Galfar
Galfar Group
Group Companies
1.
GALFAR Engineering & Contracting SAOG, Oman
2.
GALFAR (India) Pvt Ltd, India
3.
GALFAR Engineering, Libya
4.
GALFAR Engineering, Kuwait
5.
GALFAR Engineering, Saudi Arabia
Associate Companies
1.
GALFAR Engineering & Contracting WLL, Emirates
2.
GALFAR AL MISNAD Engineering & Contracting WLL, Qatar
Galfar Oman – at a Glance
 Oman’s Largest Engineering, Procurement & Construction Contractor
 Major Sectors of Operation and Largest Contract Value ongoing Projects: Oil & Gas – Off Plot Delivery service (USD 1,400+ M)
 Roads and Bridges - Batinah Expressway (USD 452 M)
 Salalah International Airport (USD 265 M)
 Civil , Utilities & Services – Seeb Sewage Network (USD 226 M)
 Turnover – Y2013:- USD 1.01 Billion
 Manpower Strength :- 23,114(Staff + Workmen)
 Equipment – 8128 Nos
Key Leaders
Chairman
Chief Executive Officer
Sheikh Dr. Salim Bin Said Al
Fannah Al Araimi
Dr. Hans Erlings
Galfar – Verticals
Oil & Gas
All Oil & Gas related
works .
Service and
maintenance
Contracts
Up stream and
down stream EPC
Projects
Downstream
facilities
turnarounds and
maintenance
contracts
Civil &
Marine
Infrastructure
Utility &
Services
Commercial and
MEP & HVAC,
Residential Bldgs,
Hospitals
Power
Transmission,
Interchanges. Dams
Hydraulic Structures
Airport EPC
Contracts
Heavy civil for
industrial structures
Grid Stations and
Distribution
networks
Tunnels,
Water supply
,Sewage schemes
Roads
and Bridges
Highways
Expressways
Bridges and
Causeways
Tech-span Bridges
Ports and harbors
Water treatment
plants
O & M Contracts
for WTP, STPs,
Water & Electric
Distribution
Networks
Galfar – Subsidiaries
Aspire Projects
& Services LLC
Galfar Aspire
LLC
Al Khalij Heavy
Equipments
LLC
Galfar Training
Institute
Value addded
Training in skills like
Facility
Management,
HVAC Solution,
Lighting Solution,
BMS
Implementation &
Maintainance
Ready mix Concrete
Supply,
Precast Concrete
Products Supply
Project
Management
Heavy Equipment
Leasing and Hiring
HSE
Carpentry
Mechanical
Heavy Equipment
Operation & Driving
Many other Skilled
Training
Galfar – Facilities
Steel Fabrication
Facility
Carpentry &
Joinery Facility
Manufacturing MSV Skids
Pipe Rack, Platforms ,
Crossovers ,Pipe supports
and Sheds,
Porta Cabins,
ASME ‘U’ & ‘R’ Certifcation
Interior Works,
Furnitures and other Allied
works for our Building
Projects
Aluminum
Works Facility
Doors & Windows,
Partitions, False Ceiling and
other allied works for our
Building projects
Quality & HSE in Galfar is managed through a
certified system compliant with ISO & OHSAS
Our Occupational Health & Safety Policies
Corporate Organisation
Financial Turnover
Resources: Manpower
Manpower
30000
27500
26616
25040
25000
22807
23706
23114
21690
20000
17031
15000
Strength
10000
5000
0
2006
2007
2008
2009
2010
2011
2012
2013
Resources: Plant & Equipment
Plant & Equipment
9000
8009
8055
8094
8120
8128
8000
7110
7000
5974
6000
5000
4476
Strength
4000
3000
2000
1000
0
2006
2007
2008
2009
2010
2011
2012
2013
Our Projects
Oil & Gas
Harweel Cluster Phase 2
EPC Contractor: Petrofac, Sharjah, Sub Contractor : Galfar
EPC for Utilities : Galfar
Scope of Civil Works
USD 296 Million
1. Structural Steel Work
8,153 Ton
2. Excavation
-
81,809 m3
3. Earth Filling
-
54,794 m3
4. Cable Trench
-
85.0 km
5. GRE Flow line trench etc. -
76,500 m
6. P . C . C.
-
3,686 m3
7. R . C . C.
-
20,870 m3
8. Concrete Paving
-
9,015 m2
9. Fencing
-
22,737 m
10. Graded Road
-
20.6 km
11. EPC of R.C.C. Building ( 5 nos.) -
Harweel Cluster Phase 2
Date of Commencement:
Date of Completion:
Date of Production:
December 2005
July 2010
April 2012
12. Steel Shelters/ sun shades
3,350 m2
-
99 nos.
Harweel Cluster Phase 2
EPC Contractor: Petrofac, Sharjah, Sub Contractor : Galfar
EPC for Utilities : Galfar
USD 296 Million
Scope of Mechanical Works
Equipment Erection
1. Static Equipment
4183 Tons
2. Rotary Equipment 1598 Tons
Plant Piping – Field Welding
1. Carbon Steel & LTCS 77,269 Inch Dia
2. Stainless Steel
26,408 Inch Dia
3. CRA
32,043 Inch Dia
4. Carbon Steel Clad piping24,584 Inch Dia
Off plot Flow lines
1. GRE Flow lines76 KM (120 bar op.pressure)
2. Gas Injection Flow lines - 18 KM (530 bar op. pr)
Harweel Cluster Phase 2
EPC Contractor: Petrofac, Sharjah, Sub Contractor : Galfar
EPC for Utilities : Galfar
Scope of Electrical Works
1. Transformers
-
38 Nos.
2. Elec. Cabling Length
-
1162 KM
3. 132 kV Over Head Line
79.0 km (EPC)
4. 33 kV Over Head Line
-
21.0 km
5. Lighting Fixtures
-
2,581 Nos.
TOTAL MANMONTHS :
4,900
TOTAL DURATION :
25 months
Scope of Instrument’n Works
1. Valves
-
525 Nos.
2. Instruments
-
9500 Nos.
3. Analyzers
-
22 Nos.
4. Gas, UV/IR Detectors
-
2337 Nos.
5. Local Panel/ Cabinets
-
264 Nos.
6. Instrument Cables
-
1,134 KM
7. SS Tubing
-
40,178 m
8. Instrument Cable Tray work
-
108,300 m
9. Flow Metering Skids
-
5 Nos.
-
30 KM
10. TELECOM WORKS:
a. Fibre optic cable
TOTAL MANMONTHS :
4,511
TOTAL DURATION :
22 months
Off-Plot Delivery Contract
Client: PDO
Scope of Works
USD 1422 Million
Design, Procurement, Construction & Testing and precommissioning of
Flow Lines,
Pipelines,
Well Hook-up,
Overhead Electrical Line to Wells,
Construction rig pad locations
Associated Civil/Electrical / Instrumentation Installation
in North Oman Fields:
1. Yibal,
Off Plot Delivery Contract
Date of Commencement:
Date of Completion :
May 2005
Aug 2014
2. Qarn Alam
3. Lekhwair
4. Fahud,
Off-Plot Delivery Contract
Client: PDO
USD 1365 Million
Noteworthy Achievements: From 2005 - 2012
Locations Handed over
 Oil Locations - 1066 nos
 Gas Locations – 172 nos
Rig Flowlines & Integrity





Off Plot Delivery Contract
Date of Commencement:
Date of Completion :
May 2005
Aug 2014
Oil Flowline Hook-up - 903 Nos
Water Injection Flowlines – 197 Nos
Integrity Flowlines Replacement – 617 Nos
Integrity Hook-up Replacement – 303 Nos
10.3 Mil. Inch Dia. (5000 KM FL) Total welded during
Contract Period
Gas Wells Flow Line & Hook Up
 Wells Commissioned – 159 Nos
 DSS Line Welded - 182 Kms
EPC Projects under ODC
Major EMC Type Projects: From 2005 – 2012
SL.NO.
PROJECT
TYPE
START DATE
PLANNED
COMPLETION
DATE
ACTUAL
COMPLETION
DATE
PROJECT
VALUE
(Million USD)
01
Musallam ILS Full Facilities Project- (QA-9 and
QA-10)
PC
28-MAY-06
07-JUN-09
29-MAR-09
25.41
02
Musallim RMS
PC
01-JUN-07
15-OCT-08
15-OCT-08
11.14
03
Mabrouk Off plot Facilities Development &
Mabrouk 132 KV OHL
EPC
01-AUG-07
19-JAN-10
24-OCT-09
48.38
04
Ufuq full facility Development Project
EPC
01-JUN-07
01-DEC-09
7-NOV-09
27.73
05
AHW WI facilities Development Project
PC
01-OCT-07
20-JUN-09
30-APR-09
22.54
06
Lekwair Gas Sweetening unit upgrade Project
EPC
01-JUN-07
25-AUG-10
10-JUN-10
34.20
07
Lekhwair Water Treatment and 3rd
Dehydration Tank construction.
EPC
01-AUG-07
30-JAN-11
30-JAN-11
32.04
08
Lekhwair RMS-11 & LEK A South New RMS
Development Project
PC
01-OCT-07
20-JUL-09
20-JUN-09
17.27
09
49 Minor projects Executed during Contract
period.
EPC
Total value of EMC Type Projects: 341 M USD
122.29
Qarn Alam Steam Project (EPC)
Client: PDO
Scope of Works
USD 260 Million
Design, Procurement, Construction & Testing and Precommissioning of the following systems.










Hydrocarbon production wells,
Steam Injection Wells,
Raw water,
Deep water,
Aquifer systems,
Shallow water disposal system,
Interconnecting Pipeline system,
Rerouting Satellite Fields Pipeline system
Steam injection systems and
EPC Off plot Works
 180 km of GRE pipe lines and
 158 km CS pipe lines.
 100 Kms of OHL construction.
 225. Kms of laying Fibre Optics
 653706 m3 Trenching
Qarn Alam Steam Project
Date of Commencement:
Date of Completion:
May 2007
Jan 2013
Significant achievements of the project include:




825 Clad pipe welding up to 24” on CS pipeline.
PE lining for X70 Grade CS pipe up to 28”.
TK-236 coated pipe welding up to 12”.
Welding of CS pipe (24” &28”) using automatic welding
machine with auto U/T.
Nimr - G & Karim West Water Flood
Projects (EPC)
Client: PDO
Scope of Works
USD 96 Million
Design, Procurement, Construction & Testing and Precommissioning of the following systems.

24” CS U/G PE Lined Header Line – 5 KM

14” GRE U/G Sub Header Line– 13 KM

15 Nos Remote Manifold Station with 21 Nos MSVs

16 Drain Concrete Pits

Permanent Scraper Launcher and Receiver for 24” CS-PE pipeline

33 KV Over Head Line – 30 KM

Electrical Switchgear Room and Filed Auxiliary Room

Process Automation system, Field Instruments, Control Valve
,Cabling & Metering
Nimr –G & Karim West Project
Date of Commencement:
Date of Exp. Completion:
Jul 2011
Jun 2014

FOC , RTU and Gate way

FWKO tank at NRPS – 1 No

Emulsion transfer pumps (capacity 8500 m3/d ) – 4 Nos

CPI separators (capacity 10000 m3/d ) – 5 Nos
Khazaan- Makarem EWT Project
Client: BP
Scope of Works
USD 32 Million
The Scope of Work included:
Construction, Installation, Inspection, Testing, Pre-
Commissioning and Commissioning assistance to the
Company during Start-Up.
The KM EWT Project consisted of the following facilities:
1. 4 nos. Sweet Gas Well Pad Facilities including Flow
Metering + Utilities at the well pad to support the
sweet gas well pads- including SDSS material and
also 15000 psi rating piping on the well pad.
2. 10” Individual Flow lines (4 Nos.) from Sweet Gas
Khazaan- Makarem EWT Project
Date of Commencement:
Feb 2009
Date of Completion:
Feb 2011
Well Pads to the Flow line Header and Flow line
Header to EWT sweet gas compression facility - 18
KM
Khazaan- Makarem EWT Project
Client: BP
Scope of Works
USD 32 Million
3.
20” Flow Line Header CS -22 KM - From well
pad facilities to EWT sweet gas compression
facility
4.
12” Multiphase Export Pipeline – CS - From
EWT Sweet Gas Compression Facility to 3rd
party processing facility (SR-CPP) – 34 KM
5.
4” Condensate line – CS - From EWT Sweet
Gas Compression Facility to 3rd party
processing facility (SR-CPP) – 34 KM
Khazaan- Makarem EWT Project
Date of Commencement:
Feb 2009
Date of Completion:
Feb 2011
6.
EWT Sweet Gas Compression Facilities
7.
Receiving Facility at Saihrawl
Civil Work Services MUK-CA-2009-0053A
Client: Oxy Mukhaizna
Scope of Works
USD 24 Million
The Scope of Work includes Construction of:
1. Substation / control buildings
2. Pipe support & Rack Foundations.
3. Equipment foundations
4. Sleepers & pipe supports precasting.
5. Fabrication and installation of pipe rack, platforms
and shed structural works
6. Kitchen, laundry & dry store extension works
including water, drainage, fire & electrical works.
Civil Work Services MUK-CA-2009-0053A
Date of Commencement:
Aug 2010
Date of Completion:
Dec 2014
7. Ware house new building including water, drainage,
fire & electrical works.
8. All types of fencing works
9. Duct banks & bund wall construction
Roads & Bridges
Muscat Expressway Project
Scope of Works
USD 340 Million
The Expressway consists of:
Muscat Expressway Project
Date of Commencement:
Date of Completion:
September 2005
September 2010








6 Lanes of 54 Km Expressway
13 Interchanges
6 Flyovers
4 Underpasses
133 Box Culverts
7 Tech Spans
11 Roundabouts
176,812 Sqm of MSE Wall
Flyovers
- 6 nos
Interchanges–
13 nos
Tech
Span–
7 nos
MSE Wall
176,812 Sqm
Bousher – Amerat Road Project
USD 60 Million
Scope of Works
 14 Km dual Carriageway
 2 Concrete Bridges
 Slope Protection
 Cross Drainage
 Guard Rails & Safety Barriers
 Guniting Works
Bousher – Amerat Road
Date of Commencement:
Date of Completion:
July 2008
October 2010
31
Hasik Shuwamiya Road Project
Scope of Works
USD 288 Million
General Scope:
The original scope of the project is to construct about
93kms of asphalt road
between Hasik and AshShuwaymiyah in North Eastern region of the Governorate
of Dhofar.
Major Items of Work:
Bituminous Courses
Hasik Shuwamiya Road Project
Date of Commencement:
October
Date of Expected Completion: May
2007
2014
: 61,891 Cum
Roadway Excavation to Embankment : 5,315,550 Cum
Roadway Excavation to Waste
: 7,519,300 Cum
Structural Excavation
: 368,322 Cum
GSB & ABC
: 242,750 Cum
Concrete for Bridges/Culverts/Berm : 130,320 Cum
Concrete for R.C.C Retaining Wall
: 36,420 Cum
Reinforced Earth Wall - Alternate to RW : 26,295 Sqm
HYSD Reinforcement
: 10,967 MT
Loose Riprap
: 16,895 Cum
Mortared Riprap
: 78,430 Cum
Guard Rail (Steel Safety Barriers)
: 17,519 LM
Concrete Safety Barriers
: 29,065 LM
32
Upgradation of Birkat- Al Mouz Sayq
Road Project (Jebel Akthar )
Scope of Works
USD 30 Million
General Scope:
The complete scope of work is sub divided into Section 1 &
Section 2
Section 1 ( Km 0+000 to Km 13+000 )
Section 2 ( Km 13+000 to Km 32+500 )
•
•
•
•
Jebel Akthar Road Project
Date of Commencement:
Date of Completion:
April 2010
Jan 2012
•
•
Earthwork ( Excavations/Filling) at the Escape ramp
locations, road widening locations & Visibility
Improvement Locations
Construction of 6 Nos of safety Escape ramps
Construction of Additional Heavy duty and Extra Heavy
duty Concrete safety barriers, additional guard rails
Construction of Extensions of drainage structures, pipe
and box culverts and utility ducts with necessary
protection works
Construction of necessary slope stabilization works at
the existing hill cut locations
Alteration of the existing alignment at 2 locations
33
Buildings & Marine Infrastructure
Ship Repair Yard & Duqm Drydock
Project
Construction Project(Galfar-Daewoo Consortium)
Scope of Works
USD 179 Million
 Ground Investigation & Civil Infrastructure
 Two (2) Dry Docks (410m x 95m x 14.2m ) & ( 410m
x80m x 14.2m), Quays, Seawalls, crane foundations,
Cofferdam, road & other pavements, drainage system
& other subsidiary facilities
 Buildings
 54 – Buildings - Main gate, Main Office, Production
office, Restaurants, Worker’s site office,
Dormitory(14 Nos), Guest room, training center,
Duqm Drydock Project
Date of Commencement:
Date of Completion:
April
June
2008
2011
Sports center, Workshops, Plant shops, Substations.
Total Built-up area of all buildings = 97,986 sqm
 All Electromechanical Works
35
Central Prison – Sumail
Civil, MEP, HVAC and Security Sytems
Scope of Works
USD 136 Million
Central Prison, Sumail project comprises of civil, mechanical,
electrical, HVAC, Road work and state-of-the-art sophisticated
security systems.
It consists of three security zones:
1. Accommodations and other affiliated buildings are in
low security area.
2. Common facilities like Central administration, Medical
facility are in next level of security area.
3. Male Prison, Female prison, Juvenile prison and VIP
Prison are in the high security area.
It also consists of an STP, Chiller Yard and Standby Generator
Building.
Central Prison - Sumail
Date of Commencement:
Date of Completion:
December 2005
March 2010
It is designed for 3,000 inmates with a future capacity of 4,200
inmates.

Total Built-up area is 103,000 sqm

Total Concrete quantity: 85,000 cum

Total Earthwork: 268,000 cum
36
Saud Bahwan Group – Corporate Office
Construction Project
Scope of Works
USD 80 Million
 6 Floors and Single Storied Service Compound
Floor Area
136,000 Sqm
 Piping
48325 m
 Fixtures
2775 Nos
 Equipment
385 Nos
 Duct
86253 m
HV , LV & Earthing Cables / Electrical Fixtures /
Electrical Equipments / CTV, MATV, SMATV, Access card,
Music, Telephone and Computer network with cables,
Saud Bahwan Corporate Office
Date of Commencement:
Date of Completion:
April 2004
October 2009
fittings and fixtures
37
Bank Muscat – Head Quarter
Construction Project
Scope of Works
USD 82 Million
 6 Floors
 Total Floor Area - 30,000 Sqm
Technologies used for first time in Oman:
Terracota German tiling – 6,600 sqm
Space Frames
Placsit Rendering – 40, 000 sqm
Aluminum Screens – 14,379 sqm
HV , LV & Earthing Cables / Electrical Fixtures /
Bank Muscat Head Quarter
Date of Commencement:
Date of Completion:
December 2007
April 2010
Electrical Equipments / CTV, MATV, SMATV, Access
card, Music, Telephone and Computer network with
cables, fittings and fixtures
38
Hallaniyat Island Harbour Project
Scope of Works
USD 101 Million
Mooring facilities include,
 Core-Loc-Armoured Rock Core Break Water s
(700m & 100m), Precast Block work Quay Walls
(470m) ,average weight of block 45-50 Tonnes
-2m3 Corelocs 14000 Nos,-3m3 Corelocs 5000 Nos,
-Wharves / working berths
-Floating Steel Pontoon with gangway 2 Nos
-Coastal Ferry Terminal,-A Ramp for Landing Craft,-
Hallaniyat Harbour Project
Date of Commencement:
Date of Exp. Completion:
September 2010
June
2014
Revetment bund with reclamation and ancillary
works
39
Khasab Port Project
USD 38 Million
Scope of Works
The port at Khasab involved construction of
400 m long quay wall 12 m deep water and
2,500,000 cum dredging upto -10 CD
And 1.2Km long breakwater.
40
Seeb Fishery Harbour Project
USD 21 Million
Scope of Works
Breakwater 1.6 KM
Rock Fill 310,000Cum
Core-Locs 16,000 nos.
100 m long Quay Wall
2nos. 6m x 30m Concrete Pontoons
Boat Ramp.
Dredging 350,000 Cum
Seeb Fishery Harbour Project
Date of Commencement:
Date of Completion:
October 2007
January 2009
41
Industrial Structures
Oman Industrial Complex (Pelletizing Plant &
Distribution)
Scope of Works
USD 48 Million
General Scope:
Scope of work includes Civil works for dry grinding /
palletizing plant areas & Utilities for the implimentation
of the Oman Industrial complex at the port of Sohar
Deliverables:
Oman Industrial Complex Project
Date of Commencement:
Date of Completion:
December 2008
November 2010
Piling
: 76,959 m
Earthwork
: 153,331 Cum
Rebar
: 8391 MT
Shuttering
: 108,293 Sqm
Concrete
: 52,200 Cum
Metal Work
: 232 MT
Bituminous Coating
: 33,526 Sqm
Sheet Piling
: 332 M
Post Tensioning work
: 61 T
Deck Sheet
: 181 Sqm
132 KVA Cable Laying
: 5000M
43
Sohar Fertilizer Project
Civil for Plant, EPC of Plant Buildings and Construction of Non Plant Buildings
Scope of Works
USD 40 Million
This project involves construction of civil and EPC of Plant building
work including HVAC for Bulk Urea Storage and Handling Shed for
Mitsubishi Heavy industries and Construction of Non Plant Buildings for
Sohar Urea Industries Company.
Supply and Construction / Installation of Civil & Associated works for
Fertilizer Project.
Sohar Fertilizer Project
Date of Commencement:
Date of Completion:
February 2006
February 2007
1.
Soil Improvement
220,000 m3,
2.
Piling
2655 nos / 29000 lm
3.
Earthwork
574,000 m3,
4.
GSB / ABC
38,000 m3,
5.
PCC / RCC
73,500 m3
6.
Rebar
5630 tons
7.
Asphalt
4080 m3
8.
Embedded Steels
250 tons
9.
Elevators
2 nos (1.4x0.85x37 lm)
10.
HVAC System for Storage Building,
11.
Protective Coating/Tiling 179,000 m2
12.
Gravel Paving
6700 m3
44
Water & Sewage
Expansion of Water Reservoirs & Transmission
Facilities for Barka Desalination Plant
Scope of Works
USD 85 Million
•
Construction of 1 number 130,000 cu.m storage
capacity ground level reservoir
•
Construction of 1 number 230,000 cu.m storage
capacity ground level reservoir
•
Construction of Pile foundation, including site
investigations, Associated pipe work , associated
expansion of existing infrastructure facilities
•
Construction of 2 nos. operator's
accommodation
Water Reservoir Project
Date of Commencement:
Date of Completion:
August 2008
September 2010
•
Electromechanical works
•
Instrumentation and Control works
•
The largest Ground Water Reservoir in Oman
46
Al Suwaiq Water Distribution Project
Detailed Design, Civil, Mech, Electrical and Inst. Project
Scope of Works
USD 23 Million
Hydraulic Detailed design of major areas in excess of
200km, including design of pumps , air valve locations
etc,, incl. construction of the following :
1500 cum Over water tank 42m high :
03 nos
1000 cum Over water tank 42 m high :
01 no
Admin Bldg 30mX25M
:
01 no
Workshop Building 25mX20M
:
01 no
Chlorination Building 20mX10M
:
01 no
Pump House Building 30mX15M
:
01 no
Generator Building 20mX12M
:
01 no
11KV substation with Transformer :
01 no
Guard House
:
03 nos
Pipelines:
HDPE 100mm /315mm dia 16 Bar :
DI pipes 300mm/600mm dia 16 bar :
Al Suwaiq Water Distribution Project
Date of Commencement:
Date of Completion:
November 2005
August 2008
267 Kms
041Kms
Equipment :
Pumps 177HP,136 KW,
440 cum/HR
:
03 Nos
Generator 11KV
:
01 No
47
Al Ansab STP Project
Civil, Mech, Elec, Inst. and MBR Process Technology
USD 82 Million
Scope of Works
Supply, Construction, Installation and Testing / Commissioning of
52,500 Cum/day Capacity. (52.5MLD Plant)
Capacity Extended Aeration with MBR Technology
Treatment Complex.
Plot Preparation,
Process RCC Tanks & Structures,
Non Process Building,
Process Equipments and Piping,
Non Process Services,
Electrical Supply and External Roads / Paths and Paving.
Supply of All Process Equipments, Commissioning of Plant &
Al Ansab STP Project
Date of Commencement:
Date of Completion:
Training Facility for Employer
March 2005
June 2010
48
A’Seeb Coastal Strip Vacuum
Sewer Networks & Ancillary Works Contract 3
USD 223 Million
Scope of Works
Detailed Design, Procurement, Construction,
Erection, Testing & Commissioning of a complete
Vacuum & Gravity Sewerage Network.
Installation of HDPE Rising
Mains/Discharge Gravity Sewers : 36,389 m
Detailed Design & Construction of the
Vacuum Station Building & Ancillaries : 11 Nos.
Installation of Manholes
(HDPE Vacuum Chambers)
Installation of House Connection
Chambers
A’Seeb Coastal Strip Vaccum
Date of CommencementFeb 2008
Date of Expected Completion- Jun 2014
: 4,206 Nos.
: 13,067 Nos.
Installation of HDPE Vacuum
Sewers
Installation of Rider Sewers
: 206 KM
: 238 KM
Installation of Dry Connections
: 7,052 Nos
49
Production Facilities
Industrial Facility at Nizwa
Overview of Fabrication Facility
Projects Jobs On Going & Completed
Fabrication of Structural (Pipe Rack, Platforms ,
Crossovers ,Pipe supports and Sheds)
Fabrication of Pipes (CS,LTCS,SS,DSS &SDSS) ,
NDT,Hydrotesting ,Blasting & Painting for the following
Oil & Gas Projects.
PDO Project
•Off
•Off Plot
Plot Delivery
Delivery Contract.
Contract.
•Kauther
Gas
Plant
•Kauther Gas Plant Project.
Project.
•Saihnadha
•Saihnadha Suhaiba
Suhaiba Depletion
Depletion
Compressor
Project
Compressor Project
•Supply
of Supply
MSV Skids.
•Design &
of MSV Skids.
•Qarnalam
Steam
Project.
•Qarnalam Steam Project.
•Marmul
A
Expansion
•Marmul A Expansion Project.
Project.
•Al
•Al Burj
Burj Project.
Project.
•Fahud
Production
•Fahud Area
Area Gas
Gas Early
Project.
System
Pipe Line
•Nimr
G & Karim
WestProject.
Project
•Nimr G & Karim West Project
Industrial Facility at Nizwa
Established in 2006
BP
•BP - Khazzan/Makarem EWT
Project
Oman Gas Company.
•Sohar GSS Project.
•Nimr Compressor Project
Daleel Petroleum
•Daleel B' Block Facilities
Project.
•U & R Stamp Approval for Coded Pressure Vessels
.•Enclosed Blasting & Painting Facility approved by Ministry of
Environment
•Instrumentation Lab with Calibration Facility .
Industrial Facility at Nizwa
Facilities Available
Area
Total Area – 38465 Sq Mtrs
Office Area : 250 Sq Mtrs
Calibration Lab : 55 Sq Mtrs
SS/DSS/SDSS Pipe Fabrication Area : 975 Sq Mtrs
CS/LTCS Pipe Fabrication Area : 1150 Sq Mtrs
Structural/Vessel Fabrication Area : 1170 Sq Mtrs
Hydro test Area : 320 Sq Mtrs.
Material Storage Area : 4576 Sq Mtrs.
Manpower & Camp Facility
Senior Staff : 28 Nos
Junior Staff : 160 Nos
Nationals : 15 Nos
Camp facility available to accommodate up to 300
persons
Equipments
Rolling Machine –(Up to 36 mm thickPlate)
Air Compressors
Rectifiers
Welding Generators
SAW Welding Machines
MIG Welding Machines.
TIG Welding Machines.
Welding Rotators ( 20 ton & 10 ton)
EOT Cranes.
Lathe Machine
Radial Drilling Machine
Threading machine.
Fast Cutter
Forklift
Load all
Tool Carrier
Industrial Facility at Nizwa
ASME ‘U’ & ‘R’ Stamp
Plate Rolling Facility
Enclosed Blasting & Painting Bay
Facility Management Experience
54
Facility Management
Projects worth USD 21 Million
Oil & Gas Facilities
We Construct, We Operate & We
Manage
Desalination Plants
All Engineering discipline technicians are available through
out the oil fields of Oman to render the maintenance services
since last 14 years.
Sewage Treatment Plants
When is comes to STP maintenance unrivally Galfar is the
best sevice provider in the industry.
Extended Aerations
SBR
Water Supply Systems
We maintain Oman’s one of the biggest natural water
resource. Al Massarath in Ibri are cluster of wells we maintain
which almost serves the whole Dhahirah region with potable
water.
A larger quarter of Muscat City water supply network is
been maintained by Galfar since 30 years and this service is
well known for its remarkable sporadic repairs by commoners
as well.
We again reiterate our supremacy in handling a multitude
of small sized plants across the length and breadth of Oman.
Hospitals
Royal Hospital in Muscat is been maintained by our team of
Engineers and Technician since 14 years now.
Our team has dedicated to serve the Royal Hospital with
the most advanced Building Management System & exclusive
resource management system for Hospitals called Al Shifa.
Our present Hospital Management team is so well
experienced that we can mentor many other junior
technicians to cater the need of such hospital facilities across
the globe.
A team of 700 workforce is operating &
maintaining various facilities in Oman
24x7.
55
Completed Projects
Completed Projects
Crown Plaza Hotel - Sohar
57
Completed Projects
Kauther Gas Plant
Sur Sports Complex
58
Completed Projects
Wadi Sarooj Dam
Dhalkut Harbour
59
Project Experience - India
60
Portfolio of Projects in India
Project
Actual/
Value in Value in Expecte
Type of
Salient Concession
Sector
Rs
Mln.
d
Contract
Features
Period
Crores USD Commis
sioning
Completed project
Four Lanning of Indor- Ujjain section of SH-27
Highways
Build, Own &
Transfer
(BOT)
341
68.2
4 Laning of
Dec-10 total 54 Km of
Road.
25 Years
Projects in Hand
Four Lanning of Ghaziabad Aligarh Section of NH91
Highways
BOT
2019
403.8
Apr-13
4 Laning of
24 years
total 126 Km including Const.
Road.
period
Six Laning of Chandikole- Jagatpur- Bhubaneswar
Section of NH-5
Highways
BOT
1628
325.6
Mar-13
6 Laning of
26 Years
total 67 Km including Const.
Road.
period
Two Laning of Salasar to Haryana border Section
of NH-65 in Rajasthan
Highways
BOT
550
100
Jun-15
2 laning of
30 Years
total 154 Km including Const.
Road
period
Four laning of Kashipur-Sitarganj Section of NH-74
in Uttarakhand and Uttar Pradesh
Highways
BOT
355
65
Aug-13
4 laning of
26 Years
total 77 Km including Const.
Road
period
61
Indore – Ujjain Bypass recently completed
and Toll Collection Started
62
Six Laning of Chandikole- JagatpurBhubaneswar Section of NH-5
63
Our Strengths
4 decades of trusted relationship with Oil Companies and Ministries in Oman.
Proven competence in Design, Procurement, Construction, Commissioning and operations of
infrastructure projects in Oil fields, harbors, hospitals, airports, etc.
Well Qualified, Experienced and Professional Team
Diverse Capabilities in Project Execution
Consistent track record of project delivery.
Strong Financial base.
Proven Supply-Chain capacity within and out of Oman.
One of the Largest Employers of Omani Nationals.
Our Contributions
Founding member of OPAL (Oman Alliance of Petroleum Companies) and Oman Society of
Contractors
Leaders in development of capacity and capability of local community contractors
In-house Training Institute for Skill Development of Omani Nationals.
We will appreciate your queries
(if any)?
Contact us at:
Corporate Head Office:
Galfar Engineering & Contracting SAOG
P.O. Box No 533, PC-100,
Muscat, Sultanate of OMAN