Stadsschouwburg, Amsterdam - Rabo Zaal 2009
Transcription
Stadsschouwburg, Amsterdam - Rabo Zaal 2009
2009 Stadsschouwburg, Amsterdam - Rabo Zaal In the extension of the old Amsterdam City Theatre’s where Trekwerk automized the flying system, a new venue was built, and Trekwerk has installed the new fly system with: SynchroDisk flybars, panorama bars, line set bars in the auditorium, SynchroPoints, chain hoists with variable speed and all operational with the TNM system. A fly loft is installed with lamels above the stage, as well as crane beams. In addition to the hoisting installation, there are three curved orchestra lifts installed with Spiralifts. Implemented Products SynchroDisk, SynchroPoints TNM Control System Regenerative Power Distribution Steel Construc4on Mechanical Drive 10% 5% Venue Info Stadsschouwburg Amsterdam, Leidseplein 26, Amsterdam 32% Chainhoists Electro technical 2% 5% TNM Controls Computer technical Realisation Award January 2003, Start Installation January 2008, First Show January 2009 24% trekwerk.com Other 22% Project related costs Labour