d l f Minas de Alquife Helge Ziehe
Transcription
d l f Minas de Alquife Helge Ziehe
Minas de Alquife d l f Helge Ziehe Helge Ziehe 10 December 2014 10 December 2014 Minas de Alquife: Location I Iron Ore Mine O Mi Andalucia Granada p. 2 │ © Minas de Alquife S.L.U. Minas de Alquife: Deposit Overburden: O b d alluvium ll i 0 – 150 m Ore is hosted in a marble‐calc‐schist of Permian‐Triassic 0 – 250 m Ore bodies from 10 x 10 x 10 m to 350 x 100 x 90 m Ore: hematite and goethite p. 3 │ © Minas de Alquife S.L.U. Minas de Alquife: History Mining Mi i since i 1895 Surface Mine 1950 ‐ 1996 1978 p. 4 │ © Minas de Alquife S.L.U. Minas de Alquife: Today Mine flooded Mi fl d d Slopes not stable Plant = scrap 2014 p. 5 │ © Minas de Alquife S.L.U. Minas de Alquife: Today Core shed C h d with ith 700 cores Drillhole logs Chemical analyses Drillhole database p. 6 │ © Minas de Alquife S.L.U. Minas de Alquife: Today QA/QC and d Resource R M d l & Statement Model St t t according di to t NI 43‐101 43 101 Potential: 50 % lump ore 10 10‐30mm 30mm, 50 % fines 0 0‐10mm 10mm total inferred+ total inferred+ indicated Hematite compact Hematite compact Hematite friable Goethite compact Goethite friable Heterogeneous TOTAL Tonnes 000´ss Tonnes 000 17,607 26,323 38,923 18,721 8,872 110,446 Fe% % 52.35 51.51 53.73 53.46 53.62 53.00 Mn ≈1.6 %, Alkali up to 0.5 %, LoI 5‐10%, high porosity p. 7 │ © Minas de Alquife S.L.U. Minas de Alquife: Potential M t ll i l Tests Metallurgical T t with ith SGA 1 Further upgrading of ore is not possible: impurities < 10 µm 1. Further upgrading of ore is not possible: impurities < 10 µm 2. Alquife lump ore can be used as direct burden in a blast furnace. The tests confirmed that the ore does not disintegrate at high The tests confirmed that the ore does not disintegrate at high temperature 3 Optical sorting of lump ore achieves efficiency of 95 % 3. O ti l ti fl hi ffi i f 95 % 4. Alquife sinter fines have interesting qualities for the sinter process as the ore acts as binding material h bi di i l p. 8 │ © Minas de Alquife S.L.U. Minas de Alquife: Process Si l crushing Simple hi and d screening i plant l t with ith optical ti l sorting ti unit it • • • • • p. 9 │ © Minas de Alquife S.L.U. Jaw crusher Jaw crusher Secondary crusher Screens Optical sorters p Diverter chutes Minas de Alquife: Mining S f Surface Mi Mine • Target production 4 Mtpa (wet) • SR: 1:3 to 1:10 (t/t) • Overburden: backhoe excavator + trucks • Marble and limestone: drilling, blasting, shovel and truck In‐pit I i backfilling b kfilli in i later l years • Ore: selective mining with smaller units to reduce dilution, IPC below depth of 150 m • Large dewatering program: 15 hm3 per year • Detailed annual planning of LoM required p. 10 │ © Minas de Alquife S.L.U. Minas de Alquife: Bulk Material Handling and Logistics • Stockpiles St k il att mine i site it 2 x Panamax P shiploads hi l d • Truck haulage to Carboneras port ≈ 150 km • Stockpiles at port 2 x Panamax shiploads • Target sales to European blast furnaces: 3 Mtpa sinter fines 1 Mtpa M l lump ore p. 11 │ © Minas de Alquife S.L.U. Minas de Alquife: PEA ‐ PFS PEA NI 43 101 report: in March 2015 PEA NI 43‐101 report: in March 2015 Environmental Permit: January 2015 y Other permits … DFS: in 2015 Start mining in 2016 p. 12 │ © Minas de Alquife S.L.U. Important Notice This document has been produced by Minas de Alquife S.L.U. Granada/Alquife, Spain. It will be incomplete without our detailed underlying y g analysis y and verbal p presentation. All information contained in this document is confidential and only intended for the relevant party with which Minas de Alquife S.L.U. has entered into a Non-Disclosure / Non-Circumvention / Non-Solicitation Agreement. Other parties receiving this document are obliged to return this document and any relevant copies to Minas de Alquife S.L.U. Dissemination to any third party requires the prior written consent of Minas de Alquife S.L.U. The statements made are based on assumptions which have been regarded to be correct based on the information made available to Minas de Alquife S.L.U. Nevertheless, Minas de Alquife S.L.U. undertakes no representation or warranties as to th accuracy off the the th assumptions ti and d irrevocably i bl waives i allll liability li bilit whatsoever h t f any loss for l or damage d arising i i outt off Minas Mi d de Alquife S.L.U.`s work on the project except to the extent caused by willful misconduct or gross negligence. Please note that Minas de Alquife S.L.U. does not accept any liability for any forward looking statement, prognosis or simulation. Actual results may differ significantly from the results and prognosis contained in this document. All terms used such as reserves, resources, inferred, measured, indicated or other do not refer to JORC or NI 43-101 terms. Minas de Alquife S.L.U. C/ Luis L i Amador A d 26 Edfo. Cámara de Comercio Oficina CP1 18014 Granada SPAIN Phone: (+34) 958 21 63 49 Fax: (+34) 958 22 27 64 Mobile: (+49) 170 45 39 71 0 pohl@minasdealquife es E: jochen [email protected] Website: www.minasdealquife.es p. 13 │ © Minas de Alquife S.L.U.