We have the right attitude!

Transcription

We have the right attitude!
“We have the right attitude!”
Page 1 of 19
"exclusive provider of
offshore services"
Page 2 of 19
Offshore
Since QP started implementation of their
Offshore Preventative
in
Co.
Maintenance Schedule
1978-1979, H.B.K. Oil & Gas Services
has
been
responsible for the great
majority of corrosion control programme.
This has consisted of a planned programme of
recoating the 410,000 square meters of the PSI,
PS2 and PS3 facilities and associated wellhead
jackets.
This does not include PS4, which to
date
has not been quantified, nor does it include
Halul Island with its 9 crude oil storage
tanks and associated pipe work and services.
The policy of QP is to let out annual
contracts
which
typically
cover
50,000-
80,000 square meters of area and have to be
completely self sustained. This has resulted
in HBK Oil & Gas Services Co. becoming
efficient in the handling and management of
marine spreads; the servicing of men and
equipment in difficult
environment; all to the exacting safety
and time requirement of the C l i e n t ,
QP. HBK Oil & Gas Services Co. is
currently carrying out all corrosion
control protection coating a c t i v i t i e s
a t offshore for various c l i e n t s s u c h
a s QP, OXY & R a s G a s , as well
as
being
shutdown
sub-contractor
work
offshore,
on
all
which
speaks for itself.
Page 3 of 19
Onshore
Apart from the offshore work, HBK Oil & Gas Services Co. is active onshore in the
various Industrial Complexes.
These
includes
QAPCO,
QAFCO,
QVC,
Q-Chem,
QASCO, NODCO, NGL, QP, OXY, RasGas and various industrial establishments .
HBK organization has track record of
completion of work within time frame
and in accordance with the specifications
at all times. Long list of satisfied clients
is
an
indication
endeavours
to
to
meet
our
the
relenting
organization
objectives and for customer satisfaction.
Highlights of our capabilities onshore are
the e s t a b l i s h e d facilities in our yard
located in Salwa Road.
Ras
Laffan
Common
Cooling
Water
System Project c o n s i d ered one of the
prestigious and challenging contracts so far
in
Qatar
was
awarded
to
CCIC
for
construction and installation of carbon steel
pipes for Qatar Petroleum. HBK Oil & Gas
Services
Co.
stood
up
to
demanding
situation of handling surface preparation
and coating of 8-12” pipes of about 3M
diameter and 24M long daily.
Handling system, unique in its kind and innovative in design was built in record time
fulfilling all safety requirements and was integrated with blast shop and paint shop.
We
had
also
been
awarded
the
prestigious blasting and painting scope
of QAFC0-4 Expansion Project which
was carried out successfully as per
contractual requirement in our yard in
Doha and Mesaieed simultaneously.
Page 4 of 19
HAMAD BIN KHALID OIL & GAS SERVICES CO.
POST BOX NO. 2903, DOHA - QATAR
COMPANY DETAILS
Company details
Name
HAMAD BIN KHALID OIL & GAS SERVICES CO.
Address to appear on Tender
communications
POST BOX NO. 2903, DOHA – QATAR
Telephone number
44687174 / 44687176 / 44685699
Fax number
44687460
Country of registration
QATAR
Registration number
19389
Class of Company
WITH LIMITED LIABILITY
Address of registered office
POST BOX 2903, DOHA – QATAR
Date Company Formed
1973
Paid-up Capital
1,800,000/-
Contact for enquiries
Name
FAROOQ A. YASSIN
Title
GENERAL MANAGER
Telephone number
44687174 / 44687176 / 44685699
Fax number
44687460
Email
[email protected]
Address
POST BOX 2903, DOHA – QATAR
Page 5 of 19
ORGANIZATION CHART
Page 6 of 19
MAJOR ONGOING & COMPLETED PROJECT
DURING THE PAST FEW YEARS
Sr. No.
Job No.
Description
Client
Work Order Value (QAR)
Duration
1.
J: 880
Contract No: CA 1561, Refurbishment of Protective Coating & Scaffolding Works at Offshore
Structures at PS-1
OXY
16.5 Million
15.05.04 - 31.07.07
2.
J: 881
Painting of Steel Pipes, Millennium Village Facilities.
Morganti-AICI JV
715,000.00
01.12.04 to 28.02.05
3.
J: 884
Painting of Spools, Cement Lined Pipes and Non-Cement Lined Pipes.
Dopet
1 Million
08.02.06 to 30.09.05
4.
J: 885
Contract No: GTC 05/143/MCO - Maintenance Support Services for PS-2/3 Shutdown Works.
Trags
1.7 Million
10.05.05 to 30.06.05
5.
J: 887
Painting of Pipes and Fittings, Dolphin Project Upstream and Compression Facilities.
Taisei Corp.
400,000.00
15.07.05 to 31.03.06
6.
J: 888
Dolphin Upstream and Compression Facilities at Ras Laffan Industrial City, Qatar.
Dodsal
3 Million
01.10.06 - 31.08.07
7.
J: 889
Coating of Bare Pipes, Miter Bends and Flanges, Qatar Gas II Development Project.
Hyojong Ind. Co.
1.2 Million
01.10.05 to 31.03.06
8.
J: 891
Contract No: GTC 04/129R/MCO - Refurbishment of Protective Coatings & Scaffolding Works at
Offshore Locations.
QP
63.1 Million
20.02.06 - 31.01.10
9.
J: 892
Blasting and Painting Works for QASCO HBI/DRI Combo Plant, Mesaieed.
Jurong Eng. Ltd.
2.1 Million
20.02.06 to 19.03.07
10.
J: 893
Blasting and Painting of Slug Catcher, Qatar Gas II LNG Onshore Development Project.
CCIC Teyseer
2.5 Million
03.06.06 to 31.12.06
11.
J: 894
12" & 18" Pipelines Remedial Works at Dukhan Field Gas Lift Project.
Black Cat
1.2 Million
20.11.06 to 31.03.07
12.
J: 896
Blasting & Painting works of 4nos. Spheres & 8nos. Tanks and Accessories Including Scaffolding
Works.
Manco
2 Million
05.06.07 - 31.08.08
13.
J: 897
Contract No: CA 1815 - Refurbishment of Protective Coatings & Scaffolding Works at PS-1
Offshore Location.
OXY
12.2 Million
03.06.07 - 02.06.11
14.
J: 102
EPIC of Mesaieed Tank Farm Upgrade - Phase II. Scaffolding, Blasting & Painting Works.
Manco
2.8 Million
15.09.07 - 30.06.11
15.
J: 104
QAFCO Melamine & Urea-1 Revamp Project (Painting & Scaffolding Works).
QCON
5.4 Million
10.01.08 - 31.07.10
Page 7 of 19
16.
J: 105
Supply of Scaffolding Materials at ORYX GTL Shutdown & QCHEM.
QCON
725,000/-
09.02.08 - 31.05.08
17.
J: 106
Contract No: CA 1894 - Offshore Coatings Refurbishment Services & Scaffolding Works.
OXY
10.8 Million
01.08.08 - 31.12.11
18.
J: 107
Coating of Structural Steel and Piping Spools.
Black Cat
620,000/-
26.07.08 - 05.09.08
19.
J: 108
Blasting & Painting of Piping, Spools, Fittings and Structurals including Scaffolding Works VOC Project.
QCON
16.7 Million
04.09.08 - 30.09.10
20.
J: 109
Painting of Sheet Piles at Halul Island
CECC
900,000/-
22.01.09 - 30.06.09
21.
J: 110
Garnet Blasting & Painting of Fabricated Structurals, EPIC for Smokeless Flare and Automatic
Blowdown System & New Control Room at FSP.
Black Cat
1.7 Million
25.01.09 - 15.07.09
22.
J: 111
Painting & Scaffolding Works for Crude Oil Tank T-13 & Re-Blasting & Re-Painting Works of
Painted and Erected Piping Inside QP Tank Farm
Manco
2.2 Million
01.04.09 - 05.07.09
23.
J: 113
Contract No: CT/RG35/G244/08 - Refurbishment of Offshore Protective Coating.
RasGas
58.7 Million
14.05.09 - 31.12.14
24.
J: 114
Painting & Scaffolding Works - QAFCO 5 (Ammonia & Urea) Project.
Hyundai
19 Million
19.05.09 - 31.05.11
25.
J: 115
Subcontract works for Blasting & Painting of Steel Pipes, Fittings & Fabricated Spools.
Civil & Industrial
Construction Group
840,000/-
20.05.09 - 31.06.09
26.
J: 116
Painting & Scaffolding Works for the Tank D, F & Foam Tank; CLSCSEF Tank Farm Expansion
Project for Dolphin Energy Limited.
QCON
3 Million
20.05.09 - 30.10.10
27.
J: 117
Blasting & Painting of Piping Spools/Supports for GSVC Project.
Larsen & Toubro Ltd.
1.2 Million
01.07.09 - 30.10.09
28.
J: 118
Coating of Steel Pipes.
Dong Young Eng.
1.2 Million
01.03.10 - 30.11.10
29.
J: 119
Project GC09102200/FP - EPIC of Sweet Fuel Gas Supply to Dukhan Consumers, Blasting,
Painting & Wrapping Scope - HBK Yard & Site.
Black Cat
2.4 Million
15.05.10 - 31.12.11
30.
J: 120
EPIC of Berths & Port Infrastructure for Ras Laffan Port Expansion Project – Coating of
Corrugated Beams.
CCC – Teyseer
2.2 Million
01.11.10 - 31.01.11
31.
J: 121
Epic for produced water treatment & Injection Phase-2. Blasting & Coating of Pipe and Structure.
Black Cat
3.5 Million
25.12.10 - 25.11.11
32.
J: 122
Internal Lining & External Coating of Fire Water Spools & Pipes - SGTP Project.
Punj Lloyd Ltd.
620,000.00
08.01.11 - 30.06.11
32.
J: 123
Contract No: CA 1894 - Offshore Coatings Refurbishment Services and Scaffolding Works.
OXY
10.8 Million
01.08.08 - 31.12.11
33.
J: 124
Painting & Scaffolding Works for Tank D; CLSCSEF Tank Farm Expansion Project for Dolphin
Energy Limited.
QCON
1.6 Million
10.08.11 - 30.09.11
Page 8 of 19
34.
J: 125
Contract No: CA 2100 - Provision of Coating Refurbishment and Scaffolding Works – ISND
Remotes.
OXY
30 Million
01.08.11 - 31.07.14
35.
J: 126
FAU2 Onsite MEG Storage Tank Replacement Project – MEG Storage Tank (30-T602) EPC
Scope (RFS-054) – Painting & Scaffolding Works.
QCON
268,000/-
31.01.12 - 09.02.12
36.
J: 127
GSF Project – Storage Tanks Works at Mesaieed/Dukhan.
Manco
173,631/-
01.02.12 - 30.04.12
37.
J: 128
EPIC for New Desalination Plant and Potable Water Storage Tanks at Halul Island, State of Qatar
- Internal and External Coating of Potable Water Tanks and Scaffolding Works.
Archirodon
766,482/-
10.03.12 - 30.06.12
36.
J: 129
Pipe Painting Works for Barzan - Off Plot - General Works at Ras Laffan.
QCON
3,428,071/-
01.07.12 – 31.07.14
37.
J: 130
Contract No: GC10109800 - Refurbishment of Protective Coatings & Repair/Replacement of Pipe
Support and Scaffolding Works at Offshore Locations.
QP
337,351,357/-
22.04.12 - 30.04.16
38.
J: 131
Contract No: LTC/OP/1659/11 - For Internal Re-Coating of Condensate Storage Tanks on Call off
Basis at Ras Laffan.
Qatar Gas
9,472,825/-
04.07.12 - 03.07.16
39.
J: 132
Contract No: GC12100300 - Provision of Maintenance Painting & Scaffolding Works in Ras
Laffan Industrial City.
QP
7,644,900/-
15.09.12 - 14.09.17
40.
J: 501
Barzan Onshore Project - Insulation Works
QCON
879,057/-
01.10.13 - 31.12.13
40.
J: 501
Fire Proofing of Steel Structures of MIC Workshop
Future Eng.
250,000/-
01.12.13 - 31.01.14
41.
J:133
Contract No: GC131098A0 - Painting, Insulation, Vinyl Ester Wrapping Services on a Call-Off
Basis in Dukhan Fields - Field Support Department.
QP
32,224,116.10
01.08.14 - 31.07.19
42.
J: 134
Contract No: CA 2426 - Provision Remote Location Coating Refurbishment Services.
OXY
46 Million
01.08.14 - 31.07.17
43.
J: 135
Contract No: LTC/C/MNT/1099/14 - Painting of Tank Farm Area on Call-Off Basis.
Qatar Gas
22,902,970/-
01.07.14 - 31.07.18
44.
J: 136
Supply & Application of Intumescent Fireproofing Paints to Structural Steel - Musheireb
Downtown Doha Project, Phase 3.
HBK Contracting
2,610,232/-
01.01.15 – 31.01.17
Page 9 of 19
KEY PERSONNELS
1. Name
Designation
Tel No. (O)
E-mail Add
:
:
:
:
Farooq A. Yassin
General Manager
+974 – 44687174 / 44687176 / 44685699
[email protected]; [email protected]
2. Name
Designation
Tel No. (O)
Cell No.
E-mail Add
:
:
:
:
:
Ahmed Al-Yasin
Project Manager – Onshore
+974 – 44687174 / 44687176 / 44685699
+974 – 55807709
[email protected]
3. Name
Designation
Tel No. (O)
Cell No.
E-mail Add
:
:
:
:
:
Suresh Raghavan
Asst. QA/QC Manager
+974 – 44687174 / 44687176 / 44685699
+974 – 33773052
[email protected]
4. Name
Designation
Tel No. (O)
Cell No.
E-mail Add
:
:
:
:
:
Mohd. Farooque Joad
Projects Manager – Offshore
+974 – 44687174 / 44687176 / 44685699
+974 – 55847841
[email protected]
5. Name
Designation
Tel No. (O)
Cell No.
E-mail Add
:
:
:
:
:
V.K. Varghese
Accounts Manager
+974 – 44687174 / 44687176 / 44685699
+974 – 55825489
[email protected]
6. Name
Designation
Tel No. (O)
Cell No.
E-mail Add
:
:
:
:
:
Luke John
Logistics Manager
+974 – 44687174 / 44687176 / 44685699
+974 – 55225387
[email protected]
Page 10 of 19
HUMAN RESOURCES
Classification
Number of Employees
Home Office
Office Manager
01
Engineers
04
Technical Staff
09
Support Services
05
Procurement
02
Project Managers
02
QA/QC Manager
01
Accounts Manager
01
Logistics Manager
01
Painting Inspectors
13
Insulation Inspectors
03
Classification
Craft Labor
Foremen
Carpenters
02
-
Drivers
14
-
Electricians
02
-
Equipment Operators
04
-
Mechanics
08
02
Scaffolders
62
07
Welders
03
-
Blasters
80
05
Spray Painters
40
04
Insulators
20
02
Fire Proofing Applicators
10
02
Fitters
15
01
Fabricators
05
-
Safety Officers
12
-
Painters / Helpers
76
04
Page 11 of 19
Nationality:
We have a diverse work force with people from different racial, educational and social
backgrounds.
Majority of our work force hails from the following nationalities.
1.
2.
3.
4.
5.
6.
Jordan
Egypt
Indian
Bangladesh
Srilanka
Pakistan
Labour Accommodation:
We have one labour accommodation located at Salwa Road which can accommodate a
minimum of 400 personnel’s at a time.
We also have a labour accommodation comprising 2,500m² within Dukhan Fields.
Moreover, we have started construction on our new labour accommodation at Al Khor
that can accommodate 200 personnel’s at a time.
We expect the new labour accommodation to be ready by mid of Year 2015.
Laydown:
We have a laydown yard in Salwa Road to carry out in-house blasting, painting and fire
proofing works.
We have another laydown yard totalling 3,000m² which includes site office facilities,
material storage area and blasting & painting shop in Ras Laffan.
Moreover, we also have a laydown yard comprising 3,750m² within Dukhan Fields Area
which includes site office facilities, material storage area and blasting & painting shop.
Page 12 of 19
PLANT, EQUIPMENT AND FACILITIES
Description
Capacity
Manufacturer
Year of Manufacture
Qty
1
2
3
4
Mobile Compressor
Mobile Compressor
Mobile Compressor
Mobile Compressor
800 cfm
800 cfm
800 cfm
800 cfm
Atlas Copco
Ingersollrand
Ingersollrand
Ingersollrand
2011
2011
2012
2008
2
14
2
1
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Mobile Compressor
Mobile Compressor
Mobile Compressor
Mobile Compressor
Mobile Compressor
Mobile Rough Terrain
Mobile Rough Terrain
Fork Lift
Fork Lift
Fork Lift
Tractor (Farm Type)
Light Truck
Pick Up 4WD
Pick Up 4WD
Pick Up 4WD
Passenger Bus
Passenger Bus
Passenger Bus
Passenger Bus
Tractor and Trailer
Tractor and Trailer
Cargo Truck
Cargo Truck
Water Tanker
Generator 352 Kva
Generator 250 Kva
Generator 66Kva
800 cfm
800 cfm
800 cfm
185 cfm
375 cfm
35 ton
35 ton
3 ton
5 ton
7 ton
Med
3.5 ton
1 ton
1 ton
1 ton
32 Seater
32 Seater
15 Seater
56 Seater
40 ton
40 ton
06 Ton
05 Ton
10,000 ltr
352 Kva
250 Kva
66 Kva
Ingersollrand
Atlas Copco
Atlas Copco
Ingersollrand
Ingersollrand
Tadano RT
Kato
Komatsu
Toyota
Komatsu
Deutz
Dropside Cargo
Mitsubshi
Nissan/Toyota
Isuzu/Toyota
Nissan Urvan
Mitsubshi
Nissan
Ashok Leyland
Mercedes
ISUZU/NISSAN
Cargo Truck - Mercedes
Cargo Truck - HINO
Mercedes
Caterpillar
Onan, Victor
Perkins
2006
2006
2007
2006
2009
1988
1991
2005
2006
2009
1985
2006/2012/2014
2015
2005/2008
2008/2010 /2015
2007
2015
2012
1999/2001/2003
1988 x 2
2009-10
1999
2015
2009
2012
1992
2013
6
4
3
2
1
1
1
1
1
1
1
3
2
2
3
2
1
1
3
2
3
1
1
1
1
2
1
Registration No
Remarks
9252
11854
17121
17556
33817
2978
136061 - 226107 - 273885
284435 / 279883
129611/129614
206957 / 207108 / 250519
169575 / 129896
162913
142137
92132,104706,105521
78636 - 86758
5703 - 200308 - 91684
82294
282152
193433
RR & Victor OH in 97,98
Page 13 of 19
BLASTING, PAINTING AND OTHER EQUIPMENTS
No
Capacity
Manufacturer
Year
Qty
1
Automatic Blast Machine
4 Wheel
Target Equipment
1995
1
2
3
4
5
6
7
8
9
10
11
12
13
Blast Pot
Blast Pot
Blast Pot
Blast Pot
Vacuum Blasting Machine
Mini Blast Pot
Airless Paint Spray Unit
Airless Paint Spray Unit
Airless Paint Spray Unit
Airless Paint Spray Unit
After Cooler
After Cooler
200 ltr
240 ltr
240 ltr
100 ltr
76ltr, 2 Heads
15 ltr
68 to 1
56 to 1
45 to 1
20 to 1
2 Pot Cap.
2 Pot Cap.
Clemco/Blastline
Euroblast
Euroblast
Clemco
SurfaceDecon
Blastline
Graco
Graco
Graco
Graco
Euroblast
Euroblast
2012/13/15
2006
2008
60
12
8
6
1
5
8
16
20
2
20
10
14
15
16
17
18
19
20
21
22
23
24
Hydracat
HP Washer Unit Diesel
HP Washing Machine (pneumatic)
Wet Blast Units
Mucking Pump
Air Extractor Fans
Air Lights
Explosion Proof Light
Internal Blasting Machine
Internal Coating Machine
Shot Blasting Machine - 500E
Shot Blasting Machine - 350
Re-Cycling Plant Garnet/Steel Shot
Re-Cycling Plant Garnet/Steel Shot
HP
3-4000 psi
20 to 1
1unit to 2 Pot
600 cfm at 100 PSI
18"
250 watts
24 V
From 3" to 36"
From 3" to 36"
130 Sqm/Hr
100 Sqm/Hr
4 Blast Pot Capacity 200 Ltr
4 Blast Pot Capacity 200 Ltr
Graco
Karcher
Graco Hydraclean
Airblast
Eagle Ind.
Various
Wolf
25
26
Description
Cleanblast
Cleanblast
Blastrac
Contec
Sybrandy RC 50-160
Target Equipment
1997
2012/14
2012/13
2005/06
1998
2012
2011
2011
2012
2015
1998
2002
4
4
12
2
2
5
5
12
3
1
1
1
1
1
Remarks
Up to 24 Inch piping
Mini Pot
Closed Blasting No Dust
Delicate Blasting
7 x 2002, 9 x 2003
8 x 1994, 8 x 92 ,4 x 90
2 x 1990
Air flow upto 1800 NM3/H
Air flow upto 1800 NM3/H
Addition to Wet Blast
Production Rate 3-5 Ton/hr
02 outlet x 16 nos light 24v -100 w
Fully automatic with winch controlled
has been modified to be easily moved and relocate
has been modified to be easily moved and relocate
Page 14 of 19
Page 15 of 19
QUALITY ASSURANCE & QUALITY CONTROL
Page 16 of 19
ISO CERTIFICATE
Page 17 of 19
HEALTH, SAFETY AND ENVIRONMENT
Page 18 of 19
MV KHALDIYAH-1
"offshore support marine work vessel
of HBK Oil & Gas Services Co."
Page 19 of 19