ANADARKO PETROLEUM CORPORATIOn
Transcription
ANADARKO PETROLEUM CORPORATIOn
ANADARKO PETROLEUM CORPORATIOn ANADARKO PETROLEUM CORPORATION Lucius – Lighting the Way to a bright future •Dec. 10, 2009 Discovery •Jan. 27, 2010 Successful Appraisal well •May 28, 2011 Successful Flow Test Confirmed Deliverability •Dec. 15, 2011 Project Sanction •July 2, 2012 signed Carried-Interest Agreement •May 26, 2013 80,000 BOPD Spar Arrives in the gulf of mexico •Jan 16, 2015 First Production At work or away from the job site, Anadarko’s Gulf of Mexico operations team views safety as a top priority. Anadarko employees and contractors promote a culture of safety by following the LiveSAFE program. LUCIUS PROJECT HIGHLIGHTS • 300+ MMBOE resource • World-class reservoir quality and deliverability • Anchor project in active area • established $2.8 billion of market value KEATHLEY CANYON 875 • ~3 Years from sanction to first oil –2– WWW.ANADARKO.COM LIVING QUARTERS TOPSIDES history of the LUCIUS NAME Lucius means “Light” in Latin, and the field was named after an Heir to the Roman throne. MAIN DECK PRODUCTION DECK CELLAR DECK SUB CELLAR DECK CHAIN JACKS SPAR CHAIN HARD TANK LUCIUS TRUSS SPAR LARGEST SPAR BUILT TO DATE BY ANADARKO STRAKE MOORING FAIRLEAD 80,000 bopd 450 mmcf/d MOORING LINE spar diameter 110 feet HEAVE PLATE spar length 605 feet TRUSS SECTION hull weight 23,000 tons water depth 7,100 feet OIL & GAS EXPORT LINES –3– KEEL TANK SPAR HULL CAPACITY ANADARKO PETROLEUM CORPORATION SUBSEA ARCHITECTURE KEATHLEY CANYON 875 PLEM PR#2 1 KC 919 WELL #3 6 KC 919 WELL #4 PLEM PR#3 5 PLEM PR #4 7 EXPORT KC 875 WELL #1 2 1 FLOWLINE 5 7 KC 875 WEST MANIFOLD 3 6 UMBILICALS 4 2 3 KC 875 EAST MANIFOLD 4 6 LUCIUS PARTNERS • Anadarko*23.828% Subsea Tieback Anadarko WI Block Oil Field Subsea Tieback • Freeport 25.123% • ExxonMobil23.295% • Petrobras • INPEX 11.500% 7.753% • Eni8.500% *Operator –4– WWW.ANADARKO.COM hull construction PORI, FINLAND –5– ANADARKO PETROLEUM CORPORATION Voyage from finland to texas APRIL 30, 2013 TO MAY 26, 2013 MIGHTY SERVANT I OFF LOAD IN INGLESIDE, TX –6– WWW.ANADARKO.COM ROUTE FROM PORI, FINLAND TO INGLESIDE, TEXAS Pori April 30, 2013 Ingleside May 26, 2013 –7– ANADARKO PETROLEUM CORPORATION suction anchor installation APRIL 2013 –8– WWW.ANADARKO.COM BALDER –9– ANADARKO PETROLEUM CORPORATION deep water INSTALLATION VESSELS TOPSIDE HULL SUCTION PILES AT SEA BOTTOM 20" GAS EXPORT INSTALLATION MOOR LINES CH EXPORT PIPELINE CASTORONE BUILT IN HOUSTON, TX TOPSIDE INSTALLATION FLOWLINES JUMPER SUBSEA TREE MANIF THIALF MANIFOLD JUMPER INSTALLATION EXPORT RISER FABRICATION AND REELING IRON HORSE DEEP BLUE – 10 – WWW.ANADARKO.COM HULL AND MOORING INSTALLATION MOORING COMMISSIONING BALDER ORION RING HAIN UMBILICAL LINE BUILT IN PORT OF W. ST. MARY, LA BUILT IN PORTUGAL BUILT IN SPAIN SUCTION PILE POLYESTER MOORING ROPES MOORING CHAIN UMBILICAL INSTALLATION SUBSEA TREE FOLD DEEP ENERGY 18" OIL EXPORT PIPELINE INSTALLATION RISERS AND FLOWLINES INSTALLATION SOLITAIRE AEGIR – 11 – ANADARKO PETROLEUM CORPORATION topsides 5 FLARE 4 EAST COMPRESSOR MODULE BUILT IN ORANGE, TX 6 NORTH STAIR TOWER 7 WEST COMPRESSOR MODULE LIVING QUARTERS BUILT IN HOUMA, LA WEST CRANE 8 WEST STAIR TOWER 9 COMPRESSOR MODULE NOTE: NUMBERS DO NOT REPRESENT THE ORDER OF INSTALLATION LIFTS HEAVY LIFT VESSEL ACCOMMODATION VESSEL THIALF EDDA FIDES ~350 PEOPLE REQUIRED FOR HOOK-UP & COMMISSIONING – 12 – WWW.ANADARKO.COM BUILT IN INGLESIDE, TX 9 INSTALLATION LIFTS MAIN MODULE DECK STRUCTURE 3 LIVING QUARTERS MOTOR CONTROL CENTER LIFT ONTO PRODUCTION DECK MAIN MODULE DECK STRUCTURE TEMPORARY WORK DECK SUB CELLAR MODULE } 1 2 TEMPORARY WORK DECK SUB CELLAR MODULE STAIR TOWER FABRICATION – 13 – ANADARKO PETROLEUM CORPORATION lucius oil export 18" OIL EXPORT PIPELINE AUDACIA INSTALLING OIL EXPORT PLET IN KEATHLEY CANYON 831 – 14 – WWW.ANADARKO.COM OIL EXPORT INSTALLATIONS • 100 miles of new pipeline installed • ~50 miles of existing pipeline reused (Retired Red Hawk Export Line) • South Marsh Island (SMI) - 205 Platform Additions to Increase Capacity LOUISIANA TEXAS TO ST. JAMES TO CLOVELLY GALVESTON PORT FOURCHON SOUTH MARSH ISLAND 205 PLATFORM GARDEN BANKS GREEN CANYON KEATHLEY CANYON WALKER RIDGE KC 875 – 15 – ANADARKO PETROLEUM CORPORATION lucius gas export 20" GAS EXPORT PIPELINE CASTORONE BERTHED AT GALVESTON – 16 – WWW.ANADARKO.COM GAS EXPORT INSTALLATIONS • 230 miles of pipeline to be installed LOUISIANA TEXAS LAROSE GAS PROCESSING PLANT GALVESTON PORT FOURCHON SOUTH TIMBALIER 283 JUNCTION PLATFORM GARDEN BANKS GREEN CANYON KEATHLEY CANYON WALKER RIDGE KC 875 – 17 – ANADARKO PETROLEUM CORPORATION LUCIUS: PATH TO FIRST OIL • 18" OIL EXPORT LINE INSTALLATION • HULL SAIL-AWAY TO GULF OF MEXICO • INSTALL HULL, FLOW LINES, RISERS, UMBILICALS • LOAD-OUT AND INSTALL TOPSIDES • HOOK-UP AND COMMISSIONING • CONCLUDE INITIAL DRILLING AND COMPLETIONS JANUARY 2015 • ACHIEVED FIRST OIL – 18 – DEVELOPMENT DRILLING AND WELL COMPLETIONS 2012 - 2014 WWW.ANADARKO.COM design one, build two. LUCIUS: 80,000 BOPD HEIDELBERG: 80,000 BOPD FIRST OIL 2015 FIRST OIL 2016 – 19 – 1201 LAKE ROBBINS DRIVE | THE WOODLANDS, TEXAS 77380 1.832.636.1000 | WWW.ANADARKO.COM | NYSE: APC FOLLOW US ON WWW.YOUTUBE.COM/ANADARKOTV LIKE US ON WWW.FACEBOOK/ANADARKOPETROLEUMCORPORATION REGARDING FORWARD-LOOKING STATEMENTS AND OTHER MATTERS This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Anadarko believes that its expectations are based on reasonable assumptions. No assurance, however, can be given that such expectations will prove to have been correct. A number of factors could cause actual results to differ materially from the projections, anticipated results or other expectations expressed in this presentation, including Anadarko’s ability to meet financial and operating guidance; to achieve its production targets, successfully manage its capital expenditures and complete, test and commercially operate the wells and prospects identified in this presentation; and to achieve its production and budget expectations on its mega projects. See “Risk Factors” in the company’s 2012 Annual Report on Form 10-K, Quarterly Reports on Form 10-Q and other public filings and press releases. Anadarko undertakes no obligation to publicly update or revise any forward-looking statements. Cautionary Note to U.S. Investors: The United States Securities and Exchange Commission (“SEC”) permits oil and gas companies, in their filings with the SEC, to disclose only proved, probable and possible reserves that meet the SEC’s definitions for such terms. Anadarko uses certain terms in this news release, such as “resources,” and similar terms that the SEC’s guidelines strictly prohibit Anadarko from including in filings with the SEC. U.S. investors are urged to consider closely the disclosure in Anadarko’s Form 10-K for the year ended Dec. 31, 2012, File No. 001-08968, available from Anadarko at www.anadarko.com or by writing Anadarko at: Anadarko Petroleum Corporation, 1201 Lake Robbins Drive, The Woodlands, Texas 77380, Attn: Investor Relations. This form may also be obtained by contacting the SEC at 1-800-SEC-0330.