General Presentation
Transcription
General Presentation
General Presentation April 2015 KCA Deutag is a leading international drilling and engineering company working onshore and offshore with a focus on . safety, quality and operational performance www.kcadeutag.com KCA Deutag – Contents of our presentation 1 Global Operations 2 Corporate Overview 3 HSE + Operational Performance 4 Our Rigs in Europe and Kazakhstan 5 Others 6 Summary 1 1 www.kcadeutag.com Global Operations KCA Deutag Vision & Business Overview To be recognised as the world’s most successful drilling and engineering contractor through measurable performance improvement, delivering safe, effective, trouble-free operations • • • • • • • 3 2014 group turnover above US$2 billion More than 9,300 staff in 21 countries Onshore fleet of 60 rigs 41 offshore platform drilling contracts Owner and operator of 2 jack-ups Engineering division of 900+ drilling facilities design professionals (RDS) Leading land rig builder and equipment manufacturer (Bentec) Onshore and Offshore Locations UK Norway 16 Platforms 10 Platforms 2 O&M JUs Germany Netherlands Azerbaijan 7 Platforms Kazakhstan 5 Land Rigs 2 Land Rigs 1 Land Rig Russia Canada 17 Land Rigs 1 Platform Sakhalin 3 Platforms Pakistan Libya 2 Land Rigs 1 Land Rig Mexico Algeria JU Ben Loyal Myanmar 7 Land Rigs 1 Platform Nigeria 6 Land Rigs Gabon 1 Land Rig Angola 3 Platforms JU Ben Rinnes Onshore - existing operations and rigs under construction 4 Offshore - existing operations and rigs under construction Oman Brunei 11 Land Rigs 2 Land Rigs Iraq UAE 4 Land Rigs 1 Land Rig RDS – a rig design engineering specialist RDS core business is to deliver a comprehensive engineering service at every stage in the design, construction or modification of drilling facilities Conceptual Engineering and Consultancy Engineering Design for new-builds Rig Reactivation and Modification Construction and Commissioning Support Technical Integrity Assurance CONCEPT • FEED • DETAIL DESIGN CONSTRUCTION & COMMISSIONING SUPPORT 5 Bentec – Manufacture of Drilling Rigs & Equipment • Design and construction of onshore rigs • Manufacture of major drilling equipment (drawworks, mud pumps, top drives) • Manufacture of electrical control systems (e.g. SCR, VFD, drillers control systems, soft torque rotary system, anti-collision system, feed-off control etc.) • Rig upgrades, refurbishments and overhaul of major drilling equipment • Extensive experience of “Arctic“ operating conditions (e.g. Kazakhstan, Siberia) • Manufacturing facilities in Bad Bentheim, Germany, Oman and Tyumen, Russia Bentec facilities in Bad Bentheim, Germany Bentec facilities in Tyumen, Russia, opened Nov 2008 6 Website: www.bentec.com 2 www.kcadeutag.com Corporate Overview 125 years supporting the Drilling Industry globally 1888 1905 1953 Onshore Russia The Beginning Drilled 1st well in Germany 8 1927 1958 Onshore Libya Onshore Yemen 1974 1987 Onshore Western Siberia Offshore North Sea 2001 1997 2003 2013 Onshore Iraq Offshore Sakhalin Offshore Caspian Sea 2011 Offshore Angola Offshore Myanmar KCA Deutag Corporate Structure Onshore (ca.50% of EBITDA) Offshore (ca.50% of EBITDA) Land Drilling Bentec Platform Services RDS MODUs Leading international premium drilling contractor High end fleet of 60 Land Rigs Track record of executing complex wells in harsh environments Design and manufacture of premium Land Rigs and key components Capacity for 12-16 Rigs and 50 Top Drives p.a. Provision of after sales services Leading global platform service operator outside of North America 40 Platform Rigs under management Operations in UK North Sea, Norway, Russia, Azerbaijan, Angola and Myanmar Design and refurbishment of offshore drilling facilities and MODUs Engineering from concept to commission RDS has more than 900 engineers worldwide Owns and operates fleet of 2 Jack-Ups 2014 EBITDA 2014 EBITDA 2014 EBITDA 45% 9 8% 2014 EBITDA 27% 16% 2014 EBITDA 4% KCA Deutag & Bentec (Germany) 10 KCA Deutag yard in Coevorden (NL) 11 3 www.kcadeutag.com HSE + Operational Performance 13 Safety - KCA Deutag Potential Matrix Factor • KCA Deutag has used its potential matrix tool as a guide to possible incident outcomes for 10 years PMF is assigned to every incident no matter the outcome Trending PMFR vs. TRIR lets management know if TRIR performance is fragile PMFR comparison between operations highlights possible need for intervention PMF determines required level of investigation. • • • • Potential consequence Non injury Number of People at Risk 0=A Equip damage to $5k Loss of containment to 1 bbl Gas release up to 0.1kg Smoke 1 2 Up 2-4=C 5-10=D 11+=E A1 B1 C1 D1 E1 10 pts 20 pts 50 pts 100 pts 200 pts A2 B2 C2 D2 E2 50 pts 100 pts 250 pts 500 pts 1,000 pts 1 First aid case (FAC) Medical treatment (MTC) or restricted work 2 case (RWC) to 3 Equip damage to >$500k Loss of containment >50 bbls Gas release >5.0kg Major fire/explosion 14 1=B Potential consequence Injury 4 A3 B3 C3 D3 E3 100 pts 200 pts 500 pts 1,000 pts 2,000 pts D4 E4 A4 B4 C4 500 pts 1,000 pts 2,500 pts 5,000 pts 10,000 pts Lost time injury (LTI) / Hospitalisation up to 3 disabling injury 4 Fatality (FAT) Safety Statistics – KCA Deutag vs. IADC Total Recordable Incident Rate (TRIR) 2,5 Lost Time Injury Rate (LTIR) 0,7 2,26 2,17 0,6 2,05 2 0,6 0,56 0,53 1,82 0,49 0,5 1,5 1,06 1 0,4 1,33 1,23 0,89 1,23 1,05 0,95 0,3 0,91 0,81 0,75 0,7 0,6 0,51 0,59 0,36 0,3 0,25 0,27 0,26 0,23 0,26 0,23 0,23 0,17 0,13 0,35 0 0,1 0,1 0,11 0,1 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 KCA Deutag TRIR and LTIR figures are calculated per 200,000 man-hours 15 0,39 0,2 0,52 0,5 0,37 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 IADC Total Recent Safety Milestones Crew T-47 – 8 years without Lost Time Incident Crew T-700 – 3 years without a recordable incident 16 KCA Deutag – Non-Productive Time Performance (2010-2014) 5 4,68 4,52 4,5 4 3,5 3,07 NPT % 3 2,5 2,86 2,57 2,46 2,35 2,29 2,07 2 2,33 2,13 1,85 1,87 1,69 1,59 1,5 1 0,5 0 2010 2011 MODU 17 2012 Platform 2013 Land 2014 Performance Improvement Process 18 4 www.kcadeutag.com Our Rigs in Europe and Kazakhstan Onshore – Europe & Kazakhstan • Currently operating in the Netherlands and Kazakhstan • Previously worked in: - Albania Austria Belgium Denmark France Germany Greece - Poland Portugal Spain Sweden Switzerland Turkey UK • European new-builds include: Bentec 1,500 HP EuroRigs T-207 and T-208 and the highly automated T-700 rig which started operating in 1Q 2012 for NAM • Market opportunities: Shale Gas (UK, Poland, Ukraine), Geothermal (Netherlands, Germany, France) and conventional oil and gas 20 Major Clients in Europe 21 Working in sensitive areas (1) The Netherlands Noise reduction in urban area Germany – Bavaria (The Alpes) Touristically high influenced region Poland Coastline of the Baltic Sea 22 Working in sensitive areas (2) The Netherlands Minimise noise at source (T-46) Germany Operations at the Wadden Sea 23 Working in Kazakhstan – land drilling, offshore environment KCA Deutag entered the country in 2001 to provide Engineering and Drilling Services for the north west basin of the Caspian shallow waters on behalf of NCOC Scope of work – – – – Engineering of surface infrastructure Provision of heavy arctic drilling rig (T-47) Provision of Accommodation for 120 PoB Operation and management of artificial island Setup – – – 24 Local branch office in Atyrau Operation, maintenance & warehousing on site offshore Logistic hub in Bautino / Aktau Working in remote & harsh environments Platform drilling in Sakhalin Island Rig modifications to drill on a on a manmade Island in Kazakhstan Operating three arctic conditions platforms since 2001 for Shell More than 13 years working on the Kashagan project Onshore drilling in Western Siberia 16 rig operation on rigs design for arctic conditions Offshore Engineering Design for Harsh Environments Conditions Examples of Projects Delivered Projects Ongoing Orlan Drilling facility on gravity based structure (GBS). Conducted FEED and Basic Design (BOD), followed by detailed design. Statoil, CAT-J Engineering and drilling operations personnel at the shipyard Arkutun Dagi In-depth concept study for a large, mechanized drilling rig for arctic conditions. Included review of options for concurrent well intervention Exxon/ Kvaerner GBS to be used for exploratory drilling in Russia Kara Sea Polar Star West Riger Design of ultra deep water, harsh environment semi-submersible with NOV drilling package. (-30 C) Shell Production GBS to be used in Alaska – concept study Hibernia & Hebron Drilling facility on GBS for ExxonMobil. Conducted detail design, procurement, construction management for Hibernia. Conducted FEED and detail design for Hebron Sakhalin Piltun South project Molikpaq upgrade Exxon Barents S Engineering study for drilling facility on gravity based structure Geothermal project in The Netherlands • Project description Drilling a geothermal doublet (LIR-GT-01 + -02) for V.O.F. Geothermie De Lier Target depth: 2,341 m; max. inclination of 40 degree Reservoir pressure: 243 bar; mid aquifer level temperature: 82º C • Commencement / duration 1st well: start: 19.05.2014; end: 30.06.2014 (planned: 37.5 days; actual: 42 days) 2nd well: start: 07.07.2014; end: 05.08.2014 (planned: 36.5 days; actual: 29 days) • Highlights Skidding of T-49 within 21 hrs. (from rig release to spud); planned for 1-2 days Good lessons learned from 1st well to drill 2nd well faster Well LIR-GT-02 was drilled in a 7 days shorter period than planned • Lowlights Rig up took longer than expected due to small location (planned: 9 days; actual: 11 days) Well LIR-GT-01 took 4.5 days longer due to pull out of 9-5/8” casing again (resistance during RIH) 26 5 www.kcadeutag.com Others KCA Deutag – Certificates (1 / 2) 28 KCA Deutag – Certificates (2 / 2) 29 Enhanced Drilling Reporting System (EDRS) • Web-based reporting systems introduced 2004 • Systems provide tools necessary to enhance KCA Deutag operations performance • Operational in more than 90% of KCA Deutag locations • All KCA Deutag operational completed using this system • Ease of input and review by wellsite and base personnel reporting • Data input on a daily basis at rig-site and final report approved at the rig for issue • Flexible query system allows a large range of on-line performance graphs • Raises awareness, e.g. Traffic Light NPT Table. 30 UK Operations - Monthly NPT % BOL BP Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Britannia Andrew Harding NA 0 1.48 1.32 4.22 5.41 0.22 0.15 26.74 0.81 40.54 NA 1.48 1.54 1.96 2.37 0.4 0.54 2.69 0.07 1.45 0 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 9.27 5.26 1.72 3.72 1.18 2.84 3.03 0.04 CNR International Magnus NA NA NA NA NA NA NA NA NA NA NA 9.91 13.35 3.14 2.09 1.39 0.72 0.13 Murchison N.Central NA NA NA NA 9.36 2.25 7.75 0 NA NA NA NA 0 0.87 7.17 3.26 2.95 10.57 18.31 0.66 0.24 0 10.93 1.68 4.73 0.63 14.49 2.53 6.51 1.12 1.33 NA NA NA 0.2 8.48 Exxo N.North N.South Tiffany B.Alp NA 2.21 4.35 6.18 5.99 2.1 NA NA NA NA NA NA NA NA NA NA NA NA 7.5 0.35 0 NA NA NA 0.09 0.74 0.69 0.13 0.13 0.45 0.14 0.35 0 0 0 0 NA 32.11 27.57 4.02 5.67 10.12 4.52 2.74 0.83 1.95 1.7 2.12 6.66 11.81 0.07 0.18 0.21 NA N N N N N N 6 6 17 6 N N N N 0 0 N DART ® - Drilling and Advanced Rig Training Services • Internationally certified drilling operations training • Training on a drilling simulator by experienced instructors allows people to learn without risk to people, equipment or the environment • DART® Services are setting the standards for drilling equipment, operations and well control training • Ability to drill a well in the full size simulator using the actual rig crew highly effective way to reduce unplanned events • Largest DART facilities are in Aberdeen, Russia and Norway; other locations include Oman and Nigeria • Alliance with Robert Gordon University which established a DART facility at the university in order to foster professional and academic drilling operations training established in 2013 31 Personnel – our key asset for success Training scheme – – – – – Safe2Lead Qualification Improvement Programs ACCA (Association for chartered certified Accountant) NEBOSH (National Examination Board in Occupational Safety and Health) IWCF (International Well Control Forum) Developing People – – – – Promotion through training and mentoring Motivation through engagement Loyalty through trust and team building “We do not distinguish between expat and local employees!” Team building – – 32 Company events Celebrating success Personnel • SCC certified • Apprenticeship Technologist) • Toolpushers and Drillers educated at the „German Drilling School“ (1 year full-time course) • Well experienced staff with low turnover • Training Matrix (see on the right) 33 Programme (Mining Competence Assurance • System to ensure all rig based employees are deemed competent • Put together the most important tasks and responsibilities for each role (about 20) • Focus on safety critical elements of each job • Assessment carried out by trained supervisors • Applied in all of KCA Deutag‘s global operations • IADC approval in process 34 5 www.kcadeutag.com Summary What differentiates KCA Deutag? • The KCA Deutag Way HSE: Superior culture and performance, Safe2Lead programme Drilling Performance: Non-Productive Time of 1.9% in 2014 across more than 100 onshore/offshore rigs Corporate Operations Function: Accountability for global operations as per KCAD worldwide standard, policies, procedures and technical integrity Performance Services: Commitment to performance improvement • International Experience: Worked in more than 30 countries in last 10 years • Drilling and Advance Rig Training: Surface equipment and down-hole drilling operations training services worldwide • Drilling Facilities Engineering Design: 900+ professionals, 60+ major drilling facility projects, conceptual studies etc. • Rig Building and Drilling Equipment Manufacturing: Bentec, German engineering for world class drilling equipment 36 Thanks for your attention! Oliver Nuffer Business Development Manager Africa, Europe, Kazakhstan Mobile: Office: Fax: +49 151 589 54 289 +49 5922 72 609 +49 5922 72 333 KCA Deutag Drilling GmbH Deilmannstrasse 1 48455 Bad Bentheim Germany www.kcadeutag.com