Bonnyville Centralized High School
Transcription
Bonnyville Centralized High School
RECAPP Facility Evaluation Report Northern Lights School Div #69 Bonnyville Centralized High School B2464A Bonnyville Report run on: January 27, 2005 8:00 AM Bonnyville - Bonnyville Centralized High School (B2464A) Facility Details Building Name: Bonnyville Centralized High S Address: 4908 - 49 Avenue Location: Bonnyville Building Id: B2464A 0.00 $10,540,823 Construction Year: 0 Gross Area (sq. m): Replacement Cost: Evaluation Details Evaluation Company: Burgess Bredo Architect Evaluation Date: May 1 2004 Evaluator Name: Mr. Burgess Bredo Evaluator Phone: (780) 431-1484 Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $542,400 5.15% General Summary: The original wood framed single story gym was constructed in 1958 (628.5). Steel and concrete bl;ock two storey stand alone building was constructed in 1971 (5,146.0 sq.m.). Original building is a stand alone former gym (628.5 sq.m.). A separate new building of 5,146.0 sq.m. was built on site in 1971. The CTS shops area was modernized in 1990. Original building is a stand alone former gym constructed in 1958 (628.5 sq.m.) A seperate new building of 5,146.0 sq.m. was built on sire in 1971. The CTS shops area was modernized in 1990. School building envelope is in reasonable condtition but the interior requires major modernization. The original gym building is still owned by the school board but leased out to a theatre group and was modernized in 1991. One room within the original building is used for one class per school year. Essentially the entire interior are leashold improvements undertaken by the theatre group and have been excluded from this evaluation. Generally, the 1971 phase is in fair condition while 1958 phase is in poor condition. Structural Summary: Foundation system is typically concrete spread footings and grade beams with concrete slab on grade. Wood framed floor, roof and walls in 1958 building while 1971 building is steel structure with metal decking and bearing on steel columns and concrete blocks. Building structural system is in good condition. Envelope Summary: Exterior finishes of 1958 building is predominately stucco while the 1971 building includes brick, concrete block, stucco and metal siding. Curtain wall and aluminum windows throughout the 1971 building in good condition; single wood framed window in 1958 building requires replacement. Aluminum entrances and hollow metal doors are in good condition. 1958 exterior wood doors require replacement. SBS membrane and bulk of built up roof membrane roofing is generally acceptable but the 1958 building roof requires re-roofing. Permanent roof access has to be provided. Generally, building envelope is in good condition. Interior Summary: Partitions are a combination of concrete block and metal stud with gypsum board. Ceiling finishes are typically acoustic tile and gypsum board. Wall finishes are ceramic tile or paint and in good condition. Floor finishes include vinyl tile, sheet vinyl, ceramic tile, hardwood gym flooring and carpet. Some carpet requires replacement. Report run on: January 27, 2005 8:00 AM Page 2 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) Solid core wood doors and hollow metal doors require some work including; replace damaged doors and upgrade door hardware to barrier free levers and introduce electromagnetic hold open devices at fire doors. Lockers, millwork and signage requires replacement. Barrier free access is generally good but does require minor modifications to washrooms. Partitions are a combination of concrete block and metal stud with gypsum board. Ceiling finishes are typically acoustic tile and gypsum board. Wall finishes are ceramic tile or paint and in good condition. Floor finishes include vinyl tile, sheet vinyl, ceramic tile, hardwood gym flooring and carpet. Some carpet requires replacement. Solid core wood doors and hollow metal doors require some work including; replace damaged doors and upgrade door hardware to barrier free levers and introduce electromagnetic hold open devices at fire doors. Lockers Inteior finishes are in need of replacement while acoustic treatment and fire stopping require upgrading. Selected millwork, interior signage and lockers need replacement. Barrier free access is deficient in a number of areas including clearances in front of the elevator. Building interior is in fair condition. Mechanical Summary: The school has had several modernizations and mechanical system upgrades. In 1990 new heating plant was installed and provided hydronic heating for radiant panels, glycol heat exchanger and other terminal heating units. In 2001 heating system was extended to provide heating media for administration and gymnasium air systems mechanical upgrades. Ventilation provided by four low velocity air systems. Ceiling space used as return air plenum where appropriate. Exhaust fans provided to exhaust rooms with activates requiring exhaust. Fire prevention consists of fire extinguishers installed on hook or in cabinets. BMCS system provides global control of the mechanical systems. Items found during school review which should be addressed but not limited to: - Upgrade plumbing fixtures. - Conduct study related to administration area air system/underground ductwork. - Conduct study related to gymnasium high/low occupancy. - Relocate duct heater in Industrial Arts air system. - Ventilate gasoline storage and paint storage. - Conduct study related to exhaust hoods in Industrial Arts. - Study alternate method of humidification for classroom air system. Mechanical system components are in fair to good condition. Electrical Summary: 120/208V/3PH/4W - 800 ampere main power service to building. T8 type fluorescent light fixtures, natural gas emergency generator, and high pressure sodium lighting to building exterior. Electrical installation is getting older and lighting, emergency power, and electrical devices need to be replaced in order to maintain continued service. Electrical systems are in fair condition. Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Report run on: January 27, 2005 8:00 AM Page 3 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) 5 - Good 6 - Excellent Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: January 27, 2005 8:00 AM Page 4 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S1 STRUCTURAL A1010 Standard Foundations* Perimeter grade beams bearing on strip footings. Rating 5 Installed Design Life 0 100 Updated October 2004 A1030 Slab on Grade* Concrete slab on grade throughout. Rating 5 Installed Design Life 0 100 Updated October 2004 B1010.01 Floor Structural Frame* Steel frame floor assembly at second floor. Wood framed floor added over conversation pit in student lunch area. Rating 5 Installed Design Life 0 100 Updated October 2004 B1010.02 Structural Interior Walls Supporting Floors* Load bearing concrete block and steel columns supporting suspended floor assemblies. Rating 5 Installed Design Life 0 100 Updated October 2004 B1010.03 Floor Decks, Slabs, and Toppings* Concrete topping slab on metal deck. Rating 5 Installed Design Life 0 100 Updated October 2004 B1010.05 Mezzanine Construction* Wood frame floor assembly at second floor conference room adjacent library. Rating 5 Installed Design Life 0 80 Updated October 2004 B1020.01 Roof Structural Frame* Steel framed structure bearing on concrete block and steel columns. Wood decking at pitched roof areas where exposed to view below; metal deck elsewhere. Rating 5 Installed Design Life 0 100 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 5 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) B1020.04 Canopies* Enclosure built around sawdust collector. Rating 3 Event: Installed Design Life 0 50 Updated October 2004 Add canopy over sawdust collector Concern: Snow piles up within enclosure and makes it difficult to empty sawdust barrels and maintain sawdust collector. Recommendation: Add canopy over sawdust collector. Type Year Cost Preventative Maintenance 2004 $2,500 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 6 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S2 ENVELOPE B2010.01.02.01 Brick Masonry: Ext. Wall Skin* 1986 Brick added over insulation and concrete block exterior walls in 1971 building. Rating 5 Installed Design Life 0 75 Updated October 2004 B2010.01.06.03 Metal Siding* 1986 Metal siding added over insulation and concrete block exterior walls in 1971 building. Rating 5 Installed Design Life 0 40 Updated October 2004 B2010.01.08 Portland Cement Plaster: Ext. Wall* 1986 Stucco added over insulation and concrete block exterior walls in 1971 building. Rating 5 Installed Design Life 0 75 Updated October 2004 B2010.01.09 Expansion Control: Exterior Wall Skin* Caulked control joints at dissimilar materials and in long walls throughout. Rating 5 Installed Design Life 0 0 Updated October 2004 B2010.02.03 Masonry Units: Ext. Wall Const.* 1971 Concrete block exterior walls throughout. Rating 5 Installed Design Life 0 0 Updated October 2004 B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* 1986 Urethane insulation and exterior cladding added during modernization to 1971 building. Rating 4 Installed Design Life 0 30 Updated October 2004 B2010.05 Parapets* Pre-finished cap flashings where exposed to view and galvanized where not exposed to view in most areas. Rating 5 Installed Design Life 0 0 Updated October 2004 B2010.06 Exterior Louvers, Grilles, and Screens* Painted and clear anodized aluminum grilles throughout. Rating 5 Installed Design Life 0 30 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 7 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) B2010.09 Exterior Soffits* Pre-finished metal siding panels. Rating 5 Installed Design Life 0 30 Updated October 2004 B2020.01.01.02 Aluminum Windows* Aluminum framed windows with vent along bottom throughout. Rating 5 Installed Design Life 0 35 Updated October 2004 B2020.03 Glazed Curtain Wall* Aluminum curtain wall with fixed double glazed sealed units at second floor conference room, lunch room and gym storage. Rating 4 Installed Design Life 0 40 Updated October 2004 B2030.01 Exterior Entrance Doors 2001 Insulated hollow metal with and without glazing set in pressed steel frames throughout. Rating 6 Installed Design Life 0 30 Updated October 2004 B2030.02 Exterior Utility Doors* 1958 1958 Solid core wood doors set in wood frames. Rating 3 Event: Installed Design Life 0 15 Updated October 2004 Replace exterior doors Concern: Selected exterior doors in 1958 are in very poor condition. Recommendation: REplace selected wood doors in 1958 phase (3 doors) Type Lifecycle Replacement Year Cost 2005 $3,500 Priority Low Updated: October 15 2004 B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)* 1991 Built up roof with gravel ballast at gym roof. Rating 5 Installed Design Life 0 25 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 8 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) B3010.04.04 Modified Bituminous Membrane Roofing (SBS)* 1986 and 1999 Two ply SBS membrane in roofs over CTS shops and two story portion. Rating 5 Installed Design Life 0 25 Updated October 2004 B3010.07 Sheet Metal Roofing* Corrugated metal roofing at sloped roofs over administration and gym stage. Rating 5 Installed Design Life 0 40 Updated October 2004 B3010.08.02 Metal Gutters and Downspouts* Pre-finished eaves trough at base of sloped roofs with down spouts spilling on to lower roof. Scuppers and down spouts provided at some roof areas. Rating 3 Event: Installed Design Life 0 30 Updated October 2004 Repair downspouts. Concern: Down spouts are leaking and staining wall surfaces behind. Recommendation: Repair downspouts. Type Year Cost Preventative Maintenance 2004 $2,000 Priority Low Updated: October 15 2004 B3010.09 Roof Specialties and Accessories* Steel ladder to roof hatch from second floor. Rating 3 Event: Installed Design Life 0 25 Updated October 2004 Add roof access ladders. Concern: Roof access is not provided to lower roof areas from upper roof level. Recommendation: Introduce permanent steel ladders for access to all levels of roof. Type Year Cost Preventative Maintenance 2005 $1,500 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 9 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) B3020.02 Other Roofing Openings* Manufactured roof hatch sitting in built up wood roof curb. Rating 5 Installed Design Life 0 0 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 10 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S3 INTERIOR C1010.01 Interior Fixed Partitions* Concrete block partitions and metal stud frame with gypsum board. Rating 5 Installed Design Life 0 50 Updated October 2004 C1010.03 Interior Operable Folding Panel Partitions* Folding partition between two classrooms. Rating 5 Installed Design Life 0 30 Updated October 2004 C1010.05 Interior Windows* Single wired glazing set in pressed steel frames throughout. Rating 5 Installed Design Life 0 40 Updated October 2004 C1010.06.02 Aluminum-Framed Storefronts Aluminum framed storefront with tempered/laminated glass at office adjacent student lunch area. Rating 5 Installed Design Life 0 0 Updated October 2004 C1010.07 Interior Partition Firestopping* Structure, mechanical ductwork and electrical conduit penetrate fire rated partitions throughout. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Add fire stopping. Concern: Openings in fire separations have not been properly fire stopped. Recommendation: Provide fire stopping at all fire rated partitions. Type Code Repair Year Cost 2004 $5,000 Priority Medium Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 11 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C1020.01 Interior Swinging Doors* Painted and clear finish solid core wood doors with and without glazed lites set in pressed steel frames throughout. Rating 3 Event: Installed Design Life 0 40 Updated October 2004 Replace damaged doors Concern: Some doors are damaged and need replacement. Recommendation: Replace approximately 25 damaged doors. Type Lifecycle Replacement Year Cost 2010 $17,000 Priority Low Updated: October 15 2004 Event: Replace door hardware Concern: Hardware is a variety of makes and styles; many have round knobs where lever design required for barrier free access. Recommendation: Replace locksets on approximately 90 doors. Type Barrier Free Access Upgrade Year Cost 2010 $25,000 Priority Low Updated: October 15 2004 C1020.02 Interior Entrance Doors* 2001 Glazed hollow metal doors set in pressed steel frames at bulk of vestibules. Rating 6 Installed Design Life 0 50 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 12 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C1020.03 Interior Fire Doors* Hollow metal and solid core wood set in pressed steel frames. Rating 3 Event: Installed Design Life 0 50 Updated October 2004 Re-install fire doors Concern: Fire doors at south stair have been removed. Recommendation: Re-install salvaged fire doors in south stair (8 doors). Type Code Repair Year Cost 2004 $1,000 Priority Medium Updated: October 15 2004 C1020.04 Interior Sliding and Folding Doors* Metal bi-fold doors at closets in administration offices. Rating 5 Installed Design Life 0 25 Updated October 2004 C1020.07.07 Lightproof Doors Revolving lightproof door provided at dark room. Dark rooms scheduled to be removed in 2004 renovation. Rating 5 Installed Design Life 0 0 Updated October 2004 C1030.01 Visual Display Boards* Chalkboards, whiteboards and tack boards throughout. Rating 4 Installed Design Life 0 10 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 13 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C1030.02 Fabricated Compartments(Toilets/Showers)* Floor supported metal toilet partitions in all washrooms. Rating 3 Event: Installed Design Life 0 20 Updated October 2004 Replace toilet partitions. Concern: Toilet partitions are in poor condition; doors are falling apart. Recommendation: Replace toilet partitions (19 cubicles) with new metal partitions. Type Failure Replacement Year Cost 2005 $5,700 Priority Low Updated: October 15 2004 C1030.08 Interior Identifying Devices* A variety of signage including plastic lamicoid signage, hand lettered on doors and hand lettered on paper. Rating 3 Event: Installed Design Life 0 20 Updated October 2004 Provide new signage Concern: Signage is sporadic as to type and presence. Recommendation: Provide new signage throughout the school. Type Program Functional Upgrade Year Cost 2008 $12,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 14 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C1030.10 Lockers* Full height lockers in selected corridors. Half height lockers in shower rooms. Rating 3 Event: Installed Design Life 0 30 Updated October 2004 Replace corridor lockers Concern: Lockers located in corridors are banged up and damaged throughout. Recommendation: Replace corridor lockers (380). Type Lifecycle Replacement Year Cost 2008 $50,000 Priority Low Updated: October 15 2004 C1030.12 Storage Shelving* Painted and clear finish plywood storage shelving. Rating 5 Installed Design Life 0 20 Updated October 2004 C1030.14 Toilet, Bath, and Laundry Accessories* Commercial grade mirrors, soap dispensers, paper towel dispensers and toilet tissue holders in all washrooms. Rating 5 Installed Design Life 0 20 Updated October 2004 C2010 Stair Construction (Including Ramps)* Cast in place concrete stairs to second floor classroom wing. Wood framed open stair to second floor above administration offices. Rating 5 Installed Design Life 0 100 Updated October 2004 C2020.02 Terrazzo Stair Finishes* Terrazzo with carborundum strips on both stairs to second floor classrooms. Rating 5 Installed Design Life 0 50 Updated October 2004 C2020.05 Resilient Stair Finishes* Vinyl tile on risers and treads. Rating 5 Installed Design Life 0 20 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 15 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C2020.06 Carpet Stair Finishes* Carpet on treads of stair to second floor above administration offices. Rating 4 Installed Design Life 0 10 Updated October 2004 C2020.08 Stair Railings and Balustrades* Wood handrail mounted over metal railings on one side; wood handrail mounted to wall on other side of both stairs to second floor. Wood handrail mounted over metal railings on one side of stair to second floor over administration offices. Rating 5 Installed Design Life 0 50 Updated October 2004 C3010.02 Wall Paneling* Wood wall paneling at main entrance vestibule. Rating 5 Installed Design Life 0 30 Updated October 2004 C3010.04 Gypsum Board Wall Finishes* Gypsum board at metal stud framed partitions throughout. Rating 5 Installed Design Life 0 40 Updated October 2004 C3010.06 Tile Wall Finishes* Ceramic wall tile in washrooms. Rating 5 Installed Design Life 0 50 Updated October 2004 C3010.11 Interior Wall Painting* All wall surfaces are painted. Rating 3 Event: Installed Design Life 0 5 Updated October 2004 Re-paint wall surfaces Concern: Paint surfaces are dirty or yellowing in many areas. Recommendation: Re-paint wall surfaces (10,300 sq.m.). Type Lifecycle Replacement Year Cost 2007 $75,000 Priority Low Updated: October 15 2004 C3020.01 Concrete Floor Finishes* Painted concrete floor finishes in selected mechanical and electrical rooms. Rating 5 Installed Design Life 0 20 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 16 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C3020.02 Tile Floor Finishes* Ceramic floor tile in washrooms throughout. Rating 5 Installed Design Life 0 30 Updated October 2004 C3020.04 Wood Flooring* Sprung hard wood gym flooring. Rating 3 Installed Design Life 0 10 Updated October 2004 Event: Repair and re-finish gym floor. Concern: Hard wood flooring is yellowing, joints are beginning to open up. Recommendation: Sand flooring down to bare wood, repair and re-finish (474 sq.m.). Type Repair Year Cost 2008 $12,000 Priority Low Updated: October 15 2004 C3020.07 Resilient Flooring* Vinyl composite tile to selected rooms and classrooms throughout. Rating 3 Event: Installed Design Life 0 20 Updated October 2004 Replace vinyl floor tile Concern: Tiles are cracked or stained in areas; joints opening up. Recommendation: Remove vinyl tiles and replace with new vinyl tiles. (1,800 sq.m.) Type Lifecycle Replacement Year Cost 2007 $72,000 Priority Low Updated: October 15 2004 C3020.07 Resilient Flooring* 2002 2002 Large rubber tiles added to corridors throughout. Rating 6 Installed Design Life 0 20 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 17 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C3020.08 Carpet Flooring* 2002 2002 Carpet in library. Rating 6 Installed Design Life 0 10 Updated October 2004 C3020.08 Carpet Flooring* 2000 2000 Carpet tiles in administration office areas. Rating 5 Installed Design Life 0 10 Updated October 2004 C3020.14 Other Floor Finishes* 2002 Epoxy 2002 Desco epoxy flooring in change rooms and main floor south stair of classroom wing have been repaired. Rating 5 Installed Design Life 0 0 Updated October 2004 C3020.14 Other Floor Finishes* Epoxy Desco epoxy flooring in CTS shops is cracked and stained. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Repair Desco epoxy flooring. Concern: Desco epoxy flooring in CTS shops is cracked and stained throughout. Recommendation: Repair Desco epoxy flooring (260 sq.m.) Type Repair Year Cost 2008 $8,000 Priority Low Updated: October 15 2004 C3030.04 Gypsum Board Ceiling Finishes* Gypsum board ceilings in washrooms, shower rooms, storage rooms, mechanical and electrical rooms. Rating 5 Installed Design Life 0 50 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 18 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)* Suspended t-bar grid system with acoustic tiles in selected corridors and classrooms. Rating 3 Event: Installed Design Life 0 15 Updated October 2004 Replace acoustic ceilings Concern: Ceiling tiles are dirty and damaged; suspension system damaged in areas. Recommendation: Replace ceiling tiles and suspension system (1,800 sq.m.) with new suspended celiing tiles. Type Lifecycle Replacement Year Cost 2007 $63,000 Priority Low Updated: October 15 2004 C3030.06 Acoustic Ceiling Treatment* No acoustic ceiling treatment in gym. Rating 3 Event: Installed Design Life 0 15 Updated October 2004 Add ceiling treatment in gym. Concern: Gym is noisy space and difficult to teach in. School plans to add acoustic. ceiling panels. Recommendation: Add acoustic ceiling panels. Type Program Functional Upgrade Year Cost 2005 $15,000 Priority Low Updated: October 15 2004 C3030.06 Acoustic Ceiling Treatment* Upgraded 1992 Ceilings have been upgraded with acoustic ceiling tiles in suspended t-bar grid in a number of areas including student lunch area, selected corridors, administration area and library. Rating 5 Installed Design Life 0 15 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 19 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) C3030.07 Interior Ceiling Painting* Gypsum board ceilings are painted. Rating 3 Event: Installed Design Life 0 10 Updated October 2004 Paint gypsum board ceilings Concern: Ceilings are yellowing and dirty. Recommendation: Re-paint gypsum board ceilings (500 sq.m.) Type Lifecycle Replacement Year Cost 2007 $5,000 Priority Low Updated: October 15 2004 C3030.09 Other Ceiling Finishes* Metal decking used as ceiling finish in bulk of corridors. Rating 4 Installed Design Life 0 0 Updated October 2004 D1010.02 Lifts* 1986 550 lb. capacity Argo lift provided adjacent mechanical room in two storey classroom wing. Rating 4 Installed Design Life 0 25 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 20 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S4 MECHANICAL D2010.01 Water Closets* Floor mounted flush tank and valve closets, open front seat. Water closets are original. Rating 5 Installed Design Life 0 30 Updated September 2004 D2010.02 Urinals* Stall type urinals with flush tank. Some tanks leak water continuous and frequency of tank flush results in water wastage. Rating 3 Event: Installed Design Life 0 30 Updated September 2004 Remove flush tanks on urinals and install battery operated flush valves. Concern: Some flush tanks leak water continuous and frequency of tank flush results in water wastage. Recommendation: Install battery sensor operated flush valve. Type Operating Efficiency Upgrade Year Cost 2005 $4,000 Priority Medium Updated: September 28 2004 D2010.03 Lavatories* Porcelain on steel bowls with time delay faucets installed in 2000. Rating 5 Installed Design Life 0 30 Updated September 2004 D2010.04 Sinks* Stainless steel counter top sinks. Some water leakage at brass. Rating 5 Installed Design Life 0 30 Updated September 2004 D2010.05 Showers* Central mix valve, on/off valve, institutional head. Rating 4 Installed Design Life 0 30 Updated September 2004 D2010.09 Other Plumbing Fixtures* Beauty salon sink in beauty culture. Rating 5 Installed Design Life 0 0 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 21 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D2010.09 Other Plumbing Fixtures* Handicap lavatory provided in boy's washroom. Lever removed due to vandalism. Handicap water closet not provided. Rating 3 Event: Installed Design Life 0 0 Updated September 2004 Install barrier free plumbing fixtures. Concern: Barrier free water closet not installed to compliment handicap lavatory. Recommendation: Install barrier free water closets. Type Barrier Free Access Upgrade Year Cost 2005 $3,400 Priority Medium Updated: September 28 2004 D2010.09 Other Plumbing Fixtures* Science room sink brass vacuum breakers not installed, brass outlets missing. Rating 3 Event: Installed Design Life 0 0 Updated September 2004 Repair sink brass in science room. Concern: Science room sink brass missing vacuum breakers and outlets. Recommendation: Install new brass. Type Repair Year Cost 2004 $3,000 Priority Medium Updated: September 28 2004 D2020.01.01 Pipes and Tubes: Domestic Water* Copper piping and fittings. Rating 4 Installed Design Life 0 40 Updated September 2004 D2020.01.02 Valves: Domestic Water Gate isolation valves. Rating 4 Installed Design Life 0 40 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 22 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D2020.01.03 Piping Specialties (Backflow Preventors)* Boiler makeup complete with backflow preventor. Not installed at operator's level. Rating 5 Installed Design Life 0 0 Updated September 2004 D2020.02.02 Plumbing Pumps: Domestic Water* Inline domestic hot water recirculation pumps installed for water heaters in mechanical room 19 and 58. Rating 5 Installed Design Life 0 20 Updated September 2004 D2020.02.06 Domestic Water Heaters* Mechanical room 58 domestic H.W. heater, 324,000 BTU/hr. input. Mechanical room 19 - domestic H.W. heater 324,000 BTU/hr. input. Rating 5 Installed Design Life 0 20 Updated September 2004 D2020.03 Water Supply Insulation*: Domestic Majority of domestic hot, cold and recirculation piping insulated. Some uninsulated piping in mechanical rooms at domestic hot water heater. Rating 5 Installed Design Life 0 0 Updated September 2004 D2030.01 Waste and Vent Piping* Cast iron and copper. Rating 5 Installed Design Life 0 50 Updated September 2004 D2030.02 Waste Piping Specialties* Bottle traps installed in Bio Lab. Rating 5 Installed Design Life 0 50 Updated September 2004 D2040.01 Rain Water Drainage Piping Systems* Cast iron piping discharges to grade. Rating 5 Installed Design Life 0 50 Updated September 2004 D2040.02.04 Roof Drains* Cast iron dome, flow control. Rating 6 Installed Design Life 0 40 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 23 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3010.02 Gas Supply Systems* Gas distribution piping installed to heating boilers, domestic hot water heater, science room. Rating 6 Installed Design Life 0 50 Updated September 2004 D3020.02.01 Heating Boilers and Accessories: H.W.* Two (2) A.O. Smith steel tube boilers, 2,160 MBH each. Boilers complete with low water cut off, relief valve and flow switch. Evidence of down draft of flue gases. Rating 2 Event: Installed Design Life 0 30 Updated September 2004 Conduct study related to report of downdraft conditions. Concern: Down draft of flue gases. Recommendation: conduct study and provide recommendations and cost estimates. Type Study Year Cost 2004 $2,000 Priority High Updated: September 28 2004 D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler* Class B chimney. Rating 5 Installed Design Life 0 30 Updated September 2004 D3020.02.03 Water Treatment: H. W. Boiler* Chemical pot feeder provided to add chemicals into heating system. Side stream filter assembly installed. Rating 5 Installed Design Life 0 30 Updated September 2004 D3020.03.01 Furnaces* In mechanical room 58 furnace heat exchangers removed and glycol coils installed in 2001. Blower and filter section reused. Rating 6 Installed Design Life 0 25 Updated September 2004 D3030.06.02 Refrigerant Condensing Units* Roof mounted condensing unit for Dx coil installed in supply air duct to computer room. Rating 6 Installed Design Life 0 25 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 24 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01 Air Distribution Systems Gymnasium area air supply from air system is distributed via low velocity underground ductwork to side wall grilles. Return air ducted to air system. Rating 5 Installed Design Life 0 30 Updated September 2004 D3040.01 Air Distribution Systems Classroom area air supply from air system is distributed via low velocity ductwork to grilles and diffusers. Ceiling space used as return air plenum. Rating 5 Installed Design Life 0 30 Updated September 2004 D3040.01 Air Distribution Systems Administration and lobby area supply from air system is distributed via underground low velocity ductwork to floor grilles. Ductwork fills up with water. Pumps were added. Rating 1 Event: Installed Design Life 0 30 Updated September 2004 Underground supply air ductwork fills up with water. Concern: Ductwork fills up with water. Pumps have been added to pump water out. Potential for mould exists despite addition of pumps. Recommendation: Install above ground ductwork, related rooftop unit, reheat coils, radiation and connect to glycol piping in Mechanical Room 58. Type Year Cost Indoor Air Quality Upgrade 2005 $95,000 Priority High Updated: September 28 2004 D3040.01 Air Distribution Systems Industrial Arts air supply form air system is distributed via low velocity ductwork to grilles. Return air ducted to air system. Rating 5 Installed Design Life 0 30 Updated September 2004 D3040.01.01 Air Handling Units: Air Distribution* Classroom air system complete with supply fan (12,660 cfm), return fan (11,400 cfm), motorized fresh, return, exhaust air dampers, glycol heating coil, 50 mm pleated filters, evaporative humidifier. Rating 5 Installed Design Life 0 30 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 25 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01.01 Air Handling Units: Air Distribution* Gymnasium air system is a Lennox rooftop unit which was reused during 2001 mechanical upgrade. Glycol heating coil was added in supply air ductwork in Mechanical Room 58. Existing in line duct heaters remained in place. Damper motors were added to control fresh, return and exhaust air dampers. Unit complete with supply fan, motorized fresh, return, exhaust dampers, filters. Rating 3 Event: Installed Design Life 0 30 Updated September 2004 Conduct study to determine upgrade required to air system for high/low occupancy functions. Concern: Air system is single speed and may not be suitable for high/low occupancy functions. Recommendation: Conduct study to determine upgrade required for high/low occupancy functions. Type Study Year Cost 2004 $2,000 Priority Low Updated: September 28 2004 D3040.01.01 Air Handling Units: Air Distribution* Administration area air system during 2001 mechanical upgrade had furnace gas fired heat exchanger and burner removed and glycol heating coils installed. Rating 3 Event: Installed Design Life 0 30 Updated September 2004 Unit supply air to underground ductwork which fills up with water. Concern: Unit supplies air to underground ductwork which fills up with water. Recommendation: Conduct study to determine if system should be abandoned and above ground and rooftop unit be installed. Type Study Year Cost 2004 $3,400 Priority High Updated: September 28 2004 Report run on: January 27, 2005 8:00 AM Page 26 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.01.01 Air Handling Units: Air Distribution* Industrial Arts air system is a ICG indoor unit installed in 1988 complete with fresh, return air dampers, supply fan, indirect fired heat exchanger, two in line gas fired duct heaters. Access to duct heaters for maintenance and repair is limited. Rating 3 Event: Installed Design Life 0 30 Updated September 2004 Relocate inline duct heater for maintenance and repair. Concern: Access to duct heater for maintenance and repair is limited. Recommendation: Relocate duct heater to allow maintenance and repair. Type Operating Efficiency Upgrade Year Cost 2005 $5,000 Priority Medium Updated: September 28 2004 D3040.01.03 Air Cleaning Devices:Air Distribution* Air systems complete with throw away filters. Rating 5 Installed Design Life 0 0 Updated September 2004 D3040.01.04 Ducts: Air Distribution* Low velocity supply air ductwork to terminal air outlets. Administration and gymnasium ductwork is underground. Rating 5 Installed Design Life 0 50 Updated September 2004 D3040.01.05 Duct Accessories: Air Distribution* Balancing dampers provided in branch line ducts to air outlets. Fire dampers provided in fire rated walls. Rating 5 Installed Design Life 0 0 Updated September 2004 D3040.01.07 Air Outlets & Inlets:Air Distribution* Air outlets vary as to type, fixed square pattern diffusers, perforated diffusers, adjustable bar grilles, sidewall grille. Rating 5 Installed Design Life 0 0 Updated September 2004 D3040.03.01 Hot Water Distribution Systems* Black iron piping to radiant panels, unit heaters, two (2) plate glycol heat exchangers, entrance heaters. Two inline circulation pumps. Rating 5 Installed Design Life 0 0 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 27 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.04 Special Exhaust Systems Screen drying exhaust. No complaints. Rating 6 Installed Design Life 0 30 Updated September 2004 D3040.04 Special Exhaust Systems Science room fume hood. Rating 5 Installed Design Life 0 30 Updated September 2004 D3040.04 Special Exhaust Systems Room previously used for acetylene storage is being used for gasoline storage and other volatiles. Room not ventilated. Paint storage in Industrial Arts requires exhaust. Rating 2 Event: Installed Design Life 0 30 Updated September 2004 Ventilate rooms containing fumes which could explode. Concern: Extraction of fumes within storage rooms not occurring. Recommendation: Install dedicated exhaust fans and related ductwork. Type Year Cost Indoor Air Quality Upgrade 2005 $3,800 Priority High Updated: September 28 2004 D3040.04 Special Exhaust Systems Paint exhaust hood, welding booth exhaust, forge exhaust do not appear to be effective in removal of fumes. Rating 3 Event: Installed Design Life 0 30 Updated September 2004 Conduct study related to indoor air quality in Industrial Arts. Concern: Paint exhaust hood, welding booth exhaust, forge exhaust do not appear to be effective in removal of fumes. Indoor air quality may be at risk. Recommendation: Conduct study to determine effectiveness of hoods. Type Study Year Cost 2004 $2,400 Priority Medium Updated: September 28 2004 Report run on: January 27, 2005 8:00 AM Page 28 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.04 Special Exhaust Systems Chemicals left on counter in science prep room. Rating 3 Event: Installed Design Life 0 30 Updated September 2004 Provide dedicated exhaust for chemical storage. Concern: Chemicals not stored within exhausted containment space. Recommendation: Provide dedicated exhaust for chemical storage compartment. Type Year Cost Indoor Air Quality Upgrade 2004 $2,000 Priority High Updated: September 28 2004 D3040.04.01 Fans*: Exhaust Roof mounted and inline exhaust fans are provided to exhaust various functions. Exhaust fans are dome or louvred design. Separation of outflow from air intakes adequate. Rating 5 Installed Design Life 0 30 Updated September 2004 D3040.04.03 Ducts*: Exhaust Low velocity exhaust air ductwork to exhaust air outlets and fans. Rating 5 Installed Design Life 0 0 Updated September 2004 D3040.04.04 Ducts Accessories*: Exhaust Balancing dampers provided in branch line ducts. Rating 5 Installed Design Life 0 0 Updated September 2004 D3040.04.05 Air Outlets and Inlets*: Exhaust Exhaust air grilles. Rating 5 Installed Design Life 0 0 Updated September 2004 D3040.05 Heat Exchangers* 2000 Plate heat exchanger for air system glycol heating coils. Two (2) glycol system circulation pumps. Butterfly, globe valves installed. Rating 6 Installed Design Life 0 30 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 29 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3040.05 Heat Exchangers* 2001 Plate heat exchanger installed for air system glycol heating coils. Two (2) glycol system circulation pumps. Butterfly, globe valves installed. Rating 6 Installed Design Life 0 30 Updated September 2004 D3050.02 Air Coils* Dx cooling coil installed in branch line duct serving completer room. Rating 6 Installed Design Life 0 30 Updated September 2004 D3050.03 Humidifiers* 1990 Classroom air system complete with wetted evaporative pads complete with reservoir. Water carryover is resulting in fan casing, motor and unit internals rusting resulting in poor aseptic condition. Rating 3 Event: Installed Design Life 0 25 Updated September 2004 Study classroom air system humidification. Concern: Evaporative humidifier water carryover is resulting in fan casing, motor and unit internals rusting resulting in poor aseptic condition and air quality compromised. Recommendation: Conduct study to determine alternate method of humidification. Type Study Year Cost 2004 $1,800 Priority Medium Updated: September 28 2004 D3050.03 Humidifiers* 2000 Gymnasium air system complete with electric humidifier installed in 2002. Rating 6 Installed Design Life 0 25 Updated September 2004 D3050.05.02 Fan Coil Units* Hot water fan coil unit installed in entrances. Rating 5 Installed Design Life 0 30 Updated September 2004 D3050.05.06 Unit Heaters* Unit heaters installed in mechanical rooms and meter room. Rating 5 Installed Design Life 0 30 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 30 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D3050.05.08 Radiant Heating (Ceiling & Floor)* Radiant panels installed in classrooms and administration area. Rating 6 Installed Design Life 0 35 Updated September 2004 D3060.02 HVAC Instrumentation and Controls BMCS enables and control air systems, heating system. Rating 6 Installed Design Life 0 30 Updated September 2004 D3060.02.01 Electric and Electronic Controls* Line voltage electric thermostats cycles unit heaters and fan coil fans to maintain set point. Rating 6 Installed Design Life 0 30 Updated September 2004 D3060.02.02 Pneumatic Controls* Duplex air compressor, refrigerated air dryer. Pneumatic room thermostats, control valves, damper motors. Rating 4 Installed Design Life 0 40 Updated September 2004 D3060.02.05 Building Systems Controls(BMCS, EMCS)* BMCS system controls equipment activation and assists in maintaining building environment. Connected via modem to control work station in Bonnyville. Rating 5 Installed Design Life 0 25 Updated September 2004 D4030.01 Fire Extinguisher, Cabinets and Accessories* Eye wash installed in Industrial Arts and are stored in office due to vandalism. Eye washes installed in Bio Lab, science room. Blanket installed in Bio Lab. ABC extinguishers on wall hooks or in cabinets. Rating 5 Installed Design Life 0 30 Updated November 2004 D4090.05 Halon Extinguishing Systems* Two sprinkler heads with halon bottle installed for finishing room. Rating 6 Installed Design Life 0 0 Updated September 2004 Report run on: January 27, 2005 8:00 AM Page 31 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S5 ELECTRICAL D5010.03 Main Electrical Switchboards (Main Distribution)* Underground service from pad mounted transformer. Main power service terminates to a Westinghouse main distribution switchboard located in Electrical Room. Service is rated for 800 ampere, 120/208V/3PH/4W. Rating 4 Installed Design Life 0 40 Updated October 2004 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)* Westinghouse branch circuit panelboards. Most panelboards are loaded to capacity with no room for future expansion. Rating 3 Event: Installed Design Life 0 30 Updated October 2004 Provide additional power panels. Concern: Existing power panels are generally loaded to capacity and have no spares to accommodate future loads. Recommendation: Provide four additional power panels to accommodate future building loads. Type Program Functional Upgrade Year Cost 2005 $16,000 Priority Low Updated: October 15 2004 D5010.07.02 Motor Starters and Accessories* Square D and Cutler Hammer combination motor starters to motor loads. Rating 4 Installed Design Life 0 0 Updated October 2004 D5020.01 Electrical Branch Wiring* Wiring & devices installed in conduit & boxes, with stainless steel cover plates with mixture of brown and ivory devices. Rating 3 Installed Design Life 0 50 Updated October 2004 Event: Replace existing wiring devices. Concern: Existing wiring devices are generally old and in poor shape and are nearing end of expected life. Recommendation: Replace wiring devices with new in order to maintain continued service. Type Lifecycle Replacement Year Cost 2005 $35,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 32 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D5020.02.01 Lighting Accessories (Lighting Controls)* Separate switching generally provided to each room. Rating 4 Installed Design Life 0 0 Updated October 2004 D5020.02.02.02 Interior Florescent Fixtures* 2002. Combination of surface mounted and recess mounted fluorescent light fixtures retrofitted with T8 lamps with electronic ballasts. Rating 3 Installed Design Life 0 0 Updated October 2004 Event: Replace building light fixtures. Concern: Existing light fixtures are old with yellowing lens and housings. Fixtures should be replaced in order to maintain continued service. Recommendation: Replace all existing fluorescent light fixtures with new in order to maintain continued service. Type Lifecycle Replacement Year Cost Priority 2010 $185,000 Low Updated: October 15 2004 D5020.02.03 Emergency Lighting* Emergency lighting uses strategically located fluorescent fixtures which are powered from the emergency generator. Exit signs are located throughout building. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Replace Exit Signs Concern: Exit signs are old, in poor shape, and nearing end of expected lift span. Replace exit signs along with emergency system lighting upgrade. Recommendation: Replace exit signs along with emergency system lighting upgrade. Type Lifecycle Replacement Year Cost 2005 $10,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 33 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D5020.03.01.04 Exterior H.P. Sodium Fixtures* Wall mounted HPS lighting units provided along building perimeter. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Replace lens on 6 exterior HPS fixtures. Concern: Lens on approximately 6 exterior HPS light fixtures have yellowed and should be replaced in order to restore quality lighting. Recommendation: Replace yellowed lens on exterior HPS lights. Type Lifecycle Replacement Year Cost 2004 $2,500 Priority Low Updated: October 15 2004 D5020.03.01.05 Other Exterior Fixtures* Quarz lights on poles provided to two sides of building. Rating 4 Installed Design Life 0 0 Updated October 2004 D5020.03.02 Lighting Accessories (Lighting Controls)* Exterior lighting photocell controlled from a central lighting control panel. Rating 4 Installed Design Life 0 0 Updated October 2004 D5030.01 Detection and Alarm Fire Alarm* 1997. Edwards manufacture (ESA 2000), hard wired, zoned, supervised system. Last tested August/1999. Panel is located at control room with remote annunciator at the entrance. Rating 4 Installed Design Life 0 25 Updated October 2004 D5030.02.02 Intrusion Detection* Ademco security system comprised of key pad entry, main controller. Multi Zones, motion sensors & door contacts. Intrusion Alarm entry key pads are located for entry/exit. Rating 4 Installed Design Life 0 25 Updated October 2004 D5030.02.04 Video Surveillance* Approximately 10 security cameras at building interior to a video recording system. Rating 4 Installed Design Life 0 25 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 34 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D5030.03 Clock and Program Systems* Battery operated clocks with class change through call system. Rating 4 Installed Design Life 0 20 Updated October 2004 D5030.04.01 Telephone Systems* Panasonic telephone system upgraded approximately in 2002. Rating 4 Installed Design Life 0 15 Updated October 2004 D5030.04.02 Paging Systems* Paging through call system with speakers in corridors and classrooms. Rating 4 Installed Design Life 0 15 Updated October 2004 D5030.04.03 Call Systems* Dukane intercom system with return call stations in classrooms. Rating 4 Installed Design Life 0 15 Updated October 2004 D5030.04.04 Data Systems* Cat. 5 data cabling to data outlets with HUB located in storage room on main floor. Rating 4 Installed Design Life 0 15 Updated October 2004 D5030.06 Television Systems* Cable TV provided by Norther Cable. Rating 4 Installed Design Life 0 0 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 35 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) D5090.02 Packaged Engine Generator Systems (Emergency Power System)* Emergency generator provides emergency power to building. Generator is natural gas fired, 120/240V/1PH, 3 KW complete with transfer switch. Rating 2 Event: Installed Design Life 0 40 Updated October 2004 Replace emergency generator with DC emergency lighting system. Concern: Emergency generator is natural gas fired, is very old and in poor shape, and no longer complies with code. Recommendation: Recommend that generator be removed and replaced with DC emergency lighting system. Type Lifecycle Replacement Year Cost 2005 $23,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 36 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E1010.07 Vending Equipment Vending machines located in corridors in several locations. Rating 5 Installed Design Life 0 0 Updated October 2004 E1090 Other Equipment Variety of power and manual for wood and metal shops in CTS; dust collector system in CTS; metal boot racks at entrances. Rating 5 Installed Design Life 0 0 Updated October 2004 E1090.04 Residential Equipment* Residential range, refrigerator, dishwasher and microwave ovens in staff room. Residential microwave ovens in student lunch area. Rating 5 Installed Design Life 0 10 Updated October 2004 E1090.07 Athletic, Recreational, and Therapeutic Equipment* Two wall hung Plexiglas and four wall hung plywood basketball backboards. Electric scoreboard and shot clocks. Fabric gymnasium divider. Rating 5 Installed Design Life 0 15 Updated October 2004 E2010.02.05 Educational Facility Casework* Painted plywood casework with plastic laminate clad tops in most classrooms. Rating 3 Installed Design Life 0 0 Event: Replace selected millwork Updated October 2004 Concern: Plastic laminate coming off countertops in areas. Cabinets doors are damaged in areas. Computer rooms lack purpose built millwork. Some millwork no longer used due to program changes in room. Recommendation: Replace millwork in selected classrooms (25 m.), provide millwork in computer rooms (120 stations) and replace storage cabinets in 8 classrooms. Type Lifecycle Replacement Year Cost 2008 $75,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 37 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) E2010.02.07 Kitchen Casework* Painted plywood cabinets with plastic laminate countertops in staff room. Rating 5 Installed Design Life 0 0 Updated October 2004 E2010.02.08 Laboratory Casework* Painted plywood cabinets with acid resistant plastic laminate countertops throughout. Clear finish plywood shelving with solid plywood doors above. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Replace laboratory millwork Concern: Plastic laminate coming off countertops in areas. Cabinets doors are damaged in areas. Some millwork no longer used due to program changes in room. Recommendation: Replace millwork (uppers and lowers) in selected labs (40 m.) and remove in room 10. Type Lifecycle Replacement Year Cost 2008 $30,000 Priority Low Updated: October 15 2004 E2010.02.09 Library Casework* Clear finish plywood shelving in library. Rating 5 Installed Design Life 0 0 Updated October 2004 E2010.02.99 Other Casework* 1971 Plastic laminate clad vanities in washrooms. 2000 Plastic laminate clad cabinet with plastic laminate clad countertop at reception in office area. Rating 4 Installed Design Life 0 0 Updated October 2004 E2010.03.01 Blinds* Horizontal aluminum blinds and vertical Louvre blinds throughout. Rating 5 Installed Design Life 0 10 Updated October 2004 E2010.03.06 Curtains and Drapes* Vinyl privacy screens in former CTS Foods remain in place; heavy duty curtains in welding booths. Rating 5 Installed Design Life 0 20 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 38 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) E2010.05 Fixed Multiple Seating* Wood benches provided at main entrance. Tables and chairs fixed in place in student lunch area. Rating 5 Installed Design Life 0 25 Updated October 2004 E2020 Moveable Furnishings* Wide variety of educational and office furnishings including desks, tables, bookshelves and chairs. Rating 5 Installed Design Life 0 20 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 39 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) F1010.03 Other Special Structures 1958 Theatre 1958 stand alone building was originally a gym. Currently leased out to a theatre group which has done leasehold improvements including adding second floor. Architectural: Stucco over wood frame exterior walls. Glu-lam roof assembly with wood decking. Built up roof with gravel ballast. No roof hatch available. Wood framed canopy at north entrance. Canvas canopy at main east entrance. Painted metal flashings, wood framed window in kitchen, solid core wood doors set in wood frames. Building envelope is in fair condition and roof requires replacement. Interior building components were not assessed but the leasehold improvements appear to have concerns with building codes. A study is required for code compliance. Mechanical: Electrical: Fluorescent lighting with T12 lamps and magnetic ballasts, branch circuit panelboards, DC battery type emergency lighting system with remote heads and exit signs, and ivory devices with stainless steel coverplates. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Introduce roof access on 1958 building Concern: Roof access is not provided to roof areas from second floor. Recommendation: Provide roof hatch and permanent steel ladders for access to roof. Type Year Cost Preventative Maintenance 2008 $2,500 Priority Low Updated: October 15 2004 Event: Replace exterior doors and frames on 1958 building. Concern: Wood doors and frames in very poor condition. Recommendation: Replace exterior doors and frames (3 doors). Type Lifecycle Replacement Year Cost 2008 $4,500 Priority Low Updated: October 15 2004 Event: Replace roof on 1958 building Concern: Roof is well in excess of 25 years old. Recommendation: Replace roof on 1958 building (628 sq.m.). Type Lifecycle Replacement Year Cost 2008 $50,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 40 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) Event: Replace wood framed window. Concern: Wood framed window in poor condition. Recommendation: Replace wood framed window on 1958 building. Type Lifecycle Replacement Year Cost 2008 $700 Priority Low Updated: October 15 2004 Event: Study life and fire safety of Theatre leasehold improvements. Concern: A number of issues observed do not appear to comply to current codes. These would include construction of rated floor assemblies, configuation and location of second floor exit stairs, construction of storage mezzanine and barrier free access. Recommendation: Undertake study life and fire safety of Theatre leasehold improvements. Type Study Year Cost 2004 $3,500 Priority Low Updated: October 15 2004 F1020.02.13 Paint Booths* Paint booth provided in CTS shops. Rating 4 Installed Design Life 0 0 Updated October 2004 Report run on: January 27, 2005 8:00 AM Page 41 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) F2020 Hazardous Components Abatement 1971 HAZMAT audit not available. Original 9 x 9 vinyl tile likely contains asbestos in a stable form. Noticeable musty odor likely due to water in underslab ductwork. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Undertake mould assessment Concern: Musty smell detected in 1971 phase; likely due to water in underslab ductwork. Recommendation: Undertake mould recommendations. assessment Type Study study Year Cost 2004 $3,000 complete with Priority High Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 42 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) S8 FUNCTIONAL ASSESSMENT K40 Current Code Issues There are no obvious issues apparent that would warrant a code analysis. Washroom doors have been removed for convenience. This has the effect of joining washrooms to corridors and it is assumed that walls around washrooms would complete fire separation of corridors. Fire doors to exit stairs have been removed. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Introduce electro magnetic hold open devices Concern: Fire doors at exit stairs are required to provide safe exiting from the building. Removing troublesome doors in heavy use locations is commonplace but defeats their purpose. Recommendation: Introduce electro magnetic hold open devices tied in to fire alarm to release on activation (8 doors). Type Code Upgrade Year Cost 2004 $12,000 Priority Low Updated: October 15 2004 K4010.01 Barrier Free Route: Parking to Entrance Access provided from drop off at east end of school to east entrance. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Add barrier free parking and ramps to main entrance. Concern: No designated BFA parking provided. Recommendation: Provide designated parking stalls in proposed new parking at south east corner of school and introduce sidewalk to east entrance. Provide concrete sidewalk from parking to east entrance. Work would be undertaken at same time as new parking lot. Type Barrier Free Access Upgrade Year Cost 2007 $5,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 43 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) K4010.02 Barrier Free Entrances Barrier free access required to main entrance doors. Rating 3 Event: Installed Design Life 0 0 Updated October 2004 Provide power assisted door operators. Concern: No power assisted door operators provided at east entrances. Recommendation: Provide power assisted door operators at east and main entrances. Type Barrier Free Access Upgrade Year Cost 2004 $4,000 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 44 of 45 Bonnyville - Bonnyville Centralized High School (B2464A) K4010.03 Barrier Free Interior Circulation Access good to all areas. Public counter at main entrance reception area. Plastic laminate clad plywood public telephone enclosure provided adjacent main entrance. Rating 3 Installed Design Life 0 0 Updated October 2004 Event: Increase clearances at elevator Concern: Clearances in front of door do not comply to current code (1040 mm provided, 1525 mm required). Recommendation: Relocate walls at boys washrooms and janitors room to increase clearancers in front of lift. Type Barrier Free Access Upgrade Year Cost 2004 $5,000 Priority Low Updated: October 15 2004 Event: Upgrade access to public counter and public telephone. Concern: Telephone enclosure provided at main entrance. Coin slots are too high for BFA (1500 mm existing, 1370 mm required) and no shelf space provided for TTY (ABC 3.8.3.15). Recommendation: Provide new telephone enclosure and mount at maximum height of 1370 mm measured from coin slots. Type Barrier Free Access Upgrade Year Cost 2010 $500 Priority Low Updated: October 15 2004 Report run on: January 27, 2005 8:00 AM Page 45 of 45 Bonnyville - Bonnyville Centralized High School (S2464) Facility Details Building Name: Bonnyville Centralized High S Address: Location: Bonnyville Building Id: S2464 0.00 $0 Construction Year: 0 Gross Area (sq. m): Replacement Cost: Evaluation Details Evaluation Company: Burgess Bredo Architect Evaluation Date: May 1 2004 Evaluator Name: Mr. Burgess Bredo Evaluator Phone: (780) 431-1484 Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $46,000 0% General Summary: Fair sized site with good access and sufficient parking. The site is too small for properly sized athletic fields. An increase in the number of parking stalls is required as well as re-paving of existing. As well, surface drainage and the concrete steps at the main entrance are problematic. Structural Summary: Envelope Summary: Interior Summary: Mechanical Summary: Electrical Summary: Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: January 28, 2005 4:40 PM Page 2 of 8 Bonnyville - Bonnyville Centralized High School (S2464) S7 SITE G2020.02.01 Aggregate Parking Lots (Gravel)* Gravel staff parking lot for 28 vehicles located at south west corner of school. Rating 3 Event: Installed Design Life 0 10 Updated July 2004 Repair and overlay gravel parking lot Concern: Parking lot has uneven surface and is prone to ponding. Recommendation: Repair soft spots and overlay with asphalt (720 sq.m.) Type Program Functional Upgrade Year Cost 2007 $28,000 Priority Low Updated: July 14 2004 G2020.02.02 Flexible Paving Parking Lots(Asphalt)* Existing parking lots for staff and students are too small. Rating 3 Installed Design Life 0 10 Event: Construct new parking lot Updated July 2004 Concern: Existing parking lot is too small for staff and student parking. Require additional 15 stalls for staff and 15 stalls for students. Recommendation: Construct new parking lot for 30 vehicles (800 sq.m.). Type Program Functional Upgrade Year Cost 2007 $45,000 Priority Low Updated: July 14 2004 Report run on: January 28, 2005 4:40 PM Page 3 of 8 Bonnyville - Bonnyville Centralized High School (S2464) G2020.02.02 Flexible Paving Parking Lots(Asphalt)* Students Asphalt student parking lot for approximately 32 cars located east of 1958 building. Rating 3 Event: Installed Design Life 0 10 Updated September 2004 Overlay student parking lot Concern: Existing lot has poor drainage and is prone to ponding. Recommendation: Overlay existing parking lot (1,000 sq.m.). Type Program Functional Upgrade Year Cost 2007 $20,000 Priority Low Updated: September 27 2004 G2020.06.02 Parking Bumpers* Precast concrete bumpers located in parking lot. Rating 5 Installed Design Life 0 0 Updated September 2004 G2030.04 Rigid Pedestrian Pavement (Concrete)* Concrete sidewalks provided around site. Concrete steps at main entrance. Rating 3 Installed Design Life 0 0 Updated September 2004 Event: Replace steps at main entrance Concern: Steps are badly damaged and pose a hazard. Recommendation: Replace steps at main entrance Type Lifecycle Replacement Year Cost 2005 $25,000 Priority Medium Updated: September 27 2004 G2040.02 Fences and Gates* Chain link fencing provided along portions of west, south and north sides of playground. Rating 5 Installed Design Life 0 0 Updated September 2004 Report run on: January 28, 2005 4:40 PM Page 4 of 8 Bonnyville - Bonnyville Centralized High School (S2464) G2040.03 Athletic and Recreational Surfaces* Asphalt surfaces at basketball area south of school; balance of play areas are rough grasses. Beach volleyball courts with sand, 2 tennis courts complete with chain link backstops, basketball back boards. Rating 4 Installed Design Life 0 0 Updated September 2004 G2040.05 Site and Street Furnishings* Picnic table located at south end of school. Rating 5 Installed Design Life 0 0 Updated September 2004 G2040.05.03 Trash and Litter Receptacles Garbage bin located at south west corner of school. Rating 4 Installed Design Life 0 0 Updated July 2004 G2040.05.04 Bicycle Racks Bike racks provided at east entrance. Rating 5 Installed Design Life 0 0 Updated July 2004 G2040.06 Exterior Signs* Aluminum letters mounted to building at main entrance. Rating 5 Installed Design Life 0 0 Updated September 2004 G2040.08 Flagpoles* One aluminum flag pole located adjacent main entrance. Rating 5 Installed Design Life 0 0 Updated September 2004 Report run on: January 28, 2005 4:40 PM Page 5 of 8 Bonnyville - Bonnyville Centralized High School (S2464) G2050.01 Irrigation Systems* Non freeze hose bibbs, vacuum breaker deficient, install vacuum breakers. Rating 3 Installed Design Life 0 0 Updated September 2004 Event: Install vacuum breaker on NFHB Concern: Non freeze hose bibbs. Vacuum breaker deficient. Recommendation: Non freeze hose bibbs, vacuum breaker deficient, install vacuum breakers. Type Maintenance Year Cost 2005 $1,000 Priority Medium Updated: September 27 2004 G2050.04 Lawns and Grasses* Lawn areas to the north and east; rough grasses over balance of site. Rating 4 Installed Design Life 0 30 Updated July 2004 G3010.02 Site Domestic Water Distribution* Municipal supplied; pressure, volume, and quality adequate. Monitor for line failures due to use of cast iron material and age of lines. Rating 4 Installed Design Life 0 0 Updated September 2004 G3010.03 Site Fire Protection Water Distribution* No siamese connection. Fire hydrant located within 90 m of front entrance. Rating 6 Installed Design Life 0 0 Updated September 2004 G3020.01 Sanitary Sewage Collection* Gravity sanitary sewer connected to municipal main. Rating 5 Installed Design Life 0 0 Updated September 2004 Report run on: January 28, 2005 4:40 PM Page 6 of 8 Bonnyville - Bonnyville Centralized High School (S2464) G3030.01 Storm Water Collection* Surface drainage throughout the site. Rating 3 Event: Installed Design Life 0 50 Updated July 2004 Re-grade site in areas Concern: Site is too flat and slopes toward building at south east corner. Recommendation: Re-grade site in conjunction with new parking lot at this location. Type Repair Year Cost 2007 $20,000 Priority Low Updated: July 14 2004 G3030.02 Storm Water Equipment* Roof drainage to grade, surface drainage, no catch basins. Rating 5 Installed Design Life 0 0 Updated September 2004 G3060.01 Gas Distribution* Gas line to interior gas meter. Rating 6 Installed Design Life 0 0 Updated September 2004 G4010.02 Electrical Power Distribution Lines* 120/208V/3PH/4W power service to building fed underground from pad mounted utility transformer to electrical service switchgear in building. Rating 4 Installed Design Life 0 0 Updated September 2004 G4010.04 Car Plugs-ins* Appears to be 24 energized stalls with outlets installed on steel channel. Rating 4 Installed Design Life 0 0 Updated September 2004 G4020.01 Area Lighting* Wall mounted HPS light fixtures along building perimeter, pole mounted lights at building front entrance. Rating 4 Installed Design Life 0 0 Updated September 2004 Report run on: January 28, 2005 4:40 PM Page 7 of 8 Bonnyville - Bonnyville Centralized High School (S2464) G4030.01 Site Detection and Alarm* Several wall mounted security cameras along building exterior. Rating 4 Installed Design Life 0 0 Updated July 2004 G4030.02 Site Voice and Data* Underground telephone service to building from TELUS. Rating 4 Installed Design Life 0 0 Updated July 2004 Report run on: January 28, 2005 4:40 PM Page 8 of 8