- Business Village
Transcription
- Business Village
LAUSANNE High quality buildings Ultramodern glass-clad buildings, latest technical installations www.business-village.ch English / French To rent g n i d il ull ! u B st f o m l a 11’000 m2 of office space Bussigny-près-Lausanne Park places available Technical Specifications The Business Village features top quality equipment that meets the strictest technical standards. Particular care has been given to cooling the buildings by intentionally using a gentler method than air conditioning. Building characteristics Windows Structure Floor loading Exterior façade Ceiling height Parking Stock storage space Double-glazed windows, solar insulated (SIA 380/1) and acoustically muffled (R’w 32–35 dB). Structural tile posts with a central core of reinforced concrete. On false floor, 300 kilograms per square metre. Minergie insulation standard: glazed façade naturally ventilated, insulated, and mounted on a metallic structure. From base: 3.1 metres; usable height from false floor: 2.7 metres. Total of 548 parking places; covered (underground garage) 470, outside 78. Total = 4 712 square metres. Heating, cooling and ventilation Air quality Industry standards are met or exceeded (SIA 382/1 and SIA 2021). Pulsed air at constant temperature year round. Air is renewed 12 times per working day. Heating Industry standards are met or exceeded (SIA 382/1). Year round isothermic temperature (20°C inside even when -10°C outside; minimum rate of relative humidity: 15 %). Cooling Building pre-equipped to cool through cool ceiling or ventilatorconvector (maximum interior temperature of 26°C when 32°C outside). Building technical management Technical facilities monitored and controlled from a central supervision station. Security provisions Type of arrangement Security systems Fire detection Elevators Elevators Telecom Telephone Optical fiber Local computer server Controlled access at entry levels. Pre-equipped so that each tenant can install an office control system. Detection heads installed in the air exchange coverings. Maximum capacity 650 kg. Meets requirements for handicapped persons. Automatic return device to the esplanade level. Intermediate distributor planned at the base of each building. Connected site. All rental agreements include the possibility of a local computer server specific to the tenant. Accessibilité optimale Accessibility BASEL UCar Lausanne Yverdon Vevey Geneva airport Geneva centre Neuchâtel Bern Basel Zurich centre Zurich airport 7km 32km 30km 58km 61km 67km 100km 194km 219km 225km 0h13’ 0h27’ 0h27’ 0h44’ 0h48’ 0h49’ 1h10’ 2h09’ 2h28’ 2h28’ STrain Lausanne Yverdon Vevey Neuchâtel Geneva centre Geneva airport Bern Zurich centre Zurich airport Basel 0h12’ 0h35’ 0h45’ 0h57’ 1h06’ 1h14’ 1h43’ 2h42’ 2h59’ 3h08’ LAUSANNE t GENEVA b Public transports In 30 minutes time, from the centre of Lausanne, up to 5 buses per hour on line n. 17 will bring you in front of the Business Village. ZURICH BERN Flexible floor space PHASE 1: ACHIEVED Building Floor 1 Floor 2 Floor 3 Floor 4 Floor 5 Floor 6 Floor 7 Floor 8 Floor 9 Total (m2) 642 983 1550 2127 2483 350 350 554 554 633 715 1187 1187 597 1210 399 393 599 599 7785 1808 59 1712 1185 1185 1208 400 1945 792 559 4932 4290 367 792 1 3155 1990 Total 635 635 635 304 460 460 460 1905 304 1380 231 462 462 462 462 2079 31847 23931 915 915 915 304 775 775 775 2745 304 2325 The Business Village comprises twelve fully equipped modern buildings, carefully designed to fit with the natural contours of the land. Overall, the entire complex extends over nine levels. The nine floors provide between 300 square metres and 2,500 square metres of workspace. All the floors are modular and multifunctional to accomodate a wide range of activities. The phases 1, 2 and 3 are intended to accommodate 1,600 people in 30,000 square metres of office space. www.business-village.ch English / French A three phase project Three construction phases are planned to deliver all 12 buildings Each phase will deliver about 10,000 square metres of offices. 3 4 5 PHASE 1: ACHIEVED The first phase, corresponds to the existing buildings n. , & . 6 7 8 9 10 11 12 PHASE 2: PROJECT 3 4 5 The second phase, corresponds to the buildings n. , , + , , , , , & . 6 7 8 1 2 3 4 5 9 10 11 12 PHASE 3: PROJECT The third phase, corresponds to the buildings n. , , , , , , , , , + & . The hearth of the Business Village Hospitality Manager Food & Beverage Cette plaquette n’a pas de valeur contractuelle. Bilingual daycare Fitness •Many prestigious neighbours: the Swiss Federal Institute of Technology in Lausanne, the University of Lausanne, the International Olympic Committee, the Union of European Football Associations, an academic teaching hospital, Nestlé, Logitech, Kudelski, Philip Morris, Yahoo… •A full-service 4 star hotel within a stone’s throw www.business-village.ch English / French Commercial partners C www.focus-immobilier.ch [email protected] T +41 79 607 90 07 www.naef.ch [email protected] T +41 22 839 39 96 Compagnie Foncière du Léman Immeuble WTC I Route de l’Aéroport 10 PO Box 209 CH - 1215 Geneva 15 T +41 22 723 29 22 F +41 22 788 08 04 [email protected] In alliance with Jones Lang LaSalle Corporate Solutions www.s-schofield.com [email protected] www.fonciere.ch A Nelson group project T +41 22 718 88 88 www.losinger.ch