PFW Engineering - Presentation
Transcription
PFW Engineering - Presentation
Presentation of PFW Engineering February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 1 PFW Engineering PFW Engineering in a nutshell CUSTOMERS PEOPLE (1st tier; examples) 280 qualified Engineers; 37 CVEs EADS incl. Airbus, Boeing, Lufthansa Technik APPROVALS EXPERIENCE (examples) est. 1995, but covers all experience of the DORNIER company Design Organization (DOA) acc. EASA Part 21J.033 for all ATA chapters CURRENTS PROJECTS Our offer (examples) TOOLS (examples) CATIA, CADAM, ENOVIA, PRIMES, PATRAN, NASTRAN A350XWB, A400M, B767, Do328, B787 to our customer February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 2 PFW Engineering the Company Milestones History – key milestones Nearly 20 years of experience in the aerospace sector 1995 Formation of ‘GCT Garner Inc ' 1998 Formation of ‘GCT Engineering Services Ltd ' 2002 Fairchild Dornier Insolvency 2003 Formation of ‘GCT Projects GmbH’ 2006 Acquisition of Dornier EASA21J and Formation of ‘GCT Design Organisation GmbH' 2006 PFW Acquisition of 20% of GCT Group 2009 PFW Acquisition of 100% of GCT Group 2010 Rename GCT Projects to SG Aerospace GmbH and GCT Garner Inc to PFW GCT Inc Airbus took over 74.9% of the shares of PFW 2012 Formation of ‘PFW Engineering Inc’ in Canada 2013 Rename of all GCT Companies to PFW Engineering February 2014 €M Formation of ‘Garner CAD Technic GmbH' 1997 2011 Key figures 2010/2011/2012 Sales Employees 2010 35.5 307 Sales Employees 2011 33.1 302 Sales Employees 2012 30.3 318 Group Products Certifications 3% Interiors 5% Structures 42% Technical Publications 5% Systems 45% © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 3 Group overview Company structure & link shareholding companies Airbus Operations GmbH Hamburg, Germany 74.9% PFW Aerospace GmbH Speyer, Germany PFW Engineering GmbH 100% Oberpfaffenhofen, Germany PFW Aerospace Engineering Ltd. Poole, UK PFW Engineering Inc. Seattle, USA PFW Aerospace Canada Inc. Montreal, Canada February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 4 PFW Group Organization By Jan 2014 Sales & Marketing R. Kästel Engineering CFO M. Pacher Ph. Visotschnig Executive Board SA - Airlines & MRO ED - Head of DO G. Hieber EE - Engineering Design E. van der Pluijm (iPU) GXH - Resource Management M. Gerner incl. Site Services B. Breitling A. Bischl EE1 - Structural Components M. Sehrschön GXQ - Quality & ERM Y. Hoffmann I. Sidsaff EDS - Systems & Equipment E. Sunarkito EE2 - Aircraft Systems A. Kollofrath GXF - Finance & PMO Office H. Felbinger SE - Airbus / PAG E. van der Pluijm EDI - Interiors & Cabin Safety G. Hieber (iPU) EE3 - Concessions GXI - IT Support & Services Ch. Klingler J. Bohlin SB - Boeing EDA - Airframe SC - Canada M. von Hacht EDF - Flight Physics K. Metzger GXB - Fuselage FISI + BASI C. Bresson GXW - Wing FISI + HYSI EDO - Airworthiness Office Ch. Thallmayr ES - Stress & Fatigue M. Heinrich ET - Tech Pub P. Garside GXD - Fuselage CDSI Th. Kupfer (iPU) H. Schuller EC - Config Management* N.N. *) leadership for DO related activities B. Braune February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 5 PFW Engineering Who we are • PFW Engineering was incorporated in 1995. • In January 2006, PFW Engineering acquired the Design Organisation for the EASA 21J Airworthiness Certificate for the Dornier 328 aircraft family. • In June 2006, PFW Aerospace GmbH acquired a strategic shareholding in the PFW Engineering and in January 2009 PFW acquired 100% of the PFW Engineering. • PFW Engineering is a worldwide organisation with EASA 21J airworthiness certification with over 350 engineers rendering engineering design services to all major aerospace customers in mainland Europe, USA, Japan, UK, and Israel. • PFW Engineering is a Tier 1 Engineering Supplier to Airbus and Lufthansa Technik as well as with Tier 1 Suppliers: Premium AeroTec, Aerolia and PFW.. • PFW Engineering is involved in design to spec on B787, A380, A350XWB, STC Dornier 328 and STC VIP Aircraft. • Customer Focus From the office locations in UK, mainland Europe, Israel and the USA, we can undertake staff projects to fulfil customer programme requirements February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 6 PFW Engineering Mission Statement We provide in the most cost effective way to our clients, products and services which conform to their standard of quality and integrity and encompass the following factors: • Creating trust • Developing partnership • A better identification of, and response to, client needs • Delivering commitments • Solving problems, not creating them • Providing value for money • Achieve customer and end-user satisfaction • Focus on the contribution that everyone can make to the business and thereby the community February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 7 Our Service we deliver to our customer complete engineering solutions PFW Engineering undertakes work packages or turn-key projects in our own offices using the latest CAD and analysis tools. We provide a full service, including project management and sub-supplier coordination and monitoring. aircraft certification services As an EASA approved design and airworthiness organisation, PFW Engineering offers development and certification services ranging from individual systems to complete aircraft. supply of aerospace engineers PFW Engineering provides professional engineers and qualified technicians for all aspects of aerospace and for all development phases. design and build solutions Through our partnerships with prime aerospace manufacturing companies, PFW Engineering is able to offer design and build solutions supporting the complete product life cycle. technical publications PFW Engineering develops and provides update services for technical publications including Aircraft Flight Operation, Maintenance Planning, Maintenance Manuals, Structural Repair Manuals and Illustrated Parts Catalogues. customer services February 2014 PFW Engineering undertakes upgrades, repairs, concessions, STC’s, Tech Doc’s for Airlines and VVIP. © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 8 PFW Engineering Phone: +49 8153 9313 0 Fax: +49 8153 9313 999 PFW Engineering Office Bremen Airbus-Allee 1 28199 Bremen Phone: +49 421 538 4035 Fax:+49 421 5967536 USA PFW Engineering Inc 1700 Seventh Avenue Suite 2100 Seattle, WA 98101 Phone: +1 206 826 7188 Fax:+1 206 826 7189 Montreal PFW Aerospace Canada Inc 6500 TransCanada Hwy, 4th floor, Pointe-Claire, Quebec H9R 0A5 Phone: +1 514 426 6166 Fax:+1 514 426 6101 Phone: +44 2476 321241 Fax:+44 2476 321270 UK PFW Aerospace Engineering Ltd. Unit A30 Arena Business Centre Holyrood Close, Poole Dorset. BH17 7FJ. United Kingdom France PFW Engineering Office France 5, ave Albert Durand 31700 Blagnac Phone: +33 534 60 69 21 Fax:+ 33 534 60 69 30 PFW Engineering GmbH 25227 Shave Zion POB 14 Phone: +972 545 315 815 Fax:+972 498 25252 Germany Headquarters PFW Engineering GmbH Sonderflughafen Oberpfaffenhofen Geb. 335 82234 Wessling Israel Worldwide Presence February 2014 HQ Oberpfaffenhofen Seattle office © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 9 PFW Engineering Headquarters LOCATION: Airfield Oberpfaffenhofen Airfield data – Certified for all aircraft, only limitations in: – yearly noise contingent / runway and taxiway load factors – Runway 2,286 x 45 m – Landing systems: ILS/DME, CAT I, Min. 1000 m / 200 ft – Owners: 80% Dornier GmbH (EADS) / 20% DLR – Operator: EDMO GmbH (EADS) Locations 1. 2. 3. 4. 5. PFW Engineering Headquarters RUAG Aerospace Deutschland RUAG Aerospace Services RUAG Aerospace Structures DLR Ground Traffic Connection – – – Expressway (300m) Train Station (1000m) Track Connection on-site 2 1 Distances 5 3 4 – to Munich International Airport 55 km – to Munich downtown 20 km – to EADS 30 km February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 10 PFW Engineering Customer Base (outline) February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 11 PFW Engineering Design Organization Approval (DOA) according EASA.21J.033 From January 2006 to September 2011, PFW Engineering DO GmbH took over the Design Organisation Approval EASA Part 21J for the 328 Aircraft with 328 SSG being the TC holder. The DO of PFW Engineering offers today • employees 50 staff including CVEs (DREs) and Technical Publications which fulfils the Design Organisation Approval for all ATA chapters. • Supplemental Type Certificates (STCs) • Major and Minor Repairs • Continuous Airworthiness issues • Technical Publications February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 12 Design Organization Approval (DOA) according EASA.21J.033 (cont.) Scope of work in detail The Design Organisation Approval (DOA) has been granted for: • Design changes and repairs for small aircraft CS23 • Design changes and repairs for large aircraft CS25 • Demonstration of compliance with all applicable airworthiness requirements to the authorities (EASA/FAA) 13 PFW Engineering CAAC STC We received recently the 1st CAAC STC for an A319 February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 14 Airframe Capabilities • Development • Structural Design • Static / Stress • Fatigue / Damage Tolerance • Materials • Processes Surfaces • Lightning Protection February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 15 System & Equipment Capabilities • Mechanical Systems • Fluid Systems • Engine and APU • Environmental System • Electrical System • Avionics System • Interior VIP February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 16 Flight Physics Capabilities 3,2% Landing, JAR 25.119 2,1% Approach, CRI B-1.6 February 2014 • • • • • Performance Handling Loads Weight & Balance Flight Test © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 17 Structure by ATA chapter 021A Stress Analysis, Static Strength 50 Structure Interface 021B Stress Analysis, Static Strength 51 Structure General Structure Repair 021C Structural Tests, Static and Fatigue 52 Doors, Doors Structure Repair 021D Stress Analysis and Static Strength 52A Doors Mechanics 022A Fatigue Strength 52B Doors Structure 023 Bird Strike 53 Fuselage, Fuselage Structure Repair 027 Sonic Fatigue 54 Nacelles / Pylons Structure Repair 082 Levelling133 Lightning Protection direct and indirect effects and Bonding 541 Engine Support 134 Composites 543 Pylon 328-300 134A Surface Protection 55 Stabilisers, Stabilisers Structure Repair 135 Materials (non Composite) 56 Windows 542 Bridge 328-300 57 Wings, Wings Structure Repair 71 Power Plant Structure Repair 78 Exhaust Structure Repair February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 18 System by ATA chapter 024 Crash Worthiness 22 Auto Flight 36 Pneumatic 026 Cabin Decompression 23 Communication 38 Water Waste 046 Human Factors 24 Electric Power 45 047 MMEL 25 Equipment / Furnishing Central Maintenance System 11 26 Fire Detection 49 Auxiliary Power Unit 131 System Interfaces 27 Flight Controls 71 Power Plant 137 Emergency Evacuation 28 Fuel 72 Engine 136 Rotor Burst 29 Hydraulic Power 73 Engine Fuel and Control 151 EMC 30 Ice & Rain Protection 74 Ignition System 152 HIRF 31 Indicating & Recording 75 Air System 21 32 Landing Gear 77 Engine Indicating 33 Lights 76 Engine Controls 34 Navigation 78 Exhaust 35 Oxygen 79 Oil System 80 Starting 90 Electric Placards and Marking Air Conditioning February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 19 Avionics Substantiation Approaches • PFW Engineering has gathered significant experience with different design and substantiation approaches, depending on – Customer (Aircraft/ Equipment OEM, Operator, Maintenance Organisation) – Available data (e.g. with operational documentation only, or with OEM data based on agreements with TC holder) Substantiation: e.g. CFD Analysis of 747-8 Camera Installation First installation: On-Site Conformity Inspection and Ground Test Certification: Boeing 747-8 Belly Camera – Display on Pilot‘s EFB Operation: PFW Engineering provides in Service Support for STC customers February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 20 Technical Publications for all aircrafts and customers Entire Technical Publications Services required from an aircraft OEM: Develop and update all necessary Information in creation of Manuals or Documents for: – Aircraft Flight Operation (e.g. Airplane Flight Manual, AFM) – Maintenance Planning (e.g. Maintenance Planning Document, MPD) – Maintenance (e.g. Aircraft Maintenance Manual, AMM) – Repair (e.g. Structural Repair Manual, SRM) – Parts Identification (e.g. Illustrated Parts Catalogue, IPC) – Data Management – Approval of Manuals/ Changes to Manuals (as part of EASA 21J DOA – Administration – Distribution of Manual – Revision Service – Technical Publications as required for changes to external TCs (based on Supplemental Type Certificates, STCs) - Creation, Approval and Distribution of Manual Supplements as – Hard Copies – Electronic Data like SGML, HTML and PDF – Document Viewing System CAMSIS 3 – WEB-Format February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 21 Customer Services History - Main activities PFW Engineering took over the Fairchild Dornier/AvCraft EASA21J033 certificate and the continuous airworthiness activities including customer support. Today's team still has that core competence and today we support , upgrades, training, STCs , Technical Publications etc. Original just for the Dornier 328 and Dornier 328Jet, but today for various aircraft including STC,s for A319, 747-800 and 767-400 VIP. PFW Engineering has a Total Quality Management System that meets worldwide recognized standards and reflects the state of the art for modern Quality Management Systems. Today’s PFW processes are based on Airworthiness Authority approvals:•EASA / LBA Design Organization approval to EASA Part 21 Subpart J •Production Organization approval to EASA Part 21 Subpart G •Maintenance Organization approval Part 145 •Approved Partner Training Organization to EASA Part 147 requirements. Additionally our company possesses a Quality Management System approval in accordance with ISO 9100 (equivalent to AS 9100) for Design, Production, Sales and Maintenance. FebruaryPFW 2014 © All EASA rights reserved. Reproduction disclosure to third of this document or any part thereof for purposes other than Part intended for by thisMaintenance document, is not permitted, Organisation : Certified Part 21Jor Design - parties EASA 21G Production - EASA 145 except with prior and express written permission by PFW Engineering 22 Customer Services Capabilities - Maintenance Repair and Overhaul (MRO) • PFW Engineering expertise in MRO support covers the entire range of Engineering support, a Maintenance Organisation may require, e.g.: – Design and Approval o Repairs on large aircraft (part ofDesign Organisation‘s 21J DOA scope of approval) – Minor/Major Changes (Design and Certification) – Flight Testing under authority of an EASA 21J DOA – Customer Support via PFW Engineering Customer Support Coordinator which provide for example clarification if questions arise during installation of a Service Bulletin. Sample pictures of PFW Engineering repairs February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 23 PFW Engineering Product Lifecycle Design & Engineering Testing +Qualification +Technical Publications Certification EASA 21J New Technologies Worldwide Customer Support Program February 2014 Production © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 24 Project Management EPM System • Project Control • Budget Usage and Technical Progress • Document Management (MS SharePoint Services) • Change Control and Claim Management • Resource Management • Risk / Issues Management • Online Collaboration • Integrated Accounting – Realistic Business Planning • avoid any delays due to different time zones. February 2014 EPM – MS Project Server Navision Navision Resource = EPM Resource with costs Project X Project X EPM Resource = Available person for GCT projects Purpose: Project Availability, such as work hours, calendar and absence. EPM Resource Pool Deleted, with email notification, manuell update in SM EPM enabling seamless integration of all its engineering related activities with administration, communication, project management, and financial functions. Web based for Multi-site teams using Microsoft Project Server for Deleted With email notification Internal Resource (manual update) Temp Resource Pool Per Company (new, deleted) Navision Resource Pool Internal Resource in PayRoll Company independent resources Status Hired (not yet in EPM) + Email notification Microsoft Dynamics CRM SM Resource Skill Management SM Resource = people that have shown their interest for working at GCT. Purpose: Skills Integrated in Outlook Project X Opportunity © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 25 PFW the Company Milestones History – key milestones 1913 Nearly 100 years of experience in the aerospace sector 1937-1990 1991-1996 Formation of 'Pfalz Flugzeugwerke' Unit of various companies, e.g. 'Flugzeugwerke Saarpfalz' and 'MBB' Part of 'Deutsche Airbus GmbH‘ (later 'Daimler-Benz Aerospace Airbus‘) 1997 Employee Buy-Out 2001 Acquisition by Safeguard International Fund 2003 Formation of PFW HS (Turkey) 2004 Acquisition of RSM Aerospace (UK) 2006 Acquisition of Spécitubes 2008 Acquisition of 50,1% in HPL 2009 Acquisition of 100% in GCT 2009 Acquisition of 100% in HPL 2011 Airbus took over 74.9% of the shares 2012 Sell of PFW UK and PFW China February 2014 Key figures 2011/2012 Sales Employees 2011 227,4 2,164 Sales Employees 2012 282 1,808 Employees excluding PFW temporary workers, including apprentices Product groups Cargo Laoding Systems 7% AeroStructures & others 33% Tubes & Ducts 60% © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 26 Today, PFW is present in Europe and North America Production sites and Engineering offices PFW Group Headquarters Speyer. Germany • c. 1260 employees • Production and management of all programmes PFW (HPL) Nuneaton / Farnborough, UK • 42 employees • Tubes, Pipes and Connectors for A350 PFW Engineering Seattle, USA Montreal, Canada • 10 employees • Design and engineering centre February 2014 Spécitubes Samer and Nanterre, France • 168 employees • Precision tubes PFW Repair Shop Hamburg, Germany • c. 8 employees • Repair and maintenance PFW Engineering Oberpfaffenhofen, Germany Bournemouth, UK Seattle, USA Montreal, Canada • 158 employees + 160 subcontractors • Design and engineering centre PFW HS Izmir, Turkey • 171 employees • Assembly of auxiliary tank, Structural Components, Inner Flaps and production of tubes for Airbus and the Boeing 787 “Dreamliner” © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 27 PFW Service Offerings Product range Tubes & ducts Cargo Loading Systems Structural Components Engineering February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 28 Technology Evolution 2002 CATIA V4 2003 CATIA V5 2004 CATIA V5 2005 GCE - CATIA V5 & ENOVIA 2000 CATIA V4 & VPM 1997 CATIA V3 1995 CADAM 2006/2008 CATIA V5 2009 GCE - CATIA V5 ENOVIA & 2010-2013 PRIMES A350 XWB and Boeing 787 CATIA V5 VVIP-STC Customer Services February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 29 EDP, like CAD Comprehensive Development Infrastructure Design 2D & 3D • • • • CATIA V6 CATIA V5 CATIA V4 CADAM (CCD) Analysis Tools DMU Tools • • • • • CATIA V5 DMU Delmia CATIA V4 4D Navigator dVise Product View February 2014 PDM Tools • Enovia • Smarteam • PRIMES • TAKSY • Systel • PDM Editor • • • • • • Patran / Nastran Isami Optistruct / Hypermesh Ansys MathCAD 2000 Interleaf © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 30 Quality Assurance Certification Compliance with the Quality Standards of • EASA 21J.033 Design Organisation • DIN EN 9100:2009 and EN ISO 9001 • Airbus Design Approval for all Airbus Sites including Germany, UK, Spain and France • AP1020 Approved via PFW • Boeing QM Digital Product Definition D6-51991 • IAQG Oasis Membership February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 31 PFW Engineering a System Integrator The PFW Engineering – The System Integrator February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 32 Projects Current Projects Current Projects February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 33 Interior Project GORE Compilations San Antonio FIRST Boeing 787 VIP February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 34 Boeing 787 Overview • B787 Tubing and Ducting Systems for complete Aircraft with PFW. Build to Specification contract – Design, integration and build. • B787 Section 46 Door Surrounds for IAI to Alenia. Design to Speciation • B787 Horizontal Tail Plane, Section 30, leading & training edge and tip for IAI for Alenia. Design to Specification. • B787 Pax and Cargo Floor Sections 46 and 47. Supply of Manpower. • B787 Horizontal Tail Plane, Weight Saving Section 30, leading & training edge and tip for IAI for Boeing. Design to Speciation. • B787 KHI Manpower Supply for Section 43 • B787 FHI Systems integration and secondary structure for centre wing box Sections 11/45 • B787 Engineering Modifications for Boeing direct for all sections of Fuselage, with team located in Everett Final Assembly Line, PFW Engineering Mukilteo and PFW Engineering Munich. Approx 120 people. • B787 Design and Stress mods to Section 46 for Alenia located at PFW Engineering Munich. • B787 KHI Stress mods to Fuselage located at PFW Engineering Munich • Export License for sections of Boeing 787 and all commercial Boeing Aircraft February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 35 Boeing 787-8 Overview – cont. Mods to Aircraft Sections for FAL Section 41, 43, 44, 46, 47, 48 Center Wing Box Section 30 Section 45 Horizontal Stabilizer Alenia Italy Section 11 KHI Japan FHI Japan Section11/45 (Integration) FHI Japan Section 46 Alenia Italy February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 36 Current Project Aerolia – Mechanical Systems Bombardier G7000 / G8000 Centre Fuselage Design and Installation of the following systems ATA 21 – ECS and LP Ducting February 2014 ATA 38 – Water and waste systems © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering ATA 24 – LRU’s 37 Current Project Airbus A350XWB • A350 XWB Tubing and Ducting Systems. • A350 XWB Plateau Phase with EADS Germany for Fuselage Sections 13&14 and components of the Fuselage Sections 16&17. • A350 XWB Premium Aerotec Sections 16- 18 Side Shells and Pax Door Surrounds • A350XWB S16-18 Lower Cargo Framework. • A350XWB S16-18 Crossbeam Struts. • A350XWB S16-18 Floor Grid. • A350 XWB Aero Data for Loads Production. • A350 XWB CFD Calculations • A350 XWB Aerodynamics • A350 XWB Flap Sizing • Spice new galley system. Concept during last four years with Airbus and Airlines February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 38 Current Project ATR 42-500 Flight Inspection Conversion • Currently PFW Engineering is working on an ATR 42-500 Flight Inspection System Integration STC ATR 42-500 • The project consists of following modifications (per area): – Flight Deck modification: • Integration of 1 new Nav Display • Integration of 1 new EHSI (Bendix King) • Centre pedestal layout change • Relocation of existing units • 2 additional push button panels • C/B panel modification – Antenna Installation • 11 additional antennas as part of the flight inspection system – Interfaces to basic aircraft avionics • Integration of Arinc Decouplers • Integration of Arinc Converters ATR42-500 fuselage – Interfaces to basic aircraft electrical power system • Development of an Automatic load shedding logic February 2014 Mission Rack Display (Cabin) ATR42-500 Flight Deck- Modification Areas Flight Inspection- Pushbutton panel © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 39 Airbus A350XWB (B2S) Tubes and Ducts – cont. • The marketing campaign started already in April 2007 • During 2009, PFW was awarded six Tubes and Ducts packages for the A350 XWB • Fuselage Fuel/Inerting • Fuselage Pneumatics • Wing Fuel/Inerting • Wing Pneumatics • Wing Hydraulics • Cargo Drainage • The development program for these packages started at the end of April 2009 A350 Wing with PFW Fuel Pipes February 2014 A350 Fuselage Section with PFW Fuel tubes and Pneumatic Ducts © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 40 Airbus A350XWB (B2S) Tubes and Ducts – cont. What is the PFW A350 XWB Tubes and Ducts Program? • An international PFW Group program • Making PFW a global player • Multi-site teams – Hamburg, Toulouse and Filton • Concurrent Engineering – different disciplines, e.g. design, ME, stress, production, procurement etc. working together to ensure the most optimum design is achieved • Introducing new technologies – Wing Fuel System - Composite Tubes – Fuselage Fuel System - Injection Molded PEEK Connector – Cargo Drainage System – Heat forming of PEEK tubing February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 41 Airbus A350XW-900-1000, Section 13/14-16/18 Stress: F&DT • Fatigue justification for all metallic parts in Section 13/14-16/18 • According to the handbook FDT Issue 3, A350XWB • Typical Parts: – DFEMs typically used for • Z-Strut attachment (Frame side). • Shear ties • Corner Fittings – GFEM typically used for • Hybrid couplings • Metal couplings • Tool-set for F&DT analysis – – – – – – – – ISAMI version 7.2.1 or higher Detailed FE-work with HyperWorks / Patran Nastran 3D – Joint Analysis Frame Splicing Module ISAMI Spectrum Analysis (1D/2D - FUEgen) STF Tool AFI Analysis (by Hand) Lug analysis, February 2014 A350 Fuselage Section Definition of AP © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 42 Airbus A350XWB A350XWB-900 and -1000 Sections 16-18 • left & right CFRP side shells including: Skins, Frames & Stringers • Fibresim & V5 CPD February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 43 Airbus A350XWB A350XWB-900 Sections 16-18 Left & right PAX door surrounds February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 44 Air Astana: Boeing 757-200 Interior Change Engineering: STC • Retrofit Campaign (Program), including Project Management • As part of a maintenance layover, we modify the interior of 5 Boeing 757-200 MSNs currently configured according to three different LOPAs • The modifications are a change to type design, requiring a 21J DOA Approval (STC). • The project results in an EASA STC as well as installation instructions for five aircraft MSNs. After project end obligations (e.g. Continued Airworthiness tasks) as well as commercial rights remain with PFW • Scope of Work: – Three A/C (P4-EAS, P4-FAS, P4-GAS) have the identical LOPA and will be upgraded with new economy seats and IFE and an improved cabin appearance – Two A/C will be upgraded with improved cabin appearance only February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 45 Interior Projects B767VIP, A319 Fin Camera and B787-8 Belly Fairing Camera Supplemental Type Certificates (STCs) February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 46 LHT: Attendant Seat for Boeing DLH 747-8 and A380 Engineering: Certification, PFW is a 21J partner for Design and Certification • Design and Certification of Structural Provions for Cabin Attendant Seats on DLH 747-8i and A380 • This modification program is to integrate a Patient Transport Compartment (PTC) on the Lufthansa A380 and 747-8I aircraft, including: – two High Comfort Cabin Attendant seats (HCCAS) for doctor and medical staff - one fwd facing, one aft facing HCCAS, in total three of the Lufthansa 747-8 and three of the A380 will be equipped • The installation shall be certified with EASA STC or an equivalent minor change approval under the PFW DOA • During the initial installation PFW will provide on-site support February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 47 Projects Previous Projects Previous Projects February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 48 Interior Projects VIP STCs for a new Completion Centre February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 49 Interior Projects VIP STCs for a new Completion Centre GCT Activity prior 1st A/C Manuals Str. Cabinet Description A CTION Panel Joints (M&T, T&G, Folding) Concepts and Test Plans Floor Attachments DWG/Test Panel Splices DWG/Test Standard Access Panels DWG Ground studs Concept Edge filling SRT to issue PPS Bonding Concept/Test Inserts Concept/Test Cabinet Lighting concept improvement Concept Deco Panels attachment Concept Drawer Concept and Front Panel Concept Decompression Panels Preferred release elements - Definition Doors - concepts for Decompression As typical design Adjustable shelves - Concept As typical design Slides Slide Concepts/PN Waste Bin Concept Access Panels Concept Internal Door Locks Concept/PN Hard Point Standard Design (Boing/Airbus) Concept Tie Rods Attachment and Rods Definition Air conditioning balancing expertise Concept Temp sensor Instl Concept/PN Motor valve Standard Concept/PN Solenoid valve standard Concept/PN Water system Standard fittings Concept/PN Gray water chamber Concept/PN Water heater standard Concept/PN Vent muffler Concept/PN Typ Tape heater Concept/PN Air conditioning ducts Concept/PN Material Manual Manual Standard Part Catalog Manual Design Manual Manual - Update to be released Model and Drawing Manual Manual © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, February 2014 Standard Parts Electrical Catalog Manual except with prior and express written permission by PFW Engineering 50 Previous Projects Airbus A380 • A380 Integration of ALL Tubes and Ducts Systems • A380 Design of Floor Structure and Integration of Systems Sections 13, 18 and 15. • A380 Interiors Furnishings, Project Managing Customer Requirements Galleys, Passenger and Cabin Attendant Seats, Trolley Lift IFE and Passenger Seat Electrical Integration • A380 PAX Interior Provisions and Electrical Brackets. Secondary Structure • A380 Technical Publication Transnational Network, AMM, TSM, TDUR, CMM, DRM, MAP, TLS • A380 Supply of Engineers • A380 FTI • A380 Change Management • A380 Wing jig Analysis • A380 Aircraft Master Surfacing & Geometry including Status 15a • A380 Slat and Flap Mechanical Systems and Flap Tracks February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 51 Previous Projects A380 Belly Fairing 2001-2002 Preliminary Design 2003 Detail Design 2003-2004 Certification • Preparation of Technical Specifications in response to Airbus RFI and RFP. • Supply of Contractual Stress Engineers, Conceptual Designers and Detail Design Engineers using Catia Version 5 and VPM • Supply of Certification Designers • Calculation of NRC and RC Costs • Project Managing Bidding Programme including Planning and QA activities • Development Design and Integration in DBT in Airbus Spain February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 52 Previous Projects A380 (EADS Ottobrunn) A380 – Design and Integration of all Standard System Mountings for Aluminium Crossbeams – Sections 13, 18 and 15 forward upper unit. • Responsible for full project management and control with a team ‘on-site’ in Airbus Hamburg. • Data Transfer established and managed to allow detail design and manufacturing drawing release by a team ‘off-site’. • Liaison and agreement of interfaces with the following systems: Hydraulics, Water/Waste/Vacuum, Electric/Fuel/Bleed Air, Supplementary Cooling, Air Conditioning • Involvement in all phases from joint definition, detail design through to release of manufacturing drawings and production support. • All designs agreed with the relative manufacturing partner. February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 53 Previous Projects A380 PAX A380 PAX Interior Provisions • Development Design Team located in CDBT at Airbus Hamburg • Development of Interior Components for different HOV • Development of Brackets and Structural provisions for: – Galley UD – Lavatory / BAR UD – Partitions / Minisiuts UD – Spacers UD – Bonding UD Monuments – Attachments for Stairs house lining FWD – Side wall Stowage February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 54 Previous Projects A380 – Analysis of transportation system for the wing • Combination of Wing, Jig and Trailer models • Calculation of total deflections of different combinations • Assessment of different models and design solutions February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 55 PFW Engineering Previous Projects Airbus A400M • A400M Supply of Engineers • A400M Flap Tracks Structural Design • A400M Whole Aircraft Master Surfacing & Geometry • A400M Main Cargo Floor and Ramp. • A400M Cargo Loading System and Air Deployment System • A400M Inlet, Outlet and Heat Exchanger • A400M ECS NACA Inlet and Plenum • A400M OBIGGS Ram Air NACA Inlets and Outlets • A400M Technical Publication Transnational Network defining all WP for the all technical documentation of the A400M. February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 56 Previous Projects A400M main cargo floor, CLS and ADS A400M main Cargo Floor and Ramp • Development, Design and Stress • Compliance and certification documentation • Final release of Manufacturing drawings • Catia V5 and PRIMES February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 57 Previous Projects E2S A320 P2F – PAX to Freighter conversations • PFW Engineering has gained experience in PAX-Freighter-Conversions while working for Elbe Flugzeugwerke (EFW) • A320 P2F floor grids, floor panel modifications, development of a main deck cargo door frame shell including • Skin panels and doublers • Frame and frame coupling • Clips for frame skin connection • Stringer • Butt straps • Cleats • Door surrounding for cargo door • Brackets • System modifications • Stress February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 58 Previous Project XAC PAX Door MA600 and MA700 Study on the MA600 door delivered successfully in September 2012 Bidding for the MA700 design and build February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 59 Previous Projects (Interior) Fairchild Dornier 328 JET and 728 JET VIP Interiors 328JET– Toliets Design & Mockup728JET February 2014 12 Seater 328JET VIP Cabin VIP Interiors 328JET 12 Seater 328JET VIP Cabin Airbus - SPICE © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 60 Previous Projects (Interior) SPLICE • PFW objectives & deliverables; – Achieve next generation efficient modular cabin monument design concepts. – Make use of new advanced materials – Create mission adaptive onboard service equipment – Perform technical research and development into Modular / flexible definitions whilst achieving certification requirements. February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 61 Previous Projects (Interior) SPLICE February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 62 Previous Projects (Interior) A380 and RECARO Aircraft Seating A380 Interiors Business Class Business Seat 6510 (RECARO) February 2014 Economy Seat 3510 (RECARO) © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 63 Previous Projects (Interior) Fairchild Dornier 728 JET • In-house Work package Milestones for Structure and Systems Integration • Supply of over 200 Aerospace Engineers February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 64 Previous Projects Fairchild Dornier 728 JET – Belly Fairing Wing Front Spar MLG Door Substructure Wing Rear Spar Fuselage Keelbeam February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 65 Previous Projects Fairchild Dornier 728 JET Complete Cabin Interiors Industrial Design and Full Size Mock-up for Farnborough 1998 • Development, Detail Design and Integration of the 728JET Insulation Blankets for Mexmil Inc. • Preparation of PDR and CDR documents. • Control of Concessions, Change Control and Configuration of first prototype. February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 66 Previous Projects ARJ 21 Controls Design of Rudder Pedals & Control Column for the ARJ21 February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 67 Previous Projects Fairchild Dornier 428 JET Wing Structure and Systems FD428JET Wing Prime Contractor to Fairchild Dornier and IAI Major Wing Components FEM - Pylon Pylon Spar Box “Hot” Leading Edge Wing/Fuselage Attachment Wing Tip Ground Spoiler 1 Aileron Roll Spoiler February 2014 Flap Ground Spoiler 2 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 68 Previous Projects Fairchild Dornier 428 JET Structures from IAI 428JET Cockpit, Fuselage& Empennage Prime Contractor to Fairchild Dornier and IAI FD 428JET & 728JET Cockpit & Cabin Layout 428JET Empennage February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 69 Previous Projects Aermacchi M346 Cockpit Structures and System Integration Aermacchi M-346 Advanced Trainer Prime Contractor to Aermacchi • Flight & Engine Controls • Cabin Pressurisation • Canopy Locking & Explosives • Head-up Display • Anti-G • Emergency Landing Gear, Brake • Seat Installation & Ejection • Oxygen Supply • Hydraulics & Fuel and Park • Inflatable Seal • Electric Equipment • Consoles & Panels • Avionics • Air Distribution February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 70 Interested in our service? Please contact us! PFW Engineering Sonderflughafen Oberpfaffenhofen Building 335 82234 Wessling Germany Phone: +49 8153 9313 0 Fax: +49 8153 9313 999 Web: www.pfw.aero/engineering Nigel Garner PFW Global Sales Phone: +49 8153 9313 210 Mobile: +49 172 8498640 Fax: +49 8153 9313 999 E-mail: [email protected] Thank you for your time! February 2014 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by PFW Engineering 71