CMA - Jabatan Meteorologi Malaysia
Transcription
CMA - Jabatan Meteorologi Malaysia
10th IWS of ESCAP/WMO TC 2015 Progress Report (WGM) LEI Xiao-tu (STI/CMA) Clarence FONG (Mete. Expert of TCS) 29, October 2015, Kuala Lumpur, Malaysia WGM parallel session at 10th IWS 27-28 October 2015 Day 2 Lumpur - Berjaya Times Square Hotel, Kuala Day 3 (28 October 2015) (27 October 2015) Participation Morning (8:30-12:00) Members report of 2015 (Meteorological component ) - 12 Members (Cambodia, Singapore absent), Review the plans in 2015 (cont’d) - 38 delegates (include WMO/PTC and TCS, Lunch (12:00-13:30) TRCG ) Afternoon Items: (13:30-17:30) Review the plans in 2015 (AOPs, POP & PPs) - Members report (Meteo. component) - Review plans (AOPs, POPs and PPs) of 2015 - Draft priority projects in 2016 - Discuss and draft the priority plans for 2016 Other business Outline Members’ progress (Mete. component) Implementation status of plans in 2015 Proposed plans & budget of 2016 Summary & Recommendation Part I: Overview of Members’ progress (meteorological component) Members’ Reports (Day 2: 27 Oct.) Cambodia (absent) DPR Korea HKO JMA Macao Malaysia Philippines Thailand Singapore (absent) USA China Lao PDR ROK Viet Nam 25 TCs in 2015 (until to 25 Oct.) Tracks of TCs over NWP in 2015 More TCs genesis in 1st half year (9) than average (4.6) More easterly TCs Longer life cycle Higher landing intensity Monthly TC genesis over NWP The impacts of tropical cyclone on Members: Affect directly (Landfall) un-directly China 6 2 DPR Korea 1 1 Remark Cambodia Hong Kong, China 73 died, ¥66 billion loss 3 Japan 4 3 Lao PDR 1 1 Macao, China 8 died 3 Malaysia / 6 The Philippine 6 6 ROK / 4 Recordable wind Singapore Thailand 1 USA Viet Nam Rainfall 12% below Record wind broken 2 Water shortages, 110died, $240million Summary of Advances on Key Result Areas Title of item 1 : Enhanced public weather service 2 : Improved the ability of weather now-casting 3 : The communication networks 5 : Capacity Building for Meteorologist KRA Meteorology 1 2 Meteorology Meteorology Training and research 3 4 5 6 7 1) Significant progress (monitoring) Satellite Radar Flight Rocket others ST-12 CMA/Cast system Cambodia China FY-2G/F DPR Korea Hong Kong, China Japan S-band Himawari-8 AIMMS-20 Ship-radiosondes Doppler Lao PDR Macao, China S-band Malaysia The Philippine ROK buoy Singapore Thailand USA Viet Nam C-band HS3 II-8. Estimation of the radius of 15m/s wind speed Regional Cooperation 8th China-Korea Workshop on Tropical Cyclones Regional Cooperation Photos of visit to TMD of the Thailand(upper) and DMH of the Lao PDR(lower) Part II: Implementation status of plans in 2015 2015 4 - POP 9 - AOP AOP1 EF (JMA) POP1 Seasonal prediction (KMA) AOP3 TRAMS (CMA) 3 - PP AOP2 Verification (CMA) PP1 High GRAPES-TCM (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP2 POP3 Forum (CMA) TCRR (CMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP4 AOP8 TAPS (KMA) EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2015 4 - POP 9 - AOP AOP1 EF (JMA) POP1 Seasonal prediction (KMA) AOP3 TRAMS (CMA) 3 - PP AOP2 Verification (CMA) PP1 High GRAPES-TCM (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP2 POP3 Forum (CMA) TCRR (CMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP4 AOP8 TAPS (KMA) EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2015 4 - POP 9 - AOP AOP1 EF (JMA) POP1 Seasonal prediction (KMA) AOP3 TRAMS (CMA) 3 - PP AOP2 Verification (CMA) PP1 High GRAPES-TCM (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP2 POP3 Forum (CMA) TCRR (CMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP4 AOP8 TAPS (KMA) EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2015 4 - POP 9 - AOP AOP1 EF (JMA) POP1 Seasonal prediction (KMA) AOP3 TRAMS (CMA) 3 - PP AOP2 Verification (CMA) PP1 High GRAPES-TCM (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP2 POP3 Forum (CMA) TCRR (CMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP4 AOP8 TAPS (KMA) EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM The implementation status of plans in 2015: I. POPs Transfer (techniques) POP1 (Seasonal prediction) POP4 (TAPS) Communication (information & knowledge) POP2 (Web-based typhoon forum) POP3 (Tropical Cyclone Research and Review) Perennial Operating Projects (POPs) Routine actions ① Transfer (techniques) Development of typhoon seasonal prediction system POP1 KMA • To further develop the techniques of typhoon seasonal prediction • To establish the web-based system to provide the products of typhoon seasonal prediction for TC Members POP4 Continue POP ① Training & transfer (techniques) Transfer of the technology of TAPS POP1 • To train the typhoon forecasters on the use of the TAPS upon Member’s request • To provide follow-on technical assistance Members on the implementation of TAPS KMA POP4 Continue POP to ② Communication (information & knowledge) Web-based typhoon forum POP2 • To run routinely • Upgrade the Forum and opening for scientists and http://www.typhoon.gov.cn/en/bbs operational forecasters upon request. CMA POP3 Continue POP ② Communication (information & knowledge) Tropical Cyclone Research and Review POP2 • To publish the journal quarterly in 2014 • Improvement of the editorial inviting2-3 visiting editors) procedure (includes CMA POP3 Continue POP The implementation status of plans in 2015: WMO demonstration projects II. AOPs AOP1 (NWP-TCEFP), AOP2 (TLFDP), AOP4 (SWFDP-SeA) Experiment (field campaign) AOP8 (EXOTICA) Operational techniques AOP3 (TRAMS), AOP5(Radar), AOP6 (TC-AR3), AOP7 (SS), AOP9(FCST Competency) Annual Operating Projects (AOPs) ① WMO demonstration projects Enhanced use of ensemble forecast AOP1 AOP2 Action in 2015: • To prepare for provision of ensemble TC track guidance of ECMWF, UKMO, NCEP, and JMA through the Numerical Typhoon Prediction Website if necessary NWP data are provided. Progress in 2015 • RSMC Tokyo relaunched the Numerical Typhoon Prediction website in May 2015 and has provided a variety of TC products including ensemble TC track guidance of ECMWF, NCEP and JMA. AOP4 Continue AOP ① WMO demonstration projects Verification of TCs operational forecast (WMO-TLFDP) AOP1 AOP2 • To carry out post-season verification and reliability analyses on the operational forecast of tropical cyclones in Committee session • To provide the real time verification information on track and intensity forecast through WMO-TLFDP website • To further improve the evaluation system for tropical cyclone forecast, with special attention on genesis and ensemble forecast conjunction with WMO-TLFDP (to be included in the TC Fellowship Scheme) • To offer fellowship for training on (b) AOP4 Move POP5 AOP ① WMO demonstration projects Implementing of RFSC in SWFDP for South East Asia AOP1 AOP2 AOP4 Continue • Provide the motion of observed precipitation areas up to 3 hours ahead (1 hour cycle) using Semi-Lagrangian advection scheme in combination with satellite data • Provide tropical cyclone track and intensity and severe weather forecasting charts based on NWP model • Coordinate with WMO-TLFDP and "Web-based Typhoon Forum" project to provide the verification product and add the "Forecast Forum" tool in SWFDP-SeA website • Set up FTP server to share raw data between Vietnam and Access others. at: http://www.swfdp-sea.com.vn/login Or: http://www.swfdp-sea.com.vn/index Username: swfdp-sea Password: RA2 Note: User is encouraged to use Firefox browser AOP ② Experiment (Field campaign) Contribution for “EXOTICA” AOP10 • To hold the OC meeting for preparing the implementation (field campaign in 2015) of the experiment • To test the field campaign by using aircraft dropsondes, mobile GPS radiosondes and rocket dropsondes • Demonstration research on tropical cyclone intensity change by using target typhoon data from the field campaign (to be included in the TC Fellowship Scheme) Eye MSLP Continue AOP ③ Operational techniques Improvement of South China Sea typhoon forecast (TRAMS) AOP3 AOP5 • Further improvement of TRAMS model and products • Provide TRAMS-9km products relate to typhoon assess through website AOP6 AOP7 AOP9 Continue AOP ③ Operational techniques Development of regional radar network AOP3 • Application of JMA's quality management technique using statistical method to each of the TMD radar • Development of source codes of radar data calibration for QPE by TMD with technical assistance of JMA • Submission of a progress report by TMD. On receipt of the report, holding a technical meeting at JMA or TMD to follow up with the progress and to identify a way forward AOP5 AOP6 AOP7 AOP9 Continue AOP ③ Operational techniques Assessment report on the impact of climate change on tropical cyclone in TC region (TC-AR3) AOP3 • Accumulate findings from CMIP5 results and Event Attribution (EA) studies AOP5 • Summarize and assess related research results emerged • Collect data of progress of work • Make a draft of outline AOP6 AOP7 AOP9 Continue TC-AR3 Typhoon Committee (Tropical Cyclone Climate Change) Assessment Report (3rd) AOP ③ Operational techniques Storm surge watch scheme AOP3 • To provide storm surge time series forecasts at more than one point if so requested by Members. • To prepare for provision of multiple scenarios of storm surge forecasts to TC Members. • To conduct verification of time series forecasts if tidal data during past storm surge events are provided by Members. AOP5 AOP6 AOP7 AOP9 Continue AOP ③ Operational techniques Development of tropical cyclone forecasting competency AOP3 • To develop an outline of tropical cyclone forecasting competency AOP5 AOP6 AOP7 AOP9 Continue AOP The significant progress of WGM in 2015: III. PP Analysis…… PP2 (Intensity analysis) PP3 (Available data) Modeling…… PP1 (G-TCM) Preliminary Projects (PPs) ① Analysis…… Harmonization of TCs intensity analysis PP2 • Continue cyclone by cyclone comparison analysis of CI numbers. • Identify reasons for CI number differences between CMA, HKO, JTWC, and RSMC Tokyo. PP3 Continue PP ① Analysis…… Available data used in operational tropical cyclone analysis PP2 • To investigate the available data in TC region • To assess the quality of the available data and try to develop the techniques to use them in operational tropical cyclone (intensity and track) analysis. PP3 Continue PP ② Modeling…… High resolution tropical cyclone model (G-TCM) PP1 • Coordinate with WMO-TLFDP, comparison of (semi-) operational typhoon model (HWRF and GRAPES-TCM) • Practicability and pilot study on the high resolution (≤ 3km) typhoon model development. Continue PP Implementation status of plans in 2015 POP1 √ POP2 (Seasonal prediction) AOP1 AOP5 √ POP4 (TCRR) √ AOP3 (Verification) √ AOP6 (Radar network) AOP9 (Typhoon forum) √ AOP2 (Ensemble Forecast) √ POP3 (TAPS) √ AOP4 (TRAMS) √ AOP7 (3rd AR-TC) √ AOP8 (SS watch scheme) (EXOTICA) √ (H-TCM) √ PP2 √ (TC intensity analysis) PP3 (Available data use) √ (SWFDP-As) (Competency) PP1 √ √ √ Part III: Proposed plans and budget of 2016 • Some activities (AOP) will be carried out repeatedly in the following years • Some projects of which preliminary studies needed to be undertaken Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) 2016 5 - POP 8 - AOP POP1 AOP1 Seasonal prediction (KMA) POP2 EF (JMA) AOP3 Forum (CMA) TRAMS (CMA) 2 - PP AOP2 × Verification (CMA) PP1 High GRAPES-TCM (CMA) AOP4 SWFDP-As (Viet Nam) × AOP5 POP3 TCRR (CMA) POP4 TAPS (KMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP5 Verification (CMA) AOP8 EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2016 5 - POP 8 - AOP POP1 2 - PP AOP1 Seasonal prediction (KMA) POP2 EF (JMA) AOP3 Forum (CMA) TRAMS (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP3 TCRR (CMA) POP4 TAPS (KMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP5 Verification (CMA) AOP8 EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2016 5 - POP 8 - AOP POP1 2 - PP AOP1 Seasonal prediction (KMA) POP2 EF (JMA) AOP3 Forum (CMA) TRAMS (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP3 TCRR (CMA) POP4 TAPS (KMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP5 Verification (CMA) AOP8 EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2016 5 - POP 8 - AOP POP1 2 - PP AOP1 Seasonal prediction (KMA) POP2 EF (JMA) AOP3 Forum (CMA) TRAMS (CMA) AOP4 SWFDP-As (Viet Nam) AOP5 POP3 TCRR (CMA) POP4 TAPS (KMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP5 Verification (CMA) AOP8 EXOTICA (CMA) AOP7 PP2 TC Intensity analysis (JMA) SS watch (JMA) AOP9 Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) PP3 Available data use (CMA) WGM 2016 5 - POP 8 - AOP POP1 2 - PP AOP1 Seasonal prediction (KMA) POP2 EF (JMA) AOP3 Forum (CMA) TRAMS (CMA) PP2 AOP4 SWFDP-As (Viet Nam) TC Intensity analysis (JMA) AOP5 POP3 TCRR (CMA) POP4 TAPS (KMA) Radar network (TMD) AOP6 TC-AR3 (Macao) POP5 Verification (CMA) AOP8 EXOTICA (CMA) AOP7 SS watch (JMA) AOP9 PP3 Available data use (CMA) Competency (RSMC) Perennial operating (or routine actions) projects (POPs) Annual operating projects (AOPs) Preliminary Projects (PPs) WGM 2016 Proposal plans ( 5POPs, 8 AOPs and 2 PPs) budget …… Plan Budget ($) Remark POP3: TCRR 5,000 Visiting editor (2) POP4: TAPS 5,000 Training (2p, 2w) POP5: Verification 3,000 AOP5: Radar network 4,000 (subtotal) 17,000 Special funding request POP3: TCRR 5,000 Editor board meeting AOP8: EXOTICCA 5,000 OC meeting (workshop) 11th IWS 10,000 11,000 10,000 total 37,000 Part IV: Summary & Recommendation Summary Members Report (Mete. component) Members made significant progress in tropical cyclone monitoring & forecast technical and the implementation of TC Strategic Plan during 2015 Action plans (4POPs + 9AOPs + 3PPs) WGM has successfully completed the tasks in 2015 Recommendation To endorse the proposed WGM plans in 2016 and the budget at the 48th Session Proposed plans ( 5POPs + 8 AOPs + 2PPs) Budget: $37,000 ($27,000 for 15plans + $10,000 for IWS) To encourage TC Members: To request WGM: To enhance the cooperation by the cross-cutting project (SSOP-II, EXOTICA, ……) & as participating Member To carry out post-season verification report on the operational forecast of tropical cyclones in Committee region in 48th Session To request the focal points & AOPs coordinators: To submit research paper to TCRR (fellowship visitor) Call for paper……Members & WGs http://tcrr.typhoon.gov.cn Thank you for your attention!