Kinnickinnic River Watercourse Rehabilitation
Transcription
Kinnickinnic River Watercourse Rehabilitation
Kinnickinnic River Watercourse Rehabilitation Earlyy Out Project j Achieving Multiple Design Objectives Thomas R. Sear, PE, CFM Short Elliott Hendrickson Patrick C. Elliott, PE Milwaukee Metropolitan Sewerage District Kinnickinnic River (KKR) Watershed KKR S. 6th St. to I-94 Bridge Location Project j Expanded Floodplains 1 Kinnickinnic River, “Improved” Channel Updated Floodplain (SEWRPC, 2008) 6th St Bridge 2 KKR Stakeholder Meetings • KKR Technical Stakeholder Group for KKR M i t W k 6th – 27th Mainstem Work: – Neighborhood Plan for 6th – 16th Street – Included: City, County, WDNR, SEWRPC, Neighborhood & Business Groups, 16th Street Community Health Center, Local NGOs • KKR 6th – I94 Bridge: – Early Out Projects – Response to 2008 Flood Event South 6th Street South h 5th Street Bridge KKR FM Project Limits Downstream WC Segment Kinnickinnic River 3 Bridge B South 5th Street KKR FM Project Limits South 6th Stre eet Downstream WC Segment Kinnickinnic River KKR FM S. 6th St. to II--94 Bridge Project Area Characteristics • South 6th Street Bridge • Upstream Watercourse Segment – – – – 500 feet of concrete lined channel Confined crosscross-Sections Steep northern embankment MMSD CSO Facility on south • Downstream Watercourse Segmentt D t W t S – 500 feet of earthen / rock lined channel – Eroded north embankment, south of 5th Street – South embankment instability 4 KKR S. 6th Street Bridge Prior to Replacement Upstream (West Side)) Downstream (East Side)) Proposed Improvements KKR S. 6th Street Bridge • Design Objectives f – Significantly reduce upstream WSE’s – Maintenance / bike path beneath bridge • Proposed Design Features – Clear span concrete girder bridge g – Functional, durable and attractive bridge • Implementation – Final Design Completed December 2009 – Construction Completed December 2010 • $2.5 Million ARRA Grant 5 KKR S. 6th St. Bridge – December 2010 Upstream (West Side)) KKR Upstream Watercourse Segment Steep Embankment with Grouted Backfill End of Concrete Lined Channel Combined Sewer Outfall MMSD KK1 Facility Maintenance Ramp South 6th Street 6 KKR Downstream of South 6th Street Bridge June 7, 1961 KKR Upstream Watercourse Segment 7 KKR Downstream Watercourse Segment End of Concrete Lined Channel Eroded Side Slope due to 5th Street Runoff Failing Revetment Wall KKR Earthen / Rock Lined Channel Storm Sewer Outfalls Storm Sewer Outfall Exposed Abandoned Flushing Pipeline Steep and Unstable Side Slopes Sl KKR Downstream Watercourse Segment 8 KKR Watercourse Improvements • Design Objectives – Stone lined channel with riffles and pools – Maintain stable side slopes / hydraulic capacity – Native vegetation plantings • Upstream Watercourse – Tiered retaining walls p – 15 ft. wide maintenance / bike path • Downstream Watercourse – 2:1 to 4:1 native vegetated side slopes – Reuse of limestone blocks Upstream KKR Improvements Minimum 2:1 Side Slope Retaining Walls Future KKR Bike Trail 9 Upstream KKR CrossCross-Sections Downstream KKR Improvements Repair erosion from 5th St. runoff Future KKR Bike Path Five Pools within Main Channel 4:1 Side Slope, where space allows 10 KKR Downstream Cross Cross--Section Typical Riffle Section KKR Main Channel CrossCross-Sections Typical Pool Section 11 2011 Watercourse Construction KKR S. 6th St. Bridge and Watercourse December 2011 p Pre-Improvement 12 KKR Watercourse - Upstream Segment December 2011 p Pre-Improvement KKR Watercourse - Transition Segment December 2011 p Pre-Improvement 13 KKR Watercourse - Transition Segment December 2011 p Pre-Improvement KKR Watercourse - Downstream Segment December 2011 p Pre-Improvement 14 KKR Watercourse - December 2011 KKR Watercourse - December 2011 15 KKR Watercourse - January 2012 KKR Watercourse – January 2012 16 KKR Watercourse Rehabilitation Improvements Schedule • Construction Start – • • September 2010 Construction Completion – May 2012 $1.5 Million Great Lakes Restoration Initiative Grant KK River Mainstem Projects 17 KKR Watercourse Rehabilitation Improvements Schedule • S. 6th Street – S. 27th Street – Neighborhood Plan Completed 2010 – Preliminary Engineering Completed 2011 – Home Acquisition/Deconstruction Ongoing • 83 Structure Acquisitions (Voluntary) q • 37 Structures Acquired To Date • 25 Structures Deconstructed To Date – Design & Construction Pending Funding • S. 27th Street to Jackson Park – USACE Feasibility Study Ongoing (Sept 2012) Kinnickinnic River S. 6th Street to II--94 SEH Project Team Members • Dale Miller, Mainstream Restoration • Rose Chmielewski, Ecological Services of Milwaukee • Doug Bath, Gestra Engineering 18
Similar documents
Plan Cover and Table of Contents
William Hatcher, EDD, Milwaukee County William Wehrley, P.E., City of Wauwatosa Craig Dillman, EDD, Milwaukee County Phil Pyne, P.E., City of Wauwatosa Gary Mick, P.E., Milwaukee County Mike Maki, ...
More information