Detroit Metropolitan Airport Reconstruction of Runway 4L/22R
Transcription
Detroit Metropolitan Airport Reconstruction of Runway 4L/22R
Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Wayne County Airport Authority Detroit Metropolitan Airport Contractor Outreach for the Reconstruction of Runway 4L/22R Public Open House Marriott 30653 Flynn Drive Romulus, Michigan March 31, 2015 Agenda WCAA Procurement Overview SBE Program DBE Program Prevailing Wage Policy Runway 4L/22R Program Sustainability Other Construction Bid Opportunities Comments and Questions WCAA Procurement Overview Register on the Michigan Inter-Governmental Trade Network (MITN) at www.MITN.info Pre-Solicitation Information and Questions Pre-Solicitation Meeting Modifications /Addenda Response to Solicitation Exceptions Cancellation/Rejection Bid Signatures No Responses (No Bid) SBE Program Business Headquarters – Air Trade Area (ATA) Genesee Macomb Washtenaw Lapeer Monroe Wayne Lenawee Oakland Livingston St. Clair 3-Year Average Gross Receipts Federal Small Business Administration (SBA) Size Standards Business Period of Operation At least 1 year More info on the SBE Program at: http://www.wcaa.us/Business/SBEProgram.aspx Disadvantaged Business Enterprise (DBE) Program Disadvantaged Business Enterprise (DBE) WCAA is a recipient of USDOT federal funds. As such WCAA is required to have and monitor a DBE Program wherein percentage goals are set to “level the playing field” so that certain ethnic and women business owners, that are presumptively economically or socially disadvantaged, can participate on contracts. Michigan Unified Certification Program (MUCP) a. Must be certified with Michigan Certifying Agency: Detroit Department of Transportation (DDOT); Michigan Department of Transportation (MDOT); or Wayne County Human Relations. b. The MUCP directory is a list of Michigan-certified DBE and ACDBE firms and is available at www.michigan.gov/mucp Disadvantaged Business Enterprise (DBE) Program Requirements for DBE Participation a. Genuine Participation b. No Pass-Through c. Must meet the standard of a “Commercially Useful Function” How Participation Can Be Achieved a. b. c. d. e. f. Contractor Subcontractor Supplier Trucker Joint Venture Mentor-Protégé Program Good Faith Efforts- Adequate documentation that supports a DBE commitment is lower than the DBE goal despite efforts otherwise WCAA Prevailing Wage Policy & Davis-Bacon Act WCAA Prevailing Wage Policy/Davis-Bacon Act (DBA) Requirements Non-Federally Funded Construction Projects valued over $50,000 Require WCAA Prevailing Wage Policy Compliance Federally Funded Construction Projects valued over $2,000 Require DBA Prevailing Wage Compliance Applies to non-salaried Skilled Trades only General Decision for Prevailing Wage/Fringe values Submit Certified Payrolls weekly for compliance review Wage Rate Interviews conducted to verify compliance Airfield Overview Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Overall Project Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Overall Project Detroit Metropolitan Airport Reconstruction of Runway 4L/22R 460,000 SY of 17” thick Portland Cement Concrete Demolition 217,230 CY of New PCC Pavement 462,000 SY of Bituminous Concrete Milling 223,500 SY of Bituminous Shoulder Demolition 145,000 Tons of New Bituminous Concrete Pavement 15,000 LFof New AOA Chain Link Security Fence 1,008 New LED Lights 59 Miles of Airfield Lighting Cable 141,700 CY of Earthwork 89 Acres of Topsoiling / Seeding 155,000 SF of Painted Pavement Markings 135,300 LF of New Underdrain Pipe Overall Project Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Three Construction Bid Packages 2015 – Temporary AOA Fence (Non-Federally Funded) 2016 – Large Scale Paving Project (Federally Funded) 2017 – Smaller Scale Paving Project (Funding Source TBD) Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Fence Project - 2015 NEW ACCESS GATE NEW ACCESS GATE NEW SECURITY FENCE Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Large Paving- 2016 ASPHALT SHOULDER RECONSTRUCTION PCC PAVEMENT REPLACEMENT Large Paving- 2016 Detroit Metropolitan Airport Reconstruction of Runway 4L/22R UNDERDRAIN IMPROVEMENTS Large Paving- 2016 SAFETY AREA GRADING Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Small Paving- 2017 ASPHALT SHOULDER RECONSTRUCTION Detroit Metropolitan Airport Reconstruction of Runway 4L/22R PCC PAVEMENT REPLACEMENT Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Small Paving- 2017 UNDERDRAIN IMPROVEMENTS SAFETY AREA GRADING Airfield Electrical Improvements NEW GUIDANCE SIGNS NEW TAXIWAY CENTERLINE AND EDGE LIGHTS Detroit Metropolitan Airport Reconstruction of Runway 4L/22R NEW RUNWAY CENTERLINE AND EDGE LIGHTS RUNWAY GUARD LIGHTS, TOUCHDOWN ZONE LIGHTS Existing Pavement Section 17” PCC 9” BITUMINOUS BASE 18” CRUSHED AGGREGATE BASE Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Existing Pavement Section Detroit Metropolitan Airport Reconstruction of Runway 4L/22R 17” PCC 9” BITUMINOUS BASE 18” CRUSHED AGGREGATE BASE 5-10” ASPHALT SHOULDER 9” AGGREGATE BASE Pavement Demolition Detroit Metropolitan Airport Reconstruction of Runway 4L/22R REMOVE 17” PCC 3” MILL BITUMINOUS BASE FULL DEPTH SHOULDER REMOVAL AND EXCAVATION Proposed Pavement Section Detroit Metropolitan Airport Reconstruction of Runway 4L/22R UNDERDRAIN IMPROVEMENTS NEW 5” ASPHALT SHOULDER NEW 9” AGGREGATE BASE Proposed Pavement Section Detroit Metropolitan Airport Reconstruction of Runway 4L/22R NEW 17” PCC NEW 3” BITUMINOUS BASE OVERLAY UNDERDRAIN IMPROVEMENTS NEW 5” ASPHALT SHOULDER NEW 9” AGGREGATE BASE Summary Portland Cement Concrete Demolition New PCC Pavement Bituminous Concrete Milling / Demolition New Bituminous Concrete Pavement New AOA Chain Link Security Fence New LED Lights Earthwork Underdrain Airfield Pavement Markings 2015 – Fence (AOA) 2016 – Large Paving (non-AOA) 2017 – Smaller Paving (AOA) Detroit Metropolitan Airport Reconstruction of Runway 4L/22R Commitment to Sustainability Detroit Metropolitan Airport Reconstruction of Runway 4L/22R • Sustainability Management Plan implementation • Potential Runway 4L/22R Initiatives: LED Lighting Stormwater reuse Encourage Landfill Diversion Potential Public Involvement OVERALL 2015 CONSTRUCTION PROJECTS MAP Other Construction Bid Opportunities Airfield Airfield Pavement Rehabilitation Roadways, Bridges, Infrastructure 2015 Roadway Improvement Program 2015 Bridge Improvement Program East Service Drive Utility/Roadway Improvements Delta Hangar Parking Lot Rehabilitation Green Lot Parking Lot Rehabilitation Select Big Blue Deck Surface Parking Lot Rehab Other Construction Bid Opportunities Facilities Parking Deck Improvements Fueling Facility and Fuel Management System at DTW and YIP Public Safety Magazine Storage Canopy McNamara Garage Parallel Walkway Building Demolitions (Berry Terminal, Bldg’s 715, 358, 466, 355) New Airport Administration Building Terminals Checkpoint Podium North Terminal Curbside Improvements and Roof Ladders Thank You Comments and Questions