rL fr/ou

Transcription

rL fr/ou
UEM@
our Ref. : UEIvIB/SO/PSB/L/JKSB/
02nd
006q*20
A member of UEM Grou p
I
2
.
-
-.{-
r)
/.
,r
',-.1
February 2012
i'.L.,.,j'
f\
--l
{
,
JAMBATAN KEDUA SDN. BHD.
3C, G1 & 2, Persiaran Bayan lndah,
Bayan Bay,
11900 Sungai Nibong,
Pulau Pinang.
.
-'v\-J
, ,.'-1.' \J
"'
C"-':'i -\.n
l,
Attn : Encik Hamizol Ngah
Dear Sir,
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
PACKAGE 2: SUPERSTRUCTURE WORKS OF APPROACH SPANS
- Submissian Of Safety And Health Monthly Report No. 32
We are pleased to submit herewith three (3) copies of "Laporan Keselamatan Dan Kesihatatt
Bulan January 2012"
Thank you
4lot
'Work With Safety'
7r
$lv
I
I
I
I
Yours faithfully,
UEM BUILDERS BERHAD
'[r
+
8rlart
iF + ]f]fn
a?^A
t ra 91 ),
I
I
I
I
I
I
i
1
I
tWi- PaAt.,t
rL fr/ou
IR. WAN AZMAN BIN WAN SALLEH
Project Director
c.c
Yg. Bhg. Dato' Prof. lr. Dr. lsmail bin lVlohamed Taib
Encik tVlahd Anuar Embi
Encik tVlohd Rizarn Abdul Ghani
- tVlanaging Director, JKSB (KL)
- Director, DOSH
- UE[/l Safety HOD (HO)
a
ZAltasha
Site office
pZB project Site Office Cornplex, Lot 282, Mukim 13, Batu Kawan, 14100 Simpang Ampat, Seberang Perai, P. Pinang
Tel : +604-5639000 Fax: +604-5639001
Head office
UEM Builders Berhad
(29354-H)
No.5A, Jalan 51/217,Ott JalanTempler,46050 Petaling Jaya, Selangor, Malaysia
Tel:+603-76517000 Fax:+603-76209010 Website:www.uembuilders.com
No. 32
KERAJAAN MALAYSIA
SYARIKAT KONSESI
LEMBAGA
LEBUHRAYA
MALAYSIA
JAMBATAN KEDUASDN BHD
PROJEK PENSWASTAAN JAMBATAN KEDUA PUTAU PINANG
LAPORAN KESELAMATAN DAN KESIHATAN
BULAN JANUARI 2012
DISEDIAKAN OLEH
UEM&
UEM BUILDERS BERHAD
No 5A,Jalan 5L/2L7,
Off Jalan Templer,
46050 Petaling Jaya.
JANUARI2Ol2
I
l
I
*2
jAMBATAN
XmUA
SDN. AHD
Grs?3-U)
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PEI{ANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEME
Irrfllr,'rF
SAFETY & HEALTH MONTHLY
REPORT ENDORSEMENT SHEET
Report No. ( Period Ending )
Gontractor
:31 JANUARY
2012
: UEM Builders Bhd.
I
This report is prepared by
:
HSSE Safety Manager:
Zamzuri bin Ariffin
UEM Builders Berhad
Signature
:
Sdn.
Date: O Z
ltbd
i
I hereby confirm the content
in this report is true and accurate.
Project Director :
lr. Wan Azman bin Wan Salleh
UEM Builders Berhad
Date
,I
:
L
UEM Builders Berhad
4'n Floor, lvlenara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lam a, 5Bl 00 Kuala Lum pur
Safety Report No. 32
JAMBATN
KDt'A
SDN.
Dt{D (8A5?3-tD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEME
rIfitilff{
TABLE OF CONTENT
Section
1.0
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
3.0
3.1
3.2
3.3
4.0
4.1
4.2
5.0
6.0
Description
I
Executive Summary
.
.
.
,
.
.
.
.
.
Summary of the Report lor January 2012
Site Work Activity
Summary of Man Worked Hour for theYear 2012
Manpower Record
lvlinutes of Safety, Health and Environmental Committee t\Ieeting
Non-ConformanceRecord
Machinery and Equipment
Audit and lnspection
Accident / lncident Report and Statistic
.
,
.
.
Training And Education
First Aider Name List
Safety lnduction & Toolbox Talk
UEMB Staff and Workers List
.
.
.
Project Organisation & HSE Committee Ghart
UE[t/ Builders Sdn. Bhd. Safety Department Chart
!
Safety Committee Chart
Site Safety Photo
Safety Signages Layout
UEM Builders Berhad
2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
4'n Floor, Ivtenara
Safety Report No. 32
1.0
UEM
BUILDERS
Second Penang Bridge
Safety and Health Monthly Report:
JANUARY 2012
Executive Summary
.i>.
;,
,AMBA',IN
KDUA SN. Btfl
(E2t5?l-tD
UEM\J
rnfinrfi!
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
1.0 Executive Summarv
HSE STATISTICS FOR THE MONTH OF JANUARY 2012
urer Sfatrstics
Item
Description
Quantitv
Average number of manpower for this month of January 2012
Man Days worked for the month of January (711x 26 davs)
Man Hours worked for the month of January fi7 ,064 x 1 0 hours)
Man Hours worked for the month of January W.L.T.l
TotalWorkdays Lost
a
b
c.
d
e.
Health and Safe
711
17,064
170,640
170,640
0
Personnel
Item
Position
Quantity
Safety Manager
Senior Safety Officer
Safety Officer
a.
b.
C.
Environmental
d
e.
1
1
1
fficer
3
Safety Supervisor
Medical Assistant
5
f
g
FirstAider
13
lncident
1
/ Accident Stafi.stics
Quantity
Item
Type
This Month
a.
b.
c.
d.
e.
f
Major
Fata!
Minor
Major
Fatal
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
FATALITY
BODILY INJURY
DAMAGE TO PROPERTY
OCCUPATIONAL DISEASE
OCCUPATIONAL
POISONING
NEAR TUISS
TOTAL
s.
Accumulative 2012
Minor
0
THEFT
No. of Lost Time Accident
Non. Lost Time Accident
Frequency Rate
lncidenVAccident Rate
Severity Rate
Fatality Rate
Frequency Rate =
Fatality Rate
No. Lost Time Accident X 1.000.000
Total Manhours Worked
No. of Fatality X 1.000
Severity Rate
=
lncident Rate
=
Annual Average Em ployment
Total Workdavs Lost X 1.000.000
Total Manhours Worked
No. of Accident X1,000
Annual Average Employment
NOTE : Near miss to be included into incident / accident statistic
Theft is recorded for security purposes only, not included into incident / accident statistic
UEM Builders Berhad
Safety Report No. 09
4'n Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
2.0
UEM
BUILDERS
Second Penang Bridge
I
Safety and Health Monthly Report:
JANUARY 2012
Summary of the Report
,O-
<_
.,AMBATN
rIiDriA
SDN.
UEM\A
rtfffiEB
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
BtiD (sas?3-rD
2,1 SITE WORK ACTIVITY
Description of Activity
Location
a
Quay Jetty
Pier 1 17 - Pier 67
(North and South)
Pier 267 - Pier 216
(North & South)
.
.
.
.
.
Launching segment and stressing
lnstallation of bearing and grouting
Tendon grouting for 1't stage PT
ln-situ closure pour
102 nos span completed as of 31't January 2012
.
o
o
o
o
Launching segment and stressing
lnstallation of bearing and grouting
Tendon grouting for 1't stage PT
ln-situ closure pour
100 nos span completed as of 31't January 2012
.
Parapet Works
Ferrying goods, passengers, workers and visitors to work
front
.
.
3675 nos (cumulative) precast parapet completed as of
January 2012
Rectification works in progress
Sand blasting activities
UE M Builders Berhad
Floor, Menara 2, Faber To,vers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
4'n
31"1
Safety Report No. 32
<_
JAMBATAN f,EDTIA SDN.
B}D
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
(82I'7}ID
Package 2: Superstructure Works of Approach Spans
UE}^G
@
2.2 SUMMARY OF MAN HOUR WORKED FOR THE YEAR 2012
l
Months
No
1
Worked
170,640
January
TOTAL
ti
Work
Force
Work
Days
170,640
711
24
170,640
711
24
Man -
UEM Builders Berhad
4n Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
lative
Safety Report No. 32
,}
J MRATN t('11)t'l
SDN.
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
BrrD (8457I(r)
UEM\,
ffiffi
$,J[.1
711
Average Manpower for January
2012:7Il
?il0
r:it-l
{i1r"r
>\
l:)
rS
CT
3,10
:(ril
irlCI
CI0000000000
r:r
T..-
Aug' 12 Sep' 12 Oct' 1 2 Nov' 12 Dec' 12
Mo
UElvl Builders Berhad
Menan2, Faber Toilers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
4'n Floor,
Safety Report No. 32
rD'
'I
L
, MBATN
KEDtTA SDN. DllD
6as7l-tD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEM\3
rcryr'ffI{
2.4 MONTHLY SITE SAFETY MEETING
2012
DATE
VENUE
REMARK
January
i
l
UEM Builders Berhad
4th Floor, Menara 2, Faber To/vers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
I MSAlAN l(Itr)tlA
UEM
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
SDN. Bl ID (82573{l)
>'.
":
-Conforman
Environmental lmprovement Notice and Non Conformance Record
REF. NO
FREYSSINET/HSEIN/
P28l037
CONTRACTOR
Freyssinet
VSL Joint
-
DATE OF
OCCURRENCE
12t0112012
Venture
LOCATION
Storage area
DESCRIPTION
Oil drum were not kept within
secondary containment traY to
prevent spillage into the ground.
STATUS
/
REMARK
Open
Safety Report No. 32
UEfiil Builders Berhad
4'n
Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
kFvrl
UEM#
*{,
R CEI
-t
_i
I
I
I
v
*ot
t *1
e rtl
P2B Project Site Office,
Lot1282, N4ukim 13, Batu Kawan.
Seberang Perai Selantan
14100 Pulau Pinang
Tel. no. : 04 - 5639000
Fax no. : 04 - 5639001
Memorandum
To : Freyssinet-VSL Joint Venture
Attn. : [Mr. Pierre Olivier Vignal
Cc
: lr. Wan Azman Bin Wan Salleh, En.TamzuriAriffin
From : Nurazwany tvld.Arshad
Date :
Ref.
121^
January 2012
:UEMB/P2B-P2IHSE/NI l5.22lQor
^ tL
Subject: DESlcN, CONSTRUCTION AND COMPLETION
OF THE SECOND PENANG BRIDGE
PACKAGE 2 : SUPERSTRUCTURE WORKS OF APPROACH SPANS
RE : Environmental lmprovement Notice
Containment Tray
Reference is made to the above matter.
-
Diesel and Oil Drum Not Kept Within
2.
Furtherto the Environmental lnspection on 12th January 2012, we noticed that oil and diesel
drum at the storage areas were not placed within containment tray to prevent any spillage into the
ground.
3.
Attached herewith is HSE lmprovement Notice foryour immediate action. We will not hesitate to
impose appropriate penalty on you in accordance to our Safety, Health & Environmental Warning &
Fines.
4.
Please take immecliate action on the matter and submit a photo as evidences to show that the
issued has tleen action within 7 DAYS from the date of this latter.
nfour imnrediate action is required.
Thank your
Youts faitlrfully,
t ,,, 1t
"
' iiila
ui
,i
x,'ItAzRAg\Y |rT MI). Altsu/ro
to4roord:cl Erocsrirc
UEJr{ Canrtiuraon Sde Bhd_
Pcraag Srcord Bn<igc rp2B)
l\.1
n1a
HEALTH & SAFEW
MANAGEMENT SYSTEM
HSE IMPROVEMENT
NOTICE
UEN,I@
1of1
HSE.FOFM No.FEV,
SECOND PENANG BRIDGE
Loeation
/ Area *
*
Where applicable
Freyssinet storage area
SUB-CONTRACTOR:
l-tsE-F001-0
R.EF NO.
FR EYSSI N ET/HS EI N IPZBI 037
Date
LzlOt.l20L2
3.00 pm
Time
Freyssinet-Vsl Joint Venture
HEAR II{ISS / DANGEROUS OCCURRENCE: This Notice is issued
following a Near Miss / Dangerous Occurrence incident and will be recorded
in Near Miss /'Dangerous Occurrence Record (HSE-F1O5-Oi.
DESCRTPTION OF WORK IN PROGRESS WITH SAFETY TNCOMPLTANCE
DANGEROUS OCCURRENCE:
YES
/
NO
NEAR MISS
/
Diesel and oil drum were not kept within containment bund/tray to prevent spillage into the
ground.
Photo attached:
PROPOSED IMPROVEMENT NEEDED
The following safety improvement should be
completed by (Attach additional page if necessary)
L9l01,l2Ot2
DATE
TIME
No
9.OOam
All diesel and oil drurreto keep within containment bund/tray to contain any spillage.
NOTICE SERVED BY LrEr,4fl
REPRESENTATIVE:
INC
NURAJE\TANY TT [ID. ARSEAT}
Envirmn<arl Erecunvc
NAME:
BY SUB.CONTRACTOR'S
F WORK:
NAME:
SIGNATURE
SIGNATURE:
ASSESSMENT OF CORRECTM ACTXOTU BY
eorrective Acti on Satisfactori ly Im plemented
/
FURTHER ACTION REQUI
lrii'i'- ;
eorreetive A,ction R.equire Further Improvement
Completion Date:
eorrective Action Not Carried out (RM1CI0 Fine per day
after elatetine lon max 3 da
eorrective Action l\ot Carrled out / unsatisfactory and
Siat'et)1 try'iolatiQrr rrlsi:iee
Becorne wonst
Correetive Action fltlot
,,r r,a [i,
i [,:Ii'jA-tr"iO
ii
S,top Work 0rcieri'
.!." 'iio [:,r: l'cr::,1'rJeej lrr Saiely [i:r-rtir:es [-{e,:ot'cl
!rt"i.:1i:-ci;
Sl@
:
:-- | -. , , ,,- -r--,-.
* t(-r,'r-,Y
!.,1_ r,,L1rt r: I
_. ,-.ji I :r !,: r,r i"t-!,J::..
i.t;:
Yes /
SIgt-r:
Lrate:
t,." ,ltit::,
No
Iilarne
Not Aeeeptecl
;''.La:
; irr
I
Yes
uired due to Absen'c of Hazard
Accepted
!
.!
!r'irlr;.'i'
f:
r*
flEE i4g!"
Cclr!.l"aci:
[v1,Jt'
t_:l
I
UEM
HEALTH & SAFETY
MANAGEMENT SYSTEM
HSE IMPROVEMENT
NOTICE
Lfilillrlt{
2of1
HSE-FORM NO-REV
SECOND PENANG BRIDGE
Observation
Main Access Road
Photo of Non
HSE.FOOl.O
nce
I
Diesel drum at
Freyssinet's storage
area were not kept
within containment
tray to prevent any
spillage onto the
ground and placed
outside the storage
area.
*J&d
Non Compliance to
EIA Approval
Condition No.20
\
i:
':,i.
.--
.'2
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG
sDN.BnDGas?lrD
Package 2: Superstructure Works of Approach Spans
BRIDGE
IAMB^TNKDDU^
UEMti
ffir,F,rirc
2.6 MACH!NERY AND EQUIPMENTS RECORD
DESCRIPTION
ITEM
NO. OF MACHINERY
Segment Launcher
4
Gantry Crane
Mobile Crane
2
2
6
Crawler crane
Sky Lift
Back Hoe
7
Van
I
I
3
Forklift
Barge
Tug Boat
Rescue Boat
Passenger Boat
Tork Wrench Set
Stressing Jack
Strands Pusher
Bripac Coil Dispenser
1
2
3
4
5
10
11
12
13
14
'15
'16
3
1
1
5
11
15
I
8
1
4
2
7
17
Hydrau lic Electric Pump
2
18
Genset
16
19
20
Genset / Pornrer Pack
Welding Set
4
21
Oxy Cutter
4
22
Pump
3
23
Vibrator Poker
I
24
Air Compressor
Bar Cutter
Bar Bender
B
25
26
UEM Builders Berhad
4tn Floor, lvlenara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
1
2
3
Safety Report No. 32
,i)
JAMBATN KMUA
SDN.
BHD (8'57}U)
UEMI-,
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
ffi..Ttx;:,3I
2.6 MACHINERY AND EQUIPMENTS RECORD
LIST OF SEGMENT LAUNCHER INSTALLED AT MARINE SITE
NO
1
2
3
4
TYPE OF MACHINERY
CAPACITY
PMA NO
Segment Launcher 4
5 T (service)
103 T (main)
PMA 5654
Segment Launcher 3
5 T (service)
103 T (main)
PMA 5648
5 T (service)
103 T (main)
PMA 5655
5 T (service)
103 T (main)
PMA 5649
Segment Launcher 2
Segment Launcher
L
PMA 5448
PMA 5447
PMA 5446
PMA 5445
REMARK
LOCATTON
P117 (South)
P117 (North)
P267 (South)
P267 (North)
until 04.LO.2072
Valid until L7 .05.201,2
Valid until 04.L0.2012
Valid until 17.05.2012
Valid until 04.10.2012
Valid until 27.A5.2072
Valid until 04.L0.2012
Valid until 27 .05.201.2
Valid
LIST OF OVERHEAD GANTRY CRANES OPERATIONAL AT LOADOUT JETTY
NO
WPE OF MACHINERY
PMA NO
t
Double Girder A-Shape
PP PMA 4810
Gantry Cranes
PP PMA 4809
Double Girder A-Shape
Gantry Cranes
PP PMA 4812
2
PMA EXPIRY
CAPACITY
OPERATOR
DATE
(roNNE)
NAME
23-9-2012
107
1207
Norizan B. Ali
Zuriyazi B. Abd Latif
23-9-2012
PP PMA 4811
UEIr/ Builders Berhad
4tn Floor, l\ilenara 2, Faber To\ /ers, Jalan Desa Bahagia, Taman Desa,
OfJ Jalan Klang Lama, 58100 Kuala Lumpur
107
120 T
Mohd Nizam B. Abd
Rahim
Mohd Suffian B. Ahmad
Safety Report No. 32
l
JAMBATN KEDUA
SDN.
BlrD
(8As?3-U)
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEME
BUI.DEnS
2.6 MACHINERY AND EQUIPMENTS RECORD
LIST OF GENERATORS OPERATIONAL AT LOAD OUT JETTY
No
L
Capacity
L80 kvA
Location
Segment Launcher A
2
180 kvA
Segment Launcher
B
3
180 kvA
Segment Launcher
C
4
180 kvA
Segment Launcher
D
5
300 kvA
Storage Facilities &
Workers Camp
Storage Facilities &
6
7
300 kvA
90
KVA
DOE Reference No.
Process Bil.
AS (B)/P36/ee1looo/086 Jid. 3
(15) dated 25 August 2010
AS (B)/P36/e9L10001086 Jid. 3
(15) dated 25 August 2010
AS (B)/P36/ee1.lOOO1086 Jid. 3
(15) dated 25 August 20L0
AS (B)/P36leeLlOOOlOs6 Jid. 3
(15) dated 25 August 20L0
AS (B)/p36/ee1.looo1086 Jid. 3 (s)
dated 7 April2010
AS
(B)/P36leeu000/086 Jid. 3 (s)
Workers Camp
dated 7 April 2010
Storage Yard
AS
(B)/P36/esu000/086 Jid. 3 ( )
dated 22 June 2010
8
90
KVA
Storage Yard
AS (B)/P36/se1,/o001086 Jid. 3 (
)
dated22 June 2010
9
90
KVA
Storage Yard
10
90
KVA
Storage Yard
1.t
50
KVA
Storage Yard
1.2
50
KVA
Storage Yard
13
50
KVA
Storage Yard
L4
50
KVA
Storage Yard
15
300 kvA
Gantry Crane
16
400 kvA
Gantry Crane
(B)/P36leeU000/086 Jid. 3 ( )
dated 22 June 2010
AS (B)/P36lssL/000/086 Jid. 3 ( )
dated 22 June 2010
AS (B)/P36/ee1/000/086 Jid. 3 (10
) dated 15 June 2010
AS (B)/P36/ee1l000/086 Jid. 3 (10
) dated 1-5 June 2010
AS (B)/P36lee11000/086 Jid. 3 (10
) dated 15 June 2010
AS (B)/P36/e9U000/086 Jid. 3 (10
) dated L5 June 2010
AS (B)/P36les1loo0/086 Jid. 3 ( )
dated 29 April2010
AS (B)/P36lesu000/086 Jid. 3 ( )
dated L5 April2010
AS
UElvl Builders Berhad
4'n Floor, N4enara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
APIE/35 (P 74l2OLOl
AP/E/35 (P 74120101
AP/E/3S (P 74/2010)
APlEl3S (P 74/2O7Ol
APlEl3S (P 30/2010)
APlEl3S (P 30/20L0)
AP/El3S (P s612010)
AP/E/3S (P s612010)
AP/E/3S (P s612010)
AP/E/3S (P s6l2010)
.N/A.
-N/A-N/A-N/AAP/E/3s (P 32/2010)
AP/El35 (P 33/2010)
Safety Report No. 32
,'D"
JAMBATAN KEDUA SDN, BIID
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
(ETs?}U)
Package 2: Superstructure Works of Approach Spans
UEM\J
mff:lfiri
2.6 MACHINERY AND EQUIPMENTS RECORD
LIST OF CRANES AND AIR COMPRESSOR OPERATIONAL AT LOAD OUT JETTY
NO
TYPE OF
MACHINERY
PMA/PMT NO
PMA EXP!RY
CAPACITY
DATE
(roNNE)
1
AIR COMPRESSOR
PMT 5944
26.0L.20t3
2
AIR COMPRESSOR
PMT 5945
26.0t.2013
3
AIR COMPRESSOR
PMT 6032
26.0t.20L3
4
AIR COMPRESSOR
PMT 2965
17.04.2012
AIR COMPRESSOR
PMT 8494
20.06.2012
6
AIR COMPRESSOR
PMT 8493
20.06.2012
7
AIR COMPRESSOR
PMT 6906
76.02.2013
8
AIR COMPRESSOR
PMT 6905
16.02.2013
5
1560 KILO
OPERATOR NAME
.NIL-
PASCAL
1560 KtLO
PASCAL
1380 KILO
PASCAL
1724 KILO
PASCAL
830
KILO
PASCAL
830
K|LO
PASCAL
1724 KILO
PASCAL
1724 K|LO
PASCAL
-NIL-NIL-NIL-NIL-NIL-NIL-NIL-
MOHD FARIZAM
9
PROPELLED SKYLIFT
PMA 10630
05.07.20L2
227
KG
YOGESWARAN
SUBRAMANIAM A/L
AYAROO
10
CRAWLER CRANE
PMA 10807
1,L.04.20t2
1OO TONNES
sPoK(D)/PP 101612006
17 oGO52012
LOW SEK MENG
t1
CRAWLER CRANE
PMA 11511
3.O8.20L2
1OO TONNES
12
MOBILE CRANE
PMA22364
L4.72.20L2
25 TONNES
SoK(D)KD:03s/2001.
27 oCT 2013
AZZAHZI BIN SHAARI
TGl03/OKl02lr43
11 JULY 2013
AZIZAN BIN YAAKOB
1-3
MOBILE CRANE
PMA 21959
23.A9.2012
25 TONNES
SoK(G)KR:02212012
16 JULY 2012
NAZARUL ASWAD BIN
ABDUL TALIB
L4
MOBILE CRANE
PMA 87456
2t.09.2012
25 TONNES
SOK(G )KR:001/2009
28 August 2013
UEl\rl Builders Berhad
4'n Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
t"i>.
'
-_:)
J MBATN rEDUA DN_ Btfl
(82$7t-tD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEMLi
ffifiH]i:ir:
2.7 Audit and lnspection
Item
1
Date
17th
January
2012
Area of lnspection
Remark
Work front 1 - Pier 220 (Launching
Segment)
General Site Safety
. Workers being inducted
. Fire extinguisher available at
barge and launcher
. First aid kit and spillage kid are
available at work barge
. Weekly toolbox talk conducted
Floor, Wall, Opening, Stairway,
Aisle and Runways
All stainvay, runways free from
.
.
obstruction
Adequate lighting provided
during night works activity
r
.
.
.
.
.
.
Personnel Protective Equipment
.
.
Ladder
.
Drinking water, washing and sanitary
facilities available at work barge
Portable toilet available at work front.
Proper collection of waste and
dispose at the location approved by
Local Authorities.
Rubbish bin and located designated
area
Housekeeping maintained at all
times, clean floor and hazard coding
is maintained.
Spotlight were provided during night
works activity
Spill kit to control spillage available at
working area
Workers equipped with proper PPE
Daily inspection and monitoring by
Safety Officer and Safety Supervisor
All ladders access to platform is
secure.
UEM Builders Berhad
Safety Report No. 09
+'n ftoor, firfunr- Z, frO"r Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58'100 Kuala Lumpur
Safety Report No. 32
/'i>-
:
.>,
JAMDATN
Item
2
xmul
sDN.
BrD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
(82s?1rD
Date
Area of lnspection
3lth January
Work front 1 - Pier 66 (Launching
Segment)
2012
General Site Safety
. Workers being inducted
. Fire extinguisher available at
barge and launcher
. First aid kit and spillage kid are
available at work barge
. Weekly toolbox talk conducted
Floor, Wall, Opening, Stairway,
Aisle and Runways
All stairuray, runways free from
.
.
UEM|.
rfill,i!'fr!
Remark
.
.
.
obstruction
.
Adequate lighting provided
during night works activity
.
.
.
Personnel Protective Equi pment
.
.
Ladder
o
Drinking water, washing and sanitary
facilities available at work barge
Portable toilet available at work front.
Proper collection of waste and
dispose at the location approved by
Local Authorities.
Rubbish bin and located designated
area
Housekeeping maintained at all
times, clean floor and hazard coding
is maintained.
Spotlight were provided during night
works activity
Spill kit to control spillage available at
working area
Workers equipped with proper PPE
Daily inspection and monitoring by
Safety Officer and Safety Supervisor.
All ladders access to platform is
secure.
UElvl Builders Berhad
Safety Report No. 09
4^ Floor, Menarc2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
t>,
:-}
J^MB^rN
Item
3
KEDUA
sDN.Bro
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
(82r573-u)
Date
Area of lnspection
'l7th January
Work Front
2012
a.
1
-
23th
January
2012
rflIElTt
Remark
Main winch LG1
Personnel Protective Equipment
.
.
Workers equipped with proper PPE
Daily inspection and monitoring by
Safety
4
UEM[Z
b.
Hoisting Equipment
c.
Brakes system
d.
Wire rope inspection
.
.
o
fficer
and Safety Supervisor
Main winch have valid PMA
Sheaves drum in good working
condition, no wrapping of wire rope
on drum.
Braking mechanism properly
functioned
o
Wire rope condition is satisfactory
Work Front 2 - Main winch LG 3 & 4
a. Personnel Protective Equipment
.
.
e.
Hoisting Equipment
.
.
f.
Brakes system
.
Workers equipped with proper PPE
Daily inspection and monitoring by
Safety Officer and Safety Supervisor
winch have valid Ptt/A
Sheaves drum in good working
condition, no yvrapping of wire rope
on drum.
lVlain
Braking mechanism properly
functioned.
g.
Wire rope inspection
UEM Builders Berhad
Safety Report No. 09
4'n Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
o
Wire rope condition is satisfactory
Safety Report No. 32
:.
JAMBATN KMT'A SN,
Item
5
BM O2$7}U)
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENIANG BRIDGE
Package 2: Superstructure Works of Approach Spans
Date
30th
January 2012
Area of Inspection
UEME
Imrr?n
Remark
Gantry Crane (GC 02)
a.
General Requirement
b.
Stops, bumpers, rail sweeps and
guards
c.
Hoisting Equipment
d.
Rope inspection
e.
Maintenance
.
.
.
PMA valid available
Travel path is clear from obstruction
Operator attended training course
.
.
.
Limit switches provided
Operator to control speed during
moving load
Machine guard provided
.
.
Daily checking by operator
Mill test certificate available
.
.
.
lnspection record kept in logistic
office
Operator to check wire rope is not
wrapped to each others during lifting
Colour coding for January 2012 is
yellow in colour.
o Maintenance logbook available at
logistic office.
f.
ElectricalEquipment
S.
Remarks
UEM Builders Berhad
Safety Report No. 09
4'n Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
.
.
.
Electrical equipment protected from
dirt, oil grease and moisture.
Emergency stop is functioning
PMA valid until 26 September 2012
Safety Report No. 32
HEALTH & SAFETY
HSE MONTHLY AUDIT
[/IANAG
E
IVI
ENT SYSTEIJI
e 1of 7
HSE -FORM NO.-REV,
SECOND PENANG BRIDGE
D6#tD
lnspected by
t4hqt,
HSE.F2O2.O
l-ocation
n<+rt I
?
z>o
KM
Contractor
lE-t,ul9
No
Date
Items
H I r l>-erz
No
Time
I\I,
lQ'?oa.q-t
6^-^-t-
General Site Safety
Safety Policy available and displayed at strategic location
,r/'
2
Compliance to Safety Committee regulation
\./
?
Emergency Contact No. available and displayed at strategic
locations.
4
Safety induction to all workers conducted accordingly
1
5
First
Aid kits, Stretcher, blankets and fire extinguisher available at
Vnbu- {-e*
site office.
6
Mandatory Safety Signages are displayed at strategic location.
7
General Housekeeping at worksite.
I
Mandatory Safety Signages displayed
I
Toolbox talk conducted on weekly basis
IU
Welfare
11
No workers camp within R.O.W.
v'
,r/
t/
t./
Floor, wall, openings, stairways, aisto & runways
Floor opening planked over or adequately barricaded with
signages
2
The railing provided on all exposed sides, except at entrance to
stairways
3
4
q
penin gs
UI more than
arrd the bottom
the
ope n ing is t^^^ than feet a bove the working SU rface) ate
a rded acco
No obstruction including electrical conduits, tinrber etc is around
openings
No water stagnancy near the openings / outside office
6
Are the floor are kept clean, no waste material such as stones or
7
Proper collection of construction waste and scrap cement and
dispose at the location approved by LocalAuthority
cement spilled
(
un&er
,aa
21..4e6a- {-cc.*r'.,.r
,tle_b 7
\ vir+ott
)
V
1
Orrl3 auaitc.Le- ot\
V
V
i lr-iti1g t.*4e*
Pl4ce
fM
ffir#
r :::.,:,,t::
HSE MONTHLY AUDIT
HEALTH & SAFETY
I/IANAG EIVI E NT SYSTEIU
Page2
of7
HSE -FORM NO,.REV,
SECOND PENANG BRIDGE
No
Items
Yes
HSE.F2O2-O
No
N/A
Remark
Floor, wall, openings, stainvays, aisle & runways (con,t)
v
Every flight of stairs are free from obstruction, stone, spilled
cement or scrap material
Different size of plywood, lumber are not bound together anO
stacked i.e. properly storage of material and equipment close to
the workstation
Enough temporary storage area provided in good ground condition
(stable and not muddy)
11
The storage areas have adequate lighting
12
Sanitary facilities provided nearby to the workplace and regular
kept clean.
13
Adequate lighting provided during night works activity
14
A.ll
t/
\/
l./
V
drains surrounding perimeter are cleared
Personnel Protective Equipment (PPE)
1
Employees provided with proper PPE and used accordingly
\r/'
2
PPE are properly maintain and in good condition
/
J
Eye and face protection are provided while handling machinery or
chemical
v.
A
A complete set of harness are provided and used during working
at height
r'
,/
6
Safety nets are install when workplace more than 25 feet
6
Safety equipment worn correctly and constantly monitored by
supervisor
\r/-
7
Safety belt in use when working on higher level anchored at strong
place
V
I
Safety equipment issued are registered and serviceability
\/
I
Workers who use hand tools are familiar with the tools and know
how to maintain it
10
Rotating mechanical parts are properly guarded
V
11
lmpact tools are kept free of mushroomed heads
V
12
The wooden handles of tools are kept of splinters and crack
V
Electrical equipment using water (concrete cutter, concrete boring
machine or etc. are grounded to prevent electrical leakage
t
14
Air tools checked, rro rupture or broken hoses
L
-77-
fto+
rca\+ ywv;Jc.).
HEALTH & SAFETY
EIVI E NT SYSTEful
IVIANAG
HSE MONTHLY AUDIT
Page J
ol /
HSE -FORIV] I\]O.-REV,
SECOND PENANG BRIDGE
No
HSE -F2O2.O
Items
Yes
is no obstruction around ladder (both top and bottom)
\,/
No
N/A
Remark
Ladders
-There
1
"/
2
Top and bottom of ladder are fixed firmly
3
Ladder used in good condition, no rings missing or broken
4
I andinn srrrfaee iq nnt mr rddrr nr ural
,/
5
Ladder are not being for jobs which required the scaffold
When ladder cannot be secured at the top for technical reasons,
ensure that they are secured near the bottom or footed
\,t
6
7
Ensure metal ladder are not being used near overhead lines
8
lnspect ladders regularly for sign of danger
lr/
'4
Scaffolds
1
Scaffolds walkways free from debris and grease
2
Working platform is enough wide to work safely with guardrails
3
No scaffold parts damaged or weakened
4
No parts of scaffold are removed or loose after it is erectecl.
A
All planking of platforms is overlapped (minimum 12 inches) or
secured from movement
6
\./
and toeboards
lVlake the upright of the scaffold vertical and securely braced to
prevent swaying or displacement
7
Board the working platform with scaffold boards or planks or
proper grade timber
o
Arrange the boards so as to avoid tipping or tripping risks
I
Erect guardrails and toeboards to a safe height at the open sides
of snaffnld nlaffnrm
10
Competent scaffolder conduct regular check and approved
scaffold use on tagging attached
t/
V
V
Confine Space
1
No one enters confined space without instruction from competent
supervisor
2
lnternal atmosphere tested for oxygen level, free from toxic gasses
and has good supply of fresh air before working
J
All safety and rescue equipment available at site office
4
Breathing apparatus available for use by the workers
l
)
I
,
/
w ww ffi & I1@\
--/-4
ffiffiffi\#
HSE MONTHLY AUDIT
HEALTH & SAFETY
MANAGEMENT SYSTEIVI
Page 4 of
7
HSE -FORIVI NO..REV
SECOND PENANG BRIDGE
No
Items
HSE.F2O2-O
Yes
No
N/A
Remark
Two persons work in confine space with one waiting outside as
vatchman
6
Use of Permit to Work System
A/
1,ry
/T
/,n
Set of rescue equipment available at site of confine space
Excavation Work
1
Ensure to outline the precautions and safety procedures to be
taken before a worker is allowed in the trench and excavation
2
Supply and adequate material with which to shore the sides of
excavation or slopped back to 45 degrees
Make daily inspection of excavation to determine the possibility of
cave in and make weekly inspection of the shoring
4
Proper barrier to stop persons falling into the excavation, warning
srgn indicate danger area and intermittent light to be used at night
q
Make sure that is no structure which stability might be effected by
excavation
6
Ensure that there is no equipment close to the edge of the
excavation
/v
ln
,/
Roof Work
I
Crawling board or crawling ladders orovided during work on roof
slopes of more than 10 % steep
2
Provide sufficient guardrails and toe boards or other forms of edge
protection to prevent a workers or material to falling more than 2 m
J
Provide crawling boards for work above fragile material such as
asbestos cement sheets
4
Display warning notice at all approaches to fragile roofs
5
All workers must wear safety harness and life secured to suitable
points
A ) /A-/\-/
I
I
L
Fire Protection
1
2
a
Provide sufficient number of fire extinguisher at strategic location
and easy accessible
The fire extinguisher is periodically checked (posses Cert of
Fitness)
v
V
v
An Alarm system available
"trio Smoking" or "Open ilame" signs are conspicuousiy posteci at
or in the vicinity of operations which constitute a fire hazards
E
Keep the flammable liquid or LPG cylinclers in a safe place when
not in use
IT
Fire fighting team organized and trained. Fire drills conducted
t/
| 1r'.i",
ffiffiffiffi
HEALTH & SAFETY
HSE MONTHLY AUDIT
TMANAGEil/ENT SYSTEI\I
Page 5 of 7
HSE -FORIVI NO..REV
SECOND PENANG BRIDGE
No
Items
Yes
Electrical
1
2
re
n cables are not ca
a
at
opening, passages, ladders, stairs or lying on ground subject to
and wetness
Not hanging directly from naiis, which may damage insulation and
well protected from sharp objects
Suspended cable not carrying out weight and should be supported
by rods or poles
4
Ensure all cables are visible. lf necessary attached (yellow and
black or red and white) plastic benching strips
t
Ensure that there is no adequate supply of extension cables for
site use
t)
Remove from site all unproved junctions i.e. "spiders"
V
\/
lr/
Plug covers, etc are irot darrraged and splash proof ones used
B
Check that the correct plugs are fitted
9
Check that the correct connection has been made colour coding
should be distinctive
10
Check that cable grips are used and that the earth cable is fitted
with same slack so that it is the last to be pulled out
11
Ensure that the correct type and rating of fuses are fitted ancl
checked by electricians
V
Ensure that improvised fuses (nail, silver paper etc) are removed
and ideally have foolproof earth leakage breaker fitted
V
13
Ensure that any special "make up" leads/extension are made by
electrician (competent person) only
Lifting Equipment
I
(
/
- Crane
Make su re that every cran is thoro ughly exa mt ned at regu
intervals by compete nt pe rson according to FIVIA requirement and
manufacturer recommendation. A test certificate obtained for each
V
2
Maintain every crane regularly forwear and tear. Recard of
servicing maintained at site office
3
Ensure that every crane is inspected weekly by competent person
and that a recorei kept
t
Ensure that every crane of more than 1 ton
has efficient
automatic safe load indicator which is inspected weekly and record
V
4
5
Provide safe mean of access to all parts of the crane to which it is
necessary to go for operation and maintenance
b
Train the operator and ensure that the age ofthe operator is
above 18 years old
7
Ensure that the operator and maintenance personnel are fit before
they are allowed to climb to the cabin jib
o
Ensure that the crane operator is provided with safe equipment i.e.
helmet and safety belt
I
Base of crane clear from any obstruction, is clean and no stagnant
water
/
v
V
HSE.F2O2.O
No
N/A
Remark
HEALTH & SAFETY
IVIANIAG EI\II E NT SYSTEI\N
HSE MONTHLY AUDIT
Page 6 of 7
HSE.FORIV NO,-REV
SECOND PENANG BRIDGE
No
Items
HSE.F2O2-O
Yes
No
N/A
Remark
Goods/ Platform Hoist
I
Ensure that every goods r p latform hoist, nclud ng the rope is
in spected weekly by a competent person and a record kept
2
Ensure that every hoists, is thoroughly examined by a competent
person every six month and record kept
3
Surround every hoists by substantial fence to prevent workers
being struck by hoist platform of falling the hoist way.
4
Provide gates at all points of access to the platform. Gate shut
unless at landing
5
Signboard warning workers not to ride on platform
t)
Attached a load rating plat to the platform
7
8
t/
,r/
Provide overhead protection over the operator's position. Operator
must be trained
Provide the platform with brakes or devices, which will hold it and
the load in position if the hoisting rope or mechanism fails
t/
SteelWorks
1
Ensure that steel erectors work from temporary access platform
where possible
2
Ensure that where temporary access platform are not in use stall
erectors are wearing safety harness and lifeline
3
Provide suitable anchorage points for the attachment of safety
harness and lifeline
4
lnstall and tightly planked temporary floor above 30 feet or two
storeys when steel erection is in progress
/tA
/v (ry
fr
lnstall safety net when the distance of fall exceed two storeys
6
No
Use safety lines to prevent the dangerous swing of steel works
when being raised or lowered by crane
General Site Condition (Lifting Equipment
-
Crane)
tg5
No
N/A
Remark
Power Tools
1
Check for SlRll\I or makers mark
2
Check trailing lead is not cut or frayed
3
4
I
Mlrl^
Checked that the cable is protected from excessive flexing by the
heavy rubber sleeve where cable enters the tool. Cabie ciamp is
secure
Check that there are no crack or pieces missing from the machine
All screws are in place and secure
3
Check that the chuck is in good condition and that the correct key
is attached
o
Check that the name plate is secure. Detail available on the
machine plate such as make, voltage, frequency, speed and etc
{
HEALTH & SAFEry
HSE MONTHLY AUDIT
I\rlANAG EM
E
I'lT SYSTETU
'tage I ot
I
}1SE .FORTiI NO.-REV.
SECOND PENANG BRIDGE
HSE.F2O2.O
Demolition
Ensure that the construction characteristic of the building being
demolition available before demolition begin
a
4
Ensure that demolition operation are being direcily supervised by
competent person who establish a demolition plan
Ensure workers involve in the demolition operation aware of the
basic principles and safe method of demolition
Provide a safe platform from which demolition workers can
operate
5
Ensure that debris are clear
6
Ensure enough and ample warning before demolition begin
Legend
:
Y-
N-No
RKS
N/A
-
ot
icable
INSPECTED BY:
Name:
|rnurD c;rAloll
tl/n, (
"tnn"rur'",flf
Date:
l1-1.2pt2.
47.o1-42
.
I
n
C
t
t
-
'"j"'.(e
,".: .B
i
"-L. c_{
tb
gr"u,&I
-
4
.ln
tL
/
tu
I
{t
lr''
(ifi*
LLrte
"-L*
l^yio(l
Joat$*.=.;
I
E
-t
\
L
a
#ro
b-J
s*/
ff
{<if.6t1
t..l
r -, \ Yi
J
::.-
/W\
ffiffiffi\R
',.'
"".i
ift--,1rt
HSE MONTHLY AUDIT
,i
lnspected by
Contractor
f
HSE -F202-O
Location
(u.nrrgurdnffiy\
KM
ViCvt,c
No
Yes
/ ,
\ro-r 66
LG+ 4.7 \&g&
t- t-zo''4
3
Date
Items
1')t
No
N/A
1
Safety Policy available and displayed at strategic location
2
Compliance to Safety Committee regulation
4
\f
Emergency Contact No. available and displayed at
locations.
Safety induction to all workers conducted accordingly
First
Aid kits, Stretcher, blankets and fire extinguisher available
at
site office.
6
Mandatory Safety Signages are displayed at strategic location.
7
General Housekeeping at worksite
B
Mandatory Safety Signages displayed
I
Toolbox talk conducted on weekly basis
10
Welfare
11
No workers camp within R.O.W.
,,/
l
Floor, wall, openings, stairways, aisle & runways
1
2
3
4
Floor opening planked over or adequately barricaded with
signages
The railing provided on all exposed sides, except at entrance to
stairways
Wall openings (drop of more than 4 feet and the bottom of the
opening is less than 3 feet above the working surface) are
guarded accordingly
No obstruction including electrical conduits, timber etc is around
openings
c
No water stagnancy near tlre openings / outside office
6
Are the floor are kept clean, no waste material such as stones or
cement spilled
7
Proper collection of construction waste and scrap cement and
dispose at the location approved by LocalAuthority
\/'"
t*"
Remark
General Site Safety
J
Page 1 of 7
HSE -FORM NO,-REV
SECOND PENANG BRIDGE
FAo@+crtDT.
HEALTH & SAFETY
IVANAGEIVENT SYSTEIVI
t o so Lr.r(
HEALTH & SAFETY
WWW
HSE MONTHLY AUDIT
IVIANAG
E
IVI
E
NT SYST
Page2 of7
HSE.FORM NO..REV.
SECOND PENANG BRIDGE
No
Items
Yes
Floor, wall, openings, stairways, aisle & runways (conrt)
o
Every flight of stairs are free from obstruction, stone, spilled
cement or scrap materia
Ll
I
10
Different
of plywood
are
tog ethe and
stacked
properly storage of materi ^t
at and equ ipment close to
the workstation
Enough temporary storage area provided in good ground
condition
(stable and not muddy)
11
The storage areas have adequate lighting
12
Sanitary facilities provided nearby to the workplace and regular
kept clean.
'13
14
Adequate lighting provided during night works activity
L-
\/
\.1
All drains surrounding perimeter are cleared
Personnel Protective Equipment (ppE)
L
1
Employees provided with proper ppE and used accordingly
2
PPE are properly maintain and in good condition
J
Eye and face protection are provided while handling machinery
or
chemical
4
A complete set of harness are provided and used during working
at height
5
Safety nets
t)
Safety equipment worn correctly and constanily monitored
by
supervisor
I
I
7
dtg
insta when
WO rkp lace
m ore tha n 25 feet
Safety belt in use when working on higher level anchored
at strong
place
o
Safety equipment issued are registered and serviceability
q
Workers who use hand tools are familiar with the tools
and know
how to maintain it
10
Rotating mechanical parts are properly guarded
11
lmpact tools are kept free of mushroomed heads
12
The wooden handles of tools are kept of splinters and
crack
13
Electrical eq u ipment I letn water (concrete cutte r, concrete
bori ng
machine or etc. are gro unded to p revent electrica leakage
14
Air tools checked, no rupture or broken hoses
\./
HSE -F202-0
No
N/A
Remark
EIVI
ffi
Mffiffiffi
HEALTH & SAFETY
ffiffi#wffi
HSE MONTHLY AUDIT
IVIANAG E IV E NT SYSTEIVI
3o'f7
HSE.FORM NO,.REV
SECOND PENANG BRIDGE
No
Items
Yes
HSE.F2O2-O
No
N/A
Remark
Ladders
1
There is no obstruction around ladder (both top and bottom)
2
Top and bottom of ladder are fixed firmly
3
Ladder used in good condition, no rings missing or broken
4
Landing surface is not muddy or wet
5
Ladder are not being for jobs which required the scaffold
6
When ladder cannot be secured at the top for technical reasons,
ensure that they are secured near the bottom or footed
7
Ensure metal ladder are not being used near overhead lines
8
lnspect ladders regularly for sign of danger
\/
Scaffolds
1
Scaffolds walkways free from debris and grease
')
Working platform is enough wide to work safely with guardrails
and toeboards
J
No scaffold parts damaged or weakened
4
No parts of scaffold are removed or loose after it ls erected.
5
All planking of platforms is overlapped (minimum 12
secured from movement
6
Make the upright of the scaffold vertical and securely braced to
prevent swaying or displacement
7
Board the working platform with scaffold boards or planks or
proper grade timber
o
Arrange the boards so as to avoid fipping or tripping risks
o
Erect guardrails and toeboards to a safe height at the open sides
of scaffold platform
10
Competent scaffolder conduct regular check and approved
scaffold use on tagging attached
c"n<e)te-^t s.ol4-lrl
I
Gonfine Space
1
2
No one ente rs confined space without instruction from competent
supeivisor
lnterna atmosphere tested for oxygen level, free from toxic gasses
and has good supply of fresh
before WO rking
a
All safety and rescue equipment available at site office
4
Breathing apparatus available for use bv the workers
WWW
HSE MONTHLY AUDIT
HEALTH & SAFETY
MANAGEIUENT SYSTEIV
Pa
e4of7
HSE.FORM NO-.REV
SECOND PENANG BRIDGE
No
Items
6
fwo persons work in confine space with one waiting outside as
6
Use of Permit to Work System
7
Set of rescue equipment available at site of confine space
Yes
HSE.F2O2-O
No
N/A
rvatchman
t ,rlq
I
Excavation Work
insure to outline the precautions and safety procedures to be
aken before a worker is allowed in the trench and excavation
2
Supply and adequate material with which to shore the sides
excavation or slopped back to 45 degrees
5
of excavation to determ ine the
weekly nspection of the shoring
Proper barrier to stop persons
sign indicate danger area and
to be
lVlake sure that is no structure which stability might be effected by
6
Ensure that there is no equipment close to the edge of the
3
4
Make daily inspection
!ave
IN
nd make
excavation
excavatlon
Roof Work
1
Crawling board or crawlling ladders provided duringI work on roof
slopes of more than 10 % steep
Provide sufficient guardrails and toe boards or other
protection to prevent a workers or material to falling
2
Provide crawling boards for work above fragile material such as
asbestos cement sheets
4
Display warning notice at all approaches to fragile roofs
5
All workers must wear safety harness and life secured to suitable
points
Fire Protection
1
Provide sufficient number of fire extinguisher at strategic location
and easy accessible
2
The fire extinguisher is periodically checked (posses Cert of
Fitness)
An Alarm system available
4
"No Smoking" or "Open flame" signs are conspicuously posted at
or in the vicinity of operations which constitute a fire hazards
E
Keep the flammable liquid or LPG cylinders in a safe place when
not in use
6
Fire fighting team organized and trained. Fire drills conducted
h1
Remark
WWWffi
HEALTH & SAFETY
TVIANAG E I\N ENT SYSTEIM
HSE MONTHLY AUDIT
Page 5
of7
HSE -FORM NO..REV,
SECOND PENANG BRIDGE
No
Items
Yes
HSE -F2O2.O
No
N/A
Remark
Electrical
1
2
Ensure that
cables are not causing ahazard al
opening, passages, ladders, stairs or lying on ground subject to
and wetness
Not hanging directly from nails, which may damage insulation and
well protected from sharp objects
a
J
Suspended cable not carrying out weight and should be supported
by rods or poles
4
Ensure all cables are visible. lf necessary attached (yellow and
black or red and white) plastic benching strips
5
Ensure that there is no adequate supply of extension cables for
site use
6
Remove from site all unproved junctions i.e. ,,spiders,,
7
Plug covers, etc are not damaged and splash proof
o
Check that the correct plugs are fitted
o
Check that the correct connection has been made colour coding
should be distinctive
10
Check that cable grips are used and that the earth cable is fitted
with same slack so that it is the last to be pulled out
11
Ensure that the correct type and rating of fuses are fitteci and
checked by electricians
12
Ensure that improvised fuses (nail, silver paper etc) are removed
and ideally have foolproof earth leakage breaker fitted
13
Ensure that any special "make up" leads/extension
electrician (competent person) only
Lifting Equipment
a
\1
\r1'
T
@-aleA
.Y.
ar\
6d/*i
CnG.r
- Crane
that every crane IS thoroughly examined at regu lar
intervals by competent person accord ing to FMA req uirement and
ma nufactu rer recomme ndation. A test certificate obtained for each
2
Maintain every crane regularly forwear and tear. Recard of
servicing maintatned at site office
J
Ensure that every crane is inspected weekly by competent person
and that a record kept
4
elrri"'nt^-^
nneo\ncrni
t\/la ke SU re
1
J
Ensure that every crane of more than 'l ton capacity has efficie
automatic safe load indicator which is inspected weekly and record
5
Provide safe mean of access to all parts of the crane to which it is
necessary to go for operation and maintenance
6
Train the operator and ensure that the age of the operator is
above 1B years old
7
Ensure that the operator and maintenance personnel are fit before
they are allowed to climb to the cabin jib
o
Ensure that the crane operator is provided with safe equipment i.e
helmet and safety belt
I
Base of crane clear from any obstruction, is clean and no stagnant
water
103
L
\.-
- piltll r
(-
L
ffiffiffiffi
HSE MONTHLY AUDIT
HEALTH & SAFETY
IiIANAGEIMENT SYSTE[/
Page 6 of
7
HSE.FORM NO.-REV,
SECOND PENANG BRIDGE
No
Items
HSE -F2O2.O
Yes
Goods/ Platform Hoist
1
Ensure that every goods or platform hoist, including the rope is
inspected weekly by a competent person and a record kept
2
Ensure that every hoists, is thoroughly examined by a competent
person every six month and record kept
3
Surround every hoists by substantial fence to prevent workers
being struck by hoist platform of falling the hoist way.
4
Provide gates at all points of access to the platform. Gate shut
unless at landing
5
Signboard warning workers not to ride on platform
6
Attached a load rating plat to the platform
7
Provide overhead protection over the operator's position Operator
must be trained
o
Provide the platform v,'ith brakes or devices, which .,r,rill hq!(, i[:66d,,,::'
the load in position if the hoisting rope or mechanism fails
No
N/A
Remark
I
\
J /A.
\
)
SteelWorks
1
Ensure that steel erectors work from temporary access platform
where possible
2
Ensure that where temporary access platform are not in use stall
erectors are wearing safety harness and lifeline
3
Provide suitable anchorage points for the attachment of safety
harness and lifeline
4
lnstall and tightly planked temporary floor above 30
storeys when steel erection is in progress
5
lnstall safety net when the distance of fall exceed two storeys
6
Use safety lines to prevent the dangerous swing of steel works
when being raised or lowered by crane
General Site Condition (Lifting Equipment
No
- Crane)
:.\
I
(
"[/n
U
Yes
Power Tools
1
Check for SlRllVl or makers mark
t/
2
Check trailing lead is not cut or frayed
v
3
Checked that the cable is protected from excessive flexing by the
heavy rubber sleeve where cable enters the tool. Cable clamp is
SECUTE
4
Check that there are no crack or pieces missing from the machine.
All screws are in place and secure
5
Check that the chuck is in good condition and that the correct key
is attached
6
Check that the name plate is secure. Detail available on the
machine plate such as make, voltage, frequency, speed and etc
\,/
/
No
N/A
Remark
WWWffi
HSE MONTHLY AUDIT
HEALTH & SAFETY
EIVI E NT SYSTE
I\4ANAG
PageT of 7
HSE -FORM NO..REV,
SECOND PENANG BRIDGE
HSE -F2O2.O
Demolition
1
Ensure that the construction characteristic of the building being
demolition available before demolition begin
2
Ensure that demolition operation are being directly supervised by
competent person who establish a demolition plan
a
4
Ensure workers involve in the demolition operation aware of the
basic principles and safe method of demolition
Provide a safe platform from which demolition workers can
operate
E
Ensure that debris are clear
t)
Ensure enough and ample warning before demolition begin
I
n/m
It
Legend
Y-Yes N_
N/A
-
Not
le
INSPECTED BY
Name
hro(ncplsI
Y
M
Signature:
Date:
hf,,,tr
sgl,ln-'
Sekty Sup|,Yissr
trEM Coortn ctiotr SdB' Bb&
(P2B)
fcnsog Sec"nd Briage Crossrq
IVI
HEALTH & SAFETY
fi/AhIAG
CHECKLIST FOR GANTRY
CRANE OPERATION
E
tVI
ENT SYSTEIM
1of 5
l-lsE-..r:oRi,4 No -REV
PENANG SECOND BRIDGE
i
,
.'
-L:J
t7
€.
t -2€_t
CHECKLIST FOR GANTRY CRANE OPERATION
z"
A)
GENERAL REOUIREMENT
DESCRIPTION
YES
NO
REMARK
Isvalid PMA available?
Is the rated load of th e crane plainly nrarked on each side cf
the crane?
I S the ma rki n clearl visible from the floor?
of 3 i nch ES m a n ta ned later,a il v betw ee n the
c ra n e a n d t h e nea rest obstru ct ion ?
Are only d esignated personnel permitted to operate the
a
Is a
c Iea ra n ce
B) STOPS, BUMPERS, RAIL
LqrL
afur*'fe,
SWEEPS, ANp cuARDs
DESCRIPTION
Are stops provided at th e limits of travel of the trolley?
a) Are stops fastened to resist forces applied when
contacted?
b) Are stops engaging the tread at least equal in diameter
to the radius of the wheel?
Is the bridge provided with bum pers/ or is the trolley
r1
rated at the a sufficient slow ^.^Ja
CEU I
Is the trolley provided with bumpe rs or is the trolley operated
at a low rate of s
?
Are guards provided:
a) To prevent hoisting roPe fouling if needed?
b) To prevent contact between the bridge electrical
conductors and the hoisting meclranism?
c)
D^5 WiA^q- cenle,r-
,/
c rane?
YES
NO
REMARK
\,/
tr
wrff 44r taet> sry.ed" 4.4
lnouc- \n"p-r
r
BRAKES
DESERIPTION
Is each independent hoisting unit equipped with at least one
self-settin brake?
Does the braking mechanism prevent over speeding?
YES
Has the holding brake been tested to ensure sufficie ncy?
Are hoiding brakes on hoists applied automatically r,rrhen
wer is renroved?
Are all brakes for stopping the mrotion of the trolley of
sufficient size to
the troll within a safe distance?
V
1
I
NO
REMARK
&.ilffinffi
ffi
HEALTH & SAFETY
SYSTEIV
TJIANAG Et\4 E NT
CHECKLIST FOR GANTRY
CRANE OPERATION
Page
2 of 5
HSE-.FORM NO,-REV,
PENANG SECOND BRIDGE
CHECKLIST FOR GANTRY CRANE OPERATION
D) ELECTRTC EOUTPMENT
DESCRIPTION
YES
Are all pendant units protected against strain?
Are pendant conti-ols adequately grounded?
L
REMARK
1,,
l/'
Are all buttons clearly marked as to their purpose?
Is the contact with live parts prevented?
Is all electrical equipment protected from dirt, oil grease, and
moisture?
I S t he pow er SU pp ly to ru n way co n d ucto rS control ed by a
fr waA
+
+L
fl^^-1
C rcu
rea ker accessi t-U t^
IE from Lt I e r ruut r
Are suffici ent emergency d iscon nects provided ?
Are all el ectrically driven traveling cranes provided with a
limit switch in the hoisti d irection?
I
NO
\."-
l./'
lr/
,a
t/.
{r"" bol4a', eoutetq*cq
)
V
E) HOISTING EOUIPMENT
DESCRIPTION
Are all sheave grooves smooth and free of defects?
Are the ropes on the sheaves prevented from bindi ng?
Are only loads lifted th at are below the manufacturers load
limit for the ro
bein used?
Is th e re m o re t h a n 2 ra ps of ro p E Ieft o n t h e d ru m whe n th U
h oo k S n its ext reme OW osi t io n ?
Is the rope end securely attached?
Are all h ooks used in accordance with the manufacturers'
recommendations?
F)
YES
NO
REMARK
NO
REMARK
l
V
V
V
{/
TNSPECTTON
DESCRIPTION
Are all the following items inspected for maladjustment at
least daily for each days
USC
a) All functioning mechanisms?
b) Visual inspection of hooks with deformations or cracks?
c) Visual inspection of hoist chains for excessive wear,
twist distorted links or stretch?
YES
j
HEALTH & SAFETY
TVIANAGETVI
CHECKLIST FOR GANTRY
GRANE OPERATION
ENT SYSTEIU
Page
3 of5
HSE.-FORM NO.-REV,
PENANG SECOND BRIDGE
CHECKLIST FOR GANTRY CRANE OPERATION
G) ROPE TNSPECTTON
DESCRIPTION
Is a thorough inspection of all running ropes (wire ropes that
raise and lower the load) made at least monthly?
Are inspections documented by a certification record which
includes the date of the inspection and the signature of the
person doinq the inspection?
Are all inspections records available for review?
Is care taken to ensure only loads are attached that can be
safely handled:
a) By ensuring the load weight restrictions are observed?
b) By ensuring that loads are attached with the chain or
rope that are free of kinks or twists and is not wrapped
around the load?
c) By ensuring that the load is attached to the load block
by slings or other devices?
Is care taken to ensure that the load is secured and properly
balanced before the load is moved?
During movement, is care taken to ensure that:
a) The hoist rope is not kinked?
b) Multiple lines are not wrapped around each other?
The hoist is not used to swing or side pull the load?
Are crane operators prohibited from carrying loads over
YES
NO
REMARK
{laua-
J*t.a
q*A
oree*\3 $.sya-Ji"'t
\,/
lr/
,r/
t/
(
people?
Are employees prohibited from riding on the load or hook?
Do the operators routinely test the brakes when a load
approachinq that of the load limit is lifted?
Are operators prohibited from leaving their positions when
load is suspended?
Is a warning signal used to notify personnel if the load
rL---5
^-.^.-L--reS iledt
crplJtudLt
ut uvet
1iltrilt:'
Is the load-raising limit switch tested prior to each shift in
which is to be used?
V
a
't/
.4
!c'n<,n Ccr..,'t8 a ttnt'ti'ro,
rhr*\ $- "x"l.t; ' J
Er ffi(ffiffi
ffi
vA ww
ww)
w HMd&&ffi
wtu#ww
i
I
I
.'Wffi
*::{}
/.1
?J
w
n/1
CHECKLIST FOR GANTRY
CRANE OPERATION
HEALTH & SAFETY
Nl A /:tr t\ilEl\lT qVqTtr [I
n
Page
CHECKLIST FOR GANTRY CRANE OPERATION
TESTTNG
DESCRIPTION
Are all new and modified cranes tested prior to use to include
the following :
a) Hoisting and lowering?
b) Trolley travel?
c) Bridge travel?
d) Limit switches?
I)
NO
REMARK
NO
REMARK
NO
REMARK
\,/
V
V
lr/
MAINTENANCE
DESERIPTION
Has a preventative maintenance program been established
based on the manufacturer's recommendations? (200 hrs normal service, periodic service every 6 months)
J)
YES
YES
)
\,/
OTHER REOUIREMENT, GENERAL
DESCRIPTION
Are all operators familiar with the operation and care of fire
extinq uishers?
Adequate PPE is provided (helmet, harness, safety boots,
qlass)?
YES
t/
of 5
HSE--FORIVI NO..REV
PENANG SECOND BRIDGE
H)
4
HEALTH & SAFETY
TUANAGET/
CHECKLIST FOR GANTRY
CRANE OPERATION
E
NT SYSTEIVI
5 of 5
HSE.-FORI\i] NO.-REV,
PENANG SECOND BRIDGE
CHECKLIST FOR GANTRY CRANE OPERATION
K)
REGULAR DAILY INSPECTIONS MUST BE CARRIED OUTTO CHECK FOR
.
.
GROUND CONDITION
SLING, ROPES, CHAIN AND STROPS CONDITION
F
CRANE IS
CHECKED
/ INSPECTED
BY
I
I
DESIGNATION
I
I
DATE
I
a
SIGNATURE
I
I NOT SAFE
FoR opERArtoN
phvlg ur+NU
AsST '9+o
\SL/reR/^rr€
ll. t'2->rL
44
FURTHER ACTION REQUIRED (For lnspector
frlcilAl
\
r
.el . ,lz
""*--)
16,4r"
)
The subject have been inspected
COMMENTS:
lssuance of
lm
Notice
lss
of
Violation N
lssuance of Sto Work Order SWO
YES / NO
YES / NO
YES / NO
1
s
(eo,nJ l*dL{
tL((
lmtex*
"5
og!rc<^{ion.
+ *"";3 y&rya^*r*
:':lr"
,
...:
')
.!
J
cc-d;.1;,)1
,.
(:,
t
i
-,:
**^
o^&
n*J*s ,f,#.,r fro*'laA ,f*"
"t''a-
TJ
.un&d>r1
u^eqet\La
UEffi@
HEALTH & SAFETY
MANAGEMENT SYSTEM
CHECKLIST FOR GANTRY
CRANE OPERATION
Page 1
of5
HSE--FORI\4 NO,.REV,
PENANG SECOND BRIDGE
HSE.F219-O
CHECKLIST FOR GANTRY CRANE OPERATION
A)
DESCRIPTION
Is valid PMA available?
Is the rated load of the crane plainly marked on each side of
the crane?
a
Is the marki
clea
visible from the floor?
Isacl earance of 3 inches maintained laterally between the
crane and the nearest obstruction?
Are only d esignated personnel permitted to operate the
YES
NO
5Rx Dort_
REMARK
\/'
-G*l^.r\
crane?
B) STOPS. BUMPERS, RArL SWEEPS. ANp GUARpS
DESCRIPTION
Are stops provided at the limits of travel of the trolley?
a) Are stops fastened to resist forces applied when
contacted?
b) Are stops engaging the tread at least equal in diameter
to the radius of the wheel?
Is the bridge provided with bumpers, or is the trolley
erated at the a sufficientl slow s
?
Is the trolley provided with bumpers or is the trolley operated
at a low rate of
ed?
Are guards provided:
a) To prevent hoisting rope fouling if needed?
b) To prevent contact between the bridge electrical
conductors and the hoistin mechanism?
c)
YES
NO
REMARK
NO
REMARK
\.-
BRAKES
DESCRIPTION
Is each independent hoisting unit equipped with at least one
self-setti
bra ke?
Does the braking mechanism prevent over speeding?
YES
Has the holding brake been tested to ensure sufficiency?
Are holding brakes on hoists applied automatically when
ower is removed?
Are all brakes for stopping the motion of the trolley of
sufficient size to
the trolle within a safe distance?
\/-
V-
"g"-Jo.s
ffiffiffiffi
HEALTH & SAFETY
IVIANAGE[NENT SYSTEIM
CHECKLIST FOR GANTRY
CRANE OPERATION
Page
2 of 5
HSE..FORM NO..REV
PENANG SECOND BRIDGE
HSE.F219.O
CHECKLIST FOR GANTRY CRANE OPERATION
D) ELECTRIC EOUIPMENT
DESCRIPTION
YES
NO
REMARK
NO
REMARK
NO
REMARK
Are all pendant units protected against strain?
Are pendant controls adequately grounded?
Are all buttons clearly marked as to their purpose?
Is the contact with live parts prevented?
Is all electrical equipment protected from dirt, oil grease, and
rnoistu re?
Is the power supply to runway conductors controlled by a
fixed circuit breaker accessible from the floor?
Are sufficient emergency disconnects provided?
Are all electrically driven traveling cranes provided with a
limit switch in the hoistin d irection?
E) HOTSTING
\-\-L/
\-/^
EOUTPMENT
DESCRIPTION
YES
Are all sheave grooves smooth and free of defects?
I
Are the ropes on the sheaves prevented from binding?
Are only loads lifted that are below the manufacturers load
limit for the ro
bein used?
Is there more than 2 wraps of rope left on the drum when the
hook is in its extreme low
ition?
Is the rope end securely attached?
Are all hooks used in accordance with the manufacturers'
recom mendations?
F)
\-/'
\//'
TNSPECTTON
DESCRIPTION
Are all the following items inspected for maladjustment at
least daily for each days
use:
a) All functioning mechanisms?
b) Visual inspection of hooks with deformations or cracks?
C) Visual inspection of hoist chains for excessive wear,
twist distorted links or stretch?
YES
IA mM&Bil
/W\
-/)
ffi I
ffiffiffi\#
HEALTH & SAFETY
I\4ANAGEIVENT SYSTEN/l
CHECKLIST FOR GANTRY
CRANE OPERATION
Page
3
of 5
HSE..FORM NO,-REV.
PENANG SECOND BRIDGE
HSE-F219.0
CHECKLIST FOR GANTRY CRANE OPERATION
G) ROPE
TNSPECTTON
DESCRIPTION
Is a thorough inspection of all running ropes (wire ropes that
raise and lower the load) made at least monthly?
Are inspections documented by a certification record which
includes the date of the inspection and the signature of the
person doing the inspection?
Are all inspections records available for review?
Is care taken to ensure only loads are attached that can be
safely handled:
a) By ensuring the load weight restrictions are observed?
b) By ensuring that loads are attached with the chain or
rope that are free of kinks or twists and is not wrapped
around the load?
c) By ensuring that the load is attached to the load block
by slinqs or other devices?
Is care taken to ensure that the load is secured and properly
balanced before the load is moved?
During movement, is care taken to ensure that:
a) The hoist rope is not kinked?
b) Multiple lines are not wrapped around each other?
The hoist is not used to swing or side pull the load?
Are crane operators prohibited from carrying loads over
YES
NO
REMARK
\-""
V/z
V/'
\./^
\-''
lr-/'
people?
Are employees prohibited from riding on the load or hook?
Do the operators routinely test the brakes when a load
approachinq that of the load limit is lifted?
Are operators proh ibited from leavin their positions when a
Ioad is suspended?
Is a warning signal used to notify personnel if the load
approaches near or over them?
Is the load-raising limit switch tested prior to each shift in
which is to be used?
\-/'
\./
fu-oal \l*f$ tAia-174 &.o;*e^^
ffiffiffiffi
HEALTH & SAFETY
MANAGEIVIENT SYSTETM
CHECKLIST FOR GANTRY
CRANE OPERATION
Page
4
of 5
HSE.-FORM NO.-REV.
PENANG SECOND BRIDGE
HSE-F219-O
CHECKLIST FOR GANTRY CRANE OPERATION
H)
TESTTNG
DESCRIPTION
Are all new and modified cranes tested prior to use to include
the following
a) Hoisting and lowering?
b) Trolley travel?
c) Bridge travel?
d) Limit switches?
YES
NO
ftNY n^od,{i ceS.a "\
,u-U -Ci% DasH
:
I)
\./
\/
$*r i.
?
p"d-L.r
c-,.1
a.ggr-ov*{,
MAINTENANCE
DESCRIPTION
Has a preventative maintenance program been established
based on the manufacturer's recommendations? (200 hrs normal servi
iodic service eve 6 months
J)
REMARK
YES
NO
REMARK
coYd-^oted
OTHER REOUIREMENT, GENERAL
DESCRIPTION
Are all operators familiar with the operation and care of fire
extinguishers?
Adequate PPE is provided (helmet, harness, safety boots,
glass)?
tg
g 0 DeCeJ *Or$
C'\
YES
v^
\-t'
NO
REMARK
ffiffieffi
ffi
CHECKLIST FOR GANTRY
CRANE OPERATION
HEALTH & SAFETY
EIVI ENT SYSTE
IVIANAG
Page
IVI
5 of 5
HSE--FORM NO..REV.
PENANG SECOND BRIDGE
HSE-F219.0
CHECKLIST FOR GANTRY CRANE OPERATION
K) REGULAR DAITY INSPECTIONS MUST BE CARRIED OUT TO CHECK
.
.
FOR
GROUND CONDITION
SLING, ROPES, CHAIN AND STROPS CONDITION
!
FE/
CRANE
CHECKED
/ INSPECTED
BY:
DESIGNATION
I
t-"
T
)
DATE
I
i
"4++l^1L
I
I
S]G NATU RE
I
a
FOR OPERATION
P
I
I
C>
P
FURTHER AGTION REQUIRED (For Inspector )
The subject have been inspected
COMMENTS:
I
I
lssuance of
lssuance of
lssuance of
I
I
Notice SIN
Violation Notice SVN
Work
YES /No
YES I No
YES N
ffiffiffiffi
;,..
,,, . ;i
'' j;,.r
;i, .,1.,.:l
SAFEry
H
SYST E
CHECKLIST FOR GANTRY
CRANE OPERATION
of5
HSE..FORIVI NO.-REV.
PENANG SECOND BRIDGE
HSE-F2T9.O
CHECKLIST FOR GANTRY CRANE OPERATION
*S+t-t
A)
5+y
GrRs-l
DESCRIPTION
YES
NO
Is valid PMA available?
Is the rated load of the crane plainly marked on each side of
the crane?
a
Is the markin clearl visible from the floor?
Is a clearance of 3 inch es maintained laterally between the
crane and the nea rest obstruction?
Are only desi gnated personnel permitted to operate the
REMARK
J?<,i^al -g*."*1ao*
crane?
B) STOPS, BUMPERS, RAIL SWEEPS, AND GUARDS
DESCRIPTION
Are stops provided at th e limits of travel of the trolley?
a) Are stops fastened to resist forces applied when
contacted?
b) Are stops engaging the tread at least equal in diameter
to the radius of the wheel?
Is th e b rid ge p rovid ed it h b um pers, o r is the t ro ey
o td ted a t the a S u llt ci entl S low
ed ?
Is the t rol ey p rov id ed wi rh bu m pe rs o r is t he tro Iey ope rated
at a OW ra te of eed ?
Are guards provided:
a) To prevent hoisting rope fou ling if needed?
b) To prevent contact between the bridge electrical
conductors and the ho istin mechanism?
c)
YES
NO
REMARK
YES
NO
REMARK
BRAKES
DESCRIPTION
Is each independent h oisting unit equipped with at least one
self-settin brake?
Does the braking mechanism prevent over speedin g?
Has the holding brake been tested to ensure sufficie ncy?
Are h ol di n g b ra kes on h o ists a p pl ed a u to mati ca II
he n
e r 5 re m OV ed ?
r6 a b ,a ke c fo r stop p g
l1
the moti on of th e t ro ey of
s U ffi ci ent tze to
th e t ro
wi th n a SA fe d sta l-t CE
I
9uotL
ffiffiffiffi
::,::
,;i
:::
.:,.r,..... i..,.,
...
.' ' . ...j - : i.. '.,.:: :i
:
SYSTEIU
CI.IECKLIST FOR GANTRY
CRANE OPERATION
l
HSE--FORM NO--REV
PENANG SECOND BRIDGE
HSE.F219-O
CHECKLIST FOR GANTRY CRANE OPERATION
D) ELECTRIC EOUIPMENT
DESCRIPTION
Are all pendant units protected
a gainst
YES
NO
REMARK
YES
NO
REMARK
YES
NO
REMARK
strain?
Are pendant controls adequately grounded?
Are all buttons clearly marked as to their purpose?
Is the contact with live parts prevented?
Is all electrical equi pment protected from dirt, oil grease, and
moisture?
Is fh 6 p ower SU p p ly to ru n WA Y co nd ucto rS co ntrol ed by a
fixed ci rc u it brea ker a ccessi bt e F?A m +t-r
Lt I e flo
r?
Are sufficient emergency disconnects provided?
Are a el ectri ca ly d riven travel n g cra nes p rov ided it h a
m it swi tch n the h oi st n d recti o n ?
E)
HOTSTTNG EOUTPMENT
DESCRIPTION
Are all sheave grooves smooth and free of defects?
Are the ropes on the sheaves prevented from bindin g?
Are only loads lifted that are below the manufacturers load
limit for the
bein used?
Is there more th an 2 wraps of rope left on the drum when the
hook is in its extreme low
ition?
Is the rope end securely attached?
Are all hooks used in accordance with the manufacturers'
recommendations?
F)
TNSPECTTON
I
i
DESCRIPTION
Are all the foll owing items inspected for maladjustment at
least daily for each days
use:
a) All functioning mechanisms?
b) Visual inspection of hooks with deformations or cracks?
c) Vlsual inspection of hoist chains for excessive wear"
A istorted links
twi
or stretch?
HEALTH & SAFETY
ffiffiffi(ffi
IVIANAGEMI
CHECKLIST FOR GANTRY
CRANE OPERATION
ENT SYSTEI\4
Page
;.
5
of 5
HSE-.FORM NO,.REV.
PENANG SECOND BRIDGE
r-rsE-F219-0
CHECKLIST FOR GANTRY CRANE OPERATION
G)
ROPE INSPECTION
DESCRIPTION
Is a thorough inspection of all running ropes (wire ropes that
raise and lower the load made t least month ?
Are inspections documenied by a certificaUon record which
includes the date of the inspection and the signature of the
rson doin the i
on?
Are all inspections records available for review?
Is care taken to ensure only loads are attached that can be
safely handled:
a) By ensuring the load weight restrictions are observed?
b) By ensuring that loads are attached with the chain or
rope that are free of kinks or twists and is not wrapped
around the load?
c) By ensuring that the load is attached to the load block
b
or other devices?
Is care taken to ensure that the load is secured and properly
balanced before the load is moved?
During movement, is care taken to ensure that:
a) The hoist rope is not kinked?
b) Multiple lines are not wrapped around each other?
The hoist is not used to swin or side ull the load?
Are crane operators prohibited from carrying loads over
people?
Are employees prohibited from riding on the load or hook?
Do th e operators routinely test the brakes when a load
approaching that of the load limit is lifted?
Are opera tors p rohibited from leavinq their positions when a
load is sur
ed1
Is a warning signal used to notify personnel if the load
a
roaches near or over them?
Is the load-raising limit switch tested prior to each shift in
which is to be used?
YES
NO
-
REMARK
\"r&t h -g
ft(o-<-n^ A.r-$e."U
k-a-ao^-
ffiffiffiffi
tl,'lf1ry,i'ii,'...,.
HEALTH & SAFEry
MANAGEIVlENT SYSTEIVI
cHEcKLrsr FoR'GANTRy
4of5
CRANE OPERATION
PENANG SECOND BRIDGE
HSE.F219-O
CHECKLIST FOR GANTR,Y CRANE OPERATION
H)
TESTTNG
DESCRIPTION
Are all new and modified cranes tested prior to use to include
the following :
a) Hoisting and lowering?
b) Trolley travel?
c) Bridge travel?
d) Limit switches?
I)
NO
REMARK
YES
NO
1(EIYIAKIl.
MAINTENANCE
DESCRIPTION
Has a preventative maintenance program been established
based on the manufacturer's recommendations? (200 hrs normal servi
odic
rvice eve 6 months
J)
YES
6o,l1ot/r-iteet
cr..g E
OTHER REOUIREMENT, GENERAL
DESCRIPTION
Are all operators familiar with the operation and care of fire
extinguishers?
Adequate PPE is provided (helmet, harness, safety boots,
lass
YES
NO
REMARK
%
HEALTH & SAFETY
ffiffifrffiffi
': -.' ...
''::-;
':i'.''..:''.-
'
.1.
..1..
.
CHECKLIST FOR GANTRY
CRANE OPERATION
..- -. .r.
I
:.:.;t,,,..:
.
: : ..:,.',::'..',
.,;.:. :L
:t:::
I\IIANAG
EM
ENT
Pase
SYSTET\4
5 ofS
HSE-.FORM NO..REV.
.:::
PENANG SECOND BRIDGE
t-tsE-F219-0
CHECKLIST FOR GANTRY CRANE OPERATION
K) REGULAR DAILY INSPECTIONS
'.
GROUND CONDITION
SLING, ROPES, CHAIN AND STROPS CONDITION
CRANE
I
r:
CHECKED
MUST BE CARRIED OUTTO CHECK FOR
/ INSPECTED
DESIGNATION
DATE
SAFE
BY:
a
I
l
ftl4f\,tT ef)
I
,Puru*,**nr.DFMz
I
I
FOR OPERATION
21-&r2oiL
r)-E{_
nrvetngtf,'AllAll. M
Safct-v Sufr'rvuor
SIGNATURE
I
FURTHER ACTION REQUIRED (For lnspector
P^fiw
Uf/\{ ( irl(uu1ufl kin' Bhd.
Croritu rrB)
Peoeng Sccood Bci&s
L
The subject have been inspected
COMMENTS:
lssuance of Safety lmprovement Notice (SlN)
lssuance of Safety Viqlation Notice (SVN)
lssuance of Sto Work
YES / NO
YES / NO
YES / NO
$C c)z L{*^- P,t'
ffiffiffi(ffi
)
HEALTH & SAFETY
E I\/l E NT SYSTENll
I\4ANAG
CHECKLIST FOR GANTRY
CRANE OPERATION
Pqge 1 ofS
HSE.-FORM NO,-REV.
PENANG SECOND BRIDGE
HSE-F219-0
CHECKLIST FOR GANTRY CRANE OPERATION
A)
GENERAL REOUIREMENT
DESCRIPTION
YES
is valid PMA available?
Is the rated load of th e crane plainly marked on each side of
the crane?
a Is the marki
clearl visible from the floor?
Is a cle arance of 3 inches maintained laterally between the
crane and the nearest obstructi on?
Are only designated personnel permitted to operate the
NO
fAe r#/C{w#T
run-eon (oT)
_/
(|n-t-
SWEEPS, AND GUARDS
DESCRIPTION
Are stops provided at the limits of travel of the trolley?
a) Are stops fastened to resist forces applied when
contacted?
b) Are stops engaging the tread at least equal in diameter
to the radius of the wh eel?
Is the bridge prov ded with bumpers, or is the trolley
1
o erate d at t h e a S u ffi ci e
sl OW s
Is t h e tro ey prov id ed ith b U m pers o r is the tro ey o pe rate d
at a low rate of eed ?
Are guards provided:
a) To prevent hoisting rope fouling if needed?
b) To prevent contact between the bridge electrical
conductors and the hoisti
mechanism?
cbal^
ffia&a,(dff'dw@,
crane?
B) STOPS, BUMPERS, RAIL
REMARK
{t/4k/E
YES
NO
REMARK
oL.
I I
c)
BRAKES
DESCRIPTION
Is each ind ependent hoisting unit equipped with at least one
self-setti
brake?
Does the braking mechanism prevent over speeding?
Has
Are
the holding brake been tested to ensure sufficien cy?
ng b ra kes o n ho ists a pp ied a uto m a t i ca ly he n
ho d
r
re a
Su
YES
I
I
IS IE lil
oved
b ra ke S
ffi ci e n t
S
ZE
for sto p p i n g t h e m ot i o n of t h e tro ey of
to
t h e tro
it h n a safe d ista nce ?
I I
/
NO
REMARK
&IH&ffi
ffi
HEALTH & SAFETY
IVIANAG EI\4 E NT SYSTET\4
CHECKLIST FOR GANTRY
CRANE OPERATION
Page
2
of 5
HSE.-FORM NO,-REV.
PENANG SECOND BRIDGE
HSE-F219.0
CHECKLIST FOR GANTRY CRANE OPERATION
D)
ELECTRTC EOUTPMENT
DESCRIPTION
YES
NO
REMARK
NO
REMARK
Are all pendant units protected against strain?
Are pendant controls adequately grounded?
Are all buttons clearly marked as to their purpose?
a
Is the contact with live parts prevented?
is all electrical equipment protected from dirt, oil grease, and
moisture?
Is the power supply to runway conductors controlled by a
fixed circuit breaker accessible from the floor?
Are sufficient emergency disconnects provided?
Are all electrically driven traveling cranes provided with a
limit switch in the hoisti ng direction?
E) HOISTING EOUIPMENT
DESCRIPTION
YES
(
Are all sheave grooves smooth and free of defects?
Are the ropes on the sheaves prevented from binding?
Are only loads lifted that are below the manufacturers load
limit for the ro pes being used?
Is there more than 2 wraps of rope left on the drum when the
hook is in its extreme low position?
Is the rope end securely attached?
Are all hooks used in accordance with the manufacturers'
recommendations?
F)
a
I
t
a
I
TNSPECTION
DESCRIPTION
Are all the following items inspected for maladjustment at
least daily for each days
YES
NO
REMARK
use:
a)
b)
All functioning mechanisms?
Visual inspection of hooks with deformations or cracks?
C) Visual inspection of hoist chains for excessive wear,
twi
distorted Iinks or stretch?
{
^#*
I
ffiffieffi
ffi
HEALTH & SAFETY
I\4ANAGEIUENT SYSTEIV
CHECKLIST FOR GANTRY
CRANE OPERATION
Page
3
of 5
HSE--FORM NO,-REV.
PENANG SECOND BRIDGE
HSE.F219-O
I
CHECKLIST FOR GANTRY CRANE OPERATION
G) ROPE TNSPECTTON
DESCRIPTION
Is a thorough inspection of all running ropes (wire ropes that
raise and lower the load) made at least monthly?
Are inspections documented by a certification record which
includes the date of the inspection and the signature of the
person doinq the inspection?
Are all inspections records available for review?
Is care taken to ensure only loads are attached that can be
safely handled:
a) By ensuring the load weight restrictions are observed?
b) By ensuring that loads are attached with the chain or
rope that are free of kinks or twists and is not wrapped
around the load?
c) By ensuring that the load is attached to the load block
by slings or other devices?
Is care taken to ensure that the load is secured and properly
balanced before the load is moved?
During movement, is care taken to ensure that:
a) The hoist rope is not kinked?
b) -The
Multiple lines are not wrapped around each other?
hoist is not used to swing or side pull the load?
Are crane operators prohibited from carrying loads over
YES
REMARK
a
(7{)
J.! f"@4/n4*a
(/,4;/-41
&p 4
(
/,{/UUrz-"vt<tt
a
people?
Are employees prohibited from riding on the load or hook?
Do the operators routinely test the brakes when a load
approaching that of the load limit is lifted?
Are operators prohibited from leaving their positions when a
&gd rs suspended?
Is a warning signal used to notify personnel if the load
approaches near or over them?
is the load-raising limit switch tested prior to each shift in
which is to be used?
NO
a
(-
ffiffiMffi
HEALTH & SAFETY
NT SYSTEIV
I\NANAG EIVI E
CHECKLIST FOR GANTRY
CRANE OPERATION
Pase
4
of 5
HSE-.FORM NO,-REV.
HSE-F219.0
PENANG SECOND BRIDGE
CHECKLIST FOR GANTRY CRANE OPERATION
H)
TESTTNG
DESCRIPTION
Are all new and modified cranes tested prior to use to include
the following
a) Hoisting and lowering?
b) Trolley travel?
c) Bridge travel?
d) Limit switches?
YES
NO
YES
NO
REMARK
:
I)
MAINTENANCE
DESCRIPTION
Has a preventative maintenance program been established
based on the manufacturer's recommendations? (200 hrs normal service, periodic service every 6 months)
J)
@
/,ffi/
OTHER REOUIREMENT, GENERAL
DESCRIPTION
Are all operators familiar with the operation and care of fire
extingu ishers?
Adequate PPE is provided (helmet, harness, safety boots,
qlass)?
YES
/^
NO
REMARK
HEALTH & SAFETY
ffiffiffiffi
I\NANAG E IVI E
CHECKLIST FOR GANTRY
CRANE OPERATION
NT SYSTE
NN
5 of5
Page
HSE.-FORM NO,-REV.
PENANG SECOND BRIDGE
HSE-F219.0
CHECKLIST FOR GANTRY CRANE OPERATION
K)
REGULAR DAILY INSPECTIONS MUST BE CARRIED OUTTO CHECK FOR
GROUND CONDITION
SLING, ROPES, CHAI
A F / NOT SAFE
CRANE IS
CHECKED
/ INSPECTED
BY:
FOR OPERATION
I
DESIGNATION
t
a
DATE
Supewiaor
UEM Ccnsb:tction Sfu. Bhd"
o/2
I
I
,)ilirui safew & Health oflict
I
I
FURTHER ACTION REQU!RED
6cot
lssuance of
I
lssuance of S
Violation Notice
Work
20(
*
{"/
or ln
The subject have been inspected.
COMMENTS
t
UEM Consiruction Sda Bbd'
(
SIGNATURE
ance of
CONDITION
ND
U
rovement Notice SIN
,il q^d'*
YES
YES NO
YES
PHOTOS (GC 021
i
-*,J
I
Travel path is free from obstruction
PMA displayed on gentry beam
T;
u,t
I
Safety Latch
*
I
r
Gantry Crane GC 02
I
JN[A]AN IiLl)rrA
DESIGN, CONSTRUCTION AND COI\,PLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
sDN. BItD (82rs73-rD
2.8 ACCIDENT / INCIDENT ST ATISTICS F
E
o
o
Month / Year
G
(E
lt
J
'=
orb
)*
ctrgo
o
January 2012
YEAR 2012
ho
,=a
EE
*o
ocl
a
o o'= tr
.!l .= -c
=
o(J<(J
otr=G
<-:=
L
t5
rIrTFr?':fi
UEl,t
3>
ot
JO
.. cL
E,9
Eo
Eu
o
o
o
o
E
G
o
8o
z
0
0
0
0
0
0
0
0
0
0
0
0
l3
(!
to
February 2O12
March2012
April2012
May 2012
June 2012
July 2012
August 2012
Sept 2012
October 2012
November 2012
December 2012
Total
UEIr/ Builders Berhad
4'n Floor, Menara 2, Faber Toders, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lam a, 581 00 Kuala Lum pur
Safety Report No. 32
3.0
UEM
BUILDERS
Second Penang Bridge
Safety and Health Monthly Report:
JANUARY 2012
Training and Education
.-.
<_
JAMB
TN
KI]DTIA SDN.BIID (8A5?}TD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
,
UEM\J
ffiffilffTiiii
3.1 First Aider Name List
NAME
NO
LOCATION
1
Mohamad Nong Abdullah
Batu Kawan Site Office
2
Leong Tien Sik
Batu Kawan Site Office
3
David Wang Pak Weng
Batu Kawan Site Office
4
Kumareswaran
Batu Kawan Site Office
5
Khairul Azhar Sharif
Batu Kawan Site Office
6
ZulkifliBin Pauzi
Batu Kawan Site Office
7
Mohd Faliq bin Shaari
Batu Kawan Site Office
8
Mohd Firdaus bin Abdul Talib
Batu Kawan Site Office
I
Mohamad Husni bin Harun
Batu Kawan Site Office
'10
Yazizbin Nordin
Batu Kawan Site Office
11
Asmarinda Binti Mohd Abdul Wahab
Batu Kawan Site Office
12
Siti NurulAbadah
Batu Kawan Site Office
13
RaubelAbdullah
Batu Kawan Site Office
UEM Builders Berhad
4'n Floor, Menara 2, Faber To,rrers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
..i>
i
:2
JAMB^rN KDDuA sDN. DrrD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
(8as73-\D
UEM(-,
ffi*
ffi
3.2 Safety lnduction and Toolbox Talk
Toolbox Talk
NO.
SUBCONTRACTOR
DATE
LOCATION
WORKERS
1
UEMC-RIGGER
02.01.2012
P 222
8
2
UEMC-SURVEY
03.01.2012
P 226
8
J
UEMC,GANDAK
03.01.2012
PARAPET
l8
4
STAR SECT'RITY
03.01.20t2
SITE OFFICE
6
5
BRANTAS
03.0t.2012
P75
7
6
UEMC-RIGGER
03.0t.2012
P 222
6
7
BRANTAS
04.0t.2012
P 226
B
8
UEMC-RIGGER
04.0t.20t2
P 226
27
9
UEMC
04.0t.20t2
P 225
6
10
UEMC-ERECTION
04.01.2012
P91 N
i8
11
UEMC
04.0t.2012
P 225
6
t2
UEMC,SBJ,GANDAK
05.01.2012
PARAPET
24
13
BRANTAS
05.01.2012
t4
VSL
05.01.2012
P75
9
15
UEMC-STITCHING
05.0r.20t2
P 230
14
l6
FRESSYNET
06.01.2012
P 224
13
t7
I]EMC
06.0t.20t2
P 224
24
l8
UEMC-LOGISTIC
06.01.2012
LOGISTIC
7
l9
UEMC,AWRAH BINA
06.01.2012
7
20
UEMC-LOCAL RIGGER
2t
UEMC-RIGGER
06.0t.20t2
06.0t.2012
QUAY JETTY
LOGISTIC
P 221
24
22
VSL
06.01.2012
P 110
2l
23
KONTIARA MOMENT
07.01.20t2
QUAY JETTY
10
24
UEMC,AWRAH BINA
07.01.2012
P 226
10
25
UEMC,GANDAK,SBJ,SY
09.0t.20t2
PARAPET
t2
26
IJEMC-BOATMANCREWS
09.0t.2012
QUAY JETTY
l9
27
BRANTAS
09.01.2012
P 223
6
28
AWRAH BINA
09.0t.2012
PO78N
l3
29
BRANTAS
09.01.2012
P 072
8
UEt\/ Builders Berhad
Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lam a, 581 00 Kuala Lum pur
4tn
sB
1803
10
6
Safety Report No. 32
..a>.
:2
JAMB ',IAN KEDtTA
SDN.
aHD 01573-U)
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: SuperstructureWorks of Approach Spans
r
UEM'J
ffiffiTiflfii1n
Toolbox Talk
NO.
SUBCONTRACTOR
DATE
LOCATION
WORKERS
30
I'EMC-LOGISTIC
10.01.2012
LOGISTIC
10
31
KONTIARA MOMENT
10.01.2012
QUAY JETTY
10
32
TIEMC-LOCAL RIGGER
10.01.2012
LOGISTIC
t9
JJ
TIEMC,AWRAH BINA
10.01.2012
QUAY JETTY
7
34
UEMC.SEGMENT
10.01.2012
LOAD OUT JETTY
2t
35
UEMC-RIGGER
10.01.2012
P 238
11
36
UEMC-LALTNCHING
10.01.2012
P92N
18
5t
UEMC,VSL
10.01.20t2
SlO3S
23
38
GANDAK,SBJ,SY
11.01.2012
PARAPET
l1
39
UEMC-LATINCHING
tt.0r.2012
PO72S
t4
40
UEMC-RIGGER
I 1 0 1 20 1 2
PO91
9
4t
UEMC.SURVEY
lt.0t.2012
P 222
8
42
SY KASTI-IRI
11.01.2012
PARAPET
6
43
UEMC,GANDAK,SBJ,SY
tt.01.20t2
PARAPET
7
44
LOGISTIC, M&E
12.01.20t2
45
12.01.2012
P 230
7
46
UEMC-RIGGER
UEMC,GANDAK,SBJ,SY
t2.0t.20t2
SITE OFFICE
6
47
AWRAH BINA, SY
13.01.2012
PO89N
20
48
UEMC-GROUTHING
t3.0t.2012
P 238
49
UEMC-STITCHING
13.0t.20t2
P 238
t9
l3
50
VSL
t4.04.2012
P 071
8
51
UEMC-STITCHING
16.01.2012
P 117
19
52
UEMC-STITCHING
16.0t.20t2
P90
20
53
16.01.20t2
P 004
8
54
UEMC-ERECTION
UEMC-STITCHING
t6.0t.20t2
P90
t2
55
UEMC-STITCHING
t6.01.2012
P96
18
56
UEMC.LOGISTIC
t7.0t.20t2
LOGISTIC
8
57
UEMC-BLASTING
t7
.0t.20t2
PARAPET
6
5B
BRANTAS
t7 .01.2012
59
KONTIARA MOMENT
18.01.2012
UEM Builders Berhad
4'h Floor, lvlenara 2, Faber Tolvers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
S
P238
sB
S
1803
QUAY JETTY
5
13
t2
Safety Report No. 32
,7.
JAMBATN KEDI'A
SDN.
BIID (EA57}TD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEM\,
ffirjT,',fltrl
Toolbox Talk
NO.
DATB
LOCATION
WORKERS
19.0t.20t2
LOAD OUT JETTY
l6
61
UEMC-RIGGER
BRANTAS
19.01.2012
P 074
7
62
I'EMC-LOCAL RIGGER
22.0t.20t2
LOGISTIC
18
63
UEMC,GANDAK,SBJ,SY
24.01.20t2
PARAPET
7
64
UEMC,GANDAK,SBJ,SY
24.0r.2012
PARAPET
8
65
SY, GANDAK,AWRAIMINA
25.0t.20t2
PARAPET
t2
66
BRANTAS SB
25.01.2012
67
IIASRAT SEDAYA
26.01.2012
PARAPET
t1
68
KONTIARA
27.01.20t2
QUAY JETTY
8
69
SY, GANDAK,AWRA}IBINA
28.01.20t2
PARAPET
9
60
SUBCONTRACTOR
UEN4 Builders Berhad
4'n Floor, tvlenara 2, Faber
sB
1803
9
Safety Report No. 32
Tol/ers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
.
JAMBATN KI]DUA
SDN, AHD GT573.TD
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
a>.
UEM.J
ffi,rffi::t
lnduction Checklist
No.
SUBCONTRACTOR
DATE
LOCATION
WORI(ERS
I
ITEMC
03.0r.2012
SITE OFFICE
10
2
TIEMC
04.0t.20t2
QUAY JETTY
2
J
HASRAT SEDAYA
t4.0t.2012
SITE OFFICE
5
4
IIASRAT SEDAYA
09.01.2012
SITE OFFICE
5
5
AWRAH BINA
09.0t.2012
WORKERS CAMP
8
6
HASRAT SEDAYA
2t.0t.2012
SITE OFFICE
4
1
GUAN LEONC
2r.01.20t2
QUAY JETTY
I
8
HASRAT SEDAYA
25.0t.20t2
SITE OFFICE
J
9
UE KURMA SDN BIID
27.01.20t2
SITE OFFICE
1
10
COMLITE ENGINEERING
27.01.20t2
SITE OFFICE
7
11
HASRAT SEDAYA
28.0t.2012
WORKERS CAMP
5
t2
CORAL RESOURCES
30.01.2012
SITE OFFICE
J
UEM Builders Berhad
4'n Floor, t\ilenara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lam a, 581 00 Kuala Lum pur
Safety Report No. 32
3.3 UEMB Staff And Workers List
Total Staff And Workers As AtO2lO2l2OL2
Name
Item
1
lr. Wan Nor'Azman Bin Wan Salleh
2
Ramli Bin Noordin
0
Designation
Project Director
Construction
General Manager
Construction
Manager
Pissp-ort
N'rmhar/la
N6
CIDB Card No.
ExpireC Date
Visa
/
Work
610926-11-5185
610926-11-5185
04.07.2073
Nil
Nil
6LL007-7L-5L25
6L1007-7L-5725
03.01.2013
Nil
Nil
72C329-07-5047
720329-07-5047
23.L2.2073
Nil
Nil
co-p"ny
Nationality
Expired Date
: .:1,
):l'
'l
:
Ng
4
Cliff Holden
Erection Manager
76709sO72
w522612200LOO4
04.05.2013
PA2260464
04.05.2013
5
Goh Hood Kit
Surveyor Manager
540923-10-s693
w41030820000015
06.t2.20L7
Nil
Nil
561208-08-6033
Js1110620030027
24.07.20L2
NiI
Nil
''-:-,'...,,,,.,,"..":
.
.'
:
6
7
8
Nor Adami Bin Mat
lsmade Bin lsmail
Che Mohammad ldza Bin lbrahim
Construction
Manaser
Construction
Manager
Construction
Manager
Construction
Manager
Construction
Manager
20.07.2072
Nil
Nil
;+i+;,"r.,r'
670429-7L-5037
w51280520020038
27.L2.20L2
Nil
NiI
al.:
Nil
Nil
7s0830-08-5801
750830-08-5801
09.05.2013
Nil
Nil
Planning Manager
74L222-O8-5272
w41010320010040
06.L2.2017
Nil
Nil
Mohd Azmi Bin Omar
Administration
Manaser
650622-O2-s435
P91140520100019
L3.O5.2072
Nil
Nil
Ady Zakri Bin Abdullah
Admin Assistant
7to625-02-5977
w91271120060018
07.03.2013
Nil
Nil
Chong Poh Kien
IT
Shalinee A/P A. Subramaniam
L2
fJ
r.
Ls:;' ';;
l#-ffi.i,
:tjffl^:";ffi
#*&*n;.--
.
- -t;.i;l
r.:::ii..aN
r
r...:;;"iS
,"-"
T4
Nordin Bin Long
4C
Mohamad Husni Bin Harun
76
Mohd Jonaidee Bin Jaya
17
Mohamed Azhar Bin Salim
18
Ahmad Safri lzan Bin Samsudin
19
Zamzuri Bin Ariffin
20
Leong Tien Sik
2L
Vythialingam A/L Pattan
?:
l:l
Renewal ln Progress
gfi tr$r:j+
"
ti:: l:::r
!.t:
jl:ll-ri:tiiiii!,ll!
iti.:::it!
: u:::l
wtr{l+:i,,,#ffi1
Renewal ln Progress
i\iirjiil jiir;Lrt:1:l::.r=i=i
i-,\ry/.*44
l
::,
rtwil;.iunn
l l ir i:..:].+i+&&
-.
Asst. Contract
;
?rI
,: lffi*:
06.t2.201L
10
:: :.t.,t::t;
Renewal ln Progress
w91011120010015
K51210420020003
Alexander Kanianthara Thomas
I
",1
..^_..^ :' ":rl'
'' ' . ,.,*THl' '..L'l{"It.
6802LO-O3-5773
770809-07--5797
9
.
^-\\;,Y
710101-09-5085
P91130520100016
12.05.2072
Ntl
NiI
820625-08-548s
w51100220070006
05.05.2012
Nil
Nil
770403-09-5173
P11270620050003
20.07.2012
Nil
Nil
'
1. .. ...,';:.I l
wr.,. ., . l*;,r-,
Project Engineer
820915-07-5435
J91100420060004
25.07.20L2
Nil
Nil
;,'.
Project Engineer
830408-02-5555
w91061020030066
28.03.20t2
NiI
Nil
Manager
670821-08-s033
670821-08-5033
31.10.2013
Nil
Nil
k*i
. : 'ii
-:"];..1.i
-n4.,""-...^ {+l.}
,:."1:
:'i.;..'i'J,&;sil
I;,.
65L002-O8-5277
651002-08-5271
09.05.2013
Nil
Nil
:
490603-01-s223
490603-01-5223
L2.O5.20L3
Nil
Nil
Manaser
Project Engineer
r)1.:
Senior Project
Ensineer
HSSE
Senior Safety
0fficer
Safety Officer
t,.
':
.
.... ,ttn
;..frag,i-: '
'l
, ,,lr,al*flj1 ,.;p'
'*-c ,.i .,.i
: -*1i:::
t
'-t
. :.:i,;1,:.1
ttt
t.,,4-*r ::
:r ....4]*tlll::
:
in!!illl<1i,izz3-;jiiti.::::ry
22
Nurazwany Binti Md Arshad
Environmental
Executive
Remark
I
3
Bak Song
I
- , .-:l
840502-07-5312
840502-07-5312
o7.o3.20t3
Nil
Nit
i | :::Iii ntt::a:a:::::
i::..1. -t:"1;I:a:r:
atP:t !:;W:
: : ::. :. :t:..,:a?
tirr,".
a,
)
",,,,,,
...".
,,:"
:'.
i]
:-.:)
48
Kumareswaran a/l Murugasu
Safety Supervisor
661228-07-5067
P91240520070080
06.08.2011
NiI
Nil
49
Shahrul Azman Bin Abu Bakar
Safety Supervisor
T823168
T823168
23.r2.20L3
Nil
Nil
50
Hasnuddin Bin Abdullah
Safety Supervisor
610220-02-604L
6LO220-02-604t
23.12.2073
Nil
fr]!:!,"., ilj#,W,,!,,#ffi
:qY:
i
52
AIi lmran Bin Che Yang
Forklift Operator
810523-08-5803
w113r"1220090040
30.12.2011
Nil
Nit
:'
Renewal ln Progress
...
w11291220080004
28.L2.20L2
Nil
Nil
yi:i=;:!i.{lffiti
Lim Kok Teong
Liaison Officer
540329-07-5745
P972107200407L2
07.03.2013
Nil
Nil
i':ii:a':/41
830801-12-s093
830801-12-5093
08.05.2013
Nil
Nil
55
Rosnahaniza Binti Shamsudin
Planner
810919-08-5818
J91010120030002
28.O3.2012
Nil
Nit
Syuhada Binti Yaacob
Secretary
82020L-O7-5205
82020L-07-5206
23.L2.20L3
Nrl
Nil
Rosmah Binti Mat Zain
Document
Controller
7205t9-O7-5224
w11051020000003
20.07.20t2
Nit
Nil
Clerk
750322-O3-s728
750322-03-5728
23.L2.2073
Nil
Nil
59
:l
lnsmarinda
Binti Mohd Abd Wahab
Kathrine A/P Primus
Clerk
860831-O1-5050
850831--01-s060
09.05.2013
Nil
Nil
/&
"*:)rli}:l'
8so927-O2-6L87
Planner
58
:::
! .l
I i i:
Mohamad Nizam Bin Abd Rahim
Mohd Nashamreyady Bin Nasir
57
i:;,
j.
Gantry Crane
Ooerator
54
56
ri
a;;....:ii*{}. Lrl:ti tt):: !
iiij?iit::j !i.:.,:::,?:,!i ;ti
,-
5a
;.rr:.{,{ril
W.^. ." Nil
Renewal ln Progress
iffifi
:::::t!t i i I
xillft.1#r1,1i1ffi#
lifx,,Y!!f,i{ffi !{itf,,ffi
itffiffiffiffi
R$jrrjrlir:::::::=:iiliiill
ji+r:.{.
jliir,Fi,##
i,,
60
67
62
l*rr""n
lSuzana
Hazreen Binti Mohd Salleh
Einti Zakaria
Admin Clerk
820628-07-s476
P91130420090020
09.05.201"3
Nil
Nil
Contract Clerk
830108-08-6794
830108-08-6794
23.L2.2013
Nil
Nil
Clerk
86042L-46-5528
860421.-46-5528
x I l$[s:1,,i/!ii,i iit:]:'t::r:::;::::H
a:iitriiffi-i,iii-
t;'
.,,, '*{{i,,,
tf,:,
.'-;;
.."1;..,;"^
'..'r-j'.l
i-1,, o,",,
'::
Siti Haslina Binti Husain
09.05.2013
Nil
Nit
fr" -.
;:.
i.:i"li:r
::llll
63
64
65
65
57
68
69
70
Siti Nurul Abadah Bt Amran Johari
Syafiq Bin Alias
lruit
ruor Sutraimi Bin lbrahim
Suhaime bin Hussin
Zuriyazi B. Abd Latif
luona
lSVed
razimi Bin zaini
Ourhanuddin Bin Abd Rahim
lVrf,..rrO
Fahmi Zuhdi Bin Abdullah
Muhammad Malik Bin Mat Sharip
72
l*ono ,rnu,r,
Bin Azzis@zahid
Planning Clerk
800926-07-s256
800926-07-5256
23.L2.20t3
Nil
NiI
Assistant Quantity
SrrrvPvor
870607-O7-5L99
P91190220080109
28.O3.2012
Nil
Nil
Chainman
840608-03-6215
AL122LO20030160
2L.L2.207r
Nil
Nil
Forklift Operator
Gantry Crane
Operator
.
76LOO2-O2-5401
w31051220010121
2I.L2.2017
Nil
Nil
P11130520100028
72.05.2012
Nil
Nil
861015-38-6423
P91230220080048
24.03.2012
Nil
Nil
Project Engineer
860201-03-s139
J91140220080045
28.O3.2012
Nil
Nil
Gantry Crane
ODerator
840912-07-5569
840912-07-5569
09.0s.2013
Nit
Nil
Chainman
930713-08-5683
P7L227020LOOO25
21.LO.20L2
Nil
Nil
Chainman
45L272-08-647L
P11070920100103
06.09.2012
Nil
Nil
ner
.
,-'-
' '. i'i'j
: :: f;.,
l;, "
I'T*';
l 'itit:,:-' ,.:;;:-,;
.
*, .'.:.
::.:!lt/t:.ar':\n':tl\ll;l!!/|f,
i: jjl.ll
'^<;tiit;ii:#;ni:!\11!1tr]:na!::!
j
r":ll
'ry
...
r'' '
: -_
" .::::.i". :1...:..ia.
--IL,.
{i*
ffi.
.'
,.
',"i",. ',,' i;,, I!*iiI
*+I*':
8603r4-O2-6L69
Pla n
..;. .
.**"+'
:: :.'
I :i ll-
o:,i..
l
-'Y*,',-
'+i.#;
1T
I
i r:
Renewal ln Progress
|!li;:;
"i;
Renewal ln Progress
il
98
Muhammad Riduan Bin lden
General Worker
880709-02-5s89
880709-02-5589
28.O2.2013
Nil
Nit
99
Mohd Faudzi Bin Hashim
General Worker
810703-07-5311
810703-07-5311
28.O2.20]'.3
Nil
Nil
Seaman
450424-07-5347
450424-07-5347
05.L2.2071
Nil
NiI
100
101
lrvrof,o
nortv Bin Sulaiman
Muhamad Firdaus Bin Samsudin
lo2
Nashahaimi Bin Shaari
L03
Ahmad Sallehuddin Bin Zainuddin
704
105
Muhd Shahizal Bin Mohd Zulkifli
lvor,o
r.i,,r. Bin
Ghazari
106
Mohd Safwan Bin Mohamad ldris
tol
Muhamad Badrolhisham Bin Mohamad
Shabri
Seaman
Seaman
Supervisor
General Worker
Chainman
830317-07-5555
830915-08-6651
650401-08-5047
910525-08-5901
870613-02-5091
830317-07-5555
83091s-08-66s1
w3129092003000s
910525-08-5901
870613-02-s091
06.L2.2017
06.tL.20t122.09.2012
28.O2.2013
10.05.2013
Nil
Nil
Nil
Nil
Nil
-
Nil
Nit
111
://::i: ..,
:
1
767LO2-O8-6981
28.O2.2013
Nil
Nil
'J-71-
Hasnawi Bin Abdullah
Boat Operator
880707-35-5699
880707-35-5699
28.O2.20L3
Nil
Nil
General Worker
921006-08-6295
927006-08-6295
28.02.20t3
Nil
NiI
113
Muhamad Anwar Bin Ahmad
General Worker
830519-07-5707
830519-07-5707
28.02.2013
Nil
Nil
L1.4
Mohamad Hafiz Bin Abdullah
Boat Operator
911031-07-5S13
911031-07-5514
37.70.2013
Nil
Nil
115
Ridhwan Bin Abdullah
520730-O2-s293
s20730-02-5293
o4.o7.20t3
Nil
Nil
716
Mohamad Yusof Bin Jamaruddin
1L7
Heah Voon Chee
118
Md Borhanudin Bin Md. lshak
Driver
. :..*.::.:..H
:!;::a.i!a:*.l
: .,.-Tq,
i+,
td;:.,;t",,.1r:.. e
761102-08-6987
r
tffi,
,&
iir.rMi4nna+
ff !r.!!.:!.a.:i.,!:!,1irL.i/,
E:." .i,,t:lt. ',;hi*
Marine Traffic
Controller
:
I
,-..,,.e
Nil
Mohd Suhaimi Bin Haji Yusof
l.IS-:,.'.1..r.-
l"::'.".
::-:" l] ,: ::-
Nil
110
Mohd Fareez Bin Mohd Rejab
.i#
1:.
28.O2.2013
Nil
raii
1r:r:,,"rd
,..
E
921226-02-5857
Nil
12.2
.ri!4.1 r.
92L226-02-5857
2a.o2.20t3
4
iiri,l,;t',;ri1iiEx,Ixi
General Worker
920330-08-5441
#
-*It
:-1
e
iiit ill,,'::1,i::,lrI
iiiiliii/..:,-::E
,'*
'tl
I
':t I
':-
:1:
;:.::::l::l:l:;:liigsrLr i:ats;l::
..:: |i rt | djs.trlt
:\1!.t
Warden
650703-Os-5501
P1L221020700074
27.70.2072
Nil
Nil
Sales Coordinator
790516-07-5169
P911910201000s1
78.L0.2072
Nil
Nil
Mechanic
570520-07-7995
P71221020LOO026
2L.70.2072
Nil
Nil
Sales Coordinator
7010L0-08-6314
P91191020100056
18.10.20t2
Nil
Nil
t i*:
690527-Ot-6289
K91200820010031
07.03.2013
Nil
Nil
eiiBl#Effi
Supervisor
s50r.20-03-s109
K3L240420020007
27.L2.2072
Nil
Nil
?;ii t,t,1 l:. i;;:::l,.::..1; ti,,
.?tt;t*:tt;;:+i"iiliiili;::ii
General Worker
87102L-OA-5941
877027-08-5941
23.12.2073
Nil
Nil
ll.liliif;]ffi
Asst. Manager
Contract
Renewal ln Progress
BR::,;: . '..,ir.: Renewal ln Progress
Nil
920330-08-5441
,.'']i *,
.,
.
NiI
Chainman
lwan
.,
Renewal ln Progress
":i..1.
" "'d-'lr:,:,
t,r
w-4.:
28.O2.2013
Mohamad Syafiq Bin Miskam
abdul Halim Bin Mohamed
:': :
d4rl..l
890719-08-6165
L09
727
f
:
890719-08-6165
Nil
Ferdaus Bin A. Aziz
ll
g"'
Chainman
Nil
L20
.
.i.{.i,
i,:i:i W,
'!':il:
28.O2.2013
trtur Shiha Binti Ahmad
lTtlr,,
- ",
Nil
8LO7L9-O3-6077
lwan
rr.
:J a,
: +1i,
8ro719-03-5077
119
l
NiI
Chainman
Saddam Btn Mohd Zain
r
: .:a: :'i
:
Nil
Muhamad Maliki Bin Mat Sulaiman
lVof,arrnaU
. .,.,r.
:u.tL
108
LL2
...
q.i,Ll+li:;'iiitiiiiiir
ii.r=liii:iirl,:r:,Js]
:
::
ii;fiirt,N,,,ffi
ililii
il
)
:
:1,
ll::a.:::a,:=,:t:,t !?|.\
!48
L49
150
m
ffi
Firdaus Bin Mohd Niza @ Mohd Nizal
QA/QC Supervisor
Nur Muhd Firdaus Bin lsmail
General Worker
Siti Nazirah Binti Abdul Fatah
Assistant Quantity
Survevor
820503-08-5477
860816-3s-s331
851218-03-5552
P4105102005000s
850816-35-5331
PL1070220050L67
L8.12.20LL
o4.o7.20L3
25.tO.2012
Nil
Nil
Nil
Renewal ln Progress
Nil
::::::: ::::: ::::::::::::::::::::::::
NiI
NiI
1:::
::::::: :
littrN,ti,Wffii!itt!.i,W
:!:.t
B
151
Kamarul Bahrin Bin Baharuddin
General Worker
680320-08-6619
A21010320100011
29.02.20t2
Nil
Nil
152
Mohd Rashid Bin Abdullah
General Worker
7409t3-O2-566t
740973-O2-s661
16.05.2013
Nil
Nil
153
Suhaime Bin Md Samat
General Worker
860724-02-5415
860724-O2-54L5
3L.O7.20L3
Nil
Nil
754
Sahimi Bin Aziz
General Worker
750822-03-5863
750822-03-s863
16.06.2013
Nil
Nil
155
Mohd Azwan Bin Ghazali
General Worker
890920-02-5823
890920-02-s823
16.06.2013
Nil
Nil
156
Mohamad Helmy Bin Zamri
General Worker
860304-26-5527
860304-26-5527
76.06.20L3
Nil
Nil
t57
Mohamad Khairi Bin Hussain
General Worker
880518-02-5607
880518-02-5607
3L.O7.20L3
Nil
Nil
158
Yusri Bin Ramli
General Worker
800520-08-5809
800520-08-5809
3t.o7.2013
Nil
Nil
::::::t:::',tt
: t:::- ,5
ti&:;rl:iiit | 11i:,.ari;,Kitltt,i
t7;;it:i:i:::;irlii:::::i:i:-!-::ti
159
Mohamad Shamsul Bahrin Bin Hariri
General Worker
910907-08-s91s
910907-08-s915
3L.O7.20t3
Nil
Nil
160
lsmail Bin Jamaludin
General Worker
660403-08-6253
660403-08-62s3
3L.O7.20t3
Nil
Nil
75L
Muhammad Sofean Bin lsmail
General Worker
930102-08-5895
930102-08-5895
3t.o7.20t3
Nil
Nil
162
Abdul Rahim Bin Satderi
General Worker
821274-08-5277
827224-O8-s2L7
31.07.20t3
Nil
Nil
163
Murad Bin Kamaruddin
General Worker
700s26-08-s617
700526-O8-56L7
3L.O7 _20L3
Nil
Nil
164
Mohd Afizal Bin lsmail
General Worker
850414-02-5285
850414-02-5285
3L.O7.20t3
Nil
Nil
165
Mohamad Rafi Bin Md Rejab
General Worker
871031-02-5811
871031-02-5811
37.07.20L3
Nil
Nil
156
Ridzwan Bin Noordin
Draftman
64032L-02-5053
64032L-O2-5053
23.L2.20L3
Nil
Nil
767
Kirtee A/P Poobalan
Receptionist
930219-07-5594
930279-07-5594
37.07.20L3
Nil
Nil
General Worker
600815-01-5705
600815-01-s705
31.07.20t3
Nil
Nil
-t:.::
.
:
ll' i::::/..;::.4, ::t: :
168
lvohd
ruor ein earnin
169
Arshad Bin Bedu
General Worker
6272L1-O1-58L7
62L2t7-O7-58L7
3t.o7.20L3
Nil
Nil
170
Mohd Zayyani Bin Mhd Fauzy
QA/QC Engineer
840706-02-sI13
840706-O2-5L73
16.06.2013
Nil
Nil
L77
Azaman Bin Aziz
General Worker
730319-09-5115
730319-09-5115
17.01.20L4
Nil
Nil
r7z
Abdul Shukor Bin Abd Ghani
Scaffolderman
77L722-O2-5085
77t122-02-so85
23.72.2013
NiI
Nil
s
..!::
I' | :'. !.j:::.:t i
,,1
.t
198
Muhammad Nor Azman Bin Abd Salam
YES
880807-03-6193
PArL20z20LOOOt7
77.O2.2072
Nil
NiI
199
Marzuha Bin Mustapha
YES
880s05-29-5157
P81120220100048
lL.O2.2012
Nil
Nil
200
Muhammad Faiz Bin Abdul Rahman
YES
880928-02-5253
P81120220100003
71.O2.20L2
Nil
Nil
201.
Mohd Alias Bin Omar
General Worker
600314-08-6599
500314-08-6599
31.LO.20L3
Nil
Nil
General Worker
840801-07-5597
840801-07-s697
31.10.2013
Nil
Ntl
Omar Bin Mhd Ariffin
General Worker
851027-08-6285
851027-08-6285
31.10.2013
Nil
Nil
r.rir.,
General Worker
840515-11-6099
840515-11-6099
31.10.2013
Nil
Nil
General Worker
690527-O8-629s
690527-08-629s
3L.70.2013
Nil
Nil
202
203
204
zos
lroha sr,rtor.
!uoha
lrvroi,a
ro.i
Bin Haron
Bin Yusup
Bin Kulop
206
Mohamad Nazri Bin Che Din
General Worker
860813-35-5731
860813-35-s731
31.LO.2073
Nil
Nil
207
Roslan Bin Samsudin
General Worker
681030-08-5639
681030-08-5539
31.10.2013
Nil
Nil
208
Pachemuthu A/L Ramayah
General Worker
670903-08-5037
670903-08-5037
31.10.2013
Nrl
Nil
209
Shahidan Bin Osman
General Worker
587277-O7-58L1
58L2L7-O7-58Lr
31.10.2013
Nil
Nil
zLO
Muhamad Fauzi Bin lshak
General Worker
840324-07-5407
840324-07-5407
3L.t0.20L3
NiI
NiI
217
Abd Aziz Bin Awang
General Worker
800228-07-5363
800228-07-5363
31.10.2013
Nil
Nil
272
Chek Mohd Yusuff Bin Chek Yum
General Worker
9to223-O2-5r29
9LO223-O2-5129
31.10.2013
Nil
Nil
General Worker
900729-02-s039
900729-02-5039
31.10.2013
Nil
Nil
General Worker
840426-02-5961
840426-02-596L
3r.10.20L3
Nil
Nil
General Worker
850505-02-6061
850605-02-6051
3L.10.20L3
Nil
Nil
2L3
214
215
lvuf,r.ra
Azhari Bin Aziz
Muhammad Basir Bin Abu Bakar
lru,o,r,,
,,n Mokhtar
2t6
Shariff Bin Mohamad
General Worker
750725-08-5703
7so125-08-5703
31.10.2013
Nil
Nil
2r7
Zainun Bin Tholib
General Worker
640801-02-5343
640801-02-s343
31.10.2013
Nil
Nil
2t8
lbrahim bin Othman
General Worker
690302-02-5627
690302-O2-s627
31.10.2013
Nil
Nil
219
Marina Binti Ramli
Logistic Clerk
880907-08-6446
880907-08-5446
31.10.2013
Nil
Nil
220
Nurul Farhi Binti Abd Aziz
YES
850818-02-5070
850818-02-5070
31.10.2013
Nil
Nil
221,
Nazri Bin Yaacob
General Worker
830125-08-5875
830126-08-5875
31.10.2013
Nil
Nil
General Worker
700319-07-5563
700319-07-5553
31.10.20r-3
NiI
Nil
222
lrrrurur"n
A/L Gopal
248
Mohamad Suffian Bin Metashim
249
Syahirah Binti Mansor
250
Azhar Bin Ahmad
257
,ro, Rizal Bin Abd Rahim
lrono
General Worker
80040s-13-5815
P31310120050007
73.70.2072
Nil
NiI
YES
870417-O7-s3s8
w81160120100074
ts.o7.20t2
Nil
Nil
General Worker
870510-08-6385
A21010320100009
29.O2.2012
Nil
Nil
General Worker
890226-07-5759
P11200s20100070
79.O5.20L2
Nil
Nil
Crane Operator
430622-08-5687
w11180s20010120
05.L2.20LL
NiI
Nil
252
Low Sek Meng
253
Ganesan A/L Subramaniam
Supervisor
640410-05-5131
w41190320010039
14.12.2072
Nil
Nil
254
Syabidin Bin Wahab
Supervlsor
761101-02-5685
J41121220030006
03.02.2072
NiI
Nil
Renewal ln Progress
:aiii?.i.i
$i;iri
;id;lfi;i
it?iBi6;iii iini;iiii:;*ii;i::
Nr$Jii,:?lJ,lt rLrlrllri*ll,rLL
255
,r,,
l*ono
Bin Abd wahab
Supervisor
82Lr27-L7-5509
P41100420080003
05.08.2012
Nil
Nil
900115-05-5217
23.72.20L3
Nil
Nil
256
Mohamad Azlan Bin Abu Bakar
General Worker
900115-05-5217
257
Mohd Fairul Akis Bin Hamid
General Worker
927076-02-5357
Attend course 19.1L.2O1L
Nil
Nil
258
Muhd Shahrul Aizat Bin lsmail
General Worker
930321-14-s691
Atte nd course
t9.L]'.20l]'
Nil
Nil
259
Muhammad Hafiz Bin lsmail
General Worker
921008-02-6181
Attend course L9.LL.2OIL
Nil
Nil
260
Mohd Shahril Amzi Bin Jaafar
General Worker
930101-02-s139
Attend course 1-9.LL.2OLL
Nil
Nil
10L
Muhamad Norhijrah Bin Puteh
General Worker
891123-08-6007
Attend course 19.Ll.ZOLl
Nil
Nil
General Worker
8st237-O2-6079
Attend course L9.L1.2OL7
Nil
Nil
Site Trainer
910819-02-5517
910819-02-5517
23.t2.2013
Nil
Nil
General Worker
90707t-14-6733
901011-14-6733
23.t2.2013
Nil
Nil
aztrar Bin Mohd Yusop
General Worker
781022-08-6365
Attend cou rse 79.ll.20L1
Nil
Nil
Bin Mohamad
General Worker
820310-08-5825
Attend course Lg.LL.ZOIL
Nil
Nil
'f.#iS;iitii:;i!::.1:itri\+tlJ
General Worker
891120-08-s021
Attend course
!g.lL.2OIl
Nil
Nrl
f!.r) i\,
262
lvon.rua
Nazri Bin Ramly
263
Muhammad Hanif Bin Hassan
264
Muhammad Haizat Bin Mashudi
265
256
267
268
269
270
lruoor
lsnur,rir.t
lrvror'U
z.t uri Bin Abdul
Hamid
Syaparil Bin Mat Yahaya
Muhammad Hafiz Bin Hashim
Muhammad Hairi Bin lbrahim
General Worker
851078-O2-s827
;+aar I
t)ri: lr
i\:!.iit#l\.t: :
'l:.tlt:t:i\tt
Nil
:il
t3,.i!,].listt'lt:
General Worker
920828-07-s427
Atte nd course
79.tl.20t1
Nil
83t725-04-5227
Attend course L9.L\.20LL
Nil
Nil
j..)aaa::.::r.4,=
li ;i:isl:,':
ii
r tt i : :tit
ri:J:
ir.r$ililliir i I i.,|i.i:::i'
,tI
:t:u
lt;:::t:
ir;i#.ii##,
rt;i1;l
:l:
rl
rtar::t:u:ut::::#:: li
!j
I
I ::::,:{t:t
.l(
ti,{
hn4r'
:
:
rL
Shukri Bin Awang Mohamad Alim
General Worker
690728-O2-5L57
272
Fazili Bin Ariffin
General Worker
720923-07-5437
690728-O2-5L57
23.12.2073
Attend course L9.LL.ZOLL
Nil
Nrl
Nil
Nil
l:r:ri,:rirllllldri
::ti:ft:,::::::t tt.:
:"^:lli
I titi::::::::u:: .;
::::::::::j li rir;:iit t:::t::
.,
'
-,
,,,"
"1,i..
.
::a
: ;:tT
ttt:tttt:: I : :ut:::::H::
:
271
utllli;i4
,7,i1,*ii*iii:n'):::::::1:l:l:i,i:i.t
: r$B\ir i., : I : ; ::: ::.:::a.r.a:
Nil
Nil
:lS
' '#
ii:i!i;i::; tl
ilil!;ji41riir riiiin ::::i-,ii
':tr
General Worker
r-:r:l
111'."t:.1'n':
m ,,;l,
i!:?!.11..:;iliti
Attend course 19.LL.20L1
r
:?
LLltix
r:.1:."
r:::t ) | ;1 lt
| :
iIil,r.:?.;11;::n;ii*.I* .:
:l::1:1:i$; !
trtli'*!.::a:::tt\
u :::u:utu:l:;
t : ::t t :1
.
*,,,\
liitstLiti);t j:i.Y;i.!.#rii.l
298
Muhamad Shahrizal Bin Saad
901013-08-6543
Attend course zl.]-L.2OLI
Nil
Nil
General Worker
900528-08-6543
Attend cou rse 21.1L.2O17
Nil
Nil
IrtE=E lf#
lsharumizan Bin lshak
General Worker
891107-03-5161
Attend
2L.1t.2OLt
NiI
Nil
lil{iiitffiirrfft
301
Mohd Zaki Bin Zainal Abidin
General Worker
8707L8-O2-5469
Attend course 21.L7.2OLI
NiI
Nil
l,rtfffffiis*
302
Azman Bin lsmail
General Worker
830703-02-5371
Attend course 21.tL.20I1
Nil
NiI
l#lllfliffi
303
Mohamad Faizal Bin Abu Bakar
General Worker
841205-08-6343
Attend course 2L.LL.2O1L
Nit
Nil
lF*Biii4ffi
304
Halid Bin Said
Forklift Operator
810820-02-s057
810820-02-5057
l','"',o,,
Nil
Nil
305
Mohd Shahrul Ridzuan Bin Tajuddin
GeneralWorker
850708-38-5381
860708-38-5381
1,,.,,.,o,,
Nil
Nit
306
Kaman Bin Kamis
Boat Operator
681118-02-5163
Attend course 2L.LL.2O17
Nil
Nil
307
Bahrim Bin Kassim
Boat Operator
570105-02-5699
Attend course 27.L7.2OLL
Nil
Nil
ll[6n+
308
Zubaidi Bin Kassim
Boat Operator
730202-02-5703
Attend course 2L.LL.aOLL
Nil
Nil
llili?r?ffiB-r
309
Seravanan Kumar A/L Mathavan
Forklift Operator
850708-05-5543
Attend course 27.tL.2OLl
Nil
Nil
310
Abdul Rahman Bin Saad
Forklift Operator
760722-07-5445
Attend course 2L.L1.2O71
Nil
Nil
lii;....r=#i*i,,
311
lsmawadi Bin Berahim
Supervisor
640709-03-50ss
Attend course 2L.1L.2OIL
Nil
Nil
liilr{+*i;;ffi
312
Roszaida Binti Abu Bakar
Clerk
890223-02-s860
Attend course 27.LL.2O17
Nil
Nil
313
Ezza Sharina Binti
9to926-O7-5034
Attend course 27.L1.2O71
Nil
Nil
li$,iiii,i,iffi,'i
3L4
Natasha Azura Binti Lahman
Clerk
850508-02-s964
Attend course 2L.7L.2O1!
Nil
Nil
l.+,.li l#j
Storekeeper
92L224-07-5033
Attend course 21.7L.2071
Nil
Nil
299
SOO
315
lzulazmi
lvona
Bin Aini
lvogatatan
Amir
A/L Muruges
General Worker
Clerk
cou rse
E
lffiirrirE
E
118
I
fi
316
Mohd lkhwan bin Khairuddin
Forklift Operator
810628-08-6087
Attend course 2L.LL.20IL
Nil
Nil
377
Wan Roslan Bin Othman
Forklift Operator
700501-03-6253
Attend course zl.Ll.aOLL
Nil
Nil
318
Philip Anak Kevin Akeu
Account Ecexutive
750s0s-13-6249
Attend course 2L.1t.2OlL
Nil
Nil
General Worker
900s28-08-6089
Attend course 21.LL.2OLL
NiI
Nil
I
General Worker
87LLO2-08-6L61
Attend course 27.LL.2OLL
Nil
Nil
General Worker
780828-08-5ss1
Attend course 21.11.2Ot1
Nil
Nil
lllrliiiiffilir
llill
General Worker
92031s-08-6323
Attend cou rse 2L.11.201,7
Nil
Nil
:ts
320
32r
322
lzrr
Azmi Bin Aini
Yusri Bin Yusoff
ll,aor,arnrnad
Roshdi Bin Satderl
Ahmad Amin Bin Mhd Ariffin
t.
itiii!.ri:iri!:iii!;i;l
llrffi,i
I
,
liiiliiliii i iiiifiiil
348
Mohd Azmi Bin Dollah
General Worker
Next Course
760706-08-5363
Nil
Nil
349
Rusnizam Bin Md Yusuf
General Worker
8LO627-O7-5247
Next Course
Nrl
Nil
3s0
Abd Rahim Bin Hashim
General Worker
6303L4-O7-522L
Next Course
Nil
Nil
-a
I
.
;l?:'i "
t :
uut:u::
:::t::uuut::
:
t::::::::
: ::::::::
il.i;
::i::
'::ii
I
::
.t
:tit:ut
::::::::
t-uuuuuul
:::::::::::::,::
.ra#iffil
ii';,il;all
:
r
:'ii;ii
^l
351
Muhamad Akmal Bin Ayob
352
Loetchai Phorncheam
353
354
355
Boat Operator
r
La uncher
nFrintendent
Su
oerintendent
Sr
lehicnai
lertwiriyapiti
lworactret
Pornchaem
Suepsak Lertwiriyaplti
Launcher
Launcher Operator
Next Course
910614-08-5057
J 695269
Nil
Nil
I 695259
74.O4.20L2
vA 9189308
14.O4.20t2
w
853615
w 8s3615
15.O4.20L2
PA 086s188
75.O4.20L2
P
64!649
P 641649
04.o4.2072
PA0247r85
04.04.201"2
w
L5.O4.20L2
PA 0865189
75.O4.20L2
La uncher
Suoerintendent
w 8s3616
853616
',:,.
ffiffi
ffi
ffiffi
ffiffi
Rigger
R 882902
R 882902
2t.o4.20t2
PA 0669157
21.O4.20L2
Wre
357
Nattapon Boonson
Rigger
v 881s90
v 881590
2r.o4.2072
PA 0669158
27.O4.2072
Wffiffiffi
lffiw
Rigger
c842205
c842205
21.O4.20L2
PA 0569150
27.04.201.2
ffi
w
805679
27.O4.20t2
PA 0669143
2t.o4.20t2
sufoo
UEMC
ffi
Wichian Ketdit
lsomnot
UEMC
ffi#Yffi
356
358
UEMC
:
UEMC
rW
!JEn4G,r,
ffi
Wffi
ffiffi
M
359
Phiboon Yimchai
Rigger
w
805679
360
Suwat Phamarno
Rlgger
R
820620
R 820620
27.04.20!2
PA 0569154
2L.O4.2012
361
Yon Meeprang
Rigger
u 888677
u 888677
27.O4.20r2
PA 0669146
27.O4.20L2
Rigger
w
w
831706
27.04.20t2
PA 06691s1
27.04.2012
Rigger
w 831678
w 831578
27.U.2012
PA 0569153
27.04.2012
Phamanet
Rigger
w
831481
w
831481
27.04.2072
PA 0669152
27.04.2012
36s
Arnon Ketthuean
Rigger
R
884768
R 884768
27.O4.20t2
PAO669L44
27.04.2012
366
Siraphob Udomnam
Rigger
R884778
884718
27.O4.20L2
PA 0659149
27.04.2072
ffiffi
367
Wichai Klaimak
Rigger
w 831664
w 831564
27.O4.20L2
PA 0691503
27.O4.20L2
ffiffiffi
368
Sayam Nakseein
Rigger
w
831495
w
831496
27.O4.20t2
PA 0669155
27.O4.20L2
Hffiffiffif;ffig
S$jtwffi
369
Napphon Thongnuk
Rigger
w
831641
w 831641
27.04.2072
PA 06691s6
27.04.20L2
Rigger
R 884791
R 884791
27.04.20L2
PA 0669145
27.04.2012
27.04.2012
PA 0559148
27.O4.20r2
27.O4.20L2
?A0669147
27.04.2072
W
362
363
lruatthapong
seechum
Noppadol Noknoy
831706
:.:::,UEMC;:
ffiffi
ffi
ffiffi
W
364
lwandi
R
ffiffi
rffiw
ffimffiwww
.LJEMC
lW
370
lsomknia
Bunserm
884730
371
Narong Bunlo
Rigger
R
372
Phanlop Taengchim
Rigger
R 884756
R
884730
R 884766
ffiffi
ffiffi
W
ffiffi
l:
,.
i,...UEMC
UEMC
:
398
Prakasit Sukkamonkun
Rigger
x 820251
399
Khamphong Laophaeng
Rigger
Y
400
Kltiphong Srigoen
Rigger
u 711L60
401
Chaiyapong Krongsak
Rigger
R
Rigger
402
lManit
Makhunthod
x82026L
22.06.2072
PC
0031263
22.06.2072
777453
22.06.20L2
PC
0031270
22.05.2012
u 711160
22.06.20L2
PC
003126s
22.06.2072
823838
22.06.2072
PC
0031269
22.06.2072
x 820070
x 420070
22.06.2072
PC
0031264
22.06.20L2
7t7453
823838
Y
R
403
Suphat Khamana
Rigger
R822984
RA229A4
22.06.2072
PC
0031258
22.06.20L2
404
Somkhuan Kaewsonthi
Rigger
u 88867s
u 88867s
L4.o5.2012
vB 3039191
18.05.2072
Mingkhon
Rigger
R
822959
22.06.2012
PC0031267
22.06.20t2
aoon.f', Khumdinphitak
Rigger
R823432
P12757220LOOOO6
22.06.20!2
PC
0031266
22.06.2072
Suphat Phutthamale
Rigger
u 892843
P12141220700041
78.O8.2012
PC
0669756
18.08.2012
ehichit ranna rat
Rigger
R
854619
P72147220700048
18.08.20r,2
PC
06697s0
18.08.2012
409
Mongkhol Karnbanjong
Rigger
R
864610
P12141220LO0OL2
78.O8.201"2
PC0669757
ra.0a.2072
4L0
Chatree Pasith
Rigger
R
864888
P12141220LOOOO4
18.08.2012
PC
0669760
18.08.2012
4L',J-
Akkadech Nyuanklang
Rigger
x 820773
P72L41220IOOOO9
r8.oa.20L2
PC
0669758
L8.O8.20L2
412
Daeng Wongprachum
Rigger
R
854612
PL2I4L220LOOOO6
18.08.2012
PC
0669752
18.08.20L2
Rigger
w 849939
PL2L4I220700047
18.08.2072
PC
0669751
78.08.2072
Rigger
R 864677
PL2741220LOOO46
18.08.2012
PC0669749
78.O8.2012
Rigger
R
P72143.220100008
18.O8.20L2
PC
0669759
18.08.20r,2
405
406
:
lrh.nor*onB
I
407
408
I
822959
R
ffi
M
4L3
4t4
lrom
ftrata
Thanom Buaphaeng
4r5 l*.rong
Raksasaeng
864620
4L6
Songkran Chata
Rigger
R 8646r.6
P12L41220LOOO34
18.08.2012
PC0669754
18.08.2012
4L7
Khampun Chaisalee
Rigger
R 864615
P12L41220100007
18.08.2012
PC 0569755
18.08.2012
Rigger
2860L42
2860742
70.10.20L2
vA 9186002
70.LO.2072
Supervisor
c 984313
c 984313
ot.o2.20L3
PA 3306139
01.02.2013
v 8s8982
v 858982
ot.o2.2013
PA 3306140
0L.o2.2073
PA 0693023
30.o3.20L2
PA 0693045
30.o3.20L2
4L8
lLikhtt
ct ai*anerut
4L9
Bunsee Khui-Klang
420
Worawit Duangnamkaew
Launcher
Suoerintendent
427
Sunthorn Sarakhu
Rigger
c 984868
c 984868
30.o3.20L2
422
Wisit Sunthaisong
Rigger
c 984199
c 984199
30.o3.20L2
ffi
ffi:
w
448
Kittiporn Tudchomuang
Rigger
1968977
Next Course
PC 1508400
ro.70.2072
449
r.a,rnon Lerdwiriyapiti
Rigger
w864664
Next Course
PC 1508405
10.t0.20L2
Rigger
s 974047
Next Course
PC 1508381
10.ro.20t2
l
450
!sr.nurt
Khamchoo
ffi
ffi
UEMC
451.
Kanha Phonya
Rigger
v850927
Next Course
PC 1508397
to.10.20L2
ffi
452
Wantha Armart
Rigger
K993347
Next Course
PC 1508387
70.L0.2072
ffi$t
453
Muan Srisuk
Rigger
Y885393
Next Course
PC
1s08404
10.ro.2072
ffi
Mffi
*
454
Kowit Khwakhun
RiBger
H 859989
Next Course
PC 1-092574
LO.70.20L2
455
Vayu Luangkun
Rigger
L
999840
Next Course
PC 1508385
70.LO.2012
456
Sonthaya Khuiklang
Rigger
N 9s6757
Next Course
PC 1508380
r0.70.20L2
457
Chokchai Chaojorhor
Rigger
u920048
Next Course
PC 1508398
L0.1o.2072
458
lam Nokchanthuek
Rigger
w 782221
Next Course
PC
1s08394
LO.LO.2072
Wffi
ffi$
Rigger
M997720
Next Course
PC 1508379
70.LO.20t2
ffi
Rigger
B 890021
Next Course
PC L092573
ro.70.20L2
Rigger
u901840
Next Course
PC 1508378
70.to.20L2
459
460
46r
lSantisuk
Wongkhong
Chalorm Thimyam
lr.o,.r,
Chaiwangrad
w
462
Poovanai Tasri
Rigger
P
995773
Next Course
PC 1508407
LO.70.2072
ts
ffi
463
Ihit Moeilin
Rigger
E925279
Next Course
PC 1508384
1o.t0.20L2
ffi
Rigger
u 920328
Next Course
PC
1s08390
70.L0.2072
ffitr
ffi
+o+
lwonctawatKhotsriwong
re
465
Chayanant Ratanavichai
Rigger
u920043
Next Course
PC 1508392
70.ro.20L2
466
Nathi Saobaen
Rigger
R
89120s
Next Course
PCLO92575
L0.10.20t2
457
Suthat Wongtason
Rigger
t
9ta704
Next Course
PC 1508383
70.10.20L2
468
Kasem Wongkhong
Rigger
R
93s9s2
Next Course
PC L508399
70.70.20].2
469
Yochin Phoeisiri
Rigger
B 950522
Next Course
PC 1092577
ro.Lo.2012
ronghin
Rigger
M 828066
Next Course
PC 1508391
70.LO.20L2
ffi
Phonchai Kaeomon
Rigger
J 81.6824
Next Course
PC 1508406
10.70.20t2
ffi
Rigger
w 779295
Next Course
PC 1095534
70.LO.20t2
470
47L
472
Inngkhana
lxasem
eangytm
W
ffi
ffi
ffi
498
499
500
501
502
s03
504
505
s06
507
508
509
510
511
572
s13
51.4
515
5l-t)
5L7
518
Zabidi Bin Azmi
519
Hamdan Bin Omar
520
Operation Manager
590805-02-5065
N/A
NiI
Nil
Malaysian
Project Manager
710829-05-s545
N/A
Nil
Nil
Malaysian
Chew Kean Whai
Seaman
800304-07-5155
N/A
Nil
Nil
Malaysian
s27
Nooraznan Bin Mat Noor
Seaman
600227-09-50s9
N/A
Nil
Nil
Malaysian
s22
Wan Zaurin Bin Yahya
Seaman
640808-07-5001
N/A
Nit
Nit
Malaysian
-
s48
Awaluddin
Seaman
R 832114
N/A
PC
0635s48
75.02.2012
Seaman
s 269747
N/A
PC
0535s50
75.O2.20t2
aennv Tambunan
Seaman
P 723723
N/A
PC
0635551
L5.02.2072
551-
Tosari Alwi
Seaman
s 54702t2
N/A
552
Achmat Hesim
Seaman
s 600663
N/A
PC
0637688
27.03.2072
Indonesian
553
Leonain Fernando Sihotang
Seaman
s 307708
N/A
PC
0637689
27.O3.20L2
Indonesian
554
Sigit Ardiansyah
Seaman
w
119118
N/A
N/A
rndonesian 'Yfr,,,ffij{
s55
Supriadi
Seaman
s 998364
N/A
N/A
Indonesian
s56
Sulaiman
Seaman
T 330497
N/A
N/a
rndonesian
W
557
Nurus Shabah
Seaman
s 080806
N/A
N/A
rndonesian
\W..ffi
558
Mohamad Suyanto
Seaman
s 500594
N/A
N/A
559
Reja Juanda Lubis
Seaman
u 789L67
N/A
N/A
560
Perin Herviansyah
Seaman
s 067989
N/A
N/A
rndonesian
W'ffiffi
561
Mohamad Faisol
Seaman
w
16850s
N/A
N/A
562
Mohamad Amirin
Seaman
w
721.787
N/A
N/A
rndonesian
563
Muhd lrhast
Seaman
u 503919
N/A
N/A
indonesia
Seaman
R
461189
N/A
N/A
lndonesian:
Seaman
u 432805
N/A
N/A
rndonesian
Seaman
s 599435
N/A
N/A
rndonesian,W,,,,*yiJ
N/A
N/A
tndonesian l, .lr;;61*f
twtT i,!*;; ;
549
550
lnseO
I
oeOen Kurniawan
rndonesian
Wffi,ffi;
tndonesiani ,l
:|ndon"lian'
N/A
,
:W".,.W
Y.',W,ffi,f,
W_
W..,,=ffi
^oon",rrui',,W,,/,
564
565
566
lrualemuaoin
Mohd Sidik
lrvuhammad
vunus
ffi
W,#,ffi
n lyl;ffi,ffi
W
'W6.ffi
567
Muhammad Nurdin
Seaman
P
568
Jerry Manullang
Seaman
u 356567
N/A
N/A
,nl.n"irrri'ffi
s69
Rizal Sofyan
Seaman
T 424894
N/A
N/A
tndonesian
W
570
Purwanto
Seaman
T 923053
N/A
N/A
Indonesian
W6ffi.#,
577
Anda Finanta
Seaman
T 545891
N/A
N/A
Seaman
v 323965
N/A
N/A
572
lf"on.rao
Davidson Pakpahan
2322292
lndonesian
I-,..
;7.-":.':.Ydi
ffita.ntas,,1
598
vonzer nti
lnaa
GeneralWorker
0860755430s31115
Nil
Nil
Nil
NiI
Bangla desh
SBJ
s99
Rezaul
General Worker
0860765430537136
NiI
Nil
Nit
NiI
Bangladesh
SBJ
600
Mahabob
General Worker
0860765430533136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
bul
Asraf
General Worker
086076s430532136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
642
Taizul
GeneralWorker
0860765430529136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
603
Younus
General Worker
086076s430549136
Nil
Nit
Nit
Nil
Bangladesh
SBJ
604
Shlung
General Worker
0860765430557136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
60s
Md Aminur lslam Pramanik
General Worker
08607654305791"36
Nil
Nil
Nit
Nil
Ba
ngladesh
SBJ
606
Harunur Rashed
GeneralWorker
0860765430s91135
Nil
Nil
Nil
Nil
Bangladesh
SBJ
General Worker
0860765430551136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
601
n" n
lrnr,i.
608
Md Fazlul Hoque
GeneralWorker
085076s430593136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
609
Md Shah Alom Khan
General Worker
0860765430592136
Nil
Nil
Nil
Nil
Ba
ngladesh
SBJ
General Worker
0860764950115136
Nil
Nil
Nil
Nil
Bangladesh
SBJ
610
oti
I'ar',
611
Md Sayful lslam
General Worker
0860765430570136
Nil
Nil
Nil
Nil
Ba
ngladesh
SBJ
6L2
Samim Ahmed
General Worker
0860755431689135
Nil
Nil
Nil
Nil
Bangladesh
SBJ
613
Md Monsur
General Worker
0850794300407136
Nit
NiI
Nil
Nil
Bangladesh
SBJ
General Worker
08607943004L2136
Nil
Nil
Nil
Nil
Ba
ngladesh
SBJ
61_4
razlul Rahman
lvd
615
Md Shiraz
General Worker
0860747430034L36
Nil
Nil
NiI
Nil
Bangladesh
SBJ
616
Momoraj
General Worker
0860701530501136
Nil
Nil
Nil
Nil
Ba
ngladesh
SBJ
General Worker
0860747430038736
Nil
Nil
Nil
Nil
Bangladesh
SBJ
General Worker
08507654305531-36
Nil
Nil
Nil
Nil
Bangladesh
SBJ
General Worker
0850755430ss2136
Nil
Nil
Nil
Nil
Bangladesh
6L7
618
619
laozlu
l:ati,.
nohman
uossain
Md Julhaj
620
Marzuki
General Worker
0850723470079L35
Nil
Nil
Nil
Nil
I
ndonesia n
621
Basri Bin Usman
General Worker
08607633911-11136
Nil
Nit
Nrl
Nil
I
ndonesian
622
Azhari Bin Muhammad Yusuf
General Worker
08607493111,06136
Nil
Nil
Nil
Nil
I
ndonesian
SBJ
Coral
Resources
Coral
Resources
Coral
Resources
Biometric
Resistration
Biometric
Reeistration
Biometric
Resistration
Biometric
Reeistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Reeistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Rooietrrtinn
Biometric
Resistration
Biometric
Resistration
Biometric
Reeistration
Blometric
Resistration
Biometric
Resistration
Biometric
Rcpiqtration
Biometric
Registration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
t
648
Samsul Bahari
General Worker
0860701914735L36
Nit
Nil
Nil
NiI
lndonesia n
Coral
Resou rces
649
Salihin
General Worker
0860796833913 136
Nil
Nil
Nil
Nil
lndonesia n
Coral
Resou rces
650
b5
_t
6q?
lrwan
General Worker
0860725431733L36
NiI
Nil
Nil
Nil
I
ndonesia n
Martunis Bin Hasanuddin
General Worker
0860738670060136
Nil
Nil
Nil
Nil
I
ndonesia n
Tarmizi AE
General Worker
0860794402080136
Nil
Nil
Nil
Nil
I
ndonesia n
653
Zulkifli
General Worker
0860796008136136
Nil
Nil
Nil
NiI
I
ndonesia n
654
Veikaremoy
General Worker
0860709335050136
Nil
Nil
NiI
Nil
I
ndonesia n
Coral
Resources
Coral
Resoltrces
Coral
Resources
Coral
Resources
Coral
Resou rces
655
Busyairi
General Worker
08607964727L2L36
Nil
Nil
Nil
Nil
I
ndonesia n
656
Dahrul
General Worker
08607039s2s83136
Nit
Nil
Nil
Nil
lndonesian
657
Muhamad Nur Hasan
General Worker
860726190246136
Nil
Nil
Nil
Nil
I
ndonesia n
Coral
Resources
Coral
Resorrrces
Coral
Resou rces
558
559
Muhammad Holik
lr.rsivan
General Worker
General Worker
086173671.7032130
0860701770231L36
660
Miswar Bin Budiman
General Worker
0860700854570136
661
Mohiuddin
General Worker
08507330302r-9136
662
Masan Ali
General Worker
563
Vishon
bb4
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
I
NiI
Nil
I
Nil
Indonesia n
Nil
ndonesia n
ndonesian
Coral
Resorrrceq
Coral
Resources
Coral
Resources
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
0860792s6064736
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
General Worker
0860763640792136
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
Sanaulla h
General Worker
08607t767L691L36
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
66s
ldris Mondol
GeneralWorker
2o6055L4
Nil
Nil
Nil
L9.O8.2072
Ba
ngladesh
Awrah Bina
666
Md Zobaydor Rahman
General Worker
E 1815751
Nit
Nil
Nil
71.t2.20L2
Bangladesh
Awrah Bina
667
Abul Kashem
General Worker
0860764600092135
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
668
Mozibur Rahman
General Worker
z 0694355
Nil
Nil
PCO74245L
21.O5.2012
Ba
ngladesh
Awrah Bina
669
Md Suman Mia
General Worker
c0923978
Nil
Nil
PC 1358005
26.Ll.)072
Bangladesh
Awrah Bina
b/u
Md Nazrul lslam
General Worker
0860730171226L36
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
6/L
Rafiqul lslam
General Worker
086070437062s136
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
General Worker
0860771770097736
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
672
vonirrrrrrrn
lMd
Biometric
Resistration
Biometric
Resistralion
Biometric
Resistration
Biometric
Resistration
Biometric
Reeistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Reeistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
ReEistration
Biometric
Resistration
Biometric
Resistration
Attend Biometric
Test On 04.08.2011
Biometric
Resistration
Biometric
Resistration
Attend Biometric
Test On O4.O8.2011
Attend Biometric
Test On O4-O8.2011
698
699
zoo
Md Akter Hossain
l*o'o ,,"n
lSoficul
lslam
General Worker
20610766
Nil
Nil
PA0749985
06.o4.2012
Ba
ngladesh
Awrah Bina
General Worker
085075340744L36
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
General Worker
0860763640801136
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
701.
Md Azmol
General Worker
0850703350170136
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
702
Manik Mia
General Worker
0860753640814136
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
703
Md Robiul Azam
Gener:al Worker
0860747720070736
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
704
Monju Mia
General Worker
0860748651669136
Nil
Nil
NiI
Nil
Ba
ngladesh
Awrah Bina
General Worker
086076260647736
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
705
Iwuhammad.taved
706
Aameer Muhammad Khan
General Worker
0860794732012136
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
707
Md Bachu Mia
General Worker
0860799837252L36
Nil
Nil
Nil
Nil
Bangladesh
Awrah Bina
708
Md Dulal
General Worker
0860734891110136
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
709
Mazidul
General Worker
086073794L767136
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
770
Shozun
General Worker
0860733s20610136
Nil
Nil
Nil
Nil
Ba
ngladesh
Awrah Bina
77L
Shohel Miah
General Worker
0860733520910136
Nil
Nil
NiI
Nil
Bangladesh
Awrah Bina
France
Pakistan
Bangladesh
lndonesia
Total
349
2
727
1,
L
99
96
233
JANUARY 2012
Staff/Workers
UEMC
SUB-CON
29
7
478
Total
7Lt
Biometric
Rcsistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
ReEistrafion
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
Biometric
Resistration
4.0
UEM
BUItDERS
Second Penang Bridge
saret,
"":ffi
llyill,
Report:
Project Organization &
HSE Gommittee Ghart
ri)-
IAMtsATAN XDDUA
SDN_
UEMIi
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
RlrD (8A571(D
I-Yt!]t:1T{
4.1 Orqanisation Chart
FROJECT DIRECTOR
IR. WAN AZMAN EIN WAN SALLEH
CONSTRUCTION GENERAL MANAGER
RAMLI NOORDIN
TECHNICAL ASSISTANT
FOST CONTROL
FINISHING VI/ORDS
CONTROL CENTRE
SYUHADA
SEGlulEItlT
H:JSE
LOGISTIC
ADMIN / HR
ZAMZURI BIN ARIFFIN
SECURITY
SAFETY
LEOI'.lri TlEl'l Sll{
TBA
ENVIRONMENTAL
ftESCUE BOAT
ENVIRONMENT
RESCUE BOAT
NUEA.TIIVANY
MAHADZIR
MEDICAL
MOHAMMAD NONG
STAE SECURITY
SAIDON
TBA
P.V.LII,JGAM
TBAXB
TBAX4
H,1ST.JUDDII'J
KUFIARESAN
RESCUE BOAT
SHAHRIL
AKM.qL
DAVID \,qiANG
SHARULATMAN
UEM Builders Berhad
4tn Floor, Menara 2, Faber To,vers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
+.
.IAMRAT N
I(til)til
SDN_ RI
UEM\;
ffiImi
DESIGN, CONSTRUCTION AND COIUPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
ID (1457!tD
4.2 Safety Committee Chart
/-''
r.I
ENfl L;,
[.l1i?fit-?:t!;
BUILDERS
PENANG SECOND BRTDGE CROSSTNG (PzB)
UEI\,1
HSE COMMITTEE CHART
SECR
LlAlr I ,::,Jr
lTFtqCT(.rR
1I
trr
I
3 Cho
JC
h,larlFg€r'r1Ent ReF
i
\'
nracl
LI
13UE-Cdir JTFI,a.CTOR
Fgrrlatrs
Managenre nt ReE
S
Managenrent Rep
lvlarraflenrent Retr
P
shkurrr
troh ltietr
shrl
lJer:s!l,srrrerrt ReF
t','1
kor
lr
i
itJ
h,lalraqerrrerrt ReF
f'lanagerrrent Rep
lvlanaqenrent Rep
Slrharrrri bin Y
Ii
l1
!l l.itrllare
1U
l't
'l'r
h
r
I
lqtl
t'l
l A.znrarr
1 lv'lohd Fareez
2 I"Joor Azri
3lulanit
4 Fasakon
[",lanagerrrerrt Rep
lvlD Z Rahn'rRn
I'"'l
a rr
n-re
nt
As of 31't January2012
UEM Builders Berhad
4''' Floor, Menaru 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lam a, 581 00 Kuala Lum pur
Safety Report No. 32
I
0
UEM
BUITDERS
Second Penang Bridge
Safety and Health Monthly Report:
JANUARY 2012
Sife Safety Photo
-a"
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
UEN^G
5.0 SITE SAFETY PHOTO
I
'.
t
Remarks
:
:
:
Month Taken
Location
Remarks
Pier 223
Portable Toilets on deck
Month Taken
Location
Off Jalan Klang Lama, 58100 Kuala Lumpur
Pier 222
Good Housekeeping
Jan 2012
UEIvI Builders Berhad
Floor, N/enara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
4tn
Jan2012
Safety Report No. 32
/'i>,
UEM\Z
fffifJt?q
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
5.0 SITE SAFETY PHOTO
T
--.--t_
Month Taken
Location
Remarks
Jan 2O12
Rear Support
Rescue Basket for emergency
lMonth Taken
Jan 2012
Location
Remarks
Erected Segment al Pier 222
Worker wearing safety harness while fixing
temporary PT bar.
UEIVI Builders Berhad
4'h Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
Safety Report No. 32
r--
UEM\3
DESIGN, CONSTRUCTION AND COMPLETION OF THE SECOND PENANG BRIDGE
Package 2: Superstructure Works of Approach Spans
Ilt?lEl?lTl
5.0 SITE SAFETY PHOTO
'j
\
J
*!
I
j
r
,t', n
.af
fr
r*5
, l
t.
:a
*{
Month Taken
Location
Remarks
i
Jan 2012
Pier 221
Toolbox Talk
titf
r**s-'
.
TiIfi;;
I
ti.-', a
-a:
Month Taken
Location
Remarks
UEM Builders Berhad
Floor, Menara 2, Faber Towers, Jalan Desa Bahagia, Taman Desa,
Off Jalan Klang Lama, 58100 Kuala Lumpur
4th
Jan 2012
Pier 221
Temporary Gangway connected
between spans
Safety Report No. 32
6.0
UEM
BUILDERS
Second Penang Bridge
Safety and Health Monthly Report:
JANUARY 2012
Sa fety Srg n
age's Layout
SAFETY SIGNAGES LAYOUT (AS OF 31 JAN 20121
Gantry Crane
TotalSignages lnstalled : 37 Nos
1
Gantry Crane
LOAD OUT JETTY
2
--a_
a
Do Not Cross
Work ln Progress
a
Bahaya! Di Larang
Melintasi Landasan Kren
a
Scheduled
Waste
Storage
Yard
;
Do Not Cross
Work ln Progress
Do Not Cross
Work ln Progress
a
Scheduled Waste
Storage Yard
skid
Canteen
Tank
LaErq
MasukTanF
Awas! Di
No Parking
Gas Cylinders
Gas Cylinders
Storage Yard
Storage Area
Logistic Office
Site Office
a
a
Skid Tank
Storage Yard
Storage Yard
Emergency
Contact
Number
Workers camp
Jaga Kebersihan
Bar Bending
Yard
Awasl Di Larang
Msuk Tanpa
Awasl Di
Kebemran
l"
Emergency
Contact
Number
Safety First
@
Gen Set
a
LaEru
Masrk TanF
Assem blyArea
AssemblyArea
e
Skid Tank
Storage Yard
Gen Set
Storage Yard
Storage Yard
20 Km/j
Open Area
Awas! Di Laraq
I\.4asukTanF
Kebenaran
Segment Launcher
Storage Yard
a
Security
Check
Safety First
a
a
Awasl Lori
Keluar Masuk
a
a
20Kmli
Kawasan Pembinaan
Di Larang Masuk
a
SAFEW SIGNAGES LAYOUT (AS OF 31 JAN 2012)
Warning
Deep Sea
WearLife Jacket
WearLife Jacket
--------------->
Floating Po
Security
Check Point
)
F'"v'*1
Passengers
Waiting Area
Boat
Boat
a
@l
-\
l.
Berhati-hati
Semasa Berkerja
di Kawasan Air
No Parking
QUAY JETTY
Parapet Loading Area