Wester Biffie, Maud - Area Committee
Transcription
Wester Biffie, Maud - Area Committee
Item 2(c) Page 1 Infrastructure Services Buchan Area Committee Report - 14 January 2014 Reference No: APP/2013/2396 Full Planning Permission for Erection of Dwellinghouse at Land Adjacent to Wester Biffie, Maud, Peterhead Applicant: Agent: Mr Colin Scott, Wester Biffie, Maud, Peterhead AB42 5PP Baxter Design, Aden Hall, 9 Kirkgate, Old Deer, Peterhead Grid Ref: Ward No. and Name: Application Type: Representations: Consultations: Relevant Proposals Map Designations: Complies with Development Plans: Main Recommendation: 395878.9 846816.8 W04 Central Buchan Full Planning Permission 0 4 Local Plan RHMA No Refuse Development Management & Building Standards 96.9m Tra ck Well Parkhouse Sheepfold Drain 87.2m Track Wester Biffie Well Braeview Tra ck 86.6m SITE Dr ain Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100020767 11 December 2013 Aberdeenshire Council Scale - 1:2500 NOT TO SCALE Reproduced from Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery Office © Crown copyright and database rights. Ordnance Survey Licence Number 0100020767. Item 2(c) Page 2 Item 2(c) Page 3 1. Reason for Report 1.1 This report relates to a planning application which is being recommended for refusal and following consultation with the Local Members, requires to be determined by the Area Committee. Councillors N. Smith, Ingram and Pirie have requested that the application be referred to Committee for the following reasons: To discuss design and impact; 2. Background and Proposal 2.1 This application seeks full planning permission for the erection of a new detached dwelling house in a rural countryside location at land adjacent to Wester Biffie, Maud. The site is approximately 400m east of the public road and approximately 1.4km north-west of Stuartfield. 2.2 At present, the site is occupied by a single storey dwellinghouse of no particular merit in terms of design. To the north, east and south there are a number of relatively large, modern style agricultural buildings. The dwelling at ‘Braeview’ is situated approximately 40m from the existing property. 2.3 The proposal is to demolish the current property, and to replace this with a new dwelling on a site approximately 11m south-west of the existing. The new dwelling is to be suburban in style and be finished externally in grey fyfestone basecourse and feature corners, grey granite dry-dash render, grey roof tiles, timber windows and doors and black UPVC rainwater goods. The existing septic tank is to be retained, whilst access is to be taken via the existing access servicing Wester Biffie, Braeview and Parkhouse – a dwelling adjacent to the public road. Visibility of 2.4m x 100m will be achieved by reducing the height of the wall to suit. 2.4 Planning history: 2.5 APP/2008/0609 refused Outline planning permission on 17/09/08. The reason given was: 1) The Proposed development does not comply with Policy 12: Housebuilding in the countryside beyond the greenbelt, as contained within the Aberdeen and Aberdeenshire Structure Plan 2001 – 2016 (NEST); and to Policy Hou\4: New housing in the countryside including the Aberdeenshire part of the Cairngorms National Park; Policy Hou\5: Cohesive groups in the rural housing market and Appendix 3: Cohesive groups in the rural housing market area as contained within the Aberdeenshire Local Plan 2006 in that it does not constitute: a) b) c) d) e) rehabilitation or extension of an existing house; replacement on the same site of a largely intact house; a new house which is essential to the efficient operation of an enterprise, which is in itself appropriate to the countryside; conversion of an existing building to a single house; or the erection of a house within an existing cohesive group of at least 5 houses in accordance with policy guidance and criteria Item 2(c) Page 4 regarding the appropriate addition to the existing cohesive group. 2.6 A Bat Survey was submitted to the planning service on 21/08/13. This shows no bats emerging from the house, and no signs of internal or external use for roosting. It was noted however that a bandit pipistrelle was heard foraging in the area. 2.7 A Design Statement was received on 24/07/13. This details the site, servicing and design principles of the property. It states that the proposed dwelling is ‘traditional’ in style and will be well located within the countryside. 2.8 No amendments have been made to the design. 3. Representations 3.1 No valid letters of representation have been received. 4. Consultations 4.1 Corporate Services (Planning Gain) does not seek any contribution from the applicant as the property is a replacement dwelling which has been subject to council tax within the past 5 years. 4.2 Infrastructure Services (Contaminated Land) has no objection to the development, but does advise a formal informative regarding the removal of asbestos be attached to any granting of Planning Permission. 4.3 Infrastructure Services (Roads Development) raises no objection to the development as the proposed access is adequate for the traffic associated with the dwelling. Standard conditions and informatives are recommended to be attached to the decision notice should the Planning Service grant permission for the development. 4.4 Scottish Water does not object to the development connecting to the infrastructure, however does advise the applicant that a full application should be made directly to Scottish Water. 5. Relevant Planning Policies 5.1 Scottish Planning Policy 5.1.1 The aim of the Scottish Planning Policies is to ensure that development and changes in land use occur in suitable locations and are sustainable. The planning system must also provide protection from inappropriate development. Its primary objectives are: to set the land use framework for promoting sustainable economic development; to encourage and support regeneration; and to maintain and enhance the quality of the natural heritage and built environment. Item 2(c) Page 5 5.1.2 Development and conservation are not mutually exclusive objectives; the aim is to resolve conflicts between the objectives set out above and to manage change. Planning policies and decisions should not prevent or inhibit development unless there are sound reasons for doing so. The planning system guides the future development and use of land in cities, towns and rural areas in the long term public interest. The goal is a prosperous and socially just Scotland with a strong economy, homes, jobs and a good living environment for everyone. 5.2 Aberdeen City and Shire Structure Plan 5.2.1 The purpose of this Structure Plan is to set a clear direction for the future development of the North East. It promotes a spatial strategy. All parts of the Structure Plan area will fall within either a strategic growth area or a local growth and diversification area. Some areas are also identified as regeneration priority areas. There are also general objectives identified. In summary, these cover promoting economic growth, promoting sustainable economic development which will reduce carbon dioxide production, adapt to the effects of climate change and limit the amount of non-renewable resources used, encouraging population growth, maintaining and improving the region’s built, natural and cultural assets, promoting sustainable communities and improving accessibility in developments. 5.3 Aberdeenshire Local Development Plan 2012 Policy 3: Development in the countryside SG Rural Development1: Housing and business development in the countryside Policy 8: Layout, siting and design of new development SG LSD2: Layout, siting and design of new development SG LSD10: Contaminated land 5.4 Other Material Considerations Planning Advice 13/2012 – Housing and business development in the countryside and greenbelt. 6. Discussion 6.1 Full planning permission is sought for the erection of a new dwelling house in a countryside location, following the demolition of the existing property. The key planning issues in this instance are if the principle of a new dwelling can be supported and if the design is acceptable. 6.2 Principle of Development 6.3 Policy 3 supports small scale housing developments within the countryside location where it is for: the replacement or refurbishment of an existing, disused building; development which constitutes organic growth of a settlement identified within Appendix 1; a single dwelling associated with the succession of a viable farm holding; an employment proposal; or Item 2(c) Page 6 an appropriate addition in terms of scale and character to an existing cohesive group of at least 5 dwellings. 6.4 As the existing dwelling to be demolished is not meritable in terms of design, it is considered to be in compliance with criteria A2 of SG Rural Development1: Housing and business development in the countryside. It should be noted however that demolition sites such as this should be redeveloped using the previous footprint of the property where possible. Due to the close proximity of the dwelling to the relatively large agricultural store buildings, it is accepted that the new dwelling be sited to an alternate area, albeit within the general site of the existing. 6.5 Policy 3 should however be used in conjunction with all other relevant policies, most notably Policy 8 and SG LSD2: Layout, siting and design of new developments. SG LSD2 aims to achieve a high standard of design in all new developments by: Optimising the sites context; Respecting its setting; Providing visual appeal; and Providing quality aesthetics. 6.6 As the principle of the redevelopment of brownfield land is supported by policy, the next stage is to assess the design of the proposed dwelling. 6.7 Design 6.8 The design statement identifies that the proposed dwelling is ‘traditional looking’. It is considered by the planning service that this is not the case, and is instead of a suburban style unsuitable to the Buchan countryside. The design statement attempts to justify the traditional styling of the property, stating that the vertically proportioned windows reflect Buchan vernacular, although do have modern detailing, whilst the bay window addition gives the house a ‘unique’ identity. The addition of the modern detailing, bay window and gable end widths being wider than 2.5x the height to the eaves along with the finishing materials of drydash harl, fyfestone featuring and concrete roof tiles only serve to further enhance the suburban styling of the property. The property lacks such features as small window openings and chimneys to gable ends which are common place within the north-east’s countryside properties. This aside, the use of stained timber windows is a welcome addition. 6.9 Whilst it is recognised that Braeview is of a more modern styling, the Planning Service must consider each application upon its own merits. The above does not demonstrate compliance with Policy 8, and is therefore considered that the design is detrimental to the character of the rural area. 6.10 In terms of amenity, it is considered that the dwelling and its siting will not cause any significant loss of amenity of the neighbouring dwelling at Braeview. The distance of approximately 20m between the proposed dwelling and Braeview, along with the boundary treatment of hedging limits overlooking. The large plot of over 4200m² and the footprint of the single storey dwelling being only approximately 150m², safely eliminates overbearing of the wider site and property at Braeview. Item 2(c) Page 7 6.11 Wildlife 6.12 Policy 11:Natural Heritage and SG Natural Environment2 (Protection of the wider biodiversity and geodiversity) states that the development will not be supported if it is detrimental to any European Protected Species. As the submitted bat survey identifies that the site is not used as a roost site for bats, it is considered the development does not cause adverse impacts upon any European Protected Species and is therefore acceptable to demolish the property. 6.13 Contamination 6.14 Information regarding the site has been provided to the councils Contaminated Land Service. No objections have been raised, however formal notes related to the discovery of contamination to the site and safe removal of asbestos are advised to be included within any decision notice granting planning permission. 6.15 Access 6.16 In terms of access, it is considered by Roads Development that this is appropriate. In order to achieve and maintain the required visibility splay, the wall at the entrance of the track is to be reduced in height. Standard conditions and informatives relating to the construction and use of the access are advised to be attached to any decision notice granting planning permission. 6.17 Servicing 6.18 Turning to the servicing of the site, it is considered, with confirmation by colleagues within Environmental Health, that the existing septic tank, which is proposed to be retained, is of a suitable scale to support the dwelling. 6.19 Conclusion 6.20 Overall, although the principle of the demolition of the existing property and erection of a replacement dwelling, albeit of a different footprint, is accepted, the design does not allow compliance with Policy 8 (Layout, siting and design of new developments). Opportunity was given to the applicant on two occasions to alter the design to meet the criteria set within Policy 8, however these have been rejected, favouring the submitted design. Should the design be altered to reflect the Buchan vernacular in areas detailed within this section, it is likely that the application be supported. 6.21 It is recommended that full planning permission be refused on the basis that the design does not reflect the surrounding rural character. 7. Area Implications 7.1 In the specific circumstances of this application there is no direct connection with the currently specified objectives and identified actions of the Local Community Plan. Item 2(c) Page 8 8. Equalities and Financial Implications 8.1 An equality impact assessment is not required because it is considered that the granting or refusal of this application will not cause significant adverse impacts upon protected characteristics of the applicant or any third party. 8.2 There are no financial implications arising from this report. 9. Sustainability Implications 9.1 No separate consideration of the current proposal’s degree of sustainability is required as the concept is implicit to and wholly integral with the planning process against the policies of which it has been measured. 10. Departures, Notifications and Referrals 10.1 Structure Plan Departures None 10.2 Local Development Plan Departures Policy 8: Layout, siting and design of new developments SG LSD2: Layout, siting and design of new developments 10.3 The application is a Departure from the valid Local Plan and has been advertised as such. Any representations received have been circulated as part of the agenda and taken into account in recommending a decision. The period for receiving representations has expired. 10.4 The application does not fall within any of the categories contained in the Schedule of the Town and Country Planning (Notification of Applications) (Scotland) Direction 2009 and the application is not required to be notified to the Scottish Ministers prior to determination. 10.5 The application would not have to be referred to the Infrastructure Services Committee in the event of the Area Committee wishing to grant permission for the application. 11. Recommendation 11.1 REFUSE Full Planning Permission for the following reasons:1. The proposed dwellinghouse by virtue of its design is out of keeping with the character of the surrounding landscape therefore the proposal is contrary to Policy 8: Layout, siting and design of new development and SG LSD2: Layout, siting and design of new development. Stephen Archer Director of Infrastructure Services Author of Report: Elizabeth Tully ET1/B/APP/2013/2396 11/12/2013 Item 2(c) Page 9 APPENDIX 1 SITE PLAN Item 2(c) Page 10 APPENDIX 2 ELEVATIONS Item 2(c) Page 11 APPENDIX 3 FLOOR PLAN