The safe direction for your projects

Transcription

The safe direction for your projects
The safe direction for your projects
GRUPPO ZEPPIERI COSTRUZIONI
Qualified Group by quality system
ISO 9001, safety system BS OHSAS
18001 and environmental system ISO
14001, operating in Public and private
contracts.
Gruppo Zeppieri’s Company, which is situated in the Frosinone area, stems from the
business spirit of Mr. Adolfo Zeppieri, who,
in 1953, started his own activities as an individual business. Over the following years
the development of the Company has spread gradually to all the constructions sectors,
with a steady growth.
The Company is specialized in constructing
of commercial sites, hospitals, residential
areas, industrial sites and road constructions
both for itself and also on behalf of third parties, thanks to its machinery, its equipment
and, even more, its skilled workers.
Loc. Girate, n. 70
A man’s passion, a group’s enthusiasm
03029 Veroli (FR)
Tel.: (+39) 0775.30991
Fax: (+39) 0775.308730
[email protected]
www.gruppozeppieri.com
3
12
20
Private buildings
Customers
LAST COMMITMENT
Shopping Centers
COMPANY U.S.L. DI FROSINONE
ITALSTRADE S.P.A.
Via A.Fabi - Frosinone
Construction of the new Hospital of Cassino
V.le M.llo Pilsudsky, n. 147 - Roma
Construction of the railway High Speed ​​RM-NA
Construction of the new Hospital of Frosinone
COMPANY U.S.L. DI CASERTA
Viale Unità Italiana, 28 - Caserta (CE)
Restructuring of the Hospital Saint Anne and Saint Sebastian
26
30
Hospitals
SANTA LUCIA FOUNDATION
Immobiliare Maria Adriana srl - Via Meropia, 112 - Roma
Renovation and completion of the building for
Via Montello N.10 - Roma
Realization street adjacent to the road of Tor Vergata
Realization of the “City of Sports” Tor Vergata (Rome)
Implementation of the Joint Computer.C.E.D
Construction of the Commercial Center and Hotel
4
Project financing
TOWN OF ROMA
Construction of the parking lot of the new auditorium
CO.GE.SY S.P.A.
Via Caldonazzo N. 22/A - Roma
Costruzione edifici residenziali e ad uso uffici
Realizzazione del Centro Commerciale “Parco Leonardo”
Construction of the viaduct and the release on the Rome-Fiumicino
Urbanization
construction of the Golf Course “Terre dei Consoli” Monterosi
IKEA ITALIA S.P.A.
LA RINASCENTE S.P.A.
LIRINVEST S.R.L.
Via Aldo Moro n.100 - Frosinone
Realization of the Hotel and Management Centre - Isola Liri (FR)
Strada 8, Palazzo N, Milanofiori - 20089 Rozzano - Milano
IMMOBILIAREUROPEA S.P.A.
Construction of Shopping Centre
Via Torino n.2 - Milano
Construction of Shopping Centre (Rinascente)
AUCHAN IPERMERCATI S.P.A.
42
P.zza VI Dicembre, Frosinone
Construction of the Conservatory of Musica
Renovation of new office complex on Via dei Taurini - Rome
S.S. Anagnina
40
TOWN OF FROSINONE
CNR - National Research Council
Sp 208, No. 3 - Carugate (MI)
Renovation of new office complex on Via dei Taurini - Rome
Realization of the Shopping Centre in Rome - Via Anagnina
Urban Redevelopment PP 32 M, Ring road SS Tuscolana
Restructuring
Via G.Marconi, 10 - Cassino (FR)
Construction of a new Faculty:
Faculty of Economics and Business - Law Faculty in Cassino
MINISTRY OF INTERIOR
RAVENNA 80 S.R.L.
Sports trade
UNIVERSITY OF CASSINO
TOR VERGATA SOC.CONSORTILE A.R.L.
Loc. Girate, 70 - Veroli (FR)
34
Via Montello n. 10 - Roma
Construction of the railway High Speed ​​RM-NA
the Center for Brain Research
Serileasing srl - P.zza Borghese, 3 - Roma
Renovation building to be used as offices of the Police
Street works
VIANINI LAVORI S.P.A.
Strada 8, Palazzo N, Milanofiori - 20089 Rozzano (Milano)
Construction of Shopping Centre
TOWN OF SORA
SNAMPROGETTI S.P.A.
industrial centers of Schito and Colle d’Arte
Corso Volsci, 111 - 03039 Sora (FR)
Construction of link road to
Corso Venezia n. 16 - Milano
Construction of the plant regeneration of waste oils
5
Technical Data
Gruppo Zeppieri
Costruzioni
Gruppo Zeppieri’s Companies
Staff
N. 114
Specialized workers
FINEDIM SRL
PUBBLICOM SRL
N. 69
Skilled workers
Real Estate and Financial company
Advertising agency
N. 37
Common workers
N. 16
Clerks
COGEZ SRL
WINNING WORK SRL
N. 5
Executives
Construction and transport itself /third parties
Broadcasters TV company (EXTRA TV)
N. 30
Quantity Surveyors/Surveyors
N. 8
Engineers
RAVENNA 80 SRL
R.T.M. SRL
N. 4
Architects
Constructions, hotels/commercial management
Transmission and Radio Programs management
EDIZIONI CIOCIARE SRL
ZEPPIERI COSTRUZIONI NIGERIA LTD
Publishing company
Contruction company
Chattels and equipment
N. 12 Merlo telescopic handlers
N. 2
Concrete Pumps
N. 4
Cranes
N. 10 Escavators 320
N. 2
Manitou 2150 telescopic handlers
N. 38
Vans
N. 1
Welder
N. 2
Shaper CAT D6
N. 2
Excavators JCB
N. 1
Roadsweeper
N. 7
Generators Sets
N. 1
CAT D5
N. 2
Concretes Merlo
N. 2
Articulated tandem rollers
N. 5
Sandblasting machines
N. 2
963
N. 5
Road rollers
N. 2
Concrete cutter
N. 2
Plasteners
N. 1
Track Loaders 973
N. 4
Dumpers
N. 1
Crusher
N. 1
Electric Shears
N. 3
953
N. 4
Container trucks 3 axis
N. 1
Krupp Hydraulic breakers
N. 1
Hydraulic Rod Bender
N. 6
Wheel loaders
N. 18 Container trucks 4 axis
N. 3
Hydraulic Breakers
N. 2
Motor Pumpsets
N. 1
Caterpillar Scrapers
N. 2
Tractor-trailers
N. 1
Paving Breakers
N. 1
Weighing machine
N. 3
Backhole loaders Venieri 4.23
N. 3
Semi-trailers
N. 1
Hydrostres Machine
Sq.m. 35.000 (about) Scaffolding
N. 2
Mini escavators
N. 3
Concrete mixers
N. 2
Escavators 330
Lending Institutions
Share Capital
UNICREDIT CORPORATE BANKING
Euro 10.000.000,00
INTESA SAN PAOLO
MONTE DEI PASCHI DI SIENA
BANCA POPOLARE DEL FRUSINATE
6
7
Certifications
Quality Policy
SOA RINA / IQ NET / RINA
ISO 9001
The Directorate General of GRUPPO ZEPPIERI COSTRUZIONI
Srl is deeply convinced that, in order to achieve the business
success, it is necessary to realize an organization which aims
at a constant improvement of performances, focused on Clients
and, at the same time, able to consider the needs of all parties
involved, first of all the company Staff.
The basic Principles which inspired the planning of the Quality
Management System of GRUPPO ZEPPIERI COSTRUZIONI Srl
are the Quality Management Principles which underlie the current
international regulations about quality, namely:
1) Client-oriented organization - GRUPPO ZEPPIERI COSTRUZIONI depends on its Clients; therefore, the Group shall understand their present and future needs, meet their requirements
and exceed their expectations;
2) Leadership – The Directorate and every person with coordination responsibilities shall establish, along with their own collaborators, the unity of purpose and goals. Only in this way the full involvement of the Staff in the pursuit of initial quality goals is achieved;
3) Staff involvement – Staff, at all levels, is the main re source of
GRUPPO ZEPPIERI COSTRUZIONI, and its full involvement allows
to offer the company the ability and creativity of each employee;
4) Organizational approach based on processes – all expected
results and initial goals can be achieved more efficiently if resources and activities are managed like a process;
5) Management systemic approach - Identifying, understanding
and managing the interconnected business processes like a
single system contributes to the efficiency and effectiveness of
GRUPPO ZEPPIERI COSTRUZIONI in the pursuit of its goals;
8
6) Continuous improvement – Continuous improvement is a primary and constant goal for GRUPPO ZEPPIERI COSTRUZIONI;
7) Deductive approach based on facts – Effective decisions are
based on the analysis of data and information;
8) Reciprocal benefit relationship with suppliers - GRUPPO
ZEPPIERI COSTRUZIONI and its Suppliers are interdependent;
therefore, a reciprocal benefit relationship improves their valuecreating capacities.
The aforementioned Principles are concretely implemented by
GRUPPO ZEPPIERI COSTRUZIONI, through the pursuit of the
following goals:
- Clients’ satisfaction; - Compliance with the Clients’ functional
and service requirements; - Compliance with mandatory constraints; - Suitability of products for use; - Availability of services;
- Measurable continuous improvement goals setting for every
business function;
- Approach integrated with the quality management as products
and services provided by GRUPPO ZEPPIERI COSTRUZIONI
are the result of the whole business system;
- Directorate’s commitment to communicating its Quality Policy
and to making aware, involving and training the whole Staff in
the pursuit of the quality goals;
- Planning, control and documentation of each business process; - Prevention of defectiveness, malfunctioning, corrections
and, in general, lack in the
quality of products and services provided, which lead to Clients
dissatisfaction;
- Periodical re-examination of the Quality Management System
according to available data and information collected;
- Evaluation of suppliers before establishing any relationship
with them;
To this purpose, a quality management system has been outlined and implemented. This system is based on the development and strengthening of Business Resources,
considering the Quality Responsible as the best resource to
involve that company structure at all levels.
The Directorate commits itself to identifying instruments, procedures, techniques and human resources which are necessary
to achieve the quality objectives, by carrying out the following
activities:
Identification, for each function, of measurable quality objectives
to be achieved within the given time limit;
Outline of Improvement Plans by each Business Function;
Introduction of a system for the documentation of the Processes which affect quality;
Systematic research of Clients’ satisfaction degree;
Training of all Staff in the acquisition of techniques in order to
obtain, control, measure and improve quality;
Defining and allocating responsibilities; Making individuals responsible for work quality.
When taking up the organization according to a Quality Management System, this Directorate is aware that a better quality, estimated in the medium-long term, will not result in higher
costs, but in great economies, and it will lead the company to
strengthen its position on the market.
In order to pursue the continuous improvement, the Directorate also commits itself to studying, elaborating and carrying out
every work strategy and technique which is considered necessary and aims at increasing the work quality and, therefore, the
wellbeing of all employees and Clients of GRUPPO ZEPPIERI
COSTRUZIONI.
9
10
Enviromental Policy
Safety Policy
ISO 14001
BS OHSAS 18001
The Directorate General of GRUPPO ZEPPIERI
COSTRUZIONI Srl strongly believes that a business organization which aims at a constant performance improvement will produce significant
advantages for the organization itself and for all
parties involved.
Since 2012, the Directorate General of GRUPPO
ZEPPIERI COSTRUZIONI Srl has also decided to
manage and reduce the impacts generated by
environmental problems caused by the Group’s
activity, following sustainable development criteria and, therefore, meeting the requirements for
the environmental protection and improvement,
considering these principles as fundamental for
the success of the Group and its Clients’.
For these reasons, GRUPPO ZEPPIERI COSTRUZIONI Srl is deeply aware of its own responsibilities towards the environment (nature
and society), and it mainly aims at protecting the
environment, in line with the activities carried out,
and at paying particular attention to the aspects
which could affect the environmental matrices.
To this end, the Directorate General has developed an Environmental Management System
(EMS) in compliance with the standard UNI EN
ISO 14001:2004, in order to constantly monitor
the overall environmental performances of the
activities carried out, and improve and reduce,
when possible, the significant environmental impacts, always choosing the best technologies
available and economically practicable.
In fact, GRUPPO ZEPPIERI COSTRUZIONI Srl
commits itself to observing the environmental regulations in force, and the adoption of a certified
management system facilitates the Group in the
fulfilment of its obligations as provided for by the
same regulations, allowing to carry out estimates
about pollution prevention with relation to the activities carried out and the processes related to
GRUPPO ZEPPIERI COSTRUZIONI Srl.
The company’s environmental management is
based on the following principles:
- The Company, along with all its employees,
shall pay particular attention to issues concerning
environmental protection and shall commit to
complying with all laws and regulations;
- Involvement of our partners in the awareness of
environmental issues and in the achievement of
the improvement goals;
- Selection of our suppliers according to qualitative guarantees of materials or work carried out, in
line with the environmental sustainability:
Products’ degree of hazard
Eco-compatibility of products (EMAS or
ISO14001 certificates) - Promotion of the use of
eco-friendly products, of innovative technologies
for acoustic
and thermal insulation or energy-saving technologies; - Continuous improvement of environmental
performances according to the significant
environmental aspects pointed out in order to
The certification of an Occupational Health and Safety Management System,
according to the standard BS OHSAS
18001 (Occupational Health and Safety
Assessment Series), is an instrument that
allows the management of issues related
to company safety, through the formulation
of specific goals and policies according to
any occupational dangers and risks. The
standard defines the correct plan of the
safety conditions, in order to guarantee a
“sound” business management and the
compliance with the mandatory regulations. “Occupational health and safety are
a commitment for everybody, which manifests itself not only in the respect of safe
and correct behaviour while carrying out
one’s work, but also in the constant research for more suitable conditions so that
they can be achieved”. Gruppo Zeppieri
Costruzioni Srl believes that increasing the
culture related to occupational health and
safety and further improve safety, health
and risk prevention levels in the work activity is very important. For these reasons,
the Directorate General decided to implement an Occupational Health and Safety
Management System in compliance with
the standard OHSAS 18001 within its own
business management.
The System’s policy is a fundamental point
of reference for all employees and those
(external) who have business relationship
with the company. The policy expresses
the business mission as regards occupational health and safety, from which
continuous goals and improvement plans
originate.
The Directorate, in collaboration with
RSPP, RLS and Medico Competente, laid
down and formalized a document which
expresses the company’s commitment
to protecting workers’ health and safety,
starting from the applicable regulations
in force, from occupational risks and the
accidents that took place, in order to promote and spread the culture of safety and
protect
the health of the whole staff, by constantly
monitoring the System to ascertain if it is in
line with the initial goals.
This document was drawn up in accordance with the company’s reality and requirements, and it can be modified during each
re-examination of the System.
The Directorate presents this document
and gives it to all the company subjects,
committing itself so that:
1) Since the phase in which new activities
are planned, or during the revision of the
existing ones, aspects related to safety
prevent pollution of the different environmental matrices.
The companies believes that it will succeed in enforcing these principles in its daily activities, and it
will take advantage in terms of management of the environmental aspects and image.
In this connection, we point out that, beyond the specific responsibilities laid down in the document of the Environmental Management System (EMS), the whole staff of the company is responsible of the achievement of the aforementioned goals. In particular, GRUPPO
ZEPPIERI COSTRUZIONI Srl plans to raise, in its employees, an increasing attention towards
environmental protection, through information meeting and periodical training and audit activities.
The EMS and, therefore, all instruments introduced with it, will be periodically examined in order to ascertain its adequacy and effectiveness, through periodical exams of the results that will
be systematically collected and processed, but also through direct verifications. Therefore, the
company expects that every employee, at any level, will concretely contribute to improve the Environmental Management System, by promptly pointing out any malfunctioning and inefficiencies.
Consequently, GRUPPO ZEPPIERI COSTRUZIONI Srl commits itself to allocating adequate human
and financial resources for the full divulgation of the present policy and for the achievement of the
initial goals as well as the environmental plan that is necessary to enforce this policy.
shall be considered fundamental;
2) All workers shall be trained and informed so they can carry out their work safely and they
can assume their responsibilities about occupational Safety and Health;
3) The whole company shall commit itself, according to its own roles and competences, to
achieving the initial safety goals, so that:
- all laws and regulations in force are observed, procedures are formulated and the company
goals are pursued;
- workplaces, operational methods and organizational aspects are carried out so that workers’
health, company’s assets and third parties involved in the company’s activities are protected;
- information about the business risks shall be divulgated to all employees, and employees’
training shall be carried out and updated with specific reference to one’s task;
- requirements emerged during work activities shall be met promptly, effectively and accurately;
- the cooperation between the different business resources and the collaboration with external
bodies in charge shall be promoted;
- activities shall be also carried out to prevent accidents, injuries and occupational diseases.
11
Private buildings / Business Centers
Data Processing Center
Professionality
reliability, fastness
One of the most important trade market of
the Gruppo Zeppieri Costruzioni is its professionalism, its reliability and its swiftness
in realizing their works. Their reference market spread step by step from the local to
the international one. Here are some pictures of private works carried out by the
Company.
SUBJECT: Data Processing Center - C.E.D. PLACE: Via Anagnina, 81 - Roma
TYPE OF WORK: Realization
COMMITTEE: Serileasing srl
12
13
Private buildings / Business Centers
Ministry of the Interior
14
Private buildings / Business Centers
Business Center
SUBJECT: Ministry of the Interior
SUBJECT: Business Center
PLACE: Via Anagnina, 81 - Roma
PLACE: Grande Raccordo Anulare - Roma
TYPE OF WORK: Realization
TYPE OF WORK: Realization
COMMITTEE: Serileasing srl
COMMITTEE: Gruppo Caltagirone
15
16
Private buildings / Residentials
Private buildings / Residentials
Residential Complex “Le Querce”
Residential Complex “Bufalotta”
SUBJECT: Residential Complex and Bank
SUBJECT: Residential complex
PLACE: Via Marcello Mastroianni, Frosinone (FR)
PLACE: Zona Bufalotta - Roma
TYPE OF WORK: Realization
TYPE OF WORK: Realization
COMMITTEE: Iride srl
COMMITTEE: Fineuropa Spa
17
18
Private buildings / Residentials
Private buildings / Offices
Residential Complex “Iride”
Offices
SUBJECT: Residential Complex
SUBJECT: Offices
PLACE: Via Tommaso Landolfi, Frosinone (FR)
PLACE: Via Petrocelli, Zona Romanina - Roma
TYPE OF WORK: Realization
TYPE OF WORK: Project and construction
COMMITTEE: Iride srl
COMMITTEE: New Building Company srl
19
Private buildings / Shopping Center division
Shopping Center Anagnina
SUBJECT: Shopping Center Anagnina
PLACE: Via Torre di Mezzavia, Roma
TYPE OF WORK: Progect and construction
COMMITTEE: Ravenna 80 srl
20
21
22
Private buildings / Shopping Center division
Private buildings / Shopping Center division
Shopping Center “Auchan”
Shopping Center “Parco Leonardo”
SUBJECT: Shopping Center Auchan
SUBJECT: Shopping Center Parco Leonardo
PLACE: Casal Bertone, Roma.
PLACE: Via Portuense, Fiumicino - Roma
TYPE OF WORK: Realization
TYPE OF WORK: Realization
COMMITTEE: Immobiliare Europea S.p.A.
COMMITTEE: CO.GE.SY. S.p.A
23
Private buildings / Shopping Center division
Shopping Center “La Piazza”
24
Private buildings / Shopping Center division
IKEA ANAGNINA
SUBJECT: Shopping Center La Piazza
SUBJECT: Ikea
PLACE: Via Casilina, Km. 49 - Colleferro (RM)
PLACE: Via Anagnina, 81 - Roma
TYPE OF WORK: Realization
TYPE OF WORK: Realization
COMMITTEE: Immobiliare Laziale Investimenti S.r.l.
COMMITTEE: IKEA Italia Retail S.r.l.
25
Public Buildings / Hospital
New Hospital “F.Spaziani”
To Build according to
humans and
enviroment rights
The company, that has worked for
high-security home districts. The pas-
many years in the public sector, has
sion for the buildings has been going
realized a lot of works such as: hospi-
on for 2 generations, Gruppo Zeppieri’s
tals, roads, bridges, viaducts and mo-
Company has always been different for
torway junctions, such as water sup-
the quality and safety of its buildings,
ply and sewerage, works high-speed
respecting all human and environment
rails, schools and conservatoires and
rights.
SUBJECT: New Hospital of Frosinone City
PLACE: Via Armando Fabi, Frosinone (FR)
TYPE OF WORK: Realization
COMMITTEE: Company U.S.L. di Frosinone
26
27
Public Buildings / Hospital
Hospital of Cassino
28
Public Buildings / Hospital
Hospital of Caserta
SUBJECT: New Hospital of Cassino
SUBJECT: Hospital of Caserta
PLACE: Via San Pasquale, snc - Cassino (FR)
PLACE: Via Palasciano - Caserta (Ce)
TYPE OF WORK: Realization
TYPE OF WORK: Restructuring
COMMITTEE: Company U.S.L. di Frosinone
COMMITTEE: Company U.S.L. di Caserta
29
Street Works / Urbanizations / Street furniture / Interchanges
Overpasses Roma-Fiumicino
Ready to complete
any kind of Work
Streets, bridges, galleries, intechanges, overpasses, the Group is organized to satisfy every request, even if
and abve all if they refer to street works. Each committement has been finished give a warranty of security, precision and timeliness in the realization of
the work.
SUBJECT: Urbanization work in Fiumicino
PLACE: Fiumicino, Roma (RM)
TYPE OF WORK: Interchanges and street furnitures.
COMMITTEE: CO.GE.SY. S.p.A.
30
31
Street Works / Urbanizations / Street furniture / Interchanges
Town of Monterosi
32
Street Works / Urbanizations / Street furniture / Interchanges
Overpass in Sora
SUBJECT: Street furnitures
SUBJECT: Interchanges
PLACE: Monterosi, Viterbo (VT)
PLACE: Sora (FR)
TYPE OF WORK: Realization
TYPE OF WORK: Realization
COMMITTEE: Astrea 3 S.r.l.
COMMITTEE: Town of Sora
33
Sports trade
City of Sport of Tor Vergata
Ready to complete
any kind of Work
One of the last and most important
achieve- ments of the Group is the realization of sports buildings such as the
Olympic swimming pool, soccer field,
golf course, sports hall. One of these
is a project still in progress to realize,
using many means, the “Sport City” of
Tor Vergata.
SUBJECT: City of Sport
PLACE: Tor Vergata, Roma (RM)
TYPE OF WORK: Realization
COMMITTEE: Tor Vergata Società Consortile A.r.l.
34
35
Sports trade
“Terre dei Consoli” Golf Club
One of the works still in progress: Is
also very important the Golf course
“Terre dei Consoli” in Monterosi
(VT). It’s divided into 3 parts: the first
of them is the practice range with a
surface of about 73.000 mq. connected with the Golf Accademy, a
path called Family Course (Executive) made of No 9 holes (36 PAR)
and a path called Champions Ship
made of No 18 holes (72PAR).
SUBJECT: Golf Course “Terre dei Consoli”
PLACE: Town of Monterosi - Viterbo (VT)
TYPE OF WORK: Realization
COMMITTEE: CO.GE.SY. Spa
36
37
Amusement Park
“Rainbow Magic Land”
SUBJECT: Playground “Rainbow Magic Land”
PLACE: Valmontone - Roma (RM)
TYPE OF WORK: Realization
COMMITTEE: Alfa 3 S.r.l. a.s.u.
42
43
Restructuring
Ex Feltrificio Pisani
38
Restructuring
EBRI Foundation
SUBJECT: Ex Feltrificio Pisani
SUBJECT: European Brain Research Centre
PLACE: Isola del Liri, Frosinone (FR)
PLACE: Prato Smeraldo, Via Fosso di Fiorano - Roma (RM)
TYPE OF WORK: Restructuring
TYPE OF WORK: Restructuring
COMMITTEE: Lirinvest srl
COMMITTEE: EBRI Foundation, Immobiliare Maria Adriana
39
Project Financing
Multistorey Car Park
40
Other works under contruction
Apartments
SUBJECT: Multistorey Car Park of Frosinone
SUBJECT: Apartments
PLACE: Viale Mazzini, Frosinone (FR)
PLACE: Via Parco della Rimembranza, Veroli, Frosinone (FR)
TYPE OF WORK: Realization
TYPE OF WORK: Under contruction
COMMITTEE: Frosinone Mobilità e Servizi srl
COMMITTEE: Gruppo Zeppieri Costruzioni srl
41
44
Other works under construction
Other works under construction
Residential complex “Colle del Sole”
“Residential complex La Botte”
SUBJECT: Residential complex Colle del Sole
SUBJECT: Residential complex “La Botte”
PLACE: Via America Latina, Frosinone (FR)
PLACE: Via La Botte, Frosinone (FR)
TYPE OF WORK: Under Construction
TYPE OF WORK: Under Construction
COMMITTEE: PiZeta Iniziative Immobiliari S.r.l.
COMMITTEE: SO.LAT. srl
45
Other international works under construction
Administrative building
SUBJECT: Administrative building realizzation
PLACE: Ambrose Alli Ekpoma University
TYPE OF WORK: Under construction
COMMITTEE: Edo Governement (Nigeria)
46
47
Loc. Girate, n. 70 - 03029 Veroli (FR)
Tel.: (+39) 0775.30991 - Fax: (+39) 0775.308730
[email protected]
www.gruppozeppieri.com