No. 32 - Company
Transcription
No. 32 - Company
No. 32 KERAJAAN MALAYSIA SYARIKAT KONSESI LEMBAGA LEBUHRAYA MALAYSIA ,/' JAMBATAN KEDUA SDN BHD PROJEK PENSWASTAAN JAMBATAN KEDUA PUTAU PINANG PACKAGE 3A : BATU MAUNG INTERCHANGE MONTHLY SAFETY AND HEALTH REPORT NO 32 PERIOD ENDING 31th MARCH 2013 DISEDIAKAN OLEH ffi ky CERGAS MURN! SDN BHD 55-1, JALAN 46N26,TAMAN SRt RAMPAt, SETAPAK, 53300, KUALA LUMPUR ffi,*' CERGAS MURNI SDN. BHD. SAFETY AND HEALTH MONTHLY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 34 -BATU MAUNG INTERCHANGE ) 1fiqffi@ .twd*e4i TABLE OF'CONTENTS SECTION I EXECUTIVE SUMMARY SECTION 2 2.1 SAFETY AND HEALTH POLICY SAFETY AND HEALTH OBJECTIVE 3.1 3.2 CMSB ORGANIZATION CHARTS HSE COMMITTEE CHARTS 4.1 MONTH 4.2 WORKPLACE DESCRIPTION SECTION 3 SECTION 4 )) 4.3 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 NO. OF STAFF NO. OF SUBCONTRACTORS NO. OFWORKERS SAFETY AND HEALTH TARGET SITE PROGRESS OCCUPATIONAL HEALTH & SAFETY INFORMATION 4.3.I MAINPOWERRECORI) 4.3.10 4.3.11 4.3.12 4.3.13 4.3.14 ESTIMATE LOSS NO. OF STOP WORK ORDER NO. OF CORRECTTVE ACTION REQUEST BRIEF DESCRIPTION OF CAR 4.3.2 MACHINERY AND EQUIPMENT RECORI) 4.3.3 LIST OF PMA/PMT 4.3.4 STAFF LIST 4.3.5 WORKERS LIST 4.3.6 NO.OFACCIDENT/INCIDENT 4.3.7 BRIEF DESCRIPTION OF ACCIDENTiINCIDENT 4.3.8 ISSUANCE OF NOUNOP 4.3.9 SPECIFY ACTION 4.4 AUDIT 4.4.I 4.4.2 4.4.3 4.4.4 i 4.5 VISIT BY INTERNAL AGENCIES AUDIT AUDIT SCHEDULE HEALTH AND SAFETY AUDIT NON CONF'ORMANCE REPORTS MEETING SAFETY COMMITTEE MEETING LETTER/IVIEMO ISSUE FORATTEND MEETING PHOTO SAFETY COMMITTEE MEETING ATTENDANCE SAFETY COMMITTEE MEETING TOOLBOX MEETING 4.5.1 4.5.2 4.5.3 4.5.4 4.5.5 4.6 TRAINING AND EDUCATION 4.6.I FIRST AIDER LIST 4.6.2 FIRE DRILL 4.6.3 SUGGESTION BOX 4.7 IMPROVEMENT AND EDUCATION 4.8 4.9 SCHEDULED WASTE INVENTORY SCHEDULED WASTE DISPOSAT RECORD ffi" CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 3A-BATU MAUNG INT ERCHANGE *s. ffi'lna#$ffi*s K %*#Md SECTION 1 - EXECUTIVE SUMMARY The proposed Second link Penang Bridge will connect Penang Island to mainland across the Southern Channel of Penang Straits. Cergas Murni Sdn. Bhd. is one of the contractors was appointed by Jambatan Kedua Sdn Bhd. for Package 3,A.: Batu Maung Interchange until CH 5 43.460m of Expressway. The project scope of work can be briefly described under following Sub-heading 1. Site Clearing & Demolition Work 2. Additional Soil Investigation (SI) 3. Relocation of Utilities r r r . 4) Relocation of Water Pipe Relocation of Telekom Cable Relocation of TNB Cable Relocation of Others Utilities Geotechnical Works , . Soft Ground Improvement Piled Embankment 5) Earthwork 6) Drainage Works 7) Pavement works 8) Road Fumiture 9) Structures . General Structures . Main Bridge . Ramp ' Retaining Walls . High Mass Foundation 10) Traffic Management & Control 11) Environmental Protection Work 12) Routine Maintenance Works 13) Temporary road diversions works 14) Temporary bridge works 1 CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BAT UMA UNA INTERCHANGE) ffi,, SECTION 2 _ SAFETY AND HEALTH POLICY 2.1 SAFETY AND HEALTH POLICY Cergas Murni Sdn. Bhd. has documented its policy in line with its objective of OH&S awareness and statutory as well as contractual obligations, and is written to demonstrate the CMSB's commitment to promote high standards of OH&S and environment for the duration ofthe project. ! .Tide fiISE.P.olicy Pagc I of We, at t to be o. ne oftbe leading, operation- ( i Wefirmlybelieveinlhepreservationoftheenvironrner*andsaGguardingtheheahhardsafetyofthe ranagement, s-taf qnd.the public. Towards this end we are commiued to practice MURNI. I . Monitor tbe environnreut through prevention ofpolhrtion, accid ents,inju4t, iO wastethrough bett*;;g;; ofresources; health and' occupational diseases and minimising ., ffphold andabidisgby allthe relereqt Healt&, SafttyaodEnvirotrmentall,egaland other re4lriremgrtq 3. Reatzationofasafeworkeq.iironmenttr'o,ghtheprovisircnand rraidenanceofa 4- N"tt*r mfe system ofwork. (; all eryloyeesfer:soz ander rhe control Cergas Murni Sdn- Bhd. by proyiding aod coutinually improving our Heahh, safe-ty and Environmental lvlaiagement Systeo4 5. Iositotiog . po.licy for ensuring and enha.cing "*tainable emPloyees, publio and fi.rture generations; I'hispolicyrrrillbeperiodicallylsvierrysdandmadeavailableto/r a better quality oflife for epubtic andzltiinterestedparties. Alt'*':-' .....1.-.-----<.. Itffid Sharif yaacob Exectiive Director Date : O3 June20O9 CONTROLLEDCOIT Gare For Yourself , Gare For The Envlronment 2 g,Mt W #! &,-3@w W 2.2 .::.... .ii; t;i CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BATU MAUNG INTERCHANGE) Safety and Health Objective HSE Objectives and Target. No 1 Objectives CREATE OPERATION FREE-ACCIDENT Target a To prevent accidents and cases of work-related ill health and provide adequate control of health and safety risks arising from work activities. 2. assessment reviewed every year or earlier if working habit or conditions To provide adequate training to ensure employees are competent to do their work. ! To maintain safe and healthy working conditions, provide and maintain plant, equipment and machinery, and ensure safe storage/use of I I a substances. 4 Minimize waste and toxic. 5 To Closed all NOI and NOP from DOSH within specified time frame. Engineer Respective Sub-contractor change). I J Relevant risk assessments completed and action arising out and those assessments implemented. (Risk Responsibilitv I . Staff and subcontractors given necessary health and safety induction and provided with appropriate training (including working at height, confined space, hot work and electrical safety) and personal protective equipment. We will ensure that suitable arrangements are in place to cover employees engaged in work remote from the main company site. Toilets, washing facilities and drinking water provided. System in place for routine inspection and testing of equipment and machinery and for ensuring that action is promptly taken to address any defects. Staff trained is safe han4ling/use of substances. Evaluating operations and ensuring they are as efficient as possible. All location of resources and provision of corrective action to indentified non conformity within I day upon issuance of notice of improvement and notice of prohibition unless for remedial process requiring more workdays as approved Project Manager Engineer Respective Sub-contractor Engineer Respective Sub-contractor Engineer Respective Sub-contractor Project Manager and Team by the Project Manager. 3 ffi,,*ffi t$-wry m ffit :Bw SECTION 3.1 3 CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BATU MAUNG INTERCHANGE ) : CMSB ORGANIZATION CHARTS AND HSE COMMITTEE : CMSB ORGANIZATION CHART Refer Attachment 3.1 3.2 : CMSB HSE COMMITTEE CHART Please refer attachm ent 3.2 4 Pto.llct tEcoBD Pt a^]{c TACXACE tA atEc! taNo Exrtt3lway IATU MAUI{C I]{IEICHANCI CEiGAS IAURNI SDN BHD ORGANIZATION CHART 6! bM^6edM@r (:I I a,'L T ,**'t fi o t6l er **11itr" ilfr I lnr Eq t I ,# ffi ffi"*a6 -s &s CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKA GE 3A-BATU MAUNG INTERCHANGE) ;!,s\ss{s N:- SECTION 4 4.I MONTH 4.2 WORKPLACE DESCRIPTION : March 2013 4.2.1 No. of Staff l8 4.2.2 No. of Subcontractors 7 Subcontractor G-Pile System Sdn Bhd FREYSSINET PSC (M) Sdn Bhd Activity No. workers Piling T-Beam Stressing Cable 7 I-Mix Concrete Industries Concrete Trail Mix 9 Brilliant Builder Sdn Bhd Utilities- TNB Construction of temporary 7 Pilacorp Sdn Bhd Giga Engineering Sdn Bhd bridge Painting Marine Works Sdn Bhd Hayana Sdn Bhd 10 t6 l1 75 I 4.2.3 No. of Workers :52 (Cergas Murni Sdn Bhd) : 7 (G-Pile System Sdn Bhd) :9 (I-Mix Concrete Industries) : 16 (HAYANA Sdn Bhd) : l0 (FREYSSINET PSC Sdn Bhd) :7 (Brilliant Builders Sdn Bhd) : 1l (Pilacorp Sdn Bhd) : 75 (Giga Engineering Sdn Bhd) 4.2.4 Safety and Health Target 4.2.5 Average Total No. of Workers at site : 205 : 750000.00 Non LTI 5 ffiM* T$]M 'MriM 4.3 CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (P ACKAGE 3A-BATU MAUNG INTERCHAN GE) TEfifl Occupational Health & Safety Information Record 4.3.1 Man Power 4.3.2 Machinery and Equipment Record : Refer attachment 4.3.2 4.3.3 List of PMA/PMT : Refer attachment 4.3.3 4.3.4 Staff List 4.3.5 Workers List 4.3.6 No. of Accident/ Incident 4.3.7 Brief Description Date :: Refer attachment 4.3.1 Rufe, attachment 4.3.4 : Refer attachment 4.3.5 of Accident/ Incident Type of Accident/ Incident Activity : Nil : Nil Status of Investigation Nil Nil 4.3.8 Issuance of NOI/ NOP by DOSH 4.3.9 Speci$ Action to be taken (if any) : Nil : Nil 4.3.10 Estimate Loss (RM) due to Accident/ Incident/ NOI/ NOP : Nil 4.3.t| No. of Stop Work Order : Nil 4.3.t2 No. of Corrective Action Request : Nil 4.3.13 Brief Description of CAR : Nil 4.3.t4 Visit by External Agencies (if any) :No 6 CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BAT U MAUNG INIJERCHANGE) 4.4 AUDIT 4.4.1 Audit : Yes 4.4.2 Audit Schedule :22Mac2013 Health and Safety Audit Carried Out Planned No ./ Yes If No, Please State the Reason (s): Nil 4.4.3 Health and Safety Audit : Yes Audit Conduct by JKSB 4.4.4 4.5 :22Mac2013 Date Venue Time :3,A' : 10.00 am Auditor :EnZaini till 12.00 pm Non Confornance Reports 0 MEETING 4.5.1 :22March2|l3 Safety Committee Meeting 4.5.2 LetterlMemo Issue for Attend Meeting : Yes 4.5.3 Photo Safety Committee Meeting : Yes 4.5.4 Attendance Safety Committee Meeting : Yes 4.5.5 Toolbox Meeting (Main Site) :06,13,20 &27 March Committee Meeting Carried Out as Planned Committee Inspection Carried Out as Planned No No ./ Yes { Yes 2013 7 ffi$\ &.5sqw*6 W CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY ( PACKAGE 3A-BATU MAUNG INTERCHAN GE) Person attend No I 2 J 4 5 6 Name Abdul Rahman Binhot Simbolon Siswo Handoko Abdul Ghafar Suroso Sulaiman Kurdi 7 8 9 l0 11 t2 13 t4 15 t6 t7 Sugeng Sareh Taji Kasimin Agus Trilrartanto Firdaus Maswan Samsudin Ibrohim Turyadi Marsid 18 Herman t9 Imron 20 Fendi Suranto Raharjo Rudianto Joko Irawan Aris Kurniawan Edi Pudianto Rubai Hendri Dinawan Sulianto Slamit Riyadi 2t 22 23 24 25 26 27 28 29 30 Company CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB CMSB 8 ffi*, w'" 4.6 CERGAS MURNI SDN. BHD. SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BATU MAUNG INTERCHANGE ) TRAINING AND EDUCATION 4.6.1 4.6.2 4.6.3 4.6.4 4.6.5 4.6.6 4.7 First Aider List Fire Drill/ Basic Fire Fighting PPE Briefing Scaffolding Briefing Safety Induction Working at height Nil : Nil : : Yes : Yes : Yes : Yes IMPROVEMENT AND INNOVATION (Advise by Safety and Health Officer) 1. Carried out housekeeping activity at site from time to time 2. Machineries and equipment shall be maintained as per scheduled 3. All the site workers and CMSB staff must wear proper personal protective equipment (PPE) especially life jacket while working at temporary bridge area. 4. Scaffolding for box girder must tag by intermediate scaffold and inspect by Advance scaffold inspector competent person. 5" All the scaffolding must have green tag and sign by competent scaffold before use by workers. 6. All the materials storage area need to barricade and the item need to arrange properly and maintain the housekeeping. 7. All the workers must obtain construction work permit and with valid CIDB passport (Green Card) I 4.8: SCHEDULED WASTE INVENTORY JADUAL KELIMA (PERATURAN I I) AKTA KUALITI ALAM SEKELILING 1974 PERATURAN-PERATURAN KUALITI ALAM SEKILILING (BUANGAN TERJADUAL), 2005 INVENTORI BUANGAN TERJADUAL SEHINGGA: MARCH 2OI3 Kod Tarikh Kategori Buangan Nama Buangan Kuantiti Dikeluarkan (Tan Metrik) Pengendalian Buangan Kuantiti Kaedah Mengikut Tempat Tan Metrik 27/0312013 sw 305 Minyak pelincir 0.2 Distor P3A (main site) terpakai 27/0312013 27103/20t3 sw sw 410 410 Penapis Tapak utama 4 unit Distor Tapak utama minyak P3A terpakai (main site) Tanah tercemar 2unit Distor Tapak utama P3A (main site) 10 4.9: SCHEDULED WASTE DISPOSAL RECORI) Kod Kategori Tarikh Kuantiti Nama Buangan Dilupuskan (Unit/Isipadu) Contaminated 0.001 m3 Kualiti Alam Sdn Bhd, LadangTanah Merah A3,71960 Bukit Pelanduk, Negeri Sembilan. 2unit Kualiti Alam Sdn Bhd, Ladang Tanah Merah A3,71960 Bukit Pelanduk, Negeri Sembilan. Buangan 27102t2013 sw408 soil 20/02t2013 sw409 Contaminated container 27102t20r3 sw30s Minyak Pelincir Terpakai 0.240 mt Nama & Alamat Premis Pelupusan Five Good Recycling (M) Sdn Bhd Plot 226, Jalan Perindustrian Bukit Minyak 7, Kawasan Perindustrian Bukit Minyak, 14100 Seberang Perai Tengah by: Ahmad B. Mohd Nor CMSB Site Safety Supervisor l1 CERGAS MURNI SDN. BHD. SAFETY AND HEATTH MONTHTY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BA TU MAUN G INTERCHANGE) 4.3.1: Summary of Manpower Record (March 2013)- Attachment 4.3.1 Bi MARCH 2OT3 I ) ,, 3 4 5 6 7 8 9 10 11 t2 Lroject Manager I Project Planner Site Engineer/ QA/ QC Surveyor & Draught I 3 I Person Safety Officer I Environmental Officer Site Quantity Survevor I I Supervisor HQ Staff 3 Site Safety Supervisor Clerk Technician/ Store Keeper Subtotal CMSB General Workers t4 SUBCON G-Pile I-Mix Concrete 15 16 HAYANA 6 7 8 9 4 I t 4 1) t* I r I I I I I I I I I I Effii s 3 3 3 3 I I I I Xi1ffi I I r t 4 3 I l t 4 22 [i:..1 r I I I I [i]iM 1 1 I 1 I Ml r 1 I I I ffi'ra 4 4 4 4 4 ffiil 3 ffil/ I 3 3 3 3 I I t I 1 1 I I 4 4 LLlel t F,#,jr11 }lffii M, 52 52 l; 4 4 4 22 22 )1 t l:t 9 9 l6 l6 t7 RFEYSSINET PSC l0 10 18 Brilliant Builders 7 l0 t9 Giga Eng /5 10 20 Pilacorp 1l lt 2t Subtotal 135 135 TOTAL 209 209 E=;i <, tt t{ tt f .t ['l il t -l Ifl kffiil l2 13 t4 15 I I I I I I I I lY{i;;;:! 52 52 52 7 7 7 7 9 9 9 9 9 l6 t6 l6 l6 l6 t t I I 3 t t 3 I I [ii?%ffi1 r t I I I I l,lirliJ ilffi lK:-?# t I I 1 I 1 1 I I I 4 4 4 4 K-:$#l 3 3 3 3 3 t I I I I I 1 1 I 4 4 4 4 fu1flfi lt:-(,ff,{5,fi l2i t r )) k t1 l 7 )) )) ,,, I sz <, l8 t9 20 2t 22 tt I I 3ffiil 1 I I I I 3 3 3 3 3 I I I t 3 I 1 I I o 0 0 0 0 I I o t I I I I I I t mffi-*Il t;#*t I I ['Ht t p/ 111 4 F7ffi4 3 irl3 1 5l,-1ffi|'ltt I lrr 4 mffi3Nl 4 zz 52 <, flfi,r,t|ltll 52 I 4 4 4 4 3 3 3 3 I I I 1 I 1 I I r I t"r- I 9 9 9 9 l6 t6 t6 t6 16 t6 f.l 16 t6 t6 l6 l6 16 It ll l3s t35 135 135 135 l3s 209 209 209 209 209 E;oiriil |' tt l t N,il l'..,,..1 t :::::::E;l 10 10 l0 l0 10 10 10 10 l0 IO 10 10 r0 10 t0 10 r0 toM-iro rH*FT l0 10 t0 10 10 l0 10 10 l0 10 lo iiiiiril lo l0 10 10 l0 l0 tl il ll ll 1l ll 1l 1l ll 11 11 135 135 t35 t35 135 t$ [.#ffi,,| rr tv\. I t:s 135 135 135 r35 t35 209 209 209 209 209 2oe 2oe 209 209 209 209 209 I }il 0 0 0 0 0 I I I I I I I 1 liiW^1 r ltLliffi I 1 I I 4 4 4 4 4 3 3 3 3 3 I I I I I I I 1 I I r,,ii.i a 4 4 4 4 4 .I 2t 2t 2t 2t 2t 2t s2 s2 52 <, 52 52 . %iirti 9 11 llo L,{L s2 9 1l I 52 [,ml ll 3 I 52 9 ll 3 I 52 9 lNiu 3 1 52 9 10 3 I 52 9 10 3 I a 9 l0 3 I l;"*Liill 2t I. : s l*Wl s 10 I I 4 tt l0 I 2t 7 tI t I 4 7 l0 I 2t 7 l0 I 2t 7 10 30 I 4 z L;,ill I z 10 29 I 4 7 l0 28 1 EZA,[iLl 7 l0 27 t piL.i*l + 7 16 26 [$,.\ffi t + F:l s llflr\ffi 3 t t t hiBl#ffi 7 K.- 25 1 2t IN::# ;,,.1 t lzq l-i zr IJ 52 23 I },rtrlllt t )) l Fi;NllA 7 10 209 3 I sz l^. I L+$ l 10 l0 3 I rl l0 l0 l0 10 3 I I .lf t6 tt 52 I tt II 11 r ltiffir t [1z; t r liii:ffi,l r )) )) )) ffid 7 Irol tl r [.] r WORKERS t3 5 fttTt STAFF 1 4 il I tllr,il ll F:--1ig#iiftl lr,iift.ttl 84 II t::::t lt L=ru I ,;J t.*t tl [r#,U tlI l I 7 7 7 7 7 9 9 9 9 9 9 t6 t6 l6 t6 t6 l6 l0 l0 l0 l0 10 t0 l0 l0 l0 10 10 l0 10 l0 10 l0 l0 l0 1t I13s ',il 209 ll 1l ll l1 ll 135 ll5 135 I35 I35 209 209 209 209 209 .31 CERGAS MURNI SDN. BHD. SAFETY AND HEALTH MONTHTY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 3A-BATU MAUNG NTERCHANGE I 4.3.2: SUMMARY OF MACHINERY & EQUIPMENT REcoRD (MARCH 2oI3) BIL March 2013 I a I Piling Rig t 2 Mobile Crane 20t 3 4 3 4 5 6 7 8 9 r0 ll t2 l3 t4 l5 t6 t7 18 t9 20 2t )) ,1 24 25 26 27 28 29 30 3l I I I t I I I I I I I 1 I I I I I I 1 I I I I I I I I I I I 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Mobile Crane 25t t I I I I I I I I I I 1 I I 1 I I I I I I I t I I I I I I I ) .| ) , I Crawler crane 50V 2 2 I 2 2 ) ) 2 ) , ) ., ,, ) ) ) ) I 2 , 2 2 2 2 ) 7 I ) , ) ,| ) ) 2 t 2 2 2 2 ) ) a ) 2 ) ) 7 2 ., a 2 ) ) a ) ) ) , , a ., ) ) 1 ) 7 ) ) ,, ., ) 1 ) ) , 't ,, ,, ) ) ) ) ., 1 1 ) 2 2 2 ,, ,, ) 1 ) ) ) ) ) ) ) ) ) ) ) 1 ., ) 2 2 , ) ., ) ) ) , ., ,, ,, 2 2 ) ) ) ) ,, ,, , 2 I ) 2 1001 5 6 7 Backhoe ) I Lorry ., ,, Dump Truck I ) ) 2 a a 1 ) 2 ., 8 Excavator 2 ) ) , a 9 Back Pusher 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 10 \ilelding I I I I t I I I t I I I I I I I I I I 1 I 1 1 I I 1 1 It I I I I Generator Set 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 t2 Sewing Machine I I I I I 1 I I I I I I I I 1 1 I I 1 1 I I I I I I I I I I I Bar bending 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Roller compactor , ) I ) ) 2 2 ) 2 2 2 2 ) ) 2 ) ,, 2 2 2 2 2 2 2 2 2 2 , 2 2 t6 Air ,, ) ,, 1 ., ) ) ) ) ) ) 2 2 ) ) ,' a ) , 2 ) 1 1 2 ) ., ) ) ) ) 2 t7 Water pump 10 TOTAL 48 l3 Set machine l4 Bar cuffing machine 15 compressor ,, IO t0 l0 l0 l0 l0 l0 t0 10 l0 l0 10 l0 10 10 l0 l0 l0 10 l0 l0 l0 t0 10 l0 l0 10 l0 l0 IO 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 ffi CERGAS MURN! SDN. BHD. SAFETY AND HEALTH MONTHTY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 3A-BATU MAUNG INTERCHAN GE Attachment 4.3.2 4.3.3 LIST of PMA for March 2013 No Date Issue Name and Transport No Company I 05101120t2 Crawler crane TSC Heavy 2 27102t20r2 Mobile Crane (WDM 3604) J 231r0t20r2 4 5 PMA No Expire Date sL230t4 03104t2013 Asia Mobile 46263 19t05t20t3 Crawler Crane JL Equipment Sdn Bhd sL 22t0U2014 03108t2012 Mobile Crane Wong Kaw Yun 101073 02ltU20t3 07106120t2 Mobile Crane Elegant Builders Sdn Bhd 103104 06109t2013 Lift Sdn Bhd 11628 LIST of Driver Competency for March 2013 No Name 1 Yuen Tuck 2 Low Sek J Azzahzi bin shaari 4 Shak Yuek Fah 5 Som Chai A/L Ariam 6 Rosmi b Tak 7 Nazarul Aswad bin Abdul Talin Attachment 4.3.3 Registration No sPoK (M)t SLt set98 SPOK (D)/ KR: 03512001 TGt 03t ow 02t 143 llql(B)tPPt0sst2007 KD/0O/oK02t137 lq4 JA( o/Iy sL/ 343t ee (G) KR: 00tt 200e Expire date rUIl12014 03110t20r3 2810912013 I5ltU20t3 0yt0t20t4 16104t2013 28108t20r3 Remarks Crawler Crane Crawler Crane Mobile Crane Mobile Crane Mobile Crane Mobile Crane Mobile Crane CERGAS MURNI SDN. BHD. SAFETY AND HEATTH MONTHLY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY _LP4qqqE 3A-BATU MAUNG INTERCHANGE) .#sswffir..... ifffi:yffi#/sltr ':HWi-...'. .MqiMf &M& * CMSB LIST OF STAFF NAME POSITION 1 Ir Haji Ridzuan B. Saidin Project Manager 2 Chan Kah Keen Technical Manager a J Kogilan Muniandy Construction Manager 4 Deva Dass Safety and Health Offrcer 5 Mohd Hazli bin Yahya Planner 6 Mohd Zulfilrl.i Bin Ghazali Site Engineer 7 Siti Noorzainani Binti Zainal Abidin Environmental Officer 8 Nurshida Samsudin Technical Engineer 9 Mazalee bin Mohamad Chief Surveyor 10 Mohd Fadhil Talhah Senior Site Supervisor 11 Nabila Nurul Huda Clerk t2 Muhamad Fuad Asst. Chief Surveyor 13 Ahmad Farid Site Safety Supervisor t4 Mohamad Noranizam Site Supervisor t5 Abd Rahman Site Supervisor I6 Mohd Thaqif Site Supervisor t7 Noor Hayati Wahab Site Quantity Surveyor 18 Kamarul Aslam Traffi c Management Offi cer t9 Yusri bin Ismail Lab Technician I I CERGAS MURNI SDN. BHD. SAFETY AND HEATTH MONTHLY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BATU MAUNG INTERCHANGE ) CMSB LIST OF WORKERS No I 2 J 4 5 6 7 8 9 10 11 t2 13 l4 t5 t6 t7 18 t9 20 2T 22 Z3 24 25 26 27 28 29 30 Name Abdul Ghafar Agus Trihartanto Amat Darmanto Arpi Sahbeni Binhot Simbolon Dampes Raja Gukguk Didik Dwi Prayitno Edy Pudianto Fandi Ferli Desi Yandi Firdaus Herman Ibrohim Johan Arif Dianto Junaidi Marsid Mohammad Suhadak Mulyadi Munim Raharjo Rendika najuli saputra Ruba'i Rundianto Sareh Siswo handoko Subkhan lqgeng Sukimin 4I Sulaiman kurdi Suliyanto Supandi Suprapto Suroso Suroso Suwarno Suyono Taji bin &asimin Turyadi Kamal Azlarr 42 Faizal 31 32 JJ 34 35 36 37 38 39 40 Designation Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Security Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi/ Security Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Kongsi Backhoe Lorry Driver backpusher Pasport/ NRIC AP 861866 AP 852009 AR 620285 AP 359712 AP 85213s AP 849386 AR 607902 AP 852216 AP 388311 1.20446tt AP 3s9691 AR s85863 1^2045320 AP 861869 AP 852010 AP 359627 AP 852215 4P607529 AP 286143 AR 853438 42044641 Ap 360078 A 1286479 Ap 849381 Ar 621053 Ar 176017 Ar 622318 Ar 621216 Ap 852080 Ar 585826 Ap 359760 Ap 849178 Ar 621217 Ar 175954 Ar 621215 Ar 175974 Ar 607592 s 833899 Ap 359675 84092003s081 CERGAS MURNI SDN. BHD. SAFETY AND HEATTH MONTHLY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BATU MAU NG INTERCHANGE) 43 Abdul Rohman 44 45 Hermanto Imron Junaidi Supriyanto 46 47 Attachment 4.3.5 KongsiKong KongsiKong KongsiKong KongsiKong KongsiKong AP 359677 Ap 360067 A2044609 Ap 359674 Ap 359703 CERGAS MURNI SDN. BHD. AND HEATTH MONTHTY REPORT SECOND PENANG BRIDGE LAND EXPRESSWAY (PACKAGE 3A-BATU MAUNG INTERCHANGE ) SAFETY SUMMARY HSE STATISTICS RECORD Project SECOND PENANG BRIDGE P3A: BATU MAUNG INTERCHANGE 750000.00 m/hour Project Commencement Date: May 2010 Month Ending I 666200.00 May 2012 (Extend to June 2013) Man-hour without LTI 3l't March 2013 Month No without LTI Item Unit 3 Staff Sub-contractors Total (Staff This Month Cumulative Sub-total This month Cumulative Sub-total remarks & SubCon) December Hrs 3 184 78594 81778 32912 551510 584422 36096 Nit No Nil Nil Nil Nil Nil Nil Nit Nil ) Man hours worked month Total ofaccident/ incident No of lost workdays Days Nil Nil Nil Nil Nil Nil Nil Nil 4 No. of lost time No Nil Nil Nil Nil Nil Nil Nil Nil No No Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nit Nit NiI No Nir Nil Nil Nil Nit Nil Nil Nil No No Nit Nil Nil 2 Nil Nil Nil Nit I I No Nil Nit Nil Nil Nil Nil Nil Nil No Nil Nil Nil Nit Nit Nit Nit Nit 2 accident 6 No of No of medical 7 No of property 5 treatment damage (fre/ 8 No of near misses 9 No of fnst aid 10 LTI Frequency LTI X I ll cases 1 1 1 1 000000 LTI Severity LTI X 1000000 1 I Toolbox meeting (Every Wednesday) l.fi*f H- I ) 1 l' \-dt W e iI I I -.1 'i h Fr I E / , j_- .- L ':'-E ffi I r CIDB training (30/03/2013) I I E 'o- I E - -=rF i \ - "-r rt L. f-)
Similar documents
Black Point Community Plan
Marin County Board of S u p e r v i s o r s Marin County P l a n n i n g Commission Marin County Off i c e s : County Counsel P u b l i c Works Environmental S E r v i c e s P a r k s and R e c r e...
More informationWarta Kerajaan Warta Kerajaan - Intellect Worldwide Sdn. Bhd.
INNOPHOS, INC.; 259, PROSPECT PLAINS ROAD, CRANBURY, NJ 08512, UNITED STATES OF AMERICA. A G E N T: Z A H A R I Z A N A H M E D M E A H , D R E W M A R K S PAT E N T S & D E S I G N S ( M A L AY S ...
More information