the application environment MSRP User List (CSV File) File Import Process RAPA (Portal) Database Link GF-I/GF-X (SharePoint) GroupWise Bank Statement (CSV File) File Import Process Database Link/ Integration Broker RATM (Treasury) RAEP (Budget/ Income) RAFC (Focus) Database Link Database Link Exchange Rates (RTF) File Import Process RAFS (Fin/SCM) Various HR Data (CSV File) RAHR (HRMS/GP) Database Link File Import Process SMS Reporting (Cognos) EFT Files Office Wings UNHCR-Net (Intranet) Data Export (CSV File) File Export Process File Export Process L and C Data (CSV) Data File (CSV) Data File (CSV) Data File (CSV) LMS (Cornerstone) UNJSPF Database Medgate UNHCR Web site (Internet) MSRP Upgrade Project (SahFire) - Target Application Versions Application PeopleSoft FSCM App Version 9.2 Comment Latest available image as at last upgrade pass To be determined. In principle, most recent supported version available that is compatible with the target PeopleSoft FSCM version/image. To be determined. In principle, most recent supported version available that is compatible with the target PeopleSoft FSCM version/image. To be determined. In principle, most recent supported version available. To be determined. In principle, most recent supported version available. 9.2 8.54 (to be confirmed) Upgrade project in progress. In principle, most recent supported version available General Ledger Commitment Control Accounts Payable Accounts Receivable Purchasing Asset Management Inventory Banking Cash/Deal/Risk Management Billing Expenses SRM (eSupplier, eProcurement, Strategic Sourcing) Real-Estate Management Project Costing Governance, Risk and Compliance Access Controls Governor Transaction Controls Governor Including: Transaction Controls Governor Connector to PeopleSoft Enterprise for TCG Hyperion Hyperion Planning Plus Including: FDMEE FDMEE Adapter Suite Demantra Demand Management SNO Strategic Network Optimization PeopleSoft HRMS PTools Oracle Database 11g or higher that is compatible with the target PeopleSoft FSCM version/image. Please note that the final PeopleTools version is to be decided in coordination with the PeopleSoft HRMS upgrade project. The PeopleTools version should be the same for all PeopleSoft environments in UNHCR. Although not required, UNHCR prefer to have the database versions of all PeopleSoft applications to be the same. In making the final decision for the database version, the PeopleSoft HRMS upgrade project should be taken into consideration. The above should respond to multiple technical questions on: PeopleSoft, GRC, Hyperion, Demantra/SNO. SAN AP01 HP DL380 8 cores 96Gb All apps 1Gb/s Production AP03 HP DL380 8 cores 96Gb All apps DP03 HP DL380 8 cores 48Gb FS WP02 HP DL360 4 cores 16Gb All apps AP02 HP DL380 8 cores 96Gb All apps WP01 HP DL360 4 cores 16Gb All apps DP02 HP DL380 8 cores 48Gb HR, TM 10Gb/s Non-Production 1Gb/s WN01 HP DL360 4 cores 16Gb PA, FS DN02 HP DL380 8 cores 48Gb HR, TM, EP WN02 HP DL360 4 cores 16Gb HR, TM, EP AN02 HP DL380 8 cores 96Gb HR, TM, EP DN01 HP DL380 8 cores 48Gb PA, FS AN01 HP DL380 8 cores 96Gb PA, FS DP01 HP DL380 8 cores 48Gb PA, EP SAN 10Gb/s RPS RPS Firewall Firewall Internet UNHCR HQ DR Network 12Tb 12Tb UNHCR HQ remo HP DL370 8 cores 12Gb Firewall remo HP DL370 8 cores 12Gb SAN 1Gb/s RPS viren HP DL370 8 cores 12Gb Training / DR WT02 HP DL360 4 cores 16Gb All apps AT02 HP DL380 8 cores 96Gb All apps WT01 HP DL360 4 cores 16Gb All apps DT02 HP DL380 8 cores 64Gb HR, TM, EP AT01 HP DL380 8 cores 96Gb All apps DT01 HP DL380 8 cores 64Gb PA, FS 10Gb/s Servers Firewall Firewall 12Tb Internet UNHCR HQ Production Network Training / DR NFS / Backup Non-Production DT01: camu Windows DN01: patmore DT02: picao Application / Web DN02: pau AT01: whiteash Database AN01: abuta AT02: whitespire Key: AN02: avenca WT02: lombardy WT01: lodgepole Production WN02: liveoak WN01: leyland AP03: amur AP02: acai AP01: ajos DP03: satomi DP02: syringa DP01: sourwood WP01: raintree viren WP02: redmaple remo Build and Implementation phase of the MSRP Upgrade Project RFP 647 - Question and Answer Additional Information Extract of Change Management Strategy on Training 1 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy on Training This is an extract of the training strategy to support the actual upgrade project. UNHCR has a Global Learning Center (GLC) with the goal of providing all staff who carry out UNHCR work with opportunities to learn new skills, acquire knowledge to improve their performance and better manage their individual career paths. GLC is responsible for coordinating internal learning activities agency-wide, ensuring that learning design, delivery, and evaluations have the highest substantive and methodological integrity, and that our learning activities closely reflect institutional priorities. Global Learning Center (GLC) has a ‘Learn and Connect’ portal for UNHCR. The "Learn & Connect" Learning Management System, with an ever-growing catalogue of courses, offers a selection of learning opportunities – both online and in more traditional workshop formats. GLC, the upgrade vendor, the project team and the business SME’s need to partner in developing appropriate training material catering to staff needs, as well as in delivering end-user and train-thetrainers courses . Target Trainees UNHCR has operations in 100+ countries with some 8,000+ staff . Of these, staff members in positions with administrative, financial, budgeting, donor relationship, managerial and supply management functions are impacted by the project and therefore form the cohort for trainings planned as part of its implementation. UNHCR resources will be impacted in different ways and therefore will need to be provided with a mix of training materials as appropriate. The assessment of training requirements will be continued during build and implementation phase. Prepare Consolidated List of Trainings required Inputs should be taken from Skill Gap analysis & Training Needs Assessment Business process changes or workflows New modules User Needs Lessons learned Organizational experience with different training methods and their effectiveness Develop Curriculum and Content Prepare focused training programs & tailored curriculum (topics covered, reference and other training materials used) and content (specific information to be delivered) for each group. The training to be provided in settings appropriate to the content and group responsibilities (e.g., Field Staff in Regional or identified hubs; HQ & GSC Staff in a training rooms). 2 Build and Implementation phase of the MSRP Upgrade Project Additional Information – Extract of Change Management Strategy on Training PeopleSoft UPKs for targeted training UPK (User Productivity Kit) is interactive learning environment that portrays a simulated PeopleSoft environment. User learns by performing the task themselves and the UPK provides instructions as one progresses. It is similar to working on the real system with the added feature of being guided through the tasks with the choice of being able to see the task being performed or performing the task as instructed. A table of contents is used to display all the available training topics. Other modes of training Conference room pilot (CRP)/Live Training People books Oracle University External Trainer (Upgrade vendor) Serious attention to be paid to methods of delivery and as a result while most employees will receive classroom presentations; certain groups will receive hands on training. In addition, relevant CBTs, presentations will be made available on the project web site as a means of distributing key information about the project to all stakeholders. The following list could be used as a guide in development of this training program: It is important to understand the training needs of each stakeholder group, develop targeted training activities, and deliver content with the appropriate method. A good training plan will serve as an effective road map for training activities. Training is essential to the success of this project. Each stakeholder group in the project may have unique training needs, this need to be captured for the groups relevant to MSRP upgrade project, their specific training needs and information about the training materials and facilities that will be used. It will form basis for the training plan. GLC Portal could be used effectively for training content accessibility. One of the possibilities could be to have a consolidated section for MSRP upgrade related training content which could be categorized based on business groups, key modules or process flows. 3 RFP 647: Information on Users and Volume of Common Transactions Questions to be answered: Please indicate the daily volume of common transactions/day (Requisitions, POs, Vouchers, Journals, etc). Also, please indicate the no. of users in the system. Generally there are more transactions per day during the first quarter and last quarter of the fiscal year. In a normal day the approximate average transactions per day are as follows: Requisitions: Purchase Orders : Vouchers: Journals: 60 75 985 350 (maximum in one day is 1,075) (maximum in one day is 743) (maximum in one day is 6,472) (maximum in one day is 4,697) The above figures include all transactions regardless of status (Open, Approved, Cancelled, or Closed). 1) Following is the count of common transactions a. Requisitions (by Year) Year 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Number of transactions 1,713 3,432 5,505 14,940 19,523 20,895 21,835 23,703 19,734 22,890 24,749 1,061 b. Purchase Orders (by Year) Year 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Number of transactions 2,375 4,261 6,169 14,650 19,628 21,963 22,912 25,639 22,429 25,674 28,135 732 c. Vouchers (by Year) Year 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Number of transactions 9,629 40,600 91,031 204,795 267,773 282,706 286,038 301,986 323,425 344,405 359,969 7,581 d. Journals (by Ledger) Ledger BUDGET CBL COMMIT COMMIT_DTL DONOR_RPT FOBS HCR OBL_PLAN PREUNOG 2) Setup/Master data a. Vendors: b. Items: c. Banks: d. Bank Accounts: Count in Journals 35,839 865 165 162 1,432 18,728 1,720,952 3,594 2,524 144,335 7,152 374 981 What are the number of users per job role and how is their geographical spread? The function is decentralized with the HQ having a monitoring and policing function. Currently UNHCR has approximately 397 office locations spread across 253 countries and 250 warehouses. The system integrator is expected to carry out assessment activities that will clearly identify roles and users in different locations based on the business requirements. How many number of users will be accessing the Planning and Budgeting system. If possible please provide approximate spread by Geography What is the expected number of users / concurrent Users for Hyperion Planning ? Currently there are 2,012 users in EPM. The system integrator is expected to carry out assessment activities that will clearly identify roles and users in different locations based on the business requirements. Number of Users: MSRP, GRC, Hyperion, Demantra/SNO Note: GRC, Hyperion, Demantra/SNO is currently not implemented and therefore information on the number of users for these applications is not available. As mentioned previously, the system integrator is expected to carry out assessment activities that will facilitate sizing. Current environment MSRP Approximate number of users per environment: DEV 20 users TST 20 Users UAT 60 Users SUP 60 Users PRD 4050 users TRN 20 users + size of a training class No. of concurrent users for the production environment: In PIA: FS/SCM: 1,429 TM: 110 EPM: 171 Concurrent named database users should not exceed 15. Anticipated in the Upgraded Version MSRP: Similar to the current environment (for applications already in use) GRC: To be determined as GRC is currently not in use. However, the initial implementation is anticipated to be "centralized". Hyperion: To be determined as Hyperion is currently not in use. In principle, at least one per field office/operation would require access, as well as at least one per HQ division. Most or all of the budgeting section in HQ would need access. Demantra/SNO: To be determined as neither Demantra nor SNO is currently in use. 2014 KENYA OPERATION BUDGET - FUNDING - EXPENDITURES as of 30.06.14 (in USD) *** FAKE DATA FOR THE PURPOSES OF ILLUSTRATION *** REGULAR EXCOM BUDGET (AB) OPS 100,000,000 OP APPROVED ABOD STAFF 10,000,000 20,000,000 TOTAL 130,000,000 110,000,000 OPS 50,000,000 OL APPROVED ABOD STAFF 5,000,000 10,000,000 TOTAL 65,000,000 55,000,000 FUNDING - CONTRIBUTIONS (recorded) UNEARMARKED 20,000,000 TOTAL UNEARMARKED 20,000,000 EARMARKED - DADAAB 10,000,000 EARMARKED - KAKUMA 5,000,000 EARMARKED - NAIROBI 5,000,000 TOTAL EARMARKED 20,000,000 TOTAL Contributions recorded 40,000,000 62% SB BUDGET - South Sudan Situation - (Kakuma) OPS 20,000,000 OP APPROVED ABOD STAFF 1,000,000 1,000,000 TOTAL 22,000,000 21,000,000 OPS 10,000,000 OL APPROVED ABOD STAFF 500,000 500,000 TOTAL 11,000,000 10,500,000 FUNDING - CONTRIBUTIONS (recorded) TOTAL (with 7%) #REF! #REF! TOTAL (excl. 7%) #REF! #REF! GRAND TOTAL BUDGET - AB + SB OPS 120,000,000 OP APPROVED ABOD STAFF 11,000,000 21,000,000 TOTAL 152,000,000 131,000,000 OPS 60,000,000 OL APPROVED ABOD STAFF 5,500,000 10,500,000 TOTAL 76,000,000 65,500,000 FUNDING - CONTRIBUTIONS (recorded + firm projections) + carry-over TOTAL (excluding 7%) #REF! #REF! H:\RFP\RFP 647 Finance MSRP upgrade\Questions and Answers\Answers\RFP 647 - QandA\RFP 647 - QandA 303 - ExampleTrackingSpreadsheet 23/01/2015 Unearmarked contributions at the country level *** FAKE DATA FOR THE PURPOSES OF ILLUSTRATION *** Country/Donors CD Amount EU 40037 100,000 JPN 40033 5,000,000 USA 40079 10,000,000 France 45022 50,000 Germany 45053 45,000 Australia 45055 40,000 PSFR: TOTAL 15,235,000 2014 NAIROBI PILLAR 1 BUDGET WITH EARMARKED CONTRIBUTIONS in USD *** FAKE DATA FOR THE PURPOSES OF ILLUSTRATION *** BUDGET Objectives 1. Favourable Protection Environment EARMARKED CONTRIBUTIONS MSRP (03/04/14) EPM CURRENT CD 33005 CD 33032 BUDGET (OL) (RPP2) (IFS) CD 40004 TOTAL Expenditures as available (EPM of 01.04.14 budget) (MSRP) 25,000 500,000 - 500,000 113 - Access to legal assistance and legal remedies improved 500,000 - 500,000 114 - Access to the territory improved 2. Fair Protection Processes and Documentation 210 - Receptions conditions improved #DIV/0! 0% 50,000 #DIV/0! 50,000 0% 1,500,000 50,000 - 50,000 0% 500,000 - 500,000 0% 213 - Access to and quality of status determination procedures improved 250,000 - 250,000 0% 50,000 0% 215 - Civil registration and civil status documentation strengthened 3. Security from Violence and Exploitation 310 - Protection from Crime 50,000 5,000 - 500,000 - 9,194 9,194 (9,194) - 50,000 - 50,000 313 - Risks related to detention reduced and freeedom of movement increased 50,000 - 50,000 400,000 - 400,000 0% 300,000 0% 50,000 0% 4. Basic Needs and essential services 410 - Health 411 - Population has optimal access to reproductive health and HIV services 0% 1,000,000 700,000 700,000 50,000 - - 418 - Population has sufficient basic and domestic items - 419 - Services for persons with specific needs strengthened 150,000 420 - Education 300,000 5. Community Empowerment and Self Reliance 400,000 100,000 100,000 150,000 0% 200,000 0% 50,000 - 50,000 0% 513 - Self reliance and livelihoods improved 350,000 - 350,000 0% 6. Durable Solutions 150,000 611 - Potential for voluntary return realized - - 612 - Reintegration 100,000 50,000 7. Leadership, Coordination and Partnerships 30,000 - 0% 50,000 15,000 - 15,000 0% 15,000 - 15,000 0% 400,000 - 400,000 0% 200,000 - 200,000 0% 8. Logistics and Operations Support 600,000 810 - Logistics and supply chain 811 - Operations Management TOTAL OPS #DIV/0! #DIV/0! 100,000 711 - Camp management and coordination refined and improved 713 - Donor relations and resource mobilization strengthened 0% - 615 - Reduction of statelessness is achieved 710 - Coordination and partnerships strengthened 0% - 415 - Population lives in satisfactory conditions of sanitations and hygiene 614 - Potential for resettlement realized #DIV/0! 1,500,000 413 - Food Security 510 - Community mobilization strengthened and expanded #DIV/0! 5,000 312 - Risk of SGBV is reduced and quality of response improved 314 - Protection of children vs income 0% 212 - Quality of registration and profiling improved or maintained 214 - Level of individual documentation increased Impl.rate 25,000 112 - Administrative institutions and practice developed or strengthened 115 - Public attitude towards persons of concern improved Impl.rate 1,000,000 110 - International and regional instruments acceded to 111 - Law and policy developed Budgetary space 5,680,000 - - 100,000 9,194 700,000 - - - - 809,194 14% 4,275,806 - 0% X.21 ABOD 2,134,040 STAFF 9,377,506 GRAND TOTAL 17,191,546 188,760 - - 288,760 2,134,040 188,760 9,194 700,000 - - - - 997,954 0% 9,188,746 6% 16,193,592 H:\RFP\RFP 647 Finance MSRP upgrade\Questions and Answers\Answers\RFP 647 - QandA\RFP 647 - QandA 303 - ExampleTrackingSpreadsheet2 23/01/2015 2014 DADAAB/ALINJUGUR BUDGET WITH EARMARKED CONTRIBUTIONS *** FAKE DATA FOR THE PURPOSES OF ILLUSTRATION *** BUDGET Objectives EPM CURRENT CD 99005 BUDGET (OL) (RPP2) 1. Favourable Protection Environment 500,000 112 - Administrative institutions and practice developed 250,000 113 - Access to legal assistance and legal remedies improved 200,000 114 - Access to the territory improved and risk of refoulement reduced 2. Fair Protection Processes and Documentation EARMARKED CONTRIBUTIONS (RECORDED + FIRM PROJECTIONS) MSRP (03/04/14) EC CD 11032 Budgetary space CD 33094 CD 88004 CD 22065 CD 77018 CD 99887 TOTAL available (EPM (IFS) budget) Expenditures as of Impl.rate 01.04.14 (MSRP) 100,000 50,000 - 100,000 0% 50,000 0% - - #DIV/0! 400,000 - 400,000 0% 213 - Access to and quality of status determination improved 300,000 - 300,000 0% 50,000 - 50,000 - - 214 - Level of individual documentation increased 215 - Civil registration and civil status documentation strengthened 312 - Risk of SGBV is reduced 1,500,000 100,000 400,000 6,000,000 411 - Reproductive health and HIV services 1,000,000 412 - Nutrition 2,000,000 413 - Food Security 2,000,000 415 - Population lives in satisfactory sanitary conditions 2,000,000 416 - Shelter and Infrastructure 1,500,000 417 - Population has sufficient access to energy 1,000,000 418 - Population has sufficient basic & domestic items 4,000,000 419 - Services for persons with specific needs strengthened 20,000 4,000,000 2,000,000 0% - 100,000 0% 380,000 0% 4,000,000 2,000,000 0% 1,000,000 0% 2,000,000 1,500,000 500,000 512 - Natural resources and environment better protected 200,000 1,500,000 - 0% 0% - 2,000,000 0% 500,000 0% 0% 0% 0% 0% - 500,000 500,000 0% 1,500,000 2,500,000 0% 150,000 0% 2,498,500 0% 400,000 0% 100,000 2,000,000 250,000 500,000 2,850,000 - 500,000 500,000 - 750,000 750,000 - - 200,000 614 - Potential for resettlement realized 300,000 7. Leadership, Coordination and Partnerships 500,000 0% 200,000 0% 650,000 0% 0% - 300,000 0% #DIV/0! 0% #DIV/0! 0% #DIV/0! 0% 0% - 500,000 500,000 712 - Emergency Management strengthened 713 - Donor relations and resource mobilizatio strengthened 40,000 40,000 0% - #DIV/0! (40,000) #DIV/0! #DIV/0! 0% 5,000,000 810 - Logistic and supply chain 2,000,000 - 2,000,000 0% 811 - Operations management 3,000,000 - 3,000,000 0% 37,250,000 - 1,010,000 100,000 7,500,000 1,000,000 5,000,000 - - 250,000 500,000 - - - 15,360,000 21,890,000 (40,000) Unearmarked@Da 5,000,000 daab level 7% 200,000 4,718,590 2,357 11,397,752 424,314 53,366,342 - 1,636,671 - 0% - 0% X.21 5,000,000 7,000 207,000 20,360,000 GRAND TOTAL 0% 200,000 710 - Coordination and partnerships strengthened STAFF 0% #DIV/0! 500,000 611 - Potential for foluntary return realized ABOD 0% 1,500 1,500,000 500,000 1,400,000 610 - Comprehensive Solutions strategy developed strengthened & updated TOTAL OPS 0% 1,500,000 1,500,000 5,348,500 400,000 8. Logistics and Operations Support 0% 500,000 2,500,000 511 - Peaceful co-existence with local communities promoted 711 - Camp management and coordination refined and improved 1,400,000 20,000 - 150,000 510 - Community mobilizations strengthened and expanded 6. Durable Solutions 100,000 1,500 414 - Water 513 - Self-reliance and livelihoods improved 0% #DIV/0! 25,000,000 410 - Health 5. Community Empowerment and Self Reliance 100,000 500,000 314 - Protection of children 420 - Education #DIV/0! 2,500,000 313 - Risks related to detention reduced & freedom of movement increased 4. Basic Needs and essential services 0% 750,000 212 - Quality of registration and profiling improved 310 - Protection from crime strengthened income 250,000 100,000 210 - Reception conditions improved 3. Security from Violence and Exploitation Impl.rate vs vs. OL #DIV/0! 2,357 1,438,291 107,000 13,938,291 383,027 1,000,000 5,383,027 2,245,632 - - 250,000 500,000 - - - 22,814,990 H:\RFP\RFP 647 Finance MSRP upgrade\Questions and Answers\Answers\RFP 647 - QandA\RFP 647 - QandA 303 - ExampleTrackingSpreadsheet2 23/01/2015 #DIV/0! Oracle GRC 8.6.4 Certification Matrix Software Component Type Component Name Version Remarks Oracle Database 11gR2 11.2.0.3 UTF-8 Characterset Firefox , Internet Explorer Interet Explorer 24 9.x,8.x Oracle Tier 1 Chinese (Simplified/Traditional), Japanese, French, German, Database Browser Languages Korean, Portuguese (Brazilian), Spanish, Danish, Italian, Dutch Application Server and Middleware for GRC Core Oracle WebLogic Server Oracle Application Development Runtime (ADR) 12.1.2 Oracle Repository Creation Utility 12.1.2 Oracle WebLogic Server Oracle Application Development Runtime (ADR) 10.3.6 with Oracle JDK 1.7 Oracle Repository Creation Utility 11.1.1.7 Oracle Business Intelligence Oracle WebLogic Server Oracle Application Development Runtime (ADR) 11.1.1.7 10.3.6 with Oracle JDK 1.7 Oracle Repository Creation Utility 11.1.1.7 Windows Operating System Linux x86‐64(Preferred) Server 200x Oracle Linux 6 Red Hat Enterprise Linux 6 Oracle VM Server 3.2.6 12.1.2 Application Server and Middleware for GRC Intelligence (Embedded) 11.1.1.7 Additional Middleware (Standalone) 11.1.1.7 Operating Systems Virtualization forApplication Server Hardware Standalone OBIEE Instance will be used for Customization and New Dashboard and Reports development. Not required for Proof of Concept Architecture Server Tiers Locate GRC application and database servers in same machine to eliminate I/O (network) boundary constraints that can cause performance issues Network When using AACG or TCG, locate GRC application and database servers in same network segment as monitored business application databases Bus and Infrastructure 64bit,Processor Speed 2.4Ghz+, Application Server CPU 16 cores (GRC) + 16 Core for (GRCI) 16 core for DB + 8 Cores for Apps Tier 64G (32+32) 40G (24+16) 500G Production environment sizing Non Production environment Production environment sizing Non Production environment 15G (GRC + GRCI) 10G (GRC + GRCI) 1TB 1TB Production environment sizing Non Production environment sizing Use RAID 5 , No RAID 1+0 or 0+1 required Use RAID 5 , No RAID 1+0 or 0+1 required Oracle PeopleSoft Enterprise FSCM & HCM 9.2 (PT8.53),9.1 (PT8.53/50),9.0 (PT8.49/48),8.9 (PT8.49/48) AACG PEA: PSFT application server running in Oracle Linux 4 or 5, Red Hat Enterprise Linux 4 or 5, or MS Windows Server 2003; and running on x86 32‐bit. Oracle PeopleSoft Enterprise HCM 9.2 PSFT application server running in WebLogic 10.x or 9.2. PSFT using Oracle database or MS SQL Server 2008 Oracle PeopleSoft Enterprise FSCM 9.2,9.1 PSFT running in Linux x86‐64. PSFT using Oracle database 11gR1 Sizes Application Server Memory Application Server Storage Database Server SGA Database Server Storage AACG TCG Oracle Hyperion Planning Plus - Version 11.1.2.3 Software Component Type Component Name Version Oracle Database 11gR2 11.x Firefox , Internet Explorer Internet Explorer 7.x Internet Explorer 8.x Internet Explorer 9.x Firefox 17.x ESR Remarks Database Browser Windows Server 2008 with SP2+ Windows Server 2008 R2 (all SP levels included) Windows Server 2003 with SP2/R2+, SP3+ Languages English (US) Application Server and Middleware Oracle WebLogic Server Oracle Application Development Runtime (ADR) Oracle Repository Creation Utility Oracle WebLogic Server 11gR1 (10.3.5 and 10.3.6) (bundled with Hyperion Planning Plus) 10.3.6 with Oracle JDK 1.7 Web Server Oracle Apache server Oracle Apache server(bundled with Hyperion Planning Plus) Additional Middleware FD(Q)M 11.1.2.X Operating Systems Windows Server 200X Windows Server 2008 with SP2+ OR Windows Server 2008 R2 (all SP levels included) Windows Server 2003 with SP2/R2+, SP3+ OR Enterprise Linux Solaris Hardware Architecture Server Tiers Production Environment(Only One) Hyperion Planning Plus Application with FDM (integrator) Prod Instance - Install Oracle epm components by Tier (Web Tier in Server#1 Virtual OS (Distributed env)) Prod Instance - Install Oracle epm components by Tier (Service Tier in Server#2 Virtual OS (Distributed env)) Prod Instance - Install Oracle epm components by Tier (Apache Server in Server#3 Physical OS (Distributed env)) Prod Instance - Install Oracle epm components by Tier (Essbase component in Server#4 Physical OS (Distributed env)) Production Instance - ORACLE RDBMS - database in Server #3 (Distributed env)-Virtual OS Non Production ( 3-4 environments) Server Tiers Non-Prod Instance - Install Oracle epm components by Tier (Web Tier in Server#1 Virtual OS (Distributed env)) Non-Prod Instance - Install Oracle epm components by Tier (Service Tier in Server#2 Virtual OS (Distributed env)) Non-Prod Instance - Install Oracle epm components by Tier (Apache Server in Server#3 Physical OS (Distributed env)) Non-Prod Instance - Install Oracle epm components by Tier (Essbase component in Server#4 Physical OS (Distributed env)) Non-Production Instance - ORACLE RDBMS - database in Server #3 (Distributed env)-Virtual OS Network Production Sizes Bus and Infrastructure NA Application Server CPU 8 core Duo Production environment sizing only Application Server Memory -RAM 24GB Virtual Memory Only Web Server Memory (Apache)-RAM Application Server Storage 16GB NA Physical Memory Database Server SGA-RAM 32GB Virtual Memory Only SAN Storage 800GB Non-Production Bus and Infrastructure NA Application Server CPU 8 core Duo Non Production environment sizing only Application Server Memory -RAM 32GB Virtual Memory Only Web Server Memory (Apache)-RAM Application Server Storage 16GB NA Physical Memory Database Server SGA-RAM 32GB Virtual Memory Only SAN Storage 2 TB QandA 320: Please interpret with the attached document on UNHCR Target Versions. PeopleSoft PeopleTools 8.53 with Oracle Database 10.2.0.5.0 Platform Version Supported Version Support Status HP-UX Itanium 11.31 10.2.0.5.0 64-bit Supported IBM AIX on POWER Systems (64-bit) 6.1 10.2.0.5.0 64-bit Supported IBM: Linux on System z Red Hat Enterprise 5 10.2.0.5.0 64-bit Supported IBM: Linux on System z SLES 11 10.2.0.5.0 64-bit Supported Linux x86-64 Oracle Linux 5 10.2.0.5.0 64-bit Supported Linux x86-64 Red Hat Enterprise 5 10.2.0.5.0 64-bit Supported Linux x86-64 SLES 11 10.2.0.5.0 64-bit Supported Microsoft Windows x64 (64-bit) 2008 10.2.0.5.0 64-bit Supported Oracle Solaris on SPARC (64-bit) 10 10.2.0.5.0 64-bit Supported Oracle Solaris on x86-64 (64-bit) 10 10.2.0.5.0 64-bit Supported PeopleSoft PeopleTools 8.53 with Oracle Database 11.1.0.7.0 Platform Version Supported Version Support Status HP-UX Itanium 11.31 11.1.0.7.0 64-bit Supported IBM AIX on POWER Systems (64-bit) 6.1 11.1.0.7.0 64-bit Supported Linux x86-64 Oracle Linux 5 11.1.0.7.0 64-bit Supported Linux x86-64 Red Hat Enterprise Linux 5 11.1.0.7.0 64-bit Supported Linux x86-64 SLES 11 11.1.0.7.0 64-bit Supported Microsoft Windows x64 (64-bit) 2008 11.1.0.7.0 64-bit Supported Oracle Solaris on SPARC (64-bit) 10 11.1.0.7.0 64-bit Supported PeopleSoft PeopleTools 8.53 with Oracle Database 11.2.0.3.0 Platform Version Supported Version Support Status HP-UX Itanium 11.31 11.2.0.2.0 64-bit (min) Supported IBM AIX on POWER Systems (64-bit) 6.1 11.2.0.2.0 64-bit (min) Supported IBM AIX on POWER Systems (64-bit) 7.1 11.2.0.2.0 64-bit (min) Supported IBM: Linux on System z Red Hat Enterprise Linux 5 11.2.0.2.0 64-bit (min) Supported IBM: Linux on System z SLES 11 11.2.0.2.0 64-bit (min) Supported Linux x86-64 Oracle Linux 5 11.2.0.2.0 64-bit (min) Supported Linux x86-64 Oracle Linux 6 11.2.0.2.0 64-bit (min) Planned Linux x86-64 Red Hat Enterprise Linux 5 11.2.0.2.0 64-bit (min) Supported Linux x86-64 Red Hat Enterprise Linux 6 Linux x86-64 SLES 11 11.2.0.2.0 64-bit (min) Supported Microsoft Windows x64 (64-bit) 2008 11.2.0.2.0 64-bit (min) Supported Microsoft Windows x64 (64-bit) 2008 R2 11.2.0.2.0 64-bit (min) Supported Oracle Solaris on SPARC (64-bit) 10 11.2.0.2.0 64-bit (min) Supported Oracle Solaris on SPARC (64-bit) 11 11.2.0.3.0 64-bit (min) Planned Oracle Solaris on x86-64 (64-bit) 10 11.2.0.2.0 64-bit (min) Supported Oracle Solaris on x86-64 (64-bit) 11 11.2.0.3.0 64-bit (min) Planned Compatibility with Tuxedo PeopleSoft PeopleTools 8.53 with Oracle Tuxedo 11.1.1.30 Platform Version Supported Version Support Status Linux x86-64 SLES 11 Tuxedo 11gR1 (11.1.1.30) Supported Linux x86-64 Red Hat Enterprise 6 Tuxedo 11gR1 (11.1.1.30) Supported Linux x86-64 Oracle Linux 6 Tuxedo 11gR1 (11.1.1.30) Supported Linux x86-64 Oracle Linux 6 Tuxedo 11gR1 (11.1.1.30) Supported PeopleSoft PeopleTools 8.53 with Oracle Tuxedo 11.1.1.20 Platform Version Supported Version Support Status HP-UX Itanium 11.31 Tuxedo 11gR1 (11.1.1.20) Supported IBM AIX on POWER Systems (64-bit) 6.1 IBM AIX on POWER Systems (64-bit) 7.1 Tuxedo 11gR1 (11.1.1.20) Tuxedo 11gR1 (11.1.1.20) Supported Supported Oracle Solaris on SPARC (64-bit) 11 Tuxedo 11gR1 (11.1.1.20) Supported Oracle Solaris on SPARC (64-bit) 10 Tuxedo 11gR1 (11.1.1.20) Supported Linux x86-64 Red Hat Enterprise 6 Tuxedo 11gR1 (11.1.1.20) Supported Linux x86-64 Red Hat Enterprise 5 Tuxedo 11gR1 (11.1.1.20) Supported Microsoft Windows x64 (64-bit) 2008 Tuxedo 11gR1 (11.1.1.20) Supported Microsoft Windows x64 (64-bit) 2008 R2 Tuxedo 11gR1 (11.1.1.20) Supported Compatibility with IBM WebSphere PeopleSoft PeopleTools 8.53 with IBM WebSphere Application Server 8.5 Platform Version Supported Version Support Status HP-UX Itanium 11.31 8.5.0.1 64Bit Supported IBM AIX on POWER Systems(64-bit) 6.1 8.5.0.1 64Bit Supported IBM AIX on POWER Systems(64-bit) 7.1 8.5.0.1 64Bit Supported Linux x86-64 Oracle Linux 6 8.5.0.1 64Bit Supported Linux x86-64 Oracle Linux 5 8.5.0.1 64Bit Supported Linux x86-64 Red Hat Enterprise Linux 6 8.5.0.1 64Bit Supported Linux x86-64 Red Hat Enterprise Linux 5 8.5.0.1 64Bit Supported Linux x86-64 SLES-11 8.5.0.1 64Bit Supported Microsoft Windows x64(64-bit)2008 8.5.0.1 64Bit Supported Microsoft Windows x64(64-bit)2008 R2 8.5.0.1 64Bit Supported Oracle Solaris on SPARC(64-bit) 10 8.5.0.1 64Bit Supported Oracle Solaris on x86-64 (64-bit) 10 8.5.0.1 64Bit Supported Compatibility with Weblogic Server PeopleSoft PeopleTools 8.53 with Oracle WebLogic Server 10.3.6.0.0 Platform Version Supported Version Support Status HP-UX Itanium 11.31 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported IBM AIX on POWER Systems (64-bit) 6.1 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported IBM AIX on POWER Systems (64-bit) 7.1 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Linux x86-64 SLES 11 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Linux x86-64 Red Hat Enterprise 6 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Linux x86-64 Red Hat Enterprise 5 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Linux x86-64 Oracle Linux 6 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Linux x86-64 Oracle Linux 5 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Microsoft Windows x64 (64-bit) 2008 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Microsoft Windows x64 (64-bit) 2008 R2 Oracle Weblogic Server 10.3.6 64-bit 10.3.6(minimum) Supported Oracle Solaris on SPARC (64-bit) 11 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Oracle Solaris on SPARC (64-bit) 10 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Oracle Solaris on x86-64 (64-bit) 11 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Oracle Solaris on x86-64 (64-bit) 10 Oracle Weblogic Server 10.3.6 64-bit 10.3.6 (minimum) Supported Compatibility with Crystal Reports 2008 PeopleSoft PeopleTools 8.53 with Crystal Reports 2008 Platform Version Supported Version Support Status Microsoft Windows (32-bit) 7 Crystal Reports 2008 SP3 Supported Microsoft Windows x64 (64-bit) 2008 Crystal Reports 2008 SP3 Supported Microsoft Windows x64 (64-bit) 2008 R2 Crystal Reports 2008 SP3 Supported Microsoft Windows x64 (64-bit) 7 Crystal Reports 2008 SP3 Supported PeopleSoft PeopleTools 8.53 with Crystal Reports 2011 Platform Version Supported Version Support Status Microsoft Windows (32-bit) 7 Crystal Reports 2008 SP3 Supported Microsoft Windows x64 (64-bit) 2008 Crystal Reports 2008 SP3 Supported Microsoft Windows x64 (64-bit) 2008 R2 Crystal Reports 2008 SP3 Supported Microsoft Windows x64 (64-bit) 7 Crystal Reports 2008 SP3 Supported Compatibility with Verity 6.5.1 PeopleSoft PeopleTools 8.53 with Verity Development Kit 6.5.1 Support Status Verity 6.5.1 Deployment support options for 6.5.1 Search Server Supported HP-UX Itanium 11.31 Verity 6.5.1 Supported 64-bit Type-1 & Type-3 Yes IBM AIX on POWER Verity 6.5.1 Systems (64-bit) 6.1 Supported 32-bit Type-2 & Type-3 Yes IBM AIX on POWER Verity 6.5.1 Systems (64-bit) 7.1 Supported 32-bit Type-2 & Type-3 Yes Linux x86-64 Oracle Enterprise Linux 5 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Linux x86-64 Red Hat Enterprise Linux 6 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Linux x86-64 Red Hat Enterprise Linux 5 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Linux x86-64 SLES11 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Linux x86-64 Oracle Linux 6 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Linux x86-64 Oracle Linux 5 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Microsoft Windows x64 (64-bit) 2008 Verity 6.5.1 Supported 32-bit Type-1 & Type-3 Yes Microsoft Windows Verity 6.5.1 x64 (64-bit) 2008 R2 Supported 32-bit Type-1 & Type-3 Yes Oracle Solaris on SPARC (64-bit) 11 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Oracle Solaris on SPARC (64-bit) 10 Verity 6.5.1 Supported 32-bit Type-2 & Type-3 Yes Oracle Solaris on x86-64 (64-bit) 11 Verity 6.5.1 Not Supported (Need to Setup 32-bit Type-3 No Platform Version Supported Version Type-3 for the Search) Oracle Solaris on x86-64 (64-bit) 10 Verity 6.5.1 Not Supported (Need to Setup Type-3 for the Search) 32-bit Type-3 No Compatibility with Microfocus COBOL NetExpress 5.1 PeopleSoft PeopleTools 8.53 with Microfocus COBOL NetExpress 5.1 Platform Version Supported Version Support Status Microsoft Windows x64 (64-bit) 2008 Micro Focus Net Express 5.1 32-bitWrap Pack 4 (minimum) Supported Microsoft Windows x64 (64-bit) 2008 R2 Micro Focus Net Express 5.1 32-bitWrap Pack 4 (minimum) Supported Compatibility with Microfocus COBOL Server Express 5.1 PeopleSoft PeopleTools 8.53 with Microfocus COBOL Server Express 5.1 Platform Version Supported Version Support Status HP-UX Itanium 11.31 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported IBM AIX on POWER Systems (64-bit) 6.1 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported IBM AIX on POWER Systems (64-bit) 7.1 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported IBM: Linux on System z: Red Hat Enterprise Micro Focus Server Express 5.1 64-bitWrap Pack 4 Linux 5 (minimum) Supported IBM: Linux on System z: SLES 11 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Linux x86-64 SLES 11 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Linux x86-64 Red Hat Enterprise 6 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Linux x86-64 Red Hat Enterprise 5 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Linux x86-64 Oracle Enterprise Linux 6 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Linux x86-64 Oracle Enterprise Linux 5 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Linux x86-64 Oracle Enterprise Linux 5 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Oracle Solaris on SPARC (64-bit) 11 Micro Focus Server Express 5.1 64-bitWrap Pack 4 Supported (minimum) Oracle Solaris on x86-64 (64-bit) 11 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Oracle Solaris on x86-64 (64-bit) 10 Micro Focus Server Express 5.1 64-bitWrap Pack 4 (minimum) Supported Compatibility with IBM COBOL for AIX 4.1 PeopleSoft PeopleTools 8.53 with IBM COBOL for AIX 4.1 Platform Version Supported Versions Support Status IBM AIX on POWER Systems (64-bit) 6.1 IBM COBOL for AIX 4.1.1.1 Supported IBM AIX on POWER Systems (64-bit) 7.1 IBM COBOL for AIX 4.1.1.1 Supported Compatibility with IBM COBOL for Windows 7.6 PeopleSoft PeopleTools 8.53 with IBM COBOL for Windows 7.6 Platform Version Supported Version Microsoft Windows x64 (64-bit) 2008 IBM COBOL for Windows 7.6 Supported Support Status Microsoft Windows x64 (64-bit) 2008 R2 IBM COBOL for Windows 7.6 Supported Compatibility with IBM COBOL for z/os PeopleSoft PeopleTools 8.53 with IBM Enterprise COBOL for z/OS 4.2 Platform Version Supported Version Support Status IBM z/OS on System z 1.13 IBM Enterprise COBOL for z/OS 4.2 Supported IBM z/OS on System z 1.12 IBM Enterprise COBOL for z/OS 4.2 Supported PeopleSoft PeopleTools 8.53 with IBM Enterprise COBOL for z/OS 4.1 Platform Version Supported Version Support Status IBM z/OS on System z 1.13 IBM Enterprise COBOL for z/OS 4.1 Supported IBM z/OS on System z 1.12 IBM Enterprise COBOL for z/OS 4.1 Supported PeopleSoft PeopleTools 8.53 with IBM Enterprise COBOL for z/OS 3.4 Platform Version Supported Version Support Status IBM z/OS on System z 1.13 IBM Enterprise COBOL for z/OS 3.4 Supported IBM z/OS on System z 1.12 IBM Enterprise COBOL for z/OS 3.4 Supported Compatibility with Operating System Operating System Apple Mac OS X(Intel)32 bit Apple Mac OS X(Intel)64 bit Apple iOS IBM: linux on system z HP-UX itanium IBM AIX on POWER System(64 bit) IBM z/OS on System z IBM Linux on System z Versions 1 versions(10.5) 2 version(10.7, 10.6) 1 versions(5) 2 Version(Red Hat Linux 5,SLES 11) 1 version(11.31) 2 Version(7.1,6.1) 2 Version(1.13,1.12) 2 Version(IBM: Linux on System z Supported Status Supported Supported Supported Supported Supported Supported Supported Supported SLES 11, Linux on System z Red Hat Enterprise Linux 5) 5 Versions(Linux x86-64 SLES 11, Linux x86-64 Supported Linux x86-64 Red Hat Enterprise Linux 6, Linux x86-64 Red Hat Enterprise Linux 5, Linux x86-64 Oracle Linux 6, Linux x86-64 Oracle Linux 5) Microsoft Windows(32-bit) Microsoft Windows(64-bit) Oracle Solaris on SPARC(64-bit) Oracle Solaris on x86-64(64-bit) 1 versions(Microsoft Windows (32bit) 7) 5 Versions(2008 R2, 2008, 2012(planned), 7, 8(planned)) 2 versions(11,10) 2 versions(11,10) Supported Supported Supported Supported Compatibility with Application ,Browsers & clients Browser Firefox Google Chrome IBM DB2 Client IBM DB2 Connect IBM Informix Client SDK Internet Explorer Microsoft SQL Server Client Oracle Database Client Safari Versions 1 Releases(17) 2 Releases(Google Chrome 24, Google Chrome 19) 2 Releases(9.7,9.5) 2 Releases(9.7,9.5) 2 releases(3.70.3.50) 2 Releases(10,9) 2 Release(2012, 2008) 3 Releases(11.2.0.3.0, 11.1.0.7.0, 10.2.0.5.0) 2 Releases(6, 5) Support Status Supported Supported Supported Supported Supported Supported Supported Supported Supported Sysbase Open client Microsoft Word Microsoft Excel 2 Release(15.7, 15.5) 2 Releases(2010,2007) 2 Releases(2010,2007) Supported Supported Supported Compatibility with Databases Product Version Support Status IBM DB2 for Linux Unix and Windows 2 Releases(9.7, 9.5) Supported IBM DB2 for z/OS 2 Releases(10.1, 9.1) Supported IBM Informix 2 Releases(11.7,11.5) Supported Microsoft SQL Server 2 Release(2012, 2008) Supported Oracle Database 3Releases(11.2.0.3,11.1.0.7,10.2.5) Supported Oracle Real Application Clusters 3Releases(11.2.0.3,11.1.0.7,10.2.5) Supported Oracle Secure Enterprise 1 Release(11.1.2.2.0) Supported Sysbase Adaptive Server 2 Release(15.7, 15.5) Supported Process Scheduler Server Hardware Requirements • Sufficient disk space to accommodate the operating system: • Intel (Windows) • Intel (Linux) • Z/series (Linux) • HP (HP-UX PA-RISC) • HP (HP-UXItanium) • IBM (AIX) • Sun (Solaris) • z/OS • Backup device • Video controller and display. • Appropriate network interface card and cabling to connect to network. Process Scheduler Server Software Requirements • RDBMS connectivity software • Operating system • Supported SQL query tool • Any required network connectivity software • PS/nVision for PeopleSoft People Tools 8.51 requires Microsoft Open XML SDK 2.0 to generate reports on Process Scheduler Application Server Hardware Requirements • Recommend two processors minimum; at least four processors for production. • Memory requirement is 512 MB (minimum) per server for roughly up to 25 users. After that add 1.5 MB per user for each user beyond 25 users. 1,000 users require roughly 2.0 GB of memory. • Recommend fastest or near fastest processors available. • Sufficient disk space to accommodate: • Oracle Tuxedo (235 MB). • Micro Focus Net Express COBOL Compiler (270 MB). • Database connectivity package varies per platform; check with vendor. • PeopleSoft application server files and code (2.5 GB). • Network interface card. Application Server Software Requirements • Oracle Tuxedo • Database connectivity package. • PeopleSoft application server files and code. • Any required application server patches. • FTP capability. (The delivery mechanism for PeopleSoft “patches” and other PeopleSoft maintenance files is through an FTP server.)