- Business Village

Transcription

- Business Village
LAUSANNE
High quality buildings
Ultramodern glass-clad buildings, latest technical installations
www.business-village.ch
English / French
To rent
g
n
i
d
il ull !
u
B st f
o
m
l
a
11’000 m2
of office space
Bussigny-près-Lausanne
Park places
available
Technical Specifications
The Business Village features top quality equipment that meets the strictest
technical standards. Particular care has been given to cooling the buildings by
intentionally using a gentler method than air conditioning.
Building characteristics
Windows
Structure
Floor loading
Exterior façade
Ceiling height
Parking
Stock storage space
Double-glazed windows, solar insulated (SIA 380/1) and
acoustically muffled (R’w 32–35 dB).
Structural tile posts with a central core of reinforced concrete.
On false floor, 300 kilograms per square metre.
Minergie insulation standard: glazed façade naturally ventilated,
insulated, and mounted on a metallic structure.
From base: 3.1 metres; usable height from false floor: 2.7
metres.
Total of 548 parking places; covered (underground garage) 470,
outside 78.
Total = 4 712 square metres.
Heating, cooling and ventilation
Air quality
Industry standards are met or exceeded (SIA 382/1 and SIA
2021). Pulsed air at constant temperature year round. Air is
renewed 12 times per working day.
Heating
Industry standards are met or exceeded (SIA 382/1). Year round
isothermic temperature (20°C inside even when -10°C outside;
minimum rate of relative humidity: 15 %).
Cooling
Building pre-equipped to cool through cool ceiling or ventilatorconvector (maximum interior temperature of 26°C when 32°C
outside).
Building technical management Technical facilities monitored and controlled from a central
supervision station.
Security provisions
Type of arrangement
Security systems
Fire detection
Elevators
Elevators
Telecom
Telephone
Optical fiber
Local computer server
Controlled access at entry levels.
Pre-equipped so that each tenant can install an office control
system.
Detection heads installed in the air exchange coverings.
Maximum capacity 650 kg. Meets requirements for
handicapped persons. Automatic return device to the esplanade
level.
Intermediate distributor planned at the base of each building.
Connected site.
All rental agreements include the possibility of a local computer
server specific to the tenant.
Accessibilité optimale
Accessibility
BASEL
UCar
Lausanne
Yverdon
Vevey
Geneva airport
Geneva centre
Neuchâtel
Bern
Basel
Zurich centre
Zurich airport
7km
32km
30km
58km
61km
67km
100km
194km
219km
225km
0h13’
0h27’
0h27’
0h44’
0h48’
0h49’
1h10’
2h09’
2h28’
2h28’
STrain
Lausanne
Yverdon
Vevey
Neuchâtel
Geneva centre
Geneva airport
Bern
Zurich centre
Zurich airport
Basel
0h12’
0h35’
0h45’
0h57’
1h06’
1h14’
1h43’
2h42’
2h59’
3h08’
LAUSANNE
t
GENEVA
b
Public transports
In 30 minutes time, from the centre of Lausanne,
up to 5 buses per hour on line n. 17 will bring you in
front of the Business Village.
ZURICH
BERN
Flexible floor space
PHASE 1: ACHIEVED
Building
Floor 1
Floor 2
Floor 3
Floor 4
Floor 5
Floor 6
Floor 7
Floor 8
Floor 9
Total (m2)
642
983
1550
2127
2483
350
350
554
554
633
715
1187
1187
597
1210
399
393
599
599
7785 1808
59
1712
1185
1185
1208
400
1945
792
559
4932
4290
367
792 1
3155 1990
Total
635
635
635
304
460
460
460
1905
304
1380
231
462
462
462
462
2079 31847
23931
915
915
915
304
775
775
775
2745
304
2325
The Business Village comprises twelve fully equipped modern
buildings, carefully designed to fit with the natural contours of
the land. Overall, the entire complex extends over nine levels.
The nine floors provide between 300 square metres and 2,500
square metres of workspace. All the floors are modular and
multifunctional to accomodate a wide range of activities.
The phases 1, 2 and 3 are intended to accommodate 1,600
people in 30,000 square metres of office space.
www.business-village.ch
English / French
A three phase
project
Three construction phases are planned to
deliver all 12 buildings Each phase will deliver
about 10,000 square metres of offices.
3 4 5
PHASE 1: ACHIEVED
The first phase,
corresponds to the
existing buildings n.
,  & .
6 7 8
9 10 11
12
PHASE 2: PROJECT
3 4 5
The second phase, corresponds
to the buildings n. , ,  +
, , , , ,  & .
6 7 8
1 2 3 4 5
9 10 11
12
PHASE 3: PROJECT
The third phase, corresponds
to the buildings n. , , ,
, , , , , , +
 & .
The hearth of the Business Village
Hospitality Manager
Food & Beverage
Cette plaquette n’a pas de valeur contractuelle.
Bilingual daycare Fitness
•Many prestigious neighbours: the Swiss Federal Institute
of Technology in Lausanne, the University of Lausanne, the
International Olympic Committee, the Union of European
Football Associations, an academic teaching hospital,
Nestlé, Logitech, Kudelski, Philip Morris, Yahoo…
•A full-service 4 star hotel within a stone’s throw
www.business-village.ch
English / French
Commercial partners
C
www.focus-immobilier.ch
[email protected]
T +41 79 607 90 07
www.naef.ch
[email protected]
T +41 22 839 39 96
Compagnie Foncière du Léman
Immeuble WTC I
Route de l’Aéroport 10
PO Box 209
CH - 1215 Geneva 15
T +41 22 723 29 22 F +41 22 788 08 04
[email protected]
In alliance with
Jones Lang LaSalle
Corporate Solutions
www.s-schofield.com
[email protected]
www.fonciere.ch
A Nelson group project
T +41 22 718 88 88
www.losinger.ch