Long Term Accommodation Plan - 2015-2020

Transcription

Long Term Accommodation Plan - 2015-2020
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
Table of Contents
Introduction
Page
1
Demographics
Page
3
Long Term Accommodation Planning Summaries
Page
7
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
Associated School Groupings (ASG)















Adam Scott Collegiate Vocational Institute
Bowmanville High School
Campbellford District High School
Clarington Central Secondary School
Clarke High School
Cobourg Collegiate Institute
Courtice Secondary School
Crestwood Secondary School
East Northumberland Secondary School
Kenner Collegiate Vocational Institute
Lakefield District Secondary School
Norwood District High School
Port Hope High School
Thomas A. Stewart Secondary School
Alternative Education Centres-Secondary
Inventory of Land Assets
Page 41
School Profiles
Page 43
Facility Condition Indices
 Summary of 5 Year Event Costs by School
 Elementary School Profiles and Enrolment Data
 Secondary School Profiles and Enrolment Data
Page 45
Page 47
Page 49
Page 201
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
Introduction
The Kawartha Pine Ridge District School Board has an obligation to provide the best possible
learning opportunities and environments regardless of where our students reside/attend
school. The Board is responsible for managing its school capital assets in an effective
manner, being stewards of Board resources, and making the best possible use of taxpayer
dollars.
As a district we must respond to changing demographics and program needs while ensuring
continued student achievement and well-being, and the financial viability/sustainability of the
school Board through the establishment of a Long Term Accommodation Plan.
This plan requires the consolidation of multiple factors which impact on the quality of
programming the Kawartha Pine Ridge District School Board strives to provide to each child,
each family and each community within its jurisdiction.
Purposes of the Long Term Accommodation Plan
The Long Term Accommodation Plan is intended to provide the Board with information and/or
direction on:
•
School buildings 20% over utilization capacity
•
School buildings where utilization is less than 80% of capacity
•
Issues regarding program viability
•
Ten year enrolment projections
•
Status of physical plant including accessibility, physical condition and buildings where
operations/maintenance costs exceed the norm
•
Indicators for future directions regarding new schools and/or additions, school
consolidations/closures, boundary reviews/changes
It is understood that while this is intended to be a multi-year plan, it is revised annually as
new information is available and projections are updated. At any point, new schools for
review may be added to the plan.
1
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
Demographics
Enrolment Summary
Enrolment in the Kawartha Pine Ridge District School Board has continued to decline over
the past decade. Specifically, there has been a 15.1% decline in enrolment since the 20062007 school year. This trend is consistent with most school districts across the province.
The Board historical enrolment data is:
Elementary
2006-2007
25,013
2013-2014
21,695
Change
(3,318)
% Change
(13.3%)
13,614
11,109
(2,505)
(18.4%)
38,627
32,804
(5,823)
(15.1%)
Headcount
Secondary
Average Daily
Enrolment (ADE)
Total
Elementary enrolment decline has levelled off, however, secondary is continuing to decline
as the small grade sizes from elementary move through to the high schools.
Birth data on a Board-wide basis for the period of 1990 through 2013 showed a significant
decline from their peak in 1991 to a low point in 2000 with a gradual rebound in subsequent
years:
Year
Births
1991
3,349
2000
2,407
2013
3,081
Births Board-wide
The data sources are the Provincial Birth Registry, Canada Revenue Agency Child Tax Credit
information and the Census.
3
The Board’s planning software projects that over the next ten years births will continue to
increase gradually and they are expected to be approximately 3,300 in the year 2024.
Projected Births Board‐wide
3400
3300
3200
3100
3000
2900
2800
2700
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Based on this information, as well as other demographic trends, the Board’s enrolment is
projected to increase to just under 35,000 by the year 2024.
Within this total, secondary (under 21) enrolment is projected to continue to decline over the
next five years, bottoming out at an estimated headcount of 9,500 in the year 2020, after
which a gradual rebound is projected to bring enrolment to approximately 10,300 in 2024.
RT = Regular Track
4
Elementary headcount is projected to gradually increase to over 24,300 by the year 2024.
Overall enrolment is projected to decline through 2016, stabilize, and then begin to increase
through 2024.
By 2024, enrolment is projected to be above the 2014 levels by about 2,150 students, but
changes will vary significantly by level:



Enrolments for JK-6 are projected to increase by almost 2,300
Enrolments for 7-8 are projected to increase by about 250
Enrolments for 9-12 are projected to decrease by almost 400 by 2024, with a low point
in 2020, when enrolment will be about 925 students below the current level
5
Kawartha Pine Ridge District School Board 2015-2020 Long Term Accommodation Plan Planning Summaries
by
Associated School Groupings
(ASG)
7
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
The 2015-2020 Long Term Accommodation Plan is a comprehensive review of all schools
and communities within our school board. Over the last months, we have talked with our
students, teachers, support staff and principals, visited other school boards, and held a
number of focus group meetings with our communities to explore the accommodation
realities for our low-enrolment secondary schools. The Long Term Accommodation Planning
Process is being shared with all regional councils.
The Long Term Accommodation Plan is administration’s proposed plan for the future. It is
understood that while this is intended to be a multi-year plan, it is revised annually as new
information is available and projections are updated. At any point, new schools for review
may be added to the plan.
The following Planning Summaries section only includes schools with recommended actions.
9
2015-2020 Long Term Accommodation Planning by ASG
ADAM SCOTT COLLEGIATE VOCATIONAL INSTITUTE ASG
School Names
Recommendations
Timelines

Build an addition and upgrade facility to address
current enrolment pressures and continue to
monitor enrolment in the future.

Allow French Immersion students to attend in
Junior Kindergarten where the parental intention
is to enrol the student in French Immersion in
Senior Kindergarten.
Highland Heights P.S.
and Queen Elizabeth
P.S.

Conduct an Accommodation Review to
consolidate Queen Elizabeth P.S. and Highland
Heights P.S. into a new building at the Queen
Elizabeth P.S. site. Review to commence in the
2016-2017 school year with potential
implementation in 2017-2018.
September
2016
R.F. Downey P.S.

Build an addition to address enrolment pressures.
September
2016
Edmison Heights P.S.
September
2016
Summary:
Enrolment at Edmison Heights P.S. is currently 475 students. The school has a capacity of
409 and is currently 16% over capacity. Enrolment is projected to increase significantly over
the next 10 years. An addition is required to meet current enrolment pressures. Enrolment will
continue to be monitored in the future.
Student enrolment at Queen Elizabeth P.S. and Highland Heights P.S. is projected to increase
marginally over the next 10 years. Highland Heights P.S., built in 1959, with an addition in
1965, has a population of 174, a capacity of 300 with 58% of the school currently being
utilized. Queen Elizabeth P.S., built in 1939 with additions in 1954, 1957, and 1967, has a
population of 222, a capacity of 295 with 75% of the school currently being utilized. The
walking distance between the two schools is 1.2 km.
An Accommodation Review is recommended to consider the consolidation of Highland Heights
P.S. and Queen Elizabeth P.S. in a new building at the Queen Elizabeth P.S. site. Review is to
commence in the 2016-2017 school year with potential implementation in 2017-2018.
11
If consolidation of the schools is not feasible then it is understood that investments will be
required to continue to maintain both operations.
Enrolment at R.F. Downey P.S. is currently 268 students. The school has a capacity of 222
and is 21% over capacity. Enrolment is projected to increase over the next 10 years. An
addition is required to meet current enrolment pressures.
12
BOWMANVILLE HIGH SCHOOL ASG
School Names
Bowmanville H.S.
Recommendations

Build an addition to address enrolment pressures.
Timelines
September
2016
Summary:
Bowmanville H.S. has been over capacity for many years with 9 portables currently on site.
The school has a capacity of 903, its current enrolment is 1,030 which is 14% above capacity.
Enrolment is projected to continue to be above capacity in the next 10 years. A permanent
addition is recommended to address enrolment pressures.
There is projected development in north Bowmanville which will lead to enrolment pressures
on our existing elementary schools. The Board will need to consider purchasing sites to
address future growth.
13
CAMPBELLFORD DISTRICT HIGH SCHOOL ASG
Recommendation/Summary:
Enrolment in the Campbellford District H.S. Associated School Grouping is remaining relatively
stable over the next 10 years. Maintaining the status quo is recommended for the area.
15
CLARINGTON CENTRAL SECONDARY SCHOOL ASG
School Names
Recommendations

Hampton Junior P.S. and
M.J. Hobbs Senior P.S.
Conduct an Accommodation Review to
consolidate M.J. Hobbs Senior P.S. and
Hampton Junior P.S. at the M.J. Hobbs
Senior P.S. site. Review to commence in the
2017-2018 school year with potential
implementation for the 2018-2019.
Timelines
September
2017
Summary:
Hampton Junior P.S. was built in 1955 with additions in 1961 and 1971. The school’s current
enrolment is 154. It has a capacity of 144 and is 7% over capacity. Enrolment is expected to
grow significantly over the next 10 years. The Hampton Junior P.S. site is 2.99 acres and has
other service restrictions that would make an addition on site difficult. M.J. Hobbs Senior P.S.
was built in 1966. The school’s current enrolment is 207. It has a capacity of 308 with 67% of
the school currently being utilized. Enrolment is projected to increase in the future. An
Accommodation Review is recommended to consider the consolidation of Hampton Junior
P.S. and M.J. Hobbs Senior P.S. at the M.J. Hobbs Senior P.S. site. The options of an addition
versus a new building will need to be considered. Review is to commence in the 2017-2018
school year with potential implementation in 2018-2019.
There is projected development in north Bowmanville which will lead to enrolment pressures
on our existing elementary schools. The Board will need to consider purchasing sites to
address future growth.
17
CLARKE HIGH SCHOOL ASG
School Names
Recommendations
Timelines
Clarke H.S. and The
Pines Senior P.S.

Determine if a new consolidated Grade 7-12 school
in Newcastle is feasible.
September
2017
Kirby Centennial P.S.
and Orono P.S.

Conduct an Accommodation Review to consolidate
Kirby Centennial P.S. and Orono P.S. at the Orono
P.S. site. Review to commence in the 2017-2018
school year with potential implementation in 20182019.
September
2017
Summary:
Clarke H.S. was built in 1962 with an addition in 1976. The school’s current enrolment is
370. It has a capacity of 576, with 64% of the school currently being utilized. The Pines
Senior P.S. was built in 1974. It has an enrolment of 215, a capacity of 251 with 86% of the
school being utilized. Education Development Charge consultants are projecting an increase
in the school age population in the Newcastle area over the next 15 year period. A
replacement school for Clarke H.S. and The Pines Senior P.S. should be considered in the
Newcastle urban area.
Kirby Centennial P.S. was built in 1968. The school’s current enrolment is 92. It has a
capacity of 164, with 56% of the school currently being utilized. Enrolment will remain stable
over the next 10 years. Orono P.S. was built in 1968 with an addition in 1971. The school’s
current enrolment is 124. It has a capacity of 176 with 70% of the school currently being
utilized. Enrolment is projected to decline slightly in the future. An Accommodation Review
is recommended to consider the consolidation of Kirby Centennial P.S. and Orono P.S. at the
Orono P.S. site. Review to commence in the 2017-2018 school year with potential
implementation in 2018-2019.
Long-term population growth should be monitored in the Newcastle urban area to determine
whether the Board will to need to consider acquiring new sites to address future demand.
19
COBOURG COLLEGIATE INSTITUTE ASG
Recommendation/Summary:
Beginning in 2015-2016, all schools in the Cobourg District Collegiate Institute West ASG will
be included in the Cobourg Collegiate Institute (CCI) ASG.
Overall enrolment in the CCI ASG is projected to remain relatively stable over the next 10
years. Maintaining the status quo is recommended for the area. However, in the future we
may need to consider closing Dale Road Senior P.S. and having Grade 7 and 8 students
remain at their home schools.
C.R. Gummow P.S. begins French Immersion in Senior Kindergarten. Like other dual track
schools across the district, it is recommended that students in Junior Kindergarten, where the
parental intention is to enrol the student in French Immersion in Senior Kindergarten, be
allowed to attend at the French Immersion school site.
21
COURTICE SECONDARY SCHOOL ASG
Recommendation/Summary:
The student population for the area schools is projected to remain stable over the next 10
years. Maintaining the status quo is recommended for these schools. There is expected
development in Courtice, north of Highway 2. The Board will need to consider acquiring land
for a future elementary school site.
Dr. G.J. MacGillivray P.S. begins French Immersion in Senior Kindergarten. Like other dual
track schools across the district, it is recommended that students in Junior Kindergarten,
where the parental intention is to enrol the student in French Immersion in Senior
Kindergarten, be allowed to attend at the French Immersion school site.
23
CRESTWOOD SECONDARY SCHOOL ASG
School Names
Recommendations
Timelines
Millbrook/South
Cavan P.S.

Build an addition to address current student
population.
September
2016
Westmount P.S.

Build an addition to address student growth.
September
2017

Allow French Immersion students to attend in
Junior Kindergarten where the parental intention is
to enrol the student in French Immersion in Senior
Kindergarten.
September
2017
Summary:
Enrolment at Millbrook/South Cavan P.S. is currently 413 students. The school has a capacity
of 349 and is currently 18% over capacity. Enrolment is projected to remain consistent over
the next 10 years.
Enrolment at Westmount P.S. is currently 448 students. The school has a capacity of 375 and
is currently 20% over capacity. Enrolment is projected to continue to increase over the next 10
years.
Funding options will be explored to support permanent additions at both schools.
25
EAST NORTHUMBERLAND SECONDARY SCHOOL ASG
School Names
Smithfield P.S. and
Spring Valley P.S.

Recommendations
Timelines
Conduct an Accommodation Review to
consolidate Smithfield P.S. and Spring Valley
P.S. at the Spring Valley P.S. site. Review to
commence in the 2016-2017 school year with
potential implementation in 2017-2018.
September
2016
Summary:
Smithfield P.S. was built in 1951 with additions in 1966 and 1968. Smithfield P.S. has a
population of 132, a capacity of 187 with 71% of the school currently being utilized. Enrolment
will remain stable over the next 10 years. Spring Valley P.S., built in 1964 with an addition in
1968, has a population of 193, a capacity of 291 with 66% of the school currently being
utilized. Enrolment is projected to decline slightly in the future. An Accommodation Review is
recommended to consider the consolidation of Smithfield P.S. and Spring Valley P.S. at the
Spring Valley P.S. site. Review to commence in the 2016-2017 school year with potential
implementation in 2017-2018.
27
KENNER COLLEGIATE VOCATIONAL INSTITUTE ASG
School Names
Prince of Wales P.S.
Recommendations

Consider renovations to upgrade and right-size
facility while maintaining historical integrity of the
building.

Allow French Immersion students to attend in
Junior Kindergarten where the parental intention
is to enrol the student in French Immersion in
Senior Kindergarten.
Timelines
September
2017
September
2016
Summary:
Enrolment at Prince of Wales P.S. is currently 492 students. The school has a capacity of 622
with 79% of the building currently being utilized. Enrolment is projected to increase slightly
over the next 10 years. Recent ministry reports indicate that the facility requires $5.1 million to
address medium and high priority issues (lighting, windows, flooring, etc.). Upgrading and
right-sizing the building while maintaining the historical integrity of the building is
recommended.
29
LAKEFIELD DISTRICT SECONDARY SCHOOL ASG
School Names
Lakefield District
Secondary and
Intermediate Schools
Ridpath Junior P.S.
Recommendations

Conduct an Accommodation Review to consolidate
Lakefield District S.S. and Thomas A. Stewart S.S.
at the T.A.S.S. site. Review to commence in the
2015-2016 school year with potential
implementation in 2016-2017.

Grade 7 and 8 students would remain at their
current feeder schools, if the consolidation option is
adopted.

Allow French Immersion students to attend in
Junior Kindergarten where the parental intention is
to enrol the student in French Immersion in Senior
Kindergarten.
Timelines
September
2015
September
2016
Summary:
Student enrolment continues to decline at Lakefield District Secondary and Intermediate
School. Enrolment has declined in the Secondary School from 653 students to its current
enrolment of 312 (over the last 15 years) and is projected to decline to 270 students. The
Intermediate School has dropped from 227 to 106 students over that same time frame. The
overall site has a capacity of 918 students with 46% of the building currently being utilized.
During the Low Enrolment School Focus Group meeting, the community identified the
strengths and challenges associated with operating a low enrolment secondary school. The
community also indicated a strong desire for a decision to resolve the question about the
future of the school. An Accommodation Review is recommended to consider the
consolidation of Lakefield District S.S. and Thomas A. Stewart S.S. at the T.A.S.S. site.
Review to commence in the 2015-2016 school year with potential implementation in 20162017. If the consolidation option is adopted, then Grade 7 and 8 students who attend
Lakefield Intermediate School would remain at their current feeder schools.
31
NORWOOD DISTRICT HIGH SCHOOL ASG
School Names
Norwood District H.S.
Recommendations

Accommodation Review beginning in
September 2016.
Timelines
September
2016
Summary:
Norwood District H.S. has a student population of 290, a capacity of 681, with 43% of the
building currently being utilized. Enrolment is projected to remain in this utilization range for
the next 10 years.
During the Low Enrolment School Focus Group meeting the community identified the strengths
and challenges associated with operating a low enrolment secondary school. The community
identified several options for the school. An Accommodation Review is recommended for
September 2016. Options to be considered include:
 establish a K-12 school on the Norwood District H.S. site.
 create a Grade 7-12 school on the Norwood District H.S. site.
 close Norwood District H.S. site with students to attend either Peterborough or
Campbellford depending upon where they reside.
As part of any option, consider providing alternative programming (CIS) within the Norwood
community.
33
PORT HOPE HIGH SCHOOL ASG
School Names
Recommendations

George Hamilton P.S.

Conduct an Accommodation Review to
consolidate George Hamilton P.S. and
Ganaraska Trail P.S. at the Ganaraska Trail
P.S. site. Review to commence in the 20152016 school year with potential implementation
in 2016-2017.
Timelines
September
2015
September
2016
Allow French Immersion students to attend in
Junior Kindergarten where the parental
intention is to enrol the student in French
Immersion in Senior Kindergarten.
Summary:
Student enrolment at George Hamilton P.S. is 59, the school has a capacity of 150, with 39%
of the school currently being utilized. Population is projected to continue to decline.
Conduct an Accommodation Review to consolidate George Hamilton P.S. and Ganaraska Trail
P.S. at the Ganaraska Trail P.S. site. Review to commence in the 2015-2016 school year with
potential implementation in 2016-2017.
35
THOMAS A. STEWART SECONDARY SCHOOL ASG
School Names
Armour Heights P.S.
and King George
P.S.
Recommendations

Conduct an Accommodation Review to
consolidate King George P.S. and Armour Heights
P.S. at the King George P.S. site. Review to
commence in the 2015-2016 school year with
potential implementation in 2016-2017.
Timelines
September
2015
Summary:
Student enrolment is stabilizing at these two schools. Armour Heights P.S., built in 1952 with
additions in 1958 and 1968, has a population of 222, a capacity of 311 with 71% of the building
currently being utilized. King George P.S., built in 1912, with an addition in 1967, has a
population of 229, a capacity of 291 with 79% of the building currently being utilized. Students
from King George P.S. attend Grade 7 and 8 at Armour Heights P.S. The walking distance
between the two schools is 0.75 km.
Consolidating students from both schools at the King George P.S. site would allow for one less
transition for King George P.S. students. Refurbishing and building an environmentally friendly
addition at the King George P.S. site, while maintaining the historical integrity of the building,
would provide an improved facility for students within the area. Alternatively, building a new
school at the King George P.S. site and disposing of both Armour Heights P.S. and King
George P.S. could be considered for this consolidation.
An Accommodation Review is recommended to consider the consolidation of King George
P.S. and Armour Heights P.S. at the King George P.S. site. Review to commence in the 20152016 school year with potential implementation in 2016-2017. If consolidation of both schools
is not feasible then it is understood that investments in both sites will be required to continue to
maintain both operations.
37
ALTERNATIVE EDUCATION CENTRES - SECONDARY
Summary:
KPR has three Alternative Education Centres throughout the school district:
Clarington Centre for Individual Studies
Northumberland Centre for Individual Studies at Grant Sine
Peterborough Alternative and Continuing Education (PACE) at PCVS.
Clarington and Northumberland sites offer alternative programming which include Teen
Education and Mothering, and PACE offers the School for Young Moms Program for students
both under and over 21. Enrolment has increased as the programs have moved to improved
facilities. Maintaining the status quo is recommended for the future of these sites.
39
Kawartha Pine Ridge District School Board
Inventory of Land Assets
Property Name
Size
B = Building
V = Vacant
ASG
Recommendations
for Action
Maple Grove East
P.S./Bowmanville
CIS
5.614
+/acres
V
N/A
 Not currently required
for pupil
accommodation
ONTARIO STREET
3.04 +/acres
B
BHS
 Not currently required
for pupil
accommodation
COBOURG
D.C.I.W.
2.36 +/acres
B
CCI
 Not currently required
for pupil
accommodation
COBOURG
D.C.I.W.
4.623
+/acres
V
CCI
 Retain for possible
future use.
WESTWOOD
14.19
+/acres
V
CCI
 Not currently required
for pupil
accommodation
GLENFOREST
7.0 +/acres
V
CRS
 Not currently required
for pupil
accommodation
 Monitor population
growth for the area
north of Parkhill
Rd./Brealey, and
consider acquiring a
school site.
SOUTH
MONAGHAN
5.50 +/acres
B
CRS
Not currently required
for pupil
accommodation
2226 Maple Grove Rd. N.
Bowmanville
116 Ontario St., Bowmanville
135 King St. W. Cobourg
Sports Field West side of
Durham St., Cobourg
Kerr St. at Westwood Dr. and
Ewing St., Cobourg
Pt4,39R-123 and Lot 9 Plan
414
1555 Glenforest Blvd.,
Peterborough
Block 27m Plan 45M-146
211 County Rd. 28,
Bailieboro
BHS = Bowmanville High School
N/A = Not applicable
CCI = Cobourg Collegiate Institute
41
CRS = Crestwood Secondary School
Timeline
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School Profiles
1. The school profiles include:
 Enrolment history for the period of 2010-2011 through 2014-2015
 Enrolment projections for the period of 2015-2016 through 2024-2025
 School Utilization percentage – both actual and projected from 2010-2011 through
2028-2029
Our Baragar Planning software is the source of this data. All enrolment is on a
headcount basis. Alternative Education Centre numbers include both students under
and over the age of 21.
2. Utilization percentages are based on the current building capacity.
Note: The legend for the School Utilization Table is:
IC
= In Catchment
OC
= Out of Catchment
BP
= Board Program
CSE
= LLS Class
The capacity of a school is determined by the Ministry of Education by loading all
instructional spaces within the facility to current Ministry standards for class size
requirements and room areas.
3. The Ministry of Education has now completed the first four years of the Condition
Assessment Program. Over this period, more than 3,700 school facilities have been
assessed across all 72 school boards. 2015 represents the fifth and final year of the
assessment cycle that began in 2011 and KPR has 23 facilities remaining that will be
inspected this summer.
These assessments provide the Facility Condition Index (FCI) which is a building
condition determined by calculating the ratio between the five-year (5)
renewal
needs and the replacement value for each facility. FCI is included with the school
profiles, where available.
In addition to the FCI, the Ministry assessment details Building Renewal needs,which
we have consolidated into four (4) categories for our review:
 Architectural/Structural – includes Substructure, Shell/Superstructure and
Interiors.
 HVAC – includes plumbing, heating, ventillation and air conditioning.
 Electrical – includes electrical supply, distribution, lighting and fire alarms.
 Site Work – includes parking lots, sidewalks, fencing and playfields.
43
The estimated costs of these renewal needs are included with the school profiles,
where available. A summary of the findings to date are also included in the following
table.
44
45
46
47
48
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
Elementary
School Profiles
and Enrolment Data
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
Elementary School Profiles and Enrolment Data




































Adam Scott Intermediate School
Apsley Central Public School
Armour Heights Public School
Baltimore Public School
Beatrice Strong Public School
Brighton Public School
Buckhorn Public School
Burnham Public School
C.R. Gummow Public School
Camborne Public School
Central Public School
Charles Bowman Public School
Chemong Public School
Colborne Public School
Courtice Intermediate School
Coutice North Public School
Dale Road Senior Public School
Dr. Emily Stowe Public School
Dr. G.J. MacGillivray Public School
Dr. M.S. Hawkins Senior Public School
Dr. Ross Tilley Public School
Duke of Cambridge Public School
Edmison Heights Public School
Enniskillen Public School
Ganaraska Trail Public School
George Hamilton Public School
Grafton Public School
Hampton Junior Public School
Harold Longworth Public School
Hastings Public School
Havelock-Belmont Public School
Highland Heights Public School
Hillcrest Public School
James Strath Public School
John M. James Public School
Kawartha Heights Public School
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
49
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
114
116
118
120
122






































Keith Wightman Public School
Kenner Intermediate School
Kent Public School
King George Public School
Kirby Centennial Public School
Lakefield Intermediate School
Lydia Trull Public School
M.J. Hobbs Senior Public School
Merwin Greer Public School
Millbrook/South Cavan Public School
Murray Centennial Public School
Newcastle Public School
North Cavan Public School
North Hope Central Public School
North Shore Public School
Northumberland Hills Public School
Norwood District Public School
Orono Public School
Otonabee Valley Public School
Percy Centennial Public School
Plainville Public School
Prince of Wales Public School
Queen Elizabeth Public School
Queen Mary Public School
R.F. Downey Public School
Ridpath Junior Public School
Roger Neilson Public School
Roseneath Centennial Public School
S.T. Worden Public School
Smithfield Public School
Spring Valley Public School
Stockdale Public School
Terry Fox Public School
The Pines Senior Public School
Vincent Massey Public School
Warsaw Public School
Waverley Public School
Westmount Public School
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
51
124
126
128
130
132
134
136
138
140
142
144
146
148
150
152
154
156
158
160
162
164
166
168
170
172
174
176
178
180
182
184
186
188
190
192
194
196
198
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Adam Scott Collegiate Vocational Institute – ASG
and Intermediate School
175 Langton Street, Peterborough, ON K9H 6K3
1,017 pupil places
On The Ground capacity (OTG): Secondary
225 pupil places
On The Ground capacity (OTG): Intermediate
Intermediate Gross Floor Area (GFA):
180,726 square feet or
16,790 square metres
15.00 +/- acres or 6.07 ha
Site Acreage for Adam Scott C.V.I.:
1960, Addition(s) 1971 and 2013
Original Building built:
Grade 7 and Grade 8
Grades and Programs:
52
Enrolment History
Enrolment Projections
School Utilization Percentages
Adam Scott Intermediate School
Facility Condition Index (FCI): 14.46%
Total Event Costs:
53
$ 4,855,214
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Apsley Central Public School and Child Care Centre
Lakefield District Secondary School – ASG
238 Burleigh Street, Apsley, ON K0L 1A0
On The Ground capacity (OTG):
141 pupil places
Gross Floor Area (GFA):
19,721 square feet or 1,832 square
metres
Site Acreage for Apsley Central P.S.:
6.19 +/- acres or 2.50 ha
2010, Addition(s) this is a replacement
school
Original Building built:
Junior Kindergarten to Grade 8
and Child Care Centre
Grades and Programs:
54
Enrolment History
Enrolment Projections
School Utilization Percentages
Apsley Central Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
55
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Armour Heights Public School
Thomas A. Stewart Secondary School – ASG
245 McFarlane Street, Peterborough, ON K9H 1K1
On The Ground capacity (OTG):
311 pupil places
Gross Floor Area (GFA):
28,605 square feet or 2,658 square
metres
Site Acreage for Armour Heights P.S.:
3.83 +/- acres or 1.55 ha
1952, Addition(s) 1958 and
1968
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
56
Enrolment History
Enrolment Projections
School Utilization Percentages
Armour Heights Public School
Facility Condition Index (FCI): 20.33%
Total Event Costs:
57
$ 1,457,837
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Baltimore Public School
Cobourg Collegiate Institute – ASG
9320 Burwash Road, Baltimore, ON K0K 1C0
On The Ground capacity (OTG):
Gross Floor Area (GFA):
291 pupil places
34,673 square feet or 3,221 square metres
Site Acreage for Baltimore P.S.:
4.68 +/- acres or 1.89 ha
1958, Addition(s) 1967 and 1992
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
58
Enrolment History Enrolment Projections School Utilization Percentages
Baltimore Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
59
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Beatrice Strong Public School and Child Care Centre
Port Hope High School – ASG
90 Rose Glen Road North, Port Hope, ON L1A 3V6
On The Ground capacity (OTG):
372 pupil places
Gross Floor Area (GFA):
41,125 square feet or 3,820 square
metres
Site Acreage for Beatrice Strong P.S.:
5.837+/- acres or 2.36 ha
1992, Addition(s) n/a
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6 and
Child Care Centre
60
Enrolment History
Enrolment Projections
School Utilization Percentages Beatrice Strong Public School
Facility Condition Index (FCI): 37.06%
Total Event Costs:
61
$ 2,935,806
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Brighton Public School and Child Care Centre
East Northumberland Secondary School – ASG
24 Elizabeth Street, Brighton, ON K0K 1C0
On The Ground capacity (OTG):
504 pupil places
Gross Floor Area (GFA):
50,216 square feet or 4,665 square
metres
Site Acreage for Brighton P.S.:
9.86 +/- acres or 4.00 ha
1967, Addition(s) 2012 replacement of
1915 and 1961 wings
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Extended French Immersion
and Living and Life Skills (LLS)
and Child Care Centre
62
Enrolment History
Enrolment Projections
School Utilization Percentages
Brighton Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
63
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Buckhorn Public School
Lakefield District Secondary School – ASG
1,800 Lakehurst Road, Lakehurst, ON K0L 1A0
On The Ground capacity (OTG):
118 pupil places
Gross Floor Area (GFA):
11,888 square feet or 1,104 square
metres
Site Acreage for Buckhorn P.S.:
7.94 +/- acres or 3.62 ha
1972, Addition(s) N/A
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
64
Enrolment History
Enrolment Projections
School Utilization Percentages
Buckhorn Public School
Facility Condition Index (FCI):
7.77%
Total Event Costs:
65
$
281,060
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Burnham Public School
Cobourg Collegiate Institute – ASG
614 Burnham Street, Cobourg, ON K9A 2X1
On The Ground capacity (OTG):
315 pupil places
Gross Floor Area (GFA):
24,168 square feet or 2,245 square metres
Site Acreage for Burnham P.S.:
5.00 +/- acres or 2.02 ha
1956, Addition(s) 1962
Original Building built
Grades and Programs:
Junior Kindergarten to Grade 6
66
Enrolment History
Enrolment Projections
School Utilization Percentages
Burnham Public School
Facility Condition Index (FCI): 41.09%
Total Event Costs:
67
$ 2,953,710
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
C.R. Gummow Public School (replacement)
Cobourg Collegiate Institute – ASG
311 Cottesmore Avenue, Cobourg, ON K9A 4E3
On The Ground capacity (OTG):
678 pupil places
Gross Floor Area (GFA):
67,427 square feet or 6,264 square
metres
Site Acreage for C.R. Gummow P.S.:
11.12 +/- acres or 4.50 ha
2015, Addition(s) replacement school
(3 buildings)
Junior Kindergarten to Grade 8 and
French Immersion and Gifted
Original Building built:
Grades and Programs:
68
Enrolment History
Enrolment Projections
School Utilization Percentages
C. R. Gummow Public School
School Condition Inspections are not completed
on facilities built in the past 5 Years
Facility Condition Index (FCI): - %
Total Event Costs:
69
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Camborne Public School
Cobourg Collegiate Institute – ASG
3546 Kennedy Road, Camborne, ON K9A 4J7
On The Ground capacity (OTG):
176 pupil places
Gross Floor Area (GFA):
15,571 square feet or 1,447 square
metres
Site Acreage for Camborne P.S.:
7.39 +/- acres or 2.99 ha
1961, Addition(s) 1966 and 2014
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
70
Enrolment History Enrolment Projections
School Utilization Percentages
Camborne Public School
Facility Condition Index (FCI): 34.46%
Total Event Costs:
71
$ 1,664,813
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Central Public School
Bowmanville High School – ASG
120 Wellington Street, Bowmanville, ON L1C 1V9
On The Ground capacity (OTG):
234 pupil places
Gross Floor Area (GFA):
28,293 square feet or 2,628 square
metres
Site Acreage for Central P. S.:
1.92 +/- acres or 0.78 ha
1889, Addition(s) 1926 and 1968
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
72
Enrolment History
Enrolment Projections School Utilization Percentages Central Public School (Bowmanville)
Facility Condition Index (FCI): 29.60%
Total Event Costs:
73
$ 1,701,066
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Charles Bowman Public School
Bowmanville High School – ASG
195 Bons Avenue, Bowmanville, ON L1C 0L3
On The Ground capacity (OTG):
686 pupil places
Gross Floor Area (GFA):
63,110 square feet or 5,863 square
metres
Site Acreage for Charles Bowman P.S.:
5.05 +/- acres or 2.04 ha
2011, Addition(s) 2015
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
74
Enrolment History
Enrolment Projections
School Utilization Percentages
Charles Bowman Public School
School Condition Inspections are not completed
on facilities built in the past 5 Years
Facility Condition Index (FCI): - %
Total Event Costs:
$ n/a
Note: When school addition is completed, school capacity is projected to
increase to 686.
75
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Chemong Public School
Adam Scott Collegiate Vocational Institute – ASG
1029 Gore Street, Bridgenorth, ON K0L 1H0
On The Ground capacity (OTG):
501 pupil places
Gross Floor Area (GFA):
43,700 square feet or 4,060 square
metres
Site Acreage for Chemong P.S.:
12.16 +/- acres or 4.92 ha
1968, Addition(s) 1972, 2002 and 2014
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
76
Enrolment History
Enrolment Projections
School Utilization Percentages
Chemong Public School
Facility Condition Index (FCI): 36.95%
Total Event Costs:
77
$ 4,225,233
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Colborne Public School
East Northumberland Secondary School – ASG
8 Alfred Street, Colborne, ON K0K 1S0
On The Ground capacity (OTG):
254 pupil places
Gross Floor Area (GFA):
20,402 square feet or 1,895 square
metres
Site Acreage for Colborne P.S.:
7.04 +/- acres or 2.85 ha
1957, Addition(s) 1961 and 1968
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
78
Enrolment History Enrolment Projections
School Utilization Percentages
Colborne Public School
Facility Condition Index (FCI): 47.10%
Total Event Costs:
79
$ 2,820,007
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Courtice Intermediate and Secondary School – ASG
1717 Nash Road, Courtice, ON L1E 2L8
On The Ground capacity (OTG): Secondary
750 pupil places
On The Ground capacity (OTG): Intermediate
115 pupil places
Gross Floor Area (GFA):
117,240 square feet or 10,892 square
metres
Site Acreage for Courtice Secondary School:
16.38 +/- acres or 6.63 ha
1960, Addition(s) 1966 and 1971
Original Building built:
Grades and Programs:
Grade 7 and Grade 8
80
Enrolment History
Enrolment Projections
School Utilization Percentages
Courtice Secondary School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
81
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Courtice North Public School
Courtice Secondary School – ASG
1675 Nash Road, Courtice, ON L1E 2L8
On The Ground capacity (OTG):
353 pupil places
Gross Floor Area (GFA):
43,882 square feet or 4,077 square
metres
Site Acreage for Courtice North P.S.:
5.46 +/- acres or 2.21 ha
1994, Addition(s) 2014
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Living and Life Skills (LLS)
82
Enrolment History
Enrolment Projections
School Utilization Percentages
Courtice North Public School
Facility Condition Index (FCI): 31.88%
Total Event Costs:
83
$ 2,499,204
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Dale Road Senior Public School
Cobourg Collegiate Institute – ASG
8228 Dale Road, Cobourg, ON K9A 4J7
On The Ground capacity (OTG):
124 pupil places
Gross Floor Area (GFA):
14,068 square feet or 1,307 square metres
Site Acreage for Dale Road Senior P.S.:
8.79 +/- acres or 3.56 ha
1965, Addition(s) 1966
Original Building built:
Grades and Programs:
Grade 7 and Grade 8
84
Enrolment History
Enrolment Projections
School Utilization Percentages
Dale Road Senior Public School
Facility Condition Index (FCI): 22.18%
Total Event Costs:
85
$
754,908
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Dr. Emily Stowe Public School
Courtice Secondary School – ASG
71 Sandringham Drive, Courtice, ON L1E 1W8
On The Ground capacity (OTG):
422 pupil places
Gross Floor Area (GFA):
43,450 square feet or 4,036 square
metres
Site Acreage for Dr. Emily Stowe P.S.:
5.89 +/- acres or 2.38 ha
1990, Addition(s) N/A
Original Building built:
Junior Kindergarten to Grade 8
and Gifted
Grades and Programs:
86
Enrolment History
Enrolment Projections
School Utilization Percentages
Dr. Emily Stowe Public School
Facility Condition Index (FCI): 27.50%
Total Event Costs:
87
$ 2,379,218
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Dr. G.J. MacGillivray Public School
Courtice Secondary School – ASG
75 Meadowglade Road, Courtice, ON L1E 3G7
On The Ground capacity (OTG):
795 pupil places
Gross Floor Area (GFA):
70,595 square feet or 6,558 square
metres
Site Acreage for Dr. G.J. MacGillivray P.S.:
6.02 +/- acres or 2.44 ha
2002, Addition(s) 2015
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
and French Immersion
88
Enrolment History
Enrolment Projections
School Utilization Percentages
Dr. G.J. MacGillivray Public School
Facility Condition Index (FCI): 19.69%
Total Event Costs:
89
$ 3,049,147
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Dr. M.S. Hawkins Senior Public School within P.H.H.S.
Port Hope High School – ASG
130 Highland Drive, Port Hope, ON L1A 2A3
On The Ground capacity (OTG):
262 pupil places
Gross Floor Area (GFA):
part of Port Hope H.S.
Site Acreage for Dr. M.S. Hawkins Senior P.S.:
part of Port Hope H.S.
1955, Addition(s) 2001(PHHS)
Hawkins Gym Addition
Original Building built:
Grades and Programs:
Grade 7 and Grade 8
90
Enrolment History
Enrolment Projections
School Utilization Percentages
Dr. M.S. Hawkins Senior Public School within Port Hope High School
Facility Condition Index (FCI): 16.86%
Total Event Costs:
91
$ 4,402,102
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Dr. Ross Tilley Public School and Child Care Centre
Clarington Central Secondary School – ASG
200 Clarington Boulevard, Bowmanville, ON L1C 5N8
On The Ground capacity (OTG):
456 pupil places
Gross Floor Area (GFA):
54,012 square feet or 5,018 square
metres
Site Acreage for Dr. Ross Tilley P.S.:
5.06 +/- acres or 2.03 ha
1996, Addition(s) 2013
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Child Care Centre
92
Enrolment History
Enrolment Projections
School Utilization Percentages
Dr. Ross Tilley Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
93
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Duke of Cambridge Public School
Bowmanville High School – ASG
47 Liberty Street North, Bowmanville, ON L1C 2L8
On The Ground capacity (OTG):
703 pupil places
Gross Floor Area (GFA):
66,664 square feet or 6,193 square
metres
Site Acreage for Duke of Cambridge P.S.:
6.75 +/- acres or 2.73 ha
2013, Addition(s) n/a
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
single track French Immersion
94
Enrolment History
Enrolment Projections
School Utilization Percentages
Duke of Cambridge Public School
School Condition Inspections are not completed
on facilities built in the past 5 Years
Facility Condition Index (FCI): - %
Total Event Costs:
95
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Edmison Heights Public School
Adam Scott Collegiate Vocational Institute – ASG
1111 Royal Drive, Peterborough, ON K9H 6P9
On The Ground capacity (OTG):
409 pupil places
Gross Floor Area (GFA):
32,550 square feet or 3,024 square
metres
8.55 +/- acres or 3.46 ha
Site Acreage for Edmison Heights P.S.:
1963, Addition(s) 1965 and 2012
Original Building built:
Junior Kindergarten to Grade 6
and French Immersion
Grades and Programs:
96
Enrolment History
Enrolment Projections
School Utilization Percentages
Edmison Heights Public School
Facility Condition Index (FCI): 51.94%
Total Event Costs:
97
$ 4,435,787
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Enniskillen Public School
Clarington Central Secondary School – ASG
8145 Old Scugog Road, Enniskillen, ON L0B 1J0
On The Ground capacity (OTG):
219 pupil places
Gross Floor Area (GFA):
26,615 square feet or 2,473 square
metres
Site Acreage for Enniskillen P.S.:
5.20 +/- acres or 2.10 ha
1926, Addition(s) 1968 and 1972
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
98
Enrolment History
Enrolment Projections
School Utilization Percentages
Enniskillen Public School
Facility Condition Index (FCI): 14.86%
Total Event Costs:
99
$
849,462
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Ganaraska Trail Public School and Child Care Centre
Port Hope High School – ASG
34 Percival Street, Port Hope, ON L1A 2B7
389 pupil places
On The Ground capacity (OTG):
39,930 square feet or 3,709 square
metres
Gross Floor Area (GFA):
5.194 +/- acres or 2.10 ha
Site Acreage for Ganaraska Trail P.S.:
2009, Addition(s) replacement Howard
Jordan/Central
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
and Child Care Centre
100
Enrolment History
Enrolment Projections
School Utilization Percentages
Ganaraska Trail Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
101
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
George Hamilton Public School
Port Hope High School – ASG
3200 County Road 10, Port Hope, ON L1A 3V5
150 pupil places
On The Ground capacity (OTG):
13,176 square feet or 1,224 square
metres
Gross Floor Area (GFA):
5.747 +/- acres or 2.33 ha
Site Acreage for George Hamilton P.S.:
1958, Addition(s) 1966
Original Building built:
Junior Kindergarten to Grade 6
Grades and Programs:
102
Enrolment History
Enrolment Projections
School Utilization Percentages
George Hamilton Public School
Facility Condition Index (FCI): 52.79%
Total Event Costs:
103
$ 2,173,588
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Grafton Public School
Cobourg Collegiate Institute – ASG
654 Station Road, Grafton, ON K0K 2G0
On The Ground capacity (OTG):
291 pupil places
Gross Floor Area (GFA):
27,050 square feet or 2,513 square
metres
Site Acreage for Grafton P.S.:
5.01 +/- acres or 2.03 ha
1957, Addition(s) 1967 and 1973
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
104
Enrolment History
Enrolment Projections
School Utilization Percentages
Grafton Public School
Facility Condition Index (FCI): 18.64%
Total Event Costs:
105
$ 1,210,909
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Hampton Junior Public School
Clarington Central Secondary School – ASG
43 Ormiston Street, Hampton, ON L0B 1J0
144 pupil places
On The Ground capacity (OTG):
19,202 square feet or 1,784 square
metres
Gross Floor Area (GFA):
2.99 +/- acres or 1.21 ha
Site Acreage for Hampton Junior P.S.:
1955, Addition(s) 1961 and 1971
Original Building built:
Junior Kindergarten to Grade 3
Grades and Programs:
106
Enrolment History
Enrolment Projections
School Utilization Percentages
Hampton Junior Public School
Facility Condition Index (FCI): 18.52%
Total Event Costs:
107
$
732,061
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Harold Longworth Public School
Bowmanville High School – ASG
350 Longworth Avenue, Bowmanville, ON L1C 5J5
On The Ground capacity (OTG):
585 pupil places
Gross Floor Area (GFA):
56,975 square feet or 5,293 square
metres
Site Acreage for Harold Longworth P.S.:
6.16 +/- acres or 2.49 ha
2003, Addition(s) N/A
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
108
Enrolment History
Enrolment Projections
School Utilization Percentages
Harold Longworth Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
109
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Hastings Public School
Campbellford District High School – ASG
25 Albert Street, Hastings, ON K0L 1Y0
On The Ground capacity (OTG):
164 pupil places
Gross Floor Area (GFA):
15,445 square feet or 1,435 square
metres
1.899 +/- acres or 0.77 ha
Site Acreage for Hastings P.S.:
1952, Addition(s) 1963 and 1988
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
110
Enrolment History
Enrolment Projections
School Utilization Percentages
Hastings Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
111
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Havelock-Belmont Public School
Norwood District High School – ASG
55 Matheson Street East, Havelock, ON K0L 1Z0
On The Ground capacity (OTG):
326 pupil places
Gross Floor Area (GFA):
24,133 square feet or 2,242 square
metres
Site Acreage for Havelock-Belmont P.S.:
8.216 +/- acres or 3.33 ha
1963, Addition(s) 1967
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
112
Enrolment History
Enrolment Projections
School Utilization Percentages
Havelock-Belmont Public School
Facility Condition Index (FCI): 36.09%
Total Event Costs:
113
$ 2,752,883
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Highland Heights Public School
Adam Scott Collegiate Vocational Institute – ASG
430 Highland Road, Peterborough, ON K9H 5J7
On The Ground capacity (OTG):
300 pupil places
Gross Floor Area (GFA):
26,158 square feet or 2,430 square
metres
Site Acreage for Highland Heights P.S.:
5.07 +/- acres or 2.05 ha
1959, Addition(s) 1965
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Living and Life Skills (LLS)
114
Enrolment History
Enrolment Projections
School Utilization Percentages
Highland Heights Public School
Facility Condition Index (FCI): 16.94%
Total Event Costs:
115
$ 1,175,535
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Hillcrest Public School
Campbellford District High School – ASG
55 Elmore Street, Campbellford, ON K0L 1L0
On The Ground capacity (OTG):
384 pupil places
Gross Floor Area (GFA):
33,432 square feet or 3,106 square
metres
Site Acreage for Hillcrest P.S.:
10.00 +/- acres or 4.05 ha
1967, Addition(s) N/A
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
with extended French Immersion
116
Enrolment History
Enrolment Projections
School Utilization Percentages
Hillcrest Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
117
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
James Strath Public School and Child Care Centre
Crestwood Secondary School – ASG
1175 Brealey Drive, Peterborough, ON K9K 0C1
On The Ground capacity (OTG):
714 pupil places
Gross Floor Area (GFA):
(including Child Care Centre)
76,475 square feet or 7,105 square
metres
Site Acreage for James Strath P.S.:
8.36 +/- acres or 3.38 ha
1992, Addition(s) 2014
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Living and Life Skills (LLS)
and Child Care Centre
118
Enrolment History
Enrolment Projections
School Utilization Percentages
James Strath Public School
Facility Condition Index (FCI): 26.49%
Total Event Costs:
119
$ 3,720,883
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
John M. James Public School
Bowmanville High School – ASG
175 Mearns Avenue, Bowmanville, ON L1C 5C6
On The Ground capacity (OTG):
504 pupil places
Gross Floor Area (GFA):
52,650 square feet or 4,891 square
metres
Site Acreage for John M. James P.S.:
6.11 +/- acres or 2.47 ha
2001, Addition(s) 2013
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
120
Enrolment History
Enrolment Projections
School Utilization Percentages
John M. James Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
121
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Kawartha Heights Public School
Crestwood Secondary School – ASG
11 Kawartha Heights Blvd., Peterborough, ON K9J 1N4
On The Ground capacity (OTG):
268 pupil places
Gross Floor Area (GFA):
25,210 square feet or 2,342 square
metres
Site Acreage for Kawartha Heights P.S.:
6.19 +/- acres or 2.51 ha
1958, Addition(s) 1961, 1967 and 1976
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
122
Enrolment History
Enrolment Projections
School Utilization Percentages
Kawartha Heights Public School
Facility Condition Index (FCI): 17.68%
Total Event Costs:
123
$ 1,099,850
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Keith Wightman Public School
Kenner Collegiate Vocational Institute – ASG
860 St. Mary’s Street, Peterborough, ON K9J 4H6
On The Ground capacity (OTG):
353 pupil places
Gross Floor Area (GFA):
31,875 square feet or 2,961 square
metres
Site Acreage for Keith Wightman P.S.:
4.85 +/- acres or 1.96 ha
1955, Addition(s) 1966
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
124
Enrolment History
Enrolment Projections
School Utilization Percentages
Keith Wightman Public School
Facility Condition Index (FCI): 15.34%
Total Event Costs:
125
$ 1,202,599
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Kenner Collegiate Vocational Institute and Intermediate School
Kenner Collegiate Vocational Institute – ASG
633 Monaghan Road South, Peterborough, ON K9J 5J2
On The Ground capacity (OTG) Secondary:
On The Ground capacity (OTG) Intermediate:
918 pupil places
306 pupil places
Gross Floor Area (GFA):
174,325 square feet or 16,195 square
metres
Site Acreage for Kenner C.V.I. and
Intermediate School:
17.62 +/- acres or 7.13 ha
Original Building built:
126
1952, Addition(s) 1957, 1964, 1966,
1971
Enrolment History
Enrolment Projections
School Utilization Percentages
Kenner Intermediate School within Kenner Collegiate Vocational
Institute
Facility Condition Index (FCI): 13.87%
Total Event Costs:
127
$ 4,487,246
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Kent Public School
Campbellford District High School – ASG
150 Kent Street, Campbellford, ON K0L 1L0
On The Ground capacity (OTG):
281 pupil places
Gross Floor Area (GFA):
24,267 square feet or 2,254 square
metres
Site Acreage for Kent P.S.:
6.00 +/- acres or 2.43 ha
1958, Addition(s) 1966 and 2013
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Living and Life Skills (LLS)
128
Enrolment History
Enrolment Projections
School Utilization Percentages
Kent Public School
Facility Condition Index (FCI): 11.31%
Total Event Costs:
129
$
709,635
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
King George Public School
Thomas A. Stewart Secondary School – ASG
220 Hunter Street, Peterborough, ON K9H 1H1
On The Ground capacity (OTG):
291 pupil places
Gross Floor Area (GFA):
29,712 square feet or 2,760 square
metres
Site Acreage for King George P.S.:
5.99 +/- acres or 2.43 ha
1912, Addition(s) 1967
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
130
Enrolment History
Enrolment Projections
School Utilization Percentages
King George Public School
Facility Condition Index (FCI): 14.96%
Total Event Costs:
131
$
971,578
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Kirby Public School
Clarke High School – ASG
3675 Concession Road 7, Orono, ON L0B 1M0
On The Ground capacity (OTG):
164 pupil places
Gross Floor Area (GFA):
14,120 square feet or 1,312 square
metres
Site Acreage for Kirby Centennial P.S.:
10.02+/- acres or 4.05 ha
1968, Addition(s) n/a
Original Building built:
Junior Kindergarten to Grade 6
Grades and Programs:
132
Enrolment History
Enrolment Projections
School Utilization Percentages
Kirby Centennial Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
133
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Lakefield Intermediate School
Lakefield District Secondary School – ASG
71 Bridge Street, Lakefield, ON K0L 2H0
On The Ground capacity (OTG):
Gross Floor Area (GFA):
216 pupil places
33,312 square feet or 3,095 square metres
Site Acreage for Lakefield District S.S.:
and Intermediate School:
18.88 +/- acres or 7.64 ha
Original Building built:
1975, Addition(s) n/a
Grades and Programs:
Grade 7 and Grade 8
134
Enrolment History
Enrolment Projections
School Utilization Percentages
Lakefield Intermediate School
Facility Condition Index (FCI): 46.66%
Total Event Costs:
135
$ 2,975,485
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Lydia Trull Public School
Courtice Secondary School – ASG
80 Avondale Drive, Courtice, ON L1E 3C2
On The Ground capacity (OTG):
469 pupil places
Gross Floor Area (GFA):
50,735 square feet or 4,713 square
metres
Site Acreage for Lydia Trull P.S.:
5.37 +/- acres or 2.17 ha
1998, Addition(s) N/A
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
136
Enrolment History
Enrolment Projections
School Utilization Percentages
Lydia Trull Public School
Facility Condition Index (FCI): 16.48%
Total Event Costs:
137
$ 1,575,956
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
M.J. Hobbs Senior Public School
and Clarington Community Education Centre
Clarington Central Secondary School – ASG
2296 Taunton Road, Hampton, ON L0B 1J0
On The Ground capacity (OTG):
308 pupil places
Gross Floor Area (GFA):
28,470 square feet or 2,645 square
metres
Site Acreage for M.J. Hobbs Senior P.S.:
11.01 +/- acres or 4.46 ha
1966, Addition(s) n/a
Original Building built:
Grades and Programs:
Grade 4 to Grade 8
and Clarington Community
Education Centre
138
Enrolment History
Enrolment Projections
School Utilization Percentages
M.J. Hobbs Senior Public School
Facility Condition Index (FCI): 71.18%
Total Event Costs:
139
$ 5,098,300
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Merwin Greer Public School
Cobourg Collegiate Institute – ASG
457 King Street East, Cobourg, ON K9A 1M7
On The Ground capacity (OTG):
107 pupil places
Gross Floor Area (GFA):
11,236 square feet or 1,044 square
metres
Site Acreage for Merwin Greer P.S.:
6.40 +/- acres or 2.59 ha
1952, Addition(s) 1957 and 1966
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
140
Enrolment History
Enrolment Projections
School Utilization Percentages
Merwin Greer Public School
Facility Condition Index (FCI): 22.14%
Total Event Costs:
141
$
650,433
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Millbrook/South Cavan Public School
Crestwood Secondary School – ASG
47 Tupper Street, Millbrook, ON L0A 1G0
On The Ground capacity (OTG):
349 pupil places
Gross Floor Area (GFA):
36,571 square feet or 3,397 square
metres
Site Acreage for Millbrook/South Cavan P.S.:
10.03 +/- acres or 4.06 ha
1960, Addition(s) 1965, 1987
and 2005
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
142
Enrolment History
Enrolment Projections
School Utilization Percentages
Millbrook/South Cavan Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
143
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Murray Centennial Public School
East Northumberland Secondary School – ASG
654 County Road 40, Trenton, ON K8V 5P4
On The Ground capacity (OTG):
467 pupil places
Gross Floor Area (GFA):
42,745 square feet or 3,971 square
metres
Site Acreage for Murray Centennial P.S:
12.37 +/- acres or 5.00 ha
Original Building built:
1968, Addition(s) 1972 and 2013
Grades and Programs:
Junior Kindergarten to Grade 8
and Extended French Immersion
144
Enrolment History
Enrolment Projections
School Utilization Percentages
Murray Centennial Public School
Facility Condition Index (FCI): 39.91%
Total Event Costs:
145
$ 3,806,486
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Newcastle Public School and Child Care Centre
Clarke High School – ASG
50 Glass Court, Newcastle, ON L1B 1M5
On The Ground capacity (OTG):
554 pupil places
Gross Floor Area (GFA):
58,384 square feet or 5,424 square
metres
Site Acreage for Newcastle P.S.:
9.733 +/- acres or 3.94 ha
1996, Addition(s) 2012 replacement
Newcastle school
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
and Child Care Centre
146
Enrolment History
Enrolment Projections
School Utilization Percentages
Newcastle Public School
Facility Condition Index (FCI): 32.58%
Total Event Costs:
147
$ 3,626,019
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
North Cavan Public School
Crestwood Secondary School – ASG
2001 County Road #10, Cavan, ON L0A 1C0
On The Ground capacity (OTG):
130 pupil places
Gross Floor Area (GFA):
13,635 square feet or 1,267 square
metres
Site Acreage for North Cavan P.S.:
8.06 +/- acres or 3.26 ha
1963, Addition(s) 1967 and 2013
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
148
Enrolment History
Enrolment Projections
School Utilization Percentages
North Cavan Public School
Facility Condition Index (FCI): 16.66%
Total Event Costs:
149
$
594,516
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
North Hope Central Public School
Port Hope High School – ASG
3278 Ganaraska Road, Campbellcroft, ON L0A 1B0
On The Ground capacity (OTG):
95 pupil places
Gross Floor Area (GFA):
9,663 square feet or 898 square
metres
Site Acreage for North Hope Central P.S.:
13.36 +/- acres or 5.4 ha
1960, Addition(s) 1967
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
150
Enrolment History
Enrolment Projections
School Utilization Percentages
North Hope Central Public School
Facility Condition Index (FCI): 93.44%
Total Event Costs:
151
$ 2,436,742
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
North Shore Public School and Child Care Centre
Thomas A. Stewart Secondary School – ASG
42 Pinecrest Avenue, Keene, ON K0L 2G0
On The Ground capacity (OTG):
441 pupil places
Gross Floor Area (GFA):
46,965 square feet or 4,363 square
metres
Site Acreage for North Shore P.S.:
7.74 +/- acres or 3.13 ha
1990, Addition(s) n/a
Original Building built:
Junior Kindergarten to Grade 8 and
Child Care Centre
Grades and Programs:
152
Enrolment History
Enrolment Projections
School Utilization Percentages
North Shore Public School
Facility Condition Index (FCI): 19.86%
Total Event Costs:
153
$ 1,789,193
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Northumberland Hills Public School
East Northumberland Secondary School – ASG
2246 Spring Street, Castleton, ON K0K 1M0
On The Ground capacity (OTG):
343 pupil places
Gross Floor Area (GFA):
34,106 square feet or 3,168 square
metres
Site Acreage for Northumberland Hills P.S.:
9.77 +/- acres or 3.95 ha
2010, Addition(s) Castleton and South
Cramahe replacement
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
154
Enrolment History
Enrolment Projections
School Utilization Percentages
Northumberland Hills Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
155
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Norwood District Public School
Norwood District High School – ASG
28 Flora Street, Norwood, ON K0L 2V0
On The Ground capacity (OTG):
323 pupil places
Gross Floor Area (GFA):
25,186 square feet or 2,340 square
metres
Site Acreage for Norwood District P.S.:
4.987 +/- acres or 2.02 ha
1961, Addition(s) 1967 and 2012
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
156
Enrolment History
Enrolment Projections
School Utilization Percentages
Norwood District Public School
Facility Condition Index (FCI): 28.83%
Total Event Costs:
157
$ 2,080,520
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Orono Public School
Clarke High School – ASG
171 Church Street, Orono, ON L0B 1M0
On The Ground capacity (OTG):
176 pupil places
Gross Floor Area (GFA):
21,153 square feet or 1,965 square
metres
Site Acreage for Orono P.S.:
Original Building built:
10.097+/- acres or 4.09 ha
1968, Addition(s) 1971
Junior Kindergarten to Grade 6
Grades and Programs:
158
Enrolment History
Enrolment Projections
School Utilization Percentages
Orono Public School
Facility Condition Index (FCI): 18.27%
Total Event Costs:
159
$
882,669
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Otonabee Valley Public School
Kenner Collegiate Vocational Institute – ASG
580 River Road South, Peterborough, ON K9J 1E7
On The Ground capacity (OTG):
459 pupil places
Gross Floor Area (GFA):
46,370 square feet or 4,308 square
metres
Site Acreage for Otonabee Valley P.S.:
5.76 +/- acres or 2.33 ha
1964, Addition(s) 1995
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
160
Enrolment History
Enrolment Projections
School Utilization Percentages
Otonabee Valley Public School
Facility Condition Index (FCI): 22.21%
Total Event Costs:
161
$ 2,102,252
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Percy Centennial Public School
Campbellford District High School – ASG
129 Church Street, Warkworth, ON K0K 3K0
On The Ground capacity (OTG):
245 pupil places
Gross Floor Area (GFA):
21,261 square feet or 1,975 square
metres
Site Acreage for Percy Centennial P.S.:
8.357 +/- acres or 3.38 ha
1967, Addition(s) 2014
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
162
Enrolment History
Enrolment Projections
School Utilization Percentages
Percy Centennial Public School
Facility Condition Index (FCI): 33.99%
Total Event Costs:
163
$ 2,027,054
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Plainville Public School
Cobourg Collegiate Institute – ASG
4877 Burnham Street, Gores Landing, ON K0K 2E0
On The Ground capacity (OTG):
199 pupil places
Gross Floor Area (GFA):
21,877 square feet or 2,032 square
metres
Site Acreage for Plainville P.S.:
7.00 +/- acres or 2.83 ha
1958, Addition(s) 1989
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
164
Enrolment History
Enrolment Projections
School Utilization Percentages
Plainville Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
165
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Prince of Wales Public School
Kenner Collegiate Vocational Institute – ASG
1211 Monaghan Road South, Peterborough, ON K9J 5L4
On The Ground capacity (OTG):
622 pupil places
Gross Floor Area (GFA):
64,510 square feet or 5,993 square
metres
Site Acreage for Prince of Wales P.S.:
7.99 +/- acres or 3.23 ha
1919, Addition(s) 1950 and 1965
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and French Immersion
166
Enrolment History
Enrolment Projections
School Utilization Percentages
Prince of Wales Public School
Facility Condition Index (FCI): 79.35%
Total Event Costs:
167
$ 9,866,057
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Queen Elizabeth Public School
Adam Scott Collegiate Vocational Institute – ASG
830 Barnardo Avenue, Peterborough, ON K9H 5V9
On The Ground capacity (OTG):
295 pupil places
Gross Floor Area (GFA):
30,806 square feet or 2,862 square
metres
Site Acreage for Queen Elizabeth P.S.:
6.97 +/- acres or 2.82 ha
1939, Addition(s) 1954, 1957 and
1967
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Living and Life Skills (LLS)
168
Enrolment History
Enrolment Projections
School Utilization Percentages
Queen Elizabeth Public School
Facility Condition Index (FCI): 58.48%
Total Event Costs:
169
$ 3,810,141
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Queen Mary Public School
Adam Scott Collegiate Vocational Institute – ASG
1445 Monaghan Road North, Peterborough, ON K9J 5M8
On The Ground capacity (OTG):
421 pupil places
Gross Floor Area (GFA):
52,320 square feet or 4,860 square
metres
Site Acreage for Queen Mary P.S.:
3.92 +/- acres or 1.59 ha
1912, Addition(s) 1947 and
1965
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
170
Enrolment History
Enrolment Projections
School Utilization Percentages
Queen Mary Public School
Facility Condition Index (FCI): 58.12%
Total Event Costs:
171
$ 5,021,856
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
R.F. Downey Public School
Adam Scott Collegiate Vocational Institute – ASG
1221 Neptune Street, Peterborough, ON K9H 7L9
On The Ground capacity (OTG):
222 pupil places
Gross Floor Area (GFA):
22,850 square feet or 2,123 square
metres
Site Acreage for R.F. Downey P.S.:
Original Building built:
8.55 +/- acres or 3.46 ha
1967, Addition(s) 2012
Junior Kindergarten to Grade 6
Grades and Programs:
172
Enrolment History
Enrolment Projections
School Utilization Percentages
R.F. Downey Public School
Facility Condition Index (FCI): 65.09%
Total Event Costs:
173
$ 3,726,107
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Ridpath Junior Public School
Lakefield District Secondary School – ASG
39 Ermatinger Street, Lakefield, ON K0L 2H0
On The Ground capacity (OTG):
435 pupil places
Gross Floor Area (GFA):
35,593 square feet or 3,307 square
metres
Site Acreage for Ridpath Junior P.S.:
5.937 +/- acres or 2.40 ha
1959, Addition(s) 1968, 1975, 2009 and
2012
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
and French Immersion
174
Enrolment History
Enrolment Projections
School Utilization Percentages
Ridpath Junior Public School
Facility Condition Index (FCI): 15.22%
Total Event Costs:
175
$ 1,521,340
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Roger Neilson Public School
Kenner Collegiate Vocational Institute – ASG
550 Erskin Avenue, Peterborough, ON K9J 5T4
On The Ground capacity (OTG):
338 pupil places
Gross Floor Area (GFA):
39,157 square feet or 3,638 square metres
Site Acreage for Roger Neilson P.S.:
5.03 +/- acres or 2.03 ha
2004, Addition(s) n/a
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 6
and Living and Life Skills (LLS)
176
Enrolment History
Enrolment Projections
School Utilization Percentages
Roger Neilson Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
177
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Roseneath Centennial Public School
Cobourg Collegiate Institute – ASG
9047 Highway 45, Roseneath, ON K0K 2X0
On The Ground capacity (OTG):
196 pupil places
Gross Floor Area (GFA):
17,646 square feet or 1,646 square
metres
Site Acreage for Roseneath Centennial P.S.:
7.02 +/- acres or 2.84 ha
Original Building built:
1967, Addition(s) 1970 and 1995
Grades and Programs
Junior Kindergarten to Grade 8
178
Enrolment History
Enrolment Projections
School Utilization Percentages
Roseneath Centennial Public School
Facility Condition Index (FCI):
9.04%
Total Event Costs:
179
$
486,325
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
S.T. Worden Public School
Courtice Secondary School – ASG
1462 Nash Road, Courtice, ON L1E 1S7
On The Ground capacity (OTG):
277 pupil places
Gross Floor Area (GFA):
30,365 square feet or 2,821 square
metres
Site Acreage for S.T. Worden P.S.:
3.93 +/- acres or 1.59 ha
1956, Addition(s) 1963 and 1988
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
180
Enrolment History
Enrolment Projections
School Utilization Percentages
S.T. Worden Public School
Facility Condition Index (FCI): 42.06%
Total Event Costs:
181
$ 2,630,793
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Smithfield Public School
East Northumberland Secondary School – ASG
241 Drewery Street, Brighton, ON K0K 1H0
On The Ground capacity (OTG):
187 pupil places
Gross Floor Area (GFA):
22,746 square feet or 2,113 square
metres
Site Acreage for Smithfield Public School:
Original Building built:
5.74 +/- acres or 2.32 ha
1951, Addition(s) 1966 and
1968
Junior Kindergarten to Grade 8
Grades and Programs:
182
Enrolment History
Enrolment Projections
School Utilization Percentages
Smithfield Public School
Facility Condition Index (FCI): 54.12%
Total Event Costs:
183
$ 2,778,137
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Spring Valley Public School
East Northumberland Secondary School – ASG
212 County Road 26, Brighton, ON K0K 1H0
On The Ground capacity (OTG):
Gross Floor Area (GFA):
291 pupil places
26,778 square feet or 2,488 square metres
Site Acreage for Spring Valley P.S.:
7.98 +/- acres or 3.63 ha
1964, Addition(s) 1968
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
184
Enrolment History
Enrolment Projections
School Utilization Percentages
Spring Valley Public School
Facility Condition Index (FCI): 23.69%
Total Event Costs:
185
$ 1,538,886
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Stockdale Public School
East Northumberland Secondary School – ASG
994 Will Johnson Road, Frankford, ON K0K 2C0
On The Ground capacity (OTG):
190 pupil places
Gross Floor Area (GFA):
17,897 square feet or 1,663 square
metres
Site Acreage for Stockdale P.S.:
8.17 +/- acres or 3.31 ha
1956, Addition(s) 1966 and 1969
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
186
Enrolment History
Enrolment Projections
School Utilization Percentages
Stockdale Public School
Facility Condition Index (FCI): 55.10%
Total Event Costs:
187
$ 2,873,982
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Terry Fox Public School and Child Care Centre
Cobourg Collegiate Institute – ASG
1065 Riddell Avenue, Cobourg, ON K9A 5N4
On The Ground capacity (OTG):
401 pupil places
Gross Floor Area (GFA):
48,323 square feet or 4,490 square
metres
Site Acreage for Terry Fox Public School:
6.34 +/- acres or 2.57 ha
1994, Addition(s) n/a
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and Living and Life Skills (LLS)
and Child Care Centre
188
Enrolment History
Enrolment Projections
School Utilization Percentages
Terry Fox Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
189
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
The Pines Senior Public School
Clarke High School – ASG
3425 Hwy. 35/115, Newcastle, ON L1B 1L9
On The Ground capacity (OTG):
251 pupil places
Gross Floor Area (GFA):
40,240 square feet or 3,738 square
metres
Site Acreage or The Pines Senior P.S.:
7.883+/- acres or 3.19 ha
Original Building built:
1974, Addition(s) n/a
Grades and Programs:
Grade 7 and Grade 8
190
Enrolment History
Enrolment Projections
School Utilization Percentages
The Pines Senior Public School
Facility Condition Index (FCI): 24.06%
Total Event Costs:
191
$ 1,437,762
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Vincent Massey Public School
Bowmanville High School – ASG
10 Church Street, Bowmanville, ON L1C 1S3
On The Ground capacity (OTG):
395 pupil places
Gross Floor Area (GFA):
34,845 square feet or 3,237 square
metres
Site Acreage for Vincent Massey P.S.:
4.45 +/- acres or 1.80 ha
1954, Addition(s) 1956 and 1990
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
192
Enrolment History
Enrolment Projections
School Utilization Percentages
Vincent Massey Public School
Facility Condition Index (FCI): 45.47%
Total Event Costs:
193
$ 3,746,858
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Warsaw Public School
Lakefield District Secondary School – ASG
975 English Line South, Warsaw, ON K0L 3A0
On The Ground capacity (OTG):
187 pupil places
Gross Floor Area (GFA):
20,261 square feet or 1,882 square
metres
Site Acreage for Warsaw P.S.:
7.368 +/- acres or 2.98 ha
1961, Addition(s) 1973
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
194
Enrolment History
Enrolment Projections
School Utilization Percentages
Warsaw Public School
Facility Condition Index (FCI): 22.24%
Total Event Costs:
195
$ 1,274,338
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Waverley Public School
Clarington Central Secondary School – ASG
168 Waverley Road, Bowmanville, ON L1C 3Y8
On The Ground capacity (OTG):
432 pupil places
Gross Floor Area (GFA):
38,616 square feet or 3,587 square
metres
Site Acreage for Waverley P.S.:
5.82 +/- acres or 2.35 ha
Original Building built:
1979, Addition(s) 2009 and 2014
Grades and Programs
Junior Kindergarten to Grade 8
196
Enrolment History
Enrolment Projections
School Utilization Percentages
Waverley Public School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
197
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Westmount Public School
Crestwood Secondary School – ASG
1520 Sherwood Crescent, Peterborough, ON K9J 6T8
On The Ground capacity (OTG):
375 pupil places
Gross Floor Area (GFA):
34,310 square feet or 3,187 square metres
Site Acreage for Westmount P.S.:
5.01 +/- acres or 2.03 ha
1956, Addition(s) 1965 and
2014
Original Building built:
Grades and Programs:
Junior Kindergarten to Grade 8
and French Immersion and Gifted
198
Enrolment History
Enrolment Projections
School Utilization Percentages
Westmount Public School
Facility Condition Index (FCI): 12.42%
Total Event Costs:
199
$
985,465
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
Secondary
School Profiles and Enrolment Data















Adam Scott Collegiate Vocational Institute
Bowmanville High School
Campbellford District High School
Clarington Central Secondary School
Clarke High School
Cobourg Collegiate Institute
Cobourg District Collegiate Institute West
Courtice Secondary School
Crestwood Secondary School
East Northumberland Secondary School
Kenner Collegiate Vocational Institute
Lakefield District Secondary School
Norwood District High School
Port Hope High School
Thomas A. Stewart Secondary School
Page 202
Page 204
Page 206
Page 208
Page 210
Page 212
Page 214
Page 216
Page 218
Page 220
Page 222
Page 224
Page 226
Page 228
Page 230
Alternative Education Centres-Secondary
Centre for Individual Studies (CIS)
 Clarington
 Northumberland
 Peterborough Alternative and Continuing Education
(PACE)
201
Page 232
Page 234
Page 236
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Adam Scott Collegiate Vocational Institute-ASG
and Intermediate School
175 Langton Street, Peterborough, ON K9H 6K3
On The Ground capacity (OTG) Secondary:
On The Ground capacity (OTG) Intermediate:
1,017 pupil places
225 pupil places
Gross Floor Area (GFA):
180,726 square feet or 16,790 square
metres
Site Acreage for Adam Scott C.V.I.:
15.00 +/- acres or 6.07 ha
1960, Addition(s) 1971 and 2013
Original Building built:
Elementary feeder schools:
- Adam Scott Intermediate
- Chemong P.S.
- Edmison Heights P.S.
- Highland Heights P.S.
- Queen Elizabeth P.S.
- Queen Mary P.S.
- R.F. Downey P.S.
at Adam Scott CVI
Bridgenorth, ON
Peterborough, ON
Peterborough, ON
Peterborough, ON
Peterborough, ON
Peterborough, ON
202
Enrolment History
Enrolment Projections
School Utilization Percentages
Adam Scott Collegiate Vocational Institute and Intermediate School
Facility Condition Index (FCI): 14.46%
Total Event Costs:
203
$ 4,855,214
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Bowmanville High School-ASG
49 Liberty Street, Bowmanville, ON L1C 2L8
On The Ground capacity (OTG):
903 pupil places
Gross Floor Area (GFA):
156,120 square feet or 14,505 square
metres
Site Acreage for Bowmanville H.S.:
18.73 +/- acres or 7.58 ha
1972, Addition(s) n/a
Original Building built:
Elementary feeder schools:
- Central P.S.
- Charles Bowman P.S.
- Duke of Cambridge P.S.
- Harold Longworth P.S.
- John M. James P.S.
- Vincent Massey P.S.
- Clarington C.I.S.
Bowmanville, ON
Bowmanville, ON
Bowmanville, ON
Bowmanville, ON
Bowmanville, ON
Bowmanville, ON
Bowmanville, ON
204
Enrolment History
Enrolment Projections
School Utilization Percentages
Bowmanville High School
Facility Condition Index (FCI): 27.44%
Total Event Costs:
205
$ 6,799,684
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Campbellford District High School – ASG
119 Ranney Street, Campbellford, ON K0L 1L0
On The Ground capacity (OTG):
Gross Floor Area (GFA):
711 pupil places
99,940 square feet or 9,285 square metres
Site Acreage for Campbellford D.H.S.:
Original Building built:
6.967 +/- acres or 2.82 ha
1960, Addition(s) 1963, 1970, 1989 and
2007
Elementary feeder schools:
- Hastings P.S.
- Hillcrest P.S.
- Kent P.S.
- Percy Centennial P.S.
Hastings, ON
Campbellford, ON
Campbellford, ON
Warkworth, ON
Alternative Secondary:
- Phoenix Campus of CDHS
Campbellford, ON
206
Enrolment History
Enrolment Projections
School Utilization Percentages
Campbellford District High School
Facility Condition Index (FCI): 27.41%
Total Event Costs:
207
$ 5,449,195
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Clarington Central Secondary School-ASG
200 Clarington Boulevard, Bowmanville, ON L1C 5N8
On The Ground capacity (OTG):
1,104 pupil places
Gross Floor Area (GFA):
143,985 square feet or 13,376 square
metres
Site Acreage for Clarington Central S.S.:
15.00 +/- acres or 6.07 ha
2005, Addition(s) n/a
Original Building built:
Elementary feeder schools:
- Dr. Ross Tilley P.S.
- Enniskillen P.S.
- Hampton Junior P.S.
- M.J. Hobbs Senior P.S.
- Waverley P.S.
Bowmanville, ON
Enniskillen, ON
Hampton, ON
Hampton, ON
Bowmanville, ON
208
Enrolment History
Enrolment Projections
School Utilization Percentages
Clarington Central Secondary School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
209
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Clarke High School-ASG
3425 Hwy. 35/115, Newcastle, ON L1B 1L9
On The Ground capacity (OTG):
576 pupil places
Gross Floor Area (GFA):
79,757 square feet or 7,410 square metres
Site Acreage for Clarke High School:
18.04 +/- acres or 7.30 ha
1962, Addition(s) 1976
Original Building built:
Elementary feeder schools:
- Kirby Centennial P.S.
- Newcastle P.S.
- Orono P.S.
- The Pines Senior P.S.
Kirby, ON
Newcastle, ON
Orono, ON
Newcastle, ON
210
Enrolment History
Enrolment Projections
School Utilization Percentages
Clarke High School
Facility Condition Index (FCI): 13.81%
Total Event Costs:
211
$ 2,321,866
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Cobourg Collegiate Institute-ASG
335 King Street East, Cobourg, ON K9A 1M2
On The Ground capacity (OTG): not including
addition
1,116 pupil places
176,735 square feet or 16,420
square metres
Gross Floor Area (GFA):
(including Additions)
Site Acreage for Cobourg Collegiate Institute:
13.09 +/- acres or 5.30 ha
1960, Addition(s) 1962, 1966 and
2015
Original Building built:
Elementary feeder schools:
- Baltimore P.S.
- C.R. Gummow (replacement) P.S.
- Grafton P.S.
- Merwin Greer P.S.
- Roseneath Centennial P.S.
212
Baltimore, ON
Cobourg, ON
Grafton, ON
Cobourg, ON
Cobourg, ON
Enrolment History
Enrolment Projections
School Utilization Percentages
Cobourg Collegiate Institute
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
213
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Cobourg District Collegiate Institute West-ASG
135 King Street West, Cobourg, ON K9A 1M7
On The Ground capacity (OTG):
639 pupil places
Gross Floor Area (GFA):
86,425 square feet or 8,030 square
metres
Site Acreage for Cobourg District Collegiate
Institute West:
Cobourg District Collegiate Institute West
Sports Field:
2.36 +/- acres or 0.96 ha
4.62 +/- acres or 1.87 ha
1901, Addition(s) 1939, 1953, 1957,
1963, 1967 and 1972
Original Building built:
Elementary feeder schools:
- Burnham P.S.
- Camborne P.S.
- Dale Road Senior P.S.
- Plainville P.S.
- Terry Fox P.S.
Cobourg, ON
Camborne, ON
Cobourg, ON
Cobourg, ON
Cobourg, ON
214
Cobourg District Collegiate Institute West
School Enrolment Data is now included with Cobourg Collegiate
Institute.
215
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Courtice Intermediate and Secondary School-ASG
1717 Nash Road, Courtice, ON L1E 2L8
On The Ground capacity (OTG) Secondary:
On The Ground capacity (OTG) Intermediate:
750 pupil places
115 pupil places
Gross Floor Area (GFA):
117,240 square feet or 10,892
square metres
Site Acreage for Courtice Secondary School:
16.38 +/- acres or 6.63 ha
1960, Addition(s) 1966 and 1971
Original Building built:
Elementary feeder schools:
- Courtice Intermediate School
- Courtice North P.S.
- Dr. Emily Stowe P.S.
- Dr. G.J. MacGillivray P.S.
- Lydia Trull P.S.
- S.T. Worden P.S.
Courtice, ON
Courtice, ON
Courtice, ON
Courtice, ON
Courtice, ON
Courtice, ON
216
Enrolment History
Enrolment Projections
School Utilization Percentages
Courtice Secondary School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
217
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Crestwood Secondary School-ASG
1885 Sherbrook Street West, Peterborough, ON K9J 0E5
On The Ground capacity (OTG):
933 pupil places
Gross Floor Area (GFA):
135,900 square feet or 12,626 square
metres
Site Acreage for Crestwood S.S.:
Original Building built:
22.68 +/- acres or 9.18 ha
1963, Addition(s) 1965, 1972 and 2008
Elementary feeder schools:
- James Strath P.S.
- Kawartha Heights P.S.
- Millbrook/South Cavan P.S.
- North Cavan P.S.
- Westmount P.S.
Peterborough, ON
Peterborough, ON
Millbrook, ON
Cavan, ON
Peterborough, ON
218
Enrolment History
Enrolment Projections
School Utilization Percentages
Crestwood Secondary School
Facility Condition Index (FCI): 52.70%
Total Event Costs:
219
$12,493,004
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
East Northumberland Secondary School-ASG
71 Dundas Street, Brighton, ON K0K 1H0
On The Ground capacity (OTG):
1,086 pupil places
Gross Floor Area (GFA):
162,085 square feet or 15,058
square metres
Site Acreage for East Northumberland S.S.:
12.04 +/- acres or 4.87 ha
1954, Addition(s) 1959, 1962 and 1970
Original Building built:
Elementary feeder schools:
- Brighton P.S.
- Colborne P.S.
- Murray Centennial P.S.
- Northumberland Hills P.S.
- Smithfield P.S.
- Spring Valley P.S.
- Stockdale P.S.
Brighton, ON
Colborne, ON
Quinte West, ON
Castleton, ON
Brighton, ON
Brighton, ON
Stockdale, ON
220
Enrolment History
Enrolment Projections
School Utilization Percentages
East Northumberland Secondary School
Facility Condition Index (FCI):
8.99%
Total Event Costs:
221
$ 2,640,698
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Kenner Collegiate Vocational Institute and Intermediate School-ASG
633 Monaghan Road South, Peterborough, ON K9J 5J2
On The Ground capacity (OTG) Secondary:
On The Ground capacity (OTG) Intermediate:
Gross Floor Area (GFA):
918 pupil places
306 pupil places
174,325 square feet or 16,195 square
metres
Site Acreage for Kenner C.V.I. and
Intermediate School:
17.62 +/- acres or 7.13 ha
1952, Addition(s) 1957, 1964, 1966 and
1971
Original Building built:
Elementary feeder schools:
- Kenner Intermediate School
- Keith Wightman P.S.
- Otonabee Valley P.S.
- Prince of Wales P.S.
- Roger Neilson P.S.
in Kenner C.V.I.
Peterborough, ON
Peterborough, ON
Peterborough, ON
Peterborough, ON
222
Enrolment History
Enrolment Projections
School Utilization Percentages
Kenner Collegiate Vocational Institute and Intermediate School
Facility Condition Index (FCI): 13.87%
Total Event Costs:
223
$ 4,487,246
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Lakefield District Secondary School-ASG
71 Bridge Street, Lakefield, ON K0L 2H0
On The Ground capacity (OTG):
702 pupil places
Gross Floor Area (GFA):
87,477 square feet or 8,127 square
metres
Site Acreage for Lakefield District S.S. and
Intermediate School:
18.88 +/- acres or 7.64 ha
1952, Addition(s) 1957, 1966 and 1971
Original Building built:
Elementary feeder schools:
- Apsley Central P.S.
- Buckhorn P.S.
- Lakefield Intermediate School
- Ridpath Junior P.S.
- Warsaw P.S.
Apsley, ON
Buckhorn, ON
Lakefield, ON
Lakefield, ON
Warsaw, ON
224
Enrolment History
Enrolment Projections
School Utilization Percentages
Lakefield District Secondary School
Facility Condition Index (FCI): 35.69%
Total Event Costs:
225
$ 7,790,732
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Norwood District High School-ASG
44 Elm Street, Norwood, ON K0L 2V0
On The Ground capacity (OTG):
681 pupil places
Gross Floor Area (GFA):
98,626 square feet or 9,162
square metres
Site Acreage for Norwood District H.S.:
18.36 +/- acres or 7.43 ha
1950, Addition(s) 1954, 1960,
1966 and 1971
Original Building built:
Elementary feeder schools:
- Havelock-Belmont P.S.
- Norwood District P.S.
Havelock, ON
Norwood, ON
226
Enrolment History
Enrolment Projections
School Utilization Percentages
Norwood District High School
Facility Condition Index (FCI): 19.16%
Total Event Costs:
227
$ 3,583,576
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Port Hope High School-ASG
Including Dr. M.S. Hawkins Senior Public School, Child Care Centre, and
Northumberland Community Education Centre
130 Highland Drive, Port Hope, ON L1A 2A3
On The Ground capacity (OTG) Secondary:
On The Ground capacity (OTG) Elementary:
714 pupil places
262 pupil places
Gross Floor Area (GFA):
166,860 square feet or 15,501 square
metres
Site Acreage for Port Hope High School:
15.96 +/- acres or 6.46 ha
1955, Addition(s) 1962 and 1970
Original Building built:
Elementary feeder schools:
- Dr. M.S. Hawkins Senior P.S.
- Beatrice Strong P.S.
- Ganaraska Trail P.S.
- George Hamilton P.S.
- North Hope Central P.S.
at Port Hope H.S.
Port Hope, ON
Port Hope, ON
Port Hope, ON
Campbellcroft, ON
228
Enrolment History
Enrolment Projections
School Utilization Percentages
Port Hope High School
Facility Condition Index (FCI): 16.86%
Total Event Costs:
229
$ 4,402,102
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Thomas A. Stewart Secondary School-ASG
1009 Armour Road North, Peterborough, ON K9H 7H2
On The Ground capacity (OTG) Secondary:
1,290 pupil places
Gross Floor Area (GFA):
219,317 square feet or 20,375 square
metres
Site Acreage for Thomas A. Stewart S.S.:
27.05 +/- acres or 10.95 ha
1967, Addition(s) n/a
Original Building built:
Elementary feeder schools:
- Armour Heights P.S
- King George P.S.
- North Shore P.S.
Peterborough, ON
Peterborough, ON
Keene, ON
230
Enrolment History
Enrolment Projections
School Utilization Percentages
Thomas A. Stewart Secondary School
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
231
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Clarington Centre for Individual Studies
140 High Street, Bowmanville, ON L1C 3C1
On The Ground capacity (OTG):
189 pupil places
Gross Floor Area (GFA):
15,340 square feet or 1,425 square
metres
Site Acreage for Clarington C.I.S.:
2.13 +/- acres or 0.86 ha
1960, Addition(s) 1964
Original Building built:
Grades and Programs:
Alternative - Grades 9 – 12
Literacy Basic Skills (LBS)
Teen Education and Mothering
232
Enrolment History
Enrolment Projections
School Utilization Percentages
Clarington Centre for Individual Studies
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
233
$ n/a
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Northumberland Centre for Individual Studies at Grant Sine
780 D’Arcy Street North, Cobourg, ON K9A 4B3
On The Ground capacity (OTG):
159 pupil places
Gross Floor Area (GFA):
13,308 square feet or 1,236 square
metres
Site Acreage for Northumberland CIS at
Grant Sine:
5.64 +/- acres or 2.28 ha
1965, Addition(s) n/a
Original Building built:
Grades and Programs:
Alternative-Grades 9–12
Teen Education and Mothering
234
Enrolment History
Enrolment Projections
School Utilization Percentages
Northumberland at Grant Sine
Facility Condition Index (FCI): 17.28%
Total Event Costs:
235
$
944,477
Kawartha Pine Ridge District School Board
2015-2020 Long Term Accommodation Plan
School and Site Fact Sheet
Peterborough Collegiate and Vocational School
Peterborough Alternative and Continuing Education (PACE)
1009 Armour Road North, Peterborough, ON K9H 2W1
On The Ground capacity (OTG) Secondary:
741 pupil places
Gross Floor Area (GFA):
113,472 square feet or 10,542 square
metres
Site Acreage for Peterborough CVS:
2.03 +/- acres or 0.82 ha
1907, Addition(s) 1927, 1947, 1964,
1965 and 1968
Original Building built:
Included at this Facility:
- Peterborough Alternative and Continuing Education (PACE)
- Peterborough Community Education Centre, School for Young Moms
- Literacy Basic Skills (LBS), and Suspension/Expulsion Program
236
Enrolment History
Enrolment Projections
School Utilization Percentages
Peterborough Collegiate Vocational School (PACE)
School Condition Inspections are to be completed during 2015
Facility Condition Index (FCI): - %
Total Event Costs:
237
$ n/a