Combined Cycle Power Plant Empalme II
Comisión Federal de Electricidad Combined Cycle Power Plant Empalme II According to the CFE’s growth forecast, the demand for electricity in Northwestern region of Mexico will grow on average, 3.6% annually. In order to meet the demand and maintain regional reserve margins at the appropriate levels, it is intended to build the Empalme II combined cycle. The project is located in Empalme, Sonora. This project will consist of a power plant with 683 MW of capacity under summer design conditions, under Financed Public Works (OPF) plan. This central plant could have the following configurations: (i) module comprising three gas turbines, three heat exchangers and one steam turbine; or (ii) module consisting of two gas turbines with two heat exchangers and one steam turbine. Project Details: The project includes the engineering and the supply of all equipment and materials, spare parts and special tools, all testing activities and the commission, as well as an electrical substation. The combined cycle will operate with natural gas, which will be provided by the CFE. The estimated project implementation period is 31 months. Geographic location State of Sonora Relevant Facts: Estimated Investment: $725 Central 313 Empalme II million U.S. dollars Capacity 683 MW Pre-bid Docs Publication: July 31, 2014 Final Docs Publication: August 28, 2014 Proposals Filing: April 20, 2015 Awarding of Contract: May 18, 2015 COD: December 2017
Similar documents
Empalme Gas Pipeline Branch
Transparencia Mexicana will overview the bidding process in order to comply the highest standards of transparency.
More information