Turkey - Anel Grup

Transcription

Turkey - Anel Grup
Group Presentation
2016
Operation Areas
Renewable Energy
Recycling
Low Voltage
Panel Production
Electrical & Mechanical
Contracting
Marine Electrical
System Solutions
Anel Group Profile
30
years of experience
2.377 Employees;
•
%10 domestic, %90 overseas
•
332 engineers, 366 technicians, 1.571 workers, 149 administrative staff
•
118 designers
Anel Group Profile
10
International Airports
experience with more than 2,5 mn sqm
2016 Q1 Revenue:
52 mn* USD
Ranked 235th largest Company in Fortune 500 Turkey list of 2015.
2010: AnelElektrik’s IPO
* The revenue belongs to Anel Electrical and Mechanical Contracting and Trade Inc.
Geographic Settlement
Ongoing Projects
Azerbaijan, Turkey, Qatar, United Arab Emirates
Completed Projects
Egypt, Jordan, Bulgaria, Ukraina, Russia, Georgia,
Azerbaijan
Regions Of Focus
• Turkey
• Middle East and North Africa
• Qatar, United Arab Emirates, Bahrain, Kuwait, Umman, Iran
• Central Asia:
• Azerbaijan and Kazakhstan
• Eastern Europe:
• South Asia:
• Sri Lanka, Indonesia, Philippines, Malaysia and Thailand
• East and West Africa:
• Botswana, Ghana, South Africa and Mauritius
Project Types Of Focus
•
•
•
•
•
•
•
•
Hospitals
Industrial Buildings
Laboratories
Pharmaceutical Industries
Data Centers
Airports
Tunnels and Railway Systems
Stadiums
Milestones
1988
KAV Factory: First
Industrial Facility
1990
Foundation of AnelSis (Low
Voltage Switchboard Production)
1998
Foundation of Operation &
Maintenance Unit
1999
First passenger terminal project in Turkey:
Istanbul Atatürk International Airport
2004
2005
2000
Anel Elektrik is established
1986
1986
2006
Foundation of Qatar Office
2007
Hamad International Airport – Qatar
National Convention Center- Qatar
2009
Transition to Electromechanical
Contracting Structure
Foundation of AnelEnerji (Renewable Energy)
2010
Anel Elektrik’s Public Offering
First International Project: Russia Tverskaya
Hotel:
Foundation of Russia Office
First overseas passenger terminal project:
Cairo Airport Terminal Building 3
2013
Foundation of AnelMarin (Ship Electrical
Electronic Systems)
2015
Cyprus Solar Power Plant Foundation
Abu Dhabi Midfield Terminal Project
Baku Olympic Stadium
Qatar Redline South Underground
Management Systems

IS0 9001 Quality Management System

ISO 14001 Environment Management
System

OHSAS 18001 Occupational Health &
Safety Management System
HSE
According to the statistics of Turkey, in 2014
1.7 days lost in every 1.000 man/hours work as a result of incidents
In Anel, it is
0,003.
7,01 incidents happened in every 1.000.000 man/hours work.
In Anel, it is
0,50.
Revenues
Anel*
Revenues – USD
31.3.2016 31.12.2015 31.12.2014 31.12.2013 31.12.2012 31.12.2011 31.12.2010 31.12.2009
52.105.625 205.707.886 292.264.569 241.803.470 162.572.452 213.798.883 213.088.024 148.447.435
292.264.569
241.803.470
205.707.886
213.798.883
213.088.024
162.572.452
148.447.435
52.105.625
31.3.2016
31.12.2015
31.12.2014
31.12.2013
31.12.2012
31.12.2011
31.12.2010
Ciro Bilgileri – $
* The revenue belongs to Anel Electrical and Mechanical Contracting and Trade Inc.
31.12.2009
Major Completed Projects
AIRPORTS
Abu Dhabi Midfield Terminal Building
İstanbul Atatürk International Airport (with extentions)
Hamad International Airport / Qatar
Cairo Airport Terminal Building 3 / Egypt
Ankara Esenboğa International Airport
Izmir Adnan Menderes International Airport
Erzincan Airport
Adıyaman Airport
Tbilisi & Batumi International Airport
Total Size
OTHER PROJECTS
Kuyumcukent Jewellery & Gold Center
İzmir Hippodrome Outdoor Lighting
Marmara Forum Mall
Ford Otosan Golcuk Facilities
Bayrampaşa Forum Mall
Qatar National Convention Center
Turkcell‘s 40 Operation Centers
Bosch-Rexroth
King’s Academy / Jordan
Total Size
GRAND TOTAL SIZE
Completion Date
Ongoing 2016
1999/2004/2005/2010
2013
2008
2007
2007
2010
2012
2007
2010
2007
2011
2006
2009
2010
2002
2009
2006
Project Size (sqm)
700.000
495.000
450.000
220.000
180.000
110.000
65.000
25.000
27.500
2.272.500
550.000
550.000
350.000
300.000
300.000
120.000
115.000
87.000
66.000
2.438.000
4.710.500
Our completed projects have a total area of
approximately
13 million m2
Our major completed projects
have a total area of approximately
5 million
2
m
Backlog
565
138
2016 Q1
Current Backlog
478
530
515
85
15
478
14
373
225
62
66
276
99
183
427
500
445
205
464
90
307
163
177
2010
2011
2012
2013
2014
International
Domestic
Backlog mn USD
mn USD
2015
1Q2016
2016
2017
2018
Backlog
Backlog Distribution Estimates mn USD
Domestic Projects
Backlog
Project
Client
Location
Tuzla Trade Center (IS REIT)
Koray
Istanbul
42 Maslak
BAY
Istanbul
DP World Yarımca Container Terminal
STFA
Kocaeli
Mavibahçe Shopping Center
Opera
Izmir
Other Domestic Projects
TOTAL (USD)
Section
Size
E
M
E
M
E
M
E
M
E
M
28.327.877
40.661.758
3.485.331
5.930.866
11.151.322
6.201.502
5.939.878
2.668.675
1425250
Total Size
Backlog
68.989.635
4.161.714
9.416.198
1.906.572
11.151.322
1.503.885
12.141.380
2.704.140
4.093.925
3.683.908
105.792.459
13.960.219
Overseas Projects
Backlog
Project
Client
Location
Total Size
Backlog
TAV-CCC-ArabTec
UAE
364.648.263
178.048.443
QDVC-GS
Al.Darwish
Qatar
237.221.412
237.221.412
Hyundai
Qatar
35.279.670
3.700.070
REDCO
Construction - AL
MANA
Qatar
114.029.208
3.493.593
Al Rayyan Road
Doğuş
Qatar
44.877.538
40.061.965
Sidra Medical Centre
KENTZ
Qatar
8.049.526
1.166.190
5.624.843
666.022
TOTAL (USD)
809.730.461
464.357.694
GRAND TOTAL (Domestic + International)
915.522.919
478.317.914
Abu Dhabi Midfield Terminal Building
Qrail Redline South Underground
Hamad Bin Khalifa Medical City – Doha
Qatar R&D Complex
Other International Projects
Section
Size
E
364.648.263
M
E
237.221.412
M
E
M
35.279.670
E
114.029.208
M
E
M
E
M
E
M
44.877.538
8.049.526
5.624.843
Backlog
Turkey
3%
Airport
38%
Infrastructure
58%
UEA
37%
Qatar
60%
Port
0% Hospital
1%
Turkey
Qatar
UEA
UAE
Infrastructure
Backlog Breakdown by Country
Business Center & Mall
Business
Center & Mall
3%
Hospital
Backlog Breakdown by Project
Project completion period;
2-3 years average
Port
Airport
Scope of Works
(Electrical)
•
•
•
•
•
•
•
•
•
•
•
•
MV Cabling
MV Cubicles
Power Transformers
SCADA System
Busduct
LV Cabling
LV Panel Boards
Cable Containment
Power Management Systems
Diesel Generators
Uninterruptable Power Supply (UPS)
Lighting Fixtures
•
•
•
•
•
•
•
•
•
•
•
•
Lighting Control Systems
Lv Panelboards
Earthing
Lightning Protection
Public Address and Announcement Systems
Fire Alarm Systems
Master Clock Systems
IT Systems
CCTV Systems
MATV Systems
Card Access Systems
Building Management System
Scope of Works
(Mechanical)
Plumbing
• Domestic Cold Water
• Domestic Hot Water
• Water Treatment
• Sewage Water
• Drain Water
• Grey Water
Storm Water
• Gravity System
• Siphonic System
Heating System
• Individual Heating
• Central Heating
• District Heating
Air Conditioning and Ventilation System
• Individual Cooling (Split Units)
• Central Cooling
• All Air Systems
• All Water Systems
• Air and Water Combined Systems
• Variable Refrigerant Flow Systems
Scope of Works
(Mechanical)
Fire Fighting Systems
• Fire Suppression Systems
• Water Suppression Systems
• Wet Pipe Systems
• Dry Pipe Systems
• Pre-Action Systems
• Deluge Systems
• Gas Suppression Systems
• Individual Suppression Systems (FM200)
• Central Suppression Systems (Inert Gas)
• Smoke Control Systems
• Stair and Lift Pressurization System
Building Management System
Natural Gas System
Superheated Water System
Compressed Air System
Steam System
LPG System
Common Engineering
Studies
Shop
Drawings
Design
Review
Load
Calculations
As Built
Submittals
Technological Tools
AutoCAD
MEP
Revit
Primavera
SAP
Technological Tools
Design
ETAP 12.5 POWER SYSTEM DESIGN&ANALYSYS
CANECO BT-INTERNATIONAL ELECTRICAL DESIGN SOFTWARE 5.3
SIEMENS-SIMARIS DESIGN PROFESSIONAL 8.0
SCHNEIDER ELECTRIC-ECODIAL ADVANCE CALCULATION 4.4 INT
DIALUX LIGHTING BUILDING CALCULATION
CARRIER E20-II H.A.P
PIPE STRESS ANALYSE
Drawing
AUTOCAD LT-AUTOCAD-MEP-REVIT-NAVISWORKS SIMULATE-NAVISWORKS
MANAGE
Planning
PRIMAVERA
ERP
SAP
Major Projects
Major Projects
Hamad Bin Khalifa Medical City
Baku Olympic Stadium
Abu Dhabi Midfield Terminal
Qatar Convention Center
The Marmaray Project BC1 Railway Bosphorus
Tube, Crossing, Tunnels and Stations
Hamad International Airport
Airports
NDIA CP99 - Airport Wide Miscellaneous Works
Project Launch/Completion: 2013 / ongoing
Main Contractor: Six Construct - Midmac Joint Venture (SMJV)
Client: NDIA
Consultant: Parsons
NDIA Passenger Terminal Complex - Retail/Food & Bevarage Concessions
Fit-Out Construction Package CP110
Project Launch/Completion: 2012 / 2015
Total Area: 60.000 m2
Main Contractor: Qit - Imar / Alec Fitout JV (QIAJV)
Client: NDIA Steering Committee
Consultant: Parsons
Hamad International Airport - Doha, Qatar
Total Area: 450.000 m2
Main Contractor: SOJV (TAISEI / TAV)
Client: NDIA
Consultant: OBI (Overseas Bechtel Incorporated)
NDIA Passenger Terminal Complex - Retail/Food & Bevarage Concessions
Fit-Out Construction Package CP111
Project Launch/Completion: September 2013 / Ongoing
Total Area: 6.000 m2
Main Contractor: Qit - Imar / Alec Fitout JV (QIAJV)
Client: NDIA Steering Committee
Consultant: Parsons
Hamad International
Airport
16,000,000
man x hour for MEP works
without any LTA
Terminal building area
450,000 m2
120,000
electrical fixtures were used
140 ea.
2000/2600 KVA
Transformers
Airports
Our
8th International Airport Project
Defined as the
star project
of Abu Dhabi 2030 projection
The biggest building of Abu Dhabi:
730,000 m2
Abu Dhabi Midfield Terminal Project - UAE
Project Launch/Completion: 2013 / ongoing
Total Area: 730.000 m2
Main Contractor: TCA JV (TAV-CCC-Arabtec)
Client: ADAC
Consultant: AECOM
One of the very few airports
which can have direct flights
to 6 continents
Airports
Tbilisi International Airport - Georgia
Atatürk International Airport - Turkey
Project Launch/Completion: 2006/2007
Total Area: 21.500 m2
Main Contractor: TAV
Client: Georgia Airlines
Project Launch/Completion: 1999 / 2010
Total Area: 495.000 m2
Main Contractor: TAV
Client: General Directorate of State Airports Authority
Consultant: Turner International
Airports
Cairo International Airport – Egypt
Project Launch/Completion: 2004/2009
Total Area: 220,000 m2
Main Contractor: TAV
Client: Cairo Airport Company
Consultant: NACO-ECG / DAR
Adnan Menderes International Airport Turkey
Project Launch/Completion: 2005/2007
Total Area: 177.000 m2
Main Contractor: TAV
Client: General Directorate of State Airports Authority
Consultant: Bureau Veritas
Airports
Esenboğa International Airport - Turkey
Project Launch/Completion: 2005/2008
Total Area: 180,000 m2
Main Contractor: TAV
Client: General Directorate of State Airports Authority
Consultant: Bureau Veritas
Tunnels & Railways
Train services every 2-10 minutes, maximum speed
of 100 km/hour and an average speed of 45
km/hour.
The total length of the Package BC1 under
Anel’s Contract ; 13.6 km,Bored tunnel length;
9.8 km,Immersed tube length; 1.4 km Cut-andcover tunnel length; 2.4 km.
5
underground stations
The Marmaray Project BC1 – Railway Bosphorus
Tube Crossing, Tunnels and Stations - Turkey
Project Launch/Completion: 2011 / 2013
Main Contractor: TAISEI Corporation
Client: General Directorate of Construction of Railways, Ports and
Airports
Consultant: Avrasya
75,000
passenger capacity per hour in each direction.
Tunnels & Railways
Scope Of Works
Electrical
• Low Voltage Power Distribution
• Lighting and Lighting Control System
• Central Battery System
• Small Power Distribution
• Fire Detection & Alarm System
Mechanical
• Heating
• Ventilation and Air Conditioning (HVAC)
• Plumbing
• Drainage
• Fire Fighting Systems
Qatar Red Line South Underground
Project
Doha - Qatar
Project Launch/Completion: 2015 / 2018
Main Contractor: QDVC – GS Eng.- Darwish Eng JV
Client: Qatar Rail
Qrail Red Line South
Underground
Tunnel length:
34 km
29 Cross Passages
One of the most important
transportation and infrastructure
projects of the Gulf Area
Hotels
Tverskaya Hotel - Moscow
Marriott Hotel - Sochi
Project Launch/Completion: 1995/1997
Total Area: 20.000 m2
Project Launch/Completion: 2012 / 2014
Total Area: 67,318 m2
Main Contractor: Koray Construction
Client: TKS
Hotels
Shangri La Hotel - Turkey
Wyndham Hotel - Turkey
Project Launch/Completion: 2011/ 2013
Total Area: 42.000 m2
Client: Ege Yapı Ltd.
Consultant: Pro-Plan Project Management
Project Launch/Completion: 2011/ 2013
Total Area: 67,000 m2
Client: Kılıçbey Tourism
Hotels
Four Seasons Hotel – Istanbul, Turkey
Holiday Inn Hotel – Moscow
Project Launch/Completion: 2006/2008
Total Area: 48.000 m2
Main Contractor: Yapı Merkezi Construction
Client: Astay Grup
Project Launch/Completion: 2005/2007
Total Area: 57.000 m2
Client: EMT
Hotels
St. Regis Hotel - Istanbul, Turkey
Les Ottomans Hotel - Istanbul, Turkey
Project Launch/Completion: 2012/2015
Total Area: 23.000 m2
Client: Demsa
Consultant: Boz Project Consulting
Project Launch/Completion: 2003/2006
Total Area: 11.050 m2
Main Contractor: Unit Tourism
Client: Astay Group
Towers & Business Centers
42 Maslak (Hotel, Shopping Mall, Business Center) - Turkey
Project Launch/Completion: 2012/ ongoing
Total Area: 48.000 m2
Number of Floors: 42
Client: Bay Construction
Anel Business Center - Istanbul, Turkey
Project Launch/Completion: 2007/2009
Total Area: 67.000 m2
Number of Floors: 19
Client: Anel Group
Towers & Business Centers
Al Handasa Complex - Doha, Qatar
Project Launch/Completion: 2005/2008
Total Area: 80.000 m2
Number of Floors: 27
Main Contractor: Baytur Construction
Client: H.H Shk.Mohamed Khalifa Al Thani
Vodafone Headquarter
- Istanbul, Turkey
Project Launch/Completion: 2007/2008
Total Area: 18.000 m2
Number of Floors: 16
Main Contractor: Sera Construction
Client: Vodafone
Towers & Business Centers
Al Reem Tower
- Doha, Qatar
Project Launch/Completion : 2005/2007
Total Area: 18.000 m2
Number of Floors: 21
Main Contractor: Baytur Construction
Client: Faisal Bin Mohamad Al Thani
Sun Plaza - Istanbul, Turkey
Project Launch/Completion: 2004/2006
Total Area: 60.000 m2
Number Of Floors: 38
Client: Sun'i Jüt Trade
Shopping Malls
Kuyumcukent Goldsmiths’ Complex - Istanbul, Turkey
Shopping Mall Marmara - Istanbul, Turkey
Project Launch/Completion: 2010/2011
Total Area: 570.000 m2
Main Contractor: Anel Sera JV
Client: Kuyumcukent Real Estate Property
Project Launch/Completion: 2010/2011
Total Area: 350.000 m2
Main Contractor: Yapı Merkezi & Yorum Construction
Client: Multi-Turkmall
Shopping Malls
Shopping Mall Bayrampaşa - Istanbul, Turkey
Shopping Mall Mega Center - Kazan, Russian Federation
Project Launch/Completion: 2008/2010
Total Area: 450.000 m2
Main Contractor: Yorum Construction
Client: Multi-Turkmall
Project Launch/Completion: 2006/2007
Total Area: 153.000 m2
Main Contractor: ENKA
Client: RF
Shopping Malls
The biggest shopping mall of Izmir (Turkey)
119,000 m2
Mavibahçe Shopping Mall – İzmir
Total Area: 119.000 m2
Project Launch/Completion: 2015/2016
Employer: Opera Gayrimenkul A.Ş.
2,000 parking capacity on 2 floors
Ganjlik Mall
The biggest shopping mall of Baku
1015 sensors in the parking area
Mechanical works man x hour
850.000 mh
Ganjlik Mall – Baku, Azerbaijan
Launch/Completion: 2014/ongoing
Total Area: 120.000 m2
Client: Pasha Construction
Electrical works man x hour
700.000 mh
Shopping Malls
Ramstore - Moscow, Russian Federation
Launch/Completion: 2005/2006
Total Area: 62.000 m2
Main Contractor: ENKA
Client: Ramstore
DP World Yarımca
Container Terminal
1.3 Million TEU capacity
One of the biggest terminal in Turkey
The first port in Turkey which has a
parking area for trailer trucks.
Electrical infrastructure which feeds
8 Sets of STS port cranes and
40 Sets of RTG electrical site cranes
DP World Yarımca Container Terminal –
Kocaeli, Turkey
Launch/Completion: 2015/ ongoing
Total Area: 460,000 m2
Client: STFA İnşaat A.Ş.
MV cables 82.180 m
LV cables 103.970 m
Technological Buildings
Resources:
2,000 kVA 35/0.4 kV Dry-Type Power Transformer: 6
2,500 kVA 35/0.4 kV Dry-Type Power Transformer: 6
Prime Generators: 2,000 kVA: 3+ 2,500 kVA: 6
2,000 kVA Dynamic UPS: 3
Is REIT Technology & Operation Center Istanbul, Turkey
Launch/Completion: 2013/ongoing
Total Area: 270,000 m2
Main Contractor: Koray Construction
Client: İş GYO (Real Estate Investment Company)
Installed Systems:
• Medium Voltage (36 kV) System
• Low Voltage (Lighting, Power Distribution (Busbar+Cable)
• Main, Secondary and MCC boards
• Lightning Protection, etc.) Systems
• Fire Detection, Card Entry System, Sound and Emergency
Announcement, TV, CCTV, Telephone/Data, Central Time,
Lightning Automation and Mechanical Automation)
Systems
• HVAC
• Plumbing
• Drainage
• Fire Fighting Systems
Is REIT Tuzla Technology
and Operation Center
Mechanical Works Total Man x hour
1.896.000
Electrical Works Total Man x hour
727.000
Technological Buildings
Resources:
1,600 kVA 10.5/0.4 kV Dry-Type Power Transformer: 2
200 kVA UPS: 1
Sabancı University Nano Technology Center/
Istanbul, Turkey
Launch/Completion: 2010/2011
Total Area: 9,000 m2
Main Contractor: Koray Construction
Client: Sabancı University
Installed Systems:
Medium Voltage (RMU) System,
Low Voltage (Lightning, Power Distribution, Earthing,
Lightning Protection) Systems,
Procurement, installation and application of the
Weak Current (Fire Detection, Card Entry System,
Sound and Announcement, Emergency Announcement, TV,
CCTV, Telephone/Data, Central Time, Lightning Automation,
Mechanical Automation) Systems
HVAC
Plumbing
Drainage
Fire Fighting Systems
Technological Buildings
Qatar Foundation Research & Development
Complex
Launch/Completion: 2013 / Ongoing
Total Area: 40,000 m2
Main Contractor: Redco Construction Almana
Client: Qatar Foundation for Education, Science and Community
Development
Consultant: Astad Project Management
Qatar Research and
Development Complex
With our HSE practices, we were evaluated as
“Best In Construction Industry” by REDCO
Construction Al Mana.
3 pcs 2.000 kVA diesel
generators
State of the art Data Center
Technological Buildings
Resources:
2,000 kVA Power Transformer (6/0.4 kV): 2
2,250 kVA Prime Jenerator (Synchronous): 2
80 kVA UPS (for BT Systems): 1
Installed Systems:
M.V. Switchgear (35 and 6 kV),
All Low Current Systems (Lightning, Power and
Distribution, Snow Melting, Lightning Protection, etc.)
Extra Low Current (Fire Detection, Card Entry, CCTV,
MATV, Emergency Announcement, Security, BT, etc.)
Systems.
Special Laboratory
- Tbilisi, Georgia
Launch/Completion: 2006/2009
Total Area: 11,000 m2
Main Contractor: Bechtel
Client: DTRA (Defense Threat Reduction Agency)
Hospitals & Medical
Centers
Hamad Bin Khalifa Medical City
Project Launch/Completion: 2011/ongoing
Total Area:
220,000 m2
Number Of Beds: 890
Main Contractor: Hyundai Eng. & Const.
Client: Ashgal
- Doha, Qatar
BSK Medline Hospital - Antalya, Turkey
Project Launch/Completion: 2010/2011
Total Area:
10,000 m2
Number Of Beds: 97
Main Contractor: Esas Holding
Hospitals & Medical
Centers
Designed with the concept of a
seven-star luxury hotel.
550 bed capacity
Closed area: 275.000
Sidra Medical and Research Center
Completion Works – Doha, Qatar
Project Launch/Completion: 2015 / ongoing
Main Contractor: Midmac-CCC JV)
Employer: Qatar Foundation
m2
Social & Sport Facilities
Diamond Award in the category of ‘Structual System’ (2016)
The Best Project in the category of Sport/ Entertainment (2015)
Hosted 1st
European
Olympic Games
Baku Olympic Stadium, Azerbaijan
Project Launch/Completion: 2013 / 2015
Total Area:
200,000 m2
Main Contractor: Tekfen A.Ş.
Client: SOCAR
68.000
Total spectator
capacity
650.000
1.200.000
52.000 pcs
Mechanical Works
Total Man x hour
Electrical Works
Total Man x hour
Lighting Fixtures
Baku Olympic Stadium
3715 m3
41.000 m PVC 270 pcs loudspeakers
Drainage Piping
GRP Water Tank
100 pcs 1.500W
170 pcs 1.700W
2 pcs 15x11 m 3 pcs 3.000 kVA 6kV
Led Scoreboard
Diesel Generator
Social & Sport Facilities
Qatar National Convention Center - Doha, Qatar
Garanti Cultural Center - Istanbul, Turkey
Project Launch/Completion: 2007/2011
Total Area: 120.000 m2
Main Contractor: Baytur Construction
Client: Qatar Foundation
Consultant: KEO International
Project Launch/Completion: 2010/2011
Total Area: 9.750 m2
Main Contractor: Promim Architecture
Client: Garanti Bank
Social & Sport Facilities
Jockey Club Hippodrome - Izmir, Turkey
Mountain Olympic Village Roza Khutor - Sochi, Russian Federation
Project Launch/Completion: 2007 / 2008
Total Area: 550.000 m2
Client: Turkey Jockey Club
Project Launch/Completion: 2012 / 2014
Total Area: 76.500 m2
Main Contractor: Hazinedaroğlu Construction
Client: Roza Khutor
Social & Sport Facilities
Vehbi Koç Foundation Education Center
Project Launch/Completion: 2010/2011
Total Area: 11.000 m2
Main Contractor: Ark Construction
Client: Vehbi Koç Foundation
- Gölcük, Turkey
King’s Academy High School
Project Launch/Completion: 2004/2006
Total Area: 620.000 m2
Main Contractor: Koray Construction
Client: Royal Court Engineering
Consultant: Khaled Azzam
- Madaba, Jordan
Road Projects
Al Rayyan Road Project – Qatar, Doha
Project Launch/Completion: 2014/2017
Total Length: 10,7 km
Client: Doğuş Onur JV
Al Rayyan Road
Installation of 120,000 m pipeline
(Diameters vary between 100-1400 mm)
5 pcs underpass
720 m length tunnel construction
Renewal of 50,000 m length pipe which serves
400,000 people
Manufacturing and testing practices to
handle 10,000
the pipelines
tons of pressure on
Displacement of main city water pipeline with 1400
diameters
mm
Industrial Facilities
Ford Automotive Factory & Additional Works - Gölcük, Turkey
Project Launch / Completion : 2000/2007
Total Area: 346.800 m2
Client: Ford
Tetrapak Packaging Factory - Moscow, Russian Federation
Project Launch/Completion: 2007/2008
Total Area: 22.000 m2
Main Contractor: Delta Construction
Client: Tetrapak
Industrial Facilities
Vyksa Steel Production Plant - Vyksa, Russian Federation
Project Launch/Completion: 2007/2008
Total Area: 110.000 m2
Main Contractor: Gama Construction
Client: OMK
Bosch – Rexroth Factory, Turkey
Project Launch/Completion: 2008/2009
Total Area: 14.000 m2
Main Contractor: Siemens
Client: Bosch
Industrial Facilities
SUN-JUT Production Plant - Istanbul, Turkey
Lineadekor Joinery Factory - Istanbul, Turkey
Project Launch/Completion: 2007/2008
Total Area: 22.000 m2
Client: Greif / Unsa
Project Launch/Completion: 2006/2007
Total Area: 25.000 m2
Client: Lineadekor
Industrial Facilities
BUFALA Dairy Products Factory - Kocaeli, Turkey
APS Textile Factory - Konya, Turkey
Project Launch/Completion: 2005 / 2005
Total Area: 17.500 m2
Client: APS Textile
Project Launch/Completion: 2015 / 2015
Total Area: 810 m2
Client: BUFALA Süt Ürünleri A.Ş.
Well - Established
Relationships
• 42 Maslak




King Hussein Military Academy / Jordan
King Hussein Cancer Hospital / Jordan
Court of Accounts Building / Russia
İş GYO Tuzla Trade Center
•
•
•
•
•
Cairo Airport / Egypt
Tbilisi&Batumi Airports / Georgia
Ankara, Istanbul & Izmir Airports
Hamad International Airport / Qatar
International Abu Dhabi Airport/ UAE
• Qrail Red Line South Underground
• Ganjlik Mall
• Is REIT Tuzla Trade Center
• DP World Yarımca Container Terminal
• Marmara Forum Mall
• Bayrampasa Forum Mall
• Qatar Al Rayyan Road Development
Well - Established
Relationships
• Architecture engineering consulting
operations and maintenance
• Hamad International Airport / Qatar
• Marmaray Railway Tube Tunnel / Istanbul
• Ras Gas Raslafan/Qatar
• Hamad International Airport / Qatar
• Biological Lab / Georgia
Construction
T.T.E Engineering
• Hamad Bin Khalifa Medical Center / Qatar
Consolidated Construction
Company
• Abu Dabi International Airport
• Baku Olympic Stadium /Azerbaijan
• CR-1 Marmaray Train Stations/Istanbul
• Baku Olympic Stadium / Azerbaijan
Operation & Maintenance
Services
Operation & Maintenance
Correct Analysis in
Investment
Budgets
Increase in
Efficiency
Immediate
Intervention &
Coordination from
One Center
Fast Solution
Decrease in
Enterprise
Maintenance
Expenses
Monitoring and
Case Tracking by
Our Expert Team
Minimized System
Errors and Work
Accidents
Advanced
Technology
Compliance
Energy, Time and
Workforce Savings
Operation & Maintenance Services
16
Revenues
years of experience
4.863.419 USD
4.601.175 USD
Providing all necessary operation and maintenance
services on a 24/7 basis for the seamless operation of
the facilities
2014
2015
References
Technical operations, operation &
maintenance services, 100% power
source continuity and emergency
intervention for electromagnetic systems
at Beşiktaş General Directorate building,
Turkmax, Sungurlar, Emek, Altnizade,
Orhanlı, Gebze, Ayazağa plants.
Turkey / Middle East Technical operations,
maintenance
and
repair,
energy
management, environment, waste and
recycling, technical budget and investment
planning, occupational health and
safety
services
and
special
project/application services (For instance,
P.A.T. Testing) for General Directorate's
building electromechanical systems
Building facility management and operations
and maintenance, periodical maintenance and
controls, failure intervention services and
structural renovation/infrastructure projects,
occupational health and safety, energy project
investment consulting, and emergency field
services for communication operators for 23
facilities across Turkey, consisting of 19
Headquarters and 4 Auxiliary buildings.
References
24/7 operation and maintenance
systems for the main and Building
Automatization System 42 Maslak
which has a 250.000 m2 total area
On-call and maintenance requests,
operation & maintenance of mobile
service for Esentepe General Directorate
building, in-house technical team and
operation&maintenance
services
at
Dudullu Datacenter building.
The electromechanical monitoring
and operations of Anel Business
Center, where Anel Group and 15
headquarter of other companies
are located.
References
Building facility management and operations
and maintenance, periodical maintenance and
controls, failure intervention services and
structural renovation/infrastructure projects,
occupational health and safety, energy project
investment consulting, and emergency field
services for communication operators for 23
facilities across Turkey, consisting of 19
Headquarters and 4 Auxiliary buildings.
Technical operations, operation and
maintenance,
energy
management,
environment,
waste
and
recycling,
technical budget and investment planning,
and occupational health and safety services
for
Sütlüce
General
Directorate's
electromechanical systems.
References
Operations, maintenance, preventive
periodical maintenance and controls,
failure intervention services and
mobile field emergency services for
celular
base
stations
and
communication opreators across
Turkey (2009-2011)
Operation and maintenance service for
electrical and mechanical systems of
GE Aviation Gebze complex.
Operation & maintenance services, monitoring
and management of all production lines,
systems, machines and auxiliary plants, as well
as the revision, Project management of the
systems and machines at ALSTOM factory
(Formerly known as Areva/Alstom Energy
Industries INC), which has a 55,000 m2 total
area with 45,000 m2 of production area that
produces on-demand transformers, LV cells and
cutters for export to 84 countries.
References
Periodical maintenance, operational
monitoring,
malfunction
intervention and services for
electrical systems at BMW Kosifler
Center automobile headquarters
and showroom buildings.
Operation and maintenance
services for the international and
domestic terminals and the
parking garage of Istanbul Ataturk
Airport, one of the biggest and
most modern airports in the
world.
Periodical maintenance, controls,
malfunction interventions and
emergency
services
of
electromechanical systems and
building management at Alcatel
Factory.
Renewable Energy
Renewable Energy
 The
first Turkish company to:
 Enter
foreign markets
 Realize

sales with IEC 61215 certificate
The EPC Contractor of the first power plant in Cyprus 1.3MWp – EU Funded
References
The biggest photovoltaic power plant in
one project in Turkey
Malatya İnönü University - 5,3 MWp
Greece - 100 kWp
Solar plant in Komotini
Projects in Bulgaria - 5,2 MWp
Troyanovo, Dimitrovgrad, Chirpan
Türk Telekom - 400 kWp
Base station installation
Anel Business Center - 25 kWp
Roof and terrace installation
The largest solar plant in the Eastern
Mediterranean Basin
1,3 MWp solar power plant - Cyprus
Low Voltage
Panel Production
Profile
25
Revenue
6.140.045
USD
6.987.912
USD
5.406.447 USD
years of experience
27 Employees;
2013
3 engineers, 24 technicians, and support departments
1,750 m2 Production Area
Franchising agreement with Schneider and Siemens
2014
2015
Operation Areas
•
•
•
•
Low Voltage Electrical Panel Production
Medium Voltage Electrical Panel Production
Operation & Maintenance
Supervision
References
Recycling
Recycling
Metal Scrap
Electronic Scrap
Hazardous Waste
End of Life Vehicles
The first and only integrated recycling company in Turkey
Activities licensed by T.C. Ministry of Environment and City Planning
Serves more than
600
companies
References
Marine Electric & Electrical
System Solutions
Electric & Electrical
Systems Solutions
•
•
•
•
•
Panel and Console Production
System Integration
Project Management & Consultancy
Electrical Outfitting and Cabling onboard
Testing and commissioning of systems
(STW, IT, FAT, HAT, SAT, SIT)
• Logistic support
• Operation & Maintenance
• Concept and configuration design of marine electric &
electronic systems according to STANAG 1008 / BV 30
standards
References
MEKO VE G-CLASS FRIGATE 3B AR (3D
Search Radar) PROJECT
• Cabling
• Cable Harnessing
• Testing of Radar Cables of 7 Frigates
and Also For Simulation Laboratory of
ASELSAN (by our personel, having JSTD-001 Class:3 and IPC/WHMA-A-620
certificates)
DIVING BOAT PROJECT (For Naval Force
of Saudi Arabia)
MOSHIP-KURYED AND SEISM PROJECTS
• Integration of Units
• Cable Harnessing
• Testing of Weapon & Electronics Systems
Cables of 4 Ships (by our personel, having
J-STD-001 Class:3 ve IPC/WHMA-A-620
certificates)





Ship Electric Design,
Design & Manufacturing of Main
Switchboards
Distribution Panels, Switchboxes
Design & Installation of Ship Alarm
& Monitoring System (With BV
Approval Certificate)
Supplying of Systems, Electrical
Outfitting, Executing of FAT, HAT, SAT
and Trainning of 2 Ships
References
MİLGEM PROJECT






Ship Electric Design
Prepearing of Integration Documents,
Design & Manufacturing of Main
Switchboards
Distribution Panels, Switchboxes
Special Navy Ship Systems (With TL Type
Approval Certificate), Supplying of
Systems
Electrical Outfitting, Executing of FAT,
HAT, SAT and Trainning of 1-4th Ships
A-CLASS MINE HUNTING SHIP PROJECT



Manufacturing of Main Switchboards
Distribution Panels and Command &
Control Consoles
Electrical Outfitting of 4th Ship
References
Disclaimer
Certain statements contained in this presentation may be considered "forward-looking statements”. Our forward-looking statements
generally contain words such as "estimate," "project, "predict," "believe," "expect," "anticipate," "potential," "plan," "goal," “will” or
other words which mean the uncertainty of future events. These forward-looking statements are based on our current expectations,
estimates and assumptions and are subject to certain risks and uncertainties. Although Anel Elektrik believes that the expectations
reflected in our forward-looking statements are reasonable at this time, actual results could differ materially from those projected or
assumed in any of our forward-looking statements. Therefore, Anel Elektrik disclaims any obligation to update these statements, and we
caution you not to rely on them unduly.