RAID Demonstration Plan
Transcription
RAID Demonstration Plan
RAID Demonstration Plan Document information Project Title RAID – RPAS ATM Integration Demonstration Project Number RPAS.03 Project Manager CIRA Deliverable Name RAID Demonstration Plan Edition 02.01.00 Abstract This document aims at providing the Demonstration plan for RAID project. It is organized around three demonstration exercises (one Real Time Simulation and two Flight Trials), each foreseeing different test conditions. Demonstration objectives targeting the assessment of SESAR Key Performance Areas are defined starting from the high-level objectives described in the project proposal. For these objectives associated success criteria, hypotheses, indicators and methods that will be used during the assessment are identified. Effects on both Pilot and Controller are considered. Differences in operating the aircraft On-Board and by the means of the Remote Station is part of the demonstration plan objectives. The document also provides the Communication Plan that will be used for the dissemination of the RAID project matured experiences and results. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Authoring & Approval Prepared By - Authors of the document. Name & Company Date Edoardo Filippone / CIRA Position & Title Leader of RAID Demonstration Plan preparation task RAID Project Manager Barbara Mellini / Deep Blue Human Performance Expert 15/11/2013 Jelena Dokic / Deep Blue 15/11/2013 Gianluca Gargiulo / NAIS Human Performance Expert Responsible for Communication Plan Communication Engineer 15/11/2013 Joe Degiorgio / MATS Operational Expert 15/11/2013 David Zammit Mangion / UoM Safety Expert 15/11/2013 Francesco Grimaccia / Nimbus Engineer 15/11/2013 Name & Company Position & Title Date Alberto Pasquini / Deep Blue Safety Engineer 20/01/2014 Saverio Del Gatto / CIRA Quality Manager 23/01/2014 Salvatore Palazzo / CIRA Flight Engineer 23/01/2014 Carlo Valbonesi / Deep Blue Safety Expert 13/12/2013 Damiano Taurino / Deep Blue Marco Romani / NAIS 30/10/2013 15/11/2013 15/11/2013 Reviewed By - Reviewers internal to the project. Reviewed By - Other SESAR projects, Airspace Users, staff association, military, Industrial Support, other organisations. Name & Company Position & Title Date <Name / Company> <Position / Title> <DD/MM/YYYY> Approved for submission to the SJU By - Representatives of the company involved in the project. Name & Company Date Joe Degiorgio / MATS Position & Title Leader of RAID Demonstration Plan preparation task RAID Project Manager Responsible for Demonstration Plan Operational Expert David Zammit Mangion / UoM Safety Expert 29/01/2014 Francesco Grimaccia / Nimbus Engineer 29/01/2014 Damiano Taurino / Deep Blue Edoardo Filippone / CIRA Marco Romani / NAIS 29/01/2014 29/01/2014 29/01/2014 29/01/2014 Rejected By - Representatives of the company involved in the project. Name & Company Position & Title Date None Rational for rejection None. 2 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Document History Edition Date Status Author Justification 00.00.01 30/10/2013 Draft Damiano Taurino New Document 00.00.02 00.00.03 00.00.04 15/11/2013 23/12/2013 15/01/2014 Draft Draft Damiano Taurino, Edoardo Filippone, Joe Degiorgio, David Zammit Mangion, Gianluca Gargiulo Jelena Dokic, Barbara Mellini, David Zammit Mangion, Gianluca Gargiulo, Edoardo Filippone, Salvatore Palazzo, Francesco Grimaccia Context of Demonstration, Scenarios Definition Definition of Demonstration Objectives and Assumptions, Design of Demonstration exercises Draft Edoardo Filippone, Marco Romani Communication Plan, Project Management, Implementation Considerations Consolidation of the document by partners, Integration of reviews Version delivered to SJU 00.00.05 24/01/2014 Draft Damiano Taurino, Jelena Dokic, Barbara Mellini, David Zammit Mangion, Gianluca Gargiulo, Marco Romani, Edoardo Filippone, Salvatore Palazzo 01.00.00 29/01/2014 Final Damiano Taurino 02.00.00 10/03/2014 Final Damiano Taurino 02.01.00 10/03/2014 Final Damiano Taurino Version addressing reviewers’ comments Minor typo errors and the lack of a reference document corrected. 3 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Table of Contents TABLE OF CONTENTS ..................................................................................................................................... 4 EXECUTIVE SUMMARY .................................................................................................................................... 6 1 INTRODUCTION.......................................................................................................................................... 7 1.1 1.2 1.3 1.4 1.5 2 PURPOSE OF THE DOCUMENT ................................................................................................................ 7 INTENDED READERSHIP .......................................................................................................................... 7 STRUCTURE OF THE DOCUMENT ............................................................................................................ 7 GLOSSARY OF TERMS ............................................................................................................................. 7 ACRONYMS AND TERMINOLOGY ............................................................................................................. 7 CONTEXT OF THE DEMONSTRATIONS............................................................................................. 10 2.1 SCOPE OF THE DEMONSTRATION AND COMPLEMENTARITY WITH THE SESAR PROGRAMME ............ 10 2.2 STAKEHOLDER IDENTIFICATION, NEEDS AND INVOLVEMENT................................................................ 13 2.2.1 Regulatory context ..................................................................................................................... 16 3 PROJECT MANAGEMENT ..................................................................................................................... 18 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 4 ORGANISATION ..................................................................................................................................... 18 W ORK BREAKDOWN STRUCTURE ........................................................................................................ 22 FORMAL DELIVERABLES ....................................................................................................................... 58 OTHER DELIVERABLES AND KEY PROJECT MILESTONES ...................................................................... 58 QUARTERLY REPORTING ...................................................................................................................... 58 RESOURCES BREAKDOWN ................................................................................................................... 58 PRE-FINANCING NEEDS ........................................................................................................................ 59 RISK MANAGEMENT .............................................................................................................................. 59 EXTRANET ACCESS RIGHTS .................................................................................................................. 61 DEMONSTRATION APPROACH ........................................................................................................... 62 4.1 DEMONSTRATION OVERVIEW ............................................................................................................... 62 4.2 STAKEHOLDERS DEMONSTRATION EXPECTATIONS............................................................................. 63 4.3 DEMONSTRATION OBJECTIVES ............................................................................................................ 63 4.3.1 Human Performance.................................................................................................................. 64 4.3.2 Security ........................................................................................................................................ 67 4.3.3 Safety ........................................................................................................................................... 70 4.3.4 System Performance ................................................................................................................. 78 4.3.5 Capacity ....................................................................................................................................... 79 4.4 DEMONSTRATION SCENARIOS.............................................................................................................. 80 4.5 DEMONSTRATION ASSUMPTIONS ......................................................................................................... 86 4.6 DEMONSTRATION EXERCISES LIST ...................................................................................................... 91 4.7 DEMONSTRATION EXERCISES PLANNING ............................................................................................ 92 5 DEMONSTRATION ACTIVITIES ............................................................................................................ 94 5.1 DEMONSTRATION EXERCISE #1 PLAN ................................................................................................. 94 5.1.1 Exercise Scope and Justification ............................................................................................. 94 5.1.2 Exercises Planning and management .................................................................................... 99 5.1.3 Results Analysis Specification ............................................................................................... 104 5.1.4 Level of representativeness/limitations ................................................................................. 106 5.2 DEMONSTRATION EXERCISE #2 PLAN ............................................................................................... 106 5.2.1 Exercise Scope and Justification ........................................................................................... 106 5.2.2 Exercises Planning and management .................................................................................. 113 5.2.3 Results Analysis Specification ............................................................................................... 117 5.2.4 Level of representativeness/limitations ................................................................................. 118 5.3 DEMONSTRATION EXERCISE #3 PLAN ............................................................................................... 118 5.3.1 Exercise Scope and Justification ........................................................................................... 118 5.3.2 Exercises Planning and management .................................................................................. 122 5.3.3 Results Analysis Specification ............................................................................................... 127 5.3.4 Level of representativeness/limitations ................................................................................. 128 4 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 6 IMPLEMENTATION CONSIDERATIONS ........................................................................................... 129 7 COMMUNICATION PLAN ..................................................................................................................... 131 7.1 OBJECTIVES AND KEY MESSAGES ...................................................................................................... 131 7.2 TARGET AUDIENCE ............................................................................................................................. 132 7.3 COMMUNICATION ACTIVITIES .............................................................................................................. 133 7.3.1 Project Logo and Presentation template .............................................................................. 136 7.3.2 Kick-off meeting press release ............................................................................................... 137 8 REFERENCES ......................................................................................................................................... 138 8.1 REFERENCE DOCUMENTS .................................................................................................................. 138 5 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Executive summary The overall context of the RAID project is the safe and seamless integration of RPAS with other airspace users. Based on the stimulus resulting from the ERSG roadmap, the present project aims at providing contribution in terms of operational procedures and technologies evaluation through the completion of several demonstration activities including both simulations and flight trials. The aim of the project is the evaluation of technological solutions and procedures to support the integration of RPAS into the ATM environment. This will be pursued by means of relevant demonstration activities, whose specific objectives are to: • Assess the similarities of managing the RPAS flight in the unrestricted airspace, with respect to the manned aircraft, from the ATM network and operators point of view; • Provide evidences of the peculiarities and possible effects on RPAS operations in the unrestricted airspace, due both to peculiar system architecture (pilot on ground) and to the specific technologies enabling the RPAS to flight (DAA, C2L); • Support the identification of possible incompatibilities of RPAS with the current ATM systems, functions, and operational aspects, in terms of operations, technologies, procedures; • Emulate and analyse malicious attacks on the communication/navigation radio links in order to assess the impact on the system performances and on the controller and remote pilot decisions; • Provide some data and considerations to identify guidelines to manage peculiarities and overcome incompatibilities for the RPAS integration in the unrestricted airspace. These objectives will be achieved through a combination of Real-Time Simulations (EXE-RPAS.03001) and Flight Trials both in segregated (EXE-RPAS.03-002) and non-segregated (EXE-RPAS.03003) airspace. These objectives are detailed and broken down into low-level objectives associated to relevant KPAs (safety, security, capacity and human performance). In addition, the objectives identified also address the system performance measurements. The focus of these objectives will be on both procedural issues and technological aspects, addressing primarily the management of transitions between temporary segregated areas (TSAs) and non-segregated airspace and the deployment of new DAA and C2L technologies. Within this document, the foreseen demonstration activities and their supporting aspects both technical (objectives, scenarios, hypothesis, indicators, data collection and analysis method) and organizational (roles and responsibilities, time planning, resources) are further detailed. 6 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 1 Introduction 1.1 Purpose of the document This document aims at providing the Demonstration plan for the RAID project. It describes how the project demonstration exercises will be organised and executed. The Demonstration Plan is organised around three exercises (one Real Time Simulation and two Flight Trials), each foreseeing different test conditions. Demonstration objectives targeting the assessment of SESAR Key Performance Areas are defined starting from the high-level objectives described in the project proposal. For these objectives associated success criteria, hypotheses, indicators and methods that will be used during the assessment are identified. Effects on both Pilot and Controller are considered. To identify and assess differences in operating the aircraft On-Board and by the means of the Remote Station is part of the demonstration plan objectives. The document also provides the Communication Plan that will be used for the dissemination of the RAID project matured experiences and results. 1.2 Intended readership This document is primarily intended for the members of the RAID Consortium and the SESAR JU as a mean to provide information about the planning and the execution of the RAID demonstration activities. 1.3 Structure of the document This document is structured as follows: • Section 1 provides a brief introduction to the Demonstration Plan; • Section 2 focuses on the context and scope of the demonstration; • Section 3 addresses the project management relevant topics (organisation, work and resources breakdowns, deliverables and key project milestones); • Section 4 provides a detailed description of the demonstration approach, associated objectives, scenarios, assumptions and the exercises through which they will be addressed; • Section 5 describes the demonstration activities to be performed for each of the planned demonstration exercises; • Section 6 introduces relevant considerations to be addressed in the follow up work before the implementation; • Section 7 lists the Communication Plan objectives and key messages together with the associated activities; • Section 8 provides a list of the Applicable and Reference Documents. 1.4 Glossary of terms The definitions of the terms that are not covered by the standard SESAR glossary are provided as footnotes within the document. 1.5 Acronyms and Terminology Term AAMS ACAS ACC ADS_B AFM AFUA AIMS ANSP Definition Advanced Airspace Management System Airborne Collision Avoidance System Area Control Centre Automatic Dependent Surveillance_ Broadcast Advanced Flight Management Advanced Flexible Use of Airspace Aeronautical Information Management System Air Navigation Service Provider 7 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan APP ATC ATCo ATM ATS ATCo BLOS BVLOS C2L C3L CA CAD CONOPS CP CWP DAA DARD DMA DOE E_OVCM ENAV ERSG FDP FHA FIR FL GA GBSAA GPS HF HIL HMI ICAO ICONUS IFR KPA KPI LDA MATS MRT NIMS NOTAM OFA OP OPV OV PSR PSSA RF RLOS ROI RP RPA RPAS RPS RTS SAM Edition 02.01.00 Approach Air Traffic Control Air Traffic Controller Air Traffic Management Air Traffic Service Air Traffic Controller Beyond Line-of-Sight Beyond Visual Line of Sight Command and Control Link Command, Control and Communication Link Collision Avoidance Civil Aviation Department of Malta Transportation Ministry Concept of Operations Communication Plan Control Working Position Detect and Avoid Direct Access Radar Data Dynamic Management of Airspace Design of Experiment European_Operational Concept Validation Methodology Ente Nazionale per l’Assistenza al Volo European RPAS Study Group Flight Data Processing Functional Hazards Assessment Flight Information Region Flight Level General Aviation Ground Based Sense and Avoid Global Positioning System Human Factor Human-in-the-loop Human Machine Interface International Civil Aviation Organization Initial CONOPS for UAS in SESAR Instrument Flight Rules Key Performance Area Key Performance Index Local Data Area Malta Airspace Traffic Service Multi radar Tracks Network Information Management System Notice to Air Men Operational Focus Area On-board Pilot Optionally Piloted Vehicle Operational Validation Primary Radar Preliminary System Safety Assessment Radio Frequency Radio Line-Of-Sight Risks, Opportunities and Issues Remote Pilot Remote Piloted Aircraft Remotely Piloted Aircraft System Remote Pilot Station Real Time Simulation Safety Assessment Methodology 8 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan SDA SES SESAR SJU SLDA SSA SSR STOL TIS_B TSA TWR UAS UASSG VFR VLA VLOS VTOL Edition 02.01.00 System Data Area Single European Sky SES ATM Research SESAR Joint Undertaking System Local Data Area Spatial Situational Awareness Secondary Radar Short Take Off Landing Traffic Information System_Broadcast Temporary Segregated Area Arriving/Departing Traffic Unmanned Aircraft System UAS Study Group Visual Flight Rules Very Light Aircraft Visual Line-of-Sight Vertical Take-off and Landing 9 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 2 Context of the Demonstrations The overall objective of RAID is the demonstration and evaluation of the impact of RPAS integration into unrestricted airspace on the current and future (short-term) ATM environment, as it is defined by the European RPAS Steering Group (ERSG) Roadmap [2]. 2.1 Scope of the demonstration and complementarity with the SESAR Programme The Demonstration focuses on the following areas identified by the ERSG Roadmap: • Integration into ATM and Airspace environments; • Verification and Validation; • Detect & Avoid systems and operational procedures; • Security issues; • Operational contingency procedures and systems. Based on these areas of interest the RAID Consortium identified four high level objectives, as following: •OBJ-1. To quantify and demonstrate the level of maturity, performance, limitations and compatibility with current infrastructures and procedures, of detect and avoid technology and of technologies for secure C2L; •OBJ-2. To assess the impact RPAS integration into un-segregated airspace could have on safety, the RPAS pilot, Air Traffic Control Officers and ATM procedures and operations; •OBJ-3. To identify the similarities between the operation of RPASs and manned aircraft in the ATM environment, as well as specificities to RPAS operation in terms of constraints and new requirements for the ATM operations; •OBJ-4. To compare technological requirements between current (manned) flight operations and RPAS operations within the flight and air traffic management environments. These objectives are then broken down into 22 low level objectives referring to four KPAs (Human Performance, Security, Safety and Capacity) and to Detect and Avoid System Performance, which are addressed by means of three demonstration exercises: Demonstration Exercise ID and Title EXE-RPAS.03-001: On-ground and Human-in-the-Loop Simulation Leading organization CIRA Demonstration exercise objectives High-level description of the Concept of Operations EXE-RPAS.03-001 addresses all the RAID demonstration objectives. In fact RTS are meant to: - identify and define the operational conditions that can be safely and efficiently addressed in the following live trials; - while at the same time providing a preliminary analysis of relevant objective-related data and information to be readdresses and further investigated by the means of flight trials in EXE-RPAS.03-002 and EXE-RPAS.03-003 A table mapping the low level objectives into the three demonstration exercises is provided in Section 4.6. The operational concept addressed in this exercise is the RPAS integration in the ATM system, with a specific focus on the en-route phase. The standard existing ATC procedures will be applied in a simulation platform. Any emerging need for modification to 10 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Applicable Operational Context Expected results per KPA Edition 02.01.00 current procedures and operating methods or creation of new ones will be investigated. Simulated RPAS operations in en-route segregated and non-segregated environment Human Performance: ATCOs’ performance remains as in today’s operations, while the roles, responsibilities and tasks of remote pilots are defined and assessed as within the scope of human capabilities and limitations and contribute to the SESAR expected performance benefits. Safety, Security and Capacity levels are maintained, as in current operations. System Performance; DAA performance is evaluated as satisfactory as with respect to the deviation between actual and planned flight time and path. The total number of infringement is sufficiently low and the minimum separation distance (traffic avoidance algorithm) is maintained. Number of simulation runs Related projects in the SESAR Programme OFA addressed 15 SESAR RPAS projects: RPAS.01 DEMORPAS RPAS.02 INSuRE RPAS.03 RAID RPAS.04 MedALE RPAS.05 TEMPAERIS RPAS.06 ODREA RPAS.07 CLAIRE RPAS.08 AIRICA RPAS.09 ARIADNA - OFA 03.01.08 System Interoperability with air and ground data sharing; - OFA03.03.01 Conflict Detection, Resolution and Monitoring - OFA03.03.03 Enhanced Decision Support Tools and Performance Based Navigation; - OFA03.04.01 Enhanced Ground Based Safety Nets Demonstration Exercise ID and Title EXE-RPAS.03-002: Flight trials in segregated area Leading organization CIRA Demonstration exercise objectives High-level description of the Concept of Operations EXE-RPAS.03-002, flight trials in segregated area, mainly addresses Human Performance, Security and Safety related objectives. A table mapping the demonstration objectives into the three demonstration exercises is provided in Section 4.6. • The operational concept addressed in this exercise is the RPAS integration in the ATM system, with a specific focus on the en-route phase. The standard existing ATC procedures will be applied and any emerging need for modification to current procedures and operating methods or creation of new ones will be 11 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 investigated. Applicable Operational Context Expected results per KPA RPAS operations in en-route segregated airspace Human Performance ATCOs’ performance remains as in today’s operations, while the roles, responsibilities and tasks of remote pilots are defined and assessed as within the scope of human capabilities and limitations and contribute to the SESAR expected performance benefits. Safety and Security The actual level as in current operations is maintained. Number of flight trials Related projects in the SESAR Programme OFA addressed 4 SESAR RPAS projects: RPAS.01 DEMORPAS RPAS.02 INSuRE RPAS.03 RAID RPAS.04 MedALE RPAS.05 TEMPAERIS RPAS.06 ODREA RPAS.07 CLAIRE RPAS.08 AIRICA RPAS.09 ARIADNA - OFA 03.01.08 System Interoperability with air and ground data sharing; - OFA03.03.01 Conflict Detection, Resolution and Monitoring - OFA03.03.03 Enhanced Decision Support Tools and Performance Based Navigation; - OFA03.04.01 Enhanced Ground Based Safety Nets Demonstration Exercise ID and Title EXE-RPAS.03-003: Flight trials in non-segregated area Leading organization CIRA Demonstration exercise objectives High-level description of the Concept of Operations Applicable Operational Context EXE-RPAS.03-003, flight trials in non-segregated area, aims at evaluating System Performance and Capacity related objectives and at deepening the evaluation of Human Performance and Safety related objectives. A table mapping the demonstration objectives into the three demonstration exercises is provided in Section 4.6. The operational concept addressed in this exercise is the RPAS integration in the ATM system, with a specific focus on the en-route phase. The standard existing ATC procedures will be applied and any emerging need for modification to current procedures and operating methods or creation of new ones will be investigated. The RPAS supporting technology that will be addressed within this demonstration exercise is the Detect and Avoid technology, focusing on solutions specifically based on the use of ADS-B and TIS-B technology, and on its compatibility with the existing safety nets. RPAS operations in en-route non-segregated environment 12 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Human Performance ATCOs’ performance remains as in today’s operations, while the roles, responsibilities and tasks of remote pilots are defined and assessed as within the scope of human capabilities and limitations and contribute to the SESAR expected performance benefits. Safety and Capacity The actual level as in current operations is maintained. System Performance DAA performance is evaluated as satisfactory as with respect to the deviation between actual and planned flight time and path. The total number of infringement is low and the minimum separation distance (traffic avoidance algorithm) is maintained. Expected results per KPA Number of flight trials 4 Related projects in the SESAR Programme SESAR RPAS projects: RPAS.01 DEMORPAS RPAS.02 INSuRE RPAS.03 RAID RPAS.04 MedALE RPAS.05 TEMPAERIS RPAS.06 ODREA RPAS.07 CLAIRE RPAS.08 AIRICA RPAS.09 ARIADNA - OFA 03.01.08 System Interoperability with air and ground data sharing; - OFA03.03.01 Conflict Detection, Resolution and Monitoring - OFA03.03.03 Enhanced Decision Support Tools and Performance Based Navigation; - OFA03.04.01 Enhanced Ground Based Safety Nets OFA addressed 2.2 Stakeholder identification, needs and involvement In the following table are presented the identified stakeholders, their involvement in the Demonstration and their expectations. Stakeholder CIRA Deep Blue External / Internal Internal Internal Involvement Why it matters to stakeholder/ Performance expectations Project Coordinator. RPAS operator. DAA System Developer Responsible for Scenario definition, Demonstration Plan definition, Flight Demonstration CIRA expects to improve the level of maturity of its DAA technology and to qualify itself as an RPAS operator able to provide all the support in using a RPAS system for experimental activities. Exercise Identifier EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 Deep Blue expects to consolidate its knowledge in the field of Validation and to increase its wellgrounded experience in the field of EXESafety by applying the methodology RPAS.03-002 of Safety Assessment to the RPAS case. EXE- 13 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan University of Malta MATS Nimbus NAIS Academia Internal Internal Internal Internal External Edition 02.01.00 Safety Assessment. Contributor to Real Time Simulations and Flight Trials as Human Performance, Safety and Operational experts. Design of simulation and flight test campaigns, support in their execution, coordination in legal issues relating to the permit to fly and results evaluation. Providing simulation and ATCO involvement RPAS.03-003 UOM expects to consolidate capacity to carry out flight tests and to evaluate results. Together with MATS and the local authorities, UoM will bring into Malta the RPAS domain of such activities. It also intends to exploit the effort of establishing a legal and operational framework in which to operate RPAS testing in Malta in the future, thus facilitating further involvement in RPAS flight test in the country. EXERPAS.03-001 Support the concept and improve the idea that ATM procedures for RPAS should be as those applicable to manned aircraft, thus the provision ATC service to such craft should be transparent to ATC controller. EXERPAS.03-001 Collect experience in light UAS segment integration in real traffic scenarios in order to foster their future development beside traditional aircrafts with suitable control technologies (e.g. automatic dependent surveillance in broadcast). Security Extend its expertise to the RPAS assessment of field and in particular the security Communication aspects concerning communication and Navigation and positioning technologies. means Improve the participation of academic institution to deal with technology problems. EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-002 EXERPAS.03-003 Light UAS manufacturer EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-001 EXERPAS.03-002 The European Commission External Results Beneficiary EXERPAS.03-003 EXERPAS.03-001 Collect new information to define new advancements for the ERSG activities. Improve understanding of the gaps to be filled in order to allow EXERPAS insertion in unrestricted RPAS.03-002 airspace, its feasibility in short term 14 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan SESAR NEXTGEN Regulatory Bodies External External External ANSPs (other External than MATS), EUROCONTROL Military Organisations, EDA The general public External External Edition 02.01.00 horizon, the resources required to fill those gaps. Results Collect results, in terms of Beneficiary technologies (DAA, C2L) and Financing Body operational aspects (use of TSA), for the integration of RPAS in the SESAR context. Interested to the results Interested to the results Interested to the results EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 Learn about SESAR state-of-the-art EXEactivities on RPAS integration, in RPAS.03-001 order to develop interoperable systems. EXERPAS.03-002 Improve Safety Assessment Procedures definition in order to standardize the Certification Process for RPAS to be allowed to fly, with specific reference to security of satellite and C2 links, and DAA requirements. Improve understanding of ATCo involvement and evaluate the effects in terms of peculiar Controller performance and workload deriving from the introduction of RPAS in controlled airspace. Improve the integration between military and civil operation, as expected by the SESAR Concept. Evaluate mature technologies developed in civil R&D activities for application to military operations and means. Improve levels of confidence and trust in RPAS unrestricted operations. EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 Civil Aviation Authorities, at National and European Level (CAD, ENAC, EASA) RPAS Operators and End Users Associations, External External Improve Safety Assessment Procedures definition in order to standardize the Certification Process for RPAS to be allowed to fly in unrestricted airspace. Evaluate the possibility to perform first unrestricted operations and limitations to the wide use of RPAS EXERPAS.03-003 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 15 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan e.g., .UVS International, Assorpas, etc. RPAS Manufacturers, e.g. Alenia Aermacchi, Aermatica, etc. Pilots Associations, e.g., AOPA, Air Traffic Controllers Associations, e.g., ANACNA, IFATCA Edition 02.01.00 in short term. External External Manufacturers can better evaluate gaps still existing to RPAS extensive use in civil/commercial operations and aspects still to be addressed. Identify differences in using the DAA system from the RPS, executing emergency operations in case of threats to the satellite or communication links. Derive possible specific improvements to training procedures. External Identify differences in controlling RPAS, namely in performing separation assurance with DAA system supported RPAS, and supporting remote pilot in managing emergency operations in case of threats to the satellite or communication links. Derive possible specific improvements to training procedures. Table 1: Stakeholders identification and expectations EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 EXERPAS.03-001 EXERPAS.03-002 EXERPAS.03-003 2.2.1 Regulatory context The project relevant task is the execution of in-flight tests with a RPAS vehicle. The vehicle which will be used, named FLARE, is a VLA class aircraft suitably modified for the execution of operations in remotely piloted conditions, while an on-board pilot can anytime act as a safety pilot, taking the control of the airplane if an emergency condition should arose. In this way, the FLARE vehicle can be recognized as an Optionally Piloted Vehicle. The FLARE vehicle has extensively been used in the Italian aerospace, under Permit-to-Fly rules, as 1 they are prescribed by ENAC (Ente Nazionale per l’Aviazione Civile), the Italian CAA . For the scope of the RAID project, the FLARE vehicle will fly inside the Malta airspace and under the MALTA CAA (CAD). A specific Permit-to-Fly in order to operate FLARE has to be required to CAD, following the procedure here under presented. It is anyway highlighted that CAD has expressed its endorsement to the project, endorsement that has been submitted to SJU as an attachment of the RAID proposal. Short description of Malta applicable regulation to obtain the Permit-to-Fly An Aerial Work Permit issued by the Maltese Civil Aviation Directorate (CAD) needs to be obtained to allow the RAID flight trials to be carried out as planned within Maltese Airspace. 1 ENAC has issued, last December 2013, the applicable regulation to RPAS flying inside the Italian airspace and under ENAC responsibility (RPAS with MTOW less than to 150Kg). The regulation is expected to become effective since 30 April 2014. 16 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The procedure for obtaining such an Aerial Work Permit already exists and it involves the following steps: • An initial, pre-operations meeting is held with the CAD to present the operational case and brief the Directorate on matter such as intent, scope, final goals, operational boundaries, general flight plan details etc. • The CAD will provide a step-by-step checklist of items required for the issue of the permit and the operators need to then create a manual for the intended RPAS operations and present it to the CAD. Guidelines for preparation of the manual will be provided by the CAD and the manual typically needs to be 20-60 pages long. • The Authority will review the document and call the operator for a meeting to clarify any outstanding matters, possibly leading to its modification. • Once the operations manual is approved, the aircraft, associated equipment (such as ground station equipment), flight and operational crew are inspected by CAD or a qualified entity representing it, upon which, a licence of competency will be issued. The CAD inspector will need to meet the crew in person and physically assess all relevant equipment. • Finally, a flight test needs to be carried out in the presence of CAD personnel and, based on the outcome, the Aerial Work Permit is issued. It is possible for the flight test to be carried out the day before the start of the flight test campaign (provided the test is completed successfully). Costs depend on the extent of complexity of the assessment that needs to be carried out and should be complete in a period of 8-16 weeks. It is understood that the duration and cost reflect the complexity of assessment. The CAD is currently preparing the regulatory framework to fully accommodate RPAS operations in Malta by the end of 2014. The first request for such operations was made in 2011, when no structure or legislation exited. In the last 12 months, there has been a substantial demand for RPAS operations and the CAD has been given the instruction by the relevant ministry to facilitate such operations in Malta. To date, the CAD has accommodated requests on a case-by-case basis and RPAs have already flown in Malta. Following brief discussion with the CAD, it may be possible that an RPAS with a safety pilot on board who will also manually fly it in and out of the terminal area be considered as a manned aircraft, but this is yet to be determined. 17 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 3 Project Management 3.1 Organisation The RAID project is managed by the RAID Consortium. The RAID Consortium consists of 7 partners from Italy and Malta: • • • • • • CIRA Aeronautical research center (IT) - Project Coordinator; Deep Blue (IT); NAIS (IT); NIMBUS (IT); University of Malta (M); MATS, Malta ANSP (M). Each partner will contribute to the achievement of the demonstration objectives by taking part to the project activities providing the needed competence and expertise. RAID Consortium composition and expertise is summarized in the table below. Name of Organization Nature of Organization Applicable expertise CIRA (Coordinator) Research Centre DAA system development and prototyping; Real-Time Simulations and In-Flight Tests execution; RPAS Operator. Deep Blue SME Support to RTS and Flight Trials preparation, organization and conduction; Human Performance, Operational Validation; Safety and RPAS introduction in non-segregated airspace: procedural, organizational and legal aspects analysis; Dissemination and Communication project results to SESAR stakeholders. NAIS SME of C2L and GPS security, including the emulation of C2L and GPS navigation security attacks (Jamming & Spoofing) during the demonstration campaign; Dissemination and communication of project results to SESAR stakeholders. MATS Air Navigation Provider Service Service Provision, ATM expertise experience in UAS operations; with ATC procedures and systems development; In-depth knowledge of the European ATM context; Dissemination in industrial fora; Safety assessments for areas concerning the provision of air traffic services. 18 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Univ. of Malta Edition 02.01.00 Academia Academic studies; Support for simulations and flight tests; Design of evaluation; experiments and results Dissemination in academic fora. NIMBUS SME Provider of an innovative hybrid light UAV platform which has already obtained Permit to Fly from ENAC Authority; Participation to the flight tests that aim at achieving a safe integration of multiple RPAs into a non-segregated Air Traffic area. Table 2: Organizations and their expertise Key roles and corresponding responsibilities will be entrusted to RAID partners’ representatives in order to efficiently manage the project. The RAID Steering Committee (RAID SC) is formed by the key representatives of the RAID Consortium partners and it is chaired by the Consortium coordinator (CIRA). The RAID SC meets at least once a year, in conjunction with one of the Main Project Meetings. The RAID SC will be responsible to monitor all the project activities, their progress, the milestones achievement, the effort spent and the effort required in future activities. In case of raised issues it will be also responsible to define mitigation actions or contingency plans to be applied. The RAID SC is composed of the following members. Edoardo Filippone CIRA Antonio Monteleone NAIS Damiano Taurino Paolo Bellezza Quater David ZammitMangion Robert Saint DEEPBLUE NIMBUS UNIVERSITY of MALTA MATS The Project Manager (RAID PM) manages and supervises the project “daily operations”. He coordinates the different work packages and implements the RAID SG directives. He is responsible for the overall risk management, ensuring that the risks identified are properly mitigated, the concerns are properly addressed and the emerging opportunities are exploited. He will chair the Main Project Meetings and participate in the RAID SG. The PM of the RAID project is Edoardo Filippone (CIRA). The Quality Manager (RAID QM) is responsible to ensure that the project and its deliverables are compliant with the SESAR JU standards and templates and that they fulfil the expected quality levels. The RAID QM is Saverio Del Gatto (CIRA). The Communication Manager (RAID CM) is responsible for the plan and execution of the project communication activities. His main objective is to ensure a high visibility to the RAID Project and to promote its results. In addition, the CM coordinates the organisation of the Project Meetings and of any project related event. The RAID Communication Manager is Marco Romani (NAIS). 19 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The Work Package Leaders (WPLs) are responsible for the progress and accomplishment of the activities pertaining to their Work Packages. They coordinate the WP activities and report on their status to the PM. WPLs are chosen among the WP task leaders in order to keep the management effort and its overhead as small as possible. The WPL is the connecting link between the PM and the Task Leaders. The Task Leader (TL) is responsible for organising the work at a task level. He convenes for the appropriate task meetings (mostly done through webex), co-ordinates the available resources and distributes sub-task activities to the partners in order to comply with the task schedule and budget. Work Packages leaders (WPL), Tasks leaders (TL) and contributors (C) for the RAID project activities are identified as follows: WP/Task # WP 1 Task 1.1 Task 1.2 WP 2 Task 2.1 Task 2.2 Task 2.3 Task 2.4 WP 3 Task 3.1 Task 3.2 Task 3.3 Task 3.4 Task 3.5 WP 4 Task 4.1 Task 4.2 Task 4.3 Task 4.4 WP 5 Task 5.1 Task 5.2 Task 5.3 CIRA NAIS DBLUE MATS UNI MALTA NIMBUS WPL TL TL C C C C C C C C C C C C WPL TL C TL TL TL C TL C C C TL C C C TL C WPL TL C TL TL C WPL TL C TL TL C C C WPL C C C TL C C TL C C C C C C C C C C C C C C C C TL C C C C C Table 3: Work Packages and Tasks leaders and contributors Project Reports The RAID project will issue two formal deliverables: • Demonstration Plan (Deliverable D_A1). • Demonstration Report (Deliverable D_B1). The present Demonstration Plan document is organized following the recommendations provided during the KOM and using the D_A1 template provided by SJU. Furthermore, the RAID project will update SJU on the project advancements by issuing Quarterly Progress Reports. All the reports will be delivered to SJU in plain English. Project formal deliverables will be issued both in Electronic (Microsoft Word editable document) and paper format (n. 1 copy) according to their scheduled deadlines (as detailed in section 3.3). 20 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Quarterly reports summarizing RAID advancements and achievements for the current reporting period as well as the outcomes expected for the subsequent one, will be delivered according to their due dates (see section 3.5). Project meetings The project Consortium has set a minimum number of meetings in order to assure the coordinated, cooperative, consistent and collaborative progress of the RAID project. Three project meetings are strictly required by the project guidelines: the Kick-Off Meeting, the first year Critical Review Meeting, the final meeting (which will match with the second year Critical Review Meeting).Two additional meetings will be arranged in correspondence to the formal deliverables submission (see section 3.3), in order to comply with the internal revision procedure. Moreover, dedicated meetings will be organized in correspondence of the RAID milestones and of the Quarterly Progress Reports (see sections 3.4 and 3.5). In addition, two planned meetings per year will be organized by the Steering Committee in correspondence of the preparation of the second and the fourth of the quarterly progress reports. While the three meetings with the SJU (the KOM and the two Critical Review Meetings) will be in presence meetings (to be held at SJU or RAID coordinator premises), the format of other meetings (in presence or via web conference) will be agreed from time to time by the consortium, depending on the issues to be discussed. Additional meetings will be arranged by partners involved in specific activities, if needed. Minutes will be prepared for each project meeting. The MoM for the face-to-face meetings held with the SJU will be distributed as official project notes. For all other meetings, a synthesis of the main topics discussed will be provided within the progress reports. Management Style RAID management is based on situated leadership. Responsibilities are distributed among partners basing on their expertise on the single tasks and work packages. Due to the intertwining of expertise and competences required by the RAID project and provided by the Consortium as a whole, leadership and responsibilities are well balanced among partners, according to the project proposal. Moreover, RAID management envisions a collaborative and shared approach to decision making, pursued by means of the Steering Committee, Technical and Administrative PoC Technical and administrative points of contact (PoC) for each partner are listed in the table below. Legal Entity Technical PoC Administrative PoC Name Phone/E-mail Name Phone/E-mail CIRA ScpA Deep Blue Srl Edoardo Filippone Damiano Taurino Monica Menzani NAIS Srl Antonio Monteleone Nimbus Srl Mario Faletto +39-0823-623322 [email protected] 0039 -06-8555208 Damiano.taurino@d blue.it +39 06 91139009 antonio.monteleone @nais-solutions.it +39 329 6543905 (mobile) [email protected] ero +39-0823-623599 [email protected] 0039 -06-8555208 Francesca.margiotta @dblue.it +39 06 91139005 daria.morbidelli@nai s-solutions.it [email protected], 011.9956.481 (011.9956.316) Francesca Margiotta Daria Morbidelli Silvia Bellezza 21 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Malta Air Traffic Services Ltd (MATS) University of Malta (UoM) Joseph Degiorgio David ZammitMangion Edition 02.01.00 0035699015644 joe.degiorgio@malta ts.com Mario J. Azzopardi 35 6 79058533 Rodianne (mobile) Buhagiar [email protected] t Table 4: Partners’ points of contact 00356 99293000 mario.j.azzopardi@ maltats.com +356 2340 4937 Rodianne.buhagiar @um.edu.mt 3.2 Work Breakdown Structure The RAID Work Breakdown Structure (WBS) consists of five work packages that cover both the preoperational validation of the RAID concept (preparation, demonstration and validation) and the transversal activities related to project management and communication. This WBS also allows a clear identification of the competences to be provided by each Consortium partner. In particular three Work Packages are considered “executive” and are associated to the three logically sequential phases representing the natural roadmap for a pre-operational validation project: • • • WP 2: Preparation activities; WP 3: Demonstration; WP 4: Results analysis and Reporting. The WBS is completed by two “transversal” WPs that cover the whole duration of the project: • • WP1: Project Management WP5: Media Communication Each task is assigned to a single partner, which is responsible for the quality and timeliness of those task activities, as well as for the distribution of the task related work among partners, basing on their competences. The figure below pictures the Pert Diagram for RAID project activities. 22 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Figure 1: Project activities Pert diagram A detailed description of the RAID work packages is provided below. It shows for each WP, the related objectives, the main activities and the core outputs, as well as leadership and effort distribution among partners. WP 1: Project Management WP1 aims at providing the RAID project with all the required management support for its timely and efficient execution, within budget constraints and with the expected level of quality. 23 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 1.1 Edition 02.01.00 Title: WP 1 Coordination, Monitoring & Controlling, Risk mgt CIRA DEEP BLUE NAIS UNIV. MALTA MATS NIMBUS L C C C C C Task 1.1 Leading Partner CIRA Task Description This Task is dedicated to ensure a proper project management. Internal Consortium coordination as well as coordination with SESAR JU members will be conducted by organising “physical” meetings, Webex meetings and offline coordination conducted by phone and email as needed. It will provide the activities needed for the proper administration of the project, such as: - Assure that the project reports are delivered on time; - Provide support to finance administrations (with special attention to timely and correct presentation of Eligible Costs); - Identify and prevent risks and mitigate their potential effect; - Identify and take advantage of any opportunity related to the project exploitation; - Address coordination issues. This task will be allocated to the RAID Project Manager together with the RAID Steering Committee. List of main Activities/deliverables Project Management Plan, Six monthly reports, Risk Management Reports, Eligible Cost statements, Project Executive Summary. • Expected inputs Risks Board updates, Reports from WP Leaders, minutes from Technical Board, directives and guidelines from AFD SG • Expected Outputs Efficient Project Management • Facilities/Services Special facilities and services to be used Facilities: N.A. Services: N.A. Partners contribution Organisation CIRA Description of its contribution to this task Will conduct this task by RAID PM. Will ensure proper Project Management skills, by assigning a dedicated adequate person to this task. 24 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan ALL Edition 02.01.00 Will participate to coordination activities at adequate management level. They will facilitate RAID SC decisions by providing their contribution in the project coordination, putting in place corrective actions and ensuring prompt responses when needed. 25 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 1.2 Edition 02.01.00 Title: WP 1 CIRA Task 1.2 Quality Assurance & Configuration Management DEEP BLUE NAIS UNIV. MALTA MATS NIMBUS L Leading Partner CIRA Task Description The Task will ensure that the Project complies with quality standards by: - providing templates; - ensuring document archiving, versioning and sharing. This task will be allocated to the RAID Quality Manager. List of main Activities/deliverables Quality Management Plan and procedures, Templates (in accordance with the one’s provided by the SJU by the date of the Kick-Off meeting), etc. Expected inputs Standards and best practices • Expected Outputs A project compliant with the expected and appropriate quality level, • Facilities/Services Special facilities and services to be used Facilities: tool for document management and collaborative work Services: n.a. Partners contribution Organisation CIRA Description of its contribution to this task CIRA will conduct this task by RAID QM 26 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 WP 2: Preparation Activities Two main outcomes will be expected from the Preparation Work Package: • The design of the demonstration experiment (DOE) • The development of a Communication Plan (CP). The DOE will focus on developing a Demonstration Plan that will enable the successful demonstration of the effective integration of RPA operation in non-segregated airspace. This will be performed through the use of appropriately challenging and representative scenarios, that will highlight effectiveness and limitations of the state-of-the-art technologies and procedures to be adopted. This objective will be achieved through representative simulations as well as real flight tests, and will be accompanied by post-demonstration assessment and evaluation to extend the value of the activity. Relevant KPAs that might be impacted by the RPAS introduction in non-segregated airspace will be identified in order to fully exploit the outcomes of the demonstration in terms of scientific results and lessons learnt to be disseminated to the project audiences. The DOE will also define the number of test cases to be run to provide statistical significance as well as the parameters to be monitored. Methodologies for data gathering and indicators for data analysis will be provided too. The E-OVCM will be adopted as reference process for the concept validation. Because the nature and expected results of the RAID demonstration activity, the project will focus on stage V3 of the process. ATM Needs Scope Feasibility Pre-industrial development & integration Industrialisation Deployment Operations Decommissioning V0 V1 V2 V3 V4 V5 V6 V7 Concept Validation (E-OCVM) Requirements development Concept development Technical development and Verification Integration Examples of other key ATM system development activities Figure 2 – E-OVCM’s Concept Lifecycle Model Tests and assessment of results in pre-operational environment will be carried out, according to V3 stage of the model. The dissemination strategy, together with the means and methodologies to be used, is provided in Section 7: Communication Plan. 27 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 2.1 Edition 02.01.00 Title: WP 2 Task 2.1 SCENARIO DEFINITION CIRA DEEP BLUE C L NAIS UNIV. MALTA MATS C NIMBUS C Leading Partner DEEP BLUE Task Description This task will detail the scope of the demonstration by defining and describing the target Operational Scenarios that will be used as reference during demonstration activities. For each Scenario the following characteristics will be identified and listed: - Involved actors; - RPAS Mission Trajectory; - On-board technologies; - Weather conditions; - Surrounding traffic complexity (type and number of intruding traffic); - Radio coverage and signal latency. Moreover, specific high-level validation objectives as with respect to technological and procedural aspects will be highlighted for each scenario. List of main Activities/deliverables • • Preliminary State of the Art about RPAS relevant documents issued by international committees and organizations, SESAR JU as well as European and National Projects, to derive baseline concepts and technologies for RPAS introduction in non-segregated airspace. In order to refine relevant and realistic scenarios and to better understand stakeholders needs, interviews, focus groups and game-based simulations will be organised both with front end operators (i.e., Air Traffic Controllers, Remote Crews, Pilots) and other relevant stakeholders (e.g., Civil Aviation Authorities representatives, European Regulators, Safety experts, Technology providers, etc.). Expected Inputs • Reports and indications from relevant SJU Projects and other international RPAS initiatives. Expected Outputs • Narrative description of target operational scenarios for Demonstration Activities. • For each Scenario high-level validation objectives will be also defined. Facilities/Services Special facilities and services to be used 28 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Facilities: N/A Services: N/A Partners contribution Organisation Description of its contribution to this task DEEP BLUE Deep Blue will contribute to the definition of target operational scenarios for the demonstration activities, gathering operational inputs and requirements from RPAS stakeholders through the organisation of ‘ad hoc’ interviews, focus groups and gamebased envisioning. Deep Blue will contribute with its Safety and Human Factors expertise to identify relevant Human Performance and Safety issues for each scenario. CIRA University Malta NIMBUS CIRA will support Operational Scenarios definition under the following two main aspects: of • Provide details for operational scenarios, both under RTS and In-Flight Trials, aimed to demonstrate DAA system accuracy and usability; • Provide details of both RTS facilities and vehicle specifications, in order to assure scenarios reproducibility. Contribution to the design of experiment with particular attention to the definition of specific objectives of the experiment, and the integration and operational aspects of simulation/flight test campaign. The University of Malta will contribute to the design of specific scenarios to ensure that they can be performed successfully to meet objectives of the project. the the the the Nimbus will contribute to the definition of operational scenarios especially for light-UAS segment for the demonstration activities gathering operational inputs and requirements from the other RPAS. 29 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 2.2 Edition 02.01.00 Title: WP 2 CIRA Task 2.2 TSA MANAGEMENT PROCEDURES DEFINITION DEEP BLUE NAIS C Leading Partner UNIV. MALTA MATS L NIMBUS C MATS Task Description - Management of RPAS entering / exiting TSA; - Management of RPAS in controlled aerodromes. List of main Activities/deliverables • ATC procedure & system support required to enable RPAS operations in TSA and controlled airports; • Preliminary safety assessment. Expected inputs • Expected Outputs ATC procedure definition • Facilities/Services Special facilities and services to be used Facilities: Radar Services Services: Air Traffic Control Partners contribution Organisation MATS DEEP BLUE NIMBUS Description of its contribution to this task MATS will assist in stipulating the TSA as well as providing air traffic control services for simulations and inflight trials. Deep Blue will contribute with its Human Factors and Safety expertise to the analysis and review of proposed TSA management procedures definition. Nimbus will support procedure definition by providing details of its platform specifications, in order to assure scenarios feasibility. 30 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 2.3 Edition 02.01.00 Title: WP 2 Task 2.3 DEMONSTRATION PLAN DEFINITION CIRA DEEP BLUE NAIS C L C UNIV. MALTA C MATS NIMBUS C Leading Partner DEEP BLUE Task Description This task will consolidate all collected requirements for the RPAS technologies to be used in the demonstration activities (identified operational scenarios, actors’ roles and responsibilities, use cases and related methods for managing operations in nominal and non-nominal cases. The task will produce the consolidated Demonstration Plan with explicit Validation and Demonstration objectives, data collection methods and a detailed planning of the demonstration activities. List of main Activities/deliverables Consolidated Demonstration Plan • Expected Inputs • Operational Scenarios and High-level Validation objectives identified in Task 2.1; • Temporary Segregated Areas management procedures as defined in Task 2.2. Expected Outputs Consolidated Demonstration Plan with recommendations and final indications for the end-to-end system adaptation to support the demonstration activities, including all means for measuring the validation indicators. • Facilities/Services Special facilities and services to be used Facilities: N/A Services: N/A Partners contribution Organisation Description of its contribution to this task DEEP BLUE Deep Blue will responsible to collect and properly summarize all the work carried out in previous Tasks and to integrate the final demonstration Concept, the detailed demonstration operational scenarios and all related validation data gathering activities, CIRA University CIRA will provide support in the detailed Demonstration Plan definition, by contributing to detailed design of Real-Time Simulation schedule and by contributing to the planning of the Flight Trails, helping to synchronize general plan with vehicle availability. of University of Malta will contribute to the detailed design of experiment and will thus 31 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Malta NAIS Edition 02.01.00 contribute to the definition of the detailed demonstration plan. NAIS will provide support in the definition of detailed demonstration activities, specifically focusing on C2L aspects of the flight trial demonstration campaign. NIMBUS Nimbus will contribute to the demo plan providing details about operational procedures and technical specifications of its hybrid platform. 32 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 2.4 Edition 02.01.00 Title: WP 2 CIRA Task 2.4 C COMMUNICATION PLAN DEFINITION DEEP BLUE NAIS UNIV. MALTA L C Leading Partner MATS NIMBUS NAIS Task Description This task will consolidate the Communication plan addressing both internal (Consortium and stakeholders) and external audiences (ATM and RPAS communities, including the widest general public and scientific targets). List of main Activities/deliverables Consolidated Communication Plan • Expected inputs Project Management Plan – Task 1.1 Stakeholders interviews (i.e. Air Traffic Controllers, Remote Crews, Pilots, Technology and Scientific opinion leaders, Civil Aviation Authorities representatives, European Regulators representatives, Safety experts, etc. – Task 2.1 Demonstration Plan – Task 2.3 • • • Expected Outputs The consolidated Communication Plan providing- target audiences, necessary resources; key messages; communication channels and means, evaluation methods for the dissemination impact assessment. • Facilities/Services Special facilities and services to be used Facilities: N/A Services: N/A Partners contribution Organisation Description of its contribution to this task NAIS NAIS is responsible to collect the input documents from previous tasks and properly summarize all of it. Provide the Communication Plan on the base of project goals. CIRA University Malta CIRA will support the Communication Plan definition by contributing in the definition of the schedule of workshops and other dissemination events, identifying the suitable topics and stakeholders list to be involved in each of the planned events of University of Malta will contribute to the definition of the communication plan to ensure appropriate exploitation of communication in academic for a. 33 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 WP 3: Demonstration To perform the demonstration campaigns, as they are described in the Demonstration Plan. The demonstration activities will be forerun by the set-up of the facilities to be used in the demonstration tests. They will support both real-time simulation with Human-in-the-loop and in-flight trials. Within this WP also the supporting activities related to the acquisition of the required authorization to perform the flight trials will be carried out. Test reports for each foreseen demonstration campaign will be issued. 34 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 3.1 Edition 02.01.00 Title: WP 3 CIRA Task 3.1 DEMONSTRATION PLATFORM PREPARATION DEEP BLUE L NAIS UNIV. MALTA MATS C C C Leading Partner NIMBUS CIRA Task Description The Task will set-up all the platforms to be used for the execution of the demonstration plan, both for Real-Time Simulations and for in-Flight Trials. All the integration activities between different simulation and emulation platforms will be carried out. Regulatory and legal aspects to fly the vehicle in the segregated area and in presence of manned and unmanned conflicting air traffic will be addressed too. List of main Activities/deliverables • Real-Time facility set-up and integration • RPAS set-up • Permit to fly and NOTAM achievements Expected inputs Test scenarios and procedures. • Expected Outputs • Demonstration platform ready to activities. • Permit to fly and NOTAMs. Facilities/Services Special facilities and services to be used Facilities: Real-Time Test Bed for RPAS. Air Traffic Generator. ATCo Control Station Simulators. FLARE vehicle for RPAS In-flight Trials. Services: Permit-to-fly request and acquisition. NOTAMs request and acquisition. Partners contribution Organisation CIRA Description of its contribution to this task Within this Task CIRA will collect all the scenarios and procedures details to be reproduced, both in RTS and in Flight Trials. Starting from these details and emerging requirements, the RT test-bed will be set-up. The RTS will be characterized by the integration of Pilot and Air Traffic Controllers. The RPAS RT test-bed will be integrated with ATCos Control Station simulators and simulated Air Traffic Generator, for realistic RTS with HIL. The OPV (FLARE) which will be used in the in-flight demonstration campaigns, and the RPS which will support the RPAS type operations will be set-up and preliminary tested on the in-flight trials location. Safety equipment, to allow safety pilot to acquire vehicle control in the case of extremely emergency conditions will be tested. 35 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 CIRA will support MATS in all the activities require to achieve the required authorization to fly in the Maltese airspace. NAIS Within this Task NAIS will contribute to the set-up of the in-flight demonstration platform by the integration and configuration of equipment aimed at emulating C2L and GNSS security attacks. University Malta of University of Malta contribution will focus on the customization of its simulation facilities (air traffic simulator, tools and appropriate HMI) for the real-time simulations as well as their integration with CIRA’s equipment to ensure correction functioning of the overall simulation facility. University of Malta will also provide coordination and logistical support for CIRA’s operation of the FLARE aircraft in Malta and the provision and operation of the intruder aircraft. MATS Will support the integration of the ATCO workstation with the real time simulation facilities and with flight experimental platform. 36 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 3.2 Edition 02.01.00 Title: WP 3 Task 3.2 FLIGHT DEMONSTRATION SAFETY ASSSESSMENT CIRA DEEP BLUE C L Leading Partner NAIS UNIV. MALTA MATS C C NIMBUS Deep Blue Task Description Before each RPAS flight demonstration campaign a dedicated Safety Assessment will be carried out. Standard safety methods, e.g. the Eurocontrol Safety Assessment Methodology (SAM), will be tailored to the specific maturity level of the different operational scenarios, remaining at a high level of abstraction when required, and detailing the findings when the RPAS scenarios are better refined. The expected outcomes of this task include: - a list of safety issues and safety benefits; - a safety analysis including a qualitative and quantitative assessment of their impact (e.g. severity and frequency); - a list with possible mitigations; - eventual needs for further studies and analyses with respect to the analysed RPAS technologies and procedures. The safety assessment will be carried out by safety experts during dedicated modelling and analysis sessions as well as during workshops with RAID partners (in particular RPAS Operators and Air Navigation Service Providers) and external stakeholders (if needed). List of main Activities/deliverables • RPAS and ATM Systems Description and Analysis, Identification of Potential Hazards, Identification of Hazard Effects, Assessment of Hazard Effects Severity, Specification of Safety Objectives (frequency), Mitigation actions. Expected inputs • RPAS and ATM systems involved in the Demonstration Activities Architectural and Functional Description, Target Operational Scenarios Description. Expected Outputs • Identification of safety issues and safety benefits, a safety analysis including a qualitative and quantitative assessment of impact (e.g. severity and frequency), mitigations proposed. Facilities/Services Special facilities and services to be used Facilities: SAM theoretical framework and toolbox, containing methods and techniques to perform: FHA (identify hazards, assess their effects and the related severity), PSSA (fault tree analysis, event tree analysis, common 37 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 cause analysis …), SSA (documentation of the evidence, collecting data, test and validation…). Services: N/A Partners contribution Organisation Description of its contribution to this task Deep Blue University Malta MATS CIRA Deep Blue will lead the RPAS flight demonstration safety assessment and will be responsible of documenting all the collected evidences building a complete Safety Case to obtain the ‘permit to fly’ and also feed the validation of demonstration activities. of University of Malta will contribute to the safety assessment, focussing on technologyrelated matters and will coordinate the outcomes that may affect the precise definition of the real-time simulations and flight tests. MATS will be involved in the scoping of the safety activities. The safety assessment will be directly related to the following aspects: • An FHA on the operational impact covering all the ATM system (mainly people, equipment and procedures) • Assessment of all the changes implemented during the trails • MATS safety case will follow the GSN model (Globe Structured Notation) • Architecture and System safety assessment being prepared by DB using the SAM methodology will be taken on board as backing evidence for the MATS safety case. Will contribute to the activities by providing all necessary information about FLARE performance and characteristics 38 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 3.3 Edition 02.01.00 Title: WP 3 ON-GROUND & HUMAN-IN –THE-LOOP SIMULATION CAMPAIGNS CIRA DEEP BLUE L C Task 3.3 NAIS UNIV. MALTA MATS C C Leading Partner NIMBUS CIRA Task Description To carry out real-time simulations, integrating both a simulated remote pilot station and simulated Air Traffic Control Station. The test procedures aiming at the evaluation of both operational (operations for the use of TSA) and technological (DAA and C2L) issues related to the ATM system when an RPAS is integrated, will be tested on-ground. Relevant data and measures will be recorded. The simulation campaign results will support the validation, by helping in the identification of the required changes in the current procedures, before to execute the in-flight trials. List of main Activities/deliverables Real-time simulations with Human-in-the-Loop. A test report of the simulation campaigns will be issued. • Expected inputs Demonstration Plan. • Expected Outputs • Simulations results and Data. • Procedures validations and/or updates in view of the in-flight trials. Facilities/Services Special facilities and services to be used Facilities: RPAS Real-time simulation test-bed (including RPS). Air Traffic Generator. Air Traffic Control Station simulators. RTS data gathering and analysis framework. Services: N.A. Partners contribution Organisation CIRA DEEP BLUE Description of its contribution to this task CIRA will manage the entire real-time simulation campaigns. CIRA personnel will assure the RPAS simulation set-up will properly work and reproduce the scenarios as foreseen by the demonstration plan, both for nominal and non-nominal conditions. A CIRA RPAS pilot will support the simulation campaigns. CIRA will contribute to analyse simulations results. Deep Blue will support the organization and conduction of real-time simulation campaigns and will be responsible of Human Factors analyses during RTS by means of operators’ direct observations, debriefings and questionnaires. Deep Blue will contribute to the RTS test report with Human Performance, Safety and operational considerations. 39 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan University Malta MATS of Edition 02.01.00 University of Malta will contribute to the conduction of real-time simulation by providing technical support as well as operational support and will contribute to the direct observation of events during real-time simulations. Will assure the participation of the ATCO to the demonstration activities 40 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 3.4 Edition 02.01.00 Title: WP 3 Task 3.4 FLIGHT TRIALS IN SEGREGATED AREA CAMPAIGN CIRA DEEP BLUE NAIS UNIV. MALTA MATS L C C C C NIMBUS Leading Partner CIRA Task Description The in-flight trials with the RPAS in a segregated area will be executed. The OPV (FLARE) will be flown as RPAS. The RPAS will be connected to Air Traffic Control station for the ATC managed operations under test. Entering and exiting a TSA towards unrestricted airspace will be tested. Actual communication performance between Remote Pilot and ATCo will be tested and evaluated. The impact of malicious attacks to the C2L subsystem on security will be tested (e.g. availability and integrity of the Command and Control information evaluated as well. List of main Activities/deliverables Flight Trials in a restricted area with the RPAS (only) actually flying, and ATCos managing the flight. A Test Report will be issued as part of the Demonstration Report. • Expected inputs Demonstration plan. Revised Procedures, as emerged from RTS demonstration campaign results. • • Expected Outputs Flight trails data and results with reference to operations in segregated area. • Facilities/Services Special facilities and services to be used Facilities: OPV (FLARE), Simulated Air Traffic Generator. Air Traffic Control Stations. Services: Air Traffic Control operations. Partners contribution Organisation CIRA Description of its contribution to this task CIRA will lead this task by providing the required technical expertise and offering the aircraft system for the testing. Demonstration activities will be managed in conformance to the Demonstration Plan, as revised on the base of RTS results. CIRA will take care of collect and record relevant flight data C2L data and PilotControllers communication. CIRA will issue a test report for the in-flight trials in a segregated area. DEEP BLUE Deep Blue will support the organization and conduction of real-time simulation campaigns and will be responsible of Human Factors analyses during FT in S-A by means of operators direct observations, debriefings and questionnaires. Deep Blue will contribute to 41 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 the FT in S-A test report with Human Performance, Safety and operational considerations NAIS NAIS will support the organization and conduction of flight trial demonstration campaign in a segregated area by focusing on C2L aspects. Malicious attacks on the RPAS data communication (C2L) link will be emulated by using equipment and assets provided by the team. Spoofing attacks to the C2L will be triggered in order to induce fake RPAS positioning coordinates within the system and inject fake telemetry at the ground remote piloting station. University Malta MATS of University of Malta will contribute to the conduction of real-time simulation and flight test campaigns by providing logistic support as well as contributing to the direct observation of events during the flight test campaign. Will assure the participation of the ATCO to the demonstration activities 42 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 3.5 Edition 02.01.00 Title: WP 3 Task 3.5 FULL FLIGHT DEMONSTRATION CAMPAIGN CIRA DEEP BLUE NAIS UNIV. MALTA MATS NIMBUS L C C C C C Leading Partner CIRA Task Description In-flight trials with RPAS and potentially conflicting air traffic will be executed. Both manned and unmanned aircraft will be used as air traffic. Different DAA modes will be tested: execution of separation recovery under ATCO responsibility, interoperability of Collision Avoidance operations with existing safety nets. List of main Activities/deliverables In-Flight Trials with air traffic and ATCos. A Test Report will be issued as part of the Demonstration Report. • Expected inputs Demonstration plan. Revised Procedures, as emerged from RTS demonstration campaign results. • • Expected Outputs Flight trials data and results on operations with actual air traffic. • Facilities/Services Special facilities and services to be used Facilities: OPV (FLARE), Air Traffic Control Stations, Manned GA / VLA aircrafts and unmanned aircrafts acting as potentially conflicting air traffic. NIMBUS UAS platform Services: Air Traffic Control operations. Partners contribution Organisation CIRA Description of its contribution to this task CIRA will lead this task by providing the required technical expertise and offering the aircraft system for the testing. Demonstration activities will be managed in conformance to the Demonstration Plan, as revised on the base of RTS results. CIRA will provide a proprietary DAA system, to support all the expected analysis and tests. All the flight data, communication reports will be recorded for post-flight analysis and measures. A test report will be prepared and issued. DEEP BLUE Deep Blue will support the organization and conduction of real-time simulation campaigns and will be responsible of Human Factors analyses during FT in NS-A by means of operators direct observations, debriefings and questionnaires. Deep Blue will contribute to 43 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 the FT in NS-A test report with Human Performance, Safety and operational considerations. NAIS NAIS will support the organization and conduction of flight trial demonstration campaign by focusing on C2L aspects. Malicious attacks on the RPAS communication (C2L) link of the RPAS will be emulated by using equipment and assets provided by the team. Spoofing attacks will be triggered in order to induce fake RPAS positioning coordinates within the system and inject fake telemetry at the ground remote piloting station. University Malta MATS NIMBUS of University of Malta will contribute to the conduction of flight test campaigns by providing logistic support as well as contributing to the direct observation of events during the flight test campaign. Will assure the participation of the ATCO to the demonstration activities Nimbus will provide its technical experience and know how offering its hybrid UAS for the testing phase. Demonstration activities will be managed in conformance to the Demonstration Plan in order to verify feasibility of light UAV integration Air Traffic Control operation. 44 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 WP 4: Results Analysis and Reporting In line with the Demonstration Plan, the demonstration activities data and reports will be analysed to draw final results. KPIs, as identified in the Demonstration Plan, will be appraised in order to measure the effects on ATM system safety, security, capacity and efficiency deriving from the RPAS integration. Both Operational procedures and technologies under test will be specifically analysed by using the methodological approach assumed in the Demonstration Plan as relevant peculiarity of the project. The Final Report that will encompass the Communication report, will be issued. 45 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 4.1 Edition 02.01.00 Title: WP 4 RESULTS ANALYSIS: DAA CIRA DEEP BLUE L C Task 4.1. NAIS UNIV. MALTA MATS NIMBUS C Leading Partner CIRA Task Description The results of the Detect and Avoid demonstration trials will be analysed. Different DAA operational modes will be analysed. Measures of the ATCos and pilot performance as with respect to the use of the DAA system will be provided. Collision Avoidance capability of the DA system will be specifically verified in terms of compatibility with the existing safety nets. List of main Activities/deliverables Full Flight demonstration results analysis. • Expected inputs • Simulations results and Data. • Flight trails data and results with reference to operations with actual air traffic. Expected Outputs • Measures of the effects of RPAS DAA system on Air Traffic Management operations. • DAA system compatibility with existing safety nets. Facilities/Services Special facilities and services to be used Facilities: N.A. Services: N.A. Partners contribution Organisation CIRA DEEP BLUE Description of its contribution to this task CIRA will guide the review of flight trials results aiming to analyse the DAA system performances, the compatibility of the system on ATM procedures and the effects of DAA system on human performances. The DAA system, strictly required to operate a RPAS in non-segregated area, will be analysed with respect to relevant and expected project outcomes. CIRA will support the analysis of the procedures proposed to operate the RPAS equipped with proprietary DAA system in the unrestricted airspace, and measure the impact the system will have on humans (Controllers, pilots) in all expected operational mode. CIRA will measures compatibility with existing safety nets CIRA will provide guidelines for system specifications and operational modes to be implemented in order to minimize the DAA system impact on the ATM system and its components performances.. Deep Blue will be responsible of the Human Performance and Safety Analysis of the demonstration results concerning DAA system. 46 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan University Malta of Edition 02.01.00 University of Malta will contribute to the analysis of the DAA performance in the demonstration campaign by conducting theoretical and statistical studies associated with the observed results. 47 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 4.2 Edition 02.01.00 Title: WP 4 CIRA Task 4.2 RESULTS ANALYSIS: TSA MANAGEMENT PROCEDURES DEEP BLUE NAIS C UNIV. MALTA MATS L C Leading Partner NIMBUS MATS Task Description This task is associated with the analysis of the results of the TSA-related demonstrations and trails. The analysis will focus on: • a review of the experience (lessons learnt) to provide feedback; • assessment of the effectiveness of the procedures in terms of safety and stakeholder (pilot and ATCo) workload; • recommendations, based on the above review and assessment, for the introduction of operations of RPAS within TSAs and transiting TSAs. List of main Activities/deliverables Results Analysis • Expected inputs Recordings and de-briefing/questionnaire forms • Expected Outputs • Facilities/Services Special facilities and services to be used Facilities: N.A. Services: N.A. Partners contribution Organisation Description of its contribution to this task MATS University Malta DEEP BLUE of As the ANSP and the expert in TSA procedures, will contribute to the analysis of the results and outcomes of the demonstration activities (WP3). Will lead to the assessment of the results. Deep Blue will be responsible of the Human Performance and Safety Analysis of the demonstration results concerning TSA Management Procedures. 48 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 4.3 Edition 02.01.00 Title: WP 4 Task 4.3 RESULTS ANALYSIS: C2L CIRA DEEP BLUE NAIS UNIV. MALTA C C L C Leading Partner MATS NIMBUS NAIS Task Description The results of the trials will be analysed from the C2L security point of view. Specifically the effects of intentional attacks to the RPAS data communication link (C2L) (e.g. in terms of availability and integrity of the Command and Control information) will be evaluated to assess the robustness of the whole system (equipment + people (ATCo + remote pilot) + procedures) against intentional interferences on the C2L itself. Countermeasures (in terms of both technologies and procedures) aimed at increasing the robustness of the Command and Control Link (C2L) against malicious attacks will be analysed as well. List of main Activities/deliverables • Full Flight demonstration results analysis Expected inputs • Flight trials data and results Expected Outputs • Measures of the effects of intentional attacks to the RPAS Command and Control Link (C2L) on Air Traffic Management operations. • Countermeasures (in terms of both technologies and procedures) aimed at increasing the robustness of the Command and Control Link (C2L) against malicious attacks and minimize the impact on Air Traffic Management operations. Facilities/Services Special facilities and services to be used Facilities: N.A. Services: N.A. Partners contribution Organisation NAIS Description of its contribution to this task NAIS will guide the review of flight trials results aiming to analyse the effects of intentional attacks to the RPAS Command and Control Link. Specifically the C2L link will be carefully analysed in respect to its possible vulnerabilities and their effects on Air Traffic Management operations. Effects of countermeasures aimed at increasing the robustness of the Command and Control Link (C2L) against malicious attacks will be analysed as well. NAIS will provide guidelines for system specifications to be implemented in order to minimize the impact of malicious attacks to the C2L on the ATM system. 49 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan DEEP BLUE University Malta CIRA of Edition 02.01.00 Deep Blue will be responsible of the Human Performance and Safety Analysis of the demonstration results concerning C2L. University of Malta will contribute to the analysis of the DAA performance in the demonstration campaign by conducting theoretical and statistical studies associated with the observed results. CIRA will provide the required support to analyse the effects of intentional disturbances on the C2 Link, by analysing, comparing and reporting the C2L performances, in nominal and disturbed conditions. 50 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 4.4 Edition 02.01.00 Title: WP 4 Task 4.4 OPERATIONAL VALIDATION AND LESSONS LEARNT CIRA DEEP BLUE NAIS UNIV. MALTA C L C C Leading Partner MATS NIMBUS C DEEP BLUE Task Description After the three demonstration campaigns, evaluation results will be collected and mapped onto stakeholders needs and validation objectives. The evaluation of a given high-level validation objective may be based on a number of results from a number of different demonstration exercises (both in real-time simulations and flight trials). These results should be aggregated and used to evaluate the different levels of the detailed validation indicators up to the high-level validation objectives, with a bottom-up approach. The qualitative and quantitative results will be analysed and discussed to provide lessons learnt and recommendations for future SESAR development and RPAS market exploitation. List of main Activities/deliverables • • • • • Integration of all demonstration results and their mapping with validation and demonstration high-level objectives. Particular focus on operational, Human Performance and Safety aspects as well as with SESAR CONOPS. Presentation and discussion of results with RPAS stakeholders to gather further inputs. lessons learnt and recommendations for future SESAR development and RPAS market exploitation Validation Report Expected inputs • Tasks 4.1, 4.2 and 4.3 results. Expected Outputs • All the activities will feed the RAID Final Report (Deliverable B3). Facilities/Services Special facilities and services to be used Facilities: N/A. Services: N/A. Partners contribution Organisation DEEP BLUE Description of its contribution to this task Deep Blue will be in charge of all the Operational Validation of RAID results by following the E-OCVM Methodology and will contribute to D-B with the final integrated Validation Report including recommendations and lessons learnt. 51 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan CIRA University Malta Edition 02.01.00 CIRA will make available all the recorded data, both from RTS campaigns and from the In-flight trials data recording. Technical evaluation and performance verification of system and equipment will be provided, in order to grant that human behaviour evaluation shall be based on a coherent and reliable base of data. of University of Malta will contribute to the operational analysis and lessons learnt. NAIS NAIS will contribute to the Operational Validation of RAID results with the outcomes of their analysis of the effects of intentional attacks to the RPAS Command and Control Link (C2L). The intent is to contribute to the analysis of operational, Human Performance and Safety aspects related to C2L security (e.g. in terms of availability and integrity of the Command and Control information). NIMBUS Nimbus will made available all the flight reports from the trials in order to perform a final operational validation from the light RPA segment integration perspective. 52 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 WP 5: Communication The Communication WP has the main objective to disseminate relevant results of the demonstration activities to the relevant audience and stakeholders. The project audience will include the widest general public and scientific targets in documenting the ATM system capability to manage RPAS flights. The Communication Plan will setup the criteria to measure the efficacy of communication and dissemination activities to reach the communication goals. 53 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 5.1 Edition 02.01.00 Title: WP 5 Task 5.1 MEDIA COMMUNICATIONS CIRA DEEP BLUE NAIS UNIV. MALTA C C L C MATS NIMBUS Leading Partner NAIS Task Description This task will be carried out on the base of the Communication Plan, by developing diversified media technologies to disseminate relevant contents on the project to the selected audiences. List of main Activities/deliverables • • Communication Plan Execution through the following communication media activities: Media printing, such as newspaper, magazine and brochures; Public speaking in the scheduled events and exhibitions; Digital media dissemination through mailing lists, the project website and blog services . These standard media will deliver information easily, by simultaneously and cost-efficiently broadcasting different regions of the world with the aim of contributing to the creation of a project community, interested on RPAS system and applications in the ATM domain. Expected inputs • Communication Plan – Task 2.4 Expected Outputs • Content delivery and message issued by means of the communication media • Evaluation reports of media communication channels effectiveness Facilities/Services Special facilities and services to be used Facilities: media communication tools such as website, press and exhibition. Services: N.A. Partners contribution Organisation Description of its contribution to this task NAIS NAIS will be in charge of media communication in order to disseminate contents and messages to the audience the RAID project steps results up to final report. DEEP BLUE Deep Blue will contribute to media communication activities by designing and realising the RAID project Coordinated Image, including project Logo, project document templates, poster and leaflets, University Malta of University of Malta will contribute to media communications by focusing on disseminating the activities and outcomes of the project primarily in Maltese media for the general public and will contribute to dissemination in international media such as Flight International and 54 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Aviation Week. CIRA Will contribute to dissemination activities by providing communication channel (i.e. web site, newsletters, papers, etc.) its own media 55 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 5.2 Edition 02.01.00 Title: WP 5 Task 5.2 WORKSHOPS AND EVENTS CIRA DEEP BLUE NAIS UNIV. MALTA L C C C MATS NIMBUS Leading Partner CIRA Task Description Workshops and dissemination events addressed to involve and inform stakeholders will be arranged and managed. Efficacy of dissemination activities will be monitored. List of main Activities/deliverables Execute the Communication plan in terms of workshops and stakeholders oriented events. Monitoring of communication efficacy. • Expected inputs Communication Plan • Expected Outputs Workshops outcomes. Evaluation reports of dissemination events. • Facilities/Services Special facilities and services to be used Facilities: Services: Partners contribution Organisation Description of its contribution to this task CIRA will cooperate with the Leader of the Work Package in assure the Communication Plan execution, by managing the contact with stakeholders to favour the widest participation to workshops and dissemination events. CIRA DEEP BLUE University Malta NAIS Deep Blue will support in the organisation and management of RAID workshops and events. Moreover, Deep Blue will disseminate RAID results in ATM and Aviation related conferences. of University of Malta will contribute to the organization and participate in the workshops and related events. NAIS will support in the event organization and content development and management in the RAID workshops. MATS Will participate to the workshop and events providing its own expertise. 56 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Task 5.3 Edition 02.01.00 Title: WP 5 CIRA Task 5.3 C COMMUNICATION MANAGEMENT AND RESULTS DEEP BLUE NAIS UNIV. MALTA MATS NIMBUS CAD L Leading Partner NAIS Task Description On the base of the Communication Plan, this task aims at managing and evaluating the results of this WP. A final communication report will be developed. It will provide a feedback on the effectiveness of goals achievement and the impact assessment of the communication strategy. List of main Activities/deliverables • Analysis of task 5.1 output - evaluation reports of media communication channels. • Analysis of task 5.2 output - evaluation reports of dissemination events. • Execute of Communication Plan, producing the Final Report on Communication effectiveness Expected inputs Communication Plan – Task 2.4 • Expected Outputs Final Communication Report that will include the evaluation of media communication channels effectiveness, the workshops and exhibition speeches feedback and the impact assessment on the audience of the communication plan. • Facilities/Services Special facilities and services to be used Facilities: N.A. Services: N.A. Partners contribution Organisation NAIS CIRA Description of its contribution to this task NAIS will be in charge of Final Communication Report issues. It will manage the contribution, suggestion and elaboration from the project partners involved in the task, in order to develop a common view of report. CIRA will cooperate to the issue of the final Communication Report by providing results and synthesis of the workshops and stakeholders involvement activities carried out during the project. 57 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 3.3 Formal Deliverables Deliverable name Date 29 January 2014 Demonstration Plan (A1) 30 September 2015 Demonstration Report (B1) 3.4 Other deliverables and key project milestones Deliverable/Milestone name Date 29 October 2013 Kick-Off Meeting Simulations test-bed completion 30 July 2014 31 October 2014 st 1 Year Critical Review Meeting In-Flight Full Test Bed Architecture Ready to tests execution 31 January 2015 30 September 2015 Final Meeting 3.5 Quarterly reporting Deadlines 11 April 2014 11 July 2014 10 October 2014 9 January 2015 10 April 2015 10 July 2015 30 September 2015 Quarterly Progress Reports will be filled on-line, in the RAID project dedicated webpage of the SJU Extranet. 3.6 Resources Breakdown The table below summarizes the effort required to partners (in man days) for each Work Package. In order to be coherent with the proposal and the co-financing agreement, a man-month corresponds to 140 man-hours, and each working month has 17.5 working days on average. CIRA NAIS Resources (Man Days) DBLUE MATS UNI NIMBUS 58 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Resources (Man Days) MALTA WP 1 WP 2 WP 3 WP 4 WP 5 61 53 210 52 44 16 18 140 44 52 10 96 122 88 36 18 36 96 52 10 9 78 130 120 53 9 26 34 14 Resources (Personnel, including overheads, in kEuro) UNI CIRA NAIS DBLUE MATS NIMBUS MALTA WP 1 WP 2 WP 3 WP 4 WP 5 48 42 165 41 35 5 6 48 15 18 4 39 49 35 14 6 12 31 17 4 2 16 26 24 10 2 6 8 3 Resources (Equipment, Subcontracting, Consumables, excluding Travelling, in kEuro) UNI CIRA NAIS DBLUE MATS NIMBUS MALTA WP 3 67 12 5 8 Table 5: Project Resources Allocation 3.7 Pre-financing needs Pre-financing need (EURO) Planned date for the submission of the request to the SJU 17 December 2013 135000 15 March 2015 135000 3.8 Risk Management Risk description Probability Severity assessmen assessm t ent (Low/Mediu (Low/Me m/High/Ver dium/Hig y high) h/Very high) Safety issues 3 4 Regulatory constraint and Permit to Fly 2 4 Mitigation actions Owne r In order to mitigate the risk, safety assessment is a pre-requisite that will be performed during flight trials preparation. A dedicated task is foreseen for flight Demonstration Safety assessment (task 3.2), that will be performed by both ANSPs and RPAS operator. The Civil Aviation Authority (CAD) for the flight trials inside the regulated airspace (MALTA airspace) has been informed and endorsed the project; cooperative attitude is granted by the authority. Deep Blue, CIRA, MATS MATS , Univ. of Malta 59 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Critical Environmental Conditions Edition 02.01.00 3 2 Simulation test 1 rigs difficult to integrate. A Real-time data link has to be realized between CIRA simulation facilities, located in Capua, south of Italy, and Malta Air Traffic Control Center. Data protocol and connection limitations could limit the RT performance. SW Adaptation to 1 RAID tests execution Activities are required to customize the software modules which equip the RPAS vehicle to the specificity of the RAID project. 3 Flying test beds 2 (other than RPAS) not available. Both manned and unmanned cooperative aircrafts have to be included in-flight tests. Lack of resources 1 3 Equip manned and 1 3 2 3 The time window for flight trials have been planned taking into account yearly meteorological behaviour on the interested areas. The time windows length has been set to allow multiple trial periods. As far as Data Communication protocol is concerned, standard links and protocols (ASTERIX) are expected to be used in the simulation test rigs integration. In order to obtain the datalink performance required, alternative solutions have been considered: Simple Internet Connection using UDP protocol, implement a Virtual Private Network, establish a Point-to-Point connection. Test on alternative network performance are undergoing. CIRA, MATS , NIMB US The SW modules implementing TA and HMI functionalities don’t need further development but only adaptation to the RAID demonstration environment. This reduces the risk severity. The risk probability is judged low since CIRA has successfully managed similar processes in several previous project activities. CIRA will provide additional resources on this task, with no effect on RAID budget, if needed. Different vehicles and solutions have been considered as suitable alternative solutions to realize “actual” air traffic. CIRA CIRA, MATS Univ. Malta, NIMB US All partners already possess the All required resources and expertise for the project realization. Three key figures are strictly required for the text execution: licensed safety Pilot, RPAS pilot and Air Traffic Controller. The unavailability of these resources can affect the scheduling of the tests. The scheduling of the demonstration activities will be agreed in advance with pilots and ATCo in order to mitigate the afore mentioned risk. The length of scheduled time slots for the demonstration activities is set to leave enough time for managing eventual unforeseen difficulties. The unmanned systems acting as CIRA, 60 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan unmanned cooperative traffic with ADS_B OUT transmitter Edition 02.01.00 cooperative traffic are provided by a partner of the Consortium, and it already granted the ADS_B OUT availability. CIRA has already matured experience in equipping manned GA and VLA aircraft with ADS_B OUT transmitter. Various type of manned aircrafts are furthermore available for the test. Table 6: Project risks Nimb us, MATS 3.9 Extranet access rights Name Email Edoardo Filippone [email protected] Damiano Taurino [email protected] Antonio Monteleone [email protected] Marco Faletto [email protected] Joseph Degiorgio [email protected] David Zammit-Mangion [email protected] 61 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 4 Demonstration Approach 4.1 Demonstration Overview The overall context of the project is the safe and seamless integration of RPAS with other airspace users. In this global framework, several activities are on-going under ICAO coordination, based on the need of having coherent development of worldwide activities. As a consequence, ICAO constituted a specific UAS Study Group (UASSG) to coordinate and propose references to all other stakeholders acting in view of UAS integration in the civil airspace. The UASSG was established in 2008 with the aim to develop a regulatory concept, coordinating the development of SARPs (Standard and Recommended Practices) and assisting other bodies to the development of technical specifications addressed to the UAS integration in the non-segregated airspace and at aerodromes. The UASSG has published its first document, the ICAO Circular 328UAS, in March 2011. The main purpose of the Circular was the definition of the ICAO perspectives on the integration of UAS in the non-segregated airspace, while emphasizing the differences from manned aviation that such integration will involve. Following the UASSG indications, ICAO upgraded on March 2012 the Standards for Annex 2-Rules of the Air, and Annex 7- Aircraft Nationality and Registration Marks, specifically referring to RPAS applicable standards. It became effective from the following November. By the end of 2012 the Study Group is expected to finalize a roadmap to be used for guiding the upcoming integration activities for several years, aiming to define standards for Annexes 1, 6 8 and 10. Relevantly, by the early 2014 ICAO UASSG will issue the Guidance Material document for authorities and operators, and an ICAO RPAS Symposium is expected to be organized in April 2014 to openly discuss the guidance material. In the EU context, relevant activities are on-going in the SESAR framework. The first approach of the SESAR JU to the RPAS integration was the inclusion as Associate Partner of the SJU of the ATMFusion Consortium, as resulting from the specific Call (SJU/LC/0055) with reference to the “Lot 6 – UAV/UAS Integration in SESAR”. The Consortium was committed by the SJU to carry out the study ICONUS (Initial CONOPS for UAS in SESAR)[3]. Furthermore, the European Commission established the European RPAS Steering Group (ERSG), “aiming to identify, plan, coordinate and monitor the activities needed to achieve the safe integration of RAPS into the non-segregated ATM environment”. In compliance with the assigned aim, the ERSG issued in 2013 the European RPAS roadmap, aiming at an initial RPAS integration by 2016[2]. Based on the stimulus resulting from the ERSG roadmap, the present project aims to provide a contribution in terms of operational procedures and technologies evaluation through the completion of several demonstration activities involving different levels of testing (simulations and flight trials). The overall aim of the project is the evaluation of proposed available technological solutions and procedures to support the integration of RPAS into the non-segregated ATM environment. This will be pursued by means of relevant demonstration activities, whose specific objectives will be: • Assess the similarities of managing the RPAS flight in the unrestricted airspace, with respect to the manned aircrafts, from the ATM network and operators point of view; • Provide evidences of the peculiarities and possible effects on RPAS operations in the unrestricted airspace, due both to peculiar system architecture (pilot on ground) and to the specific technologies enabling the RPAS to flight (DAA, C2L); • Support the identification of possible incompatibilities of RPAS with the current ATM systems, functions, and operational aspects, in terms of operations, technologies, procedures; • Emulate and analyse malicious attacks on the communication/navigation radio links in order to assess the impact on the system performances and on the controller and remote pilot decisions; • Provide some data and considerations to identify guidelines to manage peculiarities and overcome incompatibilities for the RPAS integration in the unrestricted airspace. 62 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 These objectives will be achieved through a combination of Real-Time Simulations and Flight Trials with both simulated and real traffic. The focus of this objective will be on both procedural issues and technological aspects, addressing primarily the management of transitions between temporary segregated areas (TSAs) and non-segregated airspace together with the deployment of new detect and avoid and C2L technologies. 4.2 Stakeholders Demonstration Expectations The list of stakeholders and their demonstration expectations is provided in Section 2.2. 4.3 Demonstration Objectives In order to successfully and safely fly an RPAS in un-segregated airspace with a multi-aircraft and manned flight environment, within the procedural, regulatory and legal frameworks and existent air traffic control environment, the proposal addresses four main high level Demonstration Objectives: • • • • OBJ-1. To quantify and demonstrate the level of maturity, performance, limitations and compatibility with current infrastructures and procedures, of detect and avoid technology and of technologies for secure C2L; OBJ-2. To assess the impact RPAS integration into un-segregated airspace could have on safety, the RPAS pilot, Air Traffic Control Officers and ATM procedures and operations; OBJ-3.To identify the similarities between the operation of RPASs and manned aircraft in the ATM environment, as well as specificities to RPAS operation in terms of constraints and new requirements for the ATM operations; OBJ-4. To compare technological requirements between current (manned) flight operations and RPAS operations within the flight and air traffic management environments. Furthermore, to define the success criterion and to relate the high level objectives of the proposal with the current standards in literature, the previous mentioned four high level objectives have been broken down as with respect to 4 relevant Key Performance Areas- KPAs, draw out from the 12 KPAs addressed within SESAR (11 Standard KPA coming from ICAO Doc 9883, plus an additional one, Human Performance). The KPAs addressed in the project are: • Human Performance • Security • Safety • Capacity In addition to these KPAs, given the nature of the demonstration objectives, system performance related to DAA Technology and its impact on the feasibility of the project has also been considered. Criteria to measure each of these objectives will be: • • • Remote Pilots and Controllers satisfaction Vs expectations, to be collected through interviews and questionnaire, pre and post flight briefings. The questionnaires, which will be developed by Human Factors experts will aim also to measure their level of stress perceived along the flight, and their workload. As far as the security area is concerned, we will evaluate the risk of unintended or malicious interference that could affect command and data transmitted from the RPS to RPA providing measures of the data-link security and measures of the robustness of candidate solution to the spoofing threats. Impact of RPAS integration in terms safety and security. As stated in the ICONUS study [3]: “Safety issues cover the risks and failure modes of integrated Separation Assurance, SelfSeparation and Collision Avoidance functions, and the performance of human / machine roles and responsibilities”. 63 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan • • Edition 02.01.00 Impact of RPAS integration on the en-route throughput in terms of number of movements per volume of the considered airspace. As far as the Detect And Avoid area is concerned, both the system requirements evaluation and the usability of the system from the pilot and controllers point of view will be in the assessed. 4.3.1 Human Performance The Human Performance of both the controller and the remote pilot will be assessed. The Human Performance KPA has been analysed based on the SESAR HP Assessment Process developed within the project 16.04.01, addressing the standard HP argument branches (1. Human Roles; 2. Human & System; Team Structure and Communication; 4. Implementation Impediments), broken down into the related areas of interest (as defined in the section below). 1. Human roles Roles and responsibilities – for ATCOs and pilots no changes in the roles and responsibilities are envisaged. No new roles are introduced on both sides and their high level tasks are equal to the current ones. Therefore, the responsibilities remain the same. Operating methods – Although overall task of controller and pilot remains the same, the operating methods and procedures applied when the RPAS is introduced might change in respect to the current one (applied for non-RPAS aircraft) when controller is working directly with the pilot on-board, as well as depending on the operating conditions (normal, abnormal and degraded). Thus, it is important to identify possible changes in the operating methods and to assess their feasibility, compliance and consistency with other existing procedures within the overall context. Identifier OBJ-RPAS.03-HP001 Objective To assess the impact of the new concept on the operating methods by identifying the changes imposed on the existing ones, feasibility of these changes and their compliance and consistency within the overall context (normal, abnormal and degraded conditions). Success Criterion The changes of the current operating methods with the introduction of the new concept are identified and these changes are assessed as feasible, consistent and compliant with other existing operating methods in relation to the overall environment (normal, abnormal and degraded conditions). Tasks & task performance - even though it is assumed that the tasks of the controllers would not change with the introduction of RPAS in comparison with the tasks associated to the non-RPAS flights, the assessment of the impact of the introduction should be performed to assure that no negative impact is induced on the controllers (error propensity, workload, situational awareness). Remote pilots’ tasks and task performance are supposed to change as with respect to those of the pilot on board. The assessment of the impact of remote piloting will be performed to assure that no negative impact is induced on the pilot (error propensity, workload, situational awareness) and to assess the main differences when compared to board piloting. Identifier OBJ-RPAS.03-HP002 Objective To assess the impact of the new concept on the controllers’ and pilots’ task performance (error propensity, workload, situational awareness, timeliness of actions). Success Criterion The errors and untimely actions related to the new concept are identified, and the level of workload and situational awareness are assessed as within acceptable 64 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 margins. 2. Human and System Task allocation Human & Machine – Since on the controllers’ side there is no new technology and no changes on the existing technologies are introduced, it is assumed that the task allocation between the human and the machine will remain as in the current operating conditions for what concerns the controllers. Differently, on the pilots’ side changes in the existing technologies are introduced and the impact of these changes will be evaluated especially regarding the consistency of the new system with automation principles, pilots’ workload and the trust in the system. Identifier OBJ- RPAS.03-HP003 Objective To assess the impact of the new concept on the pilots’ interaction with the system (system’s consistency with automation principles, pilots’ workload and the trust in the system). Success Criterion The problems and untimely actions related to the introduction of a new concept are identified, and the task allocation between the pilot and the system is assessed and evaluated as consistent with automation principles, not having negative impact on pilots’ workload and the trust in the system. Performance of technical systems – Surveillance and the monitoring of the RPAS aircraft will be done in the same way as for the non-RPAS flights, no changes are foreseen for the system performance (on the controllers’ side). On the remote pilots’ side, the performance of the technical systems in use in RPAS (DAA and C2L) will be tested with a special attention to the assessment of the accuracy and timeliness of system information. Identifier OBJ- RPAS.03-HP004 Objective To assess the performance of the technical systems in use (DAA and C2L) in terms of accuracy and timeliness of system information. Success Criterion The performance of the technical systems in use is assessed. Problems related to accuracy and timeliness of system information are identified and evaluated as within acceptable margins. Design of the HMI – On the controllers’ side, the HMI design as currently in use is planned to be applied to a new concept. However, the impact of the introduction of the new concept without changes to the HMI has to be assessed for identification of any negative effects on the controller’s work (HMI usability, error propensity, situational awareness, and workload). On the remote pilots’ side, changes in the HMI are foreseen and have to be assessed for identification of any negative effects on the pilot’s performance (HMI usability, error propensity, situational awareness, and workload). Identifier OBJ- RPAS.03-HP005 Objective To assess the impact of the new concept on the controllers’ interaction with the existing system (more specifically HMI). To assess the impact of the new HMI on the pilots’ interaction with the system. Success Criterion The potential discrepancies between system-provided information and userrequired information are identified. Recommendations to address them are provided in order to avoid negative impact on HMI usability, error propensity, 65 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 situational awareness and workload. 3. Team Structure & Communication Team composition – there are no changes in the team composition. The controllers’ team remains as in today’s operational environment (TC and PC). On the other side, even though on ground, there is a pilot flying the aircraft with whom the controller communicates. Task allocation between human actors – the tasks as allocated in today’s operations remain the same. Namely, the controller is not taking/handing over the tasks of/to the pilot, and vice versa. Additionally, within the controllers’ team, there is no modification in the current task allocation introduced. Team Communication – The communication that might be the subject of changes is the one between the controller and the remote pilot. The possible changes are related to the information needed on both sides, communication modalities and means, communication load (that can affect the workload of the controller) and team situational awareness (not using the R/T channels but phone communication can lead to loss of situational awareness for both the remote pilot and the other nonRPAS pilots). Identifier OBJ- RPAS.03-HP006 Objective To assess the impact of the new concept on the communication modalities and means, communication load and team situational awareness between the controller and the remote pilot. Success Criterion The potential discrepancies between current and user-required communication modalities and means imposed by the new concept are identified. Recommendations to address them are provided in order to avoid negative impact on communication load and team situational awareness between the controller and the remote pilot. 4. Implementation impediments Roles and responsibilities – Since with the introduction of RPAS flights there are foreseen impacts on the working methods both of the controller and the pilot, their acceptance of the new concept should be assessed. Identifier OBJ- RPAS.03-HP007 Objective To assess the controllers’ and pilots’ acceptance of the new concept and the changes it brings to the current way of working. Success Criterion The controllers’ and pilots’ positive judgment on the acceptability of the new concept has been obtained. Competence requirements - Since with the introduction of RPAS flights there are foreseen impacts on the working methods of the controller and the pilot, the needs related to skills, experience, knowledge, as well as training needs should be identified. Identifier OBJ- RPAS.03-HP008 Objective To assess the impact of the new concept on the needs related to skills, experience, knowledge and training for both the controllers and the pilots. 66 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Success Criterion Edition 02.01.00 Based on the judgment of the controllers and of the pilots the needs for the additional training, skills, experience and knowledge are identified. Staffing requirements & staffing Levels – Taking into the consideration the phase of the concept lifecycle addressed with this demonstration, these issues are not applicable and could not be assessed with the planned exercises. The table below summarizes how the Human Performance KPA objectives are distributed in their assessment between the two main actors involved in the demonstration: the controller and the remote pilot. OBJECTIVE OBJ- RPAS.03-HP001 OBJ- RPAS.03-HP002 OBJ- RPAS.03-HP003 OBJ- RPAS.03-HP004 OBJ- RPAS.03-HP005 OBJ- RPAS.03-HP006 OBJ- RPAS.03-HP007 OBJ- RPAS.03-HP008 CONTROLLER X X REMOTE PILOT X X X X X X X X X X X X Table 7: HP objectives for different actors 4.3.2 Security The impact the most probable security threats will be assessed during the demonstration campaign in order to highlight RPAS vulnerabilities. The impact is assessed according to the SESAR methodology for risk and security assessment that leads to the assessment of the impact on “primary assets” and in particular of the threat on their Confidentiality, Integrity and Availability. Figure 3 Impact and Threat Scenarios 67 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 As suggested by ISO 27005 [4], the methodology focuses on two types of assets: primary assets and supporting assets. Within the RAID project the impact on the primary assets of the most probable threats exploiting RPAS vulnerabilities will be assessed during the demonstration campaign. Within the RAID project the following primary assets have been identified: 1. Emergency Management (the set of automatic actions performed when the remote pilot loses the control of the aircraft) 2. Human (remote) piloting 3. Collision avoidance (not foreseen in flight trials due to the related safety risks) For each of the above mentioned primary assets, the project is considering the following SESAR Impact Areas with the related metrics for the impact: 5 Catastrophic IMPACT AREAS IA1:PERSONNEL Fatalities IA2:CAPACITY Loss of 60%100% capacity IA3:PERFORMANCE Major quality abuse that makes multiple major systems inoperable IA6:REGULATORY 4 Critical 3 Severe 2 Minor Multiple Severe injuries Loss of 60%30% capacity Severe injuries Minor injuries 1 No impact / NA No injuries Loss of 30%10% capacity Loss of up to 10% capacity No capacity loss Major quality abuse that makes major system inoperable Severe quality abuse that makes systems partially inoperable Minor system quality abuse No quality abuse Multiple Major Multiple Minor major regulatory minor regulatory regulatory infraction regulatory infraction infractions infractions Table 8: SESAR Security Impact Areas No impact For each of the identified Primary Asset and Impact Area, our preliminary assessment in case of loss of integrity and/or availability according to the previous metrics is provided in the next table. IA6:REGULATORY IA3:PERFORMANCE IA2:CAPACITY IA1:PERSONNEL Emergency management Loss of Integrity Remote piloting Loss of integrity Remote piloting Loss of availability Collision Avoidance Loss of Integrity Overall impact 1 5 5 5 5 1 3 3 3 3 1 5 5 5 5 5 NA 5 5 5 68 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Table 9: Degradation of primary assets and related severity on Impact areas By its demonstration activities RAID aims at refining such preliminary impact assessment on the Impact Areas so far identified. 2 Next table identifies the supporting assets and their relation with the above mentioned primary assets Emergency Management X Remote piloting Collision avoidance Satellite Positioning X Air to Ground data link X Table 10: Applicability of supporting assets on primary assets X The high level objective OBJ-1 of RAID is mapped to the four low level objectives described hereafter related to the assessment of security threats that can lead to safety degradation (these four objectives are strictly related to the safety objective OBJ-SAFETY-005 disclosed in the next paragraph). Identifier OBJ-RPAS.03-SEC001 Objective To assess the impact of malicious attacks on the Emergency Management functions primary asset in terms of Loss of Integrity. Malicious attacks can in fact rely on known vulnerabilities that can be easily exploited with off the shelf/cheap technologies. In particular the RAID project is focusing on the two following threats: 1. GNSS spoofing 2. Telemetry (including video) communication jamming Success Criterion The impact of the Loss of Integrity on the Emergency Management functions of the RAID RPAS system is evaluated as within acceptable margins based on the SESAR methodology for risk and security assessment. Identifier OBJ- RPAS.03-SEC002 Objective To assess the impact of malicious attacks on the Remote Piloting primary asset in terms of Loss of Integrity. Malicious attacks can in fact rely on known vulnerabilities that can be easily exploited with off the shelf/cheap technologies. In particular the RAID project is focusing on the two following threats: 1. GNSS spoofing 2. Telemetry (including video) communication jamming 2 The supporting assets are those which possess the vulnerabilities that are exploitable by threats aiming to impair the primary assets within scope. 69 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Success Criterion The impact of the Loss of Integrity on the Remote Piloting functions of the RAID RPAS system is evaluated as acceptable applying the SESAR methodology for risk and security assessment. Identifier OBJ- RPAS.03-SEC003 Objective To assess the impact of malicious attacks on the Remote Piloting primary asset in terms of Loss of Availability. Malicious attacks can in fact rely on known vulnerabilities that can be easily exploited with off the shelf/cheap technologies. In particular the RAID project is focusing on the two following threats: 1. GNSS spoofing 2. Telemetry (including video) communication jamming Success Criterion The impact of the Loss of Integrity on the Remote Piloting of the RAID RPAS system is evaluated as acceptable applying the SESAR methodology for risk and security assessment. Identifier OBJ- RPAS.03-SEC004 Objective To assess the impact of malicious attacks on the Collision Avoidance primary asset in terms of Loss of Availability. Malicious attacks can in fact rely on known vulnerabilities that can be easily exploited with off the shelf/cheap technologies. In particular the RAID project is focusing on the two following threats: Success Criterion 1. GNSS spoofing 2. Telemetry (including video) communication jamming The impact of the Loss of Integrity on the Collision Avoidance of the RAID RPAS system is evaluated as acceptable according to the SESAR methodology for risk and security assessment. 4.3.3 Safety Safety can be defined as the state in which the possibility of harm to persons or of property damage is reduced to, and maintained at or below, an acceptable level [8]. Today it is engineered through a continuing process of hazard identification and safety risk management. Hazards are conditions or objects with the potential of causing injuries to personnel, damage to equipment or structures, loss of material, or reduction of ability to perform a prescribed function cause and consequences. Once hazards are identified, their consequences (i.e.: the potential outcome of the hazard) are listed and the risk of each consequence occurring estimated, using techniques that may involve historical evidence, statistical analysis and engineering judgement. Safety can then be achieved if the combined risk associated with the identified hazards is maintained at, or below a selected level. The level chosen is a function of the particular operation (e.g. large transport aircraft, general aviation, etc.)., which for the RAID project, involves RPAS operations. 70 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 RPAS safety levels are still being developed. For this reason, general aviation levels, adapted as may be required, will be used in this work. The safety concept in general aviation revolves primarily around protecting the small number of occupants who are not flying for commercial purposes and people on the ground. The concept is therefore very close to RPAS requirements with the additional consideration of the occupants and needs to be extended to remove the consideration of occupants. The method within RAID that will be used to estimate the risk of a consequence occurring will be in line with SAE ARP 4761[9], which provides appropriate guidelines for conducting a safety assessment for civil airborne systems and equipment. That document is primarily used as a means of compliance to EASA CS25.1309 [10] and is therefore also applicable to RPAS applications. In the context of RAID, the safety related to the detect-and-avoid and C2L systems will be considered. Furthermore, the study will be focus primarily on the risk of collision with other aircraft (which will be considered as potentially catastrophic for both aircraft), causation of fatalities on the ground and damage to third party property (primarily through accident/loss of RPAS). Whilst loss of the RPAS can be considered loss of property and therefore may be included in the safety case (as is done in other category of aircraft such as the large transport category [11]), third party loss will not be considered in this study. Four hazard classes are identified, namely: • System failure • Human error • external factors in the operating environment (weather, terrain, traffic) • malicious actions 4.3.3.1 Safety Assessment The general safety assessment process will follow the guidelines of the SESAR Safety Reference Material (SRM) [7]. Whilst the SRM recommends considering safety from two perspectives, namely: • A success approach, in which the effectiveness of new concepts and technologies when working as intended is assessed • A failure approach, in which the risks generated by new systems is assessed, RAID will focus more on the failure approach, since this is more appropriate in the project context, since RAID is involved with the introduction of new systems (RPAS) in the ATM environment. Within the failure approach, the Risk Classification Scheme that will be used is based on the AIM accident framework defined by a set of accident risk models (Mid-Air Collisions (MAC), Runway Incursions (RInc), Taxiway Accidents (TAcc), Controlled Flight Into Terrain (CFIT) and Wake Accidents). For the project only MAC and CFIT models are considered, due to the limited scope of the project. The respective Risk Classification Schemes are defined by Severity Classification/Probability Classification relationship matrices depicted in the following tables, as defined in the SRM. Severity Class AIM Safety Precursor MF3 MAC-SC1 MAC Failure Description A situation where conflict geometry has not prevented physical contact Operational Effect of Failure Accident Maximum Tolerable Frequency of Occurrence 1 e-9 71 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan MF3a MAC-SC2a MAC-SC2b All ATM failed MF4 All ATC failed MF5-9 Tactical MAC-SC3 MAC-SC4 Management failed MF5.1 Planning/ Sequencing Failed MF6.1-9.1 Induced MAC-SC5 MF5.2 Pre-Tactical Traffic Management Failed Edition 02.01.00 A situation where an imminent collision was not mitigated by an airborne collision avoidance Near collision A situation where an loss of separation was not mitigated by ATC collision avoidance: STCA, expedite, etc Imminent collision A situation where a tactical conflict (coming from planned conflicts or induced conflicts) was not mitigated by ATC conflict management – within the sector (this encompassess situations where a tactical conflict is created by either ATC or crew/aircraft e.g. level bust, bad instructions) A situation where a potential conflict, (prior to entering the sector), was not mitigated by traffic planning and synchronisation A situation where, on the day of operations, a strategic conflict was not mitigated by airspace managent & DCB. A strategic conflict is typically be a conflict identified 20 mins to 3 hours prior to sector entry. 1 e-6 1 e-5 1 e-4 Loss of separation Tactical Conflict 1 e-2 (planned or induced) 1 e-1 Pre tactical conflict Table 11 Mid-Air Collision Risk Classification Scheme Severity Class AIM Safety Precursor CF1 CFIT-SC1 CFIT CF2 CFIT-SC2(a) CFIT-SC2(b) CFIT barrier failure CF3 Imminent Failure Description Operational Effect of Failure An accident where impact with terrain/water obstacle Accident A situation where impact with terrain/water obstacle was not mitigated by pilot or aircraft system terrain avoidance – TAWS GPWS Near Collision with terrain/water A situation where the threat of impact with terrain/water Aircraft below MSA Maximum Tolerable Frequency of Occurrence 1 e-8 1 e-8 72 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan CFIT CF4 CFIT-SC3 Controlled flight towards terrain CF5 – 7 CFIT-SC4 Flight towards terrain commanded (ATC, Pilot or systems) CF8 CFIT-SC5 Airspace/ procedure design and routing Edition 02.01.00 or an obstacle was mitigated by ATC Vigilance, MSAW etc. not eg, and or MOC A situation where a commanded flight towards terrain is not recognised by the crew and corrected. (This is prior to any CFIT preventing ATC intervention) Aircraft directed below MSA & or MOC A situation where the threat of impact with terrain/water or an obstacle is created as a result of diverging from a terrain clear trajectory which is commanded by either pilot or atc. Aircraft will iminently infringe MSA & or MOC A situation where procedure design can strongly influence Flight Toward Terrain (increase the likelihood of) Note: This is not in a strict sense a failure since the risk involved was an operational choice. Greater opportunity for FTT 1 e-6 1 e-5 1 e-5 1 e-3 Table 12 Controlled Flight Into Traffic Risk Classification Scheme The severity classes of failures are defined by number of hazards per accident type: Number of hazards per Severity Class per Accident Type Severity Class MAC CFIT SC1 1 1 SC2 (a) 5 5 SC2 (b) 10 10 SC3 25 50 SC4 50 100 SC5 100 200 Table 13 Maximum Hazard Numbers per Severity Class 4.3.3.2 System Failure System failure can be categorized in three types, namely: 1. complete failure – in which the system function is completely unavailable 2. partial failure – in which some of the systems are unavailable, often leading to degraded operation / performance 73 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 3. loss of integrity – in which the system continues to function but its performance is out of tolerance. System failure can be announced or un-announced, and this may have significant impact on the outcome of a given system failure. Consequently, the study will consider the effect of alerting on safety. The consideration of the consequences of detect-and-avoid and C2L system failure on safety is of interest to the RAID project, as identified in OBJ-2. Such consideration is also of relevance to OBJ-1, leading to the following lower-level objectives: Identifier OBJ- RPAS.03-SAF001 Objective To assess the effect of detect-and-avoid system failure on operational safety, considering: 1. complete system failure 2. partial system failure 3. loss of integrity Announced and unannounced failures will be considered. Success Criterion The implications of detect-and-avoid system failure on safety are estimated within acceptable margins and no major limitations are identified. Identifier OBJ-RPAS.03-SAF002 Objective To assess the effect of C2L failure on operational safety, considering: 1. complete system failure 2. partial system failure 3. loss of integrity Announced and unannounced failures will be considered. Success Criterion The implications of C2L failure on safety is estimated within acceptable margins and no major limitations are identified. 4.3.3.3 Human Error Human error in operation is identified as a major potential risk to operational safety and is consequently of major relevance to the RAID project. As RAID is concerned with the study of the implications of RPAS operation in non-segregated airspace, human error associated with other factors (such as, for example piloting error or ATCO error as would be encountered in ‘normal’ (manned) operations) are not considered. Work will therefore be specifically concerned with the safety implications of changes in current procedures, of the introduction of new procedures and on the human element. In this address there is significant overlap in the KPAs of Safety and Human Performance. The Human Performance aspect in RAID (Section 4.3.1) will focus on identifying issues such as training needs, human workload, etc. The Safety KPA within RAID will build on the analysis of the Human Performance KPA to extract the consequences of human performance in the new operational procedures proposed and, through the use of the guidelines in ICAO Doc 9859 (Safety Management Manual) [8], attempt to quantify risk of accident 74 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 (i.e.: an event leading to damage to third party property or human injury, including death). The results will then be used in the failure approach following the SESAR safety assessment process in parallel with the risk classifications and are aimed at providing a complementary view to safety classification. The tables below will be used. Probability of Occurrence Qualitative Description Frequent Meaning Value Likely to occur many times (has occurred frequently) 5 Occasional Likely to occur some times (has occurred infrequently) 4 Remote Unlikely, but possible to occur (has occurred rarely) 3 Improbable Very unlikely to occur (not known to have occurred) 2 Extremely improbable Almost inconceivable that the event will occur 1 Severity of Occurrence Aviation Definition Catastrophic Hazardous Major Minor Negligible Meaning Value Equipment destroyed Multiple deaths A large reduction in safety margins, physical distress or a workload such that the operators cannot be relied upon to perform their tasks accurately or completely Serious injury Major equipment damage A significant reduction in safety margins, a reduction in the ability of the operators to cope with adverse operating conditions as a result of increase in workload or as a result of conditions impairing their efficiency Serious incident injury to persons Nuisance Operational limitations Use of emergency procedures Minor incident A Little consequences B C D E Risk severity Risk Probability Catastrophic A Hazardous B Major C Minor D Negligible E Frequent 5 5A 5B 5C 5D 5E Occasional 4 4A 4B 4C 4D 4E 75 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Remote Edition 02.01.00 3 3A 3B 3C 3D 3E Improbable 2 2A 2B 2C 2D 2E Extremely Improbable 1 1A 1B 1C 1D 1E Table 14: Probability and risk of occurrence, risk severity [8] Accordingly, and in line with the Human Performance section of this study, the following aspects of human performance will be considered: 1. Operator (all stakeholders) tasks and roles 2 2. Human Machine Interface and Interaction (HMI ) issues 3. Organisational issues (team structure and communication, etc.) 4. Skills and training needs Operator tasks and roles issues will focus on the ‘intrinsic’ human abilities and limitations, such as 2 workload. HMI issues will focus on the specific characteristics of the interface and interaction mechanisms. Organisational issues will address factors that emerge from the operational organization, including operational (company) philosophy, definition of roles, etc. etc. Skills and training issues will address the relevance and extent of the need of training in the light of potential risk of accident. Identifier OBJ- RPAS.03-SAF003 Objective To assess the effect of limitations in human performance on safety, considering: 1. 2. 3. 4. Success Criterion Operator tasks and roles The Human-Machine Interface and Interaction Organisational issues Skills and training needs This objective will be addressed together with related HP objectives. The effect of the limitations of human performance on safety is assessed, focussing on the 4 identified areas, and no major risks to safety are identified. 4.3.3.4 External factors Traditionally, external factors that are considered to be a potential threat to safety are: 1. Traffic 2. Terrain 3. Weather In the context of RAID, the three threats need to be considered in the context of the detect-and-avoid and C2L technologies. Traffic is considered part of the detect-and-avoid technologies and its effect on C2L operation focus on the effect of other aircraft transmissions, which falls under system failure. Consequently, Traffic as an external factor is not addressed within RAID. The hazards of terrain and weather have an effect on C2L integrity and availability. Terrain can cause phenomena such as excessive attenuation, noise injection, shadowing and multi-path interference, with effects potentially impacting primarily C2L performance, although there are cases where the effect on the performance of the wireless component of the detect-and-avoid function can also affect system performance (e.g. when the RPAS is operating at low altitude in mountainous terrain). 76 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The presence of terrain and weather also have an impact on the detect-and-avoid function, as strategies for avoidance that do not take into account these factors can vector aircraft towards the relevant threats. However, present day safety-net technologies (such as TCAS and EGPWS) do not fuse weather, terrain and traffic avoidance functionalities, with only emerging technologies not yet available on large transports addressing the subject. Consequently, the independent operation of safety-net functions is considered adequate to mitigate the risks associated with the said hazards in current large transport operations. In this context, therefore, this adequacy can be extended to RPAS operation and, therefore, also for the scope of RAID. In other words, RAID will neither address the fusion of safety-net functions nor the combination of threats. As all RAID activities assume IFR operation, only IFR-related manoeuvers and hazard conditions are considered. The threat of weather and terrain is also a function of the operational model, primarily on the selection of routes and areas of operation, operational bases and the mission itself. Within the scope of RAID, these hazards are considered in view of the risk of third party property damage and human injury, including death. Consequently, it is a function of population density and development. The business case for the particular RPAS operation and to what extent weather and developed terrain is avoided have a significant impact on safety. Such considerations are beyond the scope of RAID and consequently specific operational scenarios will need to be developed to demonstrate the potential effect of weather and terrain on safety. It is not the purpose of RAID to carry out detailed simulations of weather and terrain effects and to study their effect on wireless technologies. Within the project, generic threats such as the presence of mountainous terrain will be considered and known effects on integrity of systems such as GPS will be used to address the effects of the relevant hazards on the C2L and detect-and-avoid technologies. Identifier OBJ- RPAS.03-SAF004 Objective To assess the potential effect of weather and terrain on the performance of wireless technologies associated with the detect-and-avoid and C2L technologies, addressing: 1. GNSS performance 2. C2L performance 3. detect-and-avoid wireless component performance Success Criterion The implications weather and terrain on C2L and detect-and-avoid system loss of integrity/availability and their effect on safety are assessed and evaluated as within acceptable margins. No major limitations that can preclude operations in certain conditions are identified. 4.3.3.5 Malicious actions Malicious actions associated with the functions considered by RAID are identified to be: 1. Wilful intent of other entities (aircraft) to collide with the RPAS 2. Intentional transmission of inappropriate data over the C2L link 3. Cyber attack The first two (collision and transmission of inappropriate data) are considered outside the scope of the RAID assessment. Detect-and-avoid technology is considered to provide adequate protection against collision in other, more stringent, categories of operation (such as large passenger transport) and intentional collision is significantly affected by vehicle manoeuvrability, which is beyond the scope of RAID. Furthermore, it is extremely improbable that, for most applications, other aircraft would be 77 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 used to cause damage to the RPAS ownership and if this were to occur, other technologies would be required for protection, further justifying the address of such an event as being out of scope of RAID. Transmission of inappropriate data is also outside the scope of RAID, as safety mechanisms focus on procedure and other technologies (such as operator identification at the ground station) that are strictly not associated with the integrity of the C2L technology. The effect of cyber-attacks on safety is, in contrast, of direct relevance to the project. In this case, there is significant overlap between the KPAs of Security and Safety. The former is addressed in Section 4.3.2 of this text. Consequently, the impact of loss of integrity/availability, identified through OBJ-RPAS.03-SEC001 to OBJ-RPAS.03-SEC004, will be used to identify the impact on safety. Identifier OBJ- RPAS.03-SAF005 Objective To assess the effect on safety of the loss of integrity and availability of the C2L link, the GNSS system and detect-and-avoid system, considering: 1. the Emergency Management primary asset 2. the Remote Piloting primary asset 3. Detect-and-Avoid technology (Collision Avoidance primary asset) Detected and undetected attacks will be considered. Success Criterion The implications of cyber-attacks on safety are assessed and evaluated as acceptable. No major limitations that can compromise safety are identified. 4.3.4 System Performance The performances of the Detect and Avoid (Traffic Avoidance and Collision Avoidance) algorithms implemented on-board the RPAS will be assessed by evaluating some performance indicators, as detailed in the following. The indicators cover four aspects of the performances associated with the execution of the resolution manoeuvre and they are specific for each of the considered functionalities (Traffic Avoidance and Collision Avoidance). Identifier OBJ- RPAS.03-PER001 Objective With reference to each specific test case performed, the minimum distance between RPAS trajectory and the separation volume set around the intruder is considered in order to assess the performance of the Traffic Avoidance algorithm in the performed test. Success Criterion The distance at the CPA is recorded and evaluated as sufficient for each encounter. Identifier OBJ- RPAS.03-PER002 Objective To evaluate the total number of cases where the separation volume set around the considered intruder is infringed (based on the value of the index indicated in the previous OBJ-PERFORMANCE-001 for each specific test case). This is used as global traffic avoidance algorithm success rate. Success Criterion The total number of infringements is recorded, assessed and evaluated as within acceptable margins according to the global traffic avoidance algorithm success 78 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 rate. Identifier OBJ- RPAS.03-PER003 Objective With reference to each specific test case performed, the maximum deviation (3D distance) from the nominal flight path is considered in order to assess the nuisance caused on the original path execution due to the implementation of the traffic avoidance manoeuvre. Success Criterion The deviation from the optimal flight path (calculated in function of the traffic present in the considered airspace) is recorded and evaluated as within acceptable margins. Identifier OBJ- RPAS.03-PER004 Objective With reference to each specific test case performed, the delay time in capturing the destination waypoint (4D waypoint) due to the execution of the traffic avoidance manoeuvre is considered in order to assess the nuisance caused on the time constraint compliance due to the implementation of the manoeuvre. Success Criterion The difference in actual and planned time to reach the destination waypoint is calculated and evaluated as within acceptable margins. Causes are also assessed and recommendations for their avoidance provided. 4.3.5 Capacity Capacity is defined as the KPA that addresses “the ability of the ATM System to cope with air traffic demand (in number and distribution through time and space)” Three main focus areas are associated to Capacity KPA: - Airspace Capacity; - Airport Capacity; - Network Capacity. Taking into consideration the concept addressed by the RAID demonstration activities, capacity impact can only be assessed in terms of airspace capacity, since only en-route phases of flight are foreseen (OPV take-off and landing are performed by the safety pilot on board). The impact that the introduction of RPAS has on capacity can be assessed only through exercise activities where other traffic is present. Identifier OBJ- RPAS.03-CAP001 Objective To assess the impact of the introduction of RPAS on en-route throughput in terms of number of movements per volume of the considered airspace. Success Criterion Number of movements per volume of considered en-route airspace per hour does not decrease with the introduction of RPAS. 79 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 4.4 Demonstration Scenarios The scenario which is intended to be used as basis for the definition of the scenarios to be addressed within RAID project is derived from the ICONUS study (Initial CON OPS for UAS in SESAR – the study on the integration of UAS in non-segregated airspace [3]). Specifically the project refers to the ICONUS scenario that foresees the short term integration of RPAS in the SESAR context. This scenario is adapted to the requirements and assumptions of the RAID project considering the specific characteristics of the RPAS under consideration, type of mission envisaged under relevant operational conditions. RPAS characteristics Vehicle category Remotely Piloted Turboprop aircraft Working Altitude: Medium altitude: max 3000ft (~1000m) RPAS category: Medium altitude 1000m; Short range ~ 10km Weight category: >250kg Altitude and endurance: medium altitude, medium endurance Type of mission The Remote Piloted Aircraft will perform patrolling activities in the area of predefined dimensions. The trajectory of the flight will be a point to point route between take-off and the mission area. Within the mission area the RPA will follow a systematic target seeking pattern until the target is identified. The RPA follows the target for the period of time that is previously defined after which it will proceed to a predefined return flight route towards the landing airport. Operational conditions In particular, the reference scenario considers an RPAS flying at medium level altitude, under IFR conditions, with 5nm separation minima, departing and landing on standard civil airport or local area for VTOL where no other civil air traffic will be present during the live trials. Operations will be conducted in RLOS (both in the VLOS and BVLOS). Communication between RP and ATC will be performed by telephone, while communication between OP and ATC will be based on RT. The mission (seeking) area, as foreseen also in the short term ICONUS scenario, could be managed as a Temporary Segregated Area (TSA). This TSA envisaged for the mission area (in further text referred to as TSA1) is situated 6KM (about 3.1NM) south east of Luqa aerodrome. The TSA1 comprises of an area having a square shape with 2NM sides. The vertical limits of the TSA1 are from Mean Sea Level (MSL) to an altitude of 3000FT. The TSA1 will be activated on a tactical basis for an agreed duration depending on the type of exercise/scenario. The only vehicle admitted to fly into TSA1 is the Flare OPV. 80 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Figure 4: Identified departure and arrival airport and TSA1 in Malta Figure 5: Detail of the TSA1 On the other hand, as the current demonstration activities also address the Detect and Avoid algorithms (Conflict and Traffic Avoidance functions), the TSA1 with its dimension does not comply with the area required to test this algorithm. Therefore, for the demonstration scenarios where DAA algorithm is deployed and its functions tested, another TSA with bigger dimensions is defined (in further text referred to as TSA2). TSA2 is situated 6KM (about 3.1NM) south east of Luqa aerodrome. The TSA2 comprises of an area having a square shape with 10NM sides. The vertical limits of the TSA2 are from Mean Sea Level (MSL) to an altitude of 5000FT. The TSA2 will be activated on a tactical basis for an agreed duration 81 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 depending on the type of exercise/scenario. The only vehicles admitted to fly into TSA2 are the Flare OPV and collaborative vehicles equipped with ADS-B Out. TSA2 is managed by the ATC as a class A airspace with mandatory ADS-B out equipment. Figure 6: Identified departure and arrival airport and TSA2 in Malta Based on these preconditions, following scenarios are defined to be addressed through the demonstration activities. It should be noted that these scenarios address only the RPAS integration while the reference scenarios that refer to current operations (with pilot on-board) are not specifically detailed and provided here below. Identifier Scenario SCN-RPAS.03-001 En-Route Operations of the RPAS, entering and leaving a Temporary Segregated Area from/to an unrestricted managed airspace. TSA1 is set-up by the ATC. After departure the RPAS proceeds to the mission area, which is within the TSA1. The remote pilot asks for the clearance to enter the TSA1. During the in-flight tests, the safety pilot executes the takeoff and climb phases of flight. Once the aircraft achieved its level flight condition, the control of the aircraft is handed over by the safety pilot to the remote pilot. The controller evaluates the request (depending on surrounding traffic, weather conditions, adjacent sectors, etc.) and decides how to proceed. If unable to grant clearance to enter the TSA1 immediately, the controller will clear the pilot to hold at a specific location for a limited time. After ensuring that no conflict with other non-participating traffic exists, the controller will clear the RPAS to proceed to the TSA1. The RPAS enters the TSA1 and performs the mission. During this time the ATC constantly supervise the TSA in order to avoid an infringement by other traffic and to monitor the RPAS flight. 82 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 When the mission is accomplished, the remote pilot asks the controller the clearance to leave TSA1 and enters the unrestricted managed airspace. The controller evaluates the request (depending on surrounding traffic) and decides how to proceed. If unable to grant clearance to exit the TSA1 immediately, the controller will clear the pilot to hold within the TSA1 for a limited time. After ensuring that no conflict with other non-participating traffic exists, the controller will clear the RPAS to exit the TSA1. If for any reason during the mission an unexpected event jeopardizing the mission occurs (such as an emergency situation by other non-participating aircraft), the temporary segregated area will be dismissed. Appropriate communication and procedures will be performed by controller and remote pilot. Such a procedure may be for the RPAS to leave the TSA1 and proceed to a position to hold until the controller clears the RPAS for the approach and landing. Identifier Scenario SCN-RPAS.03-002 En-Route Operations of the RPAS in presence of potentially conflicting manned traffic TSA2 is set-up by the ATC. The RPAS enters the TSA and performs its mission following the procedures described in SCNRPAS.03-001. Other IFR ADS-B equipped traffic involved in the scenario asks clearance to the ATC to cross the TSA. Once the ATC provides the clearance, the traffic crosses the TSA. The controller is in charge of maintaining separation between the RPAS and the other traffic within the TSA. The controller continuously verifies separation condition between RPAS and other relevant traffic on its CWP. As far as the occurrence of a possible loss of separation condition is recognized, the controller communicates to the remote pilot the instructions to safely recover the separation conditions. The RPAS is equipped with ADS_B IN for autonomous surveillance capability, in order to allow complete functionality of the Detect and Avoid system that will be here used as a safety net. Once the mission is accomplished the remote pilot asks the ATC the clearance to exit the TSA following the procedures described in SCN-RPAS.03-001. Identifier Scenario SCN-RPAS.03-003 Detect and Avoid (Collision Avoidance Function) TSA2 is set up by the ATC. The baseline of this scenario is SCN-RPAS.03-002. During the execution of SCN-RPAS.03-002 ATC misses a separation between RPAS and the conflicting aircraft, then the RPAS applies collision avoidance safety measures. The RPAS, by means of the ADS-B IN surveillance system, detects the Collision Avoidance (CA) condition and automatically performs the manoeuvre for recovering the safe distance conditions. The safety bubble considered by the DAA system for the Collision Avoidance function is nominally set to a sphere of 500 feet radius, possibly incremented depending on uncertainties affecting surveillance data. The distance threshold for the activation of the escape manoeuvres is variable as a function of the conflict scenario. The conflicting vehicles will not perform any concurrent manoeuvre while RPAS executes CA operations. The RP monitors the CA manoeuvre execution and he can anytime intervene to assume the full control of the flight. Compatibility check of the DAA system with ACAS functions will be also carried out. The DAA system compatibility check with the airborne safety net, that is ACAS system in its TCAS implementation, will be in agreement with the MIDCAS high level requirements [13], which cite: From the UAS (RPAS) equipped with a S&A (DAA) system point of view, meaning of <<Compatibility>> is: • Let the intruder identify UAS presence (TA level) • Let intruder determine own safe manoeuvre to be executed according to ACAS rules • Do not engage a UAS manoeuvre which might endanger intruder (“incompatible manoeuvre”) 83 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The RPAS fully satisfies the first requirement, being equipped with a Mode-S transponder. The compliance with other requirements is addressed as in the following: RPAS will continuously check if it is triggering the Alert function of the intruder TCAS. If it recognize the need to execute a manoeuvre before to alert TCAS, manoeuvre is started, and the Alert check is maintained as active. In the case the DAA system recognize that the intruder TCAS is being alerted, both in normal flight or during avoidance manoeuvre, it stops to perform any other actions, leaving the intruder TCAS to manoeuvre without other endangers. The DAA system will not determine an own manoeuvre cooperatively and non-endangering TCAS operations; this is still partly in line with MIDCAS guidelines, which foresee that no action have to be taken by the DAA system if the intruder TCAS has been alerted, until only 15 seconds remain to a potential conflict. Once the collision avoidance manoeuvre is completed, the remote pilot asks the ATC the clearance to exit the TSA following the procedures described in SCN-RPAS.03-002. Due to safety issues (DAA is not yet certified) this scenario will be performed during RTS only. Identifier Scenario SCN-RPAS.03-004 Detect and Avoid testing (Traffic Avoidance) – One manned vehicle involved TSA2 is set up by the ATC. The baseline of this scenario is SCN-RPAS.03-002. The vehicle representing the traffic in the TSA2 is equipped with ADS_B OUT, therefore it is able to broadcast its status in a Mode-S Extended Squitter standard message. Although the separation provision is performed by the ATC, the RPAS DAA (Traffic Avoidance function) is configured with increased separation minima (7NM) as with respect to the reference separation provision (5NM).This set up of increased minima allows the DAA to alert the RP on a potential loss of separation with the other vehicle and therefore to test DAA performance on traffic avoidance while the ATC separation provision is maintained. The scenario is a step forward the complete integration of RPAS also in airspace of Class D and E, following what is described in ICAO Manual [12]. The complete integration in these classes of airspace also requires high detect capacity, which are not under test in the project, but the capability of generate safe manoeuvres to recover the required separation minima is the function under evaluation, and its suitability to support pilot decision, too. The test aims at evaluating the performance of the proposed system in terms of supporting the remote pilot in recovery the separation minima, as expected in the future SESAR Conops full deployment (delegation of Self-Separation to the flight, or remote pilot, segment). This is furthermore compliant with the extension of use of CDM approach in ATM. The Remote Pilot (RP) still sees on its Remote Pilot Station (RPS) instrumentation the air traffic in the area (flying into the ADS_B standard coverage area) and uses the DAA system in order to maintain the foreseen increased separation with the vehicle (7NM). Since the DAA system monitors the separation conditions at these increased minima, it is able to alert the RP on possible risks of loss of separation and to provide him with the manoeuvre for separation recovery before the separation is requested by the ATC. The RP requires from the ATC the clearance for the suggested manoeuvre, executing it if clearance is given. If clearance for the proposed manoeuvre is denied, the ATC communicates to the RP the proper manoeuvre to be executed in order to recover separation in the case of a loss of 5NM separation. Once the traffic avoidance manoeuvre is performed, the scenario concludes following the procedures described in SCN-RPAS.03-002. Identifier Scenario SCN-RPAS.03-005 Detect and Avoid testing (Traffic Avoidance) – Multiple manned vehicles involved TSA2 is set up by the ATC. 84 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The baseline of this scenario is SCN-RPAS.03-002. All the air vehicles representing the traffic in the area are equipped with ADS_B OUT, therefore they are able to broadcast their status in a Mode-S Extended Squitter standard message. Although the separation provision is performed by the ATC, the RPAS DAA (Traffic Avoidance function) is configured with increased separation minima (7NM) as with respect to the reference separation provision (5NM). This set up of increased minima allows the DAA to alert the RP on a potential loss of separation with other vehicles and therefore to test DAA performance on traffic avoidance while the ATC separation provision is maintained. The pilot (RP) sees on its Remote Pilot Station (RPS) instrumentation the air traffic in the area (flying into the ADS_B standard coverage area) and uses the DAA system in order to maintain the foreseen increased separation with other vehicles (7NM). Since the DAA system monitors the separation conditions at these increased minima, it is able to alert the RP on possible risks of loss of separation and it to suggest him the manoeuvre for separation recovery before the separation is requested by the ATC. The RP requires the ATC the clearance for the suggested manoeuvre, executing it if clearance is given. If clearance for the proposed manoeuvre is denied, the ATC communicates to the RP the proper manoeuvre to be executed in order to recover separation in the case of a loss of 5NM separation. Once the traffic avoidance manoeuvre is performed, the scenario concludes following the procedures instituted for SCN-RPAS.03-002. SCN-RPAS.03-006 Detect and Avoid testing (Traffic Avoidance) – Unmanned vehicle involved Identifier Scenario TSA2 is set up by the ATC. In this scenario the activities described in SCN-RPAS.03-002 and SCN-RPAS.03-004 are performed with unmanned traffic involved. The vehicle representing the traffic in the TSA2 is Nimbus PRP70 RPA, equipped by Mode S Transponder with ASS-B out and a portable GCS. Once the mission is accomplished, the scenario concludes following the procedures described in SCN-RPAS.03-002. SCN-RPAS.03-007 En-Route Operations of the RPAS, under C3L security threats (spoofing, jamming) Identifier Scenario 3 A jamming attack to the C3L is simulated by nulling the data link generated by the RPA toward the RPS. The channel from the RPS toward the RPA is still available. The behaviour of the RP, who is receiving no information from the RPAS, is assessed. 4 A simulated GNSS spoofing attack is added on top of the jamming attack. The automatic (emergency) manoeuvres that the RP has probably triggered following the jamming attack, are affected by the spoofing attack possibly leading to a catastrophic (simulated) scenario. 3 A radio jamming attack on a specific communication link consists in superimposing, in the relevant frequency range, a malicious stronger dummy signal on the useful signal thus critically decreasing the signal to noise ratio eventually not allowing the reception of the useful signal at the receiver side. 4 A GNSS spoofing attack consists in emulating and direct a fake GNSS signal with sufficient power in order to over-ride the legitimate space-based GNSS signals and thus forcing any attacked receiver to compute the position decided by the attacker (and not the actual position of the receiver). 85 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Furthermore the detect and avoid technology is expected to be jeopardised by the wrong positioning due to the GNSS spoofing attack. These degraded conditions will be tested in the en-route phase within the TSA in the following scenarios: SCN-RPAS.03-001, SCN-RPAS.03-002, SCN-RPAS.03-003, SCN-RPAS.03-004 and SCN-RPAS.03-005. 4.5 Demonstration Assumptions Following a table presenting the list of the general RAID demonstration assumptions is depicted. It will be used as a reference for describing the assumptions related in the single exercises to be provided in sections 5.1.1.6, 5.2.1.6 and 5.3.1.6. Assumption Identifier Assumption Title ASS-RPAS.03-001 FLARE Permit to fly ASS-RPAS.03-002 Adequate time availability and volumes of TSAs ASS-RPAS.03-003 Communication between remote pilot and ATCOs ASS-RPAS.03-004 Communication between RPAS simulator and ATC simulator ASS-RPAS.03-005 Weather conditions (FLARE) ASS-RPAS.03-006 Weather conditions (Nimbus UAS) ASS-RPAS.03-007 Nimbus UAS Permit to fly Surveillance – availability of ADS-B ASS-RPAS.03-008 Departure and arrival operations performed by the OP ASS-RPAS.03-009 Use of cooperative traffic in Flight Trials for Traffic Scenario Avoidance. ASS-RPAS.03-010 Table 15: General Demonstration Assumptions list In the following tables a description of the assumptions is provided. Identifier ASS-RPAS.03-001 Title FLARE Permit to fly Type of Assumption Demonstration Enabler Description The FLARE system must obtain a permit to fly by Malta CAA in both modalities: experimental vehicle (when automatically flown by an on-board computer) or RPAS (when flown by a remote pilot). Both modalities include a safety pilot on-board. Justification The modifications made to the original vehicle require to be certified or authorized by the authorities. Flight Phase All 86 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 KPA Impacted Safety Source European and Maltese aviation regulation Value(s) N/A Owner CIRA Impact on Assessment Feasibility of flight trials Identifier ASS-RPAS.03-002 Title Adequate time availability and volumes of TSAs Type of Assumption Demonstration enabler Description The TSAs will be set up on a tactical basis and it will be configured for each exercise on the basis of the operational conditions and decided by MATS. Justification In order to perform necessary flight tests the TSAs must be available for an adequate time frame and volume. Flight Phase En-route KPA Impacted Safety, System Performance Source MATS Value(s) N/A Owner MATS Impact on Assessment Feasibility of flight trials Identifier ASS-RPAS.03-003 Title Communication between remote pilot and ATCOs Type of Assumption Demonstration Enabler Description The remote pilot is able to use RF to communicate with the Controller (as any on-board pilot) Justification The communication by different means (not RF) may impact on the workload and operating methods of the Controller Flight Phase All 87 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 KPA Impacted Safety, HP Source Project Team Value(s) N/A Owner CIRA/MATS Impact on Assessment Effectiveness of the Demonstration Identifier ASS-RPAS.03-004 Title Communication between RPAS simulator and ATC simulator Type of Assumption Communication Assumption Description The real-time communication between RPAS simulator and ATC simulator is available. Justification Communication and integration between the simulators is essential to perform RTS. Flight Phase All KPA Impacted All Source MATS/CIRA Value(s) N/A Owner MATS/CIRA Impact on Assessment Real Time Simulations enabler Identifier ASS-RPAS.03-005 Title Weather conditions (FLARE) Type of Assumption Flight Trials enabler Description VMC are met and wind conditions are compatible with performance limitations of the RPAS. Justification Safety pilot has to be able to keep the control of the aircraft and maintain separation with traffic and terrain by visual means. Flight Phase All 88 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan KPA Impacted All Source Project Team Value(s) N/A Owner N/A Impact on Assessment Flight Trials feasibility Identifier ASS-RPAS.03-006 Title Weather conditions (Nimbus UAS) Type of Assumption Flight Trials with other unmanned traffic enabler Description Edition 02.01.00 Standard weather conditions which can be considered acceptable for Nimbus PRP70 are a max wind speed of 15 knots and light rain. Some preliminary flight tests in Malta can restrict this limitation under particular high wind gust conditions. Justification Performance limitations of Nimbus UAS have to be considered during the flight trials Flight Phase All KPA Impacted All Source Project Team Value(s) N/A Owner Nimbus Impact on Assessment Feasibility of Nimbus UAS insertion as unmanned traffic into the flight trials. Identifier ASS-RPAS.03-007 Title Nimbus UAS Permit to fly Type of Assumption Flight trials with other unmanned traffic enabler Description The Nimbus system must obtain a permit to fly by Malta CAA. Nimbus expects an authorized VFR VMC and EVLOS up to 1 km distance for GCS. Justification The Nimbus system is involved into Exercise 3, thus an authorization is needed Flight Phase All 89 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 KPA Impacted Safety Source European and Maltese aviation regulation Value(s) N/A Owner Nimbus Impact on Assessment Feasibility of other unmanned traffic insertion in flight trials Identifier ASS-RPAS.03-008 Title Surveillance – availability of ADS-B Type of Assumption DAA enabler Description All the involved traffic has to be equipped with ADS-B out Justification DAA technology is based on ADS-B communication protocol Flight Phase All KPA Impacted Safety, System Performance Source DAA specification Value(s) N/A Owner CIRA/MATS/NIMBUS Impact on Assessment DAA assessment Identifier ASS-RPAS.03-009 Title Departure and arrival operations performed by the OP Type of Assumption Flight Trials enabler Description The departure and arrival operations have to be performed by the Optional Pilot on board the FLARE. Justification Automatic take-off and landing operations are not covered by the demonstration. This assumption is strictly related to ASS-RPAS.03-001, since the presence of the pilot on-board for terminal operations will facilitate the obtainment of the permit to fly. Flight Phase Departure and arrival 90 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 KPA Impacted Safety, Human Performance Source Maltese and EU aviation regulation Value(s) N/A Owner CIRA Impact on Assessment Flight trials feasibility Identifier ASS-RPAS.03-010 Title Use of cooperative traffic in Flight Trials for Traffic Scenario Avoidance. Type of Assumption Demonstration Enabler Description The in-flight tests with actual traffic will make the assumption that the whole air traffic (including Nimbus UAS) is able to broadcast ADS-B data (ADS_B OUT) in order to allow the proper execution of the Traffic avoidance test. Justification DAA System is based on ADS-B. Flight Phase En-Route. Traffic Avoidance KPA Impacted Safety Source Project Team Value(s) N/A Owner CIRA-MATS-Nimbus Impact on Assessment Feasibility of DAA assessment 4.6 Demonstration Exercises List This demonstration is planned to be performed through three consecutive exercises: • • • EXE-RPAS.03-001 EXE-RPAS.03-002 EXE-RPAS.03-003 The outputs of each exercise present at the same time input for the following exercise. In addition, the fulfilment of one exercise is considered as stringent requirement for the execution of the subsequent one. EXE-RPAS.03-001 is foreseen as a real-time simulation, while EXE-RPAS.03-002 and EXERPAS.03-003 are planned as live trials to be performed within Malta airspace. 91 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Technical Instances Safety Security Human Performance Objectives per KPA Capacity EXE- RPAS.03EXE- RPAS.03EXE RPAS.03001 RTS 002 LT1 003 LT2 OBJ- RPAS.03-HP001 X X X OBJ- RPAS.03-HP002 X X X OBJ- RPAS.03-HP003 X X X OBJ- RPAS.03-HP004 X X X OBJ- RPAS.03-HP005 X X X OBJ- RPAS.03-HP006 X X X OBJ- RPAS.03-HP007 X X X OBJ- RPAS.03-HP008 X X X OBJ- RPAS.03-SEC001 X X OBJ- RPAS.03-SEC002 X X OBJ- RPAS.03-SEC003 X X OBJ- RPAS.03-SEC004 X X OBJ- RPAS.03-SAF001 X X OBJ- RPAS.03-SAF002 X X OBJ- RPAS.03-SAF003 X X X OBJ- RPAS.03-SAF004 X X X OBJ- RPAS.03-SAF005 X X OBJ- RPAS.03-PER001 X X OBJ- RPAS.03-PER002 X X OBJ- RPAS.03-PER003 X X OBJ- RPAS.03-PER004 X X OBJ- RPAS.03-CAP001 X X Table 16: Mapping of Demonstration Objectives per KPA and Exercise 4.7 Demonstration Exercises Planning In the picture below a GANNT providing an overview of the exercises scheduling and planning is provided. 92 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 93 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 5 Demonstration Activities 5.1 Demonstration Exercise #1 Plan 5.1.1 Exercise Scope and Justification This exercise addresses the introduction of the RPAS in en-route operations in both segregated and non-segregated airspace by means of real time simulations. In this phase of the demonstration, real time simulations are also advantageous as they provide a possibility to investigate into the safety and security aspects. At the same time this exercise will enable the identification of the adequate operating procedures and working methods to be applied and tested during the following live flight trials. 5.1.1.1 Exercise Level Real-Time Simulation. 5.1.1.2 Description of the Operational concept being addressed The operational concept addressed in this exercise is the RPAS integration in the ATM system, with a specific focus on the en-route phase. The standard existing ATC procedures will be tested in a simulation platform and any emerging need for modification to current procedures and operating methods or creation of new ones will be investigated. In order to address the demonstration objectives some RPAS supporting technologies will be put in place. The RPAS supporting technologies that will be addressed within this demonstration exercise are: • The Detect and Avoid technology, focusing on solutions specifically based on the use of ADSB and TIS-B technology, and are compatible with the existing safety nets; • The C2L (and Communication or C3L) security technologies, focusing on the ability to support the identification of data-link and communications errors due to spoofing, and on improving the general C2L robustness and integrity. 5.1.1.3 Stakeholders and their expectations Stakeholder External / Internal CIRA Internal Deep Blue Internal University of Malta Internal Involvement Why it matters to stakeholder/ Performance expectations Project Coordinator. CIRA expects to improve the level of maturity of its RPAS operator. DAA DAA technology. Furthermore, CIRA can also System Developer qualify itself as an RPAS operator able to provide all the support in using a RPAS system for experimental activities. Responsible for Deep Blue expects to consolidate its knowledge in Scenario definition, the field of Validation. Deep Blue expects to Demonstration Plan increase its well-grounded experience in the field of definition, Flight Safety by applying the methodology of Safety Demonstration Assessment to the RPAS case. Safety Assessment. Contributor to Real Time Simulations and Flight Trials as Human Performance, Safety and Operational experts. Design of simulation UOM expects to consolidate capacity to carry out campaign supporting simulations and evaluate results. 94 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan MATS Internal NAIS Internal Edition 02.01.00 its execution. Providing simulation and ATCO involvement Support the concept and improve the idea that ATM procedures for RPAS should be as those applicable to manned aircraft, thus the provision ATC service to such craft should be transparent to ATC controller. Support to definition NAIS expects to improve its knowledge in failure of security threats to propagation due to security threat in RPAS and be introduced at ATM domain. simulation level, Security Assessment Table 17: Stakeholders' expectations 5.1.1.4 Demonstration objectives and hypothesis Obj. Identifier Hypothesis Indicators/Metrics OBJRPAS.03HP001 The changes of operating methods and procedures emerging from the introduction of the RPAS are feasible and consistent within the overall context. Remote Pilot’s and acceptability of the changes OBJRPAS.03HP002 The introduction of the RPAS has no negative impact on the pilots’ and controllers’ task performance. OBJRPAS.03HP003 The changes in the task allocation will not have a negative impact on interaction between the pilot and the system. OBJRPAS.03HP004 The accuracy and timeliness of information of the assessed technologies (C2L and DAA) is sufficient to support pilot’s task performance. OBJRPAS.03HP005 The introduction of the RPAS in managed airspace does not require major modifications of the existing HMI (both for the controller and the remote pilot). OBJRPAS.03HP006 The introduction of the RPAS has no negative impact on the pilots’ and controllers’ communication. OBJRPAS.03HP007 The new concept and changes it brings to the current way of working are considered acceptable by involved human actors (pilots and controllers). Pilots’ and controllers’ acceptability of the new concept OBJRPAS.03- The introduction of the RPAS will imply the need for additional training, skills and Discrepancies between current and RPAS required knowledge, skills and ATCO’s Situational awareness Error propensity Workload Actions’ timeliness Consistency with automation principles Pilot’s workload Situational awareness Trust in the system Actions’ timeliness Accuracy, effectiveness and timeliness of information provided by the technology HMI usability and suitability Discrepancies between systemprovided and human-required information Error propensity Situational awareness Workload Communication load Situational awareness Effectiveness and timeliness of the communication (means, modalities, phraseology, etc.) 95 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 HP008 expertise. expertise OBJRPAS.03SEC001 Emergency management is jeopardised by GNSS spoofing attacks Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SEC002 Spoofing attack deteriorates the Remote Piloting capability Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SEC003 Jamming on the telemetry jeopardises the Remote Piloting capability Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SEC004 Collision avoidance technology jeopardised by a GNSS spoofing attack is Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SAF001 The normal operation of procedures associated with the DAA technologies do not compromise the continued safety of operation Stakeholder workload, risk of error, risk of accident resulting from expected response to D&A function outputs. OBJRPAS.03SAF002 The normal operation of procedures associated with the C2L link do not compromise the continued safety of operation Stakeholder workload, risk of continued traffic conflict, risk of error. OBJRPAS.03SAF003 The human performance do not compromise the continued safety of operation Stakeholder workload, risk of error. OBJRPAS.03SAF004 The failure (complete/partial/loss of integrity) of the DAA technologies and C2L link do not compromise the continued safety of operation Impact of emergency / recovery procedures & manoeuvres on continued safety, including effects of stakeholder workload and implication of resulting vehicle manoeuvre. OBJRPAS.03SAF005 The jamming and spoofing of the DAA technologies and C2L link do not compromise the continued safety of operation. The impact of the resulting RPAS manoeuvre and stakeholder workload on continued safety. OBJRPAS.03PER001 The minimum distance value (i.e. the distance at the Closest Point of Approach) is expected to be not lower than the allowed one. In other words, the separation volume set for other traffic shall not be infringed in the considered test case. The distance between RPAS and air traffic at the CPA. OBJRPAS.03PER002 It is expected that the total number of cases where the self-separation algorithm has not been able to avoid the separation volume breach is lower than a percent threshold (to be set during the project development). The total number of infringements OBJRPAS.03PER003 It is expected that the maximum deviation is compatible with the needs of assuring the safe execution of the separation manoeuver while at the same time reducing the nuisance as much as possible (these two The deviation from the optimal flight path. 96 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 aims are in trade-off). OBJRPAS.03PER004 It is expected that the time delay deviation is compatible with the needs of assuring the safe execution of the separation manoeuver while at the same time reducing the nuisance as much as possible (these two aims are in trade-off). The difference in actual and planned time to reach the destination waypoint OBJRPAS.03CAP001 The introduction of RPAS has no negative impact on en-route throughput in terms of number of movements per volume of the considered airspace. Number of movements per volume of considered en-route airspace per hour does not decrease with the introduction of RPAS. Table 18: Exercise specific Demonstration Objectives and related hypotheses 5.1.1.5 Demonstration scenarios SCN–RPAS.03-001 En-Route Operations of the RPAS, entering and leaving a Temporary Segregated Area from/to an unrestricted managed airspace; SCN–RPAS.03-002 En-Route Operations of the RPAS in presence of potentially conflicting manned traffic; SCN–RPAS.03-003 Detect and Avoid (Collision Avoidance Function); SCN–RPAS.03-004 Detect and Avoid testing (Traffic Avoidance) – One manned vehicle involved; SCN–RPAS.03-005 Detect and Avoid testing (Traffic Avoidance) – Multiple manned vehicles involved; SCN–RPAS.03-007 En-Route Operations of the RPAS, under C3L security threats (spoofing, jamming). 5.1.1.5.1 Reference & Solution Scenarios To allow for the assessment of the impact that RPAS integration will have on the current ATC environment, it is necessary to have a baseline against which the comparison of the obtained results can be performed. This baseline is the current ATC environment (managed airspace) with realistic traffic load and existing procedures (i.e. TSA management). The solution scenarios address both the feasibility of RPAS flying in a simulated managed airspace and performing a mission in a TSA as well as application of DAA functionalities to ensure traffic and conflict avoidance. The degraded scenario will also be addressed through the introduction of security threats such as spoofing and jamming. 5.1.1.5.2 Additional Information N/A 5.1.1.6 Exercise Assumptions In the following table the exercise related assumptions are listed. A detailed description of the assumptions is provided in section 4.5. 97 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Assumption Identifier Assumption Title ASS-RPAS.03-002 Adequate time availability and volumes of TSAs ASS-RPAS.03-003 Communication between remote pilot and ATCOs ASS-RPAS.03-004 Communication between RPAS simulator and ATC simulator ASS-RPAS.03-008 Surveillance – availability of ADS-B Table 19: Exercise 1 assumptions 5.1.1.7 Exercise Tool, Demonstration Technique The demonstration technique for the Exercise #1 is based on real time simulations with human in the loop. To accomplish this exercise, a complete simulation environment will be provided by CIRA and MATS, which is composed of ATC, UAS and traffic simulation tools. Figure 7 presents at high level the simulation environment, which will be put in place for the exercise. Figure 7 – Simulation Environment The UAS simulator is composed by the following modules: • UAV Real-Time simulator which simulates the UAV dynamical model and performances and emulates the on-board software. The simulator runs on DSPACE Hardware. • Actual Remote Piloting Station (RPS) with pilot in the loop. The human machine interface reproduces a typical cockpit instrumentations developed in VAPS-XT environment, whereas the out of window is simulated through Flight Gear. • Ground Control Station (GCS) which allows • managing the simulation through SW application generated by using DSPACE Control Desk environment; • sending to and receiving from the on-board software information related to the flight status • Ethernet LAN for C2L internal exchange. 98 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan • Edition 02.01.00 Audio communication by telephone between UAS pilot and ATCOs. The simulated Traffic is reproduced through pre-fixed trajectories, which are generated in VsTasker or Matlab/Simulink environment. Traffic data, together with the UAS data, are sent on the ATN through the Ethernet using the Eurocontrol ASTERIX protocol. The MATS ATC radar simulator is based on the actual radar system used to provide Air traffic Control by MATS. It is used to train radar controllers in approach and ACC environment with the ability to combine both ACC and APP exercises simultaneously. It can generate any kind of traffic and it is managed through two pseudo pilot positions. All safety parameters and tools available on the actual radar system are also available on this simulator such as STCA, APW, MSAW etc. Danger, Restricted and Segregated areas of any shape and with any lateral and vertical limits can be generated. The technique used to run this simulator is based on the same technique radar controllers use in the real environment. The ATC simulator presents the following constraints: currently this simulator is unable to connect with external sources like simulated traffic generators since MATS did not need this requirement when such a simulator was purchased. However, a software and hardware intervention by the manufacturer (at a cost) will make this simulator capable of connecting with other sources. In order to avoid problems that may arise from the data exchange between the different components of the test beds which are deployed in CIRA and MATS premises, the ASTERIX standard has been selected to be the data format within simulation rig. The ATC Radar facility that will be used for RT-simulations, can be either connected to actual radar equipment or to another traffic simulator from which can receive data through the network. It can also generate internally simulated data. A preliminary assessment of the connection between the simulation rig and the ATC Radar simulator has been performed and its feasibility has been confirmed. 5.1.2 Exercises Planning and management 5.1.2.1 Activities General activities to be performed for the demonstration exercise within the preparatory, execution and post-execution phase are explained below. 5.1.2.1.1 Preparatory activities For the preparation of this demonstration exercise, the following activities are performed: • Identification of low-level objectives to be addressed within this exercise in support to demonstration high-level project objectives • Definition of the scenarios that will allow for the collection of the required data (for nominal, nonnominal and degraded operations) • Preparation of the Demonstration Plan • Preparation of a detailed experimental plan • ATC simulator setup and configuration • RPAS simulator setup and configuration • Preparation of the systems logs (for the quantitative data collection) • Preparation of the supporting material (for the qualitative data collection) • Familiarisation of the controllers with appropriate knowledge of RPAS concepts, operational settings and procedures under analysis • Training of the remote pilots 99 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 • Hands-on sessions to allow pilots to familiarise with operational environment. Technical experts will provide coaching during this activity. • Q&A sessions to address cases encountered during the hands-on activities; alternatively standard training exercises will be reviewed and discussed in group sessions. 5.1.2.1.2 Execution activities Following execution activities are foreseen for this exercise: • Performance of the exercise runs in support to the identified scenarios (nominal, non-nominal and degraded) • Observations of actions of the involved actors during the runs • Monitoring of the systems (RPAS simulator and ATC simulator, with the special attention to the C2L and DAA technologies) • Collection of the data for the further analyses (both qualitative and quantitative) • De-briefings (post-run and post-exercises) and collection of feedback of the participants 5.1.2.1.3 Post execution activities All simulations are recorded and can be replayed as required and could be stored for future need. The air traffic controllers used to perform the exercise would be available for a post exercise brief. When the exercise is finalised, the following activities will be carried out: • Analyses of the quantitative and qualitative data in relation to the demonstration objectives (hypothesis, success criteria, low-level and high-level objectives) • Exercise reporting (to be incorporated into overall Demonstration Report) • Review of the exercise results and accordingly adaptations of the experimental plan and inputs for the following exercises (live trials). 5.1.2.2 Roles & Responsibilities in the exercise The following actors will participate in the exercise, with the following responsibilities: Role Responsibilities Senior HF Expert Experimental framework set up Coordination of HF activities; Coordination of results analysis Junior HF Expert Preparation of supporting material; Observations; Qualitative data collection; Qualitative data analysis Information collection about quantitative data format; Monitoring of the data collection; Quantitative data analysis Identify likely security threats. Specify simulation requirements. Assess impact on impact areas (see par. 4.3.2) Definition of safety related activities; Coordination of safety related activities; Data Analyst for HP and Safety aspects Security Expert Senior Safety Expert 100 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Role Responsibilities Coordination of safety related data analysis Junior Safety Expert Preparation of supporting material; data collection; data analysis Operations as Remote Pilot in RT-Simulation; Interaction with ATCo in IFR type of operations. Prepare the Real-Time simulation facilities and Integration for simulated tests Implementation and integration in RT Simulation test-beds Integration of DAA system in RT simulation facilities; Definition of test scenarios and metrics; Results Analysis for Simulated tests on DAA system. Collect and analyse simulated data for DAA system performance evaluation. Simulation environment customisation & integration Define, activate and deactivate the TSA; Define standard operating procedures; Coordinate simulations and operational activities Provide air traffic control activities to both simulations and real operations Coordinate ATC simulator activities with ATC operational expert Operate the ATC simulator RPAS Pilot Modelling & Simulation Engineers Control Engineers Decision Support System Development Engineers Data Analysis Experts for DAA Simulation engineer ATC Operations Expert Air Traffic Control Officers ATC Simulator Expert Pseudo ATC Simulator Pilots MATS Safety Expert Conduct safety assessments with regard to TSA activation and operations Table 20: Roles and Responsibilities 5.1.2.3 Human Resources Following a table resuming the human resources distribution in Person/Month for each partner is presented. Effort (Person/Month) Activities Preparatory Execution PostExercise TOTAL by resource provider (units) TOTAL CIRA DBLUE MATS NAIS UoM 3 2 2 2 2 2 2 1 2 1 1 2 1 2 3 6 6 4 6 6 28 101 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Effort (Person/Month) Activities CIRA DBLUE MATS NAIS UoM (units) Table 21: Human Resources distribution for Exercise 1 5.1.2.4 Procedure development MATS will use the current procedures as used in the real environment in accordance with ICAO, EUROCONTROL, EASA recommendations and local regulations. Examples of procedures used in such scenarios are: • traffic information • information regarding unidentified traffic • conflicting traffic avoidance procedures • area infringement warning procedures • level bust procedures • lack or unreliable transponder mode A and Mode C. • creation, dismissal and use (clearance to entrance and exit) of a Temporary Segregated Area. A number of dedicated operating procedures are foreseen to be developed for operating the RPAS in the non-segregated traffic environment: • ATC handling procedures for RPAS (in nominal, non-nominal and degraded conditions); Any adaptation or modification needs to standard procedures that are identified during the Real Time Simulation may be eventually implemented in the exercises that follow. 5.1.2.5 System modifications As mentioned in 5.1.1.7 a modification to the current MATS radar simulator is required to enable it to receive data from external sources in ASTERIX protocol. Adaptations to the SW modules implementing DAA functionalities and HMI are not needed, since they have been previously tested by CIRA in different application environments. The foreseen system modifications aim at providing integration between the CIRA SW and the RTSimulator with Human-in-the-Loop. Since the DAA software modules and HMI have been completely developed in-house by CIRA and are continuously maintained and improved as main assets of the organization, the technical risks associated to software adaptation are considered low. The Risk Table in §3.8 includes this element. The effort charged on the RAID project specifically refers only to the activities required for the fine adaptation of the SW modules to the scenarios/requirements specific to the RAID project. The following adaptations of the RPAS simulator are required for this exercise: • Integration of the Traffic Avoidance algorithm in the Flight Control SW and related interfaces updating • Integration of the Traffic Avoidance HMI in the RPS cockpit, These activities mainly affect the Flight Control SW and the RPS HMI. Precisely: • The modification of the current Flight Control SW revision by means of integration of the available Separation algorithm for manned application. This activity shall also identify the interface changes necessary to correctly provide input data to the Separation functionality and to interact with the RP by means of a dedicated HMI in the RPS cockpit (see next point) 102 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan • Edition 02.01.00 the HMI in the RPS cockpit that shall include a dedicated instrument with the aim to visualize the traffic around the vehicle and to provide information to the RP about possible conflicts and the relative resolution manoeuvres The Flight Control SW and the RPS HMI modifications need to be verified before the Exercise demonstration, so a specific set of preliminary test shall be performed. Furthermore, also the following preparatory activities will be performed: • Adaptation of the FDR of the UAS simulator: the current simulator’s FDR should be modified in order to include all the information required for the demonstration assessment; • Protocol adaptation: the UAS and Traffic simulators currently send their outputs on the Ethernet through UDP protocol where the information are encoded using a proprietary CIRA standard. This protocol should be replaced by the Eurocontrol ASTERIX one, in order to be compliant with the ATC simulator; • Integration of the Traffic Avoidance Technology into the emulated on-board software. 5.1.2.6 Flight trials N/A 5.1.2.7 Training • Familiarisation of the controllers with appropriate knowledge of RPAS concepts, operational settings and procedures under analysis • Training of the remote pilots 5.1.2.8 Time planning Activity Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Preparatory Scenario 1 and 2 Preparatory Scenario 3, 4 and 5 6 Preparatory Scenario 7 Execution Scenario 1 and 2 Execution Scenario 3, 4 and 5 6 Execution Scenario 7 Post- 103 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Activity Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Exercise Scenario 1 and 2 PostExercise Scenario 3, 4 and 5 6 Post Exercise Scenario 7 Table 22: Detailed time planning The planned starting date for the Exercise 1 preparatory activities has been set in end of July 2014 and the closing date of the Post-exercise activities is foreseen in the first decade of December 2014. 5.1.3 Results Analysis Specification 5.1.3.1 Data collection methods Data collected during the exercise will be both qualitative and quantitative. Qualitative data will be collected by Human Factors experts and Safety experts and will consist of: • Direct “over the shoulder” observation of ATCOs and remote pilots; • ATCOs and remote pilots’ descriptive feedback collection during de-briefing (after each run and at the end of the exercise); • Interviews Questionnaires used for the subjective assessment of both ATCOs and pilots on the validated concept specifically tailored for the exercise. Qualitative data will be collected by means of paper and electronic support tools (spreadsheets, worksheets, checklists, questionnaires) and multimedia (photos, audio and video recording). What is important to notice is that interviews, debriefings, questionnaires and over-the-shoulders observations are deeply interconnected techniques. This means that on one hand, data collected though the observations and the questionnaires are then verified and discussed during the debriefings and interviews, and on the other hand insights that emerge during the debriefings are then used to guide the next observations. The triangulation of results coming from different techniques ensures validity and reliability of the validation results. • Quantitative data will be collected by Simulator Engineers, Human Factors experts, Safety experts, Security experts and will consist of: • ATCOs and remote pilots’ feedback collection by means of electronic standard questionnaires (those that incorporate rating scales or predefined sets of standard values for assessment of performance); • RPAS simulator (provided by the FDR) and ATC simulator’s logs; • Safety nets related logs; • DAA and C2L related logs; • Security related logs. 104 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 5.1.3.2 Analysis method The analysis of the data obtained during the RTS (quantitative data logs and subjective assessments of the exercise participants collected through questionnaires, interviews and debriefings) will be performed against the objectives of the simulation and the associated hypotheses and indicators. Given that the number of runs will provide a limited set of data possibly not sufficient for the statistical analysis, it is anticipated that the results will mostly rely on the qualitative assessment. 5.1.3.3 Data logging requirements ATC simulator and RPAS simulator will produce logs in Asterix format. The following RPAS state variables as function of simulation time can be recorded: • Position • Barometric Altitude • Attitude • Track angle • IAS speed • TAS speed • Ground Speed • Vertical Speed • Wind speed • Wind direction Additional variables to be recorder (always as time histories) are: Other traffic For each target indicated by the ADS-B IN Surveillance System on-board the ownship (RPAS) vehicle: • position data • velocity data • target identifier • TCAS equipment Traffic Avoidance System • diagnostic signal of the traffic avoidance algorithm • logical state signal of the traffic avoidance algorithm • conflict flag associated to each considered intruder • predicted time to Closest Point of Approach associated to each considered intruder • predicted time to First Loss of Separation associated to each considered intruder • planar dimension of the separation volume associated to each considered intruder • vertical dimension of the separation volume associated to each considered intruder • longitudinal reference command issued by the traffic avoidance algorithm • lateral reference command issued by the traffic avoidance algorithm • speed reference command issued by the traffic avoidance algorithm Collision Avoidance System • diagnostic signal of the collision avoidance algorithm • logical state signal of the collision avoidance algorithm • collision flag associated to each considered intruder 105 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 • predicted time to Closest Point of Approach associated to each considered intruder • predicted time to collision volume breach associated to each considered intruder • radius of the collision avoidance volume associated to each considered intruder • longitudinal reference command issued by the collision avoidance algorithm • lateral reference command issued by the collision avoidance algorithm • speed reference command issued by the collision avoidance algorithm. 5.1.4 Level of representativeness/limitations Representativeness: • All the ATC procedures are covered; • Emergency procedures are addressed; • DAA is tested in all the foreseen traffic conditions; • Security threats are addressed. Limitations (related to RTS methodology): • Mathematical model of the flight; • Mathematical model of the traffic; • Limited amount of collaborative manned traffic (pseudo-pilots). 5.2 Demonstration Exercise #2 Plan 5.2.1 Exercise Scope and Justification This exercise addresses the introduction of the RPAS in en-route operations in segregated airspace through the means of flight trials. In this phase of the demonstration, flight trials in segregated airspace will also provide an input for the further investigation into the feasibility of following flight trial in non-segregated airspace (Exercise #3). Furthermore in the segregated airspace, a GNSS spoofing attack will be emulated to assess the impact on the RPAS and in particular on the Remote Pilot behaviour. 5.2.1.1 Exercise Level Flight trial (segregated area). 5.2.1.2 Description of the Operational concept being addressed The RPAS supporting technology that will be addressed within this demonstration exercise is the C2L (and Communication or C3L) security technologies, focusing on the safety risks related to security breaches such as GNSS spoofing. The TSA1 related procedures will be addressed within this demonstration exercise. 5.2.1.3 Stakeholders and their expectations Stakeholder External Involvement / Internal Why it matters to stakeholder/ Performance expectations CIRA Internal Project Coordinator. CIRA expects to improve the level of maturity of its RPAS operator. DAA DAA technology. Furthermore, CIRA can also System Developer qualify itself as an RPAS operator able to provide all the support in using a RPAS system for experimental activities. Deep Blue Internal Responsible for Deep Blue expects to consolidate its knowledge in 106 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Scenario definition, Demonstration Plan definition, Flight Demonstration Safety Assessment. Contributor to Real Time Simulations and Flight Trials as Human Performance, Safety and Operational experts. the field of Validation. Deep Blue expects to increase its well-grounded experience in the field of Safety by applying the methodology of Safety Assessment to the RPAS case. University of Internal Malta Design of simulation and flight test campaigns, support in their execution, coordination in legal issues relating to the permit to fly and results evaluation. UOM expects to consolidate capacity to carry out flight tests and evaluate results and will, with MATS and the local authorities, bring into Malta the RPAS domain of such activities. It also intends to exploit the effort of establishing a legal and operational framework in which to operate RPAS testing in Malta in the future, thus facilitating further involvement in RPAS flight test in the country. MATS Internal Providing simulation Support the concept and improve the idea that ATM and ATCO procedures for RPAS should be as those applicable involvement to manned aircraft, thus the provision ATC service to such craft should be transparent to ATC controller. NAIS Internal Support to definition Improved knowledge of GNSS security threats, their of security threats to related scenario and actual system impact be introduced. Supplier and manager of the technology for the security threat emulation Table 23: Stakeholders' expectations 5.2.1.4 Demonstration objectives and hypothesis Obj. Identifier Hypothesis Indicators/Metrics OBJRPAS.03 -HP001 The changes of operating methods and procedures emerging from the introduction of the RPAS are feasible and consistent within the overall context. Remote Pilot’s and ATCO’s acceptability of the changes OBJRPAS.03 -HP002 The introduction of the RPAS has no negative impact on the pilots’ and controllers’ task performance. Situational awareness Error propensity Workload Actions’ timeliness OBJRPAS.03 -HP003 The changes in the task allocation will not have a negative impact on interaction between the pilot and the system. Consistency with automation principles Pilot’s workload 107 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Situational awareness Trust in the system Actions’ timeliness OBJRPAS.03 -HP004 The accuracy and timeliness of information of the assessed technologies (C2L and DAA) is sufficient to support pilot’s task performance. Accuracy, effectiveness and timeliness of information provided by the technology OBJRPAS.03 -HP005 The introduction of the RPAS in managed airspace does not require major modifications of the existing HMI (both for the controller and the remote pilot). HMI usability and suitability Discrepancies between system-provided and human-required information Error propensity Situational awareness Workload OBJRPAS.03 -HP006 The introduction of the RPAS has no negative impact on the pilots’ and controllers’ communication. Communication load Situational awareness Effectiveness and timeliness of the communication (means, modalities, phraseology, etc.) OBJRPAS.03 -HP007 The new concept and changes it brings to the current way of working are considered acceptable by involved human actors (pilots and controllers). Pilots’ and controllers’ acceptability of the new concept OBJRPAS.03 -HP008 The introduction of the RPAS will imply the need for additional training, skills and expertise. Discrepancies between current and RPAS required knowledge, skills and expertise OBJRPAS.03SEC001 Emergency management is jeopardised by GNSS spoofing attacks Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SEC002 Spoofing attack deteriorates the Remote Piloting capability Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SEC003 Jamming on the telemetry jeopardises the Remote Piloting capability Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03SEC004 Collision avoidance technology jeopardised by a GNSS spoofing attack is Impact will be assessed following the metrics identified in 4.3.2 OBJRPAS.03 -SAF002 The normal operation of procedures associated with the C2L link do not compromise the continued safety of operation Stakeholder workload, risk of continued traffic conflict, risk of error. OBJRPAS.03 - SAF003 The human performance do not compromise the continued safety of operation Stakeholder workload, risk of error. OBJRPAS.03 - SAF004 The failure (complete/partial/loss of integrity) of the DAA technologies and C2L link do not compromise the continued safety of operation Impact of emergency / recovery procedures & manoeuvres on continued safety, including effects of stakeholder workload and implication of resulting 108 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 vehicle manoeuvre. OBJRPAS.03 - SAF005 The jamming and spoofing of the DAA The impact of the resulting RPAS technologies and C2L link do not manoeuvre and stakeholder workload compromise the continued safety of on continued safety. operation. Table 24: Exercise Objectives and related hypotheses 5.2.1.5 Demonstration scenarios SCN–RPAS.03-001 En-Route Operations of the RPAS, entering and leaving a Temporary Segregated Area from/to an unrestricted managed airspace; SCN–RPAS.03-007 En-Route Operations of the RPAS, under C3L security threats (spoofing, jamming). 5.2.1.5.1 Reference & Solution Scenarios To allow for the assessment of the impact that RPAS integration will have on the current procedures, it is necessary to have a baseline against which the comparison of the obtained results can be performed. This baseline therefore refers to the current procedures with the pilot on-board, while the solution scenario investigates into the feasibility of RPAS flying procedures (remote piloting entering and performing a mission in a TSA). The degraded scenario will also be addressed through the introduction of security threats such as spoofing and jamming. 5.2.1.5.2 Additional Information N/A 5.2.1.6 Exercise Assumptions In the following table the exercise related assumptions are listed. A detailed description of the assumptions is provided in section 4.5. Assumption Identifier Assumption Title ASS-RPAS.03-001 FLARE Permit to fly ASS-RPAS.03-002 Adequate time availability and volumes of TSA ASS-RPAS.03-003 Communication between remote pilot and ATCOs ASS-RPAS.03-005 Weather conditions (FLARE) ASS-RPAS.03-008 ASS-RPAS.03-009 Surveillance – availability of ADS-B Departure and arrival operations performed by the OP Table 25: Exercise 2 related assumptions 5.2.1.7 Exercise Tool, Demonstration Technique The demonstration technique for EXE–RPAS.03-002 is a flight test session formed by four flight trials. FLARE 109 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan • • Edition 02.01.00 CIRA will provide a FLARE Optionally Piloted System, an experimental facility composed of: FLARE Optionally Piloted Aircraft: a TECNAM P92 VLA-class aircraft extensively modified in order to obtain an avionic flying test bed with RPAS capabilities. Ground Control Station: housed in a movable shelter and equipped with the remote pilot station and the control working positions for mission management. Data-link: for the video and data exchange between FLARE and Ground Control Station. FLARE Optionally Piloted Aircraft (OPA) is the Flying Test Bed developed by CIRA in order to carry out in flight validation of UAS and GNC enabling technologies. An Optionally Piloted Aircraft is a hybrid vehicle, able to fly with or without a human crew on board the aircraft, it is remotely piloted by a ground pilot which can interface directly with the on-board flight control system, or send just high-level commands to the on-board flight control computer that is able to manage autonomously the flight mission. The flight control computer can be charged to carry out the entire flight mission or just some phases of it. These remotely operations are possible by means of a wireless radio link between the OPA and the remote flight control station, located both on the ground and on-board another aircraft. OPAs usually have both a pilot on board and in the remote control station. The facility of hosting the crew on board offered by OPAs can prompt the designers to choose off-the shelf certified aircrafts as baseline airframes for OPAs. The baseline aircraft chosen by CIRA as Flying Test Bed, named FLARE Flying Laboratory for Aeronautical Research (FLARE), is the TECNAM P92-Echo S, VLA category. The mounted powerplant is a Rotax 912 ULS2 100 Hp, four-cylinder, four-stroke. The engine is coupled with a two blade fixed pitch propeller. The P92-Echo S was selected due to • • its excellent VLA flying characteristics, that allow it to be operated on very short semiprepared/grass airstrips; the low costs related to its modifications, operations and maintenance. The following table summarizes the TECNAM P92-Echo S main features and performances, whereas the subsequent figure shows a three-view drawing of the aircraft. SPECIFICATIONS ENGINE Manufacturer Model Power Number of cylinders PROPELLER Manufacturer Model Number of Blades Type DESIGN WEIGHT & LOADING MTOW Baggage Allowance Limit Loads Ultimate Loads DIMENSIONS Fuselage Height ROTAX 912 ULS 98 hp 4 GT PROPELLER GT-2/173/VRR-SRTC FW101 2 FIX PITCH - WOOD 600 kg 20 kg +4/-2 G +6/-3 G 2,5 m 110 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Fuselage Length 6,3 m Wing Span 9,6 m Cabin Width 1,06 m Cabin Height (Seat to cover) 0,91 m Fuel Tank Capacity 45 x2 lt PERFORMANCE (15 °C Sea Level - 450 kg) VMAX 222 km/h Cruise Speed 75% 204 km/h VNE 260 km/h Stall Speed (Flaps down - Power off) 65 km/h Practical Ceiling 4572 m Take-off Run 100 m Take-off Distance 200 m Landing Run 90 m Landing Distance 250 m Rate of Climb 6,1 m/s Range 503 Nautical Miles Table 26: TECNAM P92 Echo S specifications Figure 8: TECNAM P92 Echo S Modifications to the aircraft were needed in order to accommodate on board all the experimental avionics. In order to allocate the major portion of the equipment inside the cabin (and therefore, to facilitate installation and maintenance activities) the left seat has been removed and the resulted space has been used to this purpose, together with that of the baggage bay. For a more rational installation of the embarked systems two mounting trays have been installed in place of the left seat rails and of the baggage bay. The remote piloting camera and related mounting support has been installed on the upper side of the wing. The peculiar antennas have been installed on the upper wing (n. 4) and on the bottom fuselage (n. 3). 111 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 An auxiliary alternator to provide the required electrical power has been installed in the engine bay. . Moreover, a new propeller with a reduced blade pitch has been installed in order to minimize the weight growth impact on the aircraft performance. All modifications have been made with the aircraft manufacturer formal approval. The figure below shows a 3D view of the FLARE. Figure 9: FLARE Optionally Piloted Aircraft DATA-LINK The Data-Link System has been designed in order to provide effective communication between RPAS and Ground Control Station. The system is able to manage the receiving and the transmission of: • • • • Housekeeping data Command & Control data Remote Piloting Video Payload data FLARE Data-Link is formed by two separate simplex mono-directional channels: • • The Wide Band Data Link, devoted to the downlink and has a 12 Mbps bitrate; The Narrow Band Data Link, devoted to the uplink (with 1 Mbps bit-rate). The table below reports the FLARE- Data Link system specifications. 112 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Table 27: FLARE-Data Link Datasheet 5.2.2 Exercises Planning and management 5.2.2.1 Activities General activities to be performed for this demonstration exercise within the preparatory, execution and post-execution phases are explained below. 5.2.2.1.1 Preparatory activities For the preparation of this demonstration exercise, the following activities are performed: • Identification of low-level objectives to be addressed within this exercise in support to demonstration high-level project objectives; • Definition of the scenarios that will allow the collection of the required data (for nominal, nonnominal and degraded operations); • Preparation of the Demonstration Plan; • Preparation of a detailed experimental plan; • RPAS setup and configuration; 113 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 • Preparation of the systems logs (for the quantitative data collection); • Preparation of the supporting material (for the qualitative data collection); • Training of the remote and on-board pilots; • Q&A sessions to address questions emerging before the flight trial; alternatively standard training exercises will be reviewed and discussed within in group sessions. As the FLARE Permit To Fly from the Malta Aviation Authorities is a preliminary requirement for the exercise execution, a formal request for it will be submitted by CIRA. The Ground Control Station will be installed in a properly chosen site in order to guarantee the best data-link coverage of the airspace that will be used during the tests. The FLARE System shall be transported to the Luqa aerodrome a month before the beginning of the exercise in order to fulfil extensive on-ground activities. In this phase a shakedown of the systems involved and a rehearsal of the test procedures will be performed. At the same time a detailed planning of the flight missions will be carried out and will conclude with the issue of the “Flight Test Card” document. 5.2.2.1.2 Execution activities The following execution activities are foreseen for this exercise: • Execution of the flight trials; • Observations of the performance of the involved actors during the runs; • Monitoring of the systems (RPAS and ATC system, with the special attention to the C2L technology); • Collection of the data for further analyses (both qualitative and quantitative); • De-briefings (post-run and post-exercises) and collection of feedback from the participants. 5.2.2.1.3 Post execution activities Post execution activities are mainly related to the analysis and examination of the data acquired, along the critical review of the records of the communications between ATCOs and the RPAS pilot. All the analysed data and the performance evaluation results will be presented in the final test report plan. Once the exercise is finalised, the following activities will be carried out: • A debriefing between ATCOs, RPAS pilot and FLARE on board safety pilot will be held after the execution phase to compile any questionnaire and record any special event arisen; • Analyses of the quantitative and qualitative data in relation to the demonstration objectives (hypothesis, success criteria, low-level and high-level objectives); • Exercise reporting (to be incorporated into overall Demonstration Report); • Review of the exercise results to provide accordingly adaptations of the experimental plan and inputs for the following exercise (live trial in non-segregated airspace). 5.2.2.2 Roles & Responsibilities in the exercise The table below sketches the roles and the responsibilities of the main actors involved in the exercise. Role Senior HF Expert Responsibilities Experimental framework set up Coordination of HF activities; 114 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Role Edition 02.01.00 Responsibilities Coordination of results analysis. Junior HF Expert Preparation of supporting material; Observations; Qualitative data collection; Qualitative data analysis. Data Analyst for HP and Safety Information collection about quantitative data aspects format; Monitoring of the data collection; Quantitative data analysis. Security Expert Identify likely security threats; Identify and deploy threats emulation tools; Assess impact on impact areas (see par. 4.3.2). Senior Safety Expert Definition of safety related activities; Coordination of safety related activities; Coordination of safety related data analysis. Junior Safety Expert Preparation of supporting material; data collection; data analysis. RPAS Pilot Operations as Remote Pilot in Flight Trials; Human Factors evaluation of procedures and technologies to be implemented on RPAS, for comparison with on-board Pilot; Interact with ATCo in IFR type of operations. Safety Pilot Flight Trials Execution as on-board Safety Pilot; Human Factors evaluation of procedures and technologies to be implemented on RPAS, for comparison with RP. Systems Integration Engineers On-Board System Integration for DAA system and C2L security system. Communication/Datalink Engineers Implementation and management of C2L for RPAS Flight Trials; Support to the C2L and GPS signals spoofing simulated and flight trials. Control Engineers Implementation and integration of Flight Control System on-board. On-board Decision Support System Integration of DAA system on-board RPAS; Development Engineers Definition of test scenarios and metrics; Results Analysis for in-flight tests on DAA system. Data Analysis Experts Collect and analyse flight recorded data for DAA system performance evaluation. Coordinating Engineer Logistical coordination and technical/operational preparation for flight test. Flight Test Engineer Preparation of flight tests; Conduction of flight tests; Assessment of results. ATC Operations Expert Define, activate and deactivate the TSA; Define standard operating procedures; Coordinate simulations and operational activities. Air Traffic Control Officers Provide air traffic control activities to both simulations and real operations. MATS Safety Expert Conduct safety assessments with regard to TSA activation and operations Table 28: Exercise Roles and Responsibilities 115 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 5.2.2.3 Human Resources Following a table resuming the human resources distribution in Person/Month for each partner is presented. Effort (Person/Month) Activities Preparatory Execution PostExercise TOTAL by resource provider (units) CIRA DBLUE MATS NAIS UoM 2 2 1,5 3,5 2 2 2 1,5 1 1 2 2 1 1 3 6 6 4 5,5 6 TOTAL (units) 27,5 Table 29: Human Resources distribution for Exercise 2 5.2.2.4 Procedure development The exercise requires an interaction between ATCOs and FLARE on board safety pilot for: • Pre take-off operations and taxing; • Take-off; • Climb to test altitude; • Navigation up to the point of hand over to the remote pilot; • Navigation from the point of hand over to the on board safety pilot up to descent point; • Descent; • Approach and Landing; • Taxing to the parking lot. The remaining phases of the FLARE flight mission will be carried out by the remote pilot, interacting with ATCOs. Whenever possible, standard procedures will be applied. If minor modification to standard procedures will emerge for RPAS integration, they will be included into general recommendations. The adopted procedures will include: • ATC handling procedures for RPAS (in nominal, non-nominal and degraded conditions); • In case of communication loss the same emergency procedures already agreed on in EXERPAS.03-001 (RTS), will be applied within this exercise. • The TSA1 procedures (RPAS entering and leaving the TSA) addressed in EXE-RPAS.03-001 (RTS) will be applied within this exercise. 5.2.2.5 System modifications FLARE standard configuration will be modified embarking an on board GPS spoofing system, in order to jeopardize the GPS signal during C3L security threats tests. 116 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The following adaptations for this exercise are also required: • Adaptation of the RPAS FDR (the actual FDR should be modified in order to include all the information required for the demonstration assessment); • The MALTA ATC Centre will be equipped with an ADS-B In receiver and antenna. The equipment will support the ATC operation, complementing the Radar-based surveillance operations. 5.2.2.6 Flight trials Four flight trials will be performed within this exercise. 5.2.2.7 Training It is assumed that the familiarisation of the controllers with appropriate knowledge of RPAS concepts, operational settings and procedures, as well as the training needs of the remote pilots would have been covered during RTS. If additional training needs emerge, they will be addressed through briefing sessions. Training of the on-board pilots will be provided. 5.2.2.8 Time planning Activity Week 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 Preparatory Scenario 1 Preparatory Scenario 7 Execution Scenario 1 Execution Scenario 7 PostExercise Scenario 1 PostExercise Scenario 7 Table 30: Detailed time planning The planned starting date for the preparatory activities of Exercise 2 has been set in January 2015. 5.2.3 Results Analysis Specification 5.2.3.1 Data collection methods 117 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 In addition to data collection methods presented in 5.1.3.1, to better capture and describe the differences between the tasks, the performance and the subjective assessment of the overall concept, a specific feedback collection will be prepared for the on-board pilot (by the means of questionnaires, de-briefings and interviews). Moreover, data recording is provided by the UAS FDR. 5.2.3.2 Analysis method The analysis of the data obtained during the flight trials (quantitative data logs and subjective assessments of the exercise participants collected through questionnaires, interviews and debriefings) will be performed against the objectives of the simulation and the associated hypotheses and indicators. Given that the number of trials will provide a limited set of data possibly not sufficient for the statistical analysis, it is anticipated that the results will mostly rely on the qualitative assessment. 5.2.3.3 Data logging requirements ATC simulator and RPAS simulator will produce logs in Asterix format. The following RPAS state variables as function of simulation time can be recorded: • Position; • Barometric Altitude; • Attitude; • Track angle; • IAS speed; • TAS speed; • Ground Speed; • Vertical Speed; • Wind speed; • Wind direction. 5.2.4 Level of representativeness/limitations Limitations: • The flight trials will be performed in a segregated airspace with no actual traffic; • The flight trials will be executed in an area no wider than 10 NM from the coast. Representativeness: • All the ATC procedures are covered; • Emergency procedures are addressed; • Security threats are addressed. 5.3 Demonstration Exercise #3 Plan 5.3.1 Exercise Scope and Justification This exercise addresses the introduction of the RPAS en-route operations in non-segregated airspace through the means of flight trials. This phase of the demonstration is considered as the more realistic one as well as the more challenging one to assess the feasibility of the use of DAA system in support to remote pilot and controller’ decisions and operations in a mixed environment. Both manned and un-manned traffic is included in the scope of this exercise. 118 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 5.3.1.1 Exercise Level Flight trial (non-segregated area). 5.3.1.2 Description of the Operational concept being addressed The RPAS supporting technology that will be addressed within this demonstration exercise is the Detect and Avoid technology, focusing on solutions specifically based on the use of ADS-B and TIS-B technology, and on its compatibility with the existing safety nets. 5.3.1.3 Stakeholders and their expectations Stakeholder External / Internal Involvement Why it matters to stakeholder/ Performance expectations CIRA Internal Project Coordinator. CIRA expects to improve the level of maturity of its RPAS operator. DAA DAA technology. Furthermore, CIRA can also System Developer qualify itself as an RPAS operator able to provide all the support in using a RPAS system for experimental activities. Responsible for Deep Blue expects to consolidate its knowledge in Scenario definition, the field of Validation. Deep Blue expects to Demonstration Plan increase its well-grounded experience in the field of definition, Flight Safety by applying the methodology of Safety Demonstration Assessment to the RPAS case. Safety Assessment. Contributor to Real Time Simulations and Flight Trials as Human Performance, Safety and Operational experts. Design of simulation UOM expects to consolidate capacity to carry out and flight test flight tests and evaluate results and will, with MATS campaigns, support and the local authorities, bring into Malta the RPAS in their execution, domain of such activities. It also intends to exploit coordination in legal the effort of establishing a legal and operational issues relating to the framework in which to operate RPAS testing in permit to fly and Malta in the future, thus facilitating further results evaluation. involvement in RPAS flight test in the country. Deep Blue Internal University of Malta Internal MATS Internal Providing simulation and ATCO involvement Support the concept and improve the idea that ATM procedures for RPAS should be as those applicable to manned aircraft, thus the provision ATC service to such craft should be transparent to ATC controller. Nimbus Internal Light UAS manufacturer Collect experience in light UAS segment integration in real traffic scenarios in order to foster their future development beside traditional aircrafts with suitable control technologies (e.g. automatic dependent surveillance in broadcast). Table 31: Stakeholders' expectations 5.3.1.4 Demonstration objectives and hypothesis Obj. Identifier Hypothesis Indicators/Metrics 119 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 OBJRPAS.03HP001 The changes of operating methods and procedures emerging from the introduction of the RPAS are feasible and consistent within the overall context. Remote Pilot’s and ATCO’s acceptability of the changes OBJRPAS.03HP002 The introduction of the RPAS has no negative impact on the pilots’ and controllers’ task performance. Situational awareness Error propensity Workload Actions’ timeliness OBJRPAS.03HP003 The changes in the task allocation will not have a negative impact on interaction between the pilot and the system. Consistency with automation principles Pilot’s workload Situational awareness Trust in the system Actions’ timeliness OBJRPAS.03HP004 The accuracy and timeliness of information of the assessed technologies (C2L and DAA) is sufficient to support pilot’s task performance. Accuracy, effectiveness and timeliness of information provided by the technology OBJRPAS.03HP005 The introduction of the RPAS in managed airspace does not require major modifications of the existing HMI (both for the controller and the remote pilot). HMI usability and suitability Discrepancies between system-provided and human-required information Error propensity Situational awareness Workload OBJRPAS.03HP006 The introduction of the RPAS has no negative impact on the pilots’ and controllers’ communication. Communication load Situational awareness Effectiveness and timeliness of the communication (means, modalities, phraseology, etc.) OBJRPAS.03HP007 The new concept and changes it brings to the current way of working are considered acceptable by involved human actors (pilots and controllers). Pilots’ and controllers’ acceptability of the new concept OBJRPAS.03HP008 The introduction of the RPAS will imply the need for additional training, skills and expertise. Discrepancies between current and RPAS required knowledge, skills and expertise OBJRPAS.03SAF001 The normal operation of procedures associated with the detect-and-avoid technologies do not compromise the continued safety of operation Stakeholder workload, risk of error, risk of accident resulting from expected response to D&A function outputs. OBJRPAS.03SAF003 The human performance do not compromise the continued safety of operation Stakeholder workload, risk of error. OBJRPAS.03SAF004 The failure (complete/partial/loss of integrity) of the DAA technologies and C2L link do not compromise the continued safety of operation Impact of emergency / recovery procedures & manoeuvres on continued safety, including effects of stakeholder workload and implication of resulting vehicle manoeuvre. OBJRPAS.03PER 001 The minimum distance value (i.e. the distance at the Closest Point of Approach) is expected to be not lower than the allowed The distance between RPAS and air traffic at the CPA. 120 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 one. In other words, the separation volume set for other traffic shall not be infringed in the considered test case. OBJRPAS.03PER 002 It is expected that the total number of cases where the self-separation algorithm has not been able to avoid the separation volume breach is lower than a percent threshold (to be set during the project development). The total number of infringements OBJRPAS.03PER 003 It is expected that the maximum deviation is compatible with the needs of assuring the safe execution of the separation manoeuver while at the same time reducing the nuisance as much as possible (these two aims are in trade-off). The deviation from the optimal flight path. OBJRPAS.03PER 004 It is expected that the time delay deviation is compatible with the needs of assuring the safe execution of the separation manoeuver while at the same time reducing the nuisance as much as possible (these two aims are in trade-off). The difference in actual and planned time to reach the destination waypoint OBJRPAS.03CAP001 The introduction of RPAS has no negative impact on en-route throughput in terms of number of movements per volume of the considered airspace. Number of movements per volume of considered en-route airspace per hour does not decrease with the introduction of RPAS. Table 32: Exercise specific Demonstration Objectives and related hypotheses 5.3.1.5 Demonstration scenarios SCN–RPAS.03-002 En-Route Operations of the RPAS in presence of potentially conflicting manned traffic; SCN–RPAS.03-004 Detect and Avoid testing (Traffic Avoidance) – One manned vehicle involved; SCN–RPAS.03-006 Detect and Avoid testing (Traffic Avoidance) – Unmanned vehicle involved 5.3.1.5.1 Reference & Solution Scenarios To allow for the assessment of the impact that RPAS integration will have on the current procedures, it is necessary to have a baseline against which the comparison of the obtained results can be performed. This baseline therefore refers to the traffic situation where potentially conflicting traffic is present and current procedures in place with the pilot on-board. On the other hand, the solution scenario addresses the same situation with potentially conflicting traffic, but with the flight managed by the remote pilot. Therefore, the solution scenarios address en-route operations of RPAS in presence of potentially conflicting traffic and the performance of DAA functionalities to ensure traffic and conflict avoidance. 5.3.1.5.2 Additional Information N/A 5.3.1.6 Exercise Assumptions In the following table the exercise related assumptions are listed. A detailed description of the assumptions is provided in section 4.5. Assumption Identifier Assumption Title 121 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 ASS-RPAS.03-001 FLARE Permit to fly ASS-RPAS.03-002 Adequate time availability and volumes of TSA ASS-RPAS.03-003 Communication between remote pilot and ATCOs ASS-RPAS.03-005 Weather conditions (FLARE) ASS-RPAS.03-006 Weather conditions (Nimbus UAS) ASS-RPAS.03-007 Nimbus UAS Permit to fly ASS-RPAS.03-008 ASS-RPAS.03-009 ASS-RPAS.03-010 Surveillance – availability of ADS-B Departure and arrival operations performed by the OP Use of cooperative traffic in Flight Trials for Traffic Scenario Avoidance. Table 33: Exercise 3 related assumptions 5.3.1.7 Exercise Tool, Demonstration Technique The demonstration technique for EXE–RPAS.03-003 is a flight test session formed by four flight trials CIRA will provide FLARE Optionally Piloted System. Manned and unmanned vehicles will be present during these flight trials. General Aviation manned aircrafts equipped with Mode S Transponder with ADS-B out (supported by CIRA) will populate the scenario as manned air traffic. Unmanned traffic will be provided by Nimbus: an innovative light UAV platform with STOL capabilities which will be indicated as PRP70. This RPA is a fixed wing aircraft with a canard control horizontal surface in a forward position with respect to the main wing. The Nimbus RPA will be equipped by Mode S Transponder with ADS-B out and a portable GCS. FLARE Optionally Piloted System is an experimental facility composed of: • FLARE Optionally Piloted Aircraft: a TECNAM P92 VLA-class aircraft extensively modified in order to obtain an avionic flying test bed with RPAS capabilities; • Ground Control Station housed in a movable shelter and equipped with the remote pilot station and the control working positions for mission management; • Data-link for video and data exchange between FLARE and Ground Control Station. Details about FLARE characteristics and Data-link specifications have been described in 5.2.1.7. 5.3.2 Exercises Planning and management 5.3.2.1 Activities General activities to be performed for the demonstration exercise within the preparatory, execution and post-execution phase are explained below. 5.3.2.1.1 Preparatory activities For the preparation of this demonstration exercise, the following activities are performed: • Identification of low-level objectives to be addressed within this exercise in support to demonstration high-level project objectives; • Definition of the scenarios that will allow the collection of the required data (for nominal and nonnominal operations); • Preparation of the Demonstration Plan; 122 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 • Preparation of a detailed experimental plan; • RPAS setup and configuration; • Preparation of the systems logs (for the quantitative data collection); • Preparation of the supporting material (for the qualitative data collection); • Training of the remote and on-board pilots; • Q&A sessions to address questions emerging before the flight trial; alternatively standard training exercises will be reviewed and discussed in group sessions. 5.3.2.1.2 Execution activities The following execution activities are foreseen for this exercise: • Performance of the flight trials; • Observations of the performance of the involved actors during the runs; • Monitoring of the systems (RPAS and ATC system, with the special attention to the C2L and DAA technologies); • Collection of the data for the further analyses (both qualitative and quantitative); • De-briefings (post-run and post-exercises) and collection of feedback of the participants. 5.3.2.1.3 Post execution activities Post execution activities are mainly related to the analysis and examination of the data acquired, along the critical review of the records of the communications between ATCOs and the RPAS pilot. All the analysed data and the performance evaluation results will be presented in the final test report plan. Once the exercise is finalised, the following activities will be carried out: • A debriefing between ATCOs, RPAS pilot and FLARE on board safety pilot will be held after the execution phase to compile any questionnaire and record any special event arisen; • Analyses of the quantitative and qualitative data in relation to the demonstration objectives (hypothesis, success criteria, low-level and high-level objectives); • Exercise reporting (to be incorporated into overall Demonstration Report); • Review of the exercise results and accordingly adaptations of the experimental plan and inputs for the following exercise (live trial in non-segregated airspace). 5.3.2.2 Roles & Responsibilities in the exercise The table below sketches the roles and the responsibilities of the main actors involved in the exercise. Role Responsibilities Senior HF Expert Experimental framework set up Coordination of HF activities; Coordination of results analysis. Junior HF Expert Preparation of supporting material; Observations; Qualitative data collection; Qualitative data analysis. Information collection about quantitative data format; Monitoring of the data collection; Data Analyst for HP and Safety aspects 123 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Role Edition 02.01.00 Responsibilities Quantitative data analysis. Senior Safety Expert Definition of safety related activities; Coordination of safety related activities; Coordination of safety related data analysis. Junior Safety Expert Preparation of supporting material; data collection; data analysis. RPAS Pilot Operations as Remote Pilot in Flight Trials; Human Factors evaluation of procedures and technologies to be implemented on RPAS, for comparison with on-board Pilot; Interact with ATCo in IFR type of operations. Safety Pilot Flight Trials Execution as on-board Safety Pilot; Human Factors evaluation of procedures and technologies to be implemented on RPAS, for comparison with RP. Systems Integration Engineers On-Board System Integration for DAA system and C2L security system. Communication/Datalink Engineers Implementation and management of C2L for RPAS Flight Trials; Support to the C2L and GPS signals spoofing simulated and flight trials. Control Engineers Implementation and integration of Flight Control System on-board. On-board Decision Support System Integration of DAA system on-board RPAS; Development Engineers Definition of test scenarios and metrics; Results Analysis for in-flight tests on DAA system. Coordinating Engineer Logistical coordination and technical/operational preparation for flight test. Flight Test Engineer Preparation of flight tests; Conduction of flight test; Assessment of results. ATC Operations Expert Define, activate and deactivate the TSA; Define standard operating procedures; Coordinate simulations and operational activities. Air Traffic Control Officers Provide air traffic control activities to both simulations and real operations. MATS Safety Expert Conduct safety assessments with regard to TSA activation and operations. Data Analysis Experts Collect and analyse flight recorded data for DAA system performance evaluation; NIMBUS RPAS Crew To perform NIMBUS RPAS flight. Table 34: Exercise Roles and Responsibilities 5.3.2.3 Human Resources Following a table resuming the human resources distribution in Person/Month for each partner is presented. 124 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 Effort (Person/Month) Activities CIRA DBLUE MATS NIMBUS UoM 3 1,5 - 2 3 2 2 1,5 1,5 1 1 2 1 0,8 3 6 5,5 2,5 4,3 7 Preparatory Execution PostExercise TOTAL by resource provider (units) TOTAL (units) 25,3 Table 35: Human Resources distribution for Exercise 3 5.3.2.4 Procedure development The exercise requires an interaction between ATCOs and FLARE on board safety pilot for the following activities: • Pre take-off operations and taxing; • Take-off; • Climb to test altitude; • Navigation up to the point of hand over to the remote pilot; • Navigation from the point of hand over to the on board safety pilot up to descent point; • Descent; • Approach and Landing; • Taxing to the parking lot. The remaining phases of the FLARE flight mission will be carried out by the remote pilot, interacting with ATCOs. Whenever possible, standard procedures will be applied. If minor modification to standard procedures will emerge for RPAS integration, they will be included into general recommendations. The adopted procedures will include: • ATC handling procedures for RPAS (in nominal, non-nominal and degraded conditions);In case of communication loss the same emergency procedures already agreed on in EXE-RPAS.03-001 (RTS) , will be applied within this exercise; • The TSA2 procedures (RPAS entering and leaving the TSA) addressed in EXE-RPAS.03-001 (RTS) will be applied in this exercise. 5.3.2.5 System modifications FLARE standard configuration will be modified embarking ADS-B OUT, in order to transmit FLARE position to ATC, as well as to the ground control station. The following adaptations for this exercise are also required: • Adaptation of the RPAS FDR: the current FDR should be modified in order to include all the information required for the demonstration assessment; 125 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan • • Edition 02.01.00 Integration of the Traffic Avoidance system in the software and update of the mission automation logic in order to coordinate the operations of the collision avoidance and Traffic Avoidance algorithms. The Traffic Avoidance algorithm, indeed, is currently integrated in a software environment different from the global one including only the collision avoidance system; The MALTA ATC Centre will be equipped with an ADS-B In receiver and antenna. The equipment will support the ATC operation, complementing the Radar-based surveillance operations. 5.3.2.6 Flight trials Four flight trials will be performed within this exercise. 5.3.2.7 Training It is assumed that the familiarisation of the controllers with appropriate knowledge of RPAS concepts, operational settings and procedures, as well as the training needs of the remote pilots would have been covered during RTS and previous flight trials. If additional training needs emerge they will be addressed through briefing sessions. Training of the on-board pilots will be provided. 5.3.2.8 Time planning Activity Week 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 Preparatory Scenario 2 Preparatory Scenario 4 and 6 Execution Scenario 2 Execution Scenario 4 and 6 PostExercise Scenario 2 PostExercise Scenario 4 and 6 Table 36: Detailed time planning The planned starting date for the preparatory activities of Exercise 3 has been set in January 2015. 126 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 5.3.3 Results Analysis Specification 5.3.3.1 Data collection methods In addition to data collection methods presented in 5.1.3.1, to better capture and describe the differences between the tasks, the performance and the subjective assessment of the overall concept, a specific feedback collection will be prepared for the on-board pilot (by the means of questionnaires, de-briefings and interviews). Moreover, data recording is provided by the RPAS FDR. 5.3.3.2 Analysis method The analysis of the data obtained during the flight trials (quantitative data logs and subjective assessments of the exercise participants collected through questionnaires, interviews and debriefings) will be performed against the objectives of the simulation and the associated hypotheses and indicators. Given that the number of trials will provide a limited set of data possibly not sufficient for the statistical analysis, it is anticipated that the results will mostly rely on the qualitative assessment. 5.3.3.3 Data logging requirements ATC simulator and RPAS simulator will produce logs in Asterix format. The following RPAS state variables as function of simulation time can be recorded: • Position • Barometric Altitude • Attitude • Track angle • IAS speed • TAS speed • Ground Speed • Vertical Speed • Wind speed • Wind direction Additional variables (from other traffic, the traffic avoidance and collision avoidance systems) to be recorded are: Other traffic For each target indicated by the ADS-B IN Surveillance System on-board the RPAS vehicle: • position data; • velocity data; • target identifier; • TCAS equipment. Traffic Avoidance System • diagnostic signal of the traffic avoidance algorithm; • logical state signal of the traffic avoidance algorithm; • conflict flag associated to each considered intruder; • predicted time to Closest Point of Approach associated to each considered intruder; • predicted time to First Loss of Separation associated to each considered intruder; • planar dimension of the separation volume associated to each considered intruder; • vertical dimension of the separation volume associated to each considered intruder; 127 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan • longitudinal reference command issued by the traffic avoidance algorithm; • lateral reference command issued by the traffic avoidance algorithm; • speed reference command issued by the traffic avoidance algorithm. Edition 02.01.00 Collision Avoidance System • diagnostic signal of the collision avoidance algorithm; • logical state signal of the collision avoidance algorithm; • collision flag associated to each considered intruder; • predicted time to Closest Point of Approach associated to each considered intruder; • predicted time to collision volume breach associated to each considered intruder; • radius of the collision avoidance volume associated to each considered intruder; • longitudinal reference command issued by the collision avoidance algorithm; • lateral reference command issued by the collision avoidance algorithm; • speed reference command issued by the collision avoidance algorithm. 5.3.4 Level of representativeness/limitations Limitations: • The flight trials will be executed in an area no wider than 10 NM from the coast; Even if other IFR traffic will be involved, the test area will be managed as a TSA and all the traffic will be aware of the test purposes. Representativeness: • • All the ATC procedures are covered; • Emergency procedures are addressed; • Traffic Avoidance functionalities are tested in real traffic conditions; 128 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 6 Implementation considerations The main objective of the RAID project is to demonstrate and assess of the impact of RPAS integration into unrestricted airspace on the current ATM environment as it is defined by the European RPAS Steering Group (ERSG) Roadmap [2]. Specifically, the demonstration activities address the following areas identified by the ERSG Roadmap: • Integration into ATM and Airspace environments; • Verification and Validation; • Detect & Avoid systems and operational procedures; • Security issues; • Operational contingency procedures and systems. The RAID project furthermore foresees the definition of recommendations and guidelines in support to the integration of RPAS and deployment activities. In order to obtain the relevant information in a structured and comprehensive way, the demonstration activities have been organized around the affected KPAs: safety, security, capacity and human performance. In addition, given the nature of the demonstration objectives, system performance related to DAA Technology and its impact on the feasibility of the project has also been considered. Furthermore, the recommendations will similarly address these five main areas. As with respect to human performance aspects, for the execution of the demonstration exercise it is foreseen to use the OPV, which will ensure also participation of the on-board pilots. By this means, it has been allowed for specifically designed demonstration exercises to evaluate the different behaviour of on-board pilot and remote pilot in the execution of standard procedures and overall flight in cooperation with the Air Traffic Controller. In this first area, consequently, it is expected that the RAID outcomes could contribute to the definition and optimization of remote pilot procedures and operating methods in order to allow a smooth integration of RPAS into the current operational context. Since the project specifically applies to the en-route operations, its results have to be integrated with those of other projects focused on the Take-Off and Landing procedures. As far as the safety aspects are concerned, the project results could support the safety evaluation of new separation modes, as they are foreseen by the SESAR Concept of operations, and supported by the DAA technology implementation on RPAS. The safety aspects results will address procedures for the use of RPAS in the process of separation assurance and in the management of procedures related to the TSA. Furthermore, the project will address the occurrences of non-nominal situation and degraded situation, which will also support the identification of safety recovery procedures and in general to assess the changes in safety levels during the use of RPAS. The safety assessment expected in the project may be complemented with safety assessment outcomes of other SESAR RPAS projects to provide a global measure of RPAS integration in the commercial traffic. Together with the safety aspects, a set of security risks related to the Command and Control Link will be investigated. Quantitative measures of the negative effects caused by malicious actions (such as jamming and spoofing) on the data-link communication between RPA and the RPS will be used in assessing the intrinsic security level of the RPAS. Additionally it is envisaged that the assessment of needs for risk management and identification of mitigation activities will be performed. Further, the project aims to identify a list of hazards, the probability of their occurrence and their severity. The effects on airspace capacity of the RPAS introduction in en-route operations will be also investigated. A comparison between the number of movements per volume of considered en-route airspace per hour, with and without the RPAS, will provide relevant information about the impact of RPAS introduction on airspace capacity. Finally, the project would assess the DAA system as proposed, in terms of relevant technical performance, such as the deviation from the planned trajectories and the effectiveness of system 129 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 design in terms of Closest Point of Approach granted. The measurement and comparisons between simulated and in-flight context will allow to evaluate and to assess the effectiveness of the system, both in nominal and in non-nominal conditions. The comparison with other DAA system submitted to demonstration experimentations in the context of the SESAR RPAS Demonstration Activities will support the identification of a standard requirements set for the RPAS DAA system. 130 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 7 Communication plan This section of Demonstration Plan describes the approach to be adopted by project team to ensure the objectives & activities of the SESAR Integrated RPAS Demonstration are properly communicated to the wider Stakeholder community in an efficient manner. The execution of Communication Plan is focused on the dissemination of relevant results of the project demonstration activities to the Stakeholders such as experts, the scientific community and general public interested in RPAS development. All communications activities will be conducted following the SESAR JU communication guidance for an effective and dynamic communication and in accordance with SESAR JU Corporate Communication Team. In particular the project communication team will involve the SJU Corporate communication Team at the appropriate time when preparing external communication activities for: • • • • • Communication co-ordination and synergies with the SJU SESAR messaging support Invitation of SESAR experts to participate in RAID events SESAR content support Validation of SESAR-related content The SJU will be informed in case of any significant change in the project’s Communication Plan. Here below in the table are shown the points of contact of RAID Communication team: Company Name Telephone e-mail NAIS Marco ROMANI (Communication Manager) +39 06 91139002 [email protected] CIRA Edoardo FILIPPONE +39 082 3623322 [email protected] Table 37: RAID partner communication team Any form of communication (press release, article, brochure, report or other project documentation) will include the key messages indicated on the SESAR Communication guidance, as reported in details in the next paragraph. 7.1 Objectives and key messages The main objective of Communication Plan is to establish a community of experts and professionals interested into the integration of RPAS in ATM environment. At the same time it is intended to broaden the audience of people informed on the RPAS and its possible future applications. Therefore, the appropriate communication activities will be regularly executed during the project lifetime to present the on-going results achieved and the activities planned to be performed subsequently. By means of key messages it will be possible to create awareness on the RPAS applications and usefulness and, last but not the least, that this innovation is supported and driven by SESAR JU programme. The project communication objectives will aim: a. To present RAID as one of the nine European projects funded by the SESAR Joint Undertaking and its focus on the integrated Remotely Piloted Air System (RPAS) demonstration activities (pre-operative flight tests in the non-segregated airspace) to external audience. 131 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 b. To demonstrate to Stakeholders and wider audience that the mature technological solutions and procedures to support the integration of RPAS into the non-segregated ATM environment are available to internal and external audience. c. To present to project Stakeholders and wider audience the potential RPAS application areas, such us: monitoring and surveillance for traffic management, patrol or emergency, aerial mails and parcels distribution. d. To create a community interested into RPAS system and its applications in commercial and general aviation domains of ATM. e. To publish the RAID project results including recommendations and issues to be considered in the following steps of the RPAS development. At the same time the activities conducted by the project team in the process of the milestones achievement will be reported and major events in the Air Traffic Transport community of interest for the RPAS integration. The Communication team will also consider the Stakeholders’ feedback collected during the envisaged communication events and through other communication activities in order to improve the communication means’ effectiveness and evaluate the achievements. As already mentioned all communication materials released or conducted by RAID Communication team will include key messages that will be rephrased and tailored whenever appropriate. In any case all the external communication will include the RAID logo and will indicate SESAR JU as a co-financer of the project. Two support messages, articulated by the SESAR JU, will be used as follows: • SESAR Demonstration Activities prove that first SESAR solutions are operational, ready for industrialisation and deployment; • SESAR generates benefits in complex, real-life environments; Furthermore, a background message will be provided in order to explain what the SESAR Demonstration Activities are intended to achieve, as follows: • SESAR in-flights demonstrations show on a larger scale the benefits of the programme in day-today operations and build confidence in the SESAR solutions amongst the ATM community; • SESAR Integrated RPAS Demonstration Activities aim to: o Demonstrate how to integrate RPAS into non-segregated airspace in a multi-aircraft and manned flight environment, in order to explore the feasibility of integration with the wider aviation community by 2016. o Focus on concrete results filling the operational and technical gaps identified for RPAS integration into non-segregated airspace; o Capitalise on the SESAR delivery approach by providing synergies, risk and opportunities, with the overall SESAR programme. 7.2 Target audience The target audience of the communication will include the wide range of professionals: general public, industry, scientific community and other ATM related institutions including SESAR partners: • International and national Civil Aviation Authorities and ANSPs – ENAC, CAD (Civil Aviation Directorate of Malta Transportation Ministry), ENAV, MATS and EUROCONTROL.; • European and International Institutions and Regulators such as EASA (European Aviation Safety Agency), ICAO, EU (DG MOVE), ERSG (European RPAS Steering Group) and EDA (European Defence Agency), ESA (European Space Agency); • Military & Civil (Government) Institutions – Aeronautica Militare, Armed Forces of Malta (AFM), Red Cross and Civil Protection and Defence, Coast Guard; • Technology providers – e.g. ALENIA AERMACCHI, SELEX ES, AERMATICA and others; • Scientific community – Universities and associations (e.g. AIAA); • Quality & Standard organizations – EUROCAE (WG-73 UAV Systems), RTCA, SAE, IEEE; 132 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 • Industry and professional associations – CANSO (Transforming Global ATM Performance), AOPA (Aircraft Owners and Pilot Association), UASIT (Associazione italiana dei sistemi di velivoli senza pilota a bordo), UVS International and Assorpas (Italian Association on Light RPAS), ANACNA (Associazione Nazionale Assistenti e Controllori Navigazione Aerea) and IFATCA (International Federation of Air Traffic Controllers' Associations), STASA ( Centro Studi Trasporto Aereo Sicurezza Volo & Ambiente); • Public audience – trade press, pilots and general public; 7.3 Communication activities The communication activities are intended to implement the project communication strategies. These activities were initiated at the project kick-off meeting by means of the Consortium first press release, issued on Partners’ websites and digital media (see 7.3.2 Kick-off meeting press release). The planned communication activities consist of the following tasks: 1) Text writing and publishing by media: • Print media-such as articles on newspaper and magazine, issues of brochures. • Participation or public speaking in the scheduled events-e.g. exhibitions and workshops. Digital media such as project website, including newsletters, blogs services accessible both for desktop and mobile devices (smart-phones and tablets). 2) Organisation of project workshops, with the purpose of both dissemination of project outcomes and as an opportunity to receive feedback by the participants that may enhance the final project results. 3) Dissemination of project results. 4) Analysis and evaluation of results obtained through communication activities performed: • • Evaluation reports of media communication channels effectiveness. • Evaluation reports of dissemination events. 5) Deliver in the Final Report the Communication effectiveness analysis. 6) Contribution on SESAR JU yearly reports, as described on the SESAR JU Communication guidelines: • Not more than 2 pages • Be accessible to non-specialist readers (descriptive language, avoid jargon); • Be structured as follows: o Project objectives o Members o Description of demonstration(s) o Results (alternatively expected performance gains) o A view on implementation • Be as concise and straight forward as possible • Answer the following questions: o What was achieved in performance gains? o Which lessons were learned in terms of translating the trials into every day procedures? Any communication material and press will be provided to the SJU at the end of the project by the dissemination kit, as part of Final Report. Contribution to the six-monthly critical progress report might also include high resolution images, pictures of the trials, and graphics whenever possible to be used by the project partners and the SESAR JU in its outreach activities. 133 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 The result of the communication activities will deliver an information simple to broadcast and costefficiently with the aim of contributing to the creation of a project community interested on RPAS and their applications. In the following table is reported a summary view of planned communication activities: Activity Event Date Project kick-off October 29, 2014 Responsible Estimate costs CIRA + NAIS € 500 issues (Partners contribution) € 1000 effort for writing CIRA + NAIS € 1000 issues (Partner contribution) € 500 effort for editing NAIS € 500 design & editing Print & Digital media: Newspaper and press agency articles (minimum 2 articles in the following media including project team websites) AIRPRESS www.airpressonline.it Air Transport News www.atn.aero or Aviation Week www.aviationweek.co m Issue of Demonstration Report & In-flight demonstration(s) May, 2015 Issue of Final Report September, 2015 Issue of Demonstration Report & In-flight demonstration(s) May, 2015 FINMECCANICA press www.finmeccanica.it Magazine articles (minimun 2 articles in the following magazine) VFRMagazine www.vfrmagazine.it Volare Magazine www.edidomus.it SPACE magazine www.spacemagazine .it Issue of Final Report September, 2015 Brochures / Flyers / 2 Banner (Poster) 1° Progress meeting of Demonstration phase March / April, 2014 (RAID Comm. KIT) (updated on the base of project milestone) Project Website 1° Progress meeting of Demonstration phase Dedalonews www.dedalonews.it Avionews www.avionews.it Issue on April, 2014 and continuous update (Partners contribution) € 500 printing € 1.500 design & development NAIS € 1.000 effort for editing and up- (Partners 134 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 contribution) Multimedia animation October, 2014 dating € 1.500 effort for design and production March, 2104 Mailing / Newsletter and Social Media (Linkedin) Any progress meetings and events participation June, 2014 NAIS November, 2014 (Partners contribution) € 1.000 effort for design and editing Partner corporate communication budget May, 2015 September, 2015 November, 2015 Events & Workshops: Project promotion by RAID Comm. Kit World ATM Congress March 4-6, 2014 http://worldatmcongress. org Madrid Deep Blue SESAR Innovation Days November 24-26, 2014 CIRA / Deep Blue Partner corporate communication budget RPAS CivOps June 23-26, 2014 CIRA / NAIS € 1.000 http://rpas-civops.org/ Brussel Project results dissemination 1° RAID Project Workshop April / May, 2015 CIRA € 2.000 La Valletta, Malta MATS € 2.000 Project promotion by RAID Comm. Kit AIAA June 15, 2015 University Aviation and aeronautics forum and exposition Dallas, Texas (USA) of Partner corporate communication budget 2° RAID Project Workshop September / October, 2015 Project promotion by RAID Comm. Kit Participation & promotion Project results dissemination http://www.sesarinnovatio ndays.eu/ Malta CIRA € 2.000 CIRA Partner corporate communication budget NIMBUS Partner corporate communication budget CIRA / Deep Blue Partner corporate communication budget Capua Event participation & Project promotion Farnborough Air Show July, 2014 http://www.farnborough.c om/ Farnborough Project promotion by RAID Comm. Kit AUVSI's Unmanned Systems 2014 May 12-1, 2014 Orange County Orlando, Florida Project promotion by RAID Comm. Kit SESAR Innovation Days November, 2015 http://www.sesarinnovatio ndays.eu/ Table 38: RAID communication activities overview 135 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 7.3.1 Project Logo and Presentation template A dedicated RAID logo has been designed by the project team (see Figure 10 below) and its application initiated through the slides presented during the kick-off meeting together with the logo “Powered by SESAR”. Figure 10: RAID logo The project team and specifically the project Communication Manager is at disposal to further revise the project logo and project presentation template based on the comments and feedback provided by SESAR JU feedback, if any. 136 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 7.3.2 Kick-off meeting press release 137 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 8 References [1] EUROCONTROL ATM Lexicon https://extranet.eurocontrol.int/http://atmlexicon.eurocontrol.int/en/index.php/SESAR 8.1 Reference Documents The following documents provide input/guidance/further information/other: [2] European RPAS Steering Group (ERSG), Roadmap for the Integration of Civil Remotely Piloted Aircraft System into the European Aviation System, June 2013. [3] ATM-FUSION Consortium, ICONUS Study funded by SESAR JU, 2012. [4] ATM Master Plan https://www.atmmasterplan.eu [5] Operational Focus Area, Programme Guidance, Edition 03.00.00, date 4.05.2012 [6] SJU Communication Guidelines [7] SESAR Safety Reference Material, Ed. 00.02.01, SESAR Consortium, Brussels, 2012. [8] Safety Management Manual (SMM), ICAO Doc. 9859, 2nd edition, International Civil Aviation Organization (ICAO), Montreal, 2008. [9] Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and Equipment. SAE ARP 4761, SAE International, Warrendale, 1996. [10]Certification Specifications for Large Aeroplanes. CS-25. European Aviation Safety Agency (EASA), 2003. [11] Airworthiness Standards: Transport Category Airplanes. Government. 14 CFR Part 25, United States [12]ICAO Manual on RPAS, Ed. 1.0, April 2012. [13]MIDCAS Concept of Operations – D2.2.2-1, 15-02-2011. 138 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged. Project Number RPAS.03 RAID Demonstration Plan Edition 02.01.00 -END OF DOCUMENT- 139 of 139 ©SESAR JOINT UNDERTAKING, 2011. Created by RAID Consortium for the SESAR Joint Undertaking within the frame of the SESAR Programme co-financed by the EU and EUROCONTROL. Reprint with approval of publisher and the source properly acknowledged.