Decoding 2016 Title 24 Part 6

Transcription

Decoding 2016 Title 24 Part 6
Decoding 2016 Title 24 Part 6
Let’s Talk About What’s New
Gina Rodda
[email protected]
(510) 428-0803 ext 204
Martyn Dodd
www.energysoft.com
(415)897-6400
This program is funded by California utility customers under the auspices of the California Public Utilities Commission and in support of the California Energy Commission.
Recording For Future Use
This session is being recorded.
2
Welcome
Agenda
Agenda for Today
Approx. Length
 Welcome……………………………………………10 minutes
 Why?!............................................................... 10 minutes
 Let’s Talk…………………………………………….80 minutes

Challenge A: Nonresidential.................. 35 minutes

Challenge B: Residential Envelope…… 20 minutes

Challenge C: Residential Mechanical. 15 minutes

Challenge D: Residential Lighting….... 10 minutes
 Next Steps………………………………………… 15 minutes
 Wrap Up…………………………………………… 5 minutes
Brought to you by…
California Statewide Codes & Standards
This program is funded by California utility customers under the auspices of the California Public Utilities Commission and in support of the California Energy Commission.
Who Are We?
Host: Gina Rodda
Gina Rodda, our host for the Decoding Talk
series, is a Certified Energy Analyst (CEA), and
LEED Accredited Professional (AP).
Gabel Associates, LLC
[email protected]
She is involved in providing residential and nonresidential energy calculations for a variety of
building types throughout California; an
instructor of full day trainings; and host of
various webinars specific to Title 24 (Part 6)
Building Energy Efficiency Standards.
Gina has been in the energy modeling field since
1991, through the course of eight California
building energy code cycles.
6
Who Are We?
Co-Host: Martyn Dodd
Martyn Dodd, the founder and principal of EnergySoft
in Novato, CA, is an industry expert in performancebased building analysis. He has written software
programs used in California for Title 24 energy code
compliance since 1985, including EnergyPro, COMPLY
24, and the California Energy Commission's Perform
software.
He is also one of the original authors of the 1992 Nonresidential Alternative Calculation Method Manual,
which defines the rules for code compliance software
and has become the model for national and
international code compliance software procedures.
7
Our Goal Today
 Review the changes to Title 24 Part 6 with the 2016
code cycle:

What are the major changes to this code cycle.

How might this code affect our work, and how to
prepare.

Where can you get more information on this code
cycle.
8
Who Are You?
We would like to know
about you.
9
Why?
Why? Intent Behind the Code
History of 2016 Code Cycle
2020 – Net Zero
“New” Residential
Homes
2030 – Net Zero
“New”
Nonresidential
buildings
 1978: Title 24, Part 6, California State
Building Energy Efficiency Standards
established; updates every 3 years
 2003: California Energy Action Plan
adopted; efficiency 1st choice in
meeting future energy needs
 2006: AB32, Global Warming
Solutions Act, adopted to reduce
greenhouse gas emissions
 2008: “Big Bold Strategies” adopted –
California Energy Efficiency Strategic
Plan (CEESP)
What? When?
January 1, 2017
Subchapters
1–2
All Occupancies
Subchapters
3–6
Nonres, High-Rise Res, &
Hotel/Motel Occupancies
Subchapters
7–9
Low-Rise Residential
Appendix
1-A
Standards & Documents
Referenced in the
Standards
12
Quick reference component‐by‐component summaries of sections of Title 24, Part 6 "triggered" based on project scope.
Quick reference summaries of key requirements, forms, definitions and resources for implementing Title 24, Part 6 and Title 20
Step‐by‐step guidance for plans checks and field inspections
A list of useful links, telephone numbers and handy documents
FAQs on the program, the site and the code, and
A place to submit your own questions
EnergyCodeAce.com/resources
13
EnergyCodeAce.com/resources
14
15
5% Increased
Stringency
16
Let’s Talk
Our Question To You
Our?2U-1
Why does the energy code change every 3
years?
What resources are you using to help prepare for
this next code cycle?
What are your top 3 concerns regarding the
2016 code changes?
If you could wave your magic wand, what would
help you be more successful in regards to Title
24 Part 6?
18
Challenges
A
 Challenge A:
 Nonresidential: Envelope, Mechanical
and Lighting
B
 Challenge B:
 Residential: Envelope
C
 Challenge C:
 Residential: Mechanical
D
 Challenge D:

Residential: Lighting
19
Challenge A
Challenge A
Nonresidential: Envelope, Mechanical
and Lighting
20
Mandatory, Prescriptive, Performance
Mandatory Measures
Envelope: §110.6/7/8; 120.7
Solar Ready: §110.10
Mechanical: §110.2/3/5, 120.0
Lighting: §110.9; 120.8; 130.0-4
Electrical: §130.5
Commissioning: §120.5
Covered Process: §110.2;
120.6/8
Prescriptive Approach
ENV
HVAC
LTG
Process
§140.4 §140.3
§140.3
140.6 §140.9
DHW
140.7
§140.5 140.8
Alterations:
§141.0; 141.1
Performance Approach
CBECC-Com
Envelope
Roof
Walls
Floors
Fenestration
Roof
Table 140.3-B Prescriptive Envelope for Nonresidential buildings (not including High-Rise or Hotel/Motel)
Mandatory
U-factor
Roofs/ Ceilings
Steep- Sloped Low- sloped
Roof and Air Barrier
max. U-factor
Climate Zone
1
2
3
4
5
6
7
8
9
Metal Building
0.098
0.041
2013
0.098
0.065
10
11
12
13
14
15
16
Wood Framed
and Other
0.075
0.034
0.034
0.034
0.034
0.034
0.049
0.049
0.049
0.034
0.034
0.034
0.034
0.034
0.034
0.034
0.034
2013
0.075
0.049
0.039
0.039
0.039
0.049
0.075
0.067
0.067
0.039
0.039
0.039
0.039
0.039
0.039
0.039
0.039
Aged Solar
Reflectance
0.63
Thermal
Emittance
0.75
Aged Solar
Reflectance
0.20
Thermal
Emittance
0.75
2013
No Change
Air Barrier
NR
NR
NR
NR
NR
NR
NR
NR
2013
NR
REQ
REQ
REQ
REQ
REQ
REQ
REQ
No Change
Example Span deck roof in CZ 1-5; 9-16
New:
Mandatory U-factor = 0.075

4” concrete / R-10 (2”) / Cool roof
Prescriptive U-factor = 0.034 (was 0.039)

4” concrete / R-29 (5”) (was 4”)+ fireproofing / Cool roof
23
Wall
Table 140.3-B Prescriptive Envelope for Nonresidential buildings (not including High-Rise or Hotel/Motel)
max. U-factor
Metal Building
Climate Zone
Mandatory
U-factor
1
2
0.113
0.113
0.061
3
0.113
4
5
6
0.061
0.061
0.113
Walls
2013
8
0.113
0.061
9
10
11
12
13
14
15
16
0.061
0.061
0.061
0.061
0.061
0.061
0.057
0.061
0.062
0.062
0.062
0.062
0.062
0.062
0.062
0.062
No Change
Metal-framed
0.151
0.069
2013
0.105
0.098
Mass Light
0.440
0.196
2013
7
0.062
0.082
0.062
0.062
No Change
0.170
0.278
0.227
0.440
0.069
0.069
0.098
0.098
0.440
0.440
0.062
No Change
0.440
0.440
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.690
0.650
0.184
0.253
0.211
0.184
0.184
0.160
Mandatory:
U-factor
=0.0590.151
0.102 0.110 0.110
0.102
0.059
0.045
0.059
0.059
0.059
0.042
0.059
Example metal framed wall in CZ 2;4-5;8-16
Mass Heavy
No Change
0.690
0.253
0.650
2013
Wood-framed
and Other
0.110
0.095
2013
No Change
0.102
0.059
0.650
0.650
New:
0.110
0.650
0.690
0.690
0.690
No Change
0.059
No Change
 8” metal wall + R-22
insulation
Prescriptive U-factor = 0.062
 6” metal wall + R-19 AND
additional 2” polyicocyanurate
outside framing
24
Demising Wall
MANDATORY Envelope for Nonresidential buildings
Walls
max. U-factor
Demising Walls (not Climate Zone dependent)
Metal framed:
Wood framed:
0.151
0.099
2013
R-13
New
Metal Wall U-factor = 0.151
 4” wall with R-13 + R-2 or
 8” wall with R-22 or…
Wood Wall U-factor = 0.099
 4” wall with R-15
In our opinion…
Unconditioned lobby
25
Floors
No Change!
Table 140.3-B Prescriptive Envelope for Nonresidential buildings (not including High-Rise or Hotel/Motel)
Floor
max. U-factor
Raised Mass
Other
Mandatory
U-factor
Climate Zone
1
2
3
4
5
6
7
0.269
0.092
0.092
0.269
0.269
0.269
0.269
0.037
0.048
0.039
0.071
0.071
0.071
0.071
8
9
10
11
0.269
0.269
0.269
0.269
0.092
0.071
0.071
0.071
0.071
0.039
12
13
14
15
0.092
0.092
0.092
0.092
0.058
0.071
0.071
0.039
0.039
0.039
Example raised mass floor in CZ 1-2;11-15
New:
Mandatory U-factor = 0.269
 No insulation
Prescriptive U-factor = 0.092

4” concrete

R-7.25 (1-1/2”) spray on insulation
16
Fenestration
No Change!
Table 140.3-B Prescriptive Envelope for Nonresidential buildings (not including High-Rise or Hotel/Motel)
All Climate Zones
Fixed
Operable
Window
Window
Vertical
Fenestration
Area-Weighted
Performance Rating
Max
U-factor
Max
RSHGC
Min VT
Maximum WWR%
Curtainwall
or Storefront
Glazed
Doors
0.36
0.46
0.41
0.45
0.25
0.22
0.26
0.23
0.42
0.32
0.46
0.17
40%
New:
 Typical Curtainwall system:
 U-factor=0.41:
Thermally broken frame
 RSHGC=0.26:
Triple silver coated product
 VT=0.46:
Clear product allowing 46% of sunlight to shine through
Mechanical
What’s still here?
New Mandatory
New Prescriptive
Covered Process
What’s Still Here?
Mandatory
Prescriptive
 Controls: §110.2(c); §120.2(a)(b)(c)(e)
 Dampers: §120.2(f)
 Min. equipment efficiency: §110.2(a)
 Ventilation:
 Calculations: §120.1 min. required
 Demand Ventilation Control: §120.1(c)3,4
 Occupancy Sensor Control: §120.1(c)5
 Equipment
 Sizing: §140.4(a)(b) Cooling: 21% / Heating: 43%
 Zonal controls: §140.4(d)(f) Prevent reconditioning
 Electric Resistance: §140.4(g) Discouraged
 Economizer: §140.4(e) >54,000 BTUH of cooling
 Duct testing: §140.4(l) constant volume, single zone
 Built-up systems: §140.4(h)(i)(j)(k)
 Fan
 Power: §140.4(c) Fans systems >25 BHP
 Control: §140.4(m) >1/4 HP fans VSD
29
120.2( j) Direct Digital Control
 DDC being capable of the
following, in addition to meeting
the control logic of ventilation
control (120.1(c)) and automatic
demand shed control (120.2(h)):
Monitoring demand for fan/pump pressure, heating & cooling and then
transferring that information to system controllers
 Detecting systems excessively driving the reset logic and generate alarms
 Providing trending and input/output point graphic displays (new building
only)
 Resetting setpoint after a demand shed event (120.2(h))

3
120.2( j) Direct Digital Control
NEW APPLICATIONS
Table 120.2‐A: When DDC To Be Provided
Air handling system and all zones
served by the system
Chilled water plant and all coils
and terminal units served by the
system
Hot water plant and all coils and
terminal units served by the
system
QUALIFICATIONS
Individual systems supplying more than three zones and with design
heating or cooling capacity of 300 kBtu/h and larger
Individual plants supplying more than three zones and with design cooling capacity of 300 kBtu/h (87.9 kW) and larger
Individual plants supplying more than three zones and with design heating capacity of 300 kBtu/h (87.9 kW) and larger
ALTERATIONS/ADDITIONS APPLICATIONS
QUALIFICATIONS
VAV boxes or other zone terminal units
Where existing zones served by the SAME air handling, chilled water, or hot water systems that have DDC AH system or fan coil
Where existing AH or fan coil(s) served by the SAME chilled water, or hot water systems have DDC New AH unit and ALL new zones
served by unit
Individual systems with design heating or cooling capacity of 300 kBtu/h and larger and supplying more than three zones and more than 75 percent of zones are new New or upgraded chillwed water plant and/or hot water plant
Where all chillers and/or boilers are new and plant design cooling and/or heating capacity is 300 kBtuh (87.9 kW) and larger
3
120.2(k) Optimum start/stop controls
Graphic by tekmar control systems
In our opinion…

A building experiences delays in
dropping down its temperature
at the beginning of the setback
period, and increasing its
temperature at the end of the
setback period.

This function learns the response
of the system in order to
calculate a start and stop time for
the system so that the building is
comfortable when the occupied
period begins.

Space conditioning systems with
DDC to the zone level shall have
optimum start/stop controls.
3
140.4(e)5 Dx Systems with Economizers
 Direct expansion (DX) systems with
economizers that are:

>65,000 BTUH AND

Control the capacity of cooling
based on space temperature
 Must have minimum 2 stage
cooling capacity
This was phased in during the 2013
code cycle, but did you know that?
3
140.4(n) System Shut-off
 Directly conditioned space that have
a thermostatic control and OPERABLE
openings to the outside (i.e.
windows/non self-closing
doors/skylights):

When openings are left open for
more than 5 minutes then
 Interlocked controls will disable
or reset temperature setpoint to:
 Cooling = 90°F
 Heating = 55°F
In our opinion…
 N/A to Alterations
3
120.6(f) Elevators
 Lighting <0.6 watts per sq. ft.
 Ventilation: 0.33 watts per CFM (if no
space conditioning)
 Auto Shut-off: Stopped and
unoccupied >15 minutes then
lighting and ventilation to
automatically turn off

Emergency: If stuck with people,
then everything stays on
 Acceptance testing by installing
contractor for the above
3
120.6(g) Escalators/Moving Walkways
 Airports, hotels and transportations
function areas ONLY:

Not occupied: Automatically slow
to minimum speed per ASME A171/CSA B44

Acceptance testing by the
installing contractor for the above
In our opinion…
3
Indoor Lighting
Lighting
 New: Lighting installed for first time,
remodels including lighting changes,
and adding to the connected load and
must meet all the requirements of the
code.
 Alterations: >10% move or change; or
replace more than 2 fixtures in a space.
 Modifications: 70 fixtures or more per
year.
 Wiring: §130.1(a) area controls;
§130.1(b) multi level can be one control
step between 30-70%; §130.1(c) Shutoff; §130.1(d) auto daylighting if
rewiring 10 fixture or more in primary
Lighting
Revised Power Adjustment Factors
 AKA: Control Credits
TABLE 140.6‐A LIGHTING POWER ADJUSTMENT FACTORS (PAF)
TYPE OF CONTROL
Daylight Dimming plus
OFF Control
TYPE OF AREA
Luminaires in skylit daylit zone or primary sidelit daylit zone
Occupant Sensing
Controls in Large Open
Plan Offices
In open plan offices >250
square feet: One sensor
controlling an area that is:
Institutional Tuning
Luminaires in non-daylit areas: Luminaires that qualify for
other PAFs in this table may also qualify for this tuning PAF.
0.10
Luminaires in daylit areas: Luminaires that qualify for other
PAFs in this table may also qualify for this tuning PAF.
0.05
Demand Responsive
Control
No larger than 125 square feet
From 126 to 250 square feet
From 251 to 500 square feet
All building types less than 10,000 square feet.
Luminaires that qualify for other PAFs in this table may also
qualify for this demand responsive control PAF
FACTOR
0.10
0.40
0.30
0.20
0.05
2016 TABLE 140.6-C AREA CATEGORY METHOD Lighting Power Density (LPD) (Watt/Ft²) / <85% of LPD for Alteration Control Exceptions
PRIMARY FUNCTION AREA
Auditorium Area
Auto Repair Area
Beauty Salon Area
Civic Meeting Place Area
Classroom, Lecture, Training, Vocational Areas
Commercial and Industrial Storage Areas
(conditioned and unconditioned)
Commercial and Industrial Storage Areas
(refrigerated)
Convention, Conference, Multipurpose and
Meeting Center Areas
Corridor, Restroom, Stair, and Support Areas
Dining Area
Electrical, Mechanical, Telephone Rooms
2013 100%
2016 100%
2016 85%
2013 100%
2016 100%
2016 85%
1.5
1.4
0.9 2
1.7
1.3 3
1.2 5
1.19
0.77
1.45
1.11
1.02
1.2
Locker/Dressing Room
1.1 3
1.5 3
0.8
1.1
1.5 3
0.95 3
0.95 3
0.7
0.94
1.28
0.81
0.81
0.60
0.6
0.51
Lounge Area
1.1 3
0.90 3
0.77
0.7
0.60
Malls and Atria
1.2 3
0.95 3
0.81
1.4 3
1.2 3
1.02
Medical and Clinical Care Area
1.2
1.02
1.1 3
0.7 2
0.6
1.0 3
0.55 2
0.51
0.85
0.47
0.75
1.0
0.14
0.64
0.85
N/A
1.0
0.85
0.3
N/A
1.8
1.0 3
0.9 2
1.0 2
1.2 4
1.2 6 and 7
1.5
0.85
0.77
0.85
1.02
1.02
0.6
1.5 3
N/A
1.28
1.2 6 and 7
1.02
1.2 3
1.19
0.9 3
1.4 3
0.5
1.0
1.2 8
0.8 3
0.5
0.77
1.19
0.43
0.85
1.02
0.68
0.43
3
Exercise Center, Gymnasium Areas
Exhibit, Museum Areas
Financial Transaction Area
General Commercial and
Industrial Work Areas
2.0
1.2 3
Low bay
High bay
Precision
Grocery Sales Area
Hotel Function Area
1.5 3
3
PRIMARY FUNCTION AREA
Library Area
Lobby Area
Office Area
Parking Garage Area
Reading areas
Stack areas
Hotel lobby
Main entry lobby
3
> 250 square feet
≤ 250 square feet
Parking Area 10
Dedicated Ramps
Daylight Adaptation Zn
9
Religious Worship Area
Retail Merchandise Sales, Wholesale Showroom Areas
Theater Area
Transportation Function Area
Motion picture
Performance
Concourse & Baggage
Ticketing
1.2
3
Kitchen, Food Preparation Areas
Videoconferencing Studio
1.6
1.2
1.02
Laboratory Area, Scientific
Waiting Area
1.4 1
1.19
1.1 3
Laundry Area
All other areas
0.9
0.7
0.60
0.6
Footnote # Type of lighting system allowed
Maximum allowed added lighting power.
1
Specialized task work
0.2 W/ft²
2
Specialized task work
0.5 W/ft²
3
Ornamental lighting as defined in Section 100.1 and in accordance with Section 140.6.(c)2.
0.5 W/ft²
4
Precision commercial and industrial work
1.0 W/ft²
5
Per linear foot of white board or chalk board.
5.5 W per linear foot
6
Accent, display and feature lighting - luminaires shall be adjustable or directional
0.3 W/ft²
7
Decorative lighting - primary function shall be decorative and shall be in addition to general illumination
0.2 W/ft²
8
Additional Videoconferencing Studio lighting complying with all of the requirements in Section 140.6(c)2Gvii 1.5 W/ft²
9
Daylight Adaptation Zones shall be no longer than 66 feet from the entrance to the parking garage
200 watts for the 1st ATM location; 50 watts for each additional ATM
10
Additional allowance for ATM locations in Parking Garages (allowance per ATM)
locations in a group
Mandatory Controls §130.1
Area Controls
130.1(a)
On/off switch need not be accessible to
public in:
 Public restrooms with more than 2 stalls,
parking areas, stairwells and corridors
41
Mandatory Controls §130.1
Multi Level Controls
130.1(b)
Source
Image: Cree
Ability to control lights at multiple levels of
light using:
 Dimmers or
 Auto daylighting or
 Demand response
+
Luminaire
Image: Cree
+
Controls
Image: Enlighted
42
Mandatory Controls §130.1
Auto Shut-Off
Off
130.1(c)
Stairwells can be controlled per building
(not per floor as required in 2013)
0.10 w/ft2 exempt for emergency
lighting ALL building types
IF an office <250ft2, multipurpose room
<1,000 ft2, classroom or conference
room trigger multi-level control, then;
 partial-on OR
 vacancy sensor is required
 If the space does NOT trigger a multilevel control, then
 occupancy sensor is allowed.
43
Mandatory Controls §130.1
Auto Daylighting
130.1(d)
Demand Response
130.1(e)
Auto daylighting has minor changes on how
illuminance levels are measure in parking
garages
Non habitable spaces no longer exempt
from the 10,000 ft2 trigger (spaces less than
0.5 w/sf is still excluded)
NRCA-LTI-02-A
NRCA-LTI-03-A
NRCA-LTI-04-A
NRCA-LTI-05-A
NRCA-LTO-02-A
Acceptance testing not required for
alteration projects where controls
added to control 20 or less luminaires
for entire project.
44
Lighting: Reduced Wattage Approach
§141.0(b)2J: Luminaire Component Modification
 Reduce Area Category LPD (Table 140.6C) by 85% or more, then only the
following controls required:
 §130.1(a) Area controls
 §130.1(b) Multi level can be one
control step between 30-70%;
 §130.1(c) Shut-off
 Reduce installed wattage 50% for hotel,
office and retail occupancies and 35% for
all others, then only the following controls
are required:
 §130.1(a)1-3: Area controls
 4: Excluding separately controlled
lighting systems
 §130.1(c) 1A-C; 2, 3, 4, 5, 6A, 7B: Auto
shut-off
 1D: Excluding separately controlled
lighting systems
 6B,C: Excluding Partial-Off in
libraries, stairwells and corridors
 7A: Excluding lighting in multi
family and hotel/motel corridors
and stairs
 8: Excluding hotel/motel guest
room controls
2016 Indoor Lighting Alterations
In our opinion…
2016 Indoor Luminaire Component Modification: >70 per floor/tenant per year changed fixtures: 3 or more fixtures per room
Alteration: >10% moved, changed, replaced fixtures: 3 or more fixtures per room
Table 141.0-E
Mandatory Control
Area device (on/off):
§130.1(a)1,2,3
Multi-level control:
§130.1(b)
Adding to
connected
load or
remodeling
Resulting LPD (§140.6)
≤85% of allowable
Resulting LPD (§140.6)
>85% of allowable
NEW Reducing installed wattage
from existing method*
§141.0(b)2Jii
Yes
Yes
Yes
Excluding 130.1(a)4: separately
controlled lighting systems.
Excluding 130.1(a)4: separately
controlled lighting systems.
Excluding 130.1(a)4: separately controlled lighting
systems.
Yes
Yes
No
Yes
Yes
2 level or 130.1(b)
Only for modified
luminaires
Only for modified luminaires
Yes, Excluding
130.1(c)1D: separate controls
130.1(c)6B: Partial OFF @ libraries
130.1(c)6C: Partial OFF @ stairs/corridors
130.1(c)7A: Partial OFF @ 24 hr stairs & corridors
130.1(c)8: Hotel/Motel guest room 30 min. controls
Auto shut-off control:
§130.1(c)
Yes
Yes
Daylighting control:
§130.1(d)
No
Yes
Only for modified luminaires
No
Yes
Demand response:
§130.1(e)
No
No
No
Yes
Yes
*50% Office, retail and hotel occupancies / *35% All other occupancies
Acceptance test technician required when any number of controls for >20 fixtures being added for project
Outdoor Lighting
Photo: Cree
Lighting: Outdoor

New lighting zone: 0

Table 140.7-A & B: Reduced LPD and wattage
allowances

Mandatory:
 §130.2(b) Cutoff for >150w lamps
 See Title 24 Part 11 for backlight requirements of
BUG
 §130.2(c) Controls
1. Photo control or astronomical time-switch
2. Lighting controlled independently from other
loads
3. If fixture with 24 feet of ground, then motions
sensor required
 Exception:
 Pole: <75 watts
 Non pole: < 35 watts
 Linear: <4 watts per ft
4. Sales frontage: Part night or motion sensor
5. Façade, ornamental hardscape, outdoor dining:
Part night, motion sensor, centralized time
system; AND if within 24 ft of ground §130.2(c)3

Acceptance test technician required when any number
of controls for >20 fixtures being added for project.
Hardscape Lighting Power
 Area Wattage Allowances (AWA)
 The total illuminated hardscape area.
 Linear Wattage Allowances (LWA)
 The total perimeter illuminated
length of the hardscape.
 Initial Wattage Allowances (IWA)
 The Initial Wattage Allowance may be
used once per project site.
Table 140.7-A General Hardscape Lighting Power Allowance
Type of Power
Allowance
Lighting
Zone 0
Lighting
Zone 1
Lighting
Zone 2
Lighting
Zone 3
Lighting
Zone 4
Area Wattage
Allowance (AWA)
0.020 W/ft²
0.030 W/ft²
0.040 W/ft²
0.050 W/ft²
2013
0.035 W/ft²
0.045 W/ft²
0.090 W/ft²
0.115 W/ft²
0.15 W/lf
0.25 W/lf
0.35 W/lf
0.45 W/lf
0.25 W/lf
0.45 W/lf
0.60 W/lf
0.85 W/lf
Linear Wattage
Allowance (LWA)
2013
No Allowance
Initial Wattage
Allowance (IWA)
340 W
450 W
520 W
640 W
2013
340 W
510 W
770 W
1030 W
49
2016 Outdoor Lighting Alterations
2016 Outdoor Lighting
Retrofits: If housing stays intact and lighting technology is changed = repair. Replacing fixture head = alteration.
Alteration: >10% moved, changed, replaced fixtures: 5 or more fixtures per site
Adding to connected
NEW Reducing
Altering 10-50% fixtures
load OR
on site
Requirements
installed wattage
Altering >50%
by 40% method
§141.0(b)2Liii exception
fixtures on site
Meet lighting power allowances: §140.7
No
Incandescent >100 w controlled by motion
sensor: §130.2(a)
Yes
Luminaries >150 w to provide cut-off (BUG):
§130.2(b)
Yes
Photocontrol/astronomical time clock:
§130.2(c)1
Yes
Control separately from other electrical loads:
§130.2(c)2
Yes
Motion Sensor if within 24 ft of ground:
§130.2(c)3
Part night OR motion sensor for Sales Frontage:
§130.2(c)4
Part night OR motion sensor OR time-based for
façade, ornamental, dining: §130.2(c)5
Yes
Yes
Yes
No
Yes
Yes
Yes
For altered fixtures only
Yes
For altered fixtures only
Yes
For altered fixtures only
Yes
For altered fixtures only
Yes
For altered fixtures only
Yes
For altered fixtures only
Yes
For altered fixtures only
Yes
Yes
Yes
Yes
Yes
Yes
Acceptance test technician required when any number of controls for >20 fixtures being added for project
50
Let’s Talk Challenge A
Check your understanding
51
Challenge B
Challenge B
Residential: Envelope
52
Mandatory, Prescriptive, Performance
Mandatory Measures
Mechanical: §110.2, 110.3
Solar Ready §110.10
§150.0
Insulation
HVAC (including IAQ)
DHW Distribution
Lighting
Prescriptive Approach
Performance Approach
CBECC-Res
ENV
HVAC
DHW
§150.1
§150.1
§150.1
Alterations:
§150.2
Prescriptive Package A: §150.1
Hot/Cold Climate Zones
Mild Climate Zones
54
Table 150.1-A - ROOF
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN - ROOF
Climate Zone
7
8
9
2
3
4
5
6
10
11
12
13
14
15
16
NR
NR
NR
R8
NR
NR
NR
R8
R8
R8
R8
R8
R8
R8
R8
R8
NR
NR
NR
R6
NR
NR
NR
R6
R6
R6
R6
R6
R6
R6
R6
R6
Ceiling Insulation
R 38
R 38
R 30
R 38
R 30
R 30 R 30 R 38 R 38
R 38
R 38
R 38
R 38
R 38 R 38 R 38
Radiant Barrier
NR
REQ
REQ
REQ
REQ REQ REQ REQ REQ
REQ
REQ
REQ
REQ REQ REQ
NR
NR
NR
R 18
NR
NR
NR
R 18 R 18
R 18
R 18
R 18
R 18
R 18 R 18 R 18
NR
NR
NR
R 13
NR
NR
NR
R 13 R 13
R 13
R 13
R 13
R 13
R 13 R 13 R 13
Ceiling Insulation
R 38
R 38
R 30
R 38
R 30
R 30 R 30 R 38 R 38
R 38
R 38
R 38
R 38
R 38 R 38 R 38
Radiant Barrier
NR
REQ
REQ
NR
REQ REQ REQ
NR
NR
NR
NR
NR
NR
NR
NR
NR
Ceiling Insulation
R 38
R 30
R 30
R 30
R 30
R 30
R 30
R 30
R 30
R 30
R 38
R 38
R 38
R 38
R 38
R 38
Radiant Barrier
NR
REQ
REQ
REQ
REQ
REQ
REQ REQ
REQ
REQ
REQ
REQ
REQ
REQ
REQ
NR
With Air No Air
Space Space
Roofing Type
Below Roof Deck
With Air No Air
Space Space
1
Option A
§150.1(c)9A
Continuous
Insulation Above
Roof Rafter
Roofing Type
Option B
§150.1(c)9A
Option C
§150.1(c)9B
Envelope Insulation: Roofs/Ceilings
Mandatory
U-factor
2013 Roofs /Ceilings
0.043
(R-22)
0.031
R-30
U 0.025
R 38
U 0.031
R 30
NR
U 0.025
R 38
55
Roof: Mandatory Measures
Roof
U-factor (wood framed attic): 0.043
 Example: R-22 (JA4.2.1-1A)
With Air No Air
Space Space
Option A
§150.1(c)9A
Continuous
Insulation Above
Roof Rafter
Roofing Type
Roofs/Ceilings
Roof: Air Space Example
0.043
(R-22)
NR
NR
NR
R8
NR
NR
NR
R8
R8
R8
R8
R8
R8
R8
R8
R8
NR
NR
NR
R6
NR
NR
NR
R6
R6
R6
R6
R6
R6
R6
R6
R6
With Air Space?
No Air Space?
 Air space ABOVE the roof deck but BELOW
the roofing material

Common with tile roofing
5
7
Roof: Vented Attic
Ceiling insulation AND
above roof deck insulation
Option A
 Above roof deck, which is typically in
the purview of the roofer. R-value
depends on with or without “airspace”.
 Ceiling insulation must also be
provided.
 Radiant Barrier dependent on CZ.
 Upper insulation dependent upon CZ.
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN - ROOF
Climate Zone
7
8
9
2
3
4
5
6
NR
NR
NR
R8
NR
NR
NR
R8
NR
NR
NR
R6
NR
NR
NR
R6
Ceiling Insulation
R 38
Radiant Barrier
NR
With Air No Air
Space Space
1
Option A
§150.1(c)9A
Continuous
Insulation Above
Roof Rafter
Roofing Type
Roofs/Ceilings
Mandatory
U-factor
0.043
(R-22)
10
11
12
13
14
15
16
R8
R8
R8
R8
R8
R8
R8
R8
R6
R6
R6
R6
R6
R6
R6
R6
R 38 R 30 R 38
R 30 R 30 R 30 R 38 R 38
R 38
R 38
R 38 R 38 R 38 R 38 R 38
REQ REQ REQ
REQ REQ REQ REQ REQ REQ
REQ
REQ REQ REQ REQ
NR 5
8
Roof: Vented Attic
Ceiling insulation AND
below roof deck insulation
Option B
 Below roof deck. R-value depends on
with or without “airspace” above roof
deck.
 Ceiling insulation must also be
provided.
 Radiant Barrier dependent on CZ.
 Upper insulation dependent upon CZ.
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN - ROOF
3
4
5
6
NR
NR
NR
R 18
NR
NR
NR
NR
NR
R 13
NR
NR
Ceiling Insulation
R 38
R 38 R 30 R 38
Radiant Barrier
NR
REQ REQ
With Air
Space
No Air
Space
2
Roofing Type
1
Below Roof Deck
Option B
§150.1(c)9A
Roofs/Ceilings
Mandatory
U-factor
0.043
(R-22)
NR
Climate Zone
7
8
9
10
11
NR R 18 R 18
R 18
R 18
R 18 R 18 R 18 R 18 R 18
NR R 13 R 13
R 13
R 13
R 13 R 13 R 13 R 13 R 13
R 30 R 30 R 30 R 38 R 38
R 38
R 38
R 38 R 38 R 38 R 38 R 38
REQ REQ REQ NR
NR
NR
NR
NR
12
13
NR
14
NR
15
NR
16
NR
5
9
Roof: Vented Attic
Option C
Ducts and air handler in
conditioned space
 Conditioned space = habitable
space!
 Ceiling insulation only.

In our opinion…
Must be a vented attic
 Radiant Barrier dependent on CZ.
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN - ROOF
Option C
§150.1(c)9B
Roofs/Ceilings
Mandatory
U-factor
Ceiling Insulation
Radiant Barrier
0.043
(R-22)
Climate Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
R 38
R 30
R 30
R 30
R 30
R 30 R 30 R 30
NR
REQ
REQ
REQ
REQ
15
16
R 30
R 30
R 38
R 38
R 38
R 38
R 38 R 38
REQ REQ REQ REQ
REQ
REQ
REQ
REQ
REQ
REQ
NR
6
0
Table 150.1-A - Walls
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN
U-factors
Below Grade Mass Wall Mass Wall
Interior
Exterior
Interior
Below
Grade
Envelope Insulation: Walls
Below Grade
Above Grade
Framed
2013 Above Grade
Framed
Mandatory
0.102
(2x4)
or
0.074
(2x6)
0.102
Climate Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
U 0.065: R 15+4 or R 13+5
0.051
0.051
0.051 0.051 0.051 0.065
0.065
0.051 0.051 0.051 0.051
0.051
0.051
0.051
0.051 0.051
0.070
R 13
0.070
R 13
0.070 0.070 0.070 0.070
R 13 R 13 R 13 R 13
0.070
R 13
0.070 0.070 0.070 0.070
R 13 R 13 R 13 R 13
0.070
R 13
0.070
R 13
0.070
R 13
0.070 0.059
R 13 R 17
0.125
R 8.0
0.125
R 8.0
0.125 0.125 0.125 0.125
R 8.0 R 8.0 R 8.0 R 8.0
0.125
R 8.0
0.125 0.125 0.125 0.125
R 8.0 R 8.0 R 8.0 R 8.0
0.125
R 8.0
0.125
R 8.0
0.125
R 8.0
0.125 0.070
R 8.0 R 13
0.070
R 13
0.070
R 13
0.070 0.070 0.070 0.070
R 13 R 13 R 13 R 13
0.070
R 13
0.070 0.070 0.070 0.070
R 13 R 13 R 13 R 13
0.070
R 13
0.070
R 13
0.070
R 13
0.070 0.066
R 13 R 15
0.200
R 5.0
0.200
R 5.0
0.200 0.200 0.200 0.200
R 5.0 R 5.0 R 5.0 R 5.0
0.200
R 5.0
0.200 0.200 0.200 0.200
R 5.0 R 5.0 R 5.0 R 5.0
0.200
R 5.0
0.200
R 5.0
0.100
R 10
0.100 0.053
R 10 R 19
N/A
61
Walls: Mandatory Measures
Walls §150.0
U-factor (wood framed 2 x 4): 0.102

Example: R-13 (JA4.3.1-3A)
U-factor (wood framed 2 x 6): 0.074

Example: R-19 (JA4.3.1-5A)
No change
from 2013
standards.
62
Wall: Above Grade - Framed
U-factor = 0.051
Sheathing
Batt insulation
Continuous insulation
Vapor barrier
Siding
 2 x 6 R-19 + R-5 continuous
 Or….??
U-factor = 0.065
 2 x 4 R-13 + R-5 continuous
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN
2013 Above Grade
Framed
0.102
(2x4)
or
0.074
(2x6)
Framed
Mandatory
Walls
Above
Grade
U-factors
1
2
3
4
5
6
7
Climate Zone
8
9
10
11
12
13
14
15
16
U 0.065: R 15+4 or R 13+5
0.051 0.051
0.051 0.051 0.051 0.065 0.065 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
6
3
Framed Wall Assembly
Slide courtesy of CAHP - Master Builder
Advanced Home Design and Building Practices
2016 Code Readiness Program
In our opinion…
UStud
Cavity
Exterior
Framing
factor
Spacing Insulation Insulation
Cavity Insulation Type
0.050
2x6
24” OC
R-19
R-5 (1")
Low density fiberglass batt
0.051
2x6
16” OC
R-21
R-4 (1")
High density batt or BIB
0.049
2x6
16” OC
R-19
R-6 (1.25")
Low density fiberglass batt
0.050
2x4
16” OC
R-15
R-8 (2")
High density batt
**Multiple combinations of similar materials will achieve these same U-factors
Wall: Above Grade – Non Framed
Mandatory U-factor = 0.102
Example: Any 5” or thicker solid concrete wall
Prescriptive U-factor = 0.125
Example: 6” solid concrete wall with R-8
In Our Opinion
 New mandatory minimum not a
big deal unless you are using
nonfilled CMU blocks, which will
need to be filled or insulated
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN
Walls
Above Grade
Mass
Mass
Wall
Wall
Exterior Interior
U-factors
Mandatory
0.102
3
4
5
6
7
Climate Zone
8
9
1
2
10
11
12
13
14
15
16
0.070
R 13
0.070
R 13
0.070 0.070 0.070 0.070
R 13 R 13 R 13 R 13
0.125
R 8.0
0.125
R 8.0
0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.070
R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 8.0 R 13
0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.059
R 13 R 13 R 13 R 13 R 13 R 13 R 13 R 13 R 13 R 17
65
Floor: Mandatory & Prescriptive Measures
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN
Mandatory
2013 Floors
0.037
Envelope Insulation:
Floors
U-factors
Climate Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Same as 2016
Slab
Perimeter
N/A
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
0.58
R 7.0
Raised
0.037
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
0.037
R 19
Concrete
Raised
N/A
0.092
R 8.0
0.092
R 8.0
0.269
R0
0.269
R0
0.269
R0
0.269
R0
0.269
R0
0.269
R0
0.269
R0
0.269
R0
0.092
R 8.0
0.138
R 4.0
0.092
R 8.0
0.092
R 8.0
0.138
R 4.0
0.092
R 8.0
U-factor (raised wood): 0.037
Floor

Example: R-19 (JA4.4.1-4A)
Mass (slab on grade and raised
concrete): none
Fenestration:
Mandatory & Prescriptive Measures
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN
Mandatory
1
2
3
4
5
6
7
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
Building Envelope: Fenestration
2013 Fenestration
Max. Ufactor
0.58
Climate Zone
8
9
Same as 2016
10
11
12
13
14
15
16
0.32
0.32
0.32
0.32
0.32
0.32
0.32 0.32
Maximum
SHGC
N/A
NR
0.25
NR
0.25
NR
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25 0.25
Maximum
Total Area
N/A
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20% 20%
Maximum
West
Facing
Area
N/A
NR
5%
NR
5%
NR
5%
5%
5%
5%
5%
5%
5%
5%
5%
5%
U-factor: 0.58
Fenestration

Example: Dual paned non-metal (Table
110.6-A Default U-factors)
5%
Let’s Talk Challenge B
Check your understanding
68
Challenge C
Challenge C
Residential: Mechanical
69
Table 150.1-A: Mechanical
Central
System Space cooling
AH
DHW
Electric-Resistance
Allowed
If gas, AFUE
If Heat Pump, HSPF
SEER
Refrigerant Charge
Verification or Fault
Indicator Display
Whole House Fan
Central Fan Integrated
Ventilation System Fan
Efficacy
1
2
3
4
5
6
7
No
No
No
No
No
No
No
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
NR
REQ
NR
NR
NR
NR
NR
NR
REQ
REQ REQ
REQ
Roof/Ceiling
Roof/Ceiling
Options A &
Option C
B
Climate Zone
8
9
10
11
12
13
14
15
16
No
No
No
No
No
No
No
No
MIN MIN
MIN MIN
MIN MIN
MIN MIN
MIN MIN
MIN MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
NR
NR
NR
REQ REQ REQ REQ REQ REQ REQ
REQ
NR
NR
NR
NR
REQ REQ REQ REQ REQ REQ REQ
NR
NR
No
REQ REQ REQ REQ REQ REQ REQ REQ REQ REQ
R-6
2013 Ducts in Unconditioned Attic
Ducts
HVAC SYSTEM
Space
Heating
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN – Mechanical
Duct Insulation R-8
R-8
R-6
REQ REQ
R-8
R-8
R-6
R-8
R-6
R-6
R-6
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
R-8
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Duct Insulation R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
R-6
REQ REQ
REQ
REQ REQ REQ REQ REQ REQ REQ REQ REQ REQ
§150.1(c)9A
§150.1(c)9B
All Buildings
REQ
REQ REQ
System Shall meet Section 150.1(c)8
70
EnergyCodeAce.com/resources
71
Ducts
2016 TABLE 150.1-A COMPONENT PACKAGE-A STANDARD BUILDING DESIGN – Mechanical
Mandatory
Climate Zone
Roof/Ceiling
Roof/Ceilin
Options A &
g Option C
B
Ducts
Mandatory
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Ducts in attic
R-6
R-8
R-8
R-6
R-8
R-6
R-6 R-6
R-8 R-8 R-8
R-8
R-8 R-8
R-8
R-8
R-8
Ducts in
conditioned
R-4.2
R-6
R-6
R-6
R-6
R-6
R-6 R-6
R-6 R-6 R-6
R-6
R-6 R-6
R-6
R-6
R-6
 Mandatory duct insulation:

Min. R-4.2 conditioned space

R-6 everywhere else.
 Mandatory HERS Duct testing:

5%
7
Whole House Fans
Prescriptive
 Reduced from 2 cfm/sqft to 1.5
cfm/sqft
 Attic vent area reduced to 1 sqft
per 750 cfm of airflow
In our opinion…
7
DHW: New Construction
Mandatory
 Isolation valves on both the
cold water supply and the
hot water pipe leaving the
water heater, and hose bibbs
on each valve for flushing the
water heater.
Prescriptive
 (1) gas or propane tankless
DHW

Input of <200,000
BTUH; EF 0.82

No storage tank
2013: (1) small gas tank
DHW
74
DHW: New Construction
Gas Tank System
 Small Storage:


Input <105,000 BTUH, <55 gallons
@ minimum efficiency
HERS verified QII AND

HERS compact hot water distribution system
OR

HERS “All DHW hot water piping insulated”
 Large Storage:


Input <105,000 BTUH, >55 gallons
@ minimum efficiency
HERS compact hot water distribution system OR

HERS “All DHW hot water piping insulated”
In our opinion…
75
DHW
Recirculation
 If a recirculation pump is installed,
prescriptively it can ONLY be
Same as 2013

A manual pump control

Any other type of control (i.e. no
control, motion sensor, timer) will
require a performance run.
http://aquamotionhvac.com/wpcontent/uploads/2008/08/Hot-Brochure-1.pdf
76
Residential PV Systems
Increased PV Credit
 The PV System Credit is available only if:

The Performance Approach is used

The project is in Climate Zones 1-5, 8-16

The system is:
 ≥ 2 kWdc* for Single Family
 ≥ 1 kWdc* for Multi Family
* kilowatts direct current
A typical 1kWdc system often has
approximately four PV panels
In our opinion…

The amount of credit will depend upon
the Climate Zone and the Conditioned
Floor Area of the dwelling.
 PV System credit does not require HERS
verification unless getting rebate from the
New Solar Homes Partnership (NSHP)
For the 2019 Standards, the PV tradeoff will no longer be
available to trade away the 2016 HPA and HPW (AND not
allowed for current CAHP programs)
Challenge D
Challenge D
Residential: Lighting
78
What’s High Efficacy?
Indoor High Efficacy
Luminaires




Pin-based linear fluorescent
Pin-based compact
fluorescent
GU-24 other than LEDs
Inseparable SSL luminaires
with colored light sources
for decorative lighting
purpose
Recessed
Downlights in
Ceilings
JA8 High Efficacy
Lighting




LED luminaires with
integral sources
Screw-based LED lamps
Pin-based LED lamps
GU-24 based LED light
source


Shall not have
screw based
sockets
Shall contain JA8certified light
sources
JA8-2016-E
JA8-2016-E
JA8-2016
Joint Appendices Chapter 8
“JA8-2016” or “JA8-2016-E” LAMP
A list of compliant products will be
found a:
https://cacertappliances.energy.ca.gov
In our opinion…
Lighting Controls
 Hallways & Closets

Switch, dimmer or vacancy sensor
 Kitchens

Under cabinet lighting switched separately*

High efficacy: Switch, dimmer or vacancy sensor

JA8-2016/JA-2016-E: Dimmer or vacancy sensor
 Bathrooms, Utility/Laundry Rooms, Garage

One fixture must be on vacancy sensor

2nd fixture:
 High efficacy: Switch, dimmer or vacancy sensor
 JA8-2016/JA-2016-E: Dimmer or vacancy
sensor
 All Other
*Applies to all rooms types

High efficacy: Switch, dimmer or vacancy sensor

JA8-2016/JA-2016-E: Dimmer or vacancy sensor
Outdoor Lighting
 High Efficacy Fixture
 Controls:

On/Off switch AND

Photocell AND motion sensor OR

Photocontrol AND automatic time switch OR

Astronomical time clock OR

EMCS that provides the functionality of a astronomical time
clock AND meets installation criteria of §130.4 AND does not
allow the luminaire to always be on, AND is programmed to turn
the outdoor lights off during the day.
8
Let’s Talk Challenge D
Check your understanding
83
Next Steps
A new website developed by the Statewide Codes & Standards Program
to help you meet the requirements of Title 24, Part 6
We offer FREE
A variety of tools to
help you identify the
forms, installation
techniques, and
building energy
standards relevant to
building projects in
California
Classroom and online
trainings on Title 24,
Part 6.
visit us at
Fact Sheets, Trigger
Sheets, Checklists,
and FAQs to help
you understand when
Title 24, Part 6 is
“triggered” and how
to correctly comply
when it is
www.EnergyCodeAce.com
EnergyCodeAce.com/resources
86
Dynamic or Static
•
Dynamic:
– Computer is required
– Adobe Reader is required
– Organized to help organize plan check for all the Title 24 Part 6 certificate of Compliance forms (NRCC)
– You can choose to have predetermined “Plan Check Responses” populated for items not
meeting code.
EnergyCodeAce.com/resources
87
Static
No computer required Provides guidance on which building features must be documented with which forms
• These forms are designed to be a verification tool in the field.
•
•
EnergyCodeAce.com/resources
88
Trade Organizations
Who Is Doing This Already?
http://www.efficiencyfirstca.org/
89
Energy Consultants
Certified Energy Analysts
www.cabec.org
 California Association of Building Energy Consultants
 Education & Training – Title 24 Code, building science and energy modeling  Certified Energy Analyst certification
 Information Network
 Code related advocacy
90
Wrap Up