2010 Development Report

Transcription

2010 Development Report
 2010 DEVELOPMENT REPORT VILLAGE OF MENOMONEE FALLS Waukesha County, Wisconsin Actuant Corporate Headquarters (View from Westbrook Crossing) Actuant Corporate Headquarters (View from 124th Street) Actuant Electrical Segment (View looking southwest from Westbrook Crossing)
Prepared by: Department of Community Development February 2011 Page Intentionally Left Blank 2010 Development Report 1
TABLE OF CONTENTS VILLAGE OF MENOMONEE FALLS OVERVIEW ................................................................................. 4 POPULATION & PROJECTIONS ................................................................................................... 5 OVERVIEW OF BUILDING PERMIT ACTIVITY ................................................................................... 6 ECONOMIC DEVELOPMENT EFFORTS ........................................................................................... 7 TAX INCREMENTAL DISTRICT (TID) NO. 9. ................................................................................... 8 2011 – 2015 COMPREHENSIVE OUTDOOR RECREATION (COR) PLAN................................................ 9 VILLAGE CENTRE MASTER PLAN 2010 ...................................................................................... 10 RESIDENTIAL DEVELOPMENT ................................................................................................... 11 COMMERCIAL DEVELOPMENT .................................................................................................. 12 INSTITUTIONAL DEVELOPMENT ................................................................................................ 17 CONDITIONAL USE PERMIT SUMMARY ...................................................................................... 19 REZONING SUMMARY ........................................................................................................... 20 MUNICIPAL CODE TEXT AMENDMENTS & ORDINANCE CREATION .................................................... 20 ARCHITECTURAL CONTROL BOARD (ACB) APPROVAL SUMMARY..................................................... 21 ZONING BOARD OF APPEALS (ZBA) APPROVAL SUMMARY ............................................................ 23 2010 Development Report 2
Page Intentionally Left Blank 2010 Development Report 3
VILLAGE OF MENOMONEE FALLS OVERVIEW Menomonee Falls is the most populous village in the State of Wisconsin with a 2010 estimated population of 34,600 residents. The Village is uniquely positioned to offer its residents the same small‐town charm found in rural Wisconsin, while allowing for the modern convenience of being situated in the heart of the Milwaukee Metropolitan Region. The Village is also home to Fortune 500 companies like Kohl’s Corporation and Harley Davidson operates its largest manufacturing facility in the state in Menomonee Falls. Numerous other major employers with headquarters and/ or additional operations are located in the Village, making it a critical employment hub for the region. The variety of industries and businesses, ranging from the quaint shops located in the Village Centre, Menomonee Falls’ historic downtown, to the modern commercial Mill Pond Dam & Gazebo in the Village Centre establishments along the County Line Road corridor all contribute to the well balanced and resilient economic livelihood experienced in the Village. The Village’s strong variety in housing stock, from multi‐family developments to starter and high‐end single family homes, is attractive to existing and potential residents alike. The Village’s housing policy continues to strengthen the viability of well‐established neighborhoods as well as promotes the growth of new residential developments. Wisconsin's Top Ten Communities Ranked by
Assessed Real Estate Value
2010 Real Estate
Assessed Value
Rank
Municipality
1 Milwaukee
$27,206,258,730
2 Madison
$20,986,600,900
3 Brookfield
$6,375,280,500
4 Kenosha
$5,857,071,100
5 Waukesha
$5,721,272,900
6 Green Bay
$5,701,965,400
7 Wauwatosa
$5,301,096,900
8 New Berlin
$4,640,381,400
9 Appleton
$4,611,893,500
10 V. of Menomonee Falls
$4,224,701,290
All of these industrial, commercial, and residential land uses create the important diversity needed for a thriving community’s tax base. This is proven through a review of the 2010 Wisconsin Department of Revenue’s Statement of Assessments, which shows Menomonee Falls as the tenth highest real estate assessed value in the State of Wisconsin with over $4.2 billion. 2010 Development Report 4
POPULATION & PROJECTIONS
The Village of Menomonee Falls is a growing community in northeastern Waukesha County. The Village is the fourth largest community in Waukesha County with a 2000 census population of 32,647 and is expected to experience steady growth in the future as well. The Wisconsin Department of Administration (DOA) projects a growth of over 20% or about 6,600 new residents by 2030, bringing the Village population near 40,000 people. This is the second greatest numerical population increase projected in Waukesha County during this time period. 2000
2005
2010
2015
2020
2025
2030
Numeric
Census Estimate
Estimate
Projection Projection Projection Projection Change
C Waukesha
64,825
67,624
69,709
72,063
74,365
76,444
78,172
13,347
V Menomonee Falls
32,647
33,939
34,600
36,239
37,374
38,396
39,242
6,595
C Muskego
21,397
22,478
23,589
24,725
25,835
26,858
27,749
6,352
V Sussex
8,828
9,797
10,829
11,890
12,926
13,906
14,803
5,975
C New Berlin
38,220
39,041
39,882
40,791
41,682
42,457
43,050
4,830
V Pewaukee
8,170
8,967
9,784
10,603
11,403
12,157
12,841
4,671
C Oconomowoc
12,382
13,561
14,234
14,958
15,666
16,320
16,893
4,511
C Brookfield
38,649
39,782
40,441
41,177
41,900
42,510
42,942
4,293
C Pewaukee
11,783
12,624
13,387
14,030
14,658
15,238
15,741
3,958
T Delafield
7,820
8,299
8,851
9,410
9,955
10,464
10,917
3,097
T Mukwonago
6,868
7,490
7,930
8,348
8,756
9,134
9,466
2,598
V Mukwonago
6,162
6,528
6,918
7,349
7,769
8,161
8,511
2,349
V Hartland
7,905
8,386
8,762
9,156
9,543
9,898
10,205
2,300
C Delafield
6,472
6,881
7,265
7,653
8,035
8,388
8,698
2,226
T Merton
7,988
8,354
8,720
9,088
9,447
9,776
10,058
2,070
T Eagle
3,117
3,508
3,860
4,213
4,556
4,882
5,177
2,060
V Merton
1,926
2,419
2,671
2,934
3,189
3,431
3,652
1,726
T Genesee
7,284
7,540
7,843
8,151
8,452
8,727
8,960
1,676
T Lisbon
9,359
9,753
10,023
10,266
10,506
10,715
10,877
1,518
T Brookfield
6,390
6,389
6,695
7,006
7,310
7,590
7,833
1,443
T Waukesha
8,596
8,845
9,097
9,326
9,550
9,747
9,901
1,305
V North Prairie
1,571
1,865
2,052
2,242
2,429
2,605
2,766
1,195
T Oconomowoc
7,451
7,936
8,091
8,251
8,407
8,541
8,638
1,187
T Summit
4,999
5,173
5,442
5,626
5,806
5,968
6,103
1,104
V Dousman
1,584
1,807
1,947
2,096
2,242
2,378
2,501
917
V Nashotah
1,266
1,371
1,521
1,669
1,815
1,953
2,078
812
T Ottawa
3,758
3,849
3,992
4,132
4,270
4,394
4,498
740
V Eagle
1,707
1,779
1,892
2,006
2,118
2,222
2,315
608
T Vernon
7,227
7,452
7,464
7,479
7,496
7,494
7,465
238
V Oconomowoc Lake
564
637
611
650
688
723
755
191
V Wales
2,523
2,575
2,603
2,637
2,669
2,696
2,711
188
V Lac La Belle
329
332
339
346
354
360
365
36
V Big Bend
1,278
1,283
1,277
1,280
1,284
1,284
1,281
3
C Milwaukee
0
0
0
0
0
0
0
0
V Chenequa
583
587
581
578
574
569
562
-21
V Lannon
1,009
961
937
916
896
874
849
-160
V Butler
1,881
1,833
1,788
1,747
1,708
1,667
1,621
-260
V Elm Grove
6,249
6,228
6,091
5,972
5,856
5,730
5,588
-661
Source: Wisconsin Department of Administration, Demographic Services. Data Extracted in January 2011. Note: The chart is ordered based on numerical growth. Type & Name
Percent
Change
20.6%
20.2%
29.7%
67.7%
12.6%
57.2%
36.4%
11.1%
33.6%
39.6%
37.8%
38.1%
29.1%
34.4%
25.9%
66.1%
89.6%
23.0%
16.2%
22.6%
15.2%
76.1%
15.9%
22.1%
57.9%
64.1%
19.7%
35.6%
3.3%
33.9%
7.5%
10.9%
0.2%
0.0%
-3.6%
-15.9%
-13.8%
-10.6%
The 2010 Census information was not disseminated as of drafting this report; however, the Wisconsin DOA does release an estimated population each year based on motor vehicle registrations, income tax information, institutional population and new housing starts. Based on this information, the State of Wisconsin estimates our 2010 population at 34,600. 2010 Development Report 5
OVERVIEW OF BUILDING PERMIT ACTIVITY
The Building Inspection division of the Department of Community Development issues all the permits for commercial, institutional, industrial, and residential projects. In 2010, the Village issued 617 residential and 128 non‐residential building permits creating an estimated value of over $60,000,000. This permit activity, as shown in the chart below, brought in revenues of $573,952.07, over a 52% increase from 2009. With the restructuring of the Building Inspectors contract, the expenses for the Building Department dropped almost $19,000, leading to a $407,466.32 increase in net proceeds, almost a 115% increase from 2009, and the first increase in the last 6 years. Building Department Financial Summary
Year
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
The chart and graph show the revenue and expense trend over the last 15 years. After five years of a steady decline in net proceeds, 2010 marked a dramatic increase. Revenue
$618,874.00
$641,445.02
$599,411.61
$637,961.77
$511,394.50
$545,181.16
$534,568.94
$479,981.09
$660,568.57
$835,225.71
$785,371.50
$723,444.42
$677,619.10
$473,627.17
$375,177.43
$573,952.07
Expense
$158,649.00
$158,700.00
$163,106.00
$172,380.00
$179,604.00
$182,863.10
$188,271.60
$192,434.20
$203,216.20
$200,972.50
$206,720.00
$214,474.50
$213,835.00
$204,490.50
$185,408.75
$166,485.75
Net Proceeds
$460,225.00
$482,745.02
$436,305.61
$465,581.77
$331,790.50
$362,318.06
$346,297.34
$287,546.89
$457,352.37
$634,253.21
$578,651.50
$508,969.92
$463,784.10
$269,136.67
$189,768.68
$407,466.32
% Change in
Net Proceeds
4.9%
-9.6%
6.7%
-28.7%
9.2%
-4.4%
-17.0%
59.1%
38.7%
-8.8%
-12.0%
-8.9%
-42.0%
-29.5%
114.7%
Building Department Revenue & Expense Flow
$900,000.00
$800,000.00
$700,000.00
$600,000.00
$500,000.00
$400,000.00
$300,000.00
$200,000.00
$100,000.00
09
08
07
06
05
10
20
20
20
20
20
04
20
02
03
20
20
01
20
99
00
20
20
97
96
98
19
19
19
19
19
95
$0.00
Year
Revenue
Expense
Source: Department of Community Development 2010 Development Report 6
ECONOMIC DEVELOPMENT EFFORTS
Effective economic development is a challenging task that requires the alignment of multiple variables and entities. These challenges are especially exacerbated by the current economic slowdown and the contraction of the credit market. However, in spite of these challenges, the Village continues to move its economic development efforts forward. In 2010, the Village augmented its aggressive use of a multi‐component strategy by further expanding the economic development tools at its disposal. Specifically, the Village expanded and modified the Economic Development Master Fund to include a grant program, and utilized Industrial Revenue Bonds, Midwest Disaster Bonds, the Revolving Loan Fund, and Tax Increment Finance Districts, to redevelop under‐utilized areas of the Village. Specifically, the Economic Development Master Fund allocated approximately $58,000 in matching grant monies for five downtown area rehabilitation projects; Midwest Disaster and Industrial Revenue Bonds totaling near $14 million were utilized for the Entrust Tool & Design, NCL Graphic Specialties, Inc., and Bradley Corporation projects; and the Revolving Loan Fund was used to provide a loan for the build out of Angelo’s Café and Wine Bar in the Village Centre. The Village also continued its ongoing support of several redevelopment efforts. First, as conventional financing continued to be nearly non‐existent, the Village was prompted to provide the critical assistance to restore the redevelopment of the former Falls Inn into a new Radisson Hotel and RBG Restaurant. This is the first major project of a larger Main Street redevelopment effort and it is expected to be a catalyst for continued investment in the district. The Village continues its dedication to the redevelopment of the area generally located south of State Highway 41/ 45 from Pilgrim Road to Water Street, referred as Tax Incremental District (TID) No. 8, and outlined to the right. As efforts continued in 2010 with the honing of a land development strategy, the Village was also forced to deal with a non‐favorable economic climate and significant environmental contami‐
nation. As such, the Village created a donor and recipient tax increment finance relationship in which positive tax increments, above what is necessary to pay the existing debt in the donor TID No. 4, could be allocated to shore up the redevelopment efforts in the recipient TID No. 8. 2010 Development Report 7
TAX INCREMENTAL DISTRICT (TID) NO. 9.
In 2010, the Village also created TID No. 9. This district overlays the downtown area and is intended, in part, to continue the revitalization efforts that were highlighted in the updated Village Center Master Plan 2010. As part of TID No. 9, the Village also instituted a 50/50 matching grant program to entice owners and tenants to invest in the physical appearance of their properties in an effort to improve the aesthetic value of the entire district; in turn attracting additional patrons and prompting a renewed sense of civic pride. Since the inception of the grant, six applications for façade improvements have been approved and activity remains high. 2010 Development Report 8
2011 – 2015 COMPREHENSIVE OUTDOOR RECREATION (COR) PLAN
The five year update to the Village‐wide Comprehensive Outdoor Recreation (COR) Plan was embarked on in 2010. The COR Plan guides recreational management and park and trail development over five year increments. The plan inventories and evaluates the existing outdoor recreational amenities in the Village and tests these amenities against level of service standards. Based on the findings from this analysis, the Plan makes recommendations to advance the park and open space system in the Village. The COR Plan recommendations range widely including improvements within existing parks, enhancing trail connectivity between existing open space features, and acquiring additional land for future park development. In late 2010, two opportunities arose that will allow the Village to meet its long term park needs. The Village acquired approximately 115 acres in the northwest and 62 acres in the southwest areas of the community that would be developed with active and passive park uses to meet the needs of residents in these areas as residential growth continues. In accordance with this and prior COR Plans, the map above shows the 2010 acquisitions in the northwest and southwest areas to meet future park needs. These lands will be developed into parks as residential growth continues in these areas driving the need for additional recreational facilities. 2010 Development Report The map above shows the COR Plan recommendations linking future and existing open space features through an extensive series of trails. 9
VILLAGE CENTRE MASTER PLAN 2010
In 2010, the Village commissioned Schreiber/ Anderson Associates and their team to update the 1990 Village Centre Master Plan to guide reinvestment and redevelopment in the Village Centre for the next 15 to 20 years. This plan, while drawing from the 1990 recommendations, builds on the downtowns historic character, diversity in businesses, strong adjoining neighborhoods, and the prominent environmental/ natural features. It focuses on maintaining and enhancing the area’s pedestrian connectivity, walkability, business diversity, and visual appeal, while providing a strategy for key reinvestment opportunities. The Village Centre master plan, illustrated to the right, makes several specific recommendations including: ƒ Reconfiguring and redeveloping the Appleton/ Main/ Mill Street triangle, ƒ Continuing Garfield Street to the east of Appleton Avenue, ƒ Formalizing the Farmer’s Market and expanding the Mill Pond Park Shelter, ƒ Structured parking, ƒ Enhancing Centennial Plaza, Lime Kiln Park and John Taylor Park, ƒ Connecting existing trails and formalizing crosswalks, and ƒ Introducing additional residential options. 2010 Development Report 10
RESIDENTIAL DEVELOPMENT
The Village reviews all subdivision plats, certified survey maps, and multi‐family development proposals. Although no new subdivisions were approved in 2010, the Village did approve four certified survey maps, and continued to work with residential developers regarding concept plans. This work could lead to two new single family subdivisions and two additional multi family developments in 2011. In 2010, only two Waukesha County communities had more housing starts than Menomonee Falls; however the average value of new homes in Menomonee Falls is the highest among the communities adding at least 25 new homes. The housing starts in 2010 marked a 40% increase when compared to the 2009 value, the first increase since 2004. The average home value and the consistent volume of new home construction reinforce the high quality of life and demand for property in the Village. Municipality
Pewaukee (T)
Muskego
Menomonee Falls
Waukesha
Sussex
New Berlin
Oconomowoc
Oconomowoc (T)
Lisbon (T)
Merton (T)
Brookfield
Mukwonago (T)
Mukwonago
Delafield (T)
Pewaukee
Summit (T)
Delafield
Merton
Eagle (T)
Vernon (T)
Hartland
Genesee (T)
Ottawa (T)
Chenequa
Waukesha (T)
Dousman
Big Bend
Wales
Elm Grove
Oconomowoc Lake
2010 Development Report 2005
11
133
130
134
55
34
158
62
41
29
23
28
40
21
35
21
33
67
17
22
51
17
5
1
8
1
3
3
Single & Two Family Housing Starts
2006
2007
2008
2009
14
43
40
26
126
74
67
51
86
58
46
24
127
80
53
38
28
26
15
7
69
44
35
21
99
98
45
36
46
43
26
20
31
30
25
16
44
27
17
16
37
33
10
17
14
13
10
10
55
44
17
14
27
31
12
9
10
9
5
6
14
11
10
11
23
14
11
5
17
22
11
9
11
6
6
5
11
12
16
6
19
14
10
5
17
15
6
7
3
6
4
2
1
1
2
10
12
14
4
3
11
4
4
8
13
6
3
4
2
2
5
1
2
2
1
2010
62
46
40
37
26
23
22
21
18
16
15
12
11
10
8
7
7
6
6
5
5
4
4
3
2
2
2
1
1
1
2010 Average
Value
$283,742
$258,650
$285,369
$214,027
$267,370
$472,070
$201,818
$367,267
$324,333
$509,250
$519,600
$413,250
$209,727
$751,800
$374,750
$479,571
$537,857
$383,167
$248,167
$391,400
$435,600
$473,250
$366,250
$1,413,333
$303,000
$212,500
$284,500
$400,000
$900,000
$1,788,000
Source: MTD Marketing Services of Wisconsin Inc. 2010 YTD Municipal Ranking 11
COMMERCIAL DEVELOPMENT
Commercial activity continued to maintain steady growth during 2010 with several large projects being approved. The Village reviews all proposals of this nature and guides them through the approval process. Some of the new construction and commercial expansion projects are highlighted below. Radisson Hotel & RBG Bar and Restaurant Located at the Main Street Intersection with State Highway 41/ 45, Radisson Hotels obtained its final approvals for the renovation of the former Falls Inn to a 135 room five – story luxury hotel with a restaurant and bar. The new hotel is expected to open in early 2011 and will be a flagship for the company, having new modern upgrades, and the first RBG Bar and Restaurant in the United States, a proven success in Europe. Boucher Ford Boucher Ford, located on Main Street east of State Highway 41/ 45, obtained approval to significantly remodel the existing dealership showroom and double the size its service bay area. The renovated facility will emulate the Ford landmark building prototype in terms of color and building materials. The plan focuses on creating a two‐story showroom along Main Street showcasing classic and high profile Ford automobiles.
2010 Development Report 12
CVS Pharmacy CVS Pharmacy obtained approval to construct a 13,225 square foot pharmacy with a drive through on the corner of Appleton Avenue and Pilgrim Road at the former Griffin Dodge car dealership site. This building will be situated on the former dealership parking lot and the existing buildings will be razed providing about three acres for future commercial development. Kowalski Dental Office A new dental office gained approval to redevelop the obsolete gas station located on the corner of Hampton Road and Dolphin Drive. The plans include the removal of the existing building to make way for a new 4,155 square foot single story commercial building with a parking lot to the north and a new landscaping design. 2010 Development Report 13
Breezy Hill Nursery Breezy Hill Nursery operates facilities in Salem and Clinton, WI and recently obtained approval for a similar operation along the south side of County Line Road. This nursery will be built in two phases over the next few years and when fully developed will host a field nursery and nursery shop, a wholesale sales center, a retail garden center, administrative offices, shade houses, and green and cold frame poly‐structures.
Total Health Nutrition Center Total Health obtained approval to relocate from the Fall Plaza shopping center to a vacant, stand‐alone building near the intersection of Appleton and Pilgrim Roads. Total Health is renovating the interior and exterior of the existing building to provide space for the growth of their retail and personal care service/ consultation business. 2010 Development Report 14
INDUSTRIAL DEVELOPMENT
According to the Wisconsin Department of Revenue’s 2010 Statement of Assessments, the Village of Menomonee Falls has the third highest manufacturing real estate assessed value in Wisconsin. In 2010, the Village had over $288 million in manufacturing assessed value, behind only Milwaukee and Green Bay. Consistent with past years, the industrial areas of the Village attracted several projects in 2010 and account for much of the new and projected job growth in the community. A few of the approved industrial projects are described below. Actuant Corporation Lead by the momentum from its 132,000 square foot industrial expansion of the former Bemis‐
Kelch building in 2009, Actuant Corporation is constructing a new 81,000 square foot corporate headquarters across the street in the Westbrook Corporate Park. This prominently sited building will host Actuant’s administrative offices and leadership from several of its business segments. This building, which will house about 175 employees, will also incorporate a training facility, where employees from across the world can interact with corporate leaders. WE Energies Service Center A 48,500 square foot building was approved on the southeast corner of Lilly Road and Warren Street for the relocated WE Energies Service Center. This facility is moving from the existing facility on Water Street, to make way for the ongoing redevelopment efforts in Tax Incremental District No. 8. 2010 Development Report 15
NCL Graphic Specialties, Inc. Directly to the east of Quad Graphics on Shawn Circle, NCL Graphic Specialties, Inc. obtained approval for a new 60,220 square foot building allowing the commercial printer to service consumer product companies while centralizing their distribution channels. Milwaukee Bearing & Machine Located in the Falls Business Park, Milwaukee Bearing & Machine, a manufacturer of Babbit bearing systems, obtained approval for two additions. The approvals are for a 7,668 square foot manufacturing addition and a 1,605 square foot heat treatment addition to the existing 40,736 square foot building. Entrust Tool & Design, Inc. Entrust Tool & Design, a manufacturing of precision machine tools and automation serving the aerospace, energy, medical, and automotive industries, has been located on Shawn Circle since 1974. In 2010, Entrust obtained approval for a 55 foot tall, 22,835 square foot addition to the existing facility. 2010 Development Report 16
INSTITUTIONAL DEVELOPMENT
The Village also reviews all applications for development in the Institutional districts. Like previous years, 2010 saw significant institutional projects approved. A few of these projects are described below. Grace Evangelical Lutheran Church Grace Lutheran owns property along the south side of County Line Road to the east of the Ekceniem Subdivision. In 2010, the congregation submitted plans for a new multi‐phase church and school development on the subject parcel. The first phase of the project will be an approximately 57,500 square foot church. The second phase is planned out for 2‐5 years from the first phase and will consist of the school and athletic fields. Tamarack Place The Tamarack Place, located along the south side of Menomonee Avenue obtained approval for a 25 room addition to the southeast corner of the existing assisted living facility. 2010 Development Report 17
Menomonee Falls Food Pantry The Falls Area Food Pantry obtained Village approval to build a new 2,400 square foot building attached to an existing 1,132 square foot structure located in Riverside Park, east of Trenary Field. The Food Pantry was organized in 1985 and now serves over 475 local families. Well No. 10 Pumping Station The Well No. 10 pumping station is located on 2.81 acres along the north side of Silver Spring Drive adjacent to the Spencer’s Pass subdivision. The building is sized at 5,748 square feet and includes a 200,000 square foot above ground reservoir. The property may also be the site of a future fire station. 2010 Development Report 18
CONDITIONAL USE PERMIT SUMMARY
Some of the projects in the Village are subject to the conditional use permit process designed to lessen adverse impacts. This process consists of appearances before the Plan Commission, Architectural Control Board, and the Village Board of Trustees, and may entail a public hearing. In 2010, the Village approved or amended 18 conditional use permits. Following is brief description of each of these conditional use permits: ƒ American Landscape amended their conditional use permit that allows for a landscaping and snow removal business along Kohler Lane to also allow for the installation of a polystructure over their plant holding area on their parcel. American Landscape built a new salt storage facility in 2009/ 2010. ƒ Doreen’s Bar obtained conditional approval for an outdoor seating area on the tavern located at N48 W18490 Lisbon Road. ƒ Breezy Hill Nursery, Inc. obtained conditional approval for a wholesale nursery and landscape supply yard along with a retail garden center its conditional to be located at N96 W21627 County Line Road. ƒ Brisco County Wood Grill amended its conditional use permit to allow for a restaurant with an outdoor seating area located at N96 W16865 Cumberland Court. ƒ Clearwire Wireless LLC obtained five separate conditional use permits allowing the placement of 4th Generation wireless technologies in various locations throughout the Village. ƒ Falls Baptist Church Inc. obtained conditional use approval allowing the construction of a dormitory and classroom facility on the east side of Northfield Drive across from the Buena Vista Condominiums. ƒ Grace Lutheran Evangelical Church obtained conditional use approval allowing the construction of a church, pavilion/ storage garage, and a sports field on County Line Road to the east of the Ekceniem Subdivision. ƒ Karate America obtained a conditional use allowing martial arts and fitness based classes at N88W16644 Appleton Avenue. ƒ Ryan Companies US, Inc. obtained a conditional use for a 188 stall parking lot on the northeast corner of Town Hall Road and Custer Lane. ƒ Tamarack Place RCAC amended its conditional use permit allowing a 25 room addition to the retirement/ assisted living facility located at N84 W17147 Menomonee Avenue. ƒ Total Health Nutrition Center obtained a conditional use permit to allowing a health supplement store offering personal care services at N82 W15485 Appleton Avenue. ƒ Trysting Place amended its conditional use permit to allow for the construction of an outdoor seating area at the bar/ restaurant located at N71 W12976 Appleton Avenue. ƒ Verizon Wireless amended two separate conditional use permits allowing the placement of wireless technologies on two Village‐owned water towers. 2010 Development Report 19
REZONING SUMMARY
The Village reviews all applications to amend the zoning map. These rezoning applications include a Plan Commission appearance and recommendation, public hearing, and a final approval from the Village Board of Trustees. In 2010, the Village reviewed and processed eleven rezoning applications, nine of which were approved. Following is a description of the rezoning applications that were approved in 2010: ƒ Breezy Hill Nursery, Inc. rezoned the property located at N96 W21627 County Line Road from the R‐1 Single Family Residential District to the A‐1 Agriculture District. ƒ Brook Falls Veterinary Hospital rezoned vacant property located along the north side of Lisbon Road, south of the Willowood Community Forest from the PRD Planned Residential Development District to the C‐1 Neighborhood Business District. ƒ Kristofer Halvorson rezoned a property located at N48 W17854 Lisbon Road from the R‐
2 Single Family Residential District to the RM‐2 Multi‐Family Residential District. ƒ Kim McCarty rezoned the portion of her Menomonee Avenue property in the R‐4 Single Family Residential District to the R‐2 Single Family Residential District. ƒ Stanley and Dianne Reimer rezoned their property located at W212 N4933 Weyer Road from the A‐1 Agriculture District to the R‐2 Single Family Residential District. ƒ The Village of Menomonee Falls initiated a rezoning of a Village owned property located at N72 W15798 Good Hope Road from the R‐2 Single‐Family Residential District to the P‐2 Institutional District. ƒ The Village of Menomonee Falls initiated a rezoning of a Village owned property located between Lisbon Road and River Road from the R‐2 Single‐Family Residential District to the P‐1 Park and Open Space District. ƒ The Village of Menomonee Falls initiated a rezoning of a Village owned property located along the north side of Silver Spring Drive, west of One Mile Road from the R‐3.5 Single Family Residential District to the P‐2 Institutional District. ƒ The Village of Menomonee Falls initiated a rezoning of a Village owned property located off of Lisbon Road, east of the former Victory Drive‐In movie theater from the R‐
3 Single‐Family Residential District to the P‐1 Park and Open Space District. MUNICIPAL CODE TEXT AMENDMENTS & ORDINANCE CREATION
As in previous years, the Department of Community Development facilitated a number of amendments and ordinance modifications throughout the year. The majority of these are related to development projects such PID Planned Infill Development ordinances, comprehensive plan or zoning amendments. There were also four general municipal code amendments or creations this year related to establishing a time frame for Architectural Control Board approval expiration, floodland district references, impact fees, and the PDD No. 2 exception process. 2010 Development Report 20
ARCHITECTURAL CONTROL BOARD (ACB) APPROVAL SUMMARY
The Architectural Control Board reviews and approves all industrial, commercial and multi‐
family residential buildings. Their focus is on the types and colors of exterior treatments and other site aesthetics such as landscaping, lighting, signage, and dumpster enclosures. Following is a list of projects that were reviewed and approved by the Architectural Control Board. 2010 Architectural Control Board Appearances and Approvals
Project Tamarack Place Pilgrim Petro Municipal Well No. 10 The Brewer Company Clear Wireless LLC Clear Wireless LLC Clear Wireless LLC Clear Wireless LLC Clear Wireless LLC Falls Clark Doreen’s Bar Actuant Corporation Radisson Hotel BP Gas Station Kissak Sarajian Entrust Tool & Design, Inc. Kohl’s Department Stores, Inc. GKN Sinter Metals Grace Evangelical Lutheran Church Glenroy, Inc. Marcus Theater Corporation Harley – Davidson Grede II LLC High Point Commons, LLC American Landscape Actuant Corporation Brisco County Wood Grill The Trysting Place Crossroads on Bancroft Ryan Companies US, Inc. Total Health Nutrition Center WE Energies CVS Pharmacy Traditional Concrete F & F Tire and Service Company Cont. 2010 Development Report Location N84 W17049 Menomonee Avenue N48 W15636 Lisbon Road Silver Spring and One Mile Road W142 N9251 Fountain Boulevard County Line Road and 124th Street W178 N9390 Water Tower Place N83 W13330 Leon Road N58 W14810 Shawn Circle W172 N7348 Shady Lane N85 W16198 Appleton Avenue N48 W18490 Lisbon Road Westbrook Crossing and 124th Street N88 W14776 Main Street N56 W17450 Silver Spring Drive N90 W14700 Commerce Drive N58 W14630 Shawn Circle N56 W17000 Ridgewood Drive W156 N9305 Tipp Lane County Line and Maple Roads W158 N9332 Nor‐X‐Way Avenue W180 N9393 Premier Lane W156 N9000 Pilgrim Road W139 N5470 Oak Lane Silver Spring Drive and Lilly Road South side of Kohler Lane Westbrook Crossing and 124th Street N96 W16865 Cumberland Drive N71 W12980 Appleton Avenue W186 N9511 Bancroft Drive Town Hall Road and Custer Lane N82 W15485 Appleton Avenue Lilly Road and Warren Street Appleton Avenue and Pilgrim Road W142 N9110 Fountain Boulevard East side of Appleton Avenue Project Type Building Addition Building Modifications Building and Site Plan Approval Building and Site Plan Approval Communications Equipment Communications Equipment Communications Equipment Communications Equipment Communications Equipment Building Modifications Building and Site Plan Approval Building and Site Plan Approval Building and Site Plan Approval Master Sign Program Building and Site Modifications Building and Site Plan Approval Building and Site Plan Approval Site Modifications Building and Site Plan Approval Building Addition Building Modifications Site Modifications Building and Site Plan Approval Master Sign Program Site Modifications Building and Site Plan Approval Building and Site Plan Approval Building and Site Plan Approval Master Sign Program Site Plan Approval Building and Site Plan Approval Building and Site Plan Approval Building and Site Plan Approval Site Plan Approval Site Plan Approval 21
2010 Architectural Control Board Appearances and Approvals cont.
Project Falls Baptist Church, Inc. NCL Graphic Specialties, Inc. Menomonee Falls Food Pantry Scott J. Proell Boucher Ford Glenroy, Inc. Apple Valley Garden Condominiums Falls Baptist Church, Inc. All‐Ways Contractors, Inc JBJ Commercial L.P. Kowalski Dental Office Milwaukee Bearing & Machining, Inc. Breezy Hill Nursery Village of Menomonee Falls Fit Food Trainer Froedtert Health Behavioral Clinic Mireda LLC Purity Dialysis Center Ryan Companies US, Inc. River Court Shopping Center Mark’s Mulch, LLC 2010 Development Report Location W125 N6889 Ruby Road North side of Shawn Circle Riverside Park N89 W16776 Appleton Avenue N887 W14300 Main Street W158 N9361 Nor‐X‐Way Avenue South side of Menomonee Avenue N69 W12703 Appleton Avenue W140 N5909 Lilly Road N88 W16595 Main Street N48 W14666 Hampton Road W134 N5235 Campbell Drive N96 W21627 County Line Road W140 N7501 Lilly Road N56 W19422 Silver Spring Drive N91 W17271 Appleton Avenue N88 W16726 Appleton Avenue N87 W17301 Main Street Town Hall Road and Custer Lane N95 W16915 Richfield Way W140 N5859 Lilly Road Project Type Building and Site Plan Approval Building and Site Plan Approval Building and Site Plan Approval Building Modifications Building and Site Plan Approval Building Addition Site Plan Approval Building and Site Plan Approval Site Plan Approval Building Modifications Building and Site Plan Approval Building Addition Building and Site Plan Approval Site Plan Approval Site Plan Approval Building Modifications PRD Review Building and Site Plan Approval Conceptual Building Plan Master Sign Program Site Plan Approval 22
ZONING BOARD OF APPEALS (ZBA) APPROVAL SUMMARY
The Zoning Board of Appeals hears requests for variances from the Municipal Zoning Code. In 2010, the following variances were granted: ƒ The industrial business located at N58 W14630‐50 Shawn Circle was granted a variance allowing less at‐grade landscape coverage. ƒ The home located at N87 W15010 Rozanne Drive was granted a variance to allow a detached garage that would encroach into the street yard setback. ƒ The home located at N88 W15882 Park Boulevard was granted a variance to allow a driveway to encroach into the side yard setback. ƒ The industrial business located at W158 N9361 Nor‐x‐way Avenue was granted a variance to allow the addition to the building that would encroach into the street yard setback. ƒ The home located at W164 N8626 Hiawatha Avenue was granted a variance to allow a detached garage to exceed the maximum area. ƒ The home located at N69 W15936 Eileen Avenue was granted a variance to allow an addition to the principle structure that would encroach into the rear yard. ƒ The property located at N89 W15230 Cleveland Avenue was granted a variance to allow a detached garage to exceed the maximum area. ƒ The property located at N94 W16029 Cherokee Drive was granted a variance allowing an addition to the principal structure that would encroach into the rear setback from an industrial district. ƒ The property located at W192 N5412 One Mile Road was granted a variance to allow a detached garage that would encroach into the side yard setback ƒ Waukesha County was granted variances for reduced setbacks for buildings, parking lots, and signage along Silver Spring Drive. 2010 Development Report 23