A Global PLM strategy in Ford Motor Company
Transcription
A Global PLM strategy in Ford Motor Company
A Global PLM strategy in Ford Motor Company Dr. Richard Riff, Director Office of the Technical Fellow Ford Motor Company Ford Proprietary 1 Overview • A Global product strategy relies on a global PLM strategy • A global PLM strategy is enabled by interoperability • Interoperability must be achieved at all levels: Ford CC-Max Volvo S40 Mazda3 Primary PrimaryTarget Target 1. Geometry and Topology 3.CAD metadata (PMI, annotation , Weld, layers & groups) 2. Assembly Hierarchy Level 1 2 • r d 5-Door F o c 4-Door u s Wagon Mazda5 independent of CAD tool Volvo C70 4 5 6 8. CAD History Tree, Design Intent, geometry supporting info 7 8 9 Level-2 Interoperability across PLM Processes and Components Increasing Levels of complexity Level-1 Data & Tools Interoperability across core design and engineering activities • • • • o 9. Common user interface, common data model 5. Design-in-Context – Tessellation, 7 PDM driven data Precise, Onexchange, PMI Demand 4. Interface to ancillary products (CAx, 6. Associativity support EESE, etc.) (change notification) 3 F 3-Door Next: Next:Re-mastering Re-mastering Volvo V50 Product Definition (Geometry) PMI & Metadata Analysis and Attributes PDM-Enabled • • • • PDM BOM MFG Systems and Processes Requirements& Assumptions Ford Proprietary Level-3 Interoperability across global vehicle programs • Global Platform • Global Commodities • Global Release & Change Management • Enabled by Standard Information Model 2 Interoperability – Level 1 Product Creation Core Tools • CAD Interoperability – Working with geometry in one CAD tool with reference geometry from another CAD tool • PDM Interoperability – Product Data is shared and exchanged between multiple purpose product data management centers. • Visualization-based Interoperability – Product Data Pipeline – Data sharing and collaboration across multiple design and engineering disciplines using efficient product data representation. Ford Proprietary 3 C3PNG Levels of CAD Interoperability Primary Target Level 1 2 3 • 4 5 Next: Re-mastering 6 7 8 9 Increasing Levels of complexity Ford Proprietary 4 Product Creation Systems A Global PDM - Teamcenter Centric Integrated CAD/CAM/CAE/PIM and Global Solution - PDM / CAD Overview Visualization P1.J+Platform Landscape Digital Factory (EMS) Digital Product Structure CC to EMS BOM Authoring Over 16,000 Users Distributed Digital Vehicle Over 100 Vehicle Programs AVBOM 74 Data Distribution Servers Integrated Clash Management IDEAS CATIA V4 / V5 Teamcenter Engineering with Multi -Site Ford Proprietary PDV Issue Management 5 JT-Based Interoperability: Multi-CAD Design in Context Teamcenter Engineering Benefits: – Multi-CAD / Single PDM Environment – JT Generation via Engineering Translation Services – JT Read Capabilities in CATIA V5 and IDEAS – Seamless Integration. No manual translation/exchange is necessary History: JT Read/Write – Began Development in 2001 – Initial Production in 2003 – Currently Deployed World-wide IDEAS 12/8/2005 Copyright © Ford Motor Company, 2005 - Ford Proprietary Ford Proprietary CATIA V5 6 6 Vision Along the JT Pipeline 360 Exteriors Environment & Studio Animations Full Vehicle Buck Plant Visualization 1st Buck “On Road” Ergo-based Serviceability (1996) (1998) (1999) (2000) Mfg PMI (2000) Released Content Service Manuals (2000) (2001) Digital Occupant (2001) Dealers 360 Interiors EnvironmentCatalogs & Studio Ford GT Marketing Colors PD and Mfg Illustrations Marketing 1st Marketing For 20 Vehicles Process from JT (2007) Service Tools “InClass” Digital Pre-Assembly (2003) Swept Volume (2004) for Serviceability (2005) (2005) (2006) (2006) Options & Specs Images (2007) Wheels Photo-Realistic Engineering LIVE Reviews (2007) Immersive Buck (2007) “Shadowed” Underhood Drawings Interactive Service Pubs (2007) (2008) Safety Cage Ford Proprietary Web-based Build Powertrain and Price (2008) 7 JT Pipeline JT Enabled Interoperability across core PD tools Services PD/KBE TCVis IooDraw VisJack IooDraw VSP Adobe Illustr. PDV 3DsMax AutoTrol TCViTransCabels PDV Indirect PDV Jack PDV Jack Jack TCe Jack TCe DTCe Buck DVVT Buck VVT JT Pipeline Mfg TCM eMS Jack FIDES PartViewer EMS Planner DASSAULT SYSTEMES Confidential PTO CAE Mashing TessOnDemand ePEds PTO Buck 9 Ford Proprietary Corp Design ICIDO Opticore Bunkspeed 9 Global CAE Strategy • BOA – Bill of Analysis • Clear link between CAD and CAE Teamcenter Based Integration CAD BOM CAD Component CAE Component Ford Proprietary CAE Model CAE Results 10 Achieving Geometric Compatibility Requires Aligned BOM, CAD and DPA Processes BOM Authoring Project Mgmt D&R Engineer Weight Finance Primary Designer Digital Buck IPS PPM Vehicle Operations Package Service Recyclability CD338 Yes Yes U387 Yes Yes Yes C170 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Single Bill of Material with a Defined Maturity and Freeze Cadence D385/6 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes P415 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes D471 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes S197 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Configured CAD Data Aligned to BOM • Production End Item Based Design Solutions CAD Authoring / Config • Collaboration Structure for Layouts and Studies • Manufacturing Structures aligned to BOP Zone Layout / Digital Validation Management and Delivery of Geometric Compatibility • Cascade System and Comp Design Requirements • Validates Digital Control Models • Manages Geometric Issues and Resolution Ford Proprietary 11 Digital Pre-Assembly DPA 0 DPA 1 DPA 2 DPA 3 Function Static Nominal Taisen Craftsmanship Tolerance • Dynamic displacement • Movement • Heat Clearances • Variation • Clearances • Positional correctness • Interface completeness DPA Owner: Block Leaders DPA Owner: Block Leaders UN & UP UN & UP DPA 4 DPA 5 DPA 6 Service Mfg/ Assembly Package/ Ergo • Design Appearance • Margins/ Flushness • Grains / Gloss • VSA Focus studies agreed by Design, Program & VO • Removal • Access • Damageability DPA Owner: Craftsmanship DPA Owner: Craftsmanship DPA Owner: FCSD DPA Owner: VO & SBU ME DPA Owner: Basic Design Package UP UP UN & UP UN & UP UN & UP Craftsmanship Specifications Appearance Tolerance Service Specification Mfg/Assembly Package/Ergo • Formability • Assembly Process • Plant Floor Ergonomics • • • • • Ingress/egress Reach Vision Accessibility Spatial Relationships Requirements Verification DPA Assessments Geometric Verification, Compliance to Standards Functional Specifications • Material • Key Life • Component Nominal Taisen • Component System & interface requirements. • Exterior • Interior • Under Hood • Acceptance Criteria for Component Variation Ford Proprietary • Component Standards for Service • Component Mfg Standards • Component Ergo Req • Control specs • Component Package Standards • DFA Req 12 Fully Integrated Digital Prototyping Environment Mfg Rich Client Teamcenter 2007 BOM Authoring ICM CCDB Rich Client Thin Client FIDES ICM - Integrated Clash Management AVBOM Issue Management IDEAS CATIA V5 TC Vis Clash Mgmt Req. Mgmt Integrated Reporting Digital Prototyping Ford Proprietary 13 Significant impact on the Results • Hard work on Process Improvement • Maturation of Tools and Collaborative Capability Ford Proprietary 14 Interoperability Level-2 Current Ford PLM Environment Ford Proprietary 15 Current Ford Network Landscape Ford Proprietary 16 C3P NG Deployment Landscape • Multi-Site data sharing established across all sites • Each site can exchange data with any other site • Consolidation effort is currently under way Digital Buck Sites Teamcenter Sites Legend 1) pbtdm01.petersburg.ford.com RUSSIA # Host.servername (location) 1) Otosan_Koaceli.136.10.106.11 TURKEY 2 3 1 1) Eccha1.Pd3.ford.com (Dearborn) 2) dsc164033.pd3.ford.com (Dearborn) 3) Waptdm.ba.ford.com (Wayne) 4) Tcptdm.ba.ford.com (Twin cities) 5) vcs007.vcs.visteon.com USA 5 4 6 1) Cautdm.Cuautitlan.ford.com MEXICO 11 8 7 COUNTRY Pink: Need to confirm if receiving dbucks 1) Srvsun.cambiano.ford.com ITALY Red: Scheduled decommission 1) Mkdbd13b.neihl.ford.com 2) G1db02.niehl.ford.com 3) Dffa017.aachen.ford.com 4) Slc3psrv.saarlouis.ford.com GERMANY 1) gkc3p1.genk.ford.com BELGIUM 1) wasv104.warley.ford.com 2) U1db02.dunton.ford.com UK 1) uvg003.c3p.mazda.co.jp JAPAN 1) Vac3pser.valencia.ford.com SPAIN 1) Chnbuck.chongqing.ford.com (changan) 2) C3pnj01.nanjing.ford.com 3) Fcobuck.nanjingrec.ford.com 4) Jmcdbuck.nanchang.ford.com CHINA 9 1) edms.taiwan.ford.com TAIWAN 1) 19.199.50.46 PHILIPPINES 10 1) Bratdm4.nordeste.ford.com (Camacari) 2) Bratdm1.saobernardo.ford.com BRAZIL 1) argtdm.arg.ford.com (Pacheco) ARGENTINA No Dbuck currently (Chennai) INDIA 1) Foapdv.fcs.foa.ford.com AUSTRALIA 2 1 3 4 5 Ford Proprietary 17 Sharing information across all PLM systems and tools Electrical Domain Business BusinessSystems Systems Model Based Design Issue MGR Virtual Verification HiL Validation WERS AIMS Product Creation Systems TeamCenter UA • User Interface • Workflow manager Requirement Management Communication Functional Definitions MPNR Parts Lib CCAS AVBOM Ford Proprietary 18 Systems Engineering Framework Integrating CAD/CAE and VSEM VSEM C3P – PD/Mfg. C3P - CAE 1 Holistic Cross – Domain Requirements Management Aligning functional requirements systematically across software, electronics, mechanical 3 2 Mechatronics Architecture (applied to Holistic Req. Mgt. Solution VSEM) supporting requirements, parameters, calibration, test, etc. Manage Requirements and Validations in context of vehicle / functional structure 5 4 C3P / VSEM Convergence CAE Data Management 4a 2a 3a VSEM 2010 Project SetK / eFDVS Requirements Mgt. Ford Proprietary CAE/Req./Test Data Mgt. 4b Mfg. Feasibility 19 VSEM Infrastructure: Information Architecture Black Box Other Domains PLM Product Development Data Back bone Vehicle, Features, CAE,SW -part, HW-part…. Electrical Domain Design information (Sand box level) White Box Model Based Design Virtual Verification HiL Validation TeamCenter UA • User Interface • Workflow manager Requirement Management Communication Functional Definitions Global Enterprise information Electrical domain information • Leveraging standard data exchange formats • Minimize the number of E/E development tools Page 20 Local information in point tools Defined Exchange formats • Leverage existing Corporate infrastructure • Global data replication supporting LCC development • Allow best-in-class design tool usage 20 Ford Proprietary Interoperability – Level 3 Business Transformation Old Way New Way Regional Global Global Platforms Program Centric Global Commodities Differentiated Top Hats Ford Proprietary 21 C1 TECHNOLOGIES BEGAN THE PROCESS Ford C-Max Volvo S40 Mazda3 F 3-Door o r d 5-Door Volvo C70 F o c 4-Door u s Wagon Volvo V50 Mazda5 "If you look at C1, it's almost a microcosm of what we're trying to do in the enterprise as a whole,'' "Having a very strong and capable platform - and on top of that you put very unique products that are unique not just in how they look but are very consistent with the individual brand DNA.'' - Derrick Kuzak Ford Proprietary 22 Key Business Drivers Summary Key Business Drivers: Capability o Provide an integrated Process/Methods/Tools Solution set with improved capabilities versus today o Improve Vertical integration within Brands o Required to provide BIC capability for Product Creation (Time to Market, Efficiency, Quality) Commonality o Enable product commonality cross brand (Platform, Commodities, etc.) o Improve Horizontal integration across Brands o Required to support increased cross brand technology sharing (e.g. CD3s, C1, EU-CD, B2e, etc.) Ford Proprietary 23 Global Product Creation Hierarchy of Enablers Reduce Time to Market Business Priorities Reduce Cost Increase Profitability Capability & Commonality Commonality Key Business Strategies Distributed Engineering (LPEA, Commodities, PTO) Cross-brand Manufacturing Platform Consolidation & Part Commonality Cross-brand Purchasing Cross Brand Efficiencies in Product Creation Major Process/ Data / IT Enablers* Commonality Governance GPDS and common Processes C3P-NG Single Product Definition Common BOM (Eng, Purch, and Manuf)* Transparent part number structure Other Key enablers include: Engineering & Manufacturing Standards, Systems Library Proposed Framework for prioritizing Process/ Methods/ IT Enablers Ford Proprietary 24 Release Management Current Capabilities • Automated processes exist mostly within given toolsets and functions – – • Hybrid Solutions exist at key functional or organizational touch-points within the Product Lifecycle – – • Time based triggers (BOM Scrub to meet milestones) Less Formal Approval Required (Early Vehicle Program Changes) Wide variation in CAD release methods cross functions – • CAD & Engineering (CAD / BOM Reconciliation) Engineering & Purchasing (Part / Supplier Sourcing) Non-Automated workflow processes tend to be found at soft-points within our processes. – – • CAD Change Management Workflows (TeamCenter Engineering) Worldwide Engineering Release System (Home-grown) Powertrain, Chassis, Body and across Vehicle/PT Development Centers Overall loss of business efficiency due to: – – Variation in methods on global programs - vehicle teams follow different process based upon localized methods Audit-based process adds unnecessary time and complexity to release/change process, and false sense of integrity of release/change event Ford Proprietary 25 Strategic Workflow Direction Metrics produced directly from the process Business Process Metrics & Reports Users interact with a single process Removes complexity Users don’t have to know the whole process CPE Purchasing Manufacturing Engineering PPM Process is mapped and codified: Scaleable Captures intellectual property CAD Designer TCe CMMS3 MPNR AIMS WERS WIPS Back office environment is hidden from users Ford Proprietary 26 Global P-Release and Change Management Objective: • Deliver streamlined global Process for P-Release and Change Management built upon the principle of ensuring BOM and supporting virtual data accurate and validated prior to P-Release and all production changes by: – Use of common global process across all functions and supporting global supplier business environment: eliminates process variation across CBG and/or Engineering Functions. – Bundling virtual data into a single Teamcenter object to support virtual review, validation and signoff in Teamcenter: eliminates data re-entry, elimination of CAD information in WERS, eliminates use of review and signoff functionality in PPM Audit. – Providing pre-validation tools to ensure that all of the data in the virtual environment supporting the release/change is aligned to the BOM (production drawings/CCTM, in-context DPA validation): eliminates need for PPM Audit validation checks. Ford Proprietary 27 Example: New Global Purchasing Strategy • Global supply base - “Aligned Business Framework” • Reduce key supplier base 50%, – Mutual profitability and improving quality – Two or three global suppliers per commodity • Regional suppliers on an exception basis • Develop “Commodity Business Plan” – – – – – 100+ sets of components Reduce complexity and what is the Migration plan with suppliers Technology Manufacturing footprint Ford Proprietary 28 New Global Purchasing Strategy New Information and Interfaces Component Group 1 Strategy Global Sourcing Area 1 ABF Supplier 1 Component Group 2 Strategy Global Sourcing Area 2 ABF Supplier 2 Global Sourcing Area 200 ABF Supplier 200 Vehicle Program 1 Bill of Material 1 Component Group 100 Strategy Ford Proprietary 29 New Global Purchasing Strategy New Information and Interfaces Component Group 1 Strategy Component Group 2 Strategy Vehicle Program 1 Global Sourcing Area 1 ABF Supplier 1 Global Sourcing Area 2 ABF Supplier 2 Global Sourcing Area 200 ABF Supplier 200 Bill of Material 1 Component Group 100 Strategy Ford Proprietary 30 New Global Purchasing Strategy New Information and Interfaces Component Group 1 Strategy Component Group 2 Strategy Component Group 100 Strategy Bill of Material 1 Global Sourcing Area 1 ABF Supplier 1 Global Sourcing Area 2 ABF Supplier 2 Global Sourcing Area 200 ABF Supplier 200 Vehicle Program 1 Ford Proprietary 31 New Global Purchasing Strategy New Information and Interfaces Component Group 1 Strategy Global Sourcing Area 1 Component Group 2 Strategy Global Sourcing Area 2 Vehicle Program 1 ABF Supplier 1 ABF Supplier 2 Bill of Material 1 Component Group 100 Strategy Global Sourcing Area 200 Ford Proprietary ABF Supplier 200 32 New Global Purchasing Strategy New Information and Interfaces Component Group 1 Strategy Global Sourcing Area 1 Component Group 2 Strategy Global Sourcing Area 2 Vehicle Program 1 ABF Supplier 1 ABF Supplier 2 Bill of Material 1 Component Group 100 Strategy Global Sourcing Area 200 Ford Proprietary ABF Supplier 200 33 Business Information Standards and Integration Enable Cross Functional Collaboration Process – What work needs to be done when (e.g. GPDS process specifies timing and deliverables of gateways) Methods – How to do the work (e.g. business rules and workflow to complete process deliverables) Information Data at the point of decision (e.g. What does “Fuel System” mean? Does “Fuel System” mean the same thing to an engineer in Europe and an engineer in FNA?) Tools Applications – software customized to Ford’s needs (e.g. PeopleSoft, WERS, CMMS, ACM, SOE/SOF, etc.) Infrastructure – network, computers, operating system, DB To deliver the collaboration required for Ford’s global transformation information needs to have the same meaning to all stakeholders globally. Information needs to comply with documented and accessible standards Ford Proprietary 34 Information Standards for the Industrial Backbone: Driving Efficiencies and Integration Working with Global Platform Programs and Process Owners to leverage standardized information to deliver GPDS efficiencies and cross-functional integration PAF Nodes in TCe PAF Nodes in TC Mfg. Manufacturing Engineering Efficiencies BOM lines w/ PAF CAE templates in PAF CAE NGD Efficiencies CBP content in PAF Structured Assumptions in PAF CBP content in PAF BOM lines w/ PAF BOM lines w/ PAF Commonality and Complexity by PAF Robust inclusion of CBP direction upfront Automatic validation of CBP direction in BOM Cross platform control of commonality and complexity Platform Deployments: •B • CD •C Results: increased business satisfaction from IT delivery, defragmentation of IT landscape Examples: • PAF enables Global Commodity Hub effectiveness Wiring Interior Chassis Vehicle GVPA (Version 2.3.2) Exterior Power Source Compartment • Sunsetting of GPA simplifies IT deliverables Body Structure Ford Proprietary Key Business Tools Impacted - Current Cycle Plan 1 495 496 497 498 499 500 503 504 506 507 509 510 UID; PAF 01.01.01 Front Floor Front Floor Pan Rocker Panel Assembly - Front Floor Rocker Panel - Front Floor P525: Achieve weight reduction thru reduced WB by 189mm Torque Box U22x/P525: Torque box and front longitudinal is common and c/o P415 Front Floor pan U22x: New front floor pan. P525: New 1-piece floorpan (front half is geometrically similar to U22x, rear is new). Note: Front seat attachment points are common between U22x and P525. 2R P525 attachment points c/o P415 crew cab. Rocker Reinforcement New - Rocker reinforcement for U22x to meet FMVSS208. New - P525 Rocker reinforcement to accommodate new design Cross Member #1 Assembly - First Row Seat Cross Member #1 Cross Member # 1 U22x/P525 - Carryover P415 Cross Member #2 Assembly - Second Row Seat Cross Member # 2 U22x: c/o U22x Cross Member #2 P525: Modified U22x (stamping common with U22x with body mount cage nuts and reinf removed) Cross Member #3 Assembly - Front Floor Rear Cross Member #3 Cross Member # 3 U22x: c/o U22x P525: c/o P415 Longitudinal Rail - Under Front Floor P525: New Mid F/A Members between Cross Member #1 and #3 Rails/ Members floor side New - P525 Floor Side Inners (side sill) New - P525 for length. New U22x PAF; BMI Cost QPIP GRM ADrivers P525 - CI cpscDetail P525 ABC U22x ABC U22x TCI C 2011 2011 2011 2011 U22x U U22x U P415 XP U22x P 2011 U22x P 2011 2011 U22x P U22x U N/A Proposed Proposed Proposed Proposed System Default C N C M Proposed C Proposed N Proposed Proposed N N 2012 2011 2012 2012 2011 2011 2011 ASAP U22x P415 U22x U22x XU U XP U Proposed Static, Apvd PDF File No Yes Proposed No Yes Proposed No Yes Proposed GRM No Yes P415 XP Proposed No No No Basis U Proposed No P415 P415 U U Proposed Proposed No No GREM 100 Map to PAF in Process Indexed TS Tracker Target Setting PSA/Targets PAF; PSA LOU Scrub NPI GMCD GPLUS No No No System Default N N C C C N CPSCII/PAF Indexed Stub AVBOM II Scrub Assumption Scrub P525 - TCI P525 - TCI U22x - TCI FilterFlags Longitudinal Rail - Under Front Floor Front Floor Side Member Extension Reinforcement - Front Floor Side Member Comments PAFDetails WordAssumptions U22x ABC CI Structured Assumption Index 00.00.00 Complete Vehicle System 01.00.00 Body System 01.01.00 Body Structure Subsystem 518 520 534 P525 Variants Program Direction CPSC Word Assumptions (SALT) RowID AVBOM II Creation U22x Variants CPSCII/PAF Indexed Stub WA Revisions GCH-CBP WAConversion • Part Address Func. (PAF) • CPSC II • Base Part to Commodity • BOM file scope (PT/VL) • Engineering Modules • Features, and PAF rel. MappedMetrics EPIC Business Information Standards and Quality Vignette Drivers EPIC Business Information Standards and Quality New process for creating information standards sustainable standards and quality U22x TCI Status Mapping of all the Base Parts globally That fulfill the Same Function Support Long term Sustainment Enablers (Bus. and IT) Transition to Long term Sustainment Bus. and IT P525 - TCI Status Part Address Function: Globally agreed Taxonomy of Part Functions U22x Based On MY Clean Up Data Master source for which CSS contains which CPSC Long term Sustain. Plan PAF in CBP Revolutionary New info. Req. Evolutionary Clean up existing Governance Info. Scorecard Ad-hoc Clean up Tooling Std. & Clean up Plan CSS (Usage) Interior Trim PMT 3 FSAO - B7CTB Bracket - Park Brake Cable to Frame or Body Brakes PMT 3 FSAO - Chassis Wheels Tires Jacks and Equipment PMT 4 FSAO - DTSE Driveline PMT 4 FSAO - PTSE Powertrain Mounts PMT 3 FSAO - F6QGZ Tube - Hydraulic Electrical Control Unit (HECU) to Brakes PMT 1 FSAO - Body Exterior Fixed Glazing PMT 5 FSAO - EESE Power Supply PMT 5 FSAO - IC2ZD Speaker - Park Assistance Module Body and Security Electronics PMT 2 FSAO - Body Interior Interior Trim PMT 4 FSAO - XYVDH Clutch Assembly JD3VG Clutch Disc 8S9Z7 Clutch Pressure Plate 030501 PMT 4 FSAO - PTSE Dressed Engine Closures and Lids BIW 010205 PMT 1 FSAO - U3XTF Hood Support - Stay / Prop Rod 060603 040401 050401 020307 060603 011105 030603 131301 010604 080102 P525 - Based On MY EPIC Business Information Standards and Quality Std. & Clean up POC Unique ID Part Address Function (PAF) CPSC (Usage) PMT(Usage) (Usage;Co (Usage;Component Usage) 010507 PMT 2 FSAO - Body Interior Prefix (Ford Base (Ford Suffix Level Part) Part) (Ford Part) Name(Ford Part) 0 CN15 A31017 AAW CVR ASY QTR WHL/HS TR 1 W712474 S439 CLIP 8X16X0.8+1.2 PNL PSH IN STL 0 8V51 2251 AB CLP BRK LN TO RR AX 0 7M59 1040 HA WT WHL BAL 0 W500034 S442 BOLT M10X30 HF 8 0 W520415 S442 NUT M12 HF 8 0 CN15 2263 DA TUB ASY FRT WHL BRK 0 CN15 A29710 AA GL QTR WDO 0 W500125 S415 BOLT-M10X1.5X65 HEX FLANGE HEAD 0 3W83 15K864 AA SPKR-PRK AID 0 CN15 N20356 AA INS FRT DR O/S PNL SND 0 8V21 7540 DC CL DSC & PLT ASY 1 8V21 7550 DB DSC ASY CL FRT 1 8V21 7563 DC PLT & CVR ASY CL PRESS 0 W520413 S442 NUT M8 HF 8 0 CN15 16A931 AA PROP ASY HOD SUPT Engineering Interactions Information Standards Governing Interfaces Current State Data Asses The Global Core Engineering Common Systems Structure (CSS) Agree Interfaces U22x Based On Program Information quality metrics assessing compliance with information standards Synthesis Decomposition Six Sigma analysis of cross-functional information interfaces Required to deliver strategies Stakeholders & Governance Information Standards Example: CPSC II / Part Address Function – standardizing vehicle systems / part functions / base parts Systems Scope PAF in PAF in Mfg. Eng. Assump. Information quality metrics assessing “fit for purpose” Criteria of Merit Projects Scope PAF in BOM Cross-Functional and Global Information exchange required to deliver strategies Principles Org. Scope PAF in DPA Data Maturity Model (who gives what to whom, when, and at what quality) EPIC Business Strategies and Objectives Information Standard Development Process Business Technical Scope Scope Working with “left hand side” organizations to deploy standards – PAF example PAF in EIC CAD. EPICBusiness BusinessInformation InformationStandards Standardsand andQuality Quality(BISQ) (BISQ)project projectanswers answers“what “whatare arethe theglobal global • •EPIC informationstandards standardsrequired requiredtotodeliver deliverthe theEPIC EPICbusiness businessobjectives objectives information UseaaSystems SystemsEngineering Engineeringapproach approachstarting startingfrom fromEPIC EPICobjectives objectivesand andstrategies strategies • •Use Endresults: results:support supportfor forEPIC EPICproject projectteams teamsininintegration, integration,and andEPIC EPICInformation InformationStandards StandardsScorecard Scorecard • •End Systems Engineering and Lean Six Sigma Approach EPIC BISQ: using methods known and trusted by the business Systems Engineering Applied to EPIC Cross-Functional and Cross-Project Information Integration Creating robust global information standards for the industrial backbone P525 - Based On Program Defining the information landscape required to deliver EPIC and OneFord SAL/CPA Tracker Key Commodities v6 High Hurt Complexity Commodities CPSC II; Commodity Code -> PAF CPSC II; Commodity Code -> PAF PSA Top 100 Tooling v9 Part Mgt (Investment Efficiency) Enterprise Search “cpm” => Core Program Mgmt Process and Tools Integration => PAMS Prod Assumpt Mgt Sys => Product Assumptions Mgt Sys PAMS – PMTI Review Ver 1f.ppt p. 19 of 16 List, not Indexed pbarrow/rmille10 Proprietary GIS 25.01, S + 3 Business Results: Manufacturing Engineering: Without PAF we can’t contain the requirements of a global Manufacturing Engineering process Digital Innovation: PAF based reporting drives CAD-BOM alignment, and the CAD structure Attributes (NVH): It’s going to greatly improve the process for engineers, enable identifying issues early, and constantly staying on the status of the CAD Global Material Cost: Detailed BOM comparisons that took weeks can be done in minutes, it’s a major enabler for us Program Management: prior solutions addressed multiple symptoms, they never provided a platform the business can cross functionally converge, I feel [with PAF] we now have the critical mass 35 Thank You 36