ANADARKO PETROLEUM CORPORATIOn

Transcription

ANADARKO PETROLEUM CORPORATIOn
ANADARKO PETROLEUM CORPORATIOn
ANADARKO PETROLEUM CORPORATION
Lucius – Lighting the Way to a bright future
•Dec. 10, 2009
Discovery
•Jan. 27, 2010
Successful Appraisal well
•May 28, 2011
Successful Flow Test Confirmed Deliverability
•Dec. 15, 2011
Project Sanction
•July 2, 2012
signed Carried-Interest Agreement
•May 26, 2013
80,000 BOPD Spar Arrives in the gulf of mexico
•Jan 16, 2015
First Production
At work or away from the job
site, Anadarko’s Gulf of Mexico
operations team views safety
as a top priority. Anadarko
employees and contractors
promote a culture of safety by
following the LiveSAFE program.
LUCIUS PROJECT
HIGHLIGHTS
• 300+ MMBOE resource
• World-class reservoir quality and deliverability
• Anchor project in active area
• established $2.8 billion of market value
KEATHLEY CANYON 875
• ~3 Years from sanction to first oil
–2–
WWW.ANADARKO.COM
LIVING QUARTERS
TOPSIDES
history of the LUCIUS NAME
Lucius means “Light” in Latin,
and the field was named after
an Heir to the Roman throne.
MAIN DECK
PRODUCTION DECK
CELLAR DECK
SUB CELLAR DECK
CHAIN JACKS
SPAR CHAIN
HARD TANK
LUCIUS
TRUSS
SPAR
LARGEST SPAR BUILT TO DATE BY ANADARKO
STRAKE
MOORING
FAIRLEAD
80,000 bopd
450 mmcf/d
MOORING
LINE
spar diameter
110 feet
HEAVE
PLATE
spar length
605 feet
TRUSS
SECTION
hull weight
23,000 tons
water depth
7,100 feet
OIL & GAS
EXPORT LINES
–3–
KEEL TANK
SPAR HULL
CAPACITY
ANADARKO PETROLEUM CORPORATION
SUBSEA ARCHITECTURE
KEATHLEY CANYON 875
PLEM PR#2 1
KC 919 WELL #3 6
KC 919 WELL #4
PLEM PR#3 5
PLEM PR #4 7
EXPORT
KC 875 WELL #1 2
1
FLOWLINE
5
7
KC 875 WEST MANIFOLD 3
6
UMBILICALS
4
2
3
KC 875 EAST MANIFOLD 4
6
LUCIUS PARTNERS
• Anadarko*23.828%
Subsea
Tieback
Anadarko
WI Block
Oil Field
Subsea Tieback
• Freeport 25.123%
• ExxonMobil23.295%
• Petrobras
• INPEX
11.500%
7.753%
• Eni8.500%
*Operator
–4–
WWW.ANADARKO.COM
hull construction
PORI, FINLAND
–5–
ANADARKO PETROLEUM CORPORATION
Voyage from finland to texas
APRIL 30, 2013 TO MAY 26, 2013
MIGHTY SERVANT I OFF LOAD IN INGLESIDE, TX
–6–
WWW.ANADARKO.COM
ROUTE FROM PORI, FINLAND TO INGLESIDE, TEXAS
Pori
April 30, 2013
Ingleside
May 26, 2013
–7–
ANADARKO PETROLEUM CORPORATION
suction anchor installation
APRIL 2013
–8–
WWW.ANADARKO.COM
BALDER
–9–
ANADARKO PETROLEUM CORPORATION
deep water INSTALLATION VESSELS
TOPSIDE
HULL
SUCTION PILES
AT SEA BOTTOM
20" GAS EXPORT INSTALLATION
MOOR
LINES
CH
EXPORT PIPELINE
CASTORONE
BUILT IN HOUSTON, TX
TOPSIDE INSTALLATION
FLOWLINES
JUMPER
SUBSEA TREE
MANIF
THIALF
MANIFOLD
JUMPER INSTALLATION
EXPORT RISER FABRICATION AND REELING
IRON HORSE
DEEP BLUE
– 10 –
WWW.ANADARKO.COM
HULL AND MOORING INSTALLATION
MOORING COMMISSIONING
BALDER
ORION
RING
HAIN
UMBILICAL
LINE
BUILT IN PORT OF W. ST. MARY, LA
BUILT IN PORTUGAL
BUILT IN SPAIN
SUCTION PILE
POLYESTER MOORING ROPES
MOORING CHAIN
UMBILICAL INSTALLATION
SUBSEA TREE
FOLD
DEEP ENERGY
18" OIL EXPORT PIPELINE INSTALLATION
RISERS AND FLOWLINES INSTALLATION
SOLITAIRE
AEGIR
– 11 –
ANADARKO PETROLEUM CORPORATION
topsides
5
FLARE
4
EAST
COMPRESSOR
MODULE
BUILT IN ORANGE, TX
6
NORTH
STAIR TOWER
7
WEST
COMPRESSOR
MODULE
LIVING QUARTERS
BUILT IN HOUMA, LA
WEST CRANE
8
WEST
STAIR TOWER
9
COMPRESSOR MODULE
NOTE: NUMBERS DO NOT REPRESENT
THE ORDER OF INSTALLATION LIFTS
HEAVY LIFT VESSEL
ACCOMMODATION VESSEL
THIALF
EDDA FIDES
~350 PEOPLE REQUIRED FOR HOOK-UP & COMMISSIONING
– 12 –
WWW.ANADARKO.COM
BUILT IN INGLESIDE, TX
9 INSTALLATION LIFTS
MAIN MODULE DECK STRUCTURE
3
LIVING QUARTERS
MOTOR CONTROL CENTER LIFT ONTO
PRODUCTION DECK
MAIN MODULE
DECK STRUCTURE
TEMPORARY
WORK DECK
SUB CELLAR
MODULE
}
1
2
TEMPORARY WORK DECK
SUB CELLAR MODULE
STAIR TOWER FABRICATION
– 13 –
ANADARKO PETROLEUM CORPORATION
lucius oil export
18" OIL EXPORT PIPELINE
AUDACIA INSTALLING OIL EXPORT PLET IN KEATHLEY CANYON 831
– 14 –
WWW.ANADARKO.COM
OIL EXPORT INSTALLATIONS
• 100 miles of new pipeline installed
• ~50 miles of existing pipeline reused (Retired Red Hawk Export Line)
• South Marsh Island (SMI) - 205 Platform Additions to Increase Capacity
LOUISIANA
TEXAS
TO ST. JAMES
TO CLOVELLY
GALVESTON
PORT FOURCHON
SOUTH MARSH ISLAND 205
PLATFORM
GARDEN BANKS
GREEN CANYON
KEATHLEY CANYON
WALKER RIDGE
KC 875
– 15 –
ANADARKO PETROLEUM CORPORATION
lucius gas export
20" GAS EXPORT PIPELINE
CASTORONE BERTHED AT GALVESTON
– 16 –
WWW.ANADARKO.COM
GAS EXPORT INSTALLATIONS
• 230 miles of pipeline to be installed
LOUISIANA
TEXAS
LAROSE GAS
PROCESSING PLANT
GALVESTON
PORT FOURCHON
SOUTH TIMBALIER 283
JUNCTION PLATFORM
GARDEN BANKS
GREEN CANYON
KEATHLEY CANYON
WALKER RIDGE
KC 875
– 17 –
ANADARKO PETROLEUM CORPORATION
LUCIUS: PATH TO FIRST OIL
• 18" OIL EXPORT LINE INSTALLATION
• HULL SAIL-AWAY TO GULF OF MEXICO
• INSTALL HULL, FLOW LINES, RISERS, UMBILICALS
• LOAD-OUT AND INSTALL TOPSIDES
• HOOK-UP AND COMMISSIONING
• CONCLUDE INITIAL DRILLING AND COMPLETIONS
JANUARY 2015
• ACHIEVED FIRST OIL
– 18 –
DEVELOPMENT DRILLING AND
WELL COMPLETIONS
2012 - 2014
WWW.ANADARKO.COM
design one, build two.
LUCIUS:
80,000 BOPD
HEIDELBERG:
80,000 BOPD
FIRST OIL 2015
FIRST OIL 2016
– 19 –
1201 LAKE ROBBINS DRIVE | THE WOODLANDS, TEXAS 77380
1.832.636.1000 | WWW.ANADARKO.COM | NYSE: APC
FOLLOW US ON WWW.YOUTUBE.COM/ANADARKOTV
LIKE US ON WWW.FACEBOOK/ANADARKOPETROLEUMCORPORATION
REGARDING FORWARD-LOOKING STATEMENTS AND OTHER MATTERS
This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange
Act of 1934. Anadarko believes that its expectations are based on reasonable assumptions. No assurance, however, can be given that such expectations will prove
to have been correct. A number of factors could cause actual results to differ materially from the projections, anticipated results or other expectations expressed
in this presentation, including Anadarko’s ability to meet financial and operating guidance; to achieve its production targets, successfully manage its capital
expenditures and complete, test and commercially operate the wells and prospects identified in this presentation; and to achieve its production and budget
expectations on its mega projects. See “Risk Factors” in the company’s 2012 Annual Report on Form 10-K, Quarterly Reports on Form 10-Q and other public filings
and press releases. Anadarko undertakes no obligation to publicly update or revise any forward-looking statements.
Cautionary Note to U.S. Investors: The United States Securities and Exchange Commission (“SEC”) permits oil and gas companies, in their filings with the SEC,
to disclose only proved, probable and possible reserves that meet the SEC’s definitions for such terms. Anadarko uses certain terms in this news release, such
as “resources,” and similar terms that the SEC’s guidelines strictly prohibit Anadarko from including in filings with the SEC. U.S. investors are urged to consider
closely the disclosure in Anadarko’s Form 10-K for the year ended Dec. 31, 2012, File No. 001-08968, available from Anadarko at www.anadarko.com or by writing
Anadarko at: Anadarko Petroleum Corporation, 1201 Lake Robbins Drive, The Woodlands, Texas 77380, Attn: Investor Relations. This form may also be obtained
by contacting the SEC at 1-800-SEC-0330.