PDF drawings
Transcription
PDF drawings
SHT. NO. TITLE SM GENERAL NOTES: RAPID ROADWAY MODULAR JOINTED PRECAST PAVEMENT SYSTEM 1. PRECAST PAVEMENT SLAB SHALL BEFABRICATED IN ACCORDANCE WITH STATE DOTSTANDARD PLANS AND SPECIFICATIONS APPROVED SHOP DRAWINGS AND THE REQUIREMENTS OF THE SPECIAL PROVISIONS (SP). 2. USERS WILL NEED TO EVALUATE AND RE-ENGINEER THE SHOP DRAWINGS FOR THEIRSUITABILITY FOR USE ON THEIR PROJECTS AND CLIMATE. CONCRETE: 1. CONCRETE USED IN THEPRECAST CONCRETE SLAB SHALL BE CONSTRUCTED PERSTATE DOTSTANDARDS. GRACIE LEVELING LIFT 1.GRACIE LEVELING LIFT HAS A DUAL FUNCTION OF LIFTING AND LEVELING SIMULTANEOUSLY. 2. MAXIMUM LOAD FOR EACHGRACIE LEVELI NG LIFT IS 31,900 LBS FOR A 10 IN. SLAB. 3. DETAILS ON SHEET GG-1. BARRA GLIDE: THE BARRA GLIDE LOADTRANSFER SYSTEM IS THE BEST LOAD TRANSFER OPTION.THE DOWEL SLIDES FROM THE MIDDLE OF THE PANEL USING A VERY THIN TOP SLOT INTO THE ADJACENT PANELCENTER POCKET. THE PERFORMANCE PLUS RHLATEX FILL GROUT OPERATION DOES NOT NEED EXPENSIVE POLYESTER GROUT AND USES A FRIENDLY LATEX SANDED GROUTWHICH ALLOWS TRAFFIC IN HOUR. SEE DETAILS ON SHEET BG-1 ANDBG-2. GROUT CONTAINMENT SHEET AND METHOD: 1. GROUT CONTAINMENT SHEETAND METHOD IS TO PREVENT GROUT FROM MIGRATING TO THEADJACENT PANEL. TM GRACIE LEVELING LIFT PH 626-339-6300 www.gracielevelinglift.com TM GROUT CONTAINMENT SHEET & METHOD PH 626-339-6300 GENERAL NOTES C-1 INTERMITTENT C-2 PLAN VIEW- PCP C-3 PLAN VIEW "PRE-STRESS" C-4 DOWEL TO POCKET DETAIL RAPID RAPID ROADWAY ROADWAY C-5 JOINT DETAILS C-6 CURVE INSTALLATION GLL-1 GRACIE LEVELING LIFT BG-1 BARRA GLIDE DETAIL BG-2 LOAD TRANSFER SYSTEM GC-1 GROUT CONTAINMENT GC-2 GROUT CONTAINMENT DETAILS RR-1 RAPID ROADWAY RH BEDDING GROUT AND LATEX FILL GROUT PH 949-677-8229 R BARRA GLIDE (LOAD TRANSFER SYSTEM) TM BARRA PLUG TM PH 949-246-4177 1. PREVENTS DOWEL BAR FROM DEFLECTION. 2. DETAILS ON SHEET BG-2 ANDRR-1. 1. ADHESIVE EXPANSION PADIS APPLIED TO BOTH ENDS OF DOWEL BAR. MARK TM PATENT PENDING REVISIONS DATE Drawn By: Designed BY: Checked By: SHIPPING: TRADEMARK General Notes 1. The contractor shall verity all dimensions and drawing. DOWEL PAD: 1. USE SILICONE SEALANTPREAPPROVED BY STATE DOT WORKS IDEALLY AS A SYSTEM BUT CAN BE SOLD SEPARATELY Client BARRA PLUG: 2. DETAILS ON SHEET C-5 ANDGC-2. 1. BEDDING GROUT IS PUMPEDTHROUGH GROUT PORTS. 2. PERFORMANCE PLUS RHBEDDING GROUT BY RENU MATERIALS IS NON SANDED. 3. DETAILS ON SHEET GC-2 ANDRR-1. Project 1 Owner/Client 1. FILL GROUT IS POURED INTO LOAD TRANSFER SLOTS AND PORTS ONCE THE DOWEL BAR IS SLIDE INTO POSITION. 2. PERFORMANCE PLUS LATEXBY RENU MATERIALS IS SANDED. 3. DETAILS ON SHEET C-4 AND RR-1. JOINT SEALANT: 2. GROUTCONTAINMENT SHEETSHALL LAY OVERADJACENT PANEL. 3. DETAILS ON SHEET GC-1 ANDGC-2. PERFORMANCE PLUS RH BEDDING GROUT : Project Name PERFORMANCE PLUS RH LATEX FILL GROUT: PERFORMANCE PLUS DOWEL PAD T-1 GRACIE LEVELING LIFT, BARRA GLIDE FORMS, GROUT CONTAINMENT, BEDDING GROUT, FILL GROUT, AND JOINT SEALANT SHALL ALL BE SHIPPED DIRECTLY TO YOUR FACILITY. Submitted: x x Approved: x x Project No. PCP-1 Sheet Title TITLE SHEET CONSTRUCTION DETAILS INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. T-1 RAPID RAPID ROADWAY ROADWAY NOTES: 1. FOR PRECAST PANEL DETAILS, SEE SHEET C-2. LONGITUDINAL JOINT (TYP) 2. FOR BARRA GLIDE LOAD TRANSFER SYSTEM AND NEW TRANSVERSE JOINT(TYP) JOINT DETAILS, SEE SHEETS C-5, BG-1. RRS RRS 3. 6' Min LENGTH OF EXISTING PAVEMENT SLABS EXIST LONGITUDINAL JOINTS (TYP) MUST REMAIN. 4. STARTING LOCATING,ENDING LOCATION AND SEE NOTE 6 NUMBER OF PANELS SHALL BE VERIFIED WITH THE ENGINEER PRIOR TO FABRICATION AND/OR INSTALLATION. 5. PRECAST PANELS MAY BE TRIMMED UP TO 2" JPCP MAX IF NECESSARY. Project Name Project 1 EXIST L EXIST W APPREVIATIONS: RRS RRS A L A RRS RRS RAPID ROADWAY SLAB JPCP JOINTED PLAIN CONCRETE PAVEMENT LEGEND: EXIST JPCP TO BE REPLACED WITH IPSR Owner/Client EXIST AC SHOULDER Client EXIST EXIST TRANSVERSE LONGITUDINAL JOINTS (TYP) JOINTS (TYP) EXIST EXIST MULTIPLE SLAB EXIST MULTIPLE SINGLE SLABS IN SAME LANE SLABS IN EXIST MULTIPLE SLAB IN ADJACENT LANE ADJACENT LANES General Notes PLAN 1. The contractor shall verity all dimensions and drawing. CONSTRUCTION JOINT DRILL 1" PERFORMANCE PERFORMANCE GROUT PLUS LATEX FILL PLUS LATEX FILL GROUT PORT GROUT PERFORMANCE PLUS LATEX FILL TRANSVERSE GROUT DRILL 1" TRANSVERSE CONSTRUCTION JOINT PORT . . MARK REVISIONS DATE GROUT JOINT JOINT Drawn By: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DIRECTION OF TRAFFIC PCP ADDITIONAL PCP (AS REQUIRED) . . . . . . . . . . . . . . . . . . AND BOND DOWEL BAR DRILL 2" HOLE SECTION A-A Checked By: . . . . . DRILL 2" HOLE Designed BY: . . PCP . . EXISTING . . . . DIRECTION OF TRAFFIC . . AND BOND DOWEL BAR . . . . . . . Submitted: x x Approved: x x . . . . EXISTING Project No. 1-PCP-1 CONC CONC PVMT PVMT Sheet Title INTERMITTENT CONSTRUCTION DETAILS MULTIPLE SLAB REPLACEMENT INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. C-1 12'-0" NOTES: 12'-0" 2'-0" 4"CLR SEENOTE 8 #6 L-BAR GROUT PORTS 1'-7" A 2'-2" 2.SLAB THICKNESS T, IS THE FINISHED THICKNESS. INCREASE T IF GRINDING IS TO BE PERFORMED. 2 3/4" LOAD TRANSFER RECEIVING END #6 BAR 12"MIN C-C 1'-0" C-C TYP DIRECTION 2'-2" 1'-8"TYP SEE CONSTRUCTION 3.FOR GROUT PORT DETAILS AND JOINT DETAILS, DETAILS, C-5 AND BG-1. 4.REINFORCEMENT DIMENSIONS AND DESIGN SHALL BE VERIFIED BY THE ENGINEER BEFORE PANEL FABRICATION. 5.ADJUST REINFORCEMENT BARS TO ACCOMMODATE DOWEL BAR AND DOWEL BAR SLOTS. DIRECTION OF TRAFFIC 6.DOWEL BAR SLOT OFFSET AND SPACING SHALL MATCH 6'-1" OF TRAFFIC 2'-10" OFFSET AND SPACING OF DOWELS IN ADJACENT PCP. Project Name 7.GRACIE LEVELING LIFT WITH BOTTOM PLATE IS ATTACHED TO THE BOTTOM OF THE PANEL.SEE CONSTRUCTION DETAIL GLL-1. Project 1 8.IF 12'-2" DIMENSION ARE REDUCED, THE 4" CLEARANCE A 6'-1" (SEE NOTE 8) 9 1/2" 12'-2" RSP P10. 4"CLR SEENOTE 8 1'-7" RAPID RAPID ROADWAY ROADWAY 1.FOR DETAILS NOT SHOWN, SEE REVISED STANDARD PLAN 2'-0" A DIMENSION IS TO BE REDUCED BY HALF OF THE DIMENSION ON BOTH SIDES. A 2" MINIMUM COVER IS REQUIRED. LOAD TRANSFER 9.#4 U-BAR WILL TIE TO TOP AND BOTTOM MATS AT EACH CORNER. 12" 12" 6'-0" 4"CLR TYP #4 BAR SEE NOTE 7 1'-8" 1'-8" TYP 4"CLR 6'-0" A REBAR MAT (BOTTOM LAYER) Owner/Client LEGEND: 1'-8" #4 BAR 12"MIN C-C GRACIE LEVELING LIFT CLIENT #4 U-BAR 1 1/4" DIA GROUT PORT REBAR MAT (TOP LAYER) 12" 1‚" DIA GROUT PORT #4 BAR #4 U-BAR SEE NOTE 9 #6 BAR 2" CLR PLAN General Notes 20" 1‚" DIA GROUT PORT #4 L BAR A 1. The contractor shall verity all dimensions and drawing. T T/2 20" #4 U-BAR PLAN 2'-0" 4'-0" 4'-0" MARK 30" 2" CLR 2'-0" #6 L BAR REVISIONS DATE Drawn By: Designed BY: Checked By: A-A SECTION 30" GRACIE LEVELING LIFT (DETAILS ON SHEET GLL-1) Submitted: x x Approved: x x Project No. 1-PCP-1 PLAN Sheet Title PLAN VIEW CONSTRUCTION DETAILS PRECAST CONCRETE PANEL(PCP) INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. C-2 12'-0" 2 3/4" LOAD TRANSFER RECEIVING END REBAR #4 NOTES: 1.FOR DETAILS NOT SHOWN, SEE REVISED STANDARD PLAN RSP P10. 2'-0" 6'-0" QTY 9•" 2.SLAB THICKNESS T, IS THE FINISHED THICKNESS. INCREASE T 1'-7" 4"CLR RAPID RAPID ROADWAY ROADWAY IF GRINDING IS TO BE PERFORMED. 3.FOR GROUT PORT DETAILS AND JOINT DETAILS, SEE CONSTRUCTION U-BAR 4 DETAILS, C-5 AND BG-1. 4.REINFORCEMENT DIMENSIONS AND PRETESIONING STRAND 2'-2" DIMENSIONS SHALL BE VERIFIED BY THE MANUFACTURER BEFORE 8 5.ADJUST REINFORCEMENT BARS TO ACCOMMODATE DOWEL BARS AND DOWEL BAR SLOTS. 6.DOWEL BAR SLOT OFFSET AND SPACING SHALL MATCH OFFSET DIRECTION B-BAR AND SPACING OF DOWELS IN ADJACENT PCP. T&B-TYP OF TRAFFIC 7.GRACIE LEVELING LIFT WITH BOTTOM PLATE IS ATTACHED. 1 1/4" GROUT PORT(9) 2'-10" 5 12'-2" 1/2" STRANDS PANEL FABRICATION. 6'-1" A-BAR 4 (SEE NOTE 8) B-BAR TO THE BOTTOM OF THE PANEL.SEE CONSTRUCTION DETAILS, GLL-1. A-BAR 24" O.C.(T&B) 8.IF 12'-2" DIMENSION ARE REDUCED, THE 4" DIMENSION IS Project 1 MINIMUM COVER IS REQUIRED. LOAD TRANSFER 9.#4 U-BAR WILL TIE TO TOP AND BOTTOM MATS AT EACH CORNER. 1'-0" C-C TYP 10.FOUR #4 B-BAR WILL BE PLACE ON TOP AND BOTTOM MAT AT THE 4" CLEARANCE. A A U-BAR 1'-8" 12" TYP 4" CLR Project Name REDUCED BY HALF OF THE DIMENSION ON BOTH SIDES. A 2" 15"O.C.-TYP 1/2"STRAND 8" Owner/Client LEGEND: TOP&BOTTOM-TYP SEE NOTE 9 CLIENT GRACIE LEVELING LIFT 1'-8" 1 1/4" DIA GROUT PORT 12" REBAR MAT (TOP&BOTTOM LAYER) 1‚" DIA GROUT 1‚" DIA GROUT PORT 1„" DIA GROUT PORT 136" #4 BAR #6 BAR 2" CLR 9‚" LOAD TRANSFER (DETAILS ON BG-1) #4 U-BAR General Notes 1. The contractor shall verity all dimensions and drawing. 138" T LOAD TRANSFER RECEIVING END (DETAIL ON BG-1) #4 B-BAR T/2 9‚" 2" CLR 136" (8)1/2" DIA STRANDS 2'-0" MARK 1'-7" 4'-0" 4'-0" 2'-0" U-BAR TOP&BOTTOM DATE Designed BY: Checked By: PLAN GRACIE LEVELING LIFT (SEE DETAILS ON GLL-1) REVISIONS Drawn By: #4 A-BAR Submitted: x x Approved: x x Project No. 1-PCP-1 A-A SECTION Sheet Title PLAN VIEW CONSTRUCTION DETAILS PRECAST CONCRETE PANEL(PCP) PRE STRESSED INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. C-3 RAPID RAPID ROADWAY ROADWAY 1‚" DIA GROUT 1‚" DIA GROUT PORT 1„" DIA #4 BAR #6 BAR 2" CLR GROUT PORT DOWEL PAD T C L LOAD TRANSFER RECEIVING END (DETAIL ON BG-1) 1'-6" 9‚" 2" CLR Project Name (8)1/2" DIA STRANDS 2'-0" 4'-0" 4'-0" GRACIE LEVELING LIFT (SEE DETAILS ON GLL-1) U-BAR TOP&BOTTOM 2'-0" Project 1 SIDE VIEW Owner/Client CLIENT FLAT BAR (USED TO SLIDE DOWEL BAR) EXISTING SLAB GROUT PORT TRANSVERSE JOINT EXISTING SLAB GROUT PORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RRS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. The contractor shall verity all dimensions and drawing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawn By: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TM APPROACH OPTION DOWEL PAD ADHESIVE EXPANSION PAD DATE . . . . . . . . . . . . . . REVISIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . DRILLED IN DOWEL MARK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RRS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DOWEL BAR DEPARTURE OPTION Designed BY: DRILLED IN DOWEL Checked By: Submitted: x x Approved: x x Project No. 1-PCP-1 Sheet Title CONSTRUCTION DETAILS DOWEL TO POCKET DETAIL INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE DOWEL TO POCKET DETAIL Sheet No. C-4 Jt C L NOTES: RRS RRS 1. GROUT CONTAINMENT SHEET IS DRAPED OVER THE THE EXISTING ROADWAY AND TRIMMED FLUSH PRIOR LATEX FILL GROUT ‚" 2. IS ALSO KNOWN AS ISOLATION FOAM ‚" TO …" LOAD TRANSFER LEGEND: RAPID RAPID ROADWAY ROADWAY PERFORMANCE PLUS TO OPENING TO TRAFFIC. Œ" TO ˆ" EXPANSION FOAM CAULKING ABBREVIATIONS: 3/4" FLEXIBLE POLYURETHANE FOAM RRS RAPID ROADWAY SLAB LCBRS LEAN CONCRETE BASE RAPID SETTING CAULKING T PAVEMENT THICKNESS T=8" PERFORMANCE PLUS RH LOAD TRANSFER RECEIVING END 3/4" FLEXIBLE POLYURETHANE FOAM BEDDING GROUT 18" DOWEL BAR TABLE 1 PERFORMANCE PLUS RH BEDDING GROUT Project Name Project 1 DOWEL BAR DIAMETER TABLE GROUT CONTAINMENT SHEET PAVEMENT LCBRS 0.65' > 0.65'-0.85'> 0.85' THICKNESS Min DOWEL* 1•" 1‚" 1" RRS TO RRS BAR Dia Jt TRANSVERSE JOINT DETAIL * THE DRILLED HOLE DIAMETER MUST BE „" TO ‰" Jt C L ‚" ‚" TO …" RRS LATEX FILL GROUT RRS Œ" + ˆ" •"+ „" EXISTING CONCRETE Client ‚" TO …" (SEE NOTE 1) C L RRS PERFORMANCE PLUS DRILL 1" GROUT PORT GROUT CONTAINMENTSHEET Jt EXISTING CONCRETE Owner/Client CL Exist Conc Pvmt LARGER THAN THE BAR DIAMETER. PERFORMANCE PLUS LATEX FILL GROUT Œ" TO ˆ" DRILL 1" ‚" LOAD TRANSFER Œ" TO ˆ" GROUT PORT ‚" TO …" CAULKING T=8" CAULKING CAULKING General Notes 1/4" POLYETHYLENE 18" DOWEL BAR (SEE TABLE 1) 18" DOWEL BAR FOAM LOAD TRANSFER (SEE NOTE 2) 1. The contractor shall verity all dimensions and drawings. •" T=8" T=8" PERFORMANCE PLUS DRILLED 2" HOLE AND BOND DOWEL BAR 3/4" FLEXIBLE POLYURETHANE FOAM 3/4" FLEXIBLE POLYURETHANE FOAM DRILLED 2" HOLE AND BOND DOWEL BAR BEDDING GROUT Exist BASE LCBRS GROUT CONTAINMENT MARK REVISIONS DATE LONGITUDINAL JOINT DETAIL Drawn By: EXIST LCBRS BASE GROUT CONTAINMENT SHEET GROUT CONTAINMENT SHEET LCBRS EXIST Designed BY: BASE Checked By: EXISTING TO RRS TRANSVERSE JOINT DETAIL EXISTING TO RRS Submitted: x x Approved: x x Project No. TRANSVERSE JOINT DETAIL 1-PCP-1 Sheet Title CONSTRUCTION DETAILS JOINT DETAILS INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) JOINT DETAILS NO SCALE Sheet No. C-5 RAPID RAPID ROADWAY ROADWAY O (L) W 90 Project Name st Exi NAL UDI GIT N O L NT JOI Project 1 d d Owner/Client Client W 12'-0" Radius d (inches) (ft) 100 See Note 1 200 See Note 1 300 See Note 1 400 2 3/16 500 1 3/4 600 1 7/16 700 PRECAST REPLACEMENT PANEL ON A CURVE d=6L-(6L(R-W) / R) R General Notes 1. The contractor shall verity all dimensions and drawings. 1 1/4 NOTES: 800 1 1/8 900 1 1000 7/8 1500 9/16 1. R IS TO BE DETERMINE BY THE ENGINER FROM AS-BUILT DATA. 2. USE BARRA GLIDE SYSTEM TO INSERT DOWEL BAR. 3. VERIFY W=EXISTING LANE WIDTH IN THE FIELD. JOINT ON EACH SIDE OF THE WIDTH. 2000 7/16 2500 3/8 3000 5/16 MARK REVISIONS DATE Drawn By: 1/2" CLEARANCE OVERCUT OF THE LONGITUDINAL 4. FOR DIMENSIONS NOT SHOWN, VERIFY (d) WITH THE ENGINEER. FOR (d) NOT SHOWN, VERIFY DIMENSION WITH THE ENGINEER. Designed BY: Checked By: Submitted: x x Approved: x x Project No. 3500 1-PCP-1 1/4 4000 1/4 4500 3/16 Sheet Title CONSTRUCTION DETAILS CURVE INSTALLATION INDIVIDUAL SLAB REPLACEMENT CURVE INSTALLATION (PRECAST CONCRETE PANEL) NO SCALE Sheet No. C-6 NINE (9) GROUT PORT . . . . . . . . . . . 6" FULLY THREADED COUPLING . . •"+ „" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NEW RRS . . . . . . . . . EXISTING CONCRETE . . . . . . . . . . . . . . . . . RAPID RAPID ROADWAY ROADWAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DIRECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . www.XXXXXX.com . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . OF TRAFFIC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . Project Name . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Project 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BOND BREAKER SEE NOTE 1 . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DETAIL A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CROSS SECTION OF DETAIL A . . . . . . . . . . . . . . . . . (PLACED AND PRIOR TO LEVELING) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Owner/Client . . . . . . . . . . GROUT CONTAINMENT SHEET NEW RRS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Client . . . . . . . . . . . . GRACIELEVELING LIFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EXISTING CONCRETE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #4 REBAR . . . . . . . . . . . . NOTE: . . . . . . . . . General Notes . . . . . #6 REBAR . . . . . . . . . . . . . . . . . . . 1. BOND BREAKER IS TO BE APPLIED TOTHE TOP . 1. The contractor shall verity all dimensions and drawing prior to installation. . . . . . . . . . . . . OF THE PLATE PRIOR TO PANEL FABRICATING. . . . . . . . . . . . . . . . . . . . GROUT CONTAINMENT SHEET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . REVISIONS DATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MARK . . . Drawn By: . . . . . . . . Designed BY: . . . . . . . . . . . . . . . . Checked By: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LEVELED AND GROUTED EXISTING BASE Submitted: x x Approved: x x . . . PERFORMANCE PLUS BEDDING GROUT Project No. 1-PCP-1 LEAN CONCRETE BASE RAPID SET (LCBRS) Sheet Title CONSTRUCTION DETAILS GRACIE LEVELING LIFT INDIVIDUAL SLAB REPLACEMENT GRACIE LEVELING LIFT DETAIL (PRECAST CONCRETE PANEL) NO SCALE Sheet No. GLL-1 RAPID RAPID ROADWAY ROADWAY 1‚" DIA GROUT 1‚" DIA GROUT PORT 1„" DIA #4 BAR 9‚" 2" CLR #6 BAR LOAD TRANSFER (DETAILS ON BG-1) T LOAD TRANSFER RECEIVING END (DETAIL ON BG-2) T/2 Project Name 1'-7" 9‚" Project 1 2" CLR 2'-0" 2'-0" 4'-0" 4'-0" GRACIE LEVELING LIFT (SEE DETAILS ON C-5) SECTION Owner/Client Client 1‚" DIA GROUT PORT 1‚" DIA #4 BAR 2" CLR GROUT PORT #6 BAR #4 U-BAR General Notes T 1. The contractor shall verity all dimensions and drawings. T/2 #4 U-BAR #4 U-BAR 2" CLR 2'-0" 4'-0" 4'-0" MARK 2'-0" REVISIONS DATE Drawn By: 12" GRACIE Designed BY: LEVELING LIFT Checked By: (SEE DETAILS ON GLL-1) PLAN Submitted: x x Approved: x x Project No. 1-PCP-1 Sheet Title CONSTRUCTION DETAILS BARRA GLIDE DETAIL BARRA GLIDE DETAIL INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. BG-1 RAPID RAPID ROADWAY ROADWAY FLAT BAR (USED TO SLIDE DOWEL BAR) Project Name Project 1 TRANSVERSE JOINT DETAILS SEE SHEET C-5. PERFORMANCE PLUS LATEX FILL GROUT . . . . . . . PERFORMANCE PLUS LATEX FILL GROUT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Owner/Client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . Client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General Notes . . . . . . . . . . . . . . . . . . . . . . . . RECEIVING END LOAD TRANSFER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LOAD TRANSFER . . . . . . . . . . . . . . . . . . . . . . . 1. The contractor shall verity all dimensions and drawings. . . . . . TM DOWEL BAR BARRA PLUG DOWEL PAD ADHESIVE EXPANSION PAD (ON BOTH ENDS) MARK REVISIONS DATE Drawn By: Designed BY: Checked By: Submitted: x x Approved: x x Project No. 1-PCP-1 Sheet Title BARRA GLIDE LOAD TRANSFER SYSTEM LOAD TRANSFER SYSTEM CONSTRUCTION DETAILS INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. BG-2 RAPID RAPID ROADWAY ROADWAY Project Name Project 1 Owner/Client Client NEW PANEL General Notes EXISTING CONCRETE EXISTING CONCRETE 1. The contractor shall verity all dimensions and drawings. GROUT CONTAINMENT SHEET (6 MIL.) MARK REVISIONS DATE Drawn By: Designed BY: Checked By: Submitted: x x Approved: x x Project No. 1-PCP-1 Sheet Title GROUT CONTAINMENT SHEET & METHOD (PLACEMENT) CONSTRUCTION DETAILS GROUT CONTAINMENT INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. GC-1 1 1/4" GROUT PORT RAPID RAPID ROADWAY ROADWAY (SEE NOTE 4) 1/4" JOINTS 2' SEE NOTE 2 GROUT CONTAINMENT SHEET SEE NOTE 1-3 EXISTING PCP CONCRETE PCP PCP PCP PANEL EXISTING CONCRETE Project Name PANEL Project 1 DETAIL A LCBRS GROUT CONTAINMENT Jt Owner/Client NOTES: C L 1.GROUT CONTAINMENT SHEET IS TO PREVENT Client GROUT MIGRATING TO ADJACENT PANELS. Exist Conc Pvmt IPSR 2.GROUT CONTAINMENT SHEET LAYS OVER ADJACENT PANELS APPROXIMATLY 2 FEET. 3.GROUT CONTAINMENT SHEET THICKNESS IS GROUT CONTAINMENT 6 MIL. SHEET (SEE NOTE 2) 4.NINE 1 1/4" GROUT PORTS PER PANEL. ‚" LEGEND: CAULKING PERFORMANCE PLUS RH General Notes BEDDING GROUT T=8" 3/4" FLEXIBLE POLYURETHANE FOAM 1. The contractor shall verity all dimensions and drawings. CAULKING FLEXIBLE POLYURETHANE FOAM MARK REVISIONS DATE Drawn By: Exist BASE LCBRS PERFORMANCE PLUS RH BEDDING GROUT Designed BY: Checked By: DETAIL A Submitted: x x Approved: x x Project No. 1-PCP-1 Sheet Title CONSTRUCTION DETAILS GROUT CONTAINMENT INDIVIDUAL SLAB REPLACEMENT GROUT CONTAINMENT DETAILS (PRECAST CONCRETE PANEL) NO SCALE Sheet No. GC-2 RAPID RAPID ROADWAY ROADWAY LOAD TRANSFER LEVELING RRS RRS BOLT GROUT CONTAINMENT SHEET PERFORMANCE PLUS PERFORMANCE PLUS LATEX FILL GROUT LATEX FILL GROUT GROUT Project Name PORT CAULKING Project 1 . . . . . . . . . (TO BE TRIMMED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FLUSH PRIOR TO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CAP ON BOTH ENDS . . . . . . . . . . . . FOAM EXPANSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . OPENING TRAFFIC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GRACIE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LEVELING . . . . . . . . . . . . . . . . . . . . . . . Owner/Client . . . . . . . . . . . . . . . . . . . . . LIFT . . . . . . . . . . . . . . . . Client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BARRA PLUG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18" DOWEL . . . . . . . . . . . . . . . . . . . . . . . . BAR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3/4" RECEIVING FLEXIBLE END POLYURETHANE FOAM . . . . . . . . . . . . . . . . LOAD TRANSFER 1" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General Notes PLUS RH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LEAN CONCRETE BASE . . . . . . . . . . . . . (LCBRS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BEDDING GROUT 1. The contractor shall verity all dimensions and drawings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GROUT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONTAINMENT MARK SHEET REVISIONS DATE Drawn By: Designed BY: Checked By: Submitted: x x Approved: x x Project No. 1-PCP-1 Sheet Title RAPID ROADWAY CONSTRUCTION DETAILS RAPID ROADWAY INDIVIDUAL SLAB REPLACEMENT (PRECAST CONCRETE PANEL) NO SCALE Sheet No. RR-1