Goetting
Transcription
Goetting
3 4 5 6 8 9 B three inches = one foot ABBREVIATIONS AFF ABOVE FINISHED FLOOR EF ENTRANCE FACILITY FO FIBER OPTIC TELECOMMUNICATIONS SYMBOLS GROUND JB JUNCTION BOX NTS NOT TO SCALE ALL WORK PERFORMED BY THE TELECOMMUNICATIONS CONTRACTOR SHALL BE PERFORMED IN ACCORDANCE WITH THE EIA/TIA STANDARDS AND BICSI METHODS, AS WELL AS THE REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION OVER THIS WORK. 1. 1 VOICE AND 3 DATA OUTLET, CATEGORY 6 # DATA OUTLET, # = QUANTITY OF OUTLETS, CATEGORY 6. 2. THESE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK AND ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE CONTRACT. 3. REFER TO ARCHITECTURAL DRAWINGS FOR OUTLET LOCATIONS AND HEIGHTS OF ALL CONDUIT, SLEEVES, PULL-BOXES, POKE-THROUGHS, STUB UPS AND OUTLET BOXES REQUIRED FOR TELECOMMUNICATIONS. INSTALLATION SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR UNLESS OTHERWISE NOTED. 1 VOICE AND 3 DATA FLOORBOX OUTLET, CATEGORY 6 FODP FIBER OPTIC DISTR. PANEL GRD GENERAL NOTES W [ WALL MOUNTED TELEPHONE OUTLET. (1) CATEGORY 6 CABLE CONDUIT RUN FROM CABLE TRAY TO OUTLET CABLE TRAY (BASKET) - SIZE INDICATED ON DRAWING 4. ALL WORK DETAILED IN THIS DRAWING SET SHALL BE PERFORMED BY THE TELECOMMUNICATIONS CONTRACTOR UNLESS OTHERWISE NOTED. 5. CONTRACTOR SHALL COORDINATE CONDUIT AND AND CABLE INSTALLATION WITH OTHER TRADES AND WITH THE CONSTRUCTION MANAGER. three quarters inch = one foot C P/P PATCH PANEL PNL PANEL TEL TELEPHONE UON UNLESS OTHERWISE NOTED CABLE RACK (LADDER) - SIZE INDICATED ON DRAWING 6. 7. ALL CONDUITS SHALL BE DEBURRED, CLEANED, CAPPED, TAGGED, AND PROVIDED WITH PULL-STRINGS AND BUSHINGS. WHERE CONDUITS OR WIREWAYS PASS THROUGH FIRE RATED ASSEMBLIES, THE PENETRATIONS SHALL BE FIRE-STOPPED. CONTRACTOR TO FOLLOW 90-DEGREE ANGLES AND TAKE THE SHORTEST PATHS SERVING CABLE TRAYS, CONDUITS OR OTHER PATHWAYS. 8. THEIR SHALL BE A MINIMUM OF ONE PULL-BOX FOR EVERY 100 FEET OF STRAIGHT CONDUIT AND A PULL-BOX AFTER TWO 90-DEGREE BENDS. PULL-BOXES SHALL NOT BE USED IN THE PLACE OF BENDS. ALL PULL-BOXES SHALL BE STRAIGHT-THROUGH. ALL CABLING INSTALLED OVERHEAD, UNLESS NOTED OTHERWISE, WILL BE ROUTED IN THE CABLE TRAY OR OPEN SUPPORTED PATHWAYS AS DETAILED ON THE PATHWAY PLANS. ALL CABLES SHALL BE NEATLY BUNDLED WITH VELCO TIE-WRAPS. CABLE SHALL NOT BE SUPPORTED BY DUCTWORK, SPRINKLER PIPES, ELECTRICAL CONDUIT, CEILING GRID SUPPORTS OR GAS PIPES. D one half inch = one foot 10. three eigths inch = one foot E C CONTRACTOR SHALL COORDINATE THE INSTALLATION OF STATION CABLING AND FURNITUR SYSTEM OUTLETS WITH THE FURNITURE SYSTEM VENDOR, TELECOMMUNICATIONS CONSULTANT, AND CONSTRUCTION MANAGER. 9. D 11. TELECOMMUNICATIONS AND ELECTRICAL CONTRACTORS SHALL REVIEW ALL CONDUIT, LADDER RACK AND CABLE TRAY SUPPORT CONDITIONS WITH THE GENERAL CONTRACTOR AND PROJECT ARCHITECT. 12. CAREFUL COORDINATION WILL BE REQUIRED BETWEEN THE TELECOMMUNICATIONS CONTRACTOR AND OTHER TRADES. PROVIDE ALL REQUIRED COORDINATED ASSISTANCE AND INFORMATION IN A TIMELY MANNER. 13. ALL WALL MOUNTED OUTLETS TO HAVE A 4-11/16" SQUARE, 2-1/2" MINIMUM DEPTH OUTLET BOX WITH A SINGLE DEVICE PLASTER RING UNLESS OTHERWISE NOTED. 14. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND REFLECTED CEILING PLANS FOR HARD AND ACCESSIBLE CEILING LOCATIONS. 15. CONTRACTOR SHALL REFER TO THE TELECOMMUNICATIONS SPECIFICATIONS AS WELL AS TELECOMMUNICATIONS DRAWINGS FOR SPECIFIC PART NUMBERS. E REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR GROUNDING DETAILS. one quarter inch = one foot 16. MEP ENGINEER ARCHITECT Goetting W E S T E A S T D E S I G N G TELECOMMUNICATIONS SYMBOLS & ABBREVIATIONS R O U P 200 East Grayson, Suite 207 San Antonio, TX 78215 12710 Research Blvd. Suite 355. Austin, Texas 78759 512.416.1654 FAX:512.416.7547 Project Number Project Title Drawing Title Approved Project Director RESEARCH ADDITION TO BUILDING 205 Location WWW.WESTEASTDESIGN.COM Date Building Number 205 Drawing Number CTVHCS - 1901 S. Veterans Memorial Dr. Temple, TX 76504 210.530.0755 674-279 Checked DRAWN EW RZ T1.00 These documents can not be copied or reproduced without written consent from WestEast Design Group FEBUARY 1, 2013 Revisions: Date Dwg. 1 of 8 VA FORM 08-6231 1 2 3 4 5 6 7 8 9 Office of Construction and Facilities Management Department of Veterans Affairs © These documents can not be copied or reproduced without written consent from WestEast Design Group, USER ID: RZ DATE: 1/31/2013 9:07:36 PM FILE: C:\Users\preyes\Documents\VA TEMPLE MEP TTG_preyes(Recovery).rvt F 1 one eigth inch = one foot F 7 A one inch = one foot B one and one half inch = one foot A 2 This document has been produced from material that was stored and/or transmitted electronically and may have been inadvertently altered. Rely only on final hardcopy materials bearing the consultant's original signature and seal. 1 MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU 1 T TG 12710 Research Blvd. Suite 355 Austin, Texas 78759 512.416.1654 FAX:512.416.7547 TELECOMMUNICATIONS BACKBONE (RISER) 1 T TG 12710 Research Blvd. Suite 355 Austin, Texas 78759 512.416.1654 FAX:512.416.7547 TELECOMMUNICATIONS ONE-LINE DIAGRAM 1 3 three inches = one foot 4 5 6 7 8 9 TELECOMMUNICATIONS KEYED NOTES This document has been produced from material that was stored and/or transmitted electronically and may have been inadvertently altered. Rely only on final hardcopy materials bearing the consultant's original signature and seal. B one and one half inch = one foot A 2 1 2 PROVIDE CABLE TRAY 4" DEEP X 18' WIDE. PROVIDE 1"C FROM OUTLET BOX TO CABLE TRAY. BOND CONDUIT TO CABLE TRAY WITH #6 AWG GROUND. A 5 1 2 3 4 H B STORAGE STAIR - 3 1V01 STAIR - 3 UP F HALLWAY VESTIBULE GOWNING AREA 1H1 1V02 1V05 MICE COLONY (TYPICAL) 1 1V06 one inch = one foot E WOMEN LR. MEN LR. 1V03 1V04 WOMEN RR MEN RR 1V03a 1V04a RAT COLONY C C 1V08 TELECOMMUNICATIONS GENERAL NOTES D three quarters inch = one foot PROCEDURE ROOM PROCEDURE ROOM PROCEDURE ROOM 1V14 1V13 VESTIBULE 1V18 ABSL-2 HOLDING & PROCEDURE AREA 1V10 W 2 W 2 1V10b 1V10a HALLWAY 2 2 W 1H2 W HALLWAY (TYPICAL)HALLWAY 1 1H3 1H4 W CLEAN SIDE 1V20 W 2 ABSL-2 HOLDING AREA NECROPSY 2 CLEAN CAGE STORAGE 1V12 D 1V20a PROCEDURE ROOM W 1V16 2 1V19 PROCEDURE ROOM AUTOCLAVE 1V17 one half inch = one foot D PALLET STORAGE C 1V16a FEED & BEDDING 1V21 PLASTIC RECYCLING STORAGE 2 SOILED SIDE 2 TECH OFFICE 1V23 HALLWAY GOWNING AREA 1V25b 1V25 1H5 1V22 2 E 2 2 ELEV. - 3 VETERINARIAN OFFICE ELEV - 3 three eigths inch = one foot 2 1V23a ELEV.M.R. 1V31 1V32 (TYPICAL) 1 W TANK STOR. 2 B 2 ELECT. STAIR - 4 W E 1V26 STAIR - 4 WASTE STORAGE IT / TELECOMM 1V29 1V28 TEMP. HOLD. 1V27 RADIO. WASTE BUILDING 205 1V30 A A N N one quarter inch = one foot 1 0 1' LEVEL 1 - TELECOM 1/8" = 1'-0" 4' Project 8' 16' F MEP ENGINEER ARCHITECT Goetting W E S T E A S T D E S I G N G TELECOMMUNICATIONS PLAN FIRST FLOOR R O U P 200 East Grayson, Suite 207 San Antonio, TX 78215 12710 Research Blvd. Suite 355. Austin, Texas 78759 512.416.1654 FAX:512.416.7547 Project Number Project Title Drawing Title Approved Project Director RESEARCH ADDITION TO BUILDING 205 Location WWW.WESTEASTDESIGN.COM Date Building Number 205 Drawing Number CTVHCS - 1901 S. Veterans Memorial Dr. Temple, TX 76504 210.530.0755 674-279 Checked DRAWN EW RZ T2.01 These documents can not be copied or reproduced without written consent from WestEast Design Group FEBUARY 1, 2013 Revisions: Date Dwg. 4 of 8 VA FORM 08-6231 1 2 3 4 5 6 7 8 9 Office of Construction and Facilities Management Department of Veterans Affairs © These documents can not be copied or reproduced without written consent from WestEast Design Group, USER ID: RZ DATE: 1/31/2013 9:18:14 PM FILE: C:\Users\preyes\Documents\VA TEMPLE MEP TTG_preyes(Recovery).rvt KEY PLAN 1 one eigth inch = one foot F ue Tr B TELECOMMUNICATIONS KEYED NOTES 1 2 5 1 2 3 PROVIDE CABLE TRAY 4" DEEP X 18' WIDE. PROVIDE 1"C FROM OUTLET BOX TO CABLE TRAY. BOND CONDUIT TO CABLE TRAY WITH #6 AWG GROUND. 4 H LAB 2R38 STAIR - 3 UP HALLWAY 2C2.1 (TYPICAL) F HALLWAY 2H1 1 2 2 2 W CORE EQUIP. 2 2R40 LAB E HAC 2R39 LAB #10 2R41 2R46 TISSUE CULTURE ROOM 2 W 2 2R41a 2 2 2 D 2 D AIR PLENUM 2 2 2R42a 2 TISSUE 2 CULTURE ROOM MECHANICAL ROOM HALLWAY 2H2 2R42 TELECOMMUNICATIONS GENERAL NOTES 2 2R43a 1 W (TYPICAL) LAB #11 2R43 2 2 2 C C COLD PROCEDURE ROOM W 2 2 2 2 2R44 2 CORE EQUIPMENT 2R45 ELECTRON MICROSCOPE SUITE, PREPARATION ROOM /LAB 2 2R47 W W 2 ELEV. - 3 W 2 SCOPE ROOM 2 SUPPORT 2R47a B ELECTRICAL ROOM IT / TELECOMM 2R48 STAIR - 4 (TYPICAL) A 12710 Research Blvd. Suite 355 Austin, Texas 78759 512.416.1654 FAX:512.416.7547 2R47b ELECTRON MICROSCOPE SUITE, MICROTOME ALCOVE 2R47c B 2 2R49 1 A 1 T TG ELECTRON MICROSCOPE 2 SUITE, SCOPE ROOM 2 LEVEL 2 - TELECOM 1/8" = 1'-0" B three inches = one foot one and one half inch = one foot A 2 3 This document has been produced from material that was stored and/or transmitted electronically and may have been inadvertently altered. Rely only on final hardcopy materials bearing the consultant's original signature and seal. 1 4 5 6 7 8 9 A 1 9 MGMT 2RU 36-PORT FODP 16 GENERAL NOTES: MGMT 2RU 9 VOICE TIE CABLE 1 9 MGMT 2RU 9 MGMT 2RU MGMT 2RU 9 MGMT 2RU MGMT 2RU MGMT 2RU CONTRACTOR TO COORDINATE OVERHEAD LADDER RACK AND REQUIRED METAL DROP-OUTS WITH THE EQUIPMENT RACKS AND VERTICAL CABLE MANAGERS. 10 2. CONTRACTOR TO COORDINATE LADDER RACK WITH THE CONDUITS AND SLEEVES INSTALLED BY THE ELECTRICAL CONTRACTOR. 10 3. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL THE TELECOMMUNICATIONS MAIN GROUND BAR (TMGB) & TELECOMMUNICATIONS GROUND BAR IF REQUIRED. 9 10 12 1. 20 9 10 9 5 8 7 5 1 three quarters inch = one foot ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL RISER SLEEVES, CONDUITS, ETC. UNLESS OTHERWISE NOTED. 6. CONTRACTOR IS TO ENSURE THAT ALL CABLING, POWER WIRING, AND/OR OTHER OBJECTS DOES NOT INTERFERE WITH THE INSTALLATION OF EQUIPMENT IN THE EQUIPMENT RACKS. 7. CONTRACTOR TO FURNISH AND INSTALL, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, ALL MISCELLANEOUS HARDWARE REQUIRED TO INSTALL THE EQUIPMENT SHOWN ON ALL "T" SERIES DRAWINGS. 8. ALL CABLES ARE TO BE NEATLY BUNDLED AND FASTENED TO WALLS, EQUIPMENT RACKS, AND, CABLE RACKS WITH VELCRO TIE WRAPS. 9. CABLE TROUGHS AND THE FRONT SIDE OF THE VERTICAL CABLE MANAGER ARE FOR THE ROUTING OF PATCH CORDS AND NOT FOR ROUTING OF HORIZONTAL OR TIE CABLES. THE HORIZONTAL OR TIE CABLES SHALL BE ROUTED THROUGH THE REAR MOUNTING BRACKET OF THE VERTICAL CABLE MANAGER AND VELCRO TIE WRAPPED. 10. CONTRACTOR TO GROUND EACH EQUIPMENT RACK, EACH LADDER RACK AND BOND THE LADDER RACK TO CABLE TRAY VIA SLEEVE IN THE WALL TO THE TMGB/TGB WITHIN THE TELECOMMUNICATIONS ROOM WITH A MINIMUM OF #6 AWG GREEN INSULATED STRANDED GROUND WIRE. 11. EACH EQUIPMENT RACK IS TO BE BOLTED DIRECTLY TO THE FLOOR SLAB WITH (4) ANCHORS, BOLTS, NUTS AND WASHERS AND SECURED TO THE ABOVE CABLE RACK. 12. ALL TELECOMMUNICATIONS, COAXIAL CONNECTORS, AND DISTRIBUTION CABLING WITHIN THE BUILDING TO BE FURNISH, INSTALLED, AND TESTED BY THE COMMUNICATIONS CONTRACTOR. 13. ELECTRICAL CONTRACTOR SHALL PROVIDE TWO CLEAN POWER 20-AMP MULTI-OUTLET ASSEMBLIES ON WALL NEAR EQUIPMENT RACK IN TELECOMMUNICATIONS ROOMS. 15 2 POWER STRIP POWER STRIP POWER STRIP POWER STRIP RACK 2 DATA RACK 1 VOICE 2 12 3 6 6 1 TR-1 (ROOM 1V28) LAYOUT 1 5. 2 17 RACK 1 VOICE 4 C ELECTRICAL OUTLETS AND JUNCTION BOXES ARE SHOWN FOR REFERENCE ONLY. REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR DETAILS. 7 2 RACK 2 DATA 12 FRONT one inch = one foot 13 4. B 2 2 SCALE: NTS TR-1 (ROOM 1V28) EQUIPMENT RACK ELEVATIONS SCALE: NTS KEYED NOTES: 1 D C GENERAL CONTRACTOR SHALL FURNISH AND INSTALL 4'x8'x 3/ " 4 FIRE RETARDANT PLYWOOD. 2 FURNISH AND INSTALL 120 VAC POWER STRIPS. 3 ELECTRICAL CONTRACTOR - FURNISH AND INSTALL (2) 4" PVC RISER SLEEVES TO SECOND FLOOR. 4 FURNISH AND INSTALL (2) 4" PVC WALL SLEEVES WITH BUSHINGS TO ACCESS CABLE TRAY IN HALLWAY, FIRE STOP. 5 FURNISH AND INSTALL 18" LADDER RACK, TELCO STYLE. 6 FURNISH AND INSTALL (2) 84" EIA 19" EQUIPMENT RACK (TYPICAL) 3/ " 8 D one half inch = one foot 3 19 20 FIRE RETARDANT PLYWOOD 18 1 CORNER CORNER COLUMN 7 8 9 FIRE RETARDANT PLYWOOD 10 FURNISH AND INSTALL (2) 6" VERTICAL CABLE MANAGERS, DOUBLED SIDED & HINGED COVERS. FURNISH AND INSTALL (1) 8" VERTICAL CABLE MANAGER, DOUBLED SIDED & HINGED COVERS. FURNISH AND INSTALL HORIZONTAL CABLE MANAGER WITH DOUBLE HINGED COVER (2 RUs). FURNISH AND INSTALL 48-PORT, CATEGORY 6, PATCH PANELS. 1 11 FURNISH AND INSTALL "D-RINGS" AS REQUIRED. FURNISH AND INSTALL WALL BRACKET KIT - CPI P/N 11421-718 OR APPROVED EQUAL. 12 three eigths inch = one foot E FURNISH AND INSTALL WOOD 2'X4"X24" BACK SUPPRT FOR WALL BRACKET, PAINT GRAY. 13 21 15 FURNISH AND INSTALL 36-PORT FIBER OPTIC DISTRIBUTION PANEL. 16 ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL TMGB IN ACCORDANCE WITH J-STD-607-A. 17 FURNISH AND INSTALL 110-300 CONNECTOR BLOCK, CATEGORY 5E, FOR RISER CABLES. TR-1 (ROOM 1V28) LAYOUT - SOUTH WALL 18 SCALE: NTS one quarter inch = one foot 3 19 FURNISH AND INSTALL 50-PAIR, CATEGORY 3, UTP, PLENUM CABLE. TERMINATE 50-PAIR ON 110-BLOCK & 48-PAIR ON 48-PORT PATCH PANEL, PAIR 1 ON EACH PORT IN TR-2, VOICE RACK. 20 FURNISH AND INSTALL 50-PAIR, CATEGORY 3, UTP, PLENUM CABLE. TERMINATE 50-PAIR ON 110-BLOCK & 48-PAIR ON 48-PORT PATCH PANEL, PAIR 1 ON EACH PORT IN TR-1, VOICE RACK. 21 ELECTRICAL CONTRACTOR - FURNISH AND INSTALL 120 VAC, 20 AMP, QUAD OUTLET. MEP ENGINEER ARCHITECT Goetting W E S T E A S T D E S I G N G ENLARGED PLAN - FIRST FLOOR TELECOM ROOM R O U P 200 East Grayson, Suite 207 San Antonio, TX 78215 12710 Research Blvd. Suite 355. Austin, Texas 78759 512.416.1654 FAX:512.416.7547 Project Number Project Title Drawing Title Approved Project Director RESEARCH ADDITION TO BUILDING 205 Location WWW.WESTEASTDESIGN.COM Date Building Number 205 Drawing Number CTVHCS - 1901 S. Veterans Memorial Dr. Temple, TX 76504 210.530.0755 674-279 Checked DRAWN EW RZ T3.01 These documents can not be copied or reproduced without written consent from WestEast Design Group FEBUARY 1, 2013 Revisions: Date Dwg. 6 of 8 VA FORM 08-6231 1 2 3 4 5 6 7 8 9 Office of Construction and Facilities Management Department of Veterans Affairs © These documents can not be copied or reproduced without written consent from WestEast Design Group, USER ID: RZ DATE: 1/31/2013 9:07:42 PM FILE: C:\Users\preyes\Documents\VA TEMPLE MEP TTG_preyes(Recovery).rvt F 1 one eigth inch = one foot F E FURNISH AND INSTALL CABLE RACK SPLICE JUNCTION KIT - CPI P/N 11302-701 OR APPROVED EQUAL. MGMT 2RU 1 3 TR-2 (ROOM 2R49) LAYOUT TR-2 (ROOM 2R49) LAYOUT - SOUTH WALL T TG 12710 Research Blvd. Suite 355 Austin, Texas 78759 512.416.1654 FAX:512.416.7547 2 MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU MGMT 2RU TR-2 (ROOM 2R49) EQUIPMENT RACK ELEVATIONS B three inches = one foot one and one half inch = one foot A 2 This document has been produced from material that was stored and/or transmitted electronically and may have been inadvertently altered. Rely only on final hardcopy materials bearing the consultant's original signature and seal. 1 3 4 5 6 7 8 9 A (1) 1" EMT CONDUIT TO SBOVE ACCESSABLE CEILING AND TO CABLE TRAY. PROVIDED BY ELECTRICAL CONTRACTOR. PAIR 2 STRUCTURE 4-11/16" SQUARE 2-1/8" DEEP BACK BOX (SIMILAR TO RACO-259) WITH SINGLE GANG FACEPLATE (MUD RING). PROVIDED BY ELECTRICAL CONTRACTOR. PAIR 3 PAIR 1 PAIR 4 B NUT, TYP. 1 2 3 4 5 6 7 8 W-O O W-G BL W-BL G W-BR BR TRAPEZE SUPPORT, TYP. 2" JACK POSITIONS one inch = one foot S S 1-PORT STAINLESS STEEL FACEPLATE. PROVIDED BY THE COMMUNICATIONS CONTRACTOR. WIRE-TYPE CABLE TRAY 12" OR 18" (WIDTH VARIES) VOICE CAT. 6 RG-45 MODULAR CONNECTOR. COLOR AS SPECIFIED IN SPECIFICATION. PROVIDED BY COMMUNICATIONS CONTRACTOR. NOTE: SUPPORT CABLE TRAY IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. T568A PIN-OUT W C C T568A RJ45 JACK PINOUT TERMINATION three quarters inch = one foot 5 3 SCALE: NTS BASKET TRAY DETAIL (TYPICAL) 1 SCALE:NTS WALL MOUNTED TELEPHONE DETAIL (TYPICAL) SCALE: NTS (1) 1" EMT CONDUIT TO SBOVE ACCESSABLE CEILING AND TO CABLE TRAY. PROVIDED BY ELECTRICAL CONTRACTOR. (1) 1" EMT CONDUIT TO ABOVE ACCESSABLE CEILING AND TO CABLE TRAY. PROVIDED BY ELECTRICAL CONTRACTOR. 4-11/16" SQUARE 2-1/8" DEEP BACK BOX (SIMILAR TO RACO-259) WITH SINGLE GANG FACEPLATE (MUD RING). PROVIDED BY ELECTRICAL CONTRACTOR. 4-11/16" SQUARE 2-1/8" DEEP BACK BOX (SIMILAR TO RACO-259) WITH SINGLE GANG FACEPLATE (MUD RING). PROVIDED BY ELECTRICAL CONTRACTOR. D SEQUENCE PER EACH TELECOMMUNICATIONS ROOM D one half inch = one foot FOR EXAMPLE: 1ST TR = "1" AND 1ST PANEL = "A", THEN PORT NUMBER CABLED, E.G., "1-A01". A 1 24 MGMT 2RU B 1 48 V1 D1 D2 D3 three eigths inch = one foot (2) CAT. 6 RG-45 MODULAR CONNECTOR. COLOR AS SPECIFIED IN SPECIFICATION. PROVIDED BY COMMUNICATIONS CONTRACTOR. D1 V1 (3) DATA CAT. 6 RG-45 MODULAR CONNECTOR. COLOR AS SPECIFIED IN SPECIFICATION. PROVIDED BY COMMUNICATIONS CONTRACTOR. E (2) PORTS WITH BLANK COVERS. COLOR AS SPECIFIED IN SPECIFICATION. PROVIDED BY COMMUNICATIONS CONTRACTOR. E PORT DESIGNATOR PANEL DESIGNATOR 3 PATCH PANEL LABELING EXAMPLE SCALE: NTS 4 WALL MOUNTED 4-PORT OUTLET DETAIL (TYPICAL) 2 SCALE: NTS WALL MOUNTED 2-PORT OUTLET DETAIL SCALE: NTS one quarter inch = one foot 6 MEP ENGINEER ARCHITECT Goetting W E S T E A S T D E S I G N G TELECOMMUNICATIONS INSTALLATION DETAILS R O U P 200 East Grayson, Suite 207 San Antonio, TX 78215 12710 Research Blvd. Suite 355. Austin, Texas 78759 512.416.1654 FAX:512.416.7547 Project Number Project Title Drawing Title Approved Project Director RESEARCH ADDITION TO BUILDING 205 Location WWW.WESTEASTDESIGN.COM Date Building Number 205 Drawing Number CTVHCS - 1901 S. Veterans Memorial Dr. Temple, TX 76504 210.530.0755 674-279 Checked DRAWN EW RZ T4.01 These documents can not be copied or reproduced without written consent from WestEast Design Group FEBUARY 1, 2013 Revisions: Date Dwg. 8 of 8 VA FORM 08-6231 1 2 3 4 5 6 7 8 9 Office of Construction and Facilities Management Department of Veterans Affairs © These documents can not be copied or reproduced without written consent from WestEast Design Group, USER ID: RZ DATE: 1/31/2013 9:07:43 PM FILE: C:\Users\preyes\Documents\VA TEMPLE MEP TTG_preyes(Recovery).rvt F 1 one eigth inch = one foot F 4-PORT FACEPLATE COLOR WHITE OR IVORY TO MATCH ELECTRICAL FACEPLATES. PROVIDED BY THE COMMUNICATIONS CONTRACTOR. 4-PORT FACEPLATE COLOR WHITE OR IVORY TO MATCH ELECTRICAL FACEPLATES. PROVIDED BY THE COMMUNICATIONS CONTRACTOR. VOICE CAT. 6 RG-45 MODULAR CONNECTOR. COLOR AS SPECIFIED IN SPECIFICATION. PROVIDED BY COMMUNICATIONS CONTRACTOR.